SANG_Bldg_1414-Upgrade_HVAC_&_Fire_Alarm_-_Drawings_Pt1.pdf

PDF 3 MB Posted

Attached to
Bldg 1414 HVAC and Fire Alarm Repair
Solicitation number
W912JB-19-B-5006
Issued by

About this file

Drawings - Pt.1

View the file

Other files

File Type Posted
Bid_Opening_Abstract_1414.pdf PDF
Bid_Opening_Sign_In_Sheet.pdf PDF
RFI_DOCUMENT_8-20-19.pdf PDF
W912JB-19-B-5006_Solicitation_Amendment_0004.pdf PDF
W912JB-19-B-5006_Solicitation_Amendment_0003.pdf PDF
RFI's_From_15_August_Site_Visit.pdf PDF
Site_Visit_Minutes_1414_2nd.pdf PDF
Sign_In_Sheet_2nd.pdf PDF
Superintendent_RFI.pdf PDF
RFI_Clarification_on_ACM_and_Lead_Paint.pdf PDF
1414_TEOC_Sept_2012.pdf PDF
Appendix_D._SANG_Bldg_1414_ACM_Survey.pdf PDF
RFI_Clarification_on_4_subjects.pdf PDF
W912JB-19-B-5006_Solicitation_Amendment_0002.pdf PDF
Site_Visit_Minutes_1414.pdf PDF
Sign_In_Sheet.pdf PDF
W912JB-19-B-5006_Solicitation_Amendment_0001.pdf PDF
Bldg_1414_HVAC_DDC_-_Brand_Name_Justification.pdf PDF
W912JB19B5006.pdf PDF
Building_1414_SIMPLEX_-_Brand_Name_Justification.pdf PDF
SANGB_Vetting_Access_Request.pdf PDF
SANG_Bldg_1414-Upgrade_HVAC_&_Fire_Alarm_-_Drawings_Pt2.pdf PDF
Building_1414_-_AF_Form_66_Rev_00.xls XLS spreadsheet
SANG_Bldg_1414-Upgrade_HVAC_&_Fire_Alarm_-_Drawings_Pt4.pdf PDF
SANG_Bldg_1414-Upgrade_HVAC_&_Fire_Alarm_-_Drawings_Pt3.pdf PDF
SANG_Bldg_1414-Upgrade_HVAC_&_Fire_Alarm_-_Specifications_-_Rev_01.pdf PDF
UPDATED___Presolicitation_Notice_1414_HVAC.PDF PDF
UPDATED___Presolicitation_Notice_1414_HVAC.PDF PDF
Presolicitation_Notice_1414_HVAC.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TITLE SHEET

T100

SELFRIDGE ANG BASE MAPLOCATION MAP

BLDG.

BASE

SELFRIDGE AIR NATIONAL GUARD BASE

PROJECT NUMBER: VGLZ 182018

CONTRACT NUMBER: W912JB-D-4005-0015

MAY 29, 2019

100% SUBMITTAL

DRAWING INDEX

UPGRADE HVAC & FIRE ALARM - BLDG. 1414

THE 127th WING, MICHIGAN AIR NATIONAL GUARD

CODE SUMMARY

APPLICABLE CODES AND STANDARDS:

2018 INTERNATIONAL BUILDING CODE (IBC)

2018 INTERNATIONAL MECHANICAL CODE (IMC)

2018 INTERNATIONAL PLUMBING CODE (IPC)

2018 INTERNATIONAL ENERGY CONSERVATION CODE (IECC)

2017 NATIONAL ELECTRICAL CODE (NFPA 70)

UNIFIED FACILITIES CRITERIA (UFC) - LATEST EDITION

SELFRIDGE ANGB DESIGN STANDARDS

ANG DESIGN OBJECTIVES AND PROCEDURES - TAB C, ANG ETL 10-03 - LATEST EDITION

ANG DESIGN POLICY - TAB D, ANG ETL 15-01-00 THRU 15-01-08 - LATEST EDITION

LIFE SAFETY CODE - NFPA 101 LIFE SAFETY CODE, 2018 EDITION

FIRE CODE: UFC 3-600-01 - LATEST EDITION

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) - LATEST EDITION

APPLICABLE STATE, CITY, COUNTY CODES AND REGULATIONS

127th WING

BUILDING 1414

RENOVATION

http://www.AECOM.com

27777 Franklin Road, Suite 2000 Southfield, MI 48034 United States P: 248 204 5900 F: 248 204 5901

MECHANICAL

ABBREVIATIONS

SYMBOLS, &

M000

LEGENDS

127th WING

BUILDING 1414

RENOVATION

http://www.AECOM.com

27777 Franklin Road, Suite 2000 Southfield, MI 48034 United States P: 248 204 5900 F: 248 204 5901

R OR D

R OR D INCLINE RISE OR DROP IN

DIRECTION OF AIR FLOW

90° RADIUS ELBOW UP. USE

90° ELBOW W/ TURNING VANES

WHEN RADIUS DOES NOT FIT

90° RADIUS ELBOW DOWN. USE

90° ELBOW W/ TURNING VANES

WHEN RADIUS DOES NOT FIT

OSA DUCT

DUCT SECTION-SUPPLY AIR/

DUCT SECTION-RETURN AIR/

EXHAUST AIR DUCT

FLEXIBLE CONNECTOR

FLEXIBLE DUCT

FC

FC

FD

VD

BDD BDD

VD

FD FIRE DAMPER

VOLUME DAMPER

BACKDRAFT DAMPER

MOTORIZED DAMPER

SIZE 4

SUPPLY CEILING DIFFUSER

REGISTER(GRILLE)

CEILING EXHAUST AND RETURN AIR

SIZE 4

SUPPLY GRILLE OR REGISTER

SIZE 4

DOOR LOUVER

DDC CONTROLLER

HUMIDISTAT

DUCT SMOKE DETECTOR

WALL SWITCH

BUILDING EMERGENCY

AIR DISTRIBUTION SHUT OFF

E

SP

S

SD

H

T

DL

DDC

AHU

AS

B

CH

EF

ET

P WATER PUMP

EXPANSION TANK

EXHAUST FAN

CHEMICAL POT FEEDER

BOILER

AIR SEPARATOR

AIR HANDLING UNIT

A

AFF

AMB

AP

ARCH

AVG

A/C

BAS

BDD

BOD

BTUH

CC

CD

CFM

CG

CHW

CLG

COMP

COEF

CONC

CONT

CP

CV

D

DB

dB

DDC

DEFL DEFLECTION

DIRECT DIGITAL CONTROL

DECIBELS

DRY BULB

DRAIN

CONSTANT VOLUME

CONTROL PANEL

CONTINUATION

CONCRETE

COMPRESSOR

COEFFICIENT

CEILING

CHILLED WATER

CEILING GRILLE

CUBIC FEET PER MINUTE

CEILING DIFFUSER

COOLING COIL

BRITISH THERMAL UNIT/HR

BOTTOM OF DUCT

BACK DRAFT DAMPER

BUILDING AUTOMATION SYSTEM

AIR CHANGE

AVERAGE

ARCHITECT

ACCESS PANEL

AMBIENT

AMPERE

ABOVE FINISHED FLOOR

DIA

DIFF

DL

DN

DWG

DX

EA

ea

EAT

EFF

EL

ELEC.

ENT

EWT

EXH

EX.

FA

FD

FC

FLA

FLR

FPM

FSD

FT

GA

HDPE

GAGE or GAUGE

FOOT

FIRE SMOKE DAMPER

FEET PER MINUTE

FLOOR

FULL LOAD AMP

FIRE DAMPER

FLEXIBLE CONNECTION

FREE AREA

EXISTING

EXHAUST

ENTERING WATER TEMPERATURE

ENTERING

ELECTRICAL

ELEVATION

ENTERING AIR TEMPERATURE

EFFICIENCY

EXHAUST AIR

EACH

DIRECT EXPANSION

DRAWING

DOWN

DOOR LOUVER

DIFFERENCE

DIAMETER

INSIDE DIAMETER

INCH

INCH OF WATER GAUGE

ID

IN

INWG

KILOWATT

KILOWATT HOUR

KW

KWH

LEAVING AIR TEMPERATURE

POUND

LOCKED ROTOR AMPERES

MAXIMUM

MINIMUM CURRENT AMPERES

MOTOR CONTROL CENTER

MOTORIZED DAMPER

MINIMUM

NOISE CRITERIA

NORMALLY CLOSED

NOT IN CONTRACT

NORMALLY OPEN

NOT TO SCALE

NOT APPLICABLE

OUTSIDE AIR

OPENING

PRESSURE DROP

PHASE

LAT

LB

LRA

LWT

MAX

MCA

MCC

MD

MIN

NC

N C

NIC

N O

NTS

N/A

OA

OPNG

PD

PH

LEAVING WATER TEMPERATURE

IPLV INTEGRATED PART LOAD VALUE

HERTZHZ

RETURN AIR DIFFUSER

RETURN AIR

RATED LOAD AMPS

REVOLUTIONS PER MINUTE

RETURN AIR REGISTER

SUPPLY AIR

SUPPLY AIR GRILLE

STATIC PRESSURE

SPECIFICATION

SUPPLY AIR REGISTER

STAINLESS STEEL

TRANSFER DUCT

TEMPERATURE

TRANSFER GRILLE

THERMOSTAT

TYPICAL

UP THRU ROOF

VOLT

VOLUME DAMPER

RA

RH

RLA

RD

RPM

RR

SA

SG

SP

SPEC

SR

SS

TD

TEMP

TG

T STAT

TYP

UTR

V

VD

WATT

WITH

WET BULB

WATER COLUMN

WATER GAUGE

WEIGHT

W

W/

WB

WC

WG

WT

SF SQUARE FEET

YEARYR

HOSE END CONNECTION

CAP

BLIND FLANGE

UNION, FLANGED

UNION, SCREWED

COUPLING, JOINT

FLEXIBLE CONNECTOR

ANCHOR POINT

GUIDE

DRAIN LINE

HOT WATER SUPPLY

HOT WATER RETURN

D

HWR

HWS

HPR

HPS

CHECK VALVE

TEE, OUTLET DOWN

TEE, OUTLET UP

PIPE TURNING UP

BALL VALVE

BUTTERFLY VALVE

PIPE TURNING DOWN

CONNECTION, TOP

CONNECTION, BOTTOM

EXPANSION LOOP

STRAINER,W/ BLOWOFF

AND HOSE CONN.

AIR VENT, AUTOMATIC

RELIEF VALVE

PRESSURE REDUCING VALVE

THREE WAY CONTROL VALVE

TWO WAY CONTROL VALVE

AIR VENT, MANUAL

PRESSURE/TEMPERATURE TAP

FLOW SWITCH

THERMOMETER

PRESSURE GAUGE & GAUGE COCK

INCREASER, REDUCER

CALIBRATED BALL VALVE

W/ PRESSURE PORTS

DUCT STATIC PRESSURE SENSOR

ISOLATION VALVE

(BALL, GATE, OR BUTTERFLY)

HOA HAND-OFF-AUTO SWITCH

HIGH DENSITY POLYPROPYLENE

AC AIR CONDITIONING UNIT

SM SHEET METAL

AFS AIR FLOW MEASURING STATION

M MMD-XX MD-XX

DEGREEDEG DEGREE FAHRENHEIT°F

THERMOSTAT OR TEMPERATURE

SENSOR

RETURN/EXHAUST GRILLE OR

REGISTER SIZE 4

MAKE-UP AIR UNIT

SF

HPGR

HPGS DT DAY TANK

SB SB SECURITY BARS

CO2 CO2 SENSOR

FOR

FOS

FUEL OIL RETURN

FUEL OIL SUPPLY VAV VARIABLE AIR VOLUME

ACC AIR COOLED CONDENSER

UH UNIT HEATER

PROPYLENE GLYCOLPG

BT BUFFER TANK

CHILLER

FCU FAN COIL UNIT

MAU

SUPPLY FANS

CF

HV HEATING & VENTILATION UNIT

CCEC CLOSED-CIRCUIT

EVAPORATIVE COOLER

600x300 600x300

300 DIA

300 DIA

600x300(L) 600x300(L)

600 DIA (L) 600 DIA (L)

LINED RECTANGULAR DUCT. NUMBER

INDICATES CLEAR INSIDE DIMENSION

LINED ROUND DUCT. NUMBER

INDICATES CLEAR INSIDE DIMENSION

(24x12)

(12)

ROUND DUCT. NUMBER INDICATES

DUCT DIAMETER. IP UNITS IN

BRACKETS (TYPICAL)

(24)

(24x12)

RECTANGULAR DUCT. SIZE IN MM.

FIRST NUMBER INDICATES SIDE IN

VIEW, SECOND NUMBER INDICATES

SIDE IN DEPTH. IP UNITS IN

BRACKETS (TYPICAL)

RS

RL REFRIGERANT LIQUID LINE

REFRIGERANT SUCTION LINE

HEAT PUMP LOOP SUPPLY

HEAT PUMP LOOP RETURN

HEAT PUMP GLYCOL SUPPLY

HEAT PUMP GLYCOL RETURN

SD SUPPLY AIR DIFFUSER

CABINET UNIT HEATERCUH

A. ALL DIMENSIONS ARE IMPERIAL UNLESS OTHERWISE NOTED IN BRACKETS

B. ALL DUCT DIMENSIONS ARE INSIDE CLEAR.

C. VERIFY AND COORDINATE EQUIPMENT LAYOUT, SIZE, AND CONNECTING SERVICES WITH

EQUIPMENT ACTUALLY SELECTED FOR INSTALLATION.

D. DO NOT SCALE DUCTWORK AND EQUIPMENT FOR SIZE.

E. COORDINATE ENTIRE INSTALLATION OF THE HVAC SYSTEMS WITH THE WORK OF ALL OTHER

TRADES PRIOR TO ANY FABRICATION OR INSTALLATION.

F. COORDINATE EXACT LOCATION AND SIZES OF REQUIRED OPENINGS AND SUPPORTS FOR

FURNISHED EQUIPMENT WITH THE GENERAL CONTRACTOR.

G. ALL EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE EQUIPMENT

MANUFACTURER'S REQUIREMENTS.

H. PROVIDE ALL FITTINGS, TRANSITIONS, DAMPERS, VALVES, AND OTHER DEVICES REQUIRED

FOR COMPLETE WORKABLE INSTALLATION.

I. ALL EQUIPMENT, DUCTS, PIPING, AND OTHER DEVICES OR MATERIAL EXPOSED TO THE

WEATHER SHALL BE COMPLETELY WEATHERPROOF.

J. ALL VALVES, CONTROLS, DAMPERS, FANS, ETC. SHALL BE INSTALLED IN ACCESSIBLE

LOCATION. PROVIDE ADEQUATELY SIZED ACCESS DOOR OR PANELS WHERE REQUIRED.

K. THE LOCATION OF CEILING AIR INLETS AND OUTLETS SHALL BE IN ACCORDANCE WITH

MECHANICAL DRAWINGS.

L. PROVIDE VALVED DRAINS AT LOW POINTS AND MANUAL AIR VENTS AT HIGH POINTS OF ALL

HYDRONIC SYSTEMS.

M. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL

COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS INDICATED ON THE DRAWINGS, AS

SPECIFIED AND AS REQUIRED BY CODE.

N. CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK ARE DIAGRAMMATIC AND ARE

INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY.

O. POWER TO MOTORIZED DAMPERS SHALL BE BY DIV. 23 CONTRACTOR.

P. PROVIDE VIBRATION ISOLATORS FOR ALL PIPING SUPPORTS CONNECTED TO AND WITHIN 50

FEET OF ISOLATED EQUIPMENT IN ACCESSIBLE LOCATIONS (EXCEPT WHERE BASE ELBOW

SUPPORTS AND ANCHOR POINTS) THROUGHOUT MECHANICAL EQUIPMENT ROOMS.

Q. LOCATE ALL TEMPERATURE, PRESSURE, AND FLOW MEASURING DEVICES IN ACCESSIBLE

LOCATIONS WITH STRAIGHT SECTION OF PIPE OR DUCT UP- OR DOWN STREAM AS

RECOMMENDED BY MANUFACTURER FOR GOOD ACCURACY.

R. ALL CONTROL WIRING SHALL COMPLY WITH THE NATIONAL ELECTRICAL CODE AND

SPECIFICATIONS.

S. CONCRETE HOUSEKEEPING PADS TO SUIT MECHANICAL EQUIPMENT SHALL BE SIZED BY A

MECHANICAL CONTRACTOR.

T. FOR TYPICAL DETAILS SEE MECHANICAL SHEETS.

U. PROVIDE SUFFICIENT CLEARANCE FOR AHU'S, AND AC'S COIL/PULL AND IN FRONT OF

ACCESS DOORS/PANELS FILTER.

V. PER ANTI-TERRORISM FORCE PROTECTION GUIDELINES, ALL OVERHEAD UTILITIES, MOUNTED

FIXTURES EQUIPMENT AND FEATURES WEIGHTING 31 POUNDS OR MORE SHALL BE BRACED

TO RESIST 0.5 TIMES THE COMPONENT WEIGHT IN ANY DIRECTION AND 1.5 TIMES THE

COMPONENT WEIGHT IN THE DOWNWARD DIRECTION. THIS STANDARD DOES NOT PRECLUDE

THE NEED TO DESIGN ATTACHMENTS AND BRACING TO RESIST FORCES REQUIRED BY

OTHER CRITERIA SUCH AS WIND, SEISMIC, OR SNOW LOADING.

W. 120V POWER FROM ELECTRICAL PANELS TO DDC CONTROLLERS, ALARM PANELS AND OTHER

DDC EQUIPMENT SHALL BE THE RESPONSIBILITY OF DIV. 23 CONTRACTOR.

X. DUCTWORK LAYOUT IS DIAGRAMMATIC ONLY. IN THE PROCESS TO COORDINATE THE DUCT

INSTALLATION WITH OTHER TRADES, THE CONTRACTOR MAY REARRANGE THE DUCTWORK

DOWNSTREAM OF AHU EQUIPMENT FOR AN OPTIMAL LAYOUT. THE FOLLOWING RULES SHALL

BE FOLLOWED:

1. MAXIMUM OF 5FT OF FLEXIBLE DUCT SHALL BE USED. SEE TYPICAL DETAILS ON

MECHANICAL DRAWINGS.

2. DUCT SIZE FOR THE TOTAL FLOW THROUGH THE BRANCH SHALL BE AS FOLLOWS:

0 - 110 CFM 6-INCH 425 - 660 CFM 12-INCH

115 – 230 CFM 8-INCH 665 - 1000 CFM 14-INCH

235 - 420 CFM 10-INCH 1005 – 1500 CFM 16-INCH

1550 – 2000 CFM 18-INCH 2005 – 2600 CFM 20-INCH

Y. DUCTS SHALL NOT BE REINFORCED WITH TIE RODS OR OTHER INTERNAL REINFORCEMENT

EXCEPT FOR DUCT DIMENSIONS GREATER THAN 85 INCH AND STATIC PRESSURE IN EXCESS

OF 6 INCHES WG, AS REQUIRED BY SMACNA HVAC DUCT CONSTRUCTION STANDARDS METAL

AND FLEXIBLE, THIRD EDITION.

Z. ALL EXISTING DUCTWORK TO BE REUSED SHALL BE PROFESSIONALLY CLEANED FROM DUST

AND DEBRIS. REFER TO PROJECT SPECIFICATIONS.

AIR FLOW QUANTITY: L/S (CFM)

AIR FLOW QUANTITY: L/S (CFM)

AIR FLOW QUANTITY: L/S (CFM)

AIR FLOW QUANTITY: L/S (CFM)

CD-4 115

(250)

CG-4 260

(550)

SR-4 455

(955)

RG-4 305

(635)

MICHIGAN MECHANICAL CODEMMC

VAV VARIABLE AIR VOLUME BOX

RELATIVE HUMIDITY

HW CIRCULATION PUMP

PC PUMPED CONDENSATE

DETAILDET

HP HORSE POWER

HEATING, VENTILATING

AND AIR CONDITIONING

HVAC

MAXIMUM FUSE SIZEMFS

WSHP WATER SOURCE HEAT PUMP

TO BE DEMOLISHED

ACU AIR-COOLED CONDENSER

HP HEAT PUMP

RTU ROOFTOP UNIT

CIRCULATION PUMPCP

RHB REHEAT BOILER

2a33a44a55a66a7

G

F1

F

E1

E

D1

C1

C

B1

D

11a2

C2

C3

B2

3a1

MATCHLINE - SEE SHEET MD102

T

TTT

EX.AHU-12

DEMO

EX.HV-4

DEMO

ABANDON EX.

UNDERGROUND

DUCTS TO TOWER EX. AHU

(ABANDON IN PLACE)

EX. OA

ROOF VENT

EX. ROOF

VENT

EX.AHU-2

EX.EF-1

(ON ROOF)

EX.AC

EX.RTU-2

(ON ROOF)

EX.HWP

EX.HWP

(3) EX. HW

BOILERS

EX.RHB-1

EX.CHWP

DEMO

EX.SD

EX.SD

EX.SD EX.SD

EX.SD EX.SD

EX.SD

EX.SD

EX.SD

340 CFM

EX.SD

EX.SD

EX.SD EX.SD

EX.SD

EX.SD

EX.SD

EX.SD

EX.SDEX.SD

EX.SDEX.SD

135 CFM

EX.SDEX.SD

EX.12"Ø

EX.16"Ø

EX.4x22

EX

.14 x6

EX

.18 x8

EX

.18 x1

EX

.18 x1

EX.6x22 EX.26x22

EX.24x18

EX.22x22 EX.16x22

EX

.24 x1

EX

.24 x1

EX

.16 x1

EX.12x8 EX.12x8

EX.12x8 EX.12x8

EX.12x8EX.12x8

EX.10"Ø EX.12"Ø

EX

.16

"Ø

EX

.16 "Ø

EX

.16

"Ø

EX

.10

"Ø

EX.8"Ø

EX.10"Ø

EX.12"Ø

EX.14"Ø

EX

.12

"Ø

EX

.10 "Ø

EX.46x12

EX.SD

EX.12x8

EX.SD

EX.RD

EX.SD

EX.12x8

EX.14x10EX.20x8

EX.RD

EX.RD EX.46x12

EX.10"Ø EX.10"Ø

EX.10"Ø

EX. 10"Ø

EX.SD

EX

. 1

4" Ø

EX

. 1

4" Ø

EX

.12

"Ø

EX.12"Ø

EX.8"Ø

EX.8"Ø EX.8"Ø

EX.8"Ø EX.8"Ø

EX.8"Ø

EX

. 1

4" Ø

EX

. 1

4" Ø

EX.RD

EX.RD

EX.RD

EX. RD

EX.RD

EX.RD

EX.RD

EX. RD

DEMO EX. 48x24 WALL

GRILLE & CAP EX. DUCT

EX. RDEX

. 1

2" Ø

EX.SD

EX.SD EX.SD

EX.RTU-1

(ON ROOF)

EX

.18 x2

EX. CAPPED

ROOF VENT

(ON ROOF)

EX. 80x36

RETURN DUCT

EX.FD

EX.FDEX.FDEX.FD

EX.FD

EX.SD

EX.UH-2

EX.UH-1

CHEMICAL

FEEDER

EX.DWH

EX.AIR

COMPRESSOR

EX.DDC

PANEL

EX.4" GAS LINEEX.2" GAS

LINE TO EACH

EX.BOILER

EX.1" NG

EX. GAS

METER

EX.20" FLUE

EXHAUST VENT

UP TO ROOF

EX.RD

EX.RD

EX. RD

EX. RD

EX. RD

EX.SD EX.SD

EX. ROOF

VENT

EX. ROOF

VENT

EX. ROOF

VENT

EX.RG EX.RG EX.RG

EX. RA

ROOF VENT

EX.FD

EX.78x36

SUPPLY

DUCT

EX.RD

EX.12"Ø

EX.FRESH AIR

WALL LOUVER

EX.EXPANSION

TANK

FIRST FLOOR

PLAN - WEST

MD101

HVAC DEMO

WORK

127th WING

BUILDING 1414

RENOVATION

http://www.AECOM.com

27777 Franklin Road, Suite 2000 Southfield, MI 48034 United States P: 248 204 5900 F: 248 204 5901

SCALE: 3 32" = 1'-0"

2a33a44a55a66a7

G F1

F E1

E D

C

C B1

B A1

A

Aa Ab

Ac Ad

D

11a2

DEMOLITION KEYED NOTES:

ABANDON EXISTING AHU IN PLACE. DISCONNECT ALL UTILITIES, CONTROLS AND SERVICES.

DEMOLISH EXISTING BOILERS STACK DUCTS THROUGH ROOF. REUSE EXISTING ROOF

OPENING TO ROUTE NEW GAS LINE AND NEW BOILER FLUE VENT PIPE.

DEMOLISH EXISTING GAS LINES CONNECTED TO EXISTING BOILERS AND CAP BACK AT

MAIN.

DEMOLISH EXISTING HV-4 AIR HANDLING UNIT SERVING TOWER WITH ASSOCIATED PIPING,

CONTROLS, SUPPORTS AND SERVICES. REMOVE EX. FRESH AIR DUCT AND CAP AT EX.

WALL LOUVER. SEAL AND INSULATE EX. CAPPED WALL LOUVER.

DEMOLISH EXISTING SUPPLY AND RETURN DUCT ROUTED TO TOWER. CAP AT FLOOR

PENETRATIONS.

DEMOLISH EXISTING AHU-12 AIR HANDLING UNIT LOCATED IN MEZZANINE WITH

ASSOCIATED DUCTWORK, PIPING, CONTROLS, SUPPORTS AND SERVICES.

DEMOLISH EXISTING SUPPLY AND RETURN DUCTWORK IN CEILING SPACE WITH

ASSOCIATED INSULATION, HANGERS AND SUPPORTS TO EXTENT SHOWN.

EXISTING SUPPLY AND RETURN CEILING DIFFUSERS SHALL REMAIN IN USE. ALL EXISTING

DIFFUSERS SHALL BE CLEANED THROUGHOUT FOR PROPER USE. TYPICAL FOR ALL

DIFFUSERS SHOWN ON THIS DRAWING.

EXISTING CEILING DIFFUSER TO BE RELOCATED AND REUSED.

DEMOLISH EXISTING AIR HANDLING AND ASSOCIATED APPURTENANCES, PIPING,

SUPPORTS AND CONTROLS.

DEMOLISH EX. DUCTWORK CONNECTED TO EXISTING ROOF VENT IN AREA OF WORK. CAP

DUCT AT WALL AND ABANDON PORTION IN AREA OUT OF PROJECT WORK. CAP ROOF

VENT ON ROOF.

REUSE EXISTING DUCTWORK TO EXTENT SHOWN. ALL EXISTING DUCTWORK TO REMAIN

SHALL BE CLEANED THROUGHOUT FOR PROPER USE.

EXISTING DUCTWORK LOCATED OUTSIDE OF PROJECT AREA OF WORK SHALL BE CAPPED

AND ABANDONED.

DEMOLISH EXISTING UNIT HEATER (1414 UH-2) AND ASSOCIATED PIPING, VALVES,

SUPPORTS AND CONTROLS.

1. CONTRACTOR SHALL INCLUDE THE ABATEMENT OF ALL ASBESTOS CONTAINING BUILDING

MATERIALS (ACBM) IN THEIR BID, THAT IS REQUIRED TO COMPLETE THE SCOPE OF WORK

INDICATED ON CONTRACT DOCUMENTS.

2. ASBESTOS ABATED IN THE COURSE OF THIS PROJECT MUST BE PROPERLY COLLECTED,

CONTAINERIZED AND DISPOSED OF IN A LANDFILL LICENSED TO ACCEPT ASBESTOS WASTE. ALL

ASBESTOS DISPOSAL MANIFESTS MUST BE COORDINATED WITH, AND SIGNED BY, 127TH WING

ENVIRONMENTAL MANAGEMENT OFFICE PERSONNEL.

3. CONTRACTOR SHALL UTILIZE SELFRIDGE ANG BASE (SANGB) FORM 23 FOR TRACKING

HAZARDOUS MATERIALS AND SANGB FORM 72 FOR SOLID WASTE TRACKING AND DIVERSION.

4. CONTRACTOR SHALL ASSUME THE PRESENCE OF ASBESTOS CONTAINING DRY WALL JOINT

COMPOUND IN EXISTING WALLS ABOVE CEILING NOTED FOR PENETRATION BY NEW SUPPLY AIR

DUCTS.

GENERAL ARCHITECTURAL

NOTES:

1. SAWCUT AND REMOVE PORTION OF WALL AS REQUIRED FOR NEW WORK. TEMPORARILY

SHORE OPENING AS REQUIRED FOR INSTALLATION OF NEW WORK. PATCH EXISTING WALL IF

DAMAGED BY NEW WORK, FIRE STOP AND SEAL TO MAINTAIN EXISTING FIRE RATING.

2. PATCH AND FILL IN WALL PENETRATIONS IN KIND AS A RESULT OF DEMOLITION AND NEW

WORK SCOPE. MAINTAIN EXISTING FIRE RATING.

3. REMOVE, SALVAGE AND RE-INSTALL ALL CEILING TILES AS REQUIRED FOR DEMOLITION AND

NEW WORK SCOPE. REPLACE ANY DAMAGED AND/OR MISSING TILES IN KIND.

4. REMOVE PORTION OF ROOF AS REQUIRED FOR NEW WORK. COORDINATE LOCATION OF

OPENINGS AND CURB SUPPORTS WITH STRUCTURE BELOW. PATCH EXISTING ROOFING IF

DAMAGED BY NEW WORK IN KIND. OVERLAP NEW AND EXISTING ROOFING MINIMUM 6" ON

ALL SIDES.

5. ALL ROOFING WORK, INCLUDING EQUIPMENT CURBS, FLASHING, PATCHING, PENETRATIONS, REPAIRS, ETC. SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST NRCA, NATIONAL

ROOFING CONTRACTORS ASSOCIATION, ROOFING MANUALS AND DETAILS FOR LOW OR

STEEP SLOPE SYSTEMS AND PER ROOFING MANUFACTURER TO MAINTAIN EXISTING

WARRANTIES.

1. IF SUSPECTED ASBESTOS CONTAINING BUILDING MATERIAL (ACBM) IS ENCOUNTERED, WORK IN

THE IMMEDIATE VICINITY MUST STOP AND THE OWNERS CONTRACTING OFFICER SHALL BE

NOTIFIED. AFTER CONSULTATION WITH BASE PERSONNEL, THE OWNERS CONTRACTING OFFICER

WILL DIRECT FURTHER ACTION TO BE TAKEN. WORK SHOULD PROCEED UNINTERRUPTED IN

UNAFFECTED AREAS OF THE PROJECT.

2. BASED ON THE AGE OF THE BUILDINGS AT SELFRIDGE ANG BASE, THERE IS THE POTENTIAL FOR

THE PRESENCE OF LEAD ON PAINTED SURFACES. BEST MANAGEMENT PRACTICES MUST BE

EMPLOYED TO MINIMIZE DUST AND ADEQUATELY PROTECT WORKERS FROM LEAD BASED PAINT

(LBP) EXPOSURE IN ACCORDANCE WITH OSHA AND MIOSHA STANDARDS.

3. IF ASBESTOS AND/OR LEAD IS SUSPECTED IT SHOULD BE TESTED FOR. IF EITHER ASBESTOS

AND/OR LEAD IS FOUND, FOLLOW APPLICABLE OSHA GUIDELINES FOR REMEDIATION.

4. FOR ADDITIONAL INFORMATION, CONTRACTOR TO REQUEST ASBESTOS INSPECTION REPORT

FROM SELFRIDGE AIR NATIONAL GUARD BASE.

GENERAL NOTES:

1. DO NOT SCALE DRAWINGS.

ALL DIMENSIONS ARE IN NOMINAL BRITISH IMPERIAL UNITS.

2. SEE ADDITIONAL GENERAL NOTES ON SHEET M000.

3. DRAWINGS ARE BASED UPON GOVERNMENT'S RECORD DRAWINGS AND FIELD

VERIFICATION. NOTIFY GOVERNMENT OF DISCREPANCIES OR CONDITIONS REQUIRING

SUPPLEMENTAL INSTRUCTIONS PRIOR TO CONTINUATION OF WORK.

4. VERIFY ALL DIMENSIONS, CONDITIONS AND LOCATION OF EXISTING EQUIPMENT,

CONTROLS, PUMPS, PIPING, DUCTWORK, DIFFUSERS, ETC. IN FIELD, AND NOTIFY THE

RESPECTIVE DISCIPLINE OF ANY DISCREPANCIES BEFORE COMMENCEMENT OF WORK.

5. REFER TO ELEC. DRAWINGS FOR ADDITIONAL INFORMATION OF ELECTRICAL

REQUIREMENTS.

6. ALL WORK SHALL COMPLY WITH LOCAL AND NATIONAL CODES, UFC STANDARDS,

MANUFACTURERS RECOMMENDATIONS, SANG AND ANG DESIGN POLICIES,

ANGTEL-15-01, ANGTEL-15-01-04, ANGTEL-15-01-05, ETC.

7. INSTALL NEW HVAC EQUIPMENT AND COMPONENTS WITH ADEQUATE CLEARANCE SPACE,

FOR ACCESS AND MAINTENANCE, AS REQUIRED PER LOCAL CODE, ANG-ETL POLICIES,

UFC STANDARDS AND MANUFACTURERS REQUIREMENTS.

8. THE CONTRACTOR SHALL REPLACE/RESTORE ANY ITEM OR EQUIPMENT REQUIRED TO

REMAIN OPERATIONAL OR TEMPORARILY BEING RELOCATED/OFFSETED, OR THAT IS

DAMAGED DURING CONSTRUCTION. EXISTING PIPING, CONDUIT, WIRES, SUPPORT, ETC.

THAT IS REQUIRED TO BE OFFSET TO FACILITATE THE INSTALLATION OF NEW WORK

SHALL BE REINSTALLED AND RESTORED TO ITS ORIGINAL CONDITION. CONTRACTOR IS

REQUIRED TO FIELD VERIFY AREA OF WORK WHERE NEW EQUIPMENT ARE INSTALLED

BEFORE START OF WORK. THIS WORK IS PART OF THE CONTRACTOR'S CONTRACT

RESPONSIBILITIES.

9. MECHANICAL DEMOLITION WORK SHALL INCLUDE, BUT NOT BE LIMITED TO, THE REMOVAL

OF EXISTING AIR CONDITIONING EQUIPMENT, BOILERS, PUMPS, PIPING, SHEET METAL

DUCTWORK, HEATING COILS, AIR-COOLED CHILLER, ETC. AS INDICATED AND/OR

DESCRIBED ON DEMOLITION DRAWINGS. COMPLETELY REMOVE ALONG WITH CONTROLS,

PNEUMATIC TUBING, HANGERS, SUPPORTS AND ALL RELATED ACCESSORIES.

10. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING MECHANICAL SERVICES AND

UTILITIES BEING REUSED.

11. PATCH ALL OPENINGS IN FLOOR, CEILINGS AND WALLS CREATED BY DEMOLITION OR

NEW WORK AS REQUIRED TO MATCH EXISTING CONSTRUCTION.

12. ALL EQUIPMENT BEING REUSED AND/OR RELOCATED SHALL BE THOROUGHLY CLEANED

AND RECONDITIONED PRIOR TO START-UP.

13. CAP ALL BRANCH DUCTS FROM GRILLES, REGISTERS, DIFFUSERS, AND PIPING BEING

REMOVED, WHETHER INDICATED ON PLAN OR NOT.

14. PROVIDE TEMPORARY CAP ON ALL OPEN ENDED ACTIVE SUPPLY, RETURN AIR, EXHAUST

AIR DUCTWORK, REGISTERS AND GRILLES TO BE REUSED.

15. TEST AND BALANCE AIR & WATER VOLUMES TO FINAL DESIGN VALUES.

16. THE CONTRACTOR SHALL VERIFY WITH STRUCTURAL REQUIREMENT TO INSTALL NEW

EQUIPMENT ON ROOF, OR SUSPEND FROM EXISTING STRUCTURE.

B1

B

A1

A

Aa

Ab

Ac

Ad

B2

2a33a44a55a66a7 3a1

11a2

MATCHLINE - SEE SHEET MD101

T

T

TT

EX.AHU-5

EX.AHU-4

EX.AHU-8

EX.AHU-7

EX.AHU-9

EX

.18 x2

EX.OA DUCT

EX

.16 x1

EX

.16

"x

EX

.18 "Ø

EX.16"x18"

EX

.16 x1

EX.16x18

EX.SA DUCT

EX.32x20EX.36x20

EX.SUPPLY DUCT

TO REMAIN

EX.SD EX.SD EX.SG

EX.26x14

EX.SD

EX.28x20

EX. RELIEF AIR DUCT

EX. RELIEF AIR DUCT

EX. SDEX. SD

EX. ROOF

EX. RELIEF AIR DUCT

EX. RELIEF AIR DUCT

EX

.16 x1

EX.36x20

EX.SD

EX.SF

EX.RTU-2

EX.HV

DEMO

EX.AHU-6

EX.WALL

LOUVER

EX.AHU-10

EX.AHU-11

EX.SD

EX.SD

EX.SD

EX.SD

EX.SD EX.SD

EX.SD EX.SD

EX.SDEX.SD

EX.SD

EX.SD

EX.SD

EX.SD

EX.SD

EX.SD

EX.SD

EX.SD

EX.SD

EX.SD

EX.SD

EX.SD

EX.SDEX.SDEX.SD

EX.SD

EX.SD

EX.18x12

EX

.16

"Ø

EX. 20"ØEX. 18"Ø

EX.10"Ø

EX

.16

"Ø

EX.12"Ø

EX. 22"x14"

EX. 26"Ø

EX

.26

"Ø

EX

. 2 6"

Ø

EX

.1 8"

Ø

EX

. 1 8"

Ø

EX.14"ØEX.12"Ø

EX

.10

"Ø

EX.12"Ø

EX.12"Ø EX.10"Ø

EX.12"Ø EX.12"Ø

EX.8"Ø

EX.SD

EX

.10

"Ø

EX

.10

"Ø

EX

. 8

"Ø

EX

. 6

"Ø

EX

.10

"Ø

EX

.10 "Ø

EX

.10

"Ø

EX

.10

"Ø

EX.26"Ø

EX

.28 x1

EX.18"Ø

EX.12"Ø

EX

.12

"Ø

EX

.10 "Ø

EX

.18

"Ø

EX

.8"

Ø

EX

.8" Ø

EX.8x8

UP

EX

.10

"Ø

EX.10"Ø

EX

.10

"Ø

EX

.10 "Ø

EX

.10

"Ø

EX

.10 "Ø

EX

.8"

Ø

EX.8"Ø

EX.10"Ø

EX.SD

EX.10"Ø

EX

.18

"Ø

EX

.18 "Ø

EX

.26

"Ø

EX

.14 x1

EX.14x6

EX.10"Ø

EX.12"Ø

EX.14"Ø

EX

.10

"Ø

EX.EG

225 CFM

EX. EF

(ON ROOF)

EX.SDEX.SDEX.SD

EX.28x16EX.34x22EX.40x26EX.60x30

EX

.28 x1

EX

.28 x1

EX

.28 x1

EX

.28 x1

EX

.28 x1

EX.SDEX.SD

EX

.28 x1

EX

. 7

6" x3

8"

EX

.36 x2

EX.28x28 EX.28x16

EX

.24 x1

EX

.24 x1

EX

.24 x1

EX. 32"x32"

EX.SD

1740 CFM

EX.SD

1740 CFM

EX.SD

1740 CFM

EX.SD

1740 CFM

EX.SD

1740 CFM

EX.SD

1740 CFM

CAP, SEAL AND INSULATE

EX. WALL LOUVER

EX. RD EX. RD

EX.RD

EX.RD

EX. RD

EX.RD

EX. RD

EX.RD

EX.RD

EX.RD

EX.RD

EX.RD

EX.RD

EX. ROOF

VENT

EX. ROOF

VENT

EX.RD

EX. EF

EX. RELIEF

AIR DUCTS TO

REMAIN IN USE

EX.SD

EX. EG

100 CFM

EX. EG

75 CFM

EX.RD

EX.EFEX.SFEX.EF

EX.EF EX.EF

EX. 64x32

EX.24x20

EX.SG

EX.FD

EX.FD

EX.FDEX.FDEX.FD

EX.FD EX.FD

EX.SD

EX

.18 x1

EX. SDEX. ROOF

VENT

EX. ROOF

VENT

EX. ROOF

VENT

EX.RG

EX.RG EX.RG EX.RG

EX.SG

EX.FD

EX.16x18

EX.RD

EX.10"Ø

EX.10"Ø

EX.10"Ø EX.8"Ø

EX. ROOF

VENT

EX. ROOF

VENT

EX. ROOF

VENT

EX. RELIEF

AIR DUCTS TO

REMAIN IN USE

DEMO EX.

WINDOW AC DEMO EX.

WINDOW AC

EX.SD

EX. 26-12"x26-12"

ROOF OPENING

EX. 26-12"x26-12"

ROOF OPENING

EX. DUCT-MOUNTED

HW COIL

EX.RD

EX.ROOF VENT

EX.CUH TO

REMAIN

FIRST FLOOR

PLAN - EAST

MD102

HVAC DEMO

WORK

127th WING

BUILDING 1414

RENOVATION

http://www.AECOM.com

27777 Franklin Road, Suite 2000 Southfield, MI 48034 United States P: 248 204 5900 F: 248 204 5901

SCALE: 3 32" = 1'-0"

2a33a44a55a66a7

G F1

F E1

E D

C

C B1

B A1

A

Aa Ab

Ac Ad

D

11a2

DEMOLITION KEYED NOTES:

EXISTING RELIEF AIR DUCTS SHALL REMAIN IN USE WITH NEW HV-1 UNIT. CLEAN EXISTING

DUCTS THROUGHOUT FOR PROPER REUSE. REPAIR ANY DAMAGES PAINTING.

DEMOLISH EXISTING SUPPLY DUCT SECTION AND ASSOCIATED FIRE DAMPER IN AREA OF

WORK. PATCH EXITING WALL TO MATCH EXISTING CONSTRUCTION.

DEMOLISH EXISTING RETURN AIR WALL GRILLE (48"x24") AND ANY ASSOCIATED FIRE

DAMPER. PATCH EXISTING WALL TO MATCH EXISTING CONSTRUCTION. SEE

ARCHITECTURAL NOTES.

DEMOLISH EXISTING AIR HANDLING UNIT (HV) CURRENTLY HUNG FROM EXISTING

STRUCTURE WITH ASSOCIATED DUCT HEATING COIL, PIPING, CONTROLS, SUPPORTS AND

SERVICES. CAP AND SEAL EXISTING OUTSIDE AIR WALL LOUVER WITH SHEET METAL AND

INSULATION.

DEMOLISH EXISTING DUCTWORK IN WAREHOUSE AREA TO EXTENT SHOWN ON DRAWING.

FIELD VERIFY EXISTING CONDITIONS.

DEMOLISH EXISTING AIR HANDLING UNIT HUNG FROM EXISTING STRUCTURE WITH

ASSOCIATED DUCTWORK, PIPING, CONTROLS, SUPPORTS AND SERVICES.

DEMOLISH EXISTING SUPPLY AND RETURN DUCTWORK LOCATED IN CEILING SPACE WITH

ASSOCIATED INSULATION, HANGERS AND SUPPORTS TO EXTENT SHOWN ON DRAWING.

EXISTING SUPPLY AND RETURN DIFFUSERS SHALL REMAIN IN USE. ALL EXISTING

DIFFUSERS SHALL BE CLEANED THROUGHOUT FOR PROPER REUSE. THIS WORK IS

TYPICAL FOR ALL EXISTING DIFFUSERS SHOWN ON THIS DRAWING.

DEMOLISH EXISTING EXPOSED ROUND DIFFUSER AND CAP NECK AT MAIN.

DEMOLISH EXISTING ROOF VENT ON ROOF AND ANY ASSOCIATED DUCT CONNECTED TO

BELOW ROOF LINE. CAP AND SEAL EXISTING VENT CURB ON ROOF. SEE ARCHITECTURAL

NOTES.

TEMPORARILY DISCONNECT EXISTING EXHAUST DUCT FOR FUTURE CONNECTION TO NEW

EXHAUST FAN.

DEMOLISH EXISTING FAN ON ROOF WITH ASSOCIATED SERVICES AND CONTROLS. CAP

ROOF CURB ON ROOF. SEE ARCHITECTURAL NOTES.

DEMOLISH EXISTING FAN ON ROOF WITH ASSOCIATED SERVICES AND CONTROLS. REUSE

ROOF OPENING TO ROUTE NEW RETURN AIR DUCT DOWN FROM HV-1. FIELD VERIFY

EXISTING CONDITIONS. COORDINATE WITH STRUCTURAL DESIGN.

DEMOLISH EXISTING FAN ON ROOF WITH ASSOCIATED SERVICES AND CONTROLS. REUSE

ROOF OPENING TO INSTALL NEW RELIEF AIR DAMPER AND ASSOCIATED HOOD ON ROOF.

FIELD VERIFY EXISTING CONDITIONS. COORDINATE WITH STRUCTURAL DESIGN.

DEMOLISH EXISTING WINDOW AC UNIT WITH ASSOCIATED SERVICES AND CONTROLS.

PATCH WALL TO MATCH EXISTING CONSTRUCTION. SEE ARCHITECTURAL NOTES.

GENERAL ARCHITECTURAL NOTES:

1. SAWCUT AND REMOVE PORTION OF WALL AS REQUIRED FOR NEW WORK. TEMPORARILY SHORE OPENING AS

REQUIRED FOR INSTALLATION OF NEW WORK. PATCH EXISTING WALL IF DAMAGED BY NEW WORK, FIRE STOP

AND SEAL TO MAINTAIN EXISTING FIRE RATING.

2. PATCH AND FILL IN WALL PENETRATIONS IN KIND AS A RESULT OF DEMOLITION AND NEW WORK SCOPE.

MAINTAIN EXISTING FIRE RATING.

3. REMOVE, SALVAGE AND RE-INSTALL ALL CEILING TILES AS REQUIRED FOR DEMOLITION AND NEW WORK

SCOPE. REPLACE ANY DAMAGED AND/OR MISSING TILES IN KIND.

4. REMOVE PORTION OF ROOF AS REQUIRED FOR NEW WORK. COORDINATE LOCATION OF OPENINGS AND CURB SUPPORTS WITH STRUCTURE BELOW. PATCH EXISTING ROOFING IF DAMAGED BY NEW WORK IN KIND.

OVERLAP NEW AND EXISTING ROOFING MINIMUM 6" ON ALL SIDES.

5. ALL ROOFING WORK, INCLUDING EQUIPMENT CURBS, FLASHING, PATCHING, PENETRATIONS, REPAIRS, ETC.

SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST NRCA, NATIONAL ROOFING CONTRACTORS ASSOCIATION, ROOFING MANUALS AND DETAILS FOR LOW OR STEEP SLOPE SYSTEMS AND PER ROOFING

MANUFACTURER TO MAINTAIN EXISTING WARRANTIES.

1. CONTRACTOR SHALL INCLUDE THE ABATEMENT OF ALL ASBESTOS CONTAINING BUILDING

MATERIALS (ACBM) IN THEIR BID, THAT IS REQUIRED TO COMPLETE THE SCOPE OF WORK

INDICATED ON CONTRACT DOCUMENTS.

2. ASBESTOS ABATED IN THE COURSE OF THIS PROJECT MUST BE PROPERLY COLLECTED,

CONTAINERIZED AND DISPOSED OF IN A LANDFILL LICENSED TO ACCEPT ASBESTOS WASTE.

ALL ASBESTOS DISPOSAL MANIFESTS MUST BE COORDINATED WITH, AND SIGNED BY, 127TH

WING ENVIRONMENTAL MANAGEMENT OFFICE PERSONNEL.

3. CONTRACTOR SHALL UTILIZE SELFRIDGE ANG BASE (SANGB) FORM 23 FOR TRACKING

HAZARDOUS MATERIALS AND SANGB FORM 72 FOR SOLID WASTE TRACKING AND

DIVERSION.

4. CONTRACTOR SHALL ASSUME THE PRESENCE OF ASBESTOS CONTAINING DRY WALL JOINT

COMPOUND IN EXISTING WALLS ABOVE CEILING NOTED FOR PENETRATION BY NEW SUPPLY

AIR DUCTS.

1. IF SUSPECTED ASBESTOS CONTAINING BUILDING MATERIAL (ACBM) IS ENCOUNTERED, WORK IN

THE IMMEDIATE VICINITY MUST STOP AND THE OWNERS CONTRACTING OFFICER SHALL BE

NOTIFIED. AFTER CONSULTATION WITH BASE PERSONNEL, THE OWNERS CONTRACTING OFFICER

WILL DIRECT FURTHER ACTION TO BE TAKEN. WORK SHOULD PROCEED UNINTERRUPTED IN

UNAFFECTED AREAS OF THE PROJECT.

2. BASED ON THE AGE OF THE BUILDINGS AT SELFRIDGE ANG BASE, THERE IS THE POTENTIAL FOR

THE PRESENCE OF LEAD ON PAINTED SURFACES. BEST MANAGEMENT PRACTICES MUST BE

EMPLOYED TO MINIMIZE DUST AND ADEQUATELY PROTECT WORKERS FROM LEAD BASED PAINT

(LBP) EXPOSURE IN ACCORDANCE WITH OSHA AND MIOSHA STANDARDS.

3. IF ASBESTOS AND/OR LEAD IS SUSPECTED IT SHOULD BE TESTED FOR. IF EITHER ASBESTOS

AND/OR LEAD IS FOUND, FOLLOW APPLICABLE OSHA GUIDELINES FOR REMEDIATION.

4. FOR ADDITIONAL INFORMATION, CONTRACTOR TO REQUEST ASBESTOS INSPECTION REPORT

FROM SELFRIDGE AIR NATIONAL GUARD BASE.

GENERAL NOTES:

1. DO NOT SCALE DRAWINGS.

ALL DIMENSIONS ARE IN NOMINAL BRITISH IMPERIAL UNITS.

2. SEE ADDITIONAL GENERAL NOTES ON SHEET M000.

3. DRAWINGS ARE BASED UPON GOVERNMENT'S RECORD DRAWINGS AND FIELD

VERIFICATION. NOTIFY GOVERNMENT OF DISCREPANCIES OR CONDITIONS REQUIRING

SUPPLEMENTAL INSTRUCTIONS PRIOR TO CONTINUATION OF WORK.

4. VERIFY ALL DIMENSIONS, CONDITIONS AND LOCATION OF EXISTING EQUIPMENT,

CONTROLS, PUMPS, PIPING, DUCTWORK, DIFFUSERS, ETC. IN FIELD, AND NOTIFY THE

RESPECTIVE DISCIPLINE OF ANY DISCREPANCIES BEFORE COMMENCEMENT OF WORK.

5. REFER TO ELEC. DRAWINGS FOR ADDITIONAL INFORMATION OF ELECTRICAL

REQUIREMENTS.

6. ALL WORK SHALL COMPLY WITH LOCAL AND NATIONAL CODES, UFC STANDARDS,

MANUFACTURERS RECOMMENDATIONS, SANG AND ANG DESIGN POLICIES,

ANGTEL-15-01, ANGTEL-15-01-04, ANGTEL-15-01-05, ETC.

7. INSTALL NEW HVAC EQUIPMENT AND COMPONENTS WITH ADEQUATE CLEARANCE SPACE,

FOR ACCESS AND MAINTENANCE, AS REQUIRED PER LOCAL CODE, ANG-ETL POLICIES,

UFC STANDARDS AND MANUFACTURERS REQUIREMENTS.

8. THE CONTRACTOR SHALL REPLACE/RESTORE ANY ITEM OR EQUIPMENT REQUIRED TO

REMAIN OPERATIONAL OR TEMPORARILY BEING RELOCATED/OFFSETED, OR THAT IS

DAMAGED DURING CONSTRUCTION. EXISTING PIPING, CONDUIT, WIRES, SUPPORT, ETC.

THAT IS REQUIRED TO BE OFFSET TO FACILITATE THE INSTALLATION OF NEW WORK

SHALL BE REINSTALLED AND RESTORED TO ITS ORIGINAL CONDITION. CONTRACTOR IS

REQUIRED TO FIELD VERIFY AREA OF WORK WHERE NEW EQUIPMENT ARE INSTALLED

BEFORE START OF WORK. THIS WORK IS PART OF THE CONTRACTOR'S CONTRACT

RESPONSIBILITIES.

9. MECHANICAL DEMOLITION WORK SHALL INCLUDE, BUT NOT BE LIMITED TO, THE REMOVAL

OF EXISTING AIR CONDITIONING EQUIPMENT, BOILERS, PUMPS, PIPING, SHEET METAL

DUCTWORK, HEATING COILS, AIR-COOLED CHILLER, ETC. AS INDICATED AND/OR

DESCRIBED ON DEMOLITION DRAWINGS. COMPLETELY REMOVE ALONG WITH CONTROLS,

PNEUMATIC TUBING, HANGERS, SUPPORTS AND ALL RELATED ACCESSORIES.

10. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING MECHANICAL SERVICES AND

UTILITIES BEING REUSED.

11. PATCH ALL OPENINGS IN FLOOR, CEILINGS AND WALLS CREATED BY DEMOLITION OR

NEW WORK AS REQUIRED TO MATCH EXISTING CONSTRUCTION.

12. ALL EQUIPMENT BEING REUSED AND/OR RELOCATED SHALL BE THOROUGHLY CLEANED

AND RECONDITIONED PRIOR TO START-UP.

13. CAP ALL BRANCH DUCTS FROM GRILLES, REGISTERS, DIFFUSERS, AND PIPING BEING

REMOVED, WHETHER INDICATED ON PLAN OR NOT.

14. PROVIDE TEMPORARY CAP ON ALL OPEN ENDED ACTIVE SUPPLY, RETURN AIR, EXHAUST

AIR DUCTWORK, REGISTERS AND GRILLES TO BE REUSED.

15. TEST AND BALANCE AIR & WATER VOLUMES TO FINAL DESIGN VALUES.

F1

F

E1

E

D1

C1

C

B1

B

A1

A

Aa

Ab

Ac

Ad

D

11a2

C2

C3

B2

3a1

2a33a44a55a66a7 3a1

11a2

2a33a44a55a66a7

G

F1

F

E1

E

D1

C1

C

B1

B

A1

A

Aa

Ab

Ac

Ad

D

11a2

C2

C3

B2

3a1

2a33a44a55a66a7 3a1

11a2

G G

G G

G G

G G

G G

G G

G G

G G

G

G

EX. RTU-2

TO REMAIN

EX.ROOF VENT

(TYP FOR ALL)

EX. CAPPED

ROOF VENT

EX. HW BOILERS FLUE

STACK ROOF OPENING

(E) PLUMBING

VENT PIPE

(TYP FOR ALL)

(TYP)

(TYP)

EX.CU

(TO REMAIN)

EX.PLBG VENT

(TYP FOR ALL)

(TYP)

(TYP)

(TYP)

(TYP)

(TYP) (TYP)

(TYP)(TYP)

(TYP)

(TYP) (TYP)

(TYP) (TYP)

(TYP)

EX.2" GAS

LINE TO

EX.RTU-S

EX. RTU-1

TO REMAIN

(TYP)

(TYP)

(TYP)

(TYP)

(TYP)

EX.2" GAS LINE

DOWN TO 4"

EX. GAS MAIN

EX.1"GAS

EX. CU

GGGGG

EX. GAS

METER

CAPPED

EX.FAN

(TYP)

EX. ROOF DRAIN

(TYP FOR ALL)

(TYP)

(TYP)

EX.CAPPED

ROOF VENT (TYP)

EX.EF

(TOILETS)

EX.EF

(TOILETS)

EX.EF-1

(TO REMAIN)

(TYP)

EX.CAPPED

ROOF VENT

EX.ROOF VENT

(WAREHOUSE)

EX.EF

(WAREHOUSE)

EX.EF

(WAREHOUSE)

(TYP)

(TYP)

(TYP)

(TYP)

EX. EF

(WAREHOUSE)

EX. SF

(WAREHOUSE)

EX. SF

(WAREHOUSE)

EX. EF

(WAREHOUSE)EX. ROOF

VENT

ROOF PLAN -

HVAC DEMO

MD103

WORK

127th WING

BUILDING 1414

RENOVATION

http://www.AECOM.com

27777 Franklin Road, Suite 2000 Southfield, MI 48034 United States P: 248 204 5900 F: 248 204 5901

SCALE: 116"= 1'-0"

2a33a44a55a66a7

G F1

F E1

E D

C

C B1

B A1

A

Aa Ab

Ac Ad

D

11a2

2a33a44a55a66a7

G F1

F E1

E D

C

C B1

B A1

A

Aa Ab

Ac Ad

D

11a2

DEMOLITION KEYED NOTES:

DEMOLISH EXISTING ROOF VENT. CAP AND SEAL EX. ROOF CURB WITH SHEET METAL AND

INSULATION. SEE ARCHITECTURAL NOTES.

DEMOLISH EXISTING EXHAUST FAN. CAP AND SEAL EX. ROOF CURB WITH SHEET METAL AND

INSULATION. SEE ARCHITECTURAL NOTES.

DEMOLISH EXISTING EXHAUST FAN AND TEMPORARILY PROTECT ROOF OPENING TO

INSTALL NEW EXHAUST FAN.

DEMOLISH EXISTING EXHAUST FAN AND TEMPORARILY PROTECT ROOF OPENING FOR

REUSE TO ROUTE NEW RETURN AIR DUCT.

DEMOLISH EXISTING ROOF HOOD AND TEMPORARILY PROTECT ROOF OPENING TO INSTALL

NEW RELIEF AIR DAMPER AND ASSOCIATED ROOF HOOD.

DEMOLISH EXISTING 20" BOILER STACK AND TEMPORARILY PROTECT ROOF OPENING FOR

REUSE TO ROUTE NEW GAS LINE AND BOILER FLUE VENT.

EXISTING 4" GAS LINE ON OUTSIDE WALL ROUTED INSIDE TO MAIN MECHANICAL ROOM TO

REMAIN IN USE.

GENERAL ARCHITECTURAL NOTES:

1. SAWCUT AND REMOVE PORTION OF WALL AS REQUIRED FOR NEW WORK. TEMPORARILY SHORE OPENING AS

REQUIRED FOR INSTALLATION OF NEW WORK. PATCH EXISTING WALL IF DAMAGED BY NEW WORK, FIRE STOP

AND SEAL TO MAINTAIN EXISTING FIRE RATING.

2. PATCH AND FILL IN ROOF PENETRATIONS IN KIND AS A RESULT OF DEMOLITION AND NEW WORK SCOPE.

3. REMOVE PORTION OF ROOF AS REQUIRED FOR NEW WORK. COORDINATE LOCATION OF OPENINGS AND CURB SUPPORTS WITH STRUCTURE BELOW. PATCH EXISTING ROOFING IF DAMAGED BY NEW WORK IN KIND.

OVERLAP NEW AND EXISTING ROOFING MINIMUM 6" ON ALL SIDES.

4. ALL ROOFING WORK, INCLUDING EQUIPMENT CURBS, FLASHING, PATCHING, PENETRATIONS, REPAIRS, ETC.

SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST NRCA, NATIONAL ROOFING CONTRACTORS ASSOCIATION, ROOFING MANUALS AND DETAILS FOR LOW OR STEEP SLOPE SYSTEMS AND PER ROOFING

MANUFACTURER TO MAINTAIN EXISTING WARRANTIES.

GENERAL NOTES:

1. DO NOT SCALE DRAWINGS.

ALL DIMENSIONS ARE IN NOMINAL BRITISH IMPERIAL UNITS.

2. SEE ADDITIONAL GENERAL NOTES ON SHEET M000.

3. DRAWINGS ARE BASED UPON GOVERNMENT'S RECORD DRAWINGS AND FIELD

VERIFICATION. NOTIFY GOVERNMENT OF DISCREPANCIES OR CONDITIONS REQUIRING

SUPPLEMENTAL INSTRUCTIONS PRIOR TO CONTINUATION OF WORK.

4. VERIFY ALL DIMENSIONS, CONDITIONS AND LOCATION OF EXISTING EQUIPMENT,

CONTROLS, PUMPS, PIPING, DUCTWORK, DIFFUSERS, ETC. IN FIELD, AND NOTIFY THE

RESPECTIVE DISCIPLINE OF ANY DISCREPANCIES BEFORE COMMENCEMENT OF WORK.

5. REFER TO ELEC. DRAWINGS FOR ADDITIONAL INFORMATION OF ELECTRICAL

REQUIREMENTS.

6. ALL WORK SHALL COMPLY WITH LOCAL AND NATIONAL CODES, UFC STANDARDS,

MANUFACTURERS RECOMMENDATIONS, SANG AND ANG DESIGN POLICIES,

ANGTEL-15-01, ANGTEL-15-01-04, ANGTEL-15-01-05, ETC.

7. INSTALL NEW HVAC EQUIPMENT AND COMPONENTS WITH ADEQUATE CLEARANCE SPACE,

FOR ACCESS AND MAINTENANCE, AS REQUIRED PER LOCAL CODE, ANG-ETL POLICIES,

UFC STANDARDS AND MANUFACTURERS REQUIREMENTS.

8. THE CONTRACTOR SHALL REPLACE/RESTORE ANY ITEM OR EQUIPMENT REQUIRED TO

REMAIN OPERATIONAL OR TEMPORARILY BEING RELOCATED/OFFSETED, OR THAT IS

DAMAGED DURING CONSTRUCTION. EXISTING PIPING, CONDUIT, WIRES, SUPPORT, ETC.

THAT IS REQUIRED TO BE OFFSET TO FACILITATE THE INSTALLATION OF NEW WORK

SHALL BE REINSTALLED AND RESTORED TO ITS ORIGINAL CONDITION. CONTRACTOR IS

REQUIRED TO FIELD VERIFY AREA OF WORK WHERE NEW EQUIPMENT ARE INSTALLED

BEFORE START OF WORK. THIS WORK IS PART OF THE CONTRACTOR'S CONTRACT

RESPONSIBILITIES.

9. MECHANICAL DEMOLITION WORK SHALL INCLUDE, BUT NOT BE LIMITED TO, THE REMOVAL

OF EXISTING AIR CONDITIONING EQUIPMENT, BOILERS, PUMPS, PIPING, SHEET METAL

DUCTWORK, HEATING COILS, AIR-COOLED CHILLER, ETC. AS INDICATED AND/OR

DESCRIBED ON DEMOLITION DRAWINGS. COMPLETELY REMOVE ALONG WITH CONTROLS,

PNEUMATIC TUBING, HANGERS, SUPPORTS AND ALL RELATED ACCESSORIES.

10. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING MECHANICAL SERVICES AND

UTILITIES BEING REUSED.

11. PATCH ALL OPENINGS IN ROOF, FLOOR, CEILINGS AND WALLS CREATED BY DEMOLITION

OR NEW WORK AS REQUIRED TO MATCH EXISTING CONSTRUCTION.

12. ALL EQUIPMENT BEING REUSED AND/OR RELOCATED SHALL BE THOROUGHLY CLEANED

AND RECONDITIONED PRIOR TO START-UP.

13. CAP ALL BRANCH DUCTS FROM GRILLES, REGISTERS, DIFFUSERS, AND PIPING BEING

REMOVED, WHETHER INDICATED ON PLAN OR NOT.

14. PROVIDE TEMPORARY CAP ON ALL OPEN ENDED ACTIVE SUPPLY, RETURN AIR, EXHAUST

AIR DUCTWORK, REGISTERS AND GRILLES TO BE REUSED.

15. TEST AND BALANCE AIR & WATER VOLUMES TO FINAL DESIGN VALUES.

F1

F

E1

E

D1

C1

C

B1

D

11a2

C2

C3

B2

3a1

MATCHLINE - SEE SHEET MD105

EX.1"

EX.3 4"

EX. 3 4"

EX.3 4"

EX.1"

EX.3-12"

EX.3-12"

EX.1"

EX.3-12"

EX.4" CHW SUPPLY

& RETURN PIPING

LOOP

EX.1"

EX.1-12" HWS

& HWR LOOP

EX.AIR COOLED

CHILLER

EX.AHU-5

EX.AHU-4

EX.AHU-12

EX.HV-4

EX.AHU-7

EX.AHU-9

EX.AHU-2

EX.HWP

EX.HWP

(3) EX. HW

BOILERS

EX.RHB-1

EX.AHU-6

EX.CHWP

EX.UH-2

EX.UH-1

EX. EXPANSION

TANK

EX.DWHEX. AHU

(ABANDON IN PLACE)

EX.CAPPED

CHW PIPING

EX.3 4"

EX. ABANDONED HW SUPPLY

& RETURN PIPING LOOP

(OUT OF PROJECT AREA)

EX. ABANDONED HW SUPPLY

& RETURN PIPING LOOP

(OUT OF PROJECT AREA)

EX. ABANDONED HW SUPPLY

& RETURN PIPING LOOP

(OUT OF PROJECT AREA)

EX. CHW SUPPLY &

RETURN PIPING LOOP

EX. 2" HW REHEAT

RETURN PIPING LOOP

EX. 2" HW REHEAT

SUPPLY PIPING LOOP

EX. HW SUPPLY & RETURN

REHEAT PIPING TO EX. VAV BOXES

(OUT OF PROJECT AREA)

EX. HWS&R REHEAT

PIPING LOOP

(OUT OF PROJECT AREA)

EX. CP-1

HW RECIRC.

PUMP

EX.

CHEMICAL

FEEDER

EX. 4" CHW SUPPLY &

RETURN PIPING LOOP

EX. COMPRESSION

TANK

EX. HOUSEKEEPING

PAD TO REMAIN

EX. CW

MAKEUP LINE

EX. ABANDONED HW SUPPLY

& RETURN PIPING LOOP

(OUT OF PROJECT AREA)

EX. HW SUPPLY &

RETURN PIPING

LOOP

EX.AHU-8

EX.HWS

EX

.H

W S

EX

.H

W R

EX.HWR

EX.HWS

EX.HWR

EX

.H

W S

EX

.H

W R

EX.HWR

EX. ABANDONED HW SUPPLY

& RETURN PIPING LOOP

(OUT OF PROJECT AREA)

2"

EX. HWS&R REHEAT

PIPING TO EX.VAV BOXES

(OUT OF PROJECT AREA)

EX. 2" HWR

EX. HWS&R REHEAT

PIPING TO EX.VAV BOXES

(OUT OF PROJECT AREA)

FIRST FLOOR

PLAN-WEST

MD104

HVAC PIPING

DEMO WORK

127th WING

BUILDING 1414

RENOVATION

http://www.AECOM.com

27777 Franklin Road, Suite 2000 Southfield, MI 48034 United States P: 248 204 5900 F: 248 204 5901

SCALE: 3 32" = 1'-0"

2a33a44a55a66a7

G F1

F E1

E D

C

C B1

B A1

A

Aa Ab

Ac Ad

D

11a2

DEMOLITION KEYED NOTES:

ABANDON EXISTING AHU IN PLACE. DISCONNECT ALL EXISTING HOT AND CHILLED WATER

PIPING CONNECTIONS AND ASSOCIATED VALVES AND CONTROLS.

DEMOLISH EXISTING HOT WATER BOILERS WITH ASSOCIATED EXHAUST FLUE STACKS,

COMPRESSION TANK, PIPING, VALVES, SUPPORTS, WATER MAKEUP, GAS AND CONTROLS.

ALL EXISTING HOT WATER PIPING ASSOCIATED WITH DEMOLISHED HOT WATER SYSTEM

SHALL BE REMOVED IN ALL ACCESSIBLE AREAS OF WORK. EXISTING PIPING LOCATED OUT

OF WORK AREAS SHALL BE DRAINED, CAPPED AND ABANDONED.

DEMOLISH EXISTING HOT WATER RE-CIRCULATION PUMPS WITH ASSOCIATED PIPING

VALVES, SUPPORTS AND CONTROLS.

DEMOLISH EXISTING HW UNIT HEATER (1414 UH-2) WITH ASSOCIATED PIPING, VALVES AND

CONTROLS.

EXISTING HW UNIT HEATER (1414 UH-1) SHALL REMAIN IN USE. DISCONNECT EXISTING HW

PIPING AND CAP FOR FUTURE CONNECTION.

DEMOLISH EXISTING EXPANSION TANK AND RETURN TO OWNER. CAP EXISTING HW PIPE

FOR FUTURE CONNECTION TO NEW EXPANSION TANK.

DEMOLISH EXISTING HW REHEAT RECIRCULATION PUMP AND RETURN TO OWNER. CAP

EXISTING PIPING FOR FUTURE CONNECTION TO NEW PUMPS.

EXISTING TO REMAIN IN USE

DEMOLISH EXISTING HW AND CHW PIPING CONNECTIONS TO EXISTING INDOOR AHU WITH

ASSOCIATED VALVES, SUPPORTS AND CONTROLS.

DEMOLISH EXISTING AIR COOLED CHILLER LOCATED OUTSIDE WITH ASSOCIATED PIPING,

VALVES, CONTROLS AND SUPPORTS. CAPTURE REFRIGERANT GAS AS REQUIRED BY CODE

AND ANGB STANDARDS. PATCH EXTERIOR WALL PIPING PENETRATIONS IN KIND. SEE

ARCHITECTURAL NOTES.

DEMOLISH EXISTING CHILLED WATER RECIRCULATION PUMP WITH ASSOCIATED PIPING,

VALVES, CONTROLS, SUPPORTS AND ACCESSORIES.

DEMOLISH EXISTING CHILLED WATER SUPPLY AND RETURN DISTRIBUTION PIPING ROUTED

IN CEILING SPACE. REMOVE ALL EXISTING CHILLED WATER PIPING IN ACCESSIBLE AREA

OF WORK. DRAIN, CAP AND ABANDON EXISTING PIPING OUTSIDE AREA OF WORK.

EXISTING 1-12" HWS AND HWR REHEAT PIPING TO BE REUSED TO FEED NEW VAV REHEAT

COILS.

CAP AND SEAL EXTERIOR WALL PIPING PENETRATIONS TO MATCH EXISTING

CONSTRUCTION.

GENERAL ARCHITECTURAL

NOTES:

1. SAWCUT AND REMOVE PORTION OF WALL AS REQUIRED FOR NEW WORK. TEMPORARILY SHORE

OPENING AS REQUIRED FOR INSTALLATION OF NEW WORK. PATCH EXISTING WALL IF DAMAGED

BY NEW WORK, FIRE STOP AND SEAL TO MAINTAIN EXISTING FIRE RATING.

2. PATCH AND FILL IN WALL PENETRATIONS IN KIND AS A RESULT OF DEMOLITION AND NEW WORK

SCOPE. MAINTAIN EXISTING FIRE RATING.

3. REMOVE, SALVAGE AND RE-INSTALL ALL CEILING TILES AS REQUIRED FOR DEMOLITION AND NEW

WORK SCOPE. REPLACE ANY DAMAGED AND/OR MISSING TILES IN KIND.

4. REMOVE PORTION OF ROOF AS REQUIRED FOR NEW WORK. COORDINATE LOCATION OF

OPENINGS AND CURB SUPPORTS WITH STRUCTURE BELOW. PATCH EXISTING ROOFING IF

DAMAGED BY NEW WORK IN KIND. OVERLAP NEW AND EXISTING ROOFING MINIMUM 6" ON ALL

SIDES.

5. ALL ROOFING WORK, INCLUDING EQUIPMENT CURBS, FLASHING, PATCHING, PENETRATIONS, REPAIRS, ETC. SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST NRCA, NATIONAL

ROOFING CONTRACTORS ASSOCIATION, ROOFING MANUALS AND DETAILS FOR LOW OR STEEP

SLOPE SYSTEMS AND PER ROOFING MANUFACTURER TO MAINTAIN EXISTING WARRANTIES.

1. CONTRACTOR SHALL INCLUDE THE ABATEMENT OF ALL ASBESTOS CONTAINING BUILDING

MATERIALS (ACBM) IN THEIR BID, THAT IS REQUIRED TO COMPLETE THE SCOPE OF WORK

INDICATED ON CONTRACT DOCUMENTS.

2. ASBESTOS ABATED IN THE COURSE OF THIS PROJECT MUST BE PROPERLY COLLECTED,

CONTAINERIZED AND DISPOSED OF IN A LANDFILL LICENSED TO ACCEPT ASBESTOS WASTE. ALL

ASBESTOS DISPOSAL MANIFESTS MUST BE COORDINATED WITH, AND SIGNED BY, 127TH WING

ENVIRONMENTAL MANAGEMENT OFFICE PERSONNEL.

3. CONTRACTOR SHALL UTILIZE SELFRIDGE ANG BASE (SANGB) FORM 23 FOR TRACKING

HAZARDOUS MATERIALS AND SANGB FORM 72 FOR SOLID WASTE TRACKING AND DIVERSION.

4. CONTRACTOR SHALL ASSUME THE PRESENCE OF ASBESTOS CONTAINING DRY WALL JOINT

COMPOUND IN EXISTING WALLS ABOVE CEILING NOTED FOR PENETRATION BY NEW SUPPLY AIR

DUCTS.

1. IF SUSPECTED ASBESTOS CONTAINING BUILDING MATERIAL (ACBM) IS ENCOUNTERED, WORK IN

THE IMMEDIATE VICINITY MUST STOP AND THE OWNERS CONTRACTING OFFICER SHALL BE

NOTIFIED. AFTER CONSULTATION WITH BASE PERSONNEL, THE OWNERS CONTRACTING OFFICER

WILL DIRECT FURTHER ACTION TO BE TAKEN. WORK SHOULD PROCEED UNINTERRUPTED IN

UNAFFECTED AREAS OF THE PROJECT.

2. BASED ON THE AGE OF THE BUILDINGS AT SELFRIDGE ANG BASE, THERE IS THE POTENTIAL FOR

THE PRESENCE OF LEAD ON PAINTED SURFACES. BEST MANAGEMENT PRACTICES MUST BE

EMPLOYED TO MINIMIZE DUST AND ADEQUATELY PROTECT WORKERS FROM LEAD BASED PAINT

(LBP) EXPOSURE IN ACCORDANCE WITH OSHA AND MIOSHA STANDARDS.

3. IF ASBESTOS AND/OR LEAD IS SUSPECTED IT SHOULD BE TESTED FOR. IF EITHER ASBESTOS

AND/OR LEAD IS FOUND, FOLLOW APPLICABLE OSHA GUIDELINES FOR REMEDIATION.

4. FOR ADDITIONAL INFORMATION, CONTRACTOR TO REQUEST ASBESTOS INSPECTION REPORT

FROM SELFRIDGE AIR NATIONAL GUARD BASE.

GENERAL NOTES:

1. DO NOT SCALE DRAWINGS.

ALL DIMENSIONS ARE IN NOMINAL BRITISH IMPERIAL UNITS.

2. SEE ADDITIONAL GENERAL NOTES ON SHEET M000.

3. DRAWINGS ARE BASED UPON GOVERNMENT'S RECORD DRAWINGS AND FIELD

VERIFICATION. NOTIFY GOVERNMENT OF DISCREPANCIES OR CONDITIONS REQUIRING

SUPPLEMENTAL INSTRUCTIONS PRIOR TO CONTINUATION OF WORK.

4. VERIFY ALL DIMENSIONS, CONDITIONS AND LOCATION OF EXISTING EQUIPMENT,

CONTROLS, PUMPS, PIPING, DUCTWORK, DIFFUSERS, ETC. IN FIELD, AND NOTIFY THE

RESPECTIVE DISCIPLINE OF ANY DISCREPANCIES BEFORE COMMENCEMENT OF WORK.

5. REFER TO ELEC. DRAWINGS FOR ADDITIONAL INFORMATION OF ELECTRICAL

REQUIREMENTS.

6. ALL WORK SHALL COMPLY WITH LOCAL AND NATIONAL CODES, UFC STANDARDS,

MANUFACTURERS RECOMMENDATIONS, SANG AND ANG DESIGN POLICIES,

ANGTEL-15-01, ANGTEL-15-01-04, ANGTEL-15-01-05, ETC.

7. INSTALL NEW HVAC EQUIPMENT AND COMPONENTS WITH ADEQUATE CLEARANCE SPACE,

FOR ACCESS AND MAINTENANCE, AS REQUIRED PER LOCAL CODE, ANG-ETL POLICIES,

UFC STANDARDS AND MANUFACTURERS REQUIREMENTS.

8. THE CONTRACTOR SHALL REPLACE/RESTORE ANY ITEM OR EQUIPMENT REQUIRED TO

REMAIN OPERATIONAL OR TEMPORARILY BEING RELOCATED/OFFSETED, OR THAT IS

DAMAGED DURING CONSTRUCTION. EXISTING PIPING, CONDUIT, WIRES, SUPPORT, ETC.

THAT IS REQUIRED TO BE OFFSET TO FACILITATE THE INSTALLATION OF NEW WORK

SHALL BE REINSTALLED AND RESTORED TO ITS ORIGINAL CONDITION. CONTRACTOR IS

REQUIRED TO FIELD VERIFY AREA OF WORK WHERE NEW EQUIPMENT ARE INSTALLED

BEFORE START OF WORK. THIS WORK IS PART OF THE CONTRACTOR'S CONTRACT

RESPONSIBILITIES.

9. MECHANICAL DEMOLITION WORK SHALL INCLUDE, BUT NOT BE LIMITED TO, THE REMOVAL

OF EXISTING AIR CONDITIONING EQUIPMENT, BOILERS, PUMPS, PIPING, SHEET METAL

DUCTWORK, HEATING COILS, AIR-COOLED CHILLER, ETC. AS INDICATED AND/OR

DESCRIBED ON DEMOLITION DRAWINGS. COMPLETELY REMOVE ALONG WITH CONTROLS,

PNEUMATIC TUBING, HANGERS, SUPPORTS AND ALL RELATED ACCESSORIES.

10. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING MECHANICAL SERVICES AND

UTILITIES BEING REUSED.

11. PATCH ALL OPENINGS IN FLOOR, CEILINGS AND WALLS CREATED BY DEMOLITION OR

NEW WORK AS REQUIRED TO MATCH EXISTING CONSTRUCTION.

12. ALL EQUIPMENT BEING REUSED AND/OR RELOCATED SHALL BE THOROUGHLY CLEANED

AND RECONDITIONED PRIOR TO START-UP.

13. CAP AND TERMINATE ALL EXISTING PIPING NOT IN USE AND EXTEND OUT OF PROJECT

AREA. DRAIN ALL EXISTING PIPING, CAP AND SEAL.

14. PROVIDE TEMPORARY CAP ON ALL OPEN ENDED ACTIVE SUPPLY AND RETURN HOT

WATER PIPING TO BE REUSED.

15. TEST AND BALANCE AIR & WATER VOLUMES TO FINAL DESIGN VALUES.

C

B1

B

A1

A

Aa

Ab

Ac

Ad

B2

2a33a44a55a66a7 3a1

11a2

MATCHLINE - SEE SHEET MD104

EX.1"

EX.3 4"

EX. 3 4"

EX.3 4"

EX.1"

EX.3-12"

EX.1"

EX.1"

EX.AHU-5

EX.AHU-4

EX.AHU-7

EX.AHU-9

EX.HV UNIT

EX.AHU-6

EX.AHU-10

EX.AHU-11

EX.3 4"

EX. HW SUPPLY &

RETURN PIPING

EX. ABANDONED HW SUPPLY

& RETURN PIPING LOOP

(OUT OF PROJECT AREA)

EX. CHW SUPPLY &

RETURN PIPING LOOP

EX. SUPPLY & RETURN

CHW PIPING LOOP

EX. HW SUPPLY &

RETURN PIPING

TO HW DUCT COIL

EX.AHU-8

EX.CUH TO

REMAIN

FIRST FLOOR

PLAN - EAST

MD105

HVAC PIPING

DEMO WORK

127th WING

BUILDING 1414

RENOVATION

http://www.AECOM.com

27777 Franklin Road, Suite 2000 Southfield, MI 48034 United States P: 248 204 5900 F: 248 204 5901

SCALE: 3 32" = 1'-0"

2a33a44a55a66a7

G F1

F E1

E D

C

C B1

B A1

A

Aa Ab

Ac Ad

D

11a2

DEMOLITION KEYED NOTES:

DEMOLISH EXISTING DUCT-MOUNTED HOT WATER COIL WITH ASSOCIATED PIPING,

VALVES, CONTROLS AND SUPPORTS.

DEMOLISH EXISTING HOT WATER PIPING ASSOCIATED WITH DEMOLISHED HOT WATER

SYSTEM IN ALL ACCESSIBLE AREAS OF WORK. EXISTING PIPING LOCATED OUT OF WORK

AREAS SHALL BE DRAINED, CAPPED AND ABANDONED.

DEMOLISH EXISTING HW AND CHW PIPING CONNECTIONS TO EXISTING INDOOR AHU

WITH ASSOCIATED VALVES, SUPPORTS AND CONTROLS.

DEMOLISH EXISTING CHILLED WATER SUPPLY AND RETURN DISTRIBUTION PIPING

LOCATED IN CEILING SPACE. REMOVE ALL EXISTING PIPING IN AREA OF WORK. DRAIN,

CAP AND ABANDON EXISTING PIPING OUTSIDE AREA OF WORK.

GENERAL ARCHITECTURAL NOTES:

1. SAWCUT AND REMOVE PORTION OF WALL AS REQUIRED FOR NEW WORK. TEMPORARILY SHORE OPENING

AS REQUIRED FOR INSTALLATION OF NEW WORK. PATCH EXISTING WALL IF DAMAGED BY NEW WORK, FIRE STOP AND SEAL TO MAINTAIN EXISTING FIRE RATING.

2. PATCH AND FILL IN WALL PENETRATIONS IN KIND AS A RESULT OF DEMOLITION AND NEW WORK SCOPE.

MAINTAIN EXISTING FIRE RATING.

3. REMOVE, SALVAGE AND RE-INSTALL ALL CEILING TILES AS REQUIRED FOR DEMOLITION AND NEW WORK

SCOPE. REPLACE ANY DAMAGED AND/OR MISSING TILES IN KIND.

4. REMOVE PORTION OF ROOF AS REQUIRED FOR NEW WORK. COORDINATE LOCATION OF OPENINGS AND CURB SUPPORTS WITH STRUCTURE BELOW. PATCH EXISTING ROOFING IF DAMAGED BY NEW WORK IN

KIND. OVERLAP NEW AND EXISTING ROOFING MINIMUM 6" ON ALL SIDES.

5. ALL ROOFING WORK, INCLUDING EQUIPMENT CURBS, FLASHING, PATCHING, PENETRATIONS, REPAIRS, ETC. SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST NRCA, NATIONAL ROOFING

CONTRACTORS ASSOCIATION, ROOFING MANUALS AND DETAILS FOR LOW OR STEEP SLOPE SYSTEMS

AND PER ROOFING MANUFACTURER TO MAINTAIN EXISTING WARRANTIES.

1. CONTRACTOR SHALL INCLUDE THE ABATEMENT OF ALL ASBESTOS CONTAINING BUILDING

MATERIALS (ACBM) IN THEIR BID, THAT IS REQUIRED TO COMPLETE THE SCOPE OF WORK

INDICATED ON CONTRACT DOCUMENTS.

2. ASBESTOS ABATED IN THE COURSE OF THIS PROJECT MUST BE PROPERLY COLLECTED,

CONTAINERIZED AND DISPOSED OF IN A LANDFILL LICENSED TO ACCEPT ASBESTOS WASTE.

ALL ASBESTOS DISPOSAL MANIFESTS MUST BE COORDINATED WITH, AND SIGNED BY, 127TH

WING ENVIRONMENTAL MANAGEMENT OFFICE PERSONNEL.

3. CONTRACTOR SHALL UTILIZE SELFRIDGE ANG BASE (SANGB) FORM 23 FOR TRACKING

HAZARDOUS MATERIALS AND SANGB FORM 72 FOR SOLID WASTE TRACKING AND

DIVERSION.

4. CONTRACTOR SHALL ASSUME THE PRESENCE OF ASBESTOS CONTAINING DRY WALL JOINT

COMPOUND IN EXISTING WALLS ABOVE CEILING NOTED FOR PENETRATION BY NEW SUPPLY

AIR DUCTS.

1. IF SUSPECTED ASBESTOS CONTAINING BUILDING MATERIAL (ACBM) IS ENCOUNTERED, WORK IN

THE IMMEDIATE VICINITY MUST STOP AND THE OWNERS CONTRACTING OFFICER SHALL BE

NOTIFIED. AFTER CONSULTATION WITH BASE PERSONNEL, THE OWNERS CONTRACTING OFFICER

WILL DIRECT FURTHER ACTION TO BE TAKEN. WORK SHOULD PROCEED UNINTERRUPTED IN

UNAFFECTED AREAS OF THE PROJECT.

2. BASED ON THE AGE OF THE BUILDINGS AT SELFRIDGE ANG BASE, THERE IS THE POTENTIAL FOR

THE PRESENCE OF LEAD ON PAINTED SURFACES. BEST MANAGEMENT PRACTICES MUST BE

EMPLOYED TO MINIMIZE DUST AND ADEQUATELY PROTECT WORKERS FROM LEAD BASED PAINT

(LBP) EXPOSURE IN ACCORDANCE WITH OSHA AND MIOSHA STANDARDS.

3. IF ASBESTOS AND/OR LEAD IS SUSPECTED IT SHOULD BE TESTED FOR. IF EITHER ASBESTOS

AND/OR LEAD IS FOUND, FOLLOW APPLICABLE OSHA GUIDELINES FOR REMEDIATION.

4. FOR ADDITIONAL INFORMATION, CONTRACTOR TO REQUEST ASBESTOS INSPECTION REPORT

FROM SELFRIDGE AIR NATIONAL GUARD BASE.

GENERAL NOTES:

1. DO NOT SCALE DRAWINGS.

ALL DIMENSIONS ARE IN NOMINAL BRITISH IMPERIAL UNITS.

2. SEE ADDITIONAL GENERAL NOTES ON SHEET M000.

3. DRAWINGS ARE BASED UPON GOVERNMENT'S RECORD DRAWINGS AND FIELD

VERIFICATION. NOTIFY GOVERNMENT OF DISCREPANCIES OR CONDITIONS REQUIRING

SUPPLEMENTAL INSTRUCTIONS PRIOR TO CONTINUATION OF WORK.

4. VERIFY ALL DIMENSIONS, CONDITIONS AND LOCATION OF EXISTING EQUIPMENT,

CONTROLS, PUMPS, PIPING, DUCTWORK, DIFFUSERS, ETC. IN FIELD, AND NOTIFY THE

RESPECTIVE DISCIPLINE OF ANY DISCREPANCIES BEFORE COMMENCEMENT OF WORK.

5. REFER TO ELEC. DRAWINGS FOR ADDITIONAL INFORMATION OF ELECTRICAL

REQUIREMENTS.

6. ALL WORK SHALL COMPLY WITH LOCAL AND NATIONAL CODES, UFC STANDARDS,

MANUFACTURERS RECOMMENDATIONS, SANG AND ANG DESIGN POLICIES,

ANGTEL-15-01, ANGTEL-15-01-04, ANGTEL-15-01-05, ETC.

7. INSTALL NEW HVAC EQUIPMENT AND COMPONENTS WITH ADEQUATE CLEARANCE SPACE,

FOR ACCESS AND MAINTENANCE, AS REQUIRED PER LOCAL CODE, ANG-ETL POLICIES,

UFC STANDARDS AND MANUFACTURERS REQUIREMENTS.

8. THE CONTRACTOR SHALL REPLACE/RESTORE ANY ITEM OR EQUIPMENT REQUIRED TO

REMAIN OPERATIONAL OR TEMPORARILY BEING RELOCATED/OFFSETED, OR THAT IS

DAMAGED DURING CONSTRUCTION. EXISTING PIPING, CONDUIT, WIRES, SUPPORT, ETC.

THAT IS REQUIRED TO BE OFFSET TO FACILITATE THE INSTALLATION OF NEW WORK

SHALL BE REINSTALLED AND RESTORED TO ITS ORIGINAL CONDITION. CONTRACTOR IS

REQUIRED TO FIELD VERIFY AREA OF WORK WHERE NEW EQUIPMENT ARE INSTALLED

BEFORE START OF WORK. THIS WORK IS PART OF THE CONTRACTOR'S CONTRACT

RESPONSIBILITIES.

9. MECHANICAL DEMOLITION WORK SHALL INCLUDE, BUT NOT BE LIMITED TO, THE REMOVAL

OF EXISTING AIR CONDITIONING EQUIPMENT, BOILERS, PUMPS, PIPING, SHEET METAL

DUCTWORK, HEATING COILS, AIR-COOLED CHILLER, ETC. AS INDICATED AND/OR

DESCRIBED ON DEMOLITION DRAWINGS. COMPLETELY REMOVE ALONG WITH CONTROLS,

PNEUMATIC TUBING, HANGERS, SUPPORTS AND ALL RELATED ACCESSORIES.

10. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING MECHANICAL SERVICES AND

UTILITIES BEING REUSED.

11. PATCH ALL OPENINGS IN FLOOR, CEILINGS AND WALLS CREATED BY DEMOLITION OR

NEW WORK AS REQUIRED TO MATCH EXISTING CONSTRUCTION.

12. ALL EQUIPMENT BEING REUSED AND/OR RELOCATED SHALL BE THOROUGHLY CLEANED

AND RECONDITIONED PRIOR TO START-UP.

13. CAP AND TERMINATE ALL EXISTING PIPING NOT IN USE AND EXTEND OUT OF PROJECT

AREA. DRAIN ALL EXISTING PIPING, CAP AND SEAL.

14. PROVIDE TEMPORARY CAP ON ALL OPEN ENDED ACTIVE SUPPLY AND RETURN HOT

WATER PIPING TO BE REUSED.

15. TEST AND BALANCE AIR & WATER VOLUMES TO FINAL DESIGN VALUES.

F1

F

E1

E

D1

C1

C

B1

D

11a2

C2

C3

B2

3a1

MATCHLINE - SEE SHEET M102

T

EX. AHU

(ABANDON IN PLACE)

EX. OA

ROOF VENT

EX.EF-1

(ON ROOF)

EX.AC

EX.RTU-2

(ON ROOF)

EX.RHB-1

EX.12"Ø

EX

.16

"Ø

EX.12"Ø

EX.14"Ø

EX

.12

"Ø

EX

.10 "Ø

EX.RD

EX.10"Ø EX.10"Ø

EX.10"Ø

EX. 10"Ø

EX.8"Ø

EX.8"Ø EX.8"Ø

EX.8"Ø EX.8"Ø

EX.8"Ø

EX

. 1

2" Ø

EX.RTU-1

(ON ROOF)

EX

.18 x2

EX. CAPPED

ROOF VENT

(ON ROOF)

EX. 80x36

RETURN DUCT

EX.UH-1

CHEMICAL

FEEDER

EX.DWH

EX.AIR

COMPRESSOR

EX.DDC

PANEL

EX.4" GAS LINE

EX.1" NG

EX. GAS

METER

EX. ROOF

VENT

EX. RA

ROOF VENT

EX.78x36

SUPPLY

DUCT

EX.RD

VAV-27

VAV-26

VAV-29

VAV-31

VAV-32

VAV-34

VAV-33

VAV-30

EX.SD

400 CFM

EX.SD

400 CFM

SD-1

400 CFM

SD-1

400 CFM

SD-1

375 CFM

EX.SD

375 CFM

EX.SD

400 CFM

x1 x1 x1

28"x16" 22x16

16x16

"Ø

"Ø

"Ø

"Ø

"Ø

12"Ø

EX.SD

375 CFM

SD-1

375 CFM

EX.SD

140 CFM

EX.SD

140 CFM

14x1414x1212x1210"Ø 10"Ø

6" Ø

6" Ø

14x10

EX.SD

CFM

EX.SD

100 CFM

EX.SD

100 CFM

EX.SD

100 CFM

EX.SD

100 CFM

EX.SD

100 CFM

16x16 x1 x1 x1

EX.SD

400 CFM

EX.SD

400 CFM

EX.SD

400 CFM

EX.SD

400 CFM

12x12

"Ø

8x12

EX.SD

400 CFM

EX.SD

400 CFM

EX.SD

400 CFM

EX. SD

400 CFM

EX.SD

400 CFM EX.SD

400 CFM

EX.RD

140 CFM

EX.RD

140 CFM

EX.RD

800 CFM

EX.RD

800 CFM

EX.RD

750 CFM

RD-1

400 CFM

This is the start of the file's text. The full file is on GovTribe.