B1
B
A1
A
Aa
Ab
Ac
Ad
B2
2a33a44a55a66a7 3a1
11a2
MATCHLINE - SEE SHEET M101
EX.SA DUCT
EX.32x20EX.36x20
EX.SUPPLY DUCT
TO REMAIN
EX.28x20
EX. RELIEF AIR DUCT
EX. RELIEF AIR DUCT
EX. RELIEF AIR DUCT
EX. RELIEF AIR DUCT
EX.36x20
EX.RTU-2
(ON ROOF)
EX.WALL
LOUVER
EX.18"Ø
EX.12"Ø
EX
.12
"Ø
EX
.10 "Ø
EX
.18
"Ø
EX
.8"
Ø
EX
.8" Ø
EX.8x8
UP
EX
.10
"Ø
EX
.10 "Ø
EX
.8"
Ø
EX.8"Ø
EX.14x6
EX.10"Ø
EX.EG
225 CFM
EX.28x16EX.34x22EX.40x26EX.60x30
EX
.28 x1
EX
.28 x1
EX
.28 x1
EX
.28 x1
EX
.28 x1
EX
.36 x2
EX.28x28 EX.28x16
EX
.24 x1
EX
.24 x1
EX
.24 x1
EX. EG
100 CFM
EX. EG
75 CFM
EX. 64x32
EX.24x20
EX
.18 x1
EX.10"Ø
EX.CUH TO
REMAIN
HV-1
(ON ROOF)
RTU-4
(ON ROOF)
VAV-34
VAV-35
VAV-37
VAV-38
VAV-41
VAV-40
VAV-43
VAV-42
VAV-39
VAV-44
VAV-36 EX.SD
90 CFM
22x36 RA OPENING
ON TOP OF DUCT
WITH BIRDSCREEN
EX.SD
CFM
EX.SD
125 CFM
EX.SD
400 CFM
EX.SD
230 CFM
EX.SD
50 CFM
EX.SD
400 CFM
EX.SD
400 CFM
EX.SD
CFM
EX.SD
400 CFM
EX.SD
250 CFM
EX.SD
250 CFM
EX.SD
250 CFM
SD-1
CFM
SD-1
240 CFM
EX.SD
235 CFM
HP-3
(WALL UNIT) HP-4
(WALL UNIT)
ACU-3
ACU-4
EX.RD
600 CFM
RD-1
600 CFM
14x14
12"Ø
EX.RD
800 CFM
EX.RD
840 CFM
x1 x1
EX.RD
840 CFM
24x18
"Ø
"Ø
EX.RD
600 CFM
EX.RD
440 CFM
10x18
EX.RD
450 CFM
RD-1
CFM
"Ø
16x18
"Ø
8" Ø
EX.RD
400 CFM
EX. RD
125 CFMEX.RD
125 CFM
36x20
NEW EF-3
(ON ROOF)
6" Ø
6" Ø
8x8
40x20
PATCH EX. 26" DIA.
WALL OPENINGS
EX.RD
CFM
EX. RD
350 CFM
EX.RD
350 CFM
EX.RD
600 CFM
EX.RD
150 CFM
EX.RD
50 CFM
MODIFY EXISTING
WALL OPENING TO
ROUTE NEW DUCT
18x18 x1
NEW EF-2
280 CFM
EX.EG
115 CFM
EX. EG
165 CFM
8" Ø
8" Ø
8" Ø
8" Ø
EX.SD
175 CFM
EX.SD
175 CFM
EX.SD
175 CFM
EX.SD
175 CFM
12x8 12x12
6"Ø
EX.SD
300 CFM
EX.SD
300 CFM
SD-1
300 CFM
SD-1
300 CFM
PATCH EX. 22"x14"
WALL OPENINGS
"Ø
"Ø
"Ø
"Ø
12x10
"Ø x1
EX. SD
150 CFM
EX.SD
150 CFM
EX.SD
40 CFM
EX.SD
140 CFM
14x10
PATCH EX. 16" DIA.
WALL OPENINGS
12"Ø
8"Ø
8"Ø
6"Ø
8"Ø x1
8x
EX. SD
125 CFM
EX.SD
400 CFM
SD-1
300 CFM
EX.SD
CFM
EX.SD
200 CFM
EX.SD
200 CFM
SD-1
CFM
24x14 x1
EX.SD
1000 CFM
EX.SD
1000 CFM
EX.SD
1000 CFM
EX.SD
1000 CFM
EX.SD
1000 CFM
EX.SD
1000 CFM
HV-2
(ON ROOF)
28x1824x1424 x8 x8
30x24 RETURN
AIR DUCT MAIN
DN FROM HV-2
40x20
36x20
RTU-5
(ON ROOF)
30x24 SUPPLY
AIR DUCT MAIN
DN FROM HV-2
CAP
CAP CAP
CAPEX.SD
1500 CFM
EX.SD
1500 CFM
EX.SD
1500 CFM
EX.SD
1500 CFM
EX.SD
1500 CFM
EX.SD
1500 CFM
EX.SG
500 CFM
EX.SG
500 CFM
30x24 SUPPLY AIR DUCT
MAIN DN FROM HV-2
EX.SD
50 CFM
32x32
30x24 SUPPLY AIR DUCT
MAIN DN FROM HV-2
24x32 24x32
EX
.10
"Ø
EX
.10 "Ø
SD-1
240 CFM
EX.SD
CFM PROVIDE 16x16 GRAVITY TYPE
RELIEF AIR DAMPER AND ROOF
HOOD. REUSE AND MODIFY
EXISTING ROOF OPENING TO
INSTALL NEW HOOD (RH-1)
MODIFY EX. ROOF
OPENING FOR HV-1
RETURN AIR
24x22 24x22
22x24 RA OPENING
ON TOP OF DUCT
WITH BIRDSCREEN
22x24 RA OPENING
ON TOP OF DUCT
WITH BIRDSCREEN
EX.RD
400 CFM
EX.SD
CFM
x1
FDFD
FD
FD
FD
FD10"Ø
10"Ø
12"Ø
"Ø
6" Ø
10"Ø
8"Ø10"Ø 12x12
10"Ø
10"Ø
10"Ø x6 x1
14x12
12x6 12x10
10"Ø
10"Ø 12x812x12
18x12 x1 x1 x1 x1
30x16 x1 x2 x1
10"Ø
10"Ø 10"Ø
10"Ø
14x8 14x8
14x8 14x12 6x8
14x14
NEW 6" CONCRETE
HOUSEKEEPING PAD
FIRST FLOOR
PLAN - EAST
M102
HVAC NEW
WORK
127th WING
BUILDING 1414
RENOVATION
http://www.AECOM.com
27777 Franklin Road, Suite 2000 Southfield, MI 48034 United States P: 248 204 5900 F: 248 204 5901
SCALE: 3 32" = 1'-0"
2a33a44a55a66a7
G F1
F E1
E D
C
C B1
B A1
A
Aa Ab
Ac Ad
D
11a2
NEW WORK KEYED NOTES:
ROUTE NEW MAIN SUPPLY AND RETURN DUCTWORK UP THROUGH ROOF AND
CONNECT TO NEW HV UNIT.
REUSE EXISTING SUPPLY DUCTWORK TO EXTENT SHOWN AND RECONNECT TO NEW
DUCTWORK SYSTEM. FIELD VERIFY EXISTING CONDITIONS.
PROVIDE NEW GRAVITY TYPE RELIEF AIR DAMPER AND ASSOCIATED ROOF HOOD
(RH-1). MODIFY AND REUSE EXISTING ROOF OPENING TO INSTALL NEW DAMPER AND
ROOF HOOD. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
PROVIDE NEW FIRE DAMPER AT NEW DUCT WALL PENETRATION. VERIFY REQUIRED
FIRE DAMPER SIZE PER INSTALLED DUCT.
REUSE EXISTING SUPPLY AND/OR RETURN AIR CEILING DIFFUSER. CONNECT TO NEW
DUCTWORK SYSTEM AND RE-BALANCE TO NEW DESIGN CFM AS SHOWN ON DRAWING.
CLEAN EXISTING REUSED DIFFUSER THROUGHOUT. THIS WORK IS TYPICAL FOR ALL
EXISTING DIFFUSERS TAGGED WITH EX.SD AND EX.RD.
PROVIDE NEW SUPPLY (SD-1) AND/OR RETURN DIFFUSER (RD-1), AND CONNECT TO
NEW DUCTWORK SYSTEM. BALANCE TO DESIGN CFM AS SHOWN ON DRAWING.
PATCH EXISTING DEMOLISHED DUCT WALL PENETRATION NOT IN USE TO MATCH
EXISTING CONSTRUCTION. REFER TO ARCHITECTURAL NOTES ON THIS DRAWING.
PROVIDE NEW VAV BOX WITH ASSOCIATED REHEAT COIL, ALC COMPATIBLE CONTROLS,
SUPPORTS AND ACCESSORIES. CONNECT TO NEW DUCTWORK SYSTEM AND CEILING
DIFFUSERS AS SHOWN ON DRAWINGS. REFER TO VAV TERMINAL UNIT SCHEDULE ON
M600 FOR SIZE AND CAPACITY. INSTALL AND PROVIDE REQUIRED CLEARANCES PER
MANUFACTURER'S RECOMMENDATIONS.
CONNECT EXISTING EXHAUST DUCT TO NEW EXHAUST FAN ON ROOF.
ROUTE NEW MAIN SUPPLY AND/OR RETURN AIR DUCTWORK UP THROUGH ROOF
OPENING AND CONNECT TO NEW RTU OR HV UNIT ON ROOF.
PROVIDE NEW SPLIT TYPE HEAT PUMP UNIT WITH ASSOCIATED SUPPORTS AND
CONTROLS. ROUTE NEW REFRIGERANT LINES CONCEALED THROUGH CEILING SPACE
OR WALL-MOUNTED AS POSSIBLE. ROUTE CONDENSATE LINE INDOOR AND DRAIN
OUTDOOR ON GRADE (SEE DETAIL ON M501). PROVIDE NEW 6" CONCRETE
HOUSEKEEPING PAD ON GRADE TO INSTALL OUTDOOR CONDENSING UNIT. INSTALL
INDOOR AND OUTDOOR UNITS PER MANUFACTURER'S INSTRUCTIONS.
CAP, SEAL AND INSULATE EXISTING WALL LOUVER.
GENERAL ARCHITECTURAL NOTES:
1. SAWCUT AND REMOVE PORTION OF WALL AS REQUIRED FOR NEW WORK. TEMPORARILY SHORE OPENING AS
REQUIRED FOR INSTALLATION OF NEW WORK. PATCH EXISTING WALL IF DAMAGED BY NEW WORK, FIRE STOP AND SEAL TO MAINTAIN EXISTING FIRE RATING. PROVIDE LINTELS AT NEW WALL OPENINGS AS REQUIRED.
2. PATCH AND FILL IN WALL PENETRATIONS IN KIND AS A RESULT OF DEMOLITION AND NEW WORK SCOPE.
MAINTAIN EXISTING FIRE RATING.
3. REMOVE, SALVAGE AND RE-INSTALL ALL CEILING TILES AS REQUIRED FOR DEMOLITION AND NEW WORK
SCOPE. REPLACE ANY DAMAGED AND/OR MISSING TILES IN KIND.
4. REMOVE PORTION OF ROOF AS REQUIRED FOR NEW WORK. COORDINATE LOCATION OF OPENINGS AND CURB SUPPORTS WITH STRUCTURE BELOW. PATCH EXISTING ROOFING IF DAMAGED BY NEW WORK IN KIND.
OVERLAP NEW AND EXISTING ROOFING MINIMUM 6" ON ALL SIDES.
5. ALL ROOFING WORK, INCLUDING EQUIPMENT CURBS, FLASHING, PATCHING, PENETRATIONS, REPAIRS, ETC.
SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST NRCA, NATIONAL ROOFING CONTRACTORS ASSOCIATION, ROOFING MANUALS AND DETAILS FOR LOW OR STEEP SLOPE SYSTEMS AND PER ROOFING
MANUFACTURER TO MAINTAIN EXISTING WARRANTIES.
1. CONTRACTOR SHALL INCLUDE THE ABATEMENT OF ALL ASBESTOS CONTAINING BUILDING
MATERIALS (ACBM) IN THEIR BID, THAT IS REQUIRED TO COMPLETE THE SCOPE OF WORK
INDICATED ON CONTRACT DOCUMENTS.
2. ASBESTOS ABATED IN THE COURSE OF THIS PROJECT MUST BE PROPERLY COLLECTED,
CONTAINERIZED AND DISPOSED OF IN A LANDFILL LICENSED TO ACCEPT ASBESTOS WASTE.
ALL ASBESTOS DISPOSAL MANIFESTS MUST BE COORDINATED WITH, AND SIGNED BY, 127TH
WING ENVIRONMENTAL MANAGEMENT OFFICE PERSONNEL.
3. CONTRACTOR SHALL UTILIZE SELFRIDGE ANG BASE (SANGB) FORM 23 FOR TRACKING
HAZARDOUS MATERIALS AND SANGB FORM 72 FOR SOLID WASTE TRACKING AND
DIVERSION.
4. CONTRACTOR SHALL ASSUME THE PRESENCE OF ASBESTOS CONTAINING DRY WALL JOINT
COMPOUND IN EXISTING WALLS ABOVE CEILING NOTED FOR PENETRATION BY NEW SUPPLY
AIR DUCTS.
1. IF SUSPECTED ASBESTOS CONTAINING BUILDING MATERIAL (ACBM) IS ENCOUNTERED, WORK IN
THE IMMEDIATE VICINITY MUST STOP AND THE OWNERS CONTRACTING OFFICER SHALL BE
NOTIFIED. AFTER CONSULTATION WITH BASE PERSONNEL, THE OWNERS CONTRACTING OFFICER
WILL DIRECT FURTHER ACTION TO BE TAKEN. WORK SHOULD PROCEED UNINTERRUPTED IN
UNAFFECTED AREAS OF THE PROJECT.
2. BASED ON THE AGE OF THE BUILDINGS AT SELFRIDGE ANG BASE, THERE IS THE POTENTIAL FOR
THE PRESENCE OF LEAD ON PAINTED SURFACES. BEST MANAGEMENT PRACTICES MUST BE
EMPLOYED TO MINIMIZE DUST AND ADEQUATELY PROTECT WORKERS FROM LEAD BASED PAINT
(LBP) EXPOSURE IN ACCORDANCE WITH OSHA AND MIOSHA STANDARDS.
3. IF ASBESTOS AND/OR LEAD IS SUSPECTED IT SHOULD BE TESTED FOR. IF EITHER ASBESTOS
AND/OR LEAD IS FOUND, FOLLOW APPLICABLE OSHA GUIDELINES FOR REMEDIATION.
4. FOR ADDITIONAL INFORMATION, CONTRACTOR TO REQUEST ASBESTOS INSPECTION REPORT
FROM SELFRIDGE AIR NATIONAL GUARD BASE.
GENERAL NOTES:
1. DO NOT SCALE DRAWINGS.
ALL DIMENSIONS ARE IN NOMINAL BRITISH IMPERIAL UNITS.
2. SEE ADDITIONAL GENERAL NOTES ON SHEET M000.
3. DRAWINGS ARE BASED UPON GOVERNMENT'S RECORD DRAWINGS AND FIELD
VERIFICATION. NOTIFY GOVERNMENT OF DISCREPANCIES OR CONDITIONS REQUIRING
SUPPLEMENTAL INSTRUCTIONS PRIOR TO CONTINUATION OF WORK.
4. VERIFY ALL DIMENSIONS, CONDITIONS AND LOCATION OF EXISTING EQUIPMENT,
CONTROLS, PUMPS, PIPING, DUCTWORK, DIFFUSERS, ETC. IN FIELD, AND NOTIFY THE
RESPECTIVE DISCIPLINE OF ANY DISCREPANCIES BEFORE COMMENCEMENT OF WORK.
5. REFER TO ELEC. DRAWINGS FOR ADDITIONAL INFORMATION OF ELECTRICAL
REQUIREMENTS.
6. ALL WORK SHALL COMPLY WITH LOCAL AND NATIONAL CODES, UFC STANDARDS,
MANUFACTURERS RECOMMENDATIONS, SANG AND ANG DESIGN POLICIES,
ANGTEL-15-01, ANGTEL-15-01-04, ANGTEL-15-01-05, ETC.
7. INSTALL NEW HVAC EQUIPMENT AND COMPONENTS WITH ADEQUATE CLEARANCE SPACE,
FOR ACCESS AND MAINTENANCE, AS REQUIRED PER LOCAL CODE, ANG-ETL POLICIES,
UFC STANDARDS AND MANUFACTURERS REQUIREMENTS.
8. THE CONTRACTOR SHALL REPLACE/RESTORE ANY ITEM OR EQUIPMENT REQUIRED TO
REMAIN OPERATIONAL OR TEMPORARILY BEING RELOCATED/OFFSETED, OR THAT IS
DAMAGED DURING CONSTRUCTION. EXISTING PIPING, CONDUIT, WIRES, SUPPORT, ETC.
THAT IS REQUIRED TO BE OFFSET TO FACILITATE THE INSTALLATION OF NEW WORK
SHALL BE REINSTALLED AND RESTORED TO ITS ORIGINAL CONDITION. CONTRACTOR IS
REQUIRED TO FIELD VERIFY AREA OF WORK WHERE NEW EQUIPMENT ARE INSTALLED
BEFORE START OF WORK. THIS WORK IS PART OF THE CONTRACTOR'S CONTRACT
RESPONSIBILITIES.
9. MECHANICAL DEMOLITION WORK SHALL INCLUDE, BUT NOT BE LIMITED TO, THE REMOVAL
OF EXISTING AIR CONDITIONING EQUIPMENT, BOILERS, PUMPS, PIPING, SHEET METAL
DUCTWORK, HEATING COILS, AIR-COOLED CHILLER, ETC. AS INDICATED AND/OR
DESCRIBED ON DEMOLITION DRAWINGS. COMPLETELY REMOVE ALONG WITH CONTROLS,
PNEUMATIC TUBING, HANGERS, SUPPORTS AND ALL RELATED ACCESSORIES.
10. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING MECHANICAL SERVICES AND
UTILITIES BEING REUSED.
11. PATCH ALL OPENINGS IN FLOOR, CEILINGS AND WALLS CREATED BY DEMOLITION OR
NEW WORK AS REQUIRED TO MATCH EXISTING CONSTRUCTION.
12. ALL EQUIPMENT BEING REUSED AND/OR RELOCATED SHALL BE THOROUGHLY CLEANED
AND RECONDITIONED PRIOR TO START-UP.
13. CAP ALL BRANCH DUCTS FROM GRILLES, REGISTERS, DIFFUSERS, AND PIPING BEING
REMOVED, WHETHER INDICATED ON PLAN OR NOT.
14. PROVIDE TEMPORARY CAP ON ALL OPEN ENDED ACTIVE SUPPLY, RETURN AIR, EXHAUST
AIR DUCTWORK, REGISTERS AND GRILLES TO BE REUSED.
15. TEST AND BALANCE AIR & WATER VOLUMES TO FINAL DESIGN VALUES.
16. THE CONTRACTOR SHALL VERIFY WITH STRUCTURAL REQUIREMENT TO INSTALL NEW
EQUIPMENT ON ROOF, OR SUSPEND FROM EXISTING STRUCTURE.
2a33a44a55a66a7
G
F1
F
E1
E
D1
C1
C
B1
B
A1
A
Aa
Ab
Ac
Ad
D
11a2
C2
C3
B2
3a1
2a33a44a55a66a7 3a1
11a2
2a33a44a55a66a7
G
F1
F
E1
E
D1
C1
C
B1
B
A1
A
Aa
Ab
Ac
Ad
D
11a2
C2
C3
B2
3a1
2a33a44a55a66a7 3a1
11a2
G G
G G
G G
G G
G G
G G
G G
G G
G
G
EX. RTU-2
TO REMAIN
EX. CAPPED
ROOF VENT
EX. HW BOILERS FLUE
STACK ROOF OPENING
(E) PLUMBING
VENT PIPE
(TYP FOR ALL)
(TYP)
(TYP)
EX.CU
(TO REMAIN)
EX.PLBG VENT
(TYP FOR ALL)
(TYP)
(TYP)
(TYP)
(TYP)
(TYP) (TYP)
(TYP)(TYP)
(TYP)
(TYP)
EX.2" GAS
LINE TO
EX.RTU-S
EX. RTU-1
TO REMAIN
EX.2" GAS LINE
DOWN TO 4"
EX. GAS MAIN
EX.1"GAS
EX. CU
GGGG
GGGGG
RTU-3
(220 CFH)
(2532 LBS)
GGGGG
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G
EX. GAS
METER
CAPPED
EX.FAN
(TYP)
EX. ROOF DRAIN
(TYP FOR ALL)
(TYP)
(TYP)
EX.CAPPED
ROOF VENT
3" GAS LINE DN
TO MECH. ROOM
G
G
4" NG
4" NG
RTU-4
(220 CFH)
(2532 LBS)
4" NG
RTU-5
(220 CFH)
(2532 LBS)
1" NG
4" NG
HV-2
(300 CFH)
(2532 LBS)
HV-1
(600 CFH)
(2532 LBS)
4" NG
2" NG
3" NG
3" NG
3" NG
EF-3
(400 CFM)
EF-2
(280 CFM)
EX.EF-1
(TO REMAIN)
RHB-2 CONCENTRIC
VERTICAL FLUE VENT
CAP
CAP
CAP
CAP
CAP
CAP
CAP
CAP
CAP
CAP
CAP
EX.CAPPED
ROOF VENT
CAP
CAP
CAP
CAP
CAP
CAP
CAPCAPCAP
EX. ROOF
VENT
CAP
RH-1
(RELIEF AIR HOOD)
ROOF PLAN -
HVAC NEW
M103
WORK
127th WING
BUILDING 1414
RENOVATION
http://www.AECOM.com
27777 Franklin Road, Suite 2000 Southfield, MI 48034 United States P: 248 204 5900 F: 248 204 5901
SCALE: 116"= 1'-0"
2a33a44a55a66a7
G F1
F E1
E D
C
C B1
B A1
A
Aa Ab
Ac Ad
D
11a2
2a33a44a55a66a7
G F1
F E1
E D
C
C B1
B A1
A
Aa Ab
Ac Ad
D
11a2
NEW WORK KEYED NOTES:
PROVIDE NEW 15-TON ROOFTOP UNIT (RTU) WITH ASSOCIATED PREFABRICATED
ROOF CURB, ECONOMIZER, GAS LINE CONNECTION, ACCESSORIES AND ALC
COMPATIBLE PACKAGED CONTROLS. INSTALL UNIT CURB ON EXISTING ROOF PER
MANUFACTURER'S RECOMMENDATIONS AND ARCHITECTURAL NOTES. COORDINATE
WITH EXISTING ROOF CONDITIONS. ROUTE NEW SUPPLY AND RETURN DUCTS DOWN
TO CEILING SPACE BELOW ROOF LINE. COORDINATE WITH STRUCTURAL AND
ELECTRICAL TRADES.
PROVIDE NEW HEATING AND VENTILATION UNIT (HV) WITH ASSOCIATED
PREFABRICATED ROOF CURB, FRESH AIR HOOD, GAS LINE CONNECTION,
ACCESSORIES AND ALC COMPATIBLE PACKAGED CONTROLS. INSTALL UNIT CURB ON
EXISTING ROOF PER MANUFACTURER'S RECOMMENDATIONS AND ARCHITECTURAL
NOTES. COORDINATE WITH EXISTING ROOF CONDITIONS. ROUTE NEW SUPPLY AND
RETURN DUCTS DOWN TO CEILING SPACE BELOW ROOF LINE. COORDINATE WITH
STRUCTURAL AND ELECTRICAL TRADES.
PROVIDE NEW TOILET EXHAUST FAN EF-3 WITH ASSOCIATED PREFABRICATED ROOF
CURB, BACK DRAFT DAMPER AND ACCESSORIES. INSTALL ON EXISTING ROOF AND
COORDINATE WITH EXISTING CONDITIONS. CONNECT NEW FAN WITH EXISTING
TOILET EXHAUST DUCT BELOW ROOF LINE. INTERLOCK NEW EF-3 WITH RTU-5
OPERATION.
PROVIDE NEW TOILET EXHAUST FAN EF-2 WITH ASSOCIATED PREFABRICATED ROOF
CURB, BACK DRAFT DAMPER AND ACCESSORIES. INSTALL ON EXISTING ROOF AND
COORDINATE WITH EXISTING CONDITIONS. CONNECT NEW FAN WITH EXISTING
TOILET EXHAUST DUCT BELOW ROOF LINE. INTERLOCK NEW EF-2 WITH RTU-4
OPERATION.
REUSE AND MODIFY EXISTING ROOF OPENING (DEMOLISHED BOILERS EXHAUST
STACK) TO ACCOMMODATE NEW 3" GAS LINE AND NEW 6" CONCENTRIC FLUE VENT
SERVING NEW RHB-2. PATCH ROOF OPENING AROUND NEW PENETRATIONS AS
REQUIRED.
ROUTE NEW 3" GAS LINE FROM MAIN MECHANICAL ROOM UP TO ROOF THROUGH
EXISTING ROOF OPENING. ROUTE NEW GAS LINE ON ROOF AND CONNECT TO NEW
RTU-3,4,5 AND HV-1,2 UNITS.
ROUTE NEW 6" CONCENTRIC VENT PIPE SERVING NEW RHB-2 THROUGH EXISTING
ROOF OPENING. INSTALL PER MANUFACTURER'S REQUIREMENTS. PATCH EXISTING
ROOF OPENING AROUND NEW PENETRATION AS REQUIRED.
CAP AND SEAL EXISTING ROOF VENT CURB WITH INSULATED TYPE SHEET METAL
ROOF CAP. REFER TO ARCHITECTURAL NOTES.
CAP AND SEAL EXISTING ROOF CURB FOR DEMOLISHED ROOF FAN WITH INSULATED
TYPE SHEET METAL ROOF CAP. REFER TO ARCHITECTURAL NOTES.
MODIFY EXISTING ROOF OPENING TO INSTALL NEW RELIEF AIR HOOD.
GENERAL ARCHITECTURAL NOTES:
1. SAWCUT AND REMOVE PORTION OF WALL AS REQUIRED FOR NEW WORK. TEMPORARILY SHORE OPENING AS REQUIRED FOR INSTALLATION OF NEW WORK. PATCH EXISTING WALL IF DAMAGED BY NEW WORK, FIRE STOP
AND SEAL TO MAINTAIN EXISTING FIRE RATING.
2. PATCH AND FILL IN ROOF PENETRATIONS IN KIND AS A RESULT OF DEMOLITION AND NEW WORK SCOPE.
3. REMOVE PORTION OF ROOF AS REQUIRED FOR NEW WORK. COORDINATE LOCATION OF OPENINGS AND CURB SUPPORTS WITH STRUCTURE BELOW. PATCH EXISTING ROOFING IF DAMAGED BY NEW WORK IN KIND.
OVERLAP NEW AND EXISTING ROOFING MINIMUM 6" ON ALL SIDES.
4. ALL ROOFING WORK, INCLUDING EQUIPMENT CURBS, FLASHING, PATCHING, PENETRATIONS, REPAIRS, ETC.
SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST NRCA, NATIONAL ROOFING CONTRACTORS ASSOCIATION, ROOFING MANUALS AND DETAILS FOR LOW OR STEEP SLOPE SYSTEMS AND PER ROOFING
MANUFACTURER TO MAINTAIN EXISTING WARRANTIES.
GENERAL NOTES:
1. DO NOT SCALE DRAWINGS.
ALL DIMENSIONS ARE IN NOMINAL BRITISH IMPERIAL UNITS.
2. SEE ADDITIONAL GENERAL NOTES ON SHEET M000.
3. DRAWINGS ARE BASED UPON GOVERNMENT'S RECORD DRAWINGS AND FIELD
VERIFICATION. NOTIFY GOVERNMENT OF DISCREPANCIES OR CONDITIONS REQUIRING
SUPPLEMENTAL INSTRUCTIONS PRIOR TO CONTINUATION OF WORK.
4. VERIFY ALL DIMENSIONS, CONDITIONS AND LOCATION OF EXISTING EQUIPMENT,
CONTROLS, PUMPS, PIPING, DUCTWORK, DIFFUSERS, ETC. IN FIELD, AND NOTIFY THE
RESPECTIVE DISCIPLINE OF ANY DISCREPANCIES BEFORE COMMENCEMENT OF WORK.
5. REFER TO ELEC. DRAWINGS FOR ADDITIONAL INFORMATION OF ELECTRICAL
REQUIREMENTS.
6. ALL WORK SHALL COMPLY WITH LOCAL AND NATIONAL CODES, UFC STANDARDS,
MANUFACTURERS RECOMMENDATIONS, SANG AND ANG DESIGN POLICIES,
ANGTEL-15-01, ANGTEL-15-01-04, ANGTEL-15-01-05, ETC.
7. INSTALL NEW HVAC EQUIPMENT AND COMPONENTS WITH ADEQUATE CLEARANCE SPACE,
FOR ACCESS AND MAINTENANCE, AS REQUIRED PER LOCAL CODE, ANG-ETL POLICIES,
UFC STANDARDS AND MANUFACTURERS REQUIREMENTS.
8. THE CONTRACTOR SHALL REPLACE/RESTORE ANY ITEM OR EQUIPMENT REQUIRED TO
REMAIN OPERATIONAL OR TEMPORARILY BEING RELOCATED/OFFSETED, OR THAT IS
DAMAGED DURING CONSTRUCTION. EXISTING PIPING, CONDUIT, WIRES, SUPPORT, ETC.
THAT IS REQUIRED TO BE OFFSET TO FACILITATE THE INSTALLATION OF NEW WORK
SHALL BE REINSTALLED AND RESTORED TO ITS ORIGINAL CONDITION. CONTRACTOR IS
REQUIRED TO FIELD VERIFY AREA OF WORK WHERE NEW EQUIPMENT ARE INSTALLED
BEFORE START OF WORK. THIS WORK IS PART OF THE CONTRACTOR'S CONTRACT
RESPONSIBILITIES.
9. PAINT ALL NEW GAS PIPING ON ROOF PER SANGB STANDARDS AND REQUIREMENT.
10. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING MECHANICAL SERVICES AND
UTILITIES BEING REUSED.
11. PATCH ALL OPENINGS IN ROOF, FLOOR, CEILINGS AND WALLS CREATED BY DEMOLITION
OR NEW WORK AS REQUIRED TO MATCH EXISTING CONSTRUCTION.
12. ALL EQUIPMENT BEING REUSED AND/OR RELOCATED SHALL BE THOROUGHLY CLEANED
AND RECONDITIONED PRIOR TO START-UP.
13. CAP ALL BRANCH DUCTS FROM GRILLES, REGISTERS, DIFFUSERS, AND PIPING BEING
REMOVED, WHETHER INDICATED ON PLAN OR NOT.
14. PROVIDE TEMPORARY CAP ON ALL OPEN ENDED ACTIVE SUPPLY, RETURN AIR, EXHAUST
AIR DUCTWORK, REGISTERS AND GRILLES TO BE REUSED.
15. TEST AND BALANCE AIR & WATER VOLUMES TO FINAL DESIGN VALUES.
EX.RHB-1
EX.UH-1
EX.DWHEX. AHU
(ABANDON IN PLACE)
EX. ABANDONED HW SUPPLY
& RETURN PIPING LOOP
(OUT OF PROJECT AREA)
EX. ABANDONED HW SUPPLY
& RETURN PIPING LOOP
(OUT OF PROJECT AREA)
(OUT OF PROJECT AREA)
EX. 2" HW REHEAT
RETURN PIPING LOOP
EX. 2" HW REHEAT
SUPPLY PIPING LOOP
EX. HW SUPPLY & RETURN
REHEAT PIPING TO EX. VAV BOXES
(OUT OF PROJECT AREA)
EX. HWS&R REHEAT
PIPING LOOP
(OUT OF PROJECT AREA)
EX.
CHEMICAL
FEEDER
EX. HOUSEKEEPING
PAD TO REMAIN
EX. CW
MAKEUP LINE
EX. ABANDONED HW SUPPLY
& RETURN PIPING LOOP
(OUT OF PROJECT AREA)
EX.HWS
EX
.H
W S
EX
.H
W R
EX.HWR
EX.HWS
EX.HWR
EX
.H
W S
EX
.H
W R
EX.HWR
EX. ABANDONED HW SUPPLY
& RETURN PIPING LOOP
(OUT OF PROJECT AREA)
2"
EX. HWS&R REHEAT
PIPING TO EX.VAV BOXES
(OUT OF PROJECT AREA)
EX. 2" HWR
EX. HWS&R REHEAT
PIPING TO EX.VAV BOXES
(OUT OF PROJECT AREA)
4" HWS&R
4" HWS&R
1-14" HWS&R
1-12" HWS&R
1-12" HWS&R
1-14" HWS&R
2" HWS&R
EX.1" HWS&R
1-12" HWS&R
RHB-2
CP-1
CP-2
S
S
S
S
S
S
S
VAV-26
VAV-25
VAV-28VAV-27
VAV-29
VAV-30
VAV-31
VAV-32
VAV-33
1" HWS&R
S
S
ET-1
1"HWS
1"HWR
HW
S
HW
R
S
2a33a44a55a66a7
G
F1
F
E1
E
D1
C1
C
D
11a2
C2
C3
3a1
MATCHLINE - SEE SHEET M105
FIRST FLOOR
PLAN - WEST
M104
HVAC PIPING
NEW WORK
127th WING
BUILDING 1414
RENOVATION
http://www.AECOM.com
27777 Franklin Road, Suite 2000 Southfield, MI 48034 United States P: 248 204 5900 F: 248 204 5901
SCALE: 3 32" = 1'-0"
2a33a44a55a66a7
G F1
F E1
E D
C
C B1
B A1
A
Aa Ab
Ac Ad
D
11a2
NEW WORK KEYED NOTES:
PROVIDE A NEW CONDENSING TYPE BOILER (RHB-2) AND INSTALL ON EXISTING
HOUSEKEEPING PAD. CONNECT NEW BOILER TO EXISTING HOT WATER REHEAT
PIPING LOOP. MODIFY EXISTING PIPING LOOP AS REQUIRED TO INSTALL NEW BOILER
(SEE DRAWING M502). PROVIDE MAKE UP WATER, GAS AND VENTING CONNECTIONS
PER MANUFACTURER'S RECOMMENDATIONS. PROVIDE ALC COMPATIBLE DDC
CONTROLS AND REPROGRAM BOILER SEQUENCE FOR LEAD-LAG TYPE OPERATION.
PROVIDE TWO HOT WATER RE-CIRCULATION PUMPS (CP-1 & CP-2), AND CONNECT TO
EXISTING HOT WATER REHEAT PIPING LOOP. MODIFY EXISTING PIPING AS REQUIRED
TO INSTALL NEW PUMPS IN A PARALLEL CONFIGURATION. PROVIDE VARIABLE
FREQUENCY DRIVE FOR EACH PUMP WITH COMPATIBLE ALC DDC CONTROLS.
REPROGRAM NEW PUMPS CONTROL SEQUENCE TO OPERATE WITH MODIFIED BOILER
SYSTEM IN LEAD-LAG TYPE OPERATION.
PROVIDE A NEW EXPANSION TANK ET-1 AND RECONNECT TO EXISTING HOT WATER
REHEAT PIPING LOOP.
RECONNECT EXISTING UNIT HEATER (1414 UH-1) TO EXISTING HOT WATER REHEAT
PIPING LOOP AS SHOWN.
REUSE EXISTING 1-1/2" HWS & R REHEAT PIPING LOOP TO SUPPLY NEW VAV HOT
WATER REHEAT COILS.
CONNECT NEW VAV BOX HOT WATER REHEAT COIL TO NEW HOT WATER REHEAT
PIPING LOOP.
PROVIDE NEW SPACE TEMPERATURE SENSOR AND CONNECT TO ASSOCIATED VAV
BOX AS SHOWN.
REFER TO ASBESTOS ABATEMENT NOTES ON THIS DRAWING.
GENERAL ARCHITECTURAL NOTES:
1. SAWCUT AND REMOVE PORTION OF WALL AS REQUIRED FOR NEW WORK. TEMPORARILY SHORE OPENING AS
REQUIRED FOR INSTALLATION OF NEW WORK. PATCH EXISTING WALL IF DAMAGED BY NEW WORK, FIRE STOP AND SEAL TO MAINTAIN EXISTING FIRE RATING. PROVIDE LINTELS AT NEW WALL OPENINGS AS REQUIRED.
2. PATCH AND FILL IN WALL PENETRATIONS IN KIND AS A RESULT OF DEMOLITION AND NEW WORK SCOPE.
MAINTAIN EXISTING FIRE RATING.
3. REMOVE, SALVAGE AND RE-INSTALL ALL CEILING TILES AS REQUIRED FOR DEMOLITION AND NEW WORK
SCOPE. REPLACE ANY DAMAGED AND/OR MISSING TILES IN KIND.
4. REMOVE PORTION OF ROOF AS REQUIRED FOR NEW WORK. COORDINATE LOCATION OF OPENINGS AND CURB SUPPORTS WITH STRUCTURE BELOW. PATCH EXISTING ROOFING IF DAMAGED BY NEW WORK IN KIND.
OVERLAP NEW AND EXISTING ROOFING MINIMUM 6" ON ALL SIDES.
5. ALL ROOFING WORK, INCLUDING EQUIPMENT CURBS, FLASHING, PATCHING, PENETRATIONS, REPAIRS, ETC.
SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST NRCA, NATIONAL ROOFING CONTRACTORS ASSOCIATION, ROOFING MANUALS AND DETAILS FOR LOW OR STEEP SLOPE SYSTEMS AND PER ROOFING
MANUFACTURER TO MAINTAIN EXISTING WARRANTIES.
1. CONTRACTOR SHALL INCLUDE THE ABATEMENT OF ALL ASBESTOS CONTAINING BUILDING
MATERIALS (ACBM) IN THEIR BID, THAT IS REQUIRED TO COMPLETE THE SCOPE OF WORK
INDICATED ON CONTRACT DOCUMENTS.
2. ASBESTOS ABATED IN THE COURSE OF THIS PROJECT MUST BE PROPERLY COLLECTED,
CONTAINERIZED AND DISPOSED OF IN A LANDFILL LICENSED TO ACCEPT ASBESTOS WASTE.
ALL ASBESTOS DISPOSAL MANIFESTS MUST BE COORDINATED WITH, AND SIGNED BY, 127TH
WING ENVIRONMENTAL MANAGEMENT OFFICE PERSONNEL.
3. CONTRACTOR SHALL UTILIZE SELFRIDGE ANG BASE (SANGB) FORM 23 FOR TRACKING
HAZARDOUS MATERIALS AND SANGB FORM 72 FOR SOLID WASTE TRACKING AND
DIVERSION.
4. CONTRACTOR SHALL ASSUME THE PRESENCE OF ASBESTOS CONTAINING DRY WALL JOINT
COMPOUND IN EXISTING WALLS ABOVE CEILING NOTED FOR PENETRATION BY NEW SUPPLY
AIR DUCTS.
1. IF SUSPECTED ASBESTOS CONTAINING BUILDING MATERIAL (ACBM) IS ENCOUNTERED, WORK IN
THE IMMEDIATE VICINITY MUST STOP AND THE OWNERS CONTRACTING OFFICER SHALL BE
NOTIFIED. AFTER CONSULTATION WITH BASE PERSONNEL, THE OWNERS CONTRACTING OFFICER
WILL DIRECT FURTHER ACTION TO BE TAKEN. WORK SHOULD PROCEED UNINTERRUPTED IN
UNAFFECTED AREAS OF THE PROJECT.
2. BASED ON THE AGE OF THE BUILDINGS AT SELFRIDGE ANG BASE, THERE IS THE POTENTIAL FOR
THE PRESENCE OF LEAD ON PAINTED SURFACES. BEST MANAGEMENT PRACTICES MUST BE
EMPLOYED TO MINIMIZE DUST AND ADEQUATELY PROTECT WORKERS FROM LEAD BASED PAINT
(LBP) EXPOSURE IN ACCORDANCE WITH OSHA AND MIOSHA STANDARDS.
3. IF ASBESTOS AND/OR LEAD IS SUSPECTED IT SHOULD BE TESTED FOR. IF EITHER ASBESTOS
AND/OR LEAD IS FOUND, FOLLOW APPLICABLE OSHA GUIDELINES FOR REMEDIATION.
4. FOR ADDITIONAL INFORMATION, CONTRACTOR TO REQUEST ASBESTOS INSPECTION REPORT
FROM SELFRIDGE AIR NATIONAL GUARD BASE.
GENERAL NOTES:
1. DO NOT SCALE DRAWINGS.
ALL DIMENSIONS ARE IN NOMINAL BRITISH IMPERIAL UNITS.
2. SEE ADDITIONAL GENERAL NOTES ON SHEET M000.
3. DRAWINGS ARE BASED UPON GOVERNMENT'S RECORD DRAWINGS AND FIELD
VERIFICATION. NOTIFY GOVERNMENT OF DISCREPANCIES OR CONDITIONS REQUIRING
SUPPLEMENTAL INSTRUCTIONS PRIOR TO CONTINUATION OF WORK.
4. VERIFY ALL DIMENSIONS, CONDITIONS AND LOCATION OF EXISTING EQUIPMENT,
CONTROLS, PUMPS, PIPING, DUCTWORK, DIFFUSERS, ETC. IN FIELD, AND NOTIFY THE
RESPECTIVE DISCIPLINE OF ANY DISCREPANCIES BEFORE COMMENCEMENT OF WORK.
5. REFER TO ELEC. DRAWINGS FOR ADDITIONAL INFORMATION OF ELECTRICAL
REQUIREMENTS.
6. ALL WORK SHALL COMPLY WITH LOCAL AND NATIONAL CODES, UFC STANDARDS,
MANUFACTURERS RECOMMENDATIONS, SANG AND ANG DESIGN POLICIES,
ANGTEL-15-01, ANGTEL-15-01-04, ANGTEL-15-01-05, ETC.
7. INSTALL NEW HVAC EQUIPMENT AND COMPONENTS WITH ADEQUATE CLEARANCE SPACE,
FOR ACCESS AND MAINTENANCE, AS REQUIRED PER LOCAL CODE, ANG-ETL POLICIES,
UFC STANDARDS AND MANUFACTURERS REQUIREMENTS.
8. THE CONTRACTOR SHALL REPLACE/RESTORE ANY ITEM OR EQUIPMENT REQUIRED TO
REMAIN OPERATIONAL OR TEMPORARILY BEING RELOCATED/OFFSETED, OR THAT IS
DAMAGED DURING CONSTRUCTION. EXISTING PIPING, CONDUIT, WIRES, SUPPORT, ETC.
THAT IS REQUIRED TO BE OFFSET TO FACILITATE THE INSTALLATION OF NEW WORK
SHALL BE REINSTALLED AND RESTORED TO ITS ORIGINAL CONDITION. CONTRACTOR IS
REQUIRED TO FIELD VERIFY AREA OF WORK WHERE NEW EQUIPMENT ARE INSTALLED
BEFORE START OF WORK. THIS WORK IS PART OF THE CONTRACTOR'S CONTRACT
RESPONSIBILITIES.
9. MECHANICAL DEMOLITION WORK SHALL INCLUDE, BUT NOT BE LIMITED TO, THE REMOVAL
OF EXISTING AIR CONDITIONING EQUIPMENT, BOILERS, PUMPS, PIPING, SHEET METAL
DUCTWORK, HEATING COILS, AIR-COOLED CHILLER, ETC. AS INDICATED AND/OR
DESCRIBED ON DEMOLITION DRAWINGS. COMPLETELY REMOVE ALONG WITH CONTROLS,
PNEUMATIC TUBING, HANGERS, SUPPORTS AND ALL RELATED ACCESSORIES.
10. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING MECHANICAL SERVICES AND
UTILITIES BEING REUSED.
11. PATCH ALL OPENINGS IN FLOOR, CEILINGS AND WALLS CREATED BY DEMOLITION OR
NEW WORK AS REQUIRED TO MATCH EXISTING CONSTRUCTION.
12. ALL EQUIPMENT BEING REUSED AND/OR RELOCATED SHALL BE THOROUGHLY CLEANED
AND RECONDITIONED PRIOR TO START-UP.
13. CAP AND TERMINATE ALL EXISTING PIPING NOT IN USE AND EXTEND OUT OF PROJECT
AREA. DRAIN ALL EXISTING PIPING, CAP AND SEAL.
14. PROVIDE TEMPORARY CAP ON ALL OPEN ENDED ACTIVE SUPPLY AND RETURN HOT
WATER PIPING TO BE REUSED.
15. TEST AND BALANCE AIR & WATER VOLUMES TO FINAL DESIGN VALUES.
EX. ABANDONED HW SUPPLY
& RETURN PIPING LOOP
(OUT OF PROJECT AREA)
EX.CUH TO
REMAIN
1-14" HWS&R
1-14" HWS&R
3/4" HWS&R
1" HWS&R
1" HWS&R
1-14" HWS&R
VAV-33
VAV-34
VAV-35
VAV-36
VAV-37
VAV-38VAV-39
VAV-41
VAV-40
VAV-42
VAV-43
VAV-44
HV-2
(ON ROOF)
HV-1
(ON ROOF)
ACU-3
ACU-4
HP-3
HP-4
S S
S
S
S
S
S
S
SS
S
S
HW
S
HW
R
SC
B1
B
A1
A
Aa
Ab
Ac
Ad
B2
2a33a44a55a66a7 3a1
11a2
MATCHLINE - SEE SHEET M104
FIRST FLOOR
PLAN - EAST
M105
HVAC PIPING
NEW WORK
127th WING
BUILDING 1414
RENOVATION
http://www.AECOM.com
27777 Franklin Road, Suite 2000 Southfield, MI 48034 United States P: 248 204 5900 F: 248 204 5901
SCALE: 3 32" = 1'-0"
2a33a44a55a66a7
G F1
F E1
E D
C
C B1
B A1
A
Aa Ab
Ac Ad
D
11a2
NEW WORK KEYED NOTES:
CONNECT NEW VAV BOX HOT WATER REHEAT COIL TO NEW HOT WATER REHEAT
PIPING LOOP.
PROVIDE NEW SPACE TEMPERATURE SENSOR AND CONNECT TO ASSOCIATED VAV
BOX AS SHOWN.
PROVIDE NEW SPACE TEMPERATURE SENSOR AND CONNECT TO ASSOCIATED HV
UNIT ON ROOF AS SHOWN.
ROUTE NEW LIQUID AND GAS REFRIGERANT LINES TO NEW SPLIT TYPE HEAT PUMP
UNIT. INSTALL PIPING CONCEALED IN CEILING SPACE OR WALL-MOUNTED AS
POSSIBLE. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. SEE DETAIL ON M501.
RECONNECT EXISTING HOT WATER PIPING TO NEW HOT WATER REHEAT PIPING LOOP.
FIELD VERIFY EXISTING PIPING ABOVE CEILING.
GENERAL ARCHITECTURAL NOTES:
1. SAWCUT AND REMOVE PORTION OF WALL AS REQUIRED FOR NEW WORK. TEMPORARILY SHORE OPENING AS
REQUIRED FOR INSTALLATION OF NEW WORK. PATCH EXISTING WALL IF DAMAGED BY NEW WORK, FIRE STOP AND SEAL TO MAINTAIN EXISTING FIRE RATING. PROVIDE LINTELS AT NEW WALL OPENINGS AS REQUIRED.
2. PATCH AND FILL IN WALL PENETRATIONS IN KIND AS A RESULT OF DEMOLITION AND NEW WORK SCOPE.
MAINTAIN EXISTING FIRE RATING.
3. REMOVE, SALVAGE AND RE-INSTALL ALL CEILING TILES AS REQUIRED FOR DEMOLITION AND NEW WORK
SCOPE. REPLACE ANY DAMAGED AND/OR MISSING TILES IN KIND.
4. REMOVE PORTION OF ROOF AS REQUIRED FOR NEW WORK. COORDINATE LOCATION OF OPENINGS AND CURB SUPPORTS WITH STRUCTURE BELOW. PATCH EXISTING ROOFING IF DAMAGED BY NEW WORK IN KIND.
OVERLAP NEW AND EXISTING ROOFING MINIMUM 6" ON ALL SIDES.
5. ALL ROOFING WORK, INCLUDING EQUIPMENT CURBS, FLASHING, PATCHING, PENETRATIONS, REPAIRS, ETC.
SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST NRCA, NATIONAL ROOFING CONTRACTORS ASSOCIATION, ROOFING MANUALS AND DETAILS FOR LOW OR STEEP SLOPE SYSTEMS AND PER ROOFING
MANUFACTURER TO MAINTAIN EXISTING WARRANTIES.
1. CONTRACTOR SHALL INCLUDE THE ABATEMENT OF ALL ASBESTOS CONTAINING BUILDING
MATERIALS (ACBM) IN THEIR BID, THAT IS REQUIRED TO COMPLETE THE SCOPE OF WORK
INDICATED ON CONTRACT DOCUMENTS.
2. ASBESTOS ABATED IN THE COURSE OF THIS PROJECT MUST BE PROPERLY COLLECTED,
CONTAINERIZED AND DISPOSED OF IN A LANDFILL LICENSED TO ACCEPT ASBESTOS WASTE.
ALL ASBESTOS DISPOSAL MANIFESTS MUST BE COORDINATED WITH, AND SIGNED BY, 127TH
WING ENVIRONMENTAL MANAGEMENT OFFICE PERSONNEL.
3. CONTRACTOR SHALL UTILIZE SELFRIDGE ANG BASE (SANGB) FORM 23 FOR TRACKING
HAZARDOUS MATERIALS AND SANGB FORM 72 FOR SOLID WASTE TRACKING AND
DIVERSION.
4. CONTRACTOR SHALL ASSUME THE PRESENCE OF ASBESTOS CONTAINING DRY WALL JOINT
COMPOUND IN EXISTING WALLS ABOVE CEILING NOTED FOR PENETRATION BY NEW SUPPLY
AIR DUCTS.
1. IF SUSPECTED ASBESTOS CONTAINING BUILDING MATERIAL (ACBM) IS ENCOUNTERED, WORK IN
THE IMMEDIATE VICINITY MUST STOP AND THE OWNERS CONTRACTING OFFICER SHALL BE
NOTIFIED. AFTER CONSULTATION WITH BASE PERSONNEL, THE OWNERS CONTRACTING OFFICER
WILL DIRECT FURTHER ACTION TO BE TAKEN. WORK SHOULD PROCEED UNINTERRUPTED IN
UNAFFECTED AREAS OF THE PROJECT.
2. BASED ON THE AGE OF THE BUILDINGS AT SELFRIDGE ANG BASE, THERE IS THE POTENTIAL FOR
THE PRESENCE OF LEAD ON PAINTED SURFACES. BEST MANAGEMENT PRACTICES MUST BE
EMPLOYED TO MINIMIZE DUST AND ADEQUATELY PROTECT WORKERS FROM LEAD BASED PAINT
(LBP) EXPOSURE IN ACCORDANCE WITH OSHA AND MIOSHA STANDARDS.
3. IF ASBESTOS AND/OR LEAD IS SUSPECTED IT SHOULD BE TESTED FOR. IF EITHER ASBESTOS
AND/OR LEAD IS FOUND, FOLLOW APPLICABLE OSHA GUIDELINES FOR REMEDIATION.
4. FOR ADDITIONAL INFORMATION, CONTRACTOR TO REQUEST ASBESTOS INSPECTION REPORT
FROM SELFRIDGE AIR NATIONAL GUARD BASE.
GENERAL NOTES:
1. DO NOT SCALE DRAWINGS.
ALL DIMENSIONS ARE IN NOMINAL BRITISH IMPERIAL UNITS.
2. SEE ADDITIONAL GENERAL NOTES ON SHEET M000.
3. DRAWINGS ARE BASED UPON GOVERNMENT'S RECORD DRAWINGS AND FIELD
VERIFICATION. NOTIFY GOVERNMENT OF DISCREPANCIES OR CONDITIONS REQUIRING
SUPPLEMENTAL INSTRUCTIONS PRIOR TO CONTINUATION OF WORK.
4. VERIFY ALL DIMENSIONS, CONDITIONS AND LOCATION OF EXISTING EQUIPMENT,
CONTROLS, PUMPS, PIPING, DUCTWORK, DIFFUSERS, ETC. IN FIELD, AND NOTIFY THE
RESPECTIVE DISCIPLINE OF ANY DISCREPANCIES BEFORE COMMENCEMENT OF WORK.
5. REFER TO ELEC. DRAWINGS FOR ADDITIONAL INFORMATION OF ELECTRICAL
REQUIREMENTS.
6. ALL WORK SHALL COMPLY WITH LOCAL AND NATIONAL CODES, UFC STANDARDS,
MANUFACTURERS RECOMMENDATIONS, SANG AND ANG DESIGN POLICIES,
ANGTEL-15-01, ANGTEL-15-01-04, ANGTEL-15-01-05, ETC.
7. INSTALL NEW HVAC EQUIPMENT AND COMPONENTS WITH ADEQUATE CLEARANCE SPACE,
FOR ACCESS AND MAINTENANCE, AS REQUIRED PER LOCAL CODE, ANG-ETL POLICIES,
UFC STANDARDS AND MANUFACTURERS REQUIREMENTS.
8. THE CONTRACTOR SHALL REPLACE/RESTORE ANY ITEM OR EQUIPMENT REQUIRED TO
REMAIN OPERATIONAL OR TEMPORARILY BEING RELOCATED/OFFSETED, OR THAT IS
DAMAGED DURING CONSTRUCTION. EXISTING PIPING, CONDUIT, WIRES, SUPPORT, ETC.
THAT IS REQUIRED TO BE OFFSET TO FACILITATE THE INSTALLATION OF NEW WORK
SHALL BE REINSTALLED AND RESTORED TO ITS ORIGINAL CONDITION. CONTRACTOR IS
REQUIRED TO FIELD VERIFY AREA OF WORK WHERE NEW EQUIPMENT ARE INSTALLED
BEFORE START OF WORK. THIS WORK IS PART OF THE CONTRACTOR'S CONTRACT
RESPONSIBILITIES.
9. MECHANICAL DEMOLITION WORK SHALL INCLUDE, BUT NOT BE LIMITED TO, THE REMOVAL
OF EXISTING AIR CONDITIONING EQUIPMENT, BOILERS, PUMPS, PIPING, SHEET METAL
DUCTWORK, HEATING COILS, AIR-COOLED CHILLER, ETC. AS INDICATED AND/OR
DESCRIBED ON DEMOLITION DRAWINGS. COMPLETELY REMOVE ALONG WITH CONTROLS,
PNEUMATIC TUBING, HANGERS, SUPPORTS AND ALL RELATED ACCESSORIES.
10. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING MECHANICAL SERVICES AND
UTILITIES BEING REUSED.
11. PATCH ALL OPENINGS IN FLOOR, CEILINGS AND WALLS CREATED BY DEMOLITION OR
NEW WORK AS REQUIRED TO MATCH EXISTING CONSTRUCTION.
12. ALL EQUIPMENT BEING REUSED AND/OR RELOCATED SHALL BE THOROUGHLY CLEANED
AND RECONDITIONED PRIOR TO START-UP.
13. CAP AND TERMINATE ALL EXISTING PIPING NOT IN USE AND EXTEND OUT OF PROJECT
AREA. DRAIN ALL EXISTING PIPING, CAP AND SEAL.
14. PROVIDE TEMPORARY CAP ON ALL OPEN ENDED ACTIVE SUPPLY AND RETURN HOT
WATER PIPING TO BE REUSED.
15. TEST AND BALANCE AIR & WATER VOLUMES TO FINAL DESIGN VALUES.
NOTES:
1. INSULATE ALL NEW SUPPLY AND FRESH AIR DUCTWORK PER DUCTWORK.
2. ALL FLEXIBLE LOW-PRESSURE DUCTWORK SHALL BE INSULATED AND NOT EXCEED 5'-0" IN LENGTH.
MAIN SUPPLY DUCT
VOLUME DAMPER
ROUND BRANCH
DUCT
DIFFUSER
RIGID DUCT (MIN 12")
LAY-IN CEILING
MAIN SUPPLY DUCT
VOLUME DAMPER
DUCT
45° SMACNA
TAKE-OFF FITTING
(TYP)
5'-0" (MAX) FLEXIBLE
DUCT
DIFFUSER
CEILING
TYPICAL BRANCH DUCTWORK DETAIL
N.T.S.
45° SMACNA TAKE-OFF
FITTING TO AIR TERMINAL
UNIT
MAIN
SUPPLY
PLAN VIEW
FLOW
FL
OW
TYPICAL SUPPLY DUCT TAKEOFF DETAIL
N.T.S.PROVIDE MAX 5'-0"
FLEXIBLE DUCT
DUCT COLLAR
(TYP)
RIGID DUCT
(MIN 12")
DUCT COLLAR
(TYP)
VOLUME DAMPER
(TYP AT EACH
BRANCH DUCT)
VD
FLEX DUCT SUPPORTED
WITHOUT SAGS OR KINKS SAME
SIZE AS DIFFUSER THROAT
SEE DUCT
TAKEOFF DETAIL
45° SMACNA
TAKE-OFF FITTING
(TYP)
RECTANGULAR MED.
VELOCITY SUPPLY DUCT
CONICAL SPIN-IN FITTINGS WITH
DAMPERS. LOW VELOCITY FLEX DUCT
FLEX DUCT SIZE EQUAL TO THE DUCT
DIMENSIONS SHOWN ON THE DRAWING
LOW VELOCITY FLEX. DUCT MAX.
5'- 0" LENGTH
FLEXIBLE DUCT CONNECTION
TO AIR DISTRIBUTION DEVICE
SEE SCHEDULE FOR SIZE
SQUARE TO
ROUND
TRANSITION
VOLUME
DAMPER
LOW VELOCITY
DUCT
REHEAT COIL
TERMINAL BOX
MED. VELOCITY
FLEX. DUCT. 1'- 0"
MAX. LENGTH
TYPICAL VAV TERMINAL BOX DETAIL WITH REHEAT COIL
N.T.S.
ROOF EXHAUST FAN DETAIL
N.T.S.
W/ROD TO STRUCTURE
PIPE HANGER
ENDS
LONG) W/FLARED
SHIELD (MIN 12"
18 GAUGE PIPE
PIPE
1"
PITCH DOWN
OPEN DRAIN
DRAIN PAN
WHERE X = CASING STATIC PRESSURE IN INCHES WC.
B (1" + X)/2
AHU TYPE
DRAW THRU 1" + X
A
B
A
SIZE AS THE NIPPLE ON THE DRAIN PAN
DRAIN LINE SHALL BE AT LEAST THE SAME
TOWARD DRAIN
OR ROOF
BLOW THRU 1" 1" + X
CLEAN OUT
6" MIN.
EXISTING ROOF
BACKDRAFT
DRIP PAN - ALL JOINTS
SOLDERED WATERTIGHT
PAN MINIMUM DEPTH OF 2"
MINIMUM 1/4 THROAT
ROOF MOUNTED HOOD
ACOUSTICALLY LINED WITH 1"
LINING IN HOOD AND THROAT
ALL SIDES
WASHERS, MAX. 12"O.C.
BRASS SCREWS WITH 3/4"DIA.
MUST BE LEVEL
TOP OF CURB
" M
IN
MAXIMUM DIMENSION
CONSTRUCTION
DAMPER
TYPICAL PIPE HANGER DETAIL
N.T.S.
NOTE:
USE FOR COLD PIPING ONLY. FOR HOT PIPING AND STEAM
PIPING OMIT SHIELD AND USE CLEVIS SIZE SAME AS PIPE SIZE.
AIR HANDLING UNIT CONDENSATE DRAIN TRAP DETAIL
N.T.S.
NOTE:
VERIFY TRAP DEPTH & THE DISTANCE BETWEEN THE TRAP OUTLET & DRAIN PAN
OUTLET WITH AHU MANUFACTURER'S INSTALLATION INSTRUCTIONS.
PIPE TO DRAIN
WHEN SHOWN ON
FLOOR PLANS.
TYPICAL ROOF RELIEF HOOD DETAIL
N.T.S.
TYPICAL ROOFTOP UNIT DETAIL
N.T.S.
SPUN ALUMINUM OR
FIBERGLASS HOUSING
ROOF OPENING PER
SELECTED FAN
MANUFACTURER'S
INSULATED
PRE-FABROOF
SOUND CURB
TYPICAL GAS PIPING CONNECTION
GAS-FIRED
EQUIPMENT
UNION (SHOWN)
OR FLANGED
CONNECTION
6'-0" MAXIMUM
PLUG
COCKS
N.T.S
ROOFTOP UNIT
SUPPLY
AIR
RETURN
AIR
VARIES - FIELD VERIFY
NOTE:
EXISTING ROOF CURB CONDITIONS TO BE
VERIFIED IN FIELD PRIOR TO CONSTRUCTION
4-1 4"
8" MIN.
NOTE: SWEEP BACK EXISTING GRAVEL.
CLEAN AND PREPARE ROOF FOR NEW WORK.
TYPICAL ROOF CURB CAP DETAIL
N.T.S
FAN MOTOR DRIVE AND
BEARING OUT OF AIR STREAM
GRAVITY
DAMPER
PROVIDE COUNTER
FLASHING
PREFABRICATED
SOUND CURB
ALUMINUM MESH
BIRD SCREEN
DISCONNECT SWITCH
FACTORY WIRED TO MOTOR
PIPE
INSULATION
12" SECTION
OF HEAVY
DENSITY
COVERING
EXISTING ROOF
CONSTRUCTION
EXISTING ROOF
STRUCTURE
CLEAN
OUT
INSULATED PRE-FAB
ROOF CURB WITH
WOOD NAILER
EXISTING ROOF
STRUCTURE
VENT
ROOF
BOOT/FLASHING
(FIELD SUPPLIED)
12" MINIMUM
CLEARANCE ABOVE
HEIGHT ANTICIPATED
SNOW LEVEL. MAXIMUM
OF 24" ABOVE ROOF.
ROOF
COMBUSTION
AIR
VENT
CAP
STRAP SUPPORT
(FIELD SUPPLIED)
EXHAUST
VENT
COMBUSTION
AIR
TYPICAL VENT TERMINATION DETAIL
N.T.S.
NOTE:
1. REFER TO MANUFACTURER'S MANUAL FOR
INSTALLATION INSTRUCTIONS.
MECHANICAL
DETAILS
M501
127th WING
BUILDING 1414
RENOVATION
http://www.AECOM.com
27777 Franklin Road, Suite 2000 Southfield, MI 48034 United States P: 248 204 5900 F: 248 204 5901
SPLIT HEAT PUMP - SCHEMATIC DETAIL
FINISHED FLOOR
NEW 6" CONCRETE
HOUSEKEEPING PAD
OUTDOOR UNIT
ACU-3,4
ROOF
CEILING
INTEGRATED SUPPLY
AND RETURN CEILING
GRILLES
NOTE:
1. PROVIDE AND INSTALL REFRIGERANT
PIPING AND ACCESSORIES PER THE
MANUFACTURER'S RECOMMENDATIONS.
FLEXIBLE
CONNECTION (TYP)
GRADE
INSTALL AS REQUIRED
PER MANUFACTURER'S
REQUIREMENTS
INDOOR UNIT
HP-3,4
ROUTE REFRIGERANT PIPING
INSIDE ROOM CONCEALED AS
POSSIBLE. FIELD VERIFY
STRUCTURAL STEEL
SEAL ALL PIPING
PENETRATIONS
RUN CONDENSATE LINE INSIDE ROOM
AND DRAIN OUTDOOR ON GRADE
HWHR
HOSE END DRAIN CONNECTION
AIRFLOW
HOT WATER
TEMPERING COIL
AUTOMATIC BALANCING
VALVE
HWHS
BALL VALVE
P/T
P/T NO
CNC
HOT WATER REHEAT COIL WITH THREE WAY CONTROL VALVE PIPING DETAIL
N.T.S.
MV
DRAIN
MAX. SPACING 4
PIPE DIA.
EX. AIR
SEPARATOR
EX.CHEMICAL
FEEDER
EX.3 4" BYPASS
3/4 " B
YP
AS
S
EX
.3 4"
BY
PA
SS
HIGH CAPACITY
AIR VENT
HIGH CAPACITY
AIR VENT
EX.3/4" CW
MAKEUP
EXPANSION
TANK
DRAIN
VALVE
NEW
ET-1
CP
EX.VAV
VAV
BP
1/2"
HWS
1/2"
HWR
2"
HWS
2"
HWR
EX.2" HWREX.2" HWS
EX.2" HWS
EX.2" HWS
2" HWS
EX. 2" HWS
FS
EX.1" HWREX.1" HWREX.3 4" HWR EX.3 4" HWR
EX. 1" HWS EX. 1" HWS EX.3 4" HWS EX.3 4" HWS
RHB
HEATING HOT WATER VAV REHEAT BOILER - PIPING SCHEMATIC
N.T.S.
EX. 2" HWS
EX.2" HWR
BACKFLOW
PREVENTER
S
BOILER SENSOR
PARALLEL HW INLINE CIRCULATING PUMPS DETAIL
N.T.S.
DRAIN
RHB
EX.
EX.
BP
CP
2" HWS & R
1/2" DRAIN VALVE
UNIONS
CALIBRATED
2-WAY CONTROL VALVE
HEATING RETURN
HEATING SUPPLY
MANUAL
AIR VENT
BALANCING VALVE
PETE'S PLUGS
(TYPICAL)
WITH HOSE CONNECTION
COIL AT VARIABLE
VOLUME BOX
(SEE PLANS)
SHUTOFF VALVE
(LINE SIZE)
NOTES:
1. ALL VALVES AND FITTINGS (EXCEPT CONTROL VALVES) SHALL BE
THE SAME SIZE AS PIPE UNLESS NOTED OTHERWISE.
2. CONTROL VALVE SHALL BE SIZED AND PROVIDED BY TEMPERATURE
CONTROL CONTRACTOR. FOR LINE SIZE, REFERENCE GPM, AS
PROVIDED BY THE SCHEDULE ON M600 DRAWING.
3. SHUTOFF VALVE TYPE PER SPECIFICATION.
4. COORDINATE BOX LOCATION WITH LIGHTING, SPRINKLER SYSTEMS,
DUCTS, PIPING, ETC, SO THAT SYSTEM IS COMPLETELY ACCESSIBLE
FOR SERVICE.
VARIABLE VOLUME BOX W/ HOT WATER REHEAT COIL PIPING DETAIL
N.T.S.
REDUCER (AS
NEEDLE VALVE
P
P
PRESSURE GAUGE
PUMP
SIDE VIEW
PUMP
REDUCER
PLAN VIEW
PUMP
REQ'D)
SUPPLY
RETURN
IF OPENING IN STRUCTURE IS
IRREGULAR AND GREATER THAN
1", WRAP DUCT WITH 1" THICK
FIBROUS MATERIAL AND FILL
REMAINING OPENING WITH GROUT.
IF OPENING LIMITED TO DESIRED
3/4" SPACE, PACK WITH FIBROUS
MATERIAL AND SEAL BOTH SIDES
WITH RESILIENT NON-HARDENING
SEALER.
PIPE SLEEVE OR
SHEET METAL SLEEVE.
3/4" SPACE, PACK WITH
FIBROUS MATERIAL ALL AROUND
BUILDING WALL
NON-HARDENING
RESILIENT SEALANT
BOTH SIDES.
DUCT (OR SILENCER)AS REQUIRED.
DUCT LINING
PIPE
IN ALL FINISHED AREAS.
CHROME PLATED ESCUTCHEON
LET THEM LOAD ONTO
SIDE OF WALL. DO NOT
AND DUCTS ON EITHER
NOTE: SUPPORT PIPES
THE WALL.
NOTE: FOR FIRE RATED WALLS
RATING, PROVIDE APPROVED SEALANT
SYSTEM EQUAL TO 3M OR FLAMESTOP.
REQUIRING ONE HOUR OR GREATER
TYPICAL WALL PENETRATIONS DETAIL (NON-FIRE-RATED WALLS)
N.T.S.
(MIN.) (MIN.)(TYP.)
AS REQUIRED (TYP.)
FIRE-PROOF WALL
"FIRESTOP" MATERIAL
CARRIER PIPE 6"
INSULATION SHALL
BE PROVIDED WITH
THE SAME PERFORMANCE
AS THE FIRESTOPPING
METALLIC PIPE
MATERIAL
6"
PIPE INSULATION
REQUIRED (TYP.)
COUPLING AS
METAL JACKET
TYPICAL FIRE-PROOF FRAMED WALL PENETRATION DETAIL
N.T.S.
FITTING
"S" TYPE SLIP
FIRE DAMPER
WALL SLEEVE
DUCTWORK
ANGLE
SLEEVE RETAINING
FIRE PARTITION
BOTTOM OF DUCT.
ACCESS DOOR IN
DAMPER.
FOR SERVICING
TYPICAL FIRE DAMPER DETAIL
N.T.S.
BUILDING WALL
EX.VAV
TO VAV
TO
MECHANICAL
DETAILS
M502
127th WING
BUILDING 1414
RENOVATION
http://www.AECOM.com
27777 Franklin Road, Suite 2000 Southfield, MI 48034 United States P: 248 204 5900 F: 248 204 5901
MECHANICAL
SCHEDULES
M600
127th WING
BUILDING 1414
RENOVATION
http://www.AECOM.com
27777 Franklin Road, Suite 2000 Southfield, MI 48034 United States P: 248 204 5900 F: 248 204 5901
ROOFTOP UNIT (RTU) SCHEDULE
MARK MODEL FAN & MOTOR COOLING HEATING PHYSICAL DATA ELECTRICAL REMARKS
SUPPLY AIR
(CFM)
OUTSIDE AIR
(CFM)
HEATING AIR
(CFM)
FAN
TYPE
NO.
FANS
ESP
(IN WC)
FAN SPEED
(RPM)
POWER
(BHP)
TYPE STAGES REFRIGERANT CAPACITY
(TOTAL/SENS. MBH)
MAT
(DB/WB °F)
LAT
(DB/WB °F)
EER/IEER TYPE SIZE STAGES EFF
INPUT
(MBH)
OUTPUT
(MBH)
MAT
(DB°F)
LAT
(DB °F)
LENGTH
(IN)
WIDTH
(IN)
HEIGHT
(IN)
WEIGHT
(LBS)
VOLT PHASE MCA MOP FLA
RTU-3
48LCS017B3M6-1E1
C0 4875 1650 3900 CENTR. 1 1.4 947 3.17 DX 3 R-410A 179.73/123.05 79.5/67.2 56.1/55.4 12.5/18.4 N. GAS LOW 2 81 220.0/176.0 178.0/142.0 35.0 68.8 141 86.4 58.5 2,562 460 3 44.9 50 48 1, 2, 3, 4
RTU-4
48LCS017B3M6-1E1
C0 4500 1300 3000 CENTR. 1 1.4 931 2.88 DX 3 R-410A 173.41/118.93 78.8/66.2 54.3/53.5 12.5/18.4 N. GAS LOW 2 81 220.0/176.0 178.0/142.0 34.2 70.8 141 86.4 58.5 2,562 460 3 44.9 50 48 1, 2, 3, 4
RTU-5
48LCS017B3M6-1E1
C0 5200 1300 3000 CENTR. 1 1.4 962 3.45 DX 3 R-410A 175.17/132.39 78.5/65.2 54.9/54.0 12.5/18.4 N. GAS LOW 2 81 220.0/176.0 178.0/142.0 34.2 65.9 141 86.4 58.5 2,562 460 3 44.9 50 48 1, 2, 3, 4
HEATING & VENTILATION UNIT (HV) SCHEDULE
MARK MODEL FAN & MOTOR HEATING PHYSICAL DATA ELECTRICAL REMARKS
SUPPLY AIR
(CFM)
OUTSIDE AIR
(CFM)
FAN
TYPE
NO.
FANS
ESP
(IN WC)
FAN SPEED
(RPM)
POWER
(BHP)
TYPE NO.
BURNERS
STAGES EFF
INPUT
(MBH)
OUTPUT
(MBH)
MAT
(DB°F)
LAT
(DB °F)
LENGTH
(IN)
WIDTH
(IN)
HEIGHT
(IN)
WEIGHT
(LBS)
VOLT PHASE MCA MOP FLA
HV-1 HDG600TMRLN71F3JY2AGA00 10000 1800 CENTR. 2 0.8 1118 12.05 N. GAS 2 2 80 600 480 54 89.8 182 44 43 1,861 460 3 18.9 25 19.1 1, 2, 3
HV-2 HDG300TMRLN71F2HT2AGA00 6000 600 CENTR. 2 0.8 984 4.24 N. GAS 1 2 80 300 240 60.2 90 114 44 43 1,264 460 3 6.8 15 7.1 1, 2, 3
NOTES:
1. MODEL NUMBERS: BASIS OF DESIGN CARRIER, OR APPROVED EQUAL.
2. PROVIDE WITH 16" INSULATED ROOF CURB, SINGLE POINT CONNECTION W/ NON-FUSED DISCONNECT, MERV 8 CARTRIDGE FILTERS, OUTSIDE AIR INTAKE HOOD, SINGLE ENTHALPY ECONOMIZER W/ BAROMETRIC RELIEF, UNPOWERED CONVENIENCE OUTLET, STAINLESS STEEL HEAT EXCHANGER, RETURN AIR SMOKE DETECTOR AND HAIL GUARD.
3. FACTORY PROVIDED CONTROLS SHALL BE DDC READY FOR USE ON EXISTING DISTRICT CONTROLS SYSTEM.X
4. HEATING CAPACITY CALCULATED AT -10°F OUTSIDE AIR TEMPERATURE.
NOTES:
1. MODEL NUMBERS ARE MODINE. ACCEPTABLE ALTERNATE: REZNOR.
2. PROVIDE WITH 16" INSULATED ROOF CURB, SINGLE POINT CONNECTION W/ NON-FUSED DISCONNECT, MERV 8 CARTRIDGE FILTERS, OUTSIDE AIR INTAKE HOOD, UNPOWERED CONVENIENCE OUTLET, STAINLESS STEEL HEAT EXCHANGER AND RETURN AIR SMOKE DETECTOR.
3. FACTORY PROVIDED CONTROLS SHALL BE DDC READY FOR USE ON EXISTING DISTRICT CONTROLS SYSTEM.
4. HEATING CAPACITY CALCULATED AT -10°F OUTSIDE AIR TEMPERATURE.
VARIABLE AIR VOLUME TERMINAL UNIT W/ REHEAT COIL SCHEDULE
MARK INLET SIZE
(IN DIA)
BASIS OF DESIGN COOLING AIRFLOW DATA HEATING DATA REMARKS
MANUFACTURER MODEL MAX AIRFLOW
(CFM)
MAX APD
(IN WC)
AIRFLOW
(CFM)
CAPACITY
(MBH)
FLOW
(GPM)
EWT
(°F)
LWT
(°F)
MAX WPD
(FT HD)
ROWS
VAV-25 12 PRICE SDV 1200 0.5 485 15.8 1.1 160 130 0.09 2 1,2
VAV-26 14 PRICE SDV 1600 0.41 800 26.0 1.7 160 130 0.1 2 1,2
VAV-27 10 PRICE SDV 750 0.58 290 9.4 0.6 160 130 0.06 2 1,2
VAV-28 12 PRICE SDV 1300 0.5 700 22.8 1.5 160 130 0.15 2 1
VAV-29 7 PRICE SDV 400 0.75 400 13.0 0.9 160 130 0.18 2 1
VAV-30 14 PRICE SDV 1600 0.41 800 26.0 1.7 160 130 0.1 2 1
VAV-31 10 PRICE SDV 800 0.58 400 13.0 0.9 160 130 0.1 2 1
VAV-32 14 PRICE SDV 1600 0.41 600 19.5 1.3 160 130 0.07 2 1
VAV-33 10 PRICE SDV 750 0.58 665 21.6 1.4 160 130 0.19 2 1
VAV-34 8 PRICE SDV 600 0.69 190 6.2 0.5 160 135 0.06 2 1,2
VAV-35 7 PRICE SDV 400 0.75 310 10.1 0.7 160 130 0.11 2 1
VAV-36 12 PRICE SDV 1200 0.5 375 12.2 0.8 160 130 0.06 2 1
VAV-37 10 PRICE SDV 750 0.58 400 13.0 0.9 160 130 0.1 2 1
VAV-38 6 PRICE SDV 195 0.32 80 2.6 0.5 160 150 0.04 2 1,2
VAV-39 12 PRICE SDV 950 0.5 285 9.3 0.6 160 130 0.06 2 1,2
VAV-40 12 PRICE SDV 1000 0.5 600 19.5 1.3 160 130 0.12 2 1
VAV-41 10 PRICE SDV 775 0.58 480 15.6 1.0 160 130 0.14 2 1
VAV-42 12 PRICE SDV 1080 0.5 1080 35.2 2.3 160 130 0.27 2 1,2
VAV-43 8 PRICE SDV 600 0.69 315 10.3 0.7 160 130 0.11 2 1,2
VAV-44 12 PRICE SDV 1200 0.5 730 23.8 1.6 160 130 0.15 2 1
NOTES:
1. MODEL NUMBERS ARE PRICE. ACCEPTABLE ALTERNATE: TITUS.
2. PROVIDE WITH 3-WAY CONTROL VALVE.
PUMP SCHEDULE
MARK LOCATION MODEL SERVICE FLOW
(GPM)
PRESSURE
(FT HD)
SPEED
(RPM)
IMPELLER DIA
(IN)
ELECTRICAL REMARKS
VOLT/
PHASE
MOTOR
(HP)
BRAKE
(HP)
CP-1 MECH RM E-80 1.5x1.5x9.5B VAV REHEAT 40 85 1800 9 480/3 5 1.85 1, 2, 3
CP-2 MECH RM E-80 1.5x1.5x9.5B VAV REHEAT 40 85 1800 9 480/3 5 1.85 1, 2, 3
NOTES:
1. MODEL NUMBERS ARE BELL & GOSSETT. ACCEPTABLE ALTERNATE: TACO, ARMSTRONG.
2. SEE HVAC PIPING DETAILS FOR INSTALLATION REQUIREMENTS.
3. PROVIDE WITH VARIABLE SPEED MOTOR AND DRIVE.
BOILER SCHEDULE
MARK LOCATION MODEL INPUT
(MBH)
OUTPUT
(MBH)
GPM MAX. PD
(FT)
VENT
(IN DIA)
INTAKE
(IN DIA)
HOT WATER
SUPPLY TEMP
(°F)
HOT WATER
RETURN TEMP
(°F)
REMARKS
RHB-2
MAIN MECH
RM KBN400 400 376 25 20 4 4 160 130 1, 2,3,4,5
NOTES:
1. MODEL NUMBERS: BASIS OF DESIGN LOCHINVAR KNIGHT SERIES, OR APPROVED EQUAL.
2. PROVIDE W/ BOILER CIRCULATION PUMP INTEGRAL TO BOILER (BP-2: GRUNDFOS 40-80 ECM, OR EQUAL), 120V/1PH, 2.5 AMPS, 0.37 HP. THREE WIRES TO PUMP: 120V, 0-10v FROM
BOILER TO PUMP AND ENABLE CONTACTS FROM BOILER TO PUMP.
3. PROVIDE CONDENSATE NEUTRALIZER.
4. PROVIDE WITH BOILER FLOW SWITCH.
5. PROVIDE WITH BACNET GATEAWAY FOR COMMUNICATION WITH BASE ALC NETWORK AND 3-WIRE CASCADE CONTROLLER.
6. NEW BOILER SHALL BE PROGRAMMED TO OPERATE IN LEAD-LAG OPERATION WITH EX. RHB-1.
SPLIT SYSTEM HEAT PUMP SCHEDULE
SERVICE OUTDOOR CONDENSING UNIT INDOOR UNIT REMARKS
MARK MODEL COOLING HEATING SOUND POWER
(DB)
WEIGHT
(LBS)
ELECTRICAL MARK MODEL TYPE AIRFLOW
(CFM)
WEIGHT
(LBS)
SOUND POWER
(DB)
DIMENSIONS
CAPACITY
(MBH)
AMBIENT
(°F)
SEER CAPACITY
(MBH)
HSPF COP VOLT PHASE MCA MOP LENGTH
(IN)
WIDTH
(IN)
HEIGHT
(IN)
OFFICE HP-3 38MHRQ12A 12 95 17 10.1 9 3.2 64 58 208 1 7 15 ACU-3 40MHHQ12 WALL 324 22 41 32 8 12 1, 2, 3 OFFICE HP-4 38MHRQ12A 12 95 17 10.1 9 3.2 64 58 208 1 7 15 ACU-4 40MHHQ12 WALL 324 22 41 32 8 12 1, 2, 3
NOTES:
1. MODEL NUMBERS: BASIS OF DESIGN CARRIER, OR APPROVED EQUAL.
2. PROVIDE WITH LOW AMBIENT KIT, CONDENSATE PUMP, THERMOSTAT, AND MANUFACTURER'S REFRIGERATION LINESET.
3. NOISE LEVELS AND AIRFLOW EXPRESSED AT "HIGH" FAN SETTING
4. PUMPED CONDENSATE OUTSIDE ON GRADE THOUGH OUTSIDE WALL. FIELD VERIFY FOR LOCATION.
EXPANSION TANK SCHEDULE
MARK LOCATION MODEL SERVICE TANK VOLUME
(GAL)
INITIAL FILL PRESSURE
(PSI)
TANK DIAMETER
(IN)
TANK HEIGHT
(IN)
REMARKS
ET-1 MAIN MECH
ROOM
85LBC HOT WATER REHEAT 22 12 16 35 1,2
NOTES:
1. MODEL NUMBER: BASIS OF DESIGN AMTROL. ACCEPTABLE ALTERNATE: WESSLES, ARMSTRONG, FLEXCON, BELL & GOSSETT.
ROOF EXHAUST FAN SCHEDULE
UNIT DATA PERFORMANC DATA MOTOR DATA
MARK LOCATION MODEL FAN TYPE FLOW (CFM) ESP (IN. WG) DRIVE TYPE SOUND RATING
(SONES)
HP BHP VOLTS PHASE WEIGHT (LBS) REMARKS
EF-2 ROOF G-098 CENTRIFUGAL 280 0.5 DIRECT 5.5 1/6 0.05 115 1 54 1,2,3,4
EF-3 ROOF G-098 CENTRIFUGAL 400 0.5 DIRECT 7 1/6 0.12 115 1 54 1,2,3,5
DIFFUSER, REGISTER, GRILLE SCHEDULE
MARK TYPE MODEL CFM RANGE NECK SIZE FACE SIZE CEILING
MODULE SIZE
VOLUME CONTROL
DAMPER
FINISH REMARKS
SD-1 SUPPLY
CEILING
SCD 201 - 250 8" RD 22x22 24x24 NO WHITE 1
SD-1 SUPPLY
CEILING
SCD 251 - 400 10" RD 22x22 24x24 NO WHITE 1
SD-1 SUPPLY
CEILING
SCD 401 - 550 12" RD 22x22 24x24 NO WHITE 1
RD-1 RETURN
CEILING
80SR 150 - 800 6" RD-16" RD 23-¾ x 23-¾ 24x24 NO WHITE 1,2
SG-1 SUPPLY WALL 510/L 250 12x6 12x6 NO WHITE 1
REMARKS:
1. MODEL NUMBER: BASIS OF DESIGN GREENHECK. ACCEPTABLE ALTERNATE: LOREN COOK, , PENN BERRY, OR EQUAL.
2. PROVIDE WITH MATCHING ROOF CURB, BACKDRAFT DAMPER AND BIRD SCREEN.
3. PROVIDE WITH UNIT -MOUNTED DISCONNECT.
4. INTERLOCK WITH RTU-4 OPERATION.
5. INTERLOCK WITH RTU-5 OPERATION.
REMARKS:
1. MODEL NUMBER: BASED ON PRICE. ACCEPTABLE ALTERNATE: TITUS, KRUEGER, OR EQUAL.
2. PROVIDE WITH INTEGRATED PLENUM TO ROUND NECK CONNECTION.
HOOD DIMENSIONS
RELIEF AIR HOOD
MARK LOCATION SERVICE CFM
WIDTH HEIGHTLENGTH
THROAT
DIMENSIONS
REMARKS
RH-1 WAREHOUSE HV-2 993 30" 39" 16" 16"x16" 1, 2
NOTES:
1. MODEL NUMBERS ARE GREENHECK, OR ACCEPTABLE EQUAL.
2. PROVIDE WITH 22"x22" PREFABRICATED ROOF CURB.
MECHANICAL
CONTROLS -
M701
SCHEMATIC
DIAGRAMS
127th WING
BUILDING 1414
RENOVATION
http://www.AECOM.com
27777 Franklin Road, Suite 2000 Southfield, MI 48034 United States P: 248 204 5900 F: 248 204 5901
AO - OUTSIDE AIR
DAMPER AT FURNACE
AI - DISCHARGE AIR TEMP
RA
N.C.
OA
BI - FAN STATUS
BO - FAN START/STOP
BO - COOLING STAGES
DX
GAS
BO - HEATING STAGES
DA
BI - ZONE OVERRIDE
AI - ZONE TEMP
AI - ZONE SETPOINT ADJUST
RTU-3, 4 & 5 - SEQUENCE OF OPERATION:
RUN CONDITIONS - OCCUPANCY SCHEDULE:
THE UNIT SHALL RUN ACCORDING TO A USER DEFINABLE OCCUPANCY SCHEDULE IN THE FOLLOWING MODES:
OCCUPIED MODE:
THE UNIT SHALL MAINTAIN:
• A 76°F (ADJ.) COOLING SETPOINT
• A 68°F (ADJ.) HEATING SETPOINT.
UNOCCUPIED MODE (NIGHT SETBACK):
THE UNIT SHALL MAINTAIN:
• A 85°F (ADJ.) COOLING SETPOINT.
• A 55°F (ADJ.) HEATING SETPOINT.
OCCUPANCY SCHEDULE FOR DAILY WORKING HOURS, WEEKENDS AND HOLIDAYS SHALL BE CLOSELY COORDINATED WITH BUILDING OWNER TO DEFINE AND PROGRAM DDC CONTROLS AND HVAC SYSTEMS OPERATION ACCORDINGLY.
ZONE TEMPERATURE ALARMS:
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• HIGH ZONE TEMP: IF THE ZONE TEMPERATURE IS GREATER THAN THE COOLING SETPOINT BY A USER DEFINABLE
AMOUNT (ADJ.).
• LOW ZONE TEMP: IF THE ZONE TEMPERATURE IS LESS THAN THE HEATING SETPOINT BY A USER DEFINABLE
AMOUNT (ADJ.).
ZONE SETPOINT ADJUST:
THE OCCUPANT SHALL BE ABLE TO ADJUST THE ZONE TEMPERATURE HEATING AND COOLING SETPOINTS AT THE
ZONE SENSOR.
ZONE OPTIMAL START:
THE UNIT SHALL USE AN OPTIMAL START ALGORITHM FOR MORNING START-UP. THIS ALGORITHM SHALL MINIMIZE THE UNOCCUPIED WARM-UP OR COOL-DOWN PERIOD WHILE STILL ACHIEVING COMFORT CONDITIONS BY THE START OF
SCHEDULED OCCUPIED PERIOD.
ZONE UNOCCUPIED OVERRIDE:
A TIMED LOCAL OVERRIDE CONTROL SHALL ALLOW AN OCCUPANT TO OVERRIDE THE SCHEDULE AND PLACE THE UNIT INTO AN OCCUPIED MODE FOR AN ADJUSTABLE PERIOD OF TIME. AT THE EXPIRATION OF THIS TIME, CONTROL
OF THE UNIT SHALL AUTOMATICALLY RETURN TO THE SCHEDULE.
FAN:
THE FAN SHALL RUN ANYTIME THE FURNACE IS COMMANDED TO RUN, UNLESS SHUTDOWN ON SAFETIES. THE FAN SHALL RUN CONTINUOUSLY DURING OCCUPIED MODE OF OPERATION. DURING UNOCCUPIED MODE OF OPERATION, THE FAN SHALL CYCLE AUTOMATICALLY WITH THE FURNACE TO MAINTAIN THE NIGHT SETBACK TEMPERATURE
SETPOINTS DURING UNOCCUPIED MODE OF OPERATION.
COOLING STAGE:
THE CONTROLLER SHALL MEASURE THE ZONE TEMPERATURE AND STAGE THE COOLING TO MAINTAIN ITS COOLING SETPOINT. TO PREVENT SHORT CYCLING, THE STAGE SHALL HAVE A USER DEFINABLE (ADJ.) MINIMUM RUNTIME.
THE COOLING SHALL BE ENABLED WHENEVER:
• OUTSIDE AIR TEMPERATURE IS GREATER THAN 60°F (ADJ.).
• AND THE ZONE TEMPERATURE IS ABOVE COOLING SETPOINT.
• AND THE FAN IS ON.
GAS HEATING STAGE:
THE CONTROLLER SHALL MEASURE THE ZONE TEMPERATURE AND STAGE THE HEATING TO MAINTAIN ITS HEATING SETPOINT. TO PREVENT SHORT CYCLING, THE STAGE SHALL HAVE A USER DEFINABLE (ADJ.) MINIMUM RUNTIME.
THE HEATING SHALL BE ENABLED WHENEVER:
• OUTSIDE AIR TEMPERATURE IS LESS THAN 65°F (ADJ.).
• AND THE ZONE TEMPERATURE IS BELOW HEATING SETPOINT.
• AND THE FAN IS ON.
MINIMUM OUTSIDE AIR VENTILATION - FIXED PERCENTAGE:
THE MAIN AND FURNACE OUTSIDE AIR DAMPERS SHALL BE OPEN DURING BUILDING OCCUPIED HOURS AND CLOSED
DURING UNOCCUPIED HOURS OR EMERGENCY SHUTDOWN.
DISCHARGE AIR TEMPERATURE:
THE CONTROLLER SHALL MONITOR THE DISCHARGE AIR TEMPERATURE.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• HIGH DISCHARGE AIR TEMP: IF THE DISCHARGE AIR TEMPERATURE IS GREATER THAN 120°F (ADJ.).
• LOW DISCHARGE AIR TEMP: IF THE DISCHARGE AIR TEMPERATURE IS LESS THAN 40°F (ADJ.).
FAN STATUS:
THE CONTROLLER…