Materials submittal
View the file
Other versions and copies of AF Form 66
Show all 20
Who attaches AF Form 66
| State | Files |
|---|---|
| Iowa | 1 |
| Massachusetts | 1 |
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| SCHEDULE OF MATERIAL SUBMITTALS | ||||||||||||||||||
| (AF Form 66 Modified) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||
| VGLZ 182018 | Upgrade HVAC & Fire Alarm – Bldg. 1414 | W912JB-13-D-4005-0015 | ||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | ||||||||||||||||||
| NO. OF COPIES REQUIRED | ||||||||||||||||||
| LINE NUMBER | Spec Section | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE AND CLOSEOUT | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OTHER MATERIAL or DATA | OPERATING INSTRUCTIONS | SUBMITTAL |
REQUIRED
BY 14 DAYS
AFTER
NTP DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGINEERING RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | |||
| APPROVAL | REMARKS | ||||||
| APPROVED | DISAPPROVED | ||||||
| 1 | 01.00.00 | Requirements of Selfrisge Air National Guard Base | |||||
| Contractor Base Pass Request | |||||||
| Schedule of Materials Submittal - AF Form 66 Modified | |||||||
| Material approval submittal - AF Form 3000 | |||||||
| Request for Information (RFI) Format | |||||||
| Contract Progress Schedule - AF Form 3064 | |||||||
| Contract Progress Report - AF Form 3065 | |||||||
| Spare materials Parts Spreadsheet | |||||||
| Extended Manufacrurer Warranty Spreadsheet | |||||||
| Transfer and Acceptance of Military Real Property - DD Form 1354 | |||||||
| Real Property Installed Cost Worksheet | |||||||
| O&M Data Spreadsheet | |||||||
| Contractor Hazardous Material Identification - SANGB Form 23 | |||||||
| 2 | Solid Waste Disposal and Diversion Tracking Form | ||||||
| 3 | 01.00.10 | Affirmative Procurement Reporting Form | |||||
| 4 | 01.01.00 | General Requirements | |||||
| 5 | 01.10.00 | Summary of Work | |||||
| 6 | 01.25.00 | Subsitution Procedures | |||||
| 7 | 01.26.00 | Contract Considerations | |||||
| 8 | 01.29.00 | Applications for Payement | |||||
| 9 | 01.31.00 | Coordination and Project Meetings | |||||
| 10 | 01.32.00 | Construction Progress Schedules | |||||
| 11 | 01.32.33 | Construction Photographs | |||||
| 12 | 01.33.00 | Submittals | |||||
| 13 | 01.35.23 | Safety Policies and Procedures | |||||
| 14 | 01.40.00 | Quality Requirements | |||||
| 15 | 01.41.00 | Project Coordination | |||||
| 16 | 01.42.00 | Reference Standards | |||||
| 17 | 01.45.23 | Testing Services | |||||
| 18 | 01.50.00 | Construction Facilties and Temporary Controls | |||||
| 19 | 01.51.00 | Temporary Utilities | |||||
| 20 | 01.52.13 | Field Offices and Sheds | |||||
| 21 | 01.57.19 | Environmental Protection | |||||
| 22 | 01.60.00 | Material and Equipment | |||||
| 23 | 01.64.00 | SANG Furnished-Contractor Installed Equipment | |||||
| 24 | 01.73.29 | Cutting and Patching | |||||
| 25 | 01.74.00 | Warranties | |||||
| 26 | 01.75.00 | Starting of Systems | |||||
| 27 | 01.77.00 | Project Closeout | |||||
| 28 | 01.78.23 | Operation and Maintenance Data | |||||
| 29 | 01.78.39 | Project Record Documents | |||||
| 30 | 01.79.00 | Demonstration and Training | |||||
| 31 | 01.88.18 | Weather | |||||
| 32 | 02.41.19 | Selective Demolition | |||||
| 33 | 05.55.00 | Metal Fabrications | |||||
| Product Data | |||||||
| Fabrication | |||||||
| Finishes | |||||||
| 34 | 23.01.30.52 | Existing HVAC Air Distribution System Cleaning Plan | |||||
| Product Data | |||||||
| 35 | 23.05.13 | Common Motor Requirements for HVAC Equipment | |||||
| Product Data | |||||||
| 36 | 23.05.17 | Sleeves and Sleeve Seal for HVAC Piping | |||||
| Product Data for General Duty Valves | |||||||
| 37 | 23.05.18 | Escutcheons for HVAC Piping | |||||
| Product Data | |||||||
| Shop Drawing | |||||||
| 38 | 23.05.19 | Meters and Gages for HVAC Piping | |||||
| Product Data for Meters and Gages | |||||||
| Shop Drawing | |||||||
| O & M Data | |||||||
| Warranty | |||||||
| 39 | 23.05.23 | General-Duty Valves for HVAC Piping | |||||
| Product Data for General Duty Valves | |||||||
| Shop Drawing | |||||||
| O & M Data | |||||||
| Warranty | |||||||
| 40 | 23.05.29 | Hangers & Supports for HVAC Piping & Equipment | |||||
| Product Data | |||||||
| Shop Drawing | |||||||
| O & M Data | |||||||
| Warranty | |||||||
| 41 | 23.05.48.13 | Vibration Controls for HVAC | |||||
| Product Data | |||||||
| Shop Drawing | |||||||
| O & M Data | |||||||
| Warranty | |||||||
| 42 | 23.05.53 | Identifcation for HVAC Piping and Equipment | |||||
| Product Data | |||||||
| Sample for ID | |||||||
| Equipment Label Schedule / Scheme | |||||||
| Valve Schedule | |||||||
| 43 | 23.05.93 | Testing, Adjusting, & Balancing for HVAC | |||||
| Qualification Data | |||||||
| Contract Document Examination Report | |||||||
| Certified TAB Reports | |||||||
| 44 | 23.07.13 | Duct Insulation | |||||
| Product Data on Duct Insulation | |||||||
| Samples of Insulation | |||||||
| 45 | 23.07.19 | HVAC Piping Insulation | |||||
| Product Data on Insulation | |||||||
| Samples of Insulation | |||||||
| 46 | 23.09.00 | Instrumentation & Control for HVAC | |||||
| Product Data on DDC System & Controls | |||||||
| Shop Drawing | |||||||
| Data Comm. Protocol Certificates | |||||||
| 47 | 23.09.23.11 | Control Valves | |||||
| Product Data | |||||||
| Shop Drawing | |||||||
| O & M Data | |||||||
| Warranty | |||||||
| 48 | 23.09.93.11 | Sequence of Operation for HVAC DDC | |||||
| Control Sequences | |||||||
| 49 | 23.11.23 | Facility Natural Gas Piping | |||||
| Product Data | |||||||
| Shop Drawing | |||||||
| Piping Schedule and Specialties | |||||||
| Service Meters | |||||||
| 50 | 23.21.13 | Hydronic Piping | |||||
| Product Data on the following Material: | |||||||
| Air Control Devices | |||||||
| Hydronic Specialties | |||||||
| O & M Data | |||||||
| 51 | 23.21.16 | Hydronic Piping Specialities | |||||
| Product Data | |||||||
| Shop Drawing | |||||||
| Warranty | |||||||
| O & M Data | |||||||
| 52 | 23.21.23 | Hydronic Pumps | |||||
| Product Data | |||||||
| Shop Drawing | |||||||
| Warranty | |||||||
| O & M Data | |||||||
| 53 | 23.23.00 | Refrigerant Piping | |||||
| Product Data | |||||||
| Piping Schedule | |||||||
| Piping Specialties | |||||||
| O & M Data | |||||||
| 54 | 23.31.13 | Metal Ducts | |||||
| Product Data on the following material: | |||||||
| Sealants and Gaskets | |||||||
| Seismic Restraint Devices | |||||||
| Shop Drawings |
Installation Shop Drawings
| 55 | 23.33.00 | Air Duct Accessories |
| Product Data | ||
| Shop Drawings for Duct Accessories | ||
| O & M Data | ||
| 56 | 23.34.23 | HVAC Power Ventilators |
| Product Data on items indicated | ||
| O & M Data | ||
| 23.36.00 | Air terminal Units | |
| Product Data | ||
| Shop Drawing |
Installation Shop Drawings
| Warranty | ||
| O & M Data | ||
| 57 | 23.37.13 | Diffusers, Registers, & Grilles |
| Product Data on the following material: | ||
| CD: Ceiling Diffusers | ||
| CG: Exhaust/Return Grille | ||
| 58 | 23.52.16 | Condensing Boilers |
| Product Data | ||
| Shop Drawing |
Installation Shop Drawings
| Warranty | ||
| O & M Data | ||
| 58 | 23.74.16.11 | Packaged, Small-Capacity, Rooftop Air-Conditioning Units And Curbs |
| Product Data | ||
| Shop Drawing | ||
| Warranty | ||
| O & M Data | ||
| 60 | 23.81.26 | Split-System Air-Conditioners |
| Product Data | ||
| Shop Drawings |
Installation Shop Drawings
| O & M Data | ||
| Warranty | ||
| 61 | 26.05.00 | Common Work Rresults For Electrical |
| Product Data | ||
| Shop Drawings | ||
| O & M Data | ||
| Warranty | ||
| 62 | 26.05.19 | Low-Voltage Electrical Power Conductors & Cables |
| Product Data for Each Type of Cable | ||
| 63 | 26.05.26 | Grounding & Bonding for Electrical Systems |
| O & M Data | ||
| 64 | 26.05.29 | Hangers & Supports for Electrical Systems |
| Product Data | ||
| Shop Drawing | ||
| O & M Data | ||
| Warranty | ||
| 65 | 26.05.33 | Raceway & Boxes for Electrical Systems |
| Product Data on the following Material: | ||
| Metal Conduit & Tubing | ||
| Metal Wireways | ||
| Surface Raceways | ||
| Boxes, Enclosures, Cabinets | ||
| 66 | 26.05.53 | Identifcation for Electrical Systems |
| Product Data | ||
| Color and Legend Requirements | ||
| Labels | ||
| 67 | 26.05.44 | Sleeves and Sleeve Seal for Electrical Raceways and Cabling |
| Product Data on the following Material: | ||
| Sleeves | ||
| Sleeve-Seal Systems | ||
| Sleeve-Seal Fittings | ||
| Grout | ||
| Silicone Sealants | ||
| 68 | 26.22.00 | Low-Voltage Transformers |
| Product Data | ||
| Shop Drawings | ||
| O & M Data | ||
| Warranty | ||
| 69 | 26.24.16 | Panelboards |
| Product Data | ||
| Shop Drawings | ||
| O & M Data | ||
| Warranty | ||
| 70 | 26.27.26 | Wiring Devices |
| Product Data | ||
| Shop Drawings | ||
| O & M Data | ||
| Warranty | ||
| 71 | 26.28.13 | Fuses |
| Product Data | ||
| Shop Drawings | ||
| O & M Data | ||
| Warranty | ||
| 72 | 26.28.16 | Enclosed Switches |
| Product Data | ||
| Shop Drawings | ||
| O & M Data | ||
| 73 | 26.29.13 | Enclosed Controllers |
| Product Data | ||
| Shop Drawings | ||
| O & M Data | ||
| 74 | 26.29.23 | Variable-Frequency Motor Controllers |
| Product Data | ||
| Shop Drawings | ||
| O & M Data | ||
| Warranty | ||
| 75 | 26.31.76 | Interior Fire Alarm and Mass Notification System |
| Product Data | ||
| Shop Drawings | ||
| O & M Data | ||
| Warranty |