(Attachment 66) SABER Seed SOO Honor Guard Building 10250 Attachment 13 - Asbestos and Lead testing building history.xlsx
XLSX spreadsheet 10 KB Posted
- Attached to
- SABER IDIQ
- Solicitation number
- FA486125R0003
About this file
The attachment is an Excel spreadsheet documenting asbestos and lead-based paint (LBP) testing for Building #10250, with test records spanning from 2007 to 2016. The testing results show multiple site assessments with varying outcomes: the 2007 test (Test #107079) detected asbestos in mastic and built-up roofing, and lead-based paint in multiple locations including cinder block walls, metal door frames, columns, and railings. Subsequent tests in 2011, 2014, and 2016 for the exterior walls, communication room, mechanical room, and mechanical yard returned negative results for both asbestos and lead-based paint. This testing data appears to be part of the SABER IDIQ solicitation for Nellis Air Force Base, which involves base engineering requirements and infrastructure maintenance projects.
View the file
Other files
Show 40 more
Latest 50 of 126 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Building #10250
| Test Date | Test # | Room # | Asb (Y/N) | LBP (Y/N) | Remarks |
| 2007-07-25 | 107079 | Test Building | Y & N | Y & N | Y: AB34, AB35 Mastic - On Flashing - Black; Built-Up-Roof- Beneath Stone - Black Lead Y: L2, L3, L8, L9, L12 - L15, L18 Beige Cinder Block Wall; Brown Metal Door Frame; Beie Metal Column; Brown Metal Door - 6 Panel; Beige Metal Pipe; Off-White Metal Louver; Tan Metal Louver; Red Metal Hand Rail |
| 2011-09-29 | 11870 | 106 | N | N | |
| 2014-11-10 | 14718 | Exterior Walls | N | N | |
| 2014-02-24 | 14548 | Comm Room | N | N | |
| 2016-08-04 | 16603 | Mech Room | N | N | 1 Mech Room 1 Mech Yard |
File details come from the government source that posted it. Updated .