MICHIGAN AIR NATIONAL GUARD
127TH Civil Engineering WIng
SELFRIDGE ANG BASE, MICHIGAN
31 July 2019
MEMORANDUM FOR 127 MSC
FROM: 127 CES/CEN
SUBJECT: Clarification on Requirements for construction on SANGB Building 1414 HVAC and Fire Alarm Project in regards to Lead Paint and Asbestos. VGLZ 182 018
1) Lead paint:
Field testing indicates the potential for lead paint in Building 1414.
The contractor will take into account for safe worker protection measures regarding material having lead based paint.
2) Asbestos Containing Materials:
It is anticipated that areas of demolition will NOT have Asbestos Containing Material
(ACM). However, there is the potential to encounter ACM in the building. This is noted in the SOW and was covered in the (2) environmental reports included in the bid package.
Thomas Resh, GS-12
Mechanical Engineer