2 - Price Schedule _13 Jan 2026.xlsx

XLSX spreadsheet 49 KB Posted

Attached to
SABER IDIQ
Solicitation number
FA486125R0003
Issued by

About this file

This document is a detailed Price Schedule Excel spreadsheet for the Nellis SABER Indefinite-Delivery Indefinite-Quantity (IDIQ) contract. The pricing schedule covers five years of potential task orders for engineering and construction services across multiple locations including Nellis Air Force Base, Creech Air Force Base, and Nellis Test and Training Range. The contract includes estimated pricing for various work categories such as standard and non-standard working hours in unrestricted, controlled, and restricted areas, with project magnitudes ranging from $15,000 to $4,500,000.

The solicitation is specifically a HUBZone competitive procurement with a maximum ceiling amount of $185 million, targeting design and construction projects like carpentry, road repair, roofing, electrical work, HVAC, plumbing, and other infrastructure-related services. The period of performance is five years, with individual task orders estimated between $15,000 and $4,000,000, requiring contractors to have in-house or readily accessible design capabilities. The contract will be administered by the 99th Contracting Squadron at Nellis Air Force Base, with proposals due by February 5, 2025, and is limited to qualified HUBZone small businesses.

View the file

Other files

File Type Posted
Solicitation Amendment FA486125R00030017 SF 30.pdf PDF
Solicitation Amendment - FA486125R00030017.pdf PDF
Atch 80_ RFI Response Log_General Solicitation 9 March 2026.xlsx XLSX spreadsheet
Solicitation Amendment FA486125R00030016 SF 30.pdf PDF
Solicitation Amendment - FA486125R00030016.pdf PDF
Solicitation Amendment - FA486125R00030015.pdf PDF
Solicitation Amendment FA486125R00030015 SF 30.pdf PDF
Solicitation Amendment - FA486125R00030014.pdf PDF
3 - Self Scoring Matrix 17 Feb 26.xlsx XLSX spreadsheet
Solicitation Amendment FA486125R00030014 SF 30.pdf PDF
Solicitation Amendment - FA486125R00030013.pdf PDF
Solicitation Amendment FA486125R00030013 SF 30.pdf PDF
Attach 79 RFI Log SABER Seed 29 Jan 2026_.xlsx XLSX spreadsheet
Att 78 RFI Log Additional Responses General Solicitation 27 Jan 2026_.xlsx XLSX spreadsheet
Att 3 -Self Scoring Matrix 3_Feb_2026.xlsx XLSX spreadsheet
44- SABER SOO RKMF240010 Renovate Honor Guard 99 FSS B10250_28January2026 (003).pdf PDF
Solicitation Amendment FA486125R00030012 SF 30.pdf PDF
Solicitation Amendment - FA486125R00030012.pdf PDF
Solicitation Amendment FA486125R00030011 SF 30 .pdf PDF
1 - SABER SOW 7 Jan 2026.pdf PDF
Solicitation Amendment - FA486125R00030011.pdf PDF
3 - Self Scoring Matrix 7_Jan 26.xlsx XLSX spreadsheet
77 - RFI Response Log SABER Seed Related _ 13_Jan 2026.xlsx XLSX spreadsheet
Solicitation Amendment - FA486125R00030010.pdf PDF
44 -Statement of Objectives (SOO) for RKMF 240010 20 Nov 25.pdf PDF
Attach 75 SABER Seed Attachment 19 - B10250 comm room.pdf PDF
Attach 74 SABER Seed Attachment 18 - Knox Box Location.pdf PDF
73 - Task Order Pricing Letter _ Gordian System Licens Fees 5 percent and 1.95 percent.pdf PDF
1- SABER SOW 7 Jan 2025 .pdf PDF
76 - RFI Response Log General Solicitation 13_Jan 26.xlsx XLSX spreadsheet
Solicitation Amendment FA486125R00030010 SF 30.pdf PDF
Solicitation Amendment - FA486125R00030009.pdf PDF
Solicitation Amendment FA486125R00030009_SF 30.pdf PDF
Solicitation Amendment FA486125R00030007 SF 30.pdf PDF
Solicitation Amendment FA486125R00030006 SF 30.pdf PDF
(Attachment 65) SABER Seed SOO Honor Guard Building 10250 Attachment 12 - Mech. Room Report.pdf PDF
(Attachment 66) SABER Seed SOO Honor Guard Building 10250 Attachment 13 - Asbestos and Lead testing building history.xlsx XLSX spreadsheet
Solicitation Amendment - FA486125R00030006.pdf PDF
Attachment 72 SABER IDIQ Preproposal Sign In Sheet 29 October 2025 FA486125R0003.pdf PDF
(Attachment 63) SABER Seed SOO Honor Guard Building 10250 Attachment 10 - Asbestos and Lead testing dated 24 February 2014.pdf PDF
(Attachment 68) SABER Seed SOO Honor Guard Building 10250 Attachment 15 - B10250 room numbers.pdf PDF
(Attachment 55) SABER Seed SOO Honor Guard Building 10250 Attachment 1 - HAZMAT Results 10250 Restrooms Part 1.pdf PDF
(Attachment 58) SABER Seed SOO Honor Guard Building 10250 Attachment 5 - Attachment 5 AFGIMS Utilities Snapshot.pdf PDF
(Attachment 69) SABER Seed SOO Honor Guard Building 10250 Attachment 16 - 10250 BFP Device replacement.png PNG image
(Attachment 57) SABER Seed SOO Honor Guard Building 10250 Attachment 3 - As-Builts 65 LOCATION and GRADING.pdf PDF
(Attachment 70) SABER Seed SOO Honor Guard Building 10250 Attachment 17 - Double Check Valve Assembly.pdf PDF
(Attachment 60) SABER Seed SOO Honor Guard Building 10250 Attachment 7 - Sewer Line with Measurements and Pictures.pdf PDF
Attachment 71 SABER IDIQ Preproposal Conference Slides 29 October 2025 FA486125R0003.pptx PPTX presentation
(Attachment 61) SABER Seed SOO Honor Guard Building 10250 Attachment 8 - Asbestos and Lead testing of entire building dated 7 July 2007.pdf PDF
(Attachment 59) SABER Seed SOO Honor Guard Building 10250 Attachment 6 - Floorplan Conceptual.pdf PDF
Show 40 more

Latest 50 of 126 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Year 1 Instructions: Fill out Price Schedule per Solicitation Section L. Offerors shall only fill out the cells highlighted in orange. Do not tamper or mess with other cells.

ITEM(S) 0001 - PRICING SCHEDULE - YEAR ONE
NELLIS SABER IDIQ EXHIBIT 01
PRICING SCHEDULE - ORDERING PERIOD 01
ITEM #DESCRIPTIONEstimated Annual
AmountEstimated Coefficient (Coefficient must be in Number format. Do not change to percentage).Total
Nellis AFB to include work within 10 miles of

Nellis AFB

0001AAUnrestricted Area Standard Working Hours (as defined in "Definitions" of specifications)$ 9,200,000.00$ - 0
0001ABUnrestricted Area Non-Standard Working Hours (as defined in "Definitions" of specifications)$ 552,000.00$ - 0
0001ACControlled Area Standard Working Hours (as defined in "Definitions" of specifications)$ 1,012,000.00$ - 0
0001ADRestricted Area Standard Working Hours (as defined in "Definitions" of specifications)$ 460,000.00$ - 0
Creech AFB to include work within 20 miles of Creech AFB
0001AEUnrestricted Area Standard Working Hours (as defined in "Definitions" of specifications)$ 1,518,000.00$ - 0
0001AFUnrestricted Area Non-Standard Working Hours (as defined in "Definitions" of specifications)$ 110,400.00$ - 0
0001AGControlled Area Standard Working Hours (as defined in "Definitions" of specifications)$ 184,000.00$ - 0
0001AHRestricted Area Standard Working Hours (as defined in "Definitions" of specifications)$ 92,000.00$ - 0
Nellis Test and Traing Range
0001AIUnrestricted Area Standard Working Hours (as defined in "Definitions" of specifications)$ 4,180,020.00$ - 0
0001AJUnrestricted Area Non-Standard Working Hours (as defined in "Definitions" of specifications)$ 258,336.00$ - 0
0001AKControlled Area Standard Working Hours (as defined in "Definitions" of specifications)$ 466,440.00$ - 0
0001ALRestricted Area Standard Working Hours (as defined in "Definitions" of specifications)$ 215,280.00$ - 0
ITEM #DESCRIPTIONEstimated DaysPrice Per Day Per EscortTotal
Escorts
0001AMContractor Provided Escort (In accordance with Attachment 01, paragraph 1.29.4)750$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit Price ($)Total
SABER Project – Level 0 Cost Estimate: Contractor shall provide all work and incidental requirements necessary to prepare, provide and negotiate, as necessary, a detailed cost estimate (to include prepriced and non-prepriced items) and a period of performance for ordered projects. Government will provide a Statement of Work (SOW) and drawings, where applicable.
0001ANMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0
0001AOMAGNITUDE 2 value projects ($500,001 to $1,500,000)1$ - 0
0001APMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0
0001AQMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit Price ($)Total
SABER Project – Level 0 Revised Cost Estimate: Contractor shall provide all work and incidental requirements necessary to prepare, provide and negotiate, as necessary, a detailed revised cost estimate (to include prepriced and non-prepriced items) and a period of performance due to a change in scope. Government will provide a Statement of Work (SOW) and drawings, where applicable.
0001ARMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0
0001ASMAGNITUDE 2 value projects ($500,001 to $1,500,000)1$ - 0
0001ATMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0
0001AUMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit Price ($)Total
SABER Project – Level 1 Design & Cost Estimate: Contractor shall provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary to prepare, provide, and negotiate, as necessary, a detailed cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance for ordered projects.
0001AVMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0
0001AWMAGNITUDE 2 value projects ($500,001 to $1,500,000)1$ - 0
0001AXMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0
0001AYMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit Price ($)Total
SABER Project – Level 1 Revised Design & Cost Estimate: Contractor shall provide all work and incidental requirements necessary to prepare, provide, and negotiate, as necessary, a detailed revised cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance due to a change in scope.
0001AZMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0
0001BAMAGNITUDE 2 value projects ($500,001 to $1,500,000)1$ - 0
0001BBMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0
0001BCMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit Price ($)Total
SABER Project – Level 1 Design, Cost Estimate & Survey: Contractor shall provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary, and accomplish Lead-Based Paint (LBP) and Asbestos surveys to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance for ordered projects.
0001BDMAGNITUDE 1 value projects ($15,000 to $500,000)2$ - 0
0001BEMAGNITUDE 2 value projects ($500,001 to $1,500,000)3$ - 0
0001BFMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0
0001BGMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 1 Revised Design, Cost Estimate & Survey: Contractor shall provide all work and incidental requirements necessary to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed revised cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance due to a change in scope.
0001BHMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0
0001BIMAGNITUDE 2 value projects ($500,001 to $1,500,000)1$ - 0
0001BJMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0
0001BKMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit Price ($)Total
SABER Project – Level 2 Design & Cost Estimate: Contractor shall provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary to prepare, provide, and negotiate, as necessary, a detailed cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance for ordered projects.
0001BLMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0
0001BMMAGNITUDE 2 value projects ($500,001 to $1,500,000)1$ - 0
0001BNMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0
0001BOMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit Price ($)Total
SABER Project – Level 2 Revised Design & Cost Estimate: Contractor shall provide all work and incidental requirements necessary to prepare, provide, and negotiate, as necessary, a detailed revised cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance due to a change in scope.
0001BPMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0
0001BQMAGNITUDE 2 value projects ($500,001 to $1,500,000)1$ - 0
0001BRMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0
0001BSMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit Price ($)Total
SABER Project – Level 2 Design, Cost Estimate & Survey: Contractor shall provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary, and accomplish Lead-Based Paint (LBP) and Asbestos surveys to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance for ordered projects.
0001BTMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0
0001BUMAGNITUDE 2 value projects ($500,001 to $1,500,000)3$ - 0
0001BVMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)2$ - 0
0001BWMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit Price ($)Total
SABER Project – Level 2 Revised Design, Cost Estimate & Survey: Contractor shall provide all work and incidental requirements necessary to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed revised cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance due to a change in scope.
0001BVMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0
0001BXMAGNITUDE 2 value projects ($500,001 to $1,500,000)1$ - 0
0001BYMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0
0001BYMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0
YEAR 1 TOTAL$ - 0

Year 2

ITEM(S) 0002 - PRICING SCHEDULE - YEAR TWO
NELLIS SABER IDIQ EXHIBIT 02
PRICING SCHEDULE - ORDERING PERIOD 02
ITEM #DESCRIPTIONEstimated Annual
AmountEstimated CoefficientTotal
Nellis AFB to include work within 10 miles of

Nellis AFB

0002AAUnrestricted Area Standard Working Hours (as defined in "Definitions" of specifications)$ 13,800,000.00$ - 0
0002ABUnrestricted Area Non-Standard Working Hours (as defined in "Definitions" of specifications)$ 828,000.00$ - 0
0002ACControlled Area Standard Working Hours (as defined in "Definitions" of specifications)$ 1,656,000.00$ - 0
0002ADRestricted Area Standard Working Hours (as defined in "Definitions" of specifications)$ 736,000.00$ - 0
Creech AFB to include work within 20 miles of Creech AFB
0002AEUnrestricted Area Standard Working Hours (as defined in "Definitions" of specifications)$ 2,300,000.00$ - 0
0002AFUnrestricted Area Non-Standard Working Hours (as defined in "Definitions" of specifications)$ 138,000.00$ - 0
0002AGControlled Area Standard Working Hours (as defined in "Definitions" of specifications)$ 253,000.00$ - 0
0002AHRestricted Area Standard Working Hours (as defined in "Definitions" of specifications)$ 115,000.00$ - 0
Nellis Test and Traing Range
0002AIUnrestricted Area Standard Working Hours (as defined in "Definitions" of specifications)$ 6,440,000.00$ - 0
0002AJUnrestricted Area Non-Standard Working Hours (as defined in "Definitions" of specifications)$ 386,400.00$ - 0
0002AKControlled Area Standard Working Hours (as defined in "Definitions" of specifications)$ 763,600.00$ - 0
0002ALRestricted Area Standard Working Hours (as defined in "Definitions" of specifications)$ 340,400.00$ - 0
ITEM #DESCRIPTIONEstimated DaysPrice Per Day Per EscortTotal
Escorts
0002AMContractor Provided Escort (In accordance with Attachment 01, paragraph 1.29.4)$ 900.00$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 0 Cost Estimate: Contractor shall provide all work and incidental requirements necessary to prepare, provide and negotiate, as necessary, a detailed cost estimate (to include prepriced and non-prepriced items) and a period of performance for ordered projects. Government will provide a Statement of Work (SOW) and drawings, where applicable.
0002ANMAGNITUDE 1 value projects ($15,000 to $500,000)3$ - 0$ - 0
0002AOMAGNITUDE 2 value projects ($500,001 to $1,500,000)3$ - 0$ - 0
0002APMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0$ - 0
0002AQMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 0 Revised Cost Estimate: Contractor shall provide all work and incidental requirements necessary to prepare, provide and negotiate, as necessary, a detailed revised cost estimate (to include prepriced and non-prepriced items) and a period of performance due to a change in scope. Government will provide a Statement of Work (SOW) and drawings, where applicable.
0002ARMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0$ - 0
0002ASMAGNITUDE 2 value projects ($500,001 to $1,500,000)1$ - 0$ - 0
0002ATMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0$ - 0
0002AUMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 1 Design & Cost Estimate: Contractor shall provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary to prepare, provide, and negotiate, as necessary, a detailed cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance for ordered projects.
0002AVMAGNITUDE 1 value projects ($15,000 to $500,000)4$ - 0$ - 0
0002\AWMAGNITUDE 2 value projects ($500,001 to $1,500,000)3$ - 0$ - 0
0002AXMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0$ - 0
0002AYMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 1 Revised Design & Cost Estimate: Contractor shall provide all work and incidental requirements necessary to prepare, provide, and negotiate, as necessary, a detailed revised cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance due to a change in scope.
0002AZMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0$ - 0
0002BAMAGNITUDE 2 value projects ($500,001 to $1,500,000)1$ - 0$ - 0
0002BBMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0$ - 0
0002BCMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 1 Design, Cost Estimate & Survey: Contractor shall provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary, and accomplish Lead-Based Paint (LBP) and Asbestos surveys to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance for ordered projects.
0002BDMAGNITUDE 1 value projects ($15,000 to $500,000)4$ - 0$ - 0
0002BEMAGNITUDE 2 value projects ($500,001 to $1,500,000)3$ - 0$ - 0
0002BFMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)2$ - 0$ - 0
0002BGMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 1 Revised Design, Cost Estimate & Survey: Contractor shall provide all work and incidental requirements necessary to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed revised cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance due to a change in scope.
0002BHMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0$ - 0
0002BIMAGNITUDE 2 value projects ($500,001 to $1,500,000)1$ - 0$ - 0
0002BJMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0$ - 0
0002BKMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 2 Design & Cost Estimate: Contractor shall provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary to prepare, provide, and negotiate, as necessary, a detailed cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance for ordered projects.
0002BLMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0$ - 0
0002BMMAGNITUDE 2 value projects ($500,001 to $1,500,000)4$ - 0$ - 0
0002BNMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)2$ - 0$ - 0
0002BOMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)2$ - 0$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 2 Revised Design & Cost Estimate: Contractor shall provide all work and incidental requirements necessary to prepare, provide, and negotiate, as necessary, a detailed revised cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance due to a change in scope.
0002BPMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0$ - 0
0002BQMAGNITUDE 2 value projects ($500,001 to $1,500,000)1$ - 0$ - 0
0002BRMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0$ - 0
0002BSMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 2 Design, Cost Estimate & Survey: Contractor shall provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary, and accomplish Lead-Based Paint (LBP) and Asbestos surveys to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance for ordered projects.
0002BTMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0$ - 0
0002BUMAGNITUDE 2 value projects ($500,001 to $1,500,000)5$ - 0$ - 0
0002BVMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)2$ - 0$ - 0
0002BWMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)2$ - 0$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 2 Revised Design, Cost Estimate & Survey: Contractor shall provide all work and incidental requirements necessary to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed revised cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance due to a change in scope.
0002BVMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0$ - 0
0002BXMAGNITUDE 2 value projects ($500,001 to $1,500,000)1$ - 0$ - 0
0002BYMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0$ - 0
0002BYMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0$ - 0

YEAR 2 TOTAL $ - 0

Year 3

ITEM(S) 0003 - PRICING SCHEDULE - YEAR THREE
NELLIS SABER IDIQ EXHIBIT 03
PRICING SCHEDULE - ORDERING PERIOD 03
ITEM #DESCRIPTIONEstimated Annual
AmountEstimated CoefficientTotal
Nellis AFB to include work within 10 miles of

Nellis AFB

0003AAUnrestricted Area Standard Working Hours (as defined in "Definitions" of specifications)$ 16,560,000.00$ - 0
0003ABUnrestricted Area Non-Standard Working Hours (as defined in "Definitions" of specifications)$ 920,000.00$ - 0
0003ACControlled Area Standard Working Hours (as defined in "Definitions" of specifications)$ 1,932,000.00$ - 0
0003ADRestricted Area Standard Working Hours (as defined in "Definitions" of specifications)$ 690,000.00$ - 0
Creech AFB to include work within 20 miles of Creech AFB
0003AEUnrestricted Area Standard Working Hours (as defined in "Definitions" of specifications)$ 2,760,000.00$ - 0
0003AFUnrestricted Area Non-Standard Working Hours (as defined in "Definitions" of specifications)$ 151,800.00$ - 0
0003AGControlled Area Standard Working Hours (as defined in "Definitions" of specifications)$ 276,000.00$ - 0
0003AHRestricted Area Standard Working Hours (as defined in "Definitions" of specifications)$ 138,000.00$ - 0
Nellis Test and Traing Range
0003AIUnrestricted Area Standard Working Hours (as defined in "Definitions" of specifications)$ 5,409,600.00$ - 0
0003AJUnrestricted Area Non-Standard Working Hours (as defined in "Definitions" of specifications)$ 300,104.00$ - 0
0003AKControlled Area Standard Working Hours (as defined in "Definitions" of specifications)$ 618,240.00$ - 0
0003ALRestricted Area Standard Working Hours (as defined in "Definitions" of specifications)$ 231,840.00$ - 0
ITEM #DESCRIPTIONEstimated DaysPrice Per Day Per EscortTotal
Escorts
0003AMContractor Provided Escort (In accordance with Attachment 01, paragraph 1.29.4)1100$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 0 Cost Estimate: Contractor shall provide all work and incidental requirements necessary to prepare, provide and negotiate, as necessary, a detailed cost estimate (to include prepriced and non-prepriced items) and a period of performance for ordered projects. Government will provide a Statement of Work (SOW) and drawings, where applicable.
0003ANMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0$ - 0
0003AOMAGNITUDE 2 value projects ($500,001 to $1,500,000)1$ - 0$ - 0
0003APMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0$ - 0
0003AQMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 0 Revised Cost Estimate: Contractor shall provide all work and incidental requirements necessary to prepare, provide and negotiate, as necessary, a detailed revised cost estimate (to include prepriced and non-prepriced items) and a period of performance due to a change in scope. Government will provide a Statement of Work (SOW) and drawings, where applicable.
0003ARMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0$ - 0
0003ASMAGNITUDE 2 value projects ($500,001 to $1,500,000)1$ - 0$ - 0
0003ATMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0$ - 0
0003AUMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 1 Design & Cost Estimate: Contractor shall provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary to prepare, provide, and negotiate, as necessary, a detailed cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance for ordered projects.
0003AVMAGNITUDE 1 value projects ($15,000 to $500,000)3$ - 0$ - 0
0003AWMAGNITUDE 2 value projects ($500,001 to $1,500,000)3$ - 0$ - 0
0003AXMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0$ - 0
0003AYMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 1 Revised Design & Cost Estimate: Contractor shall provide all work and incidental requirements necessary to prepare, provide, and negotiate, as necessary, a detailed revised cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance due to a change in scope.
0003AZMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0$ - 0
0003BAMAGNITUDE 2 value projects ($500,001 to $1,500,000)1$ - 0$ - 0
0003BBMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0$ - 0
0003BCMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 1 Design, Cost Estimate & Survey: Contractor shall provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary, and accomplish Lead-Based Paint (LBP) and Asbestos surveys to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance for ordered projects.
0003BDMAGNITUDE 1 value projects ($15,000 to $500,000)2$ - 0$ - 0
0003BEMAGNITUDE 2 value projects ($500,001 to $1,500,000)2$ - 0$ - 0
0003BFMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0$ - 0
0003BGMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 1 Revised Design, Cost Estimate & Survey: Contractor shall provide all work and incidental requirements necessary to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed revised cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance due to a change in scope.
0003BHMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0$ - 0
0003BIMAGNITUDE 2 value projects ($500,001 to $1,500,000)1$ - 0$ - 0
0003BJMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0$ - 0
0003BKMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 2 Design & Cost Estimate: Contractor shall provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary to prepare, provide, and negotiate, as necessary, a detailed cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance for ordered projects.
0003BLMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0$ - 0
0003BMMAGNITUDE 2 value projects ($500,001 to $1,500,000)3$ - 0$ - 0
0003BNMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0$ - 0
0003BOMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 2 Revised Design & Cost Estimate: Contractor shall provide all work and incidental requirements necessary to prepare, provide, and negotiate, as necessary, a detailed revised cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance due to a change in scope.
0003BPMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0$ - 0
0003BQMAGNITUDE 2 value projects ($500,001 to $1,500,000)1$ - 0$ - 0
0003BRMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0$ - 0
0003BSMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 2 Design, Cost Estimate & Survey: Contractor shall provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary, and accomplish Lead-Based Paint (LBP) and Asbestos surveys to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance for ordered projects.
0003BTMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0$ - 0
0003BUMAGNITUDE 2 value projects ($500,001 to $1,500,000)5$ - 0$ - 0
0003BVMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)4$ - 0$ - 0
0003BWMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 2 Revised Design, Cost Estimate & Survey: Contractor shall provide all work and incidental requirements necessary to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed revised cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance due to a change in scope.
0003BVMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0$ - 0
0003BXMAGNITUDE 2 value projects ($500,001 to $1,500,000)1$ - 0$ - 0
0003BYMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0$ - 0
0003BYMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0$ - 0

YEAR 3 TOTAL $ - 0

Year 4

ITEM(S) 0004- PRICING SCHEDULE - YEAR FOUR
NELLIS SABER IDIQ EXHIBIT 04
PRICING SCHEDULE - ORDERING PERIOD 04
ITEM #DESCRIPTIONEstimated Annual
AmountEstimated CoefficientTotal
Nellis AFB to include work within 10 miles of

Nellis AFB

0004AAUnrestricted Area Standard Working Hours (as defined in "Definitions" of specifications)$ 15,640,000.00$ - 0
0004ABUnrestricted Area Non-Standard Working Hours (as defined in "Definitions" of specifications)$ 736,000.00$ - 0
0004ACControlled Area Standard Working Hours (as defined in "Definitions" of specifications)$ 1,564,000.00$ - 0
0004ADRestricted Area Standard Working Hours (as defined in "Definitions" of specifications)$ 736,000.00$ - 0
Creech AFB to include work within 20 miles of Creech AFB
0004AEUnrestricted Area Standard Working Hours (as defined in "Definitions" of specifications)$ 2,576,000.00$ - 0
0004AFUnrestricted Area Non-Standard Working Hours (as defined in "Definitions" of specifications)$ 138,000.00$ - 0
0004AGControlled Area Standard Working Hours (as defined in "Definitions" of specifications)$ 253,000.00$ - 0
0004AHRestricted Area Standard Working Hours (as defined in "Definitions" of specifications)$ 115,000.00$ - 0
Nellis Test and Traing Range
0004AIUnrestricted Area Standard Working Hours (as defined in "Definitions" of specifications)$ 5,829,120.00$ - 0
0004AJUnrestricted Area Non-Standard Working Hours (as defined in "Definitions" of specifications)$ 279,680.00$ - 0
0004AKControlled Area Standard Working Hours (as defined in "Definitions" of specifications)$ 581,440.00$ - 0
0004ALRestricted Area Standard Working Hours (as defined in "Definitions" of specifications)$ 272,320.00$ - 0
ITEM #DESCRIPTIONEstimated DaysPrice Per Day Per EscortTotal
Escorts
0004AMContractor Provided Escort (In accordance with Attachment 01, paragraph 1.29.4)1000$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 0 Cost Estimate: Contractor shall provide all work and incidental requirements necessary to prepare, provide and negotiate, as necessary, a detailed cost estimate (to include prepriced and non-prepriced items) and a period of performance for ordered projects. Government will provide a Statement of Work (SOW) and drawings, where applicable.
0004ANMAGNITUDE 1 value projects ($15,000 to $500,000)2$ - 0$ - 0
0004AOMAGNITUDE 2 value projects ($500,001 to $1,500,000)3$ - 0$ - 0
0004APMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0$ - 0
0004AQMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 0 Revised Cost Estimate: Contractor shall provide all work and incidental requirements necessary to prepare, provide and negotiate, as necessary, a detailed revised cost estimate (to include prepriced and non-prepriced items) and a period of performance due to a change in scope. Government will provide a Statement of Work (SOW) and drawings, where applicable.
0004ARMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0$ - 0
0004ASMAGNITUDE 2 value projects ($500,001 to $1,500,000)1$ - 0$ - 0
0004ATMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0$ - 0
0004AUMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 1 Design & Cost Estimate: Contractor shall provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary to prepare, provide, and negotiate, as necessary, a detailed cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance for ordered projects.
0004AVMAGNITUDE 1 value projects ($15,000 to $500,000)3$ - 0$ - 0
0004AWMAGNITUDE 2 value projects ($500,001 to $1,500,000)3$ - 0$ - 0
0004AXMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0$ - 0
0004AYMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 1 Revised Design & Cost Estimate: Contractor shall provide all work and incidental requirements necessary to prepare, provide, and negotiate, as necessary, a detailed revised cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance due to a change in scope.
0004AZMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0$ - 0
0004BAMAGNITUDE 2 value projects ($500,001 to $1,500,000)1$ - 0$ - 0
0004BBMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0$ - 0
0004BCMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 1 Design, Cost Estimate & Survey: Contractor shall provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary, and accomplish Lead-Based Paint (LBP) and Asbestos surveys to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance for ordered projects.
0004BDMAGNITUDE 1 value projects ($15,000 to $500,000)2$ - 0$ - 0
0004BEMAGNITUDE 2 value projects ($500,001 to $1,500,000)3$ - 0$ - 0
0004BFMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)3$ - 0$ - 0
0004BGMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 1 Revised Design, Cost Estimate & Survey: Contractor shall provide all work and incidental requirements necessary to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed revised cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance due to a change in scope.
0004BHMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0$ - 0
0004BIMAGNITUDE 2 value projects ($500,001 to $1,500,000)1$ - 0$ - 0
0004BJMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0$ - 0
0004BKMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 2 Design & Cost Estimate: Contractor shall provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary to prepare, provide, and negotiate, as necessary, a detailed cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance for ordered projects.
0004BLMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0$ - 0
0004BMMAGNITUDE 2 value projects ($500,001 to $1,500,000)4$ - 0$ - 0
0004BNMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)3$ - 0$ - 0
0004BOMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)2$ - 0$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 2 Revised Design & Cost Estimate: Contractor shall provide all work and incidental requirements necessary to prepare, provide, and negotiate, as necessary, a detailed revised cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance due to a change in scope.
0004BPMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0$ - 0
0004BQMAGNITUDE 2 value projects ($500,001 to $1,500,000)1$ - 0$ - 0
0004BRMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0$ - 0
0004BSMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 2 Design, Cost Estimate & Survey: Contractor shall provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary, and accomplish Lead-Based Paint (LBP) and Asbestos surveys to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance for ordered projects.
0004BTMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0$ - 0
0004BUMAGNITUDE 2 value projects ($500,001 to $1,500,000)5$ - 0$ - 0
0004BVMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)3$ - 0$ - 0
0004BWMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 2 Revised Design, Cost Estimate & Survey: Contractor shall provide all work and incidental requirements necessary to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed revised cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance due to a change in scope.
0004BVMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0$ - 0
0004BXMAGNITUDE 2 value projects ($500,001 to $1,500,000)1$ - 0$ - 0
0004BYMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0$ - 0
0004BYMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0$ - 0

YEAR 4 TOTAL $ - 0

Year 5

ITEM(S) 0005- PRICING SCHEDULE - YEAR FIVE
NELLIS SABER IDIQ EXHIBIT 05
PRICING SCHEDULE - ORDERING PERIOD 05
ITEM #DESCRIPTIONEstimated Annual
AmountEstimated CoefficientTotal
Nellis AFB to include work within 10 miles of

Nellis AFB

0005AAUnrestricted Area Standard Working Hours (as defined in "Definitions" of specifications)$ 10,120,000.00$ - 0
0005ABUnrestricted Area Non-Standard Working Hours (as defined in "Definitions" of specifications)$ 690,000.00$ - 0
0005ACControlled Area Standard Working Hours (as defined in "Definitions" of specifications)$ 1,288,000.00$ - 0
0004ADRestricted Area Standard Working Hours (as defined in "Definitions" of specifications)$ 522,000.00$ - 0
Creech AFB to include work within 20 miles of Creech AFB
0005AEUnrestricted Area Standard Working Hours (as defined in "Definitions" of specifications)$ 1,610,000.00$ - 0
0005AFUnrestricted Area Non-Standard Working Hours (as defined in "Definitions" of specifications)$ 105,800.00$ - 0
0005AGControlled Area Standard Working Hours (as defined in "Definitions" of specifications)$ 207,000.00$ - 0
0005AHRestricted Area Standard Working Hours (as defined in "Definitions" of specifications)$ 101,200.00$ - 0
Nellis Test and Traing Range
0005AIUnrestricted Area Standard Working Hours (as defined in "Definitions" of specifications)$ 3,636,300.00$ - 0
0005AJUnrestricted Area Non-Standard Working Hours (as defined in "Definitions" of specifications)$ 246,698.00$ - 0
0005AKControlled Area Standard Working Hours (as defined in "Definitions" of specifications)$ 463,450.00$ - 0
0005ALRestricted Area Standard Working Hours (as defined in "Definitions" of specifications)$ 193,192.00$ - 0
ITEM #DESCRIPTIONEstimated DaysPrice Per Day Per EscortTotal
Escorts
0005AMContractor Provided Escort (In accordance with Attachment 01, paragraph 1.29.4)800$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 0 Cost Estimate: Contractor shall provide all work and incidental requirements necessary to prepare, provide and negotiate, as necessary, a detailed cost estimate (to include prepriced and non-prepriced items) and a period of performance for ordered projects. Government will provide a Statement of Work (SOW) and drawings, where applicable.
0005ANMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0$ - 0
0005AOMAGNITUDE 2 value projects ($500,001 to $1,500,000)3$ - 0$ - 0
0005APMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0$ - 0
0005AQMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 0 Revised Cost Estimate: Contractor shall provide all work and incidental requirements necessary to prepare, provide and negotiate, as necessary, a detailed revised cost estimate (to include prepriced and non-prepriced items) and a period of performance due to a change in scope. Government will provide a Statement of Work (SOW) and drawings, where applicable.
0005ARMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0$ - 0
0005ASMAGNITUDE 2 value projects ($500,001 to $1,500,000)1$ - 0$ - 0
0005ATMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0$ - 0
0005AUMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 1 Design & Cost Estimate: Contractor shall provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary to prepare, provide, and negotiate, as necessary, a detailed cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance for ordered projects.
0005AVMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0$ - 0
0005AWMAGNITUDE 2 value projects ($500,001 to $1,500,000)3$ - 0$ - 0
0005AXMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0$ - 0
0005AYMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 1 Revised Design & Cost Estimate: Contractor shall provide all work and incidental requirements necessary to prepare, provide, and negotiate, as necessary, a detailed revised cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance due to a change in scope.
0005AZMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0$ - 0
0005BAMAGNITUDE 2 value projects ($500,001 to $1,500,000)1$ - 0$ - 0
0005BBMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0$ - 0
0005BCMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 1 Design, Cost Estimate & Survey: Contractor shall provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary, and accomplish Lead-Based Paint (LBP) and Asbestos surveys to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance for ordered projects.
0005BDMAGNITUDE 1 value projects ($15,000 to $500,000)3$ - 0$ - 0
0005BEMAGNITUDE 2 value projects ($500,001 to $1,500,000)3$ - 0$ - 0
0005BFMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)2$ - 0$ - 0
0005BGMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 1 Revised Design, Cost Estimate & Survey: Contractor shall provide all work and incidental requirements necessary to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed revised cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance due to a change in scope.
0005BHMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0$ - 0
0005BIMAGNITUDE 2 value projects ($500,001 to $1,500,000)1$ - 0$ - 0
0005BJMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0$ - 0
0005BKMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 2 Design & Cost Estimate: Contractor shall provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary to prepare, provide, and negotiate, as necessary, a detailed cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance for ordered projects.
0005BLMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0$ - 0
0005BMMAGNITUDE 2 value projects ($500,001 to $1,500,000)4$ - 0$ - 0
0005BNMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)2$ - 0$ - 0
0005BOMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 2 Revised Design & Cost Estimate: Contractor shall provide all work and incidental requirements necessary to prepare, provide, and negotiate, as necessary, a detailed revised cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance due to a change in scope.
0005BPMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0$ - 0
0005BQMAGNITUDE 2 value projects ($500,001 to $1,500,000)1$ - 0$ - 0
0005BRMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0$ - 0
0005BSMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 2 Design, Cost Estimate & Survey: Contractor shall provide all work and incidental requirements necessary to attend site visits, scoping meetings, and negotiation sessions as necessary, and accomplish Lead-Based Paint (LBP) and Asbestos surveys to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance for ordered projects.
0005BTMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0$ - 0
0005BUMAGNITUDE 2 value projects ($500,001 to $1,500,000)4$ - 0$ - 0
0005BVMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)2$ - 0$ - 0
0005BWMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0$ - 0
ITEM #DESCRIPTIONEstimated QuantityUnit PriceTotal
SABER Project – Level 2 Revised Design, Cost Estimate & Survey: Contractor shall provide all work and incidental requirements necessary to provide survey reports and prepare, provide, and negotiate, as necessary, a detailed revised cost estimate (to include prepriced and non-prepriced items), drawings, a Statement of Work (SOW), and a period of performance due to a change in scope.
0005BVMAGNITUDE 1 value projects ($15,000 to $500,000)1$ - 0$ - 0
0005BXMAGNITUDE 2 value projects ($500,001 to $1,500,000)1$ - 0$ - 0
0005BYMAGNITUDE 3 value projects ($1,500,001 to $3,000,000)1$ - 0$ - 0
0005BYMAGNITUDE 4 value projects ($3,000,001 to $4,500,000)1$ - 0$ - 0

YEAR 5 TOTAL $ - 0

Total Aggregrate Page

Total of Pricing Schedule For All Years
Year 1$ - 0
Year 2$ - 0
Year 3$ - 0
Year 4$ - 0
Year 5$ - 0
Aggregrate Amount$ - 0