SANG_Bldg_1414-Upgrade_HVAC_&_Fire_Alarm_-_Drawings_Pt1.pdf
PDF 3 MB Posted
- Attached to
- Bldg 1414 HVAC and Fire Alarm Repair
- Solicitation number
- W912JB-19-B-5006
About this file
Drawings - Pt.1
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TITLE SHEET
T100
SELFRIDGE ANG BASE MAPLOCATION MAP
BLDG.
BASE
SELFRIDGE AIR NATIONAL GUARD BASE
PROJECT NUMBER: VGLZ 182018
CONTRACT NUMBER: W912JB-D-4005-0015
MAY 29, 2019
100% SUBMITTAL
DRAWING INDEX
UPGRADE HVAC & FIRE ALARM - BLDG. 1414
THE 127th WING, MICHIGAN AIR NATIONAL GUARD
CODE SUMMARY
APPLICABLE CODES AND STANDARDS:
2018 INTERNATIONAL BUILDING CODE (IBC)
2018 INTERNATIONAL MECHANICAL CODE (IMC)
2018 INTERNATIONAL PLUMBING CODE (IPC)
2018 INTERNATIONAL ENERGY CONSERVATION CODE (IECC)
2017 NATIONAL ELECTRICAL CODE (NFPA 70)
UNIFIED FACILITIES CRITERIA (UFC) - LATEST EDITION
SELFRIDGE ANGB DESIGN STANDARDS
ANG DESIGN OBJECTIVES AND PROCEDURES - TAB C, ANG ETL 10-03 - LATEST EDITION
ANG DESIGN POLICY - TAB D, ANG ETL 15-01-00 THRU 15-01-08 - LATEST EDITION
LIFE SAFETY CODE - NFPA 101 LIFE SAFETY CODE, 2018 EDITION
FIRE CODE: UFC 3-600-01 - LATEST EDITION
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) - LATEST EDITION
APPLICABLE STATE, CITY, COUNTY CODES AND REGULATIONS
127th WING
BUILDING 1414
RENOVATION
http://www.AECOM.com
27777 Franklin Road, Suite 2000 Southfield, MI 48034 United States P: 248 204 5900 F: 248 204 5901
MECHANICAL
ABBREVIATIONS
SYMBOLS, &
M000
LEGENDS
127th WING
BUILDING 1414
RENOVATION
http://www.AECOM.com
27777 Franklin Road, Suite 2000 Southfield, MI 48034 United States P: 248 204 5900 F: 248 204 5901
R OR D
R OR D INCLINE RISE OR DROP IN
DIRECTION OF AIR FLOW
90° RADIUS ELBOW UP. USE
90° ELBOW W/ TURNING VANES
WHEN RADIUS DOES NOT FIT
90° RADIUS ELBOW DOWN. USE
90° ELBOW W/ TURNING VANES
WHEN RADIUS DOES NOT FIT
OSA DUCT
DUCT SECTION-SUPPLY AIR/
DUCT SECTION-RETURN AIR/
EXHAUST AIR DUCT
FLEXIBLE CONNECTOR
FLEXIBLE DUCT
FC
FC
FD
VD
BDD BDD
VD
FD FIRE DAMPER
VOLUME DAMPER
BACKDRAFT DAMPER
MOTORIZED DAMPER
SIZE 4
SUPPLY CEILING DIFFUSER
REGISTER(GRILLE)
CEILING EXHAUST AND RETURN AIR
SIZE 4
SUPPLY GRILLE OR REGISTER
SIZE 4
DOOR LOUVER
DDC CONTROLLER
HUMIDISTAT
DUCT SMOKE DETECTOR
WALL SWITCH
BUILDING EMERGENCY
AIR DISTRIBUTION SHUT OFF
E
SP
S
SD
H
T
DL
DDC
AHU
AS
B
CH
EF
ET
P WATER PUMP
EXPANSION TANK
EXHAUST FAN
CHEMICAL POT FEEDER
BOILER
AIR SEPARATOR
AIR HANDLING UNIT
A
AFF
AMB
AP
ARCH
AVG
A/C
BAS
BDD
BOD
BTUH
CC
CD
CFM
CG
CHW
CLG
COMP
COEF
CONC
CONT
CP
CV
D
DB
dB
DDC
DEFL DEFLECTION
DIRECT DIGITAL CONTROL
DECIBELS
DRY BULB
DRAIN
CONSTANT VOLUME
CONTROL PANEL
CONTINUATION
CONCRETE
COMPRESSOR
COEFFICIENT
CEILING
CHILLED WATER
CEILING GRILLE
CUBIC FEET PER MINUTE
CEILING DIFFUSER
COOLING COIL
BRITISH THERMAL UNIT/HR
BOTTOM OF DUCT
BACK DRAFT DAMPER
BUILDING AUTOMATION SYSTEM
AIR CHANGE
AVERAGE
ARCHITECT
ACCESS PANEL
AMBIENT
AMPERE
ABOVE FINISHED FLOOR
DIA
DIFF
DL
DN
DWG
DX
EA
ea
EAT
EFF
EL
ELEC.
ENT
EWT
EXH
EX.
FA
FD
FC
FLA
FLR
FPM
FSD
FT
GA
HDPE
GAGE or GAUGE
FOOT
FIRE SMOKE DAMPER
FEET PER MINUTE
FLOOR
FULL LOAD AMP
FIRE DAMPER
FLEXIBLE CONNECTION
FREE AREA
EXISTING
EXHAUST
ENTERING WATER TEMPERATURE
ENTERING
ELECTRICAL
ELEVATION
ENTERING AIR TEMPERATURE
EFFICIENCY
EXHAUST AIR
EACH
DIRECT EXPANSION
DRAWING
DOWN
DOOR LOUVER
DIFFERENCE
DIAMETER
INSIDE DIAMETER
INCH
INCH OF WATER GAUGE
ID
IN
INWG
KILOWATT
KILOWATT HOUR
KW
KWH
LEAVING AIR TEMPERATURE
POUND
LOCKED ROTOR AMPERES
MAXIMUM
MINIMUM CURRENT AMPERES
MOTOR CONTROL CENTER
MOTORIZED DAMPER
MINIMUM
NOISE CRITERIA
NORMALLY CLOSED
NOT IN CONTRACT
NORMALLY OPEN
NOT TO SCALE
NOT APPLICABLE
OUTSIDE AIR
OPENING
PRESSURE DROP
PHASE
LAT
LB
LRA
LWT
MAX
MCA
MCC
MD
MIN
NC
N C
NIC
N O
NTS
N/A
OA
OPNG
PD
PH
LEAVING WATER TEMPERATURE
IPLV INTEGRATED PART LOAD VALUE
HERTZHZ
RETURN AIR DIFFUSER
RETURN AIR
RATED LOAD AMPS
REVOLUTIONS PER MINUTE
RETURN AIR REGISTER
SUPPLY AIR
SUPPLY AIR GRILLE
STATIC PRESSURE
SPECIFICATION
SUPPLY AIR REGISTER
STAINLESS STEEL
TRANSFER DUCT
TEMPERATURE
TRANSFER GRILLE
THERMOSTAT
TYPICAL
UP THRU ROOF
VOLT
VOLUME DAMPER
RA
RH
RLA
RD
RPM
RR
SA
SG
SP
SPEC
SR
SS
TD
TEMP
TG
T STAT
TYP
UTR
V
VD
WATT
WITH
WET BULB
WATER COLUMN
WATER GAUGE
WEIGHT
W
W/
WB
WC
WG
WT
SF SQUARE FEET
YEARYR
HOSE END CONNECTION
CAP
BLIND FLANGE
UNION, FLANGED
UNION, SCREWED
COUPLING, JOINT
FLEXIBLE CONNECTOR
ANCHOR POINT
GUIDE
DRAIN LINE
HOT WATER SUPPLY
HOT WATER RETURN
D
HWR
HWS
HPR
HPS
CHECK VALVE
TEE, OUTLET DOWN
TEE, OUTLET UP
PIPE TURNING UP
BALL VALVE
BUTTERFLY VALVE
PIPE TURNING DOWN
CONNECTION, TOP
CONNECTION, BOTTOM
EXPANSION LOOP
STRAINER,W/ BLOWOFF
AND HOSE CONN.
AIR VENT, AUTOMATIC
RELIEF VALVE
PRESSURE REDUCING VALVE
THREE WAY CONTROL VALVE
TWO WAY CONTROL VALVE
AIR VENT, MANUAL
PRESSURE/TEMPERATURE TAP
FLOW SWITCH
THERMOMETER
PRESSURE GAUGE & GAUGE COCK
INCREASER, REDUCER
CALIBRATED BALL VALVE
W/ PRESSURE PORTS
DUCT STATIC PRESSURE SENSOR
ISOLATION VALVE
(BALL, GATE, OR BUTTERFLY)
HOA HAND-OFF-AUTO SWITCH
HIGH DENSITY POLYPROPYLENE
AC AIR CONDITIONING UNIT
SM SHEET METAL
AFS AIR FLOW MEASURING STATION
M MMD-XX MD-XX
DEGREEDEG DEGREE FAHRENHEIT°F
THERMOSTAT OR TEMPERATURE
SENSOR
RETURN/EXHAUST GRILLE OR
REGISTER SIZE 4
MAKE-UP AIR UNIT
SF
HPGR
HPGS DT DAY TANK
SB SB SECURITY BARS
CO2 CO2 SENSOR
FOR
FOS
FUEL OIL RETURN
FUEL OIL SUPPLY VAV VARIABLE AIR VOLUME
ACC AIR COOLED CONDENSER
UH UNIT HEATER
PROPYLENE GLYCOLPG
BT BUFFER TANK
CHILLER
FCU FAN COIL UNIT
MAU
SUPPLY FANS
CF
HV HEATING & VENTILATION UNIT
CCEC CLOSED-CIRCUIT
EVAPORATIVE COOLER
600x300 600x300
300 DIA
300 DIA
600x300(L) 600x300(L)
600 DIA (L) 600 DIA (L)
LINED RECTANGULAR DUCT. NUMBER
INDICATES CLEAR INSIDE DIMENSION
LINED ROUND DUCT. NUMBER
INDICATES CLEAR INSIDE DIMENSION
(24x12)
(12)
ROUND DUCT. NUMBER INDICATES
DUCT DIAMETER. IP UNITS IN
BRACKETS (TYPICAL)
(24)
(24x12)
RECTANGULAR DUCT. SIZE IN MM.
FIRST NUMBER INDICATES SIDE IN
VIEW, SECOND NUMBER INDICATES
SIDE IN DEPTH. IP UNITS IN
BRACKETS (TYPICAL)
RS
RL REFRIGERANT LIQUID LINE
REFRIGERANT SUCTION LINE
HEAT PUMP LOOP SUPPLY
HEAT PUMP LOOP RETURN
HEAT PUMP GLYCOL SUPPLY
HEAT PUMP GLYCOL RETURN
SD SUPPLY AIR DIFFUSER
CABINET UNIT HEATERCUH
A. ALL DIMENSIONS ARE IMPERIAL UNLESS OTHERWISE NOTED IN BRACKETS
B. ALL DUCT DIMENSIONS ARE INSIDE CLEAR.
C. VERIFY AND COORDINATE EQUIPMENT LAYOUT, SIZE, AND CONNECTING SERVICES WITH
EQUIPMENT ACTUALLY SELECTED FOR INSTALLATION.
D. DO NOT SCALE DUCTWORK AND EQUIPMENT FOR SIZE.
E. COORDINATE ENTIRE INSTALLATION OF THE HVAC SYSTEMS WITH THE WORK OF ALL OTHER
TRADES PRIOR TO ANY FABRICATION OR INSTALLATION.
F. COORDINATE EXACT LOCATION AND SIZES OF REQUIRED OPENINGS AND SUPPORTS FOR
FURNISHED EQUIPMENT WITH THE GENERAL CONTRACTOR.
G. ALL EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE EQUIPMENT
MANUFACTURER'S REQUIREMENTS.
H. PROVIDE ALL FITTINGS, TRANSITIONS, DAMPERS, VALVES, AND OTHER DEVICES REQUIRED
FOR COMPLETE WORKABLE INSTALLATION.
I. ALL EQUIPMENT, DUCTS, PIPING, AND OTHER DEVICES OR MATERIAL EXPOSED TO THE
WEATHER SHALL BE COMPLETELY WEATHERPROOF.
J. ALL VALVES, CONTROLS, DAMPERS, FANS, ETC. SHALL BE INSTALLED IN ACCESSIBLE
LOCATION. PROVIDE ADEQUATELY SIZED ACCESS DOOR OR PANELS WHERE REQUIRED.
K. THE LOCATION OF CEILING AIR INLETS AND OUTLETS SHALL BE IN ACCORDANCE WITH
MECHANICAL DRAWINGS.
L. PROVIDE VALVED DRAINS AT LOW POINTS AND MANUAL AIR VENTS AT HIGH POINTS OF ALL
HYDRONIC SYSTEMS.
M. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL
COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS INDICATED ON THE DRAWINGS, AS
SPECIFIED AND AS REQUIRED BY CODE.
N. CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK ARE DIAGRAMMATIC AND ARE
INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY.
O. POWER TO MOTORIZED DAMPERS SHALL BE BY DIV. 23 CONTRACTOR.
P. PROVIDE VIBRATION ISOLATORS FOR ALL PIPING SUPPORTS CONNECTED TO AND WITHIN 50
FEET OF ISOLATED EQUIPMENT IN ACCESSIBLE LOCATIONS (EXCEPT WHERE BASE ELBOW
SUPPORTS AND ANCHOR POINTS) THROUGHOUT MECHANICAL EQUIPMENT ROOMS.
Q. LOCATE ALL TEMPERATURE, PRESSURE, AND FLOW MEASURING DEVICES IN ACCESSIBLE
LOCATIONS WITH STRAIGHT SECTION OF PIPE OR DUCT UP- OR DOWN STREAM AS
RECOMMENDED BY MANUFACTURER FOR GOOD ACCURACY.
R. ALL CONTROL WIRING SHALL COMPLY WITH THE NATIONAL ELECTRICAL CODE AND
SPECIFICATIONS.
S. CONCRETE HOUSEKEEPING PADS TO SUIT MECHANICAL EQUIPMENT SHALL BE SIZED BY A
MECHANICAL CONTRACTOR.
T. FOR TYPICAL DETAILS SEE MECHANICAL SHEETS.
U. PROVIDE SUFFICIENT CLEARANCE FOR AHU'S, AND AC'S COIL/PULL AND IN FRONT OF
ACCESS DOORS/PANELS FILTER.
V. PER ANTI-TERRORISM FORCE PROTECTION GUIDELINES, ALL OVERHEAD UTILITIES, MOUNTED
FIXTURES EQUIPMENT AND FEATURES WEIGHTING 31 POUNDS OR MORE SHALL BE BRACED
TO RESIST 0.5 TIMES THE COMPONENT WEIGHT IN ANY DIRECTION AND 1.5 TIMES THE
COMPONENT WEIGHT IN THE DOWNWARD DIRECTION. THIS STANDARD DOES NOT PRECLUDE
THE NEED TO DESIGN ATTACHMENTS AND BRACING TO RESIST FORCES REQUIRED BY
OTHER CRITERIA SUCH AS WIND, SEISMIC, OR SNOW LOADING.
W. 120V POWER FROM ELECTRICAL PANELS TO DDC CONTROLLERS, ALARM PANELS AND OTHER
DDC EQUIPMENT SHALL BE THE RESPONSIBILITY OF DIV. 23 CONTRACTOR.
X. DUCTWORK LAYOUT IS DIAGRAMMATIC ONLY. IN THE PROCESS TO COORDINATE THE DUCT
INSTALLATION WITH OTHER TRADES, THE CONTRACTOR MAY REARRANGE THE DUCTWORK
DOWNSTREAM OF AHU EQUIPMENT FOR AN OPTIMAL LAYOUT. THE FOLLOWING RULES SHALL
BE FOLLOWED:
1. MAXIMUM OF 5FT OF FLEXIBLE DUCT SHALL BE USED. SEE TYPICAL DETAILS ON
MECHANICAL DRAWINGS.
2. DUCT SIZE FOR THE TOTAL FLOW THROUGH THE BRANCH SHALL BE AS FOLLOWS:
0 - 110 CFM 6-INCH 425 - 660 CFM 12-INCH
115 – 230 CFM 8-INCH 665 - 1000 CFM 14-INCH
235 - 420 CFM 10-INCH 1005 – 1500 CFM 16-INCH
1550 – 2000 CFM 18-INCH 2005 – 2600 CFM 20-INCH
Y. DUCTS SHALL NOT BE REINFORCED WITH TIE RODS OR OTHER INTERNAL REINFORCEMENT
EXCEPT FOR DUCT DIMENSIONS GREATER THAN 85 INCH AND STATIC PRESSURE IN EXCESS
OF 6 INCHES WG, AS REQUIRED BY SMACNA HVAC DUCT CONSTRUCTION STANDARDS METAL
AND FLEXIBLE, THIRD EDITION.
Z. ALL EXISTING DUCTWORK TO BE REUSED SHALL BE PROFESSIONALLY CLEANED FROM DUST
AND DEBRIS. REFER TO PROJECT SPECIFICATIONS.
AIR FLOW QUANTITY: L/S (CFM)
AIR FLOW QUANTITY: L/S (CFM)
AIR FLOW QUANTITY: L/S (CFM)
AIR FLOW QUANTITY: L/S (CFM)
CD-4 115
(250)
CG-4 260
(550)
SR-4 455
(955)
RG-4 305
(635)
MICHIGAN MECHANICAL CODEMMC
VAV VARIABLE AIR VOLUME BOX
RELATIVE HUMIDITY
HW CIRCULATION PUMP
PC PUMPED CONDENSATE
DETAILDET
HP HORSE POWER
HEATING, VENTILATING
AND AIR CONDITIONING
HVAC
MAXIMUM FUSE SIZEMFS
WSHP WATER SOURCE HEAT PUMP
TO BE DEMOLISHED
ACU AIR-COOLED CONDENSER
HP HEAT PUMP
RTU ROOFTOP UNIT
CIRCULATION PUMPCP
RHB REHEAT BOILER
2a33a44a55a66a7
G
F1
F
E1
E
D1
C1
C
B1
D
11a2
C2
C3
B2
3a1
MATCHLINE - SEE SHEET MD102
T
TTT
EX.AHU-12
DEMO
EX.HV-4
DEMO
ABANDON EX.
UNDERGROUND
DUCTS TO TOWER EX. AHU
(ABANDON IN PLACE)
EX. OA
ROOF VENT
EX. ROOF
VENT
EX.AHU-2
EX.EF-1
(ON ROOF)
EX.AC
EX.RTU-2
(ON ROOF)
EX.HWP
EX.HWP
(3) EX. HW
BOILERS
EX.RHB-1
EX.CHWP
DEMO
EX.SD
EX.SD
EX.SD EX.SD
EX.SD EX.SD
EX.SD
EX.SD
EX.SD
340 CFM
EX.SD
EX.SD
EX.SD EX.SD
EX.SD
EX.SD
EX.SD
EX.SD
EX.SDEX.SD
EX.SDEX.SD
135 CFM
EX.SDEX.SD
EX.12"Ø
EX.16"Ø
EX.4x22
EX
.14 x6
EX
.18 x8
EX
.18 x1
EX
.18 x1
EX.6x22 EX.26x22
EX.24x18
EX.22x22 EX.16x22
EX
.24 x1
EX
.24 x1
EX
.16 x1
EX.12x8 EX.12x8
EX.12x8 EX.12x8
EX.12x8EX.12x8
EX.10"Ø EX.12"Ø
EX
.16
"Ø
EX
.16 "Ø
EX
.16
"Ø
EX
.10
"Ø
EX.8"Ø
EX.10"Ø
EX.12"Ø
EX.14"Ø
EX
.12
"Ø
EX
.10 "Ø
EX.46x12
EX.SD
EX.12x8
EX.SD
EX.RD
EX.SD
EX.12x8
EX.14x10EX.20x8
EX.RD
EX.RD EX.46x12
EX.10"Ø EX.10"Ø
EX.10"Ø
EX. 10"Ø
EX.SD
EX
. 1
4" Ø
EX
. 1
4" Ø
EX
.12
"Ø
EX.12"Ø
EX.8"Ø
EX.8"Ø EX.8"Ø
EX.8"Ø EX.8"Ø
EX.8"Ø
EX
. 1
4" Ø
EX
. 1
4" Ø
EX.RD
EX.RD
EX.RD
EX. RD
EX.RD
EX.RD
EX.RD
EX. RD
DEMO EX. 48x24 WALL
GRILLE & CAP EX. DUCT
EX. RDEX
. 1
2" Ø
EX.SD
EX.SD EX.SD
EX.RTU-1
(ON ROOF)
EX
.18 x2
EX. CAPPED
ROOF VENT
(ON ROOF)
EX. 80x36
RETURN DUCT
EX.FD
EX.FDEX.FDEX.FD
EX.FD
EX.SD
EX.UH-2
EX.UH-1
CHEMICAL
FEEDER
EX.DWH
EX.AIR
COMPRESSOR
EX.DDC
PANEL
EX.4" GAS LINEEX.2" GAS
LINE TO EACH
EX.BOILER
EX.1" NG
EX. GAS
METER
EX.20" FLUE
EXHAUST VENT
UP TO ROOF
EX.RD
EX.RD
EX. RD
EX. RD
EX. RD
EX.SD EX.SD
EX. ROOF
VENT
EX. ROOF
VENT
EX. ROOF
VENT
EX.RG EX.RG EX.RG
EX. RA
ROOF VENT
EX.FD
EX.78x36
SUPPLY
DUCT
EX.RD
EX.12"Ø
EX.FRESH AIR
WALL LOUVER
EX.EXPANSION
TANK
FIRST FLOOR
PLAN - WEST
MD101
HVAC DEMO
WORK
127th WING
BUILDING 1414
RENOVATION
http://www.AECOM.com
27777 Franklin Road, Suite 2000 Southfield, MI 48034 United States P: 248 204 5900 F: 248 204 5901
SCALE: 3 32" = 1'-0"
2a33a44a55a66a7
G F1
F E1
E D
C
C B1
B A1
A
Aa Ab
Ac Ad
D
11a2
DEMOLITION KEYED NOTES:
ABANDON EXISTING AHU IN PLACE. DISCONNECT ALL UTILITIES, CONTROLS AND SERVICES.
DEMOLISH EXISTING BOILERS STACK DUCTS THROUGH ROOF. REUSE EXISTING ROOF
OPENING TO ROUTE NEW GAS LINE AND NEW BOILER FLUE VENT PIPE.
DEMOLISH EXISTING GAS LINES CONNECTED TO EXISTING BOILERS AND CAP BACK AT
MAIN.
DEMOLISH EXISTING HV-4 AIR HANDLING UNIT SERVING TOWER WITH ASSOCIATED PIPING,
CONTROLS, SUPPORTS AND SERVICES. REMOVE EX. FRESH AIR DUCT AND CAP AT EX.
WALL LOUVER. SEAL AND INSULATE EX. CAPPED WALL LOUVER.
DEMOLISH EXISTING SUPPLY AND RETURN DUCT ROUTED TO TOWER. CAP AT FLOOR
PENETRATIONS.
DEMOLISH EXISTING AHU-12 AIR HANDLING UNIT LOCATED IN MEZZANINE WITH
ASSOCIATED DUCTWORK, PIPING, CONTROLS, SUPPORTS AND SERVICES.
DEMOLISH EXISTING SUPPLY AND RETURN DUCTWORK IN CEILING SPACE WITH
ASSOCIATED INSULATION, HANGERS AND SUPPORTS TO EXTENT SHOWN.
EXISTING SUPPLY AND RETURN CEILING DIFFUSERS SHALL REMAIN IN USE. ALL EXISTING
DIFFUSERS SHALL BE CLEANED THROUGHOUT FOR PROPER USE. TYPICAL FOR ALL
DIFFUSERS SHOWN ON THIS DRAWING.
EXISTING CEILING DIFFUSER TO BE RELOCATED AND REUSED.
DEMOLISH EXISTING AIR HANDLING AND ASSOCIATED APPURTENANCES, PIPING,
SUPPORTS AND CONTROLS.
DEMOLISH EX. DUCTWORK CONNECTED TO EXISTING ROOF VENT IN AREA OF WORK. CAP
DUCT AT WALL AND ABANDON PORTION IN AREA OUT OF PROJECT WORK. CAP ROOF
VENT ON ROOF.
REUSE EXISTING DUCTWORK TO EXTENT SHOWN. ALL EXISTING DUCTWORK TO REMAIN
SHALL BE CLEANED THROUGHOUT FOR PROPER USE.
EXISTING DUCTWORK LOCATED OUTSIDE OF PROJECT AREA OF WORK SHALL BE CAPPED
AND ABANDONED.
DEMOLISH EXISTING UNIT HEATER (1414 UH-2) AND ASSOCIATED PIPING, VALVES,
SUPPORTS AND CONTROLS.
1. CONTRACTOR SHALL INCLUDE THE ABATEMENT OF ALL ASBESTOS CONTAINING BUILDING
MATERIALS (ACBM) IN THEIR BID, THAT IS REQUIRED TO COMPLETE THE SCOPE OF WORK
INDICATED ON CONTRACT DOCUMENTS.
2. ASBESTOS ABATED IN THE COURSE OF THIS PROJECT MUST BE PROPERLY COLLECTED,
CONTAINERIZED AND DISPOSED OF IN A LANDFILL LICENSED TO ACCEPT ASBESTOS WASTE. ALL
ASBESTOS DISPOSAL MANIFESTS MUST BE COORDINATED WITH, AND SIGNED BY, 127TH WING
ENVIRONMENTAL MANAGEMENT OFFICE PERSONNEL.
3. CONTRACTOR SHALL UTILIZE SELFRIDGE ANG BASE (SANGB) FORM 23 FOR TRACKING
HAZARDOUS MATERIALS AND SANGB FORM 72 FOR SOLID WASTE TRACKING AND DIVERSION.
4. CONTRACTOR SHALL ASSUME THE PRESENCE OF ASBESTOS CONTAINING DRY WALL JOINT
COMPOUND IN EXISTING WALLS ABOVE CEILING NOTED FOR PENETRATION BY NEW SUPPLY AIR
DUCTS.
GENERAL ARCHITECTURAL
NOTES:
1. SAWCUT AND REMOVE PORTION OF WALL AS REQUIRED FOR NEW WORK. TEMPORARILY
SHORE OPENING AS REQUIRED FOR INSTALLATION OF NEW WORK. PATCH EXISTING WALL IF
DAMAGED BY NEW WORK, FIRE STOP AND SEAL TO MAINTAIN EXISTING FIRE RATING.
2. PATCH AND FILL IN WALL PENETRATIONS IN KIND AS A RESULT OF DEMOLITION AND NEW
WORK SCOPE. MAINTAIN EXISTING FIRE RATING.
3. REMOVE, SALVAGE AND RE-INSTALL ALL CEILING TILES AS REQUIRED FOR DEMOLITION AND
NEW WORK SCOPE. REPLACE ANY DAMAGED AND/OR MISSING TILES IN KIND.
4. REMOVE PORTION OF ROOF AS REQUIRED FOR NEW WORK. COORDINATE LOCATION OF
OPENINGS AND CURB SUPPORTS WITH STRUCTURE BELOW. PATCH EXISTING ROOFING IF
DAMAGED BY NEW WORK IN KIND. OVERLAP NEW AND EXISTING ROOFING MINIMUM 6" ON
ALL SIDES.
5. ALL ROOFING WORK, INCLUDING EQUIPMENT CURBS, FLASHING, PATCHING, PENETRATIONS, REPAIRS, ETC. SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST NRCA, NATIONAL
ROOFING CONTRACTORS ASSOCIATION, ROOFING MANUALS AND DETAILS FOR LOW OR
STEEP SLOPE SYSTEMS AND PER ROOFING MANUFACTURER TO MAINTAIN EXISTING
WARRANTIES.
1. IF SUSPECTED ASBESTOS CONTAINING BUILDING MATERIAL (ACBM) IS ENCOUNTERED, WORK IN
THE IMMEDIATE VICINITY MUST STOP AND THE OWNERS CONTRACTING OFFICER SHALL BE
NOTIFIED. AFTER CONSULTATION WITH BASE PERSONNEL, THE OWNERS CONTRACTING OFFICER
WILL DIRECT FURTHER ACTION TO BE TAKEN. WORK SHOULD PROCEED UNINTERRUPTED IN
UNAFFECTED AREAS OF THE PROJECT.
2. BASED ON THE AGE OF THE BUILDINGS AT SELFRIDGE ANG BASE, THERE IS THE POTENTIAL FOR
THE PRESENCE OF LEAD ON PAINTED SURFACES. BEST MANAGEMENT PRACTICES MUST BE
EMPLOYED TO MINIMIZE DUST AND ADEQUATELY PROTECT WORKERS FROM LEAD BASED PAINT
(LBP) EXPOSURE IN ACCORDANCE WITH OSHA AND MIOSHA STANDARDS.
3. IF ASBESTOS AND/OR LEAD IS SUSPECTED IT SHOULD BE TESTED FOR. IF EITHER ASBESTOS
AND/OR LEAD IS FOUND, FOLLOW APPLICABLE OSHA GUIDELINES FOR REMEDIATION.
4. FOR ADDITIONAL INFORMATION, CONTRACTOR TO REQUEST ASBESTOS INSPECTION REPORT
FROM SELFRIDGE AIR NATIONAL GUARD BASE.
GENERAL NOTES:
1. DO NOT SCALE DRAWINGS.
ALL DIMENSIONS ARE IN NOMINAL BRITISH IMPERIAL UNITS.
2. SEE ADDITIONAL GENERAL NOTES ON SHEET M000.
3. DRAWINGS ARE BASED UPON GOVERNMENT'S RECORD DRAWINGS AND FIELD
VERIFICATION. NOTIFY GOVERNMENT OF DISCREPANCIES OR CONDITIONS REQUIRING
SUPPLEMENTAL INSTRUCTIONS PRIOR TO CONTINUATION OF WORK.
4. VERIFY ALL DIMENSIONS, CONDITIONS AND LOCATION OF EXISTING EQUIPMENT,
CONTROLS, PUMPS, PIPING, DUCTWORK, DIFFUSERS, ETC. IN FIELD, AND NOTIFY THE
RESPECTIVE DISCIPLINE OF ANY DISCREPANCIES BEFORE COMMENCEMENT OF WORK.
5. REFER TO ELEC. DRAWINGS FOR ADDITIONAL INFORMATION OF ELECTRICAL
REQUIREMENTS.
6. ALL WORK SHALL COMPLY WITH LOCAL AND NATIONAL CODES, UFC STANDARDS,
MANUFACTURERS RECOMMENDATIONS, SANG AND ANG DESIGN POLICIES,
ANGTEL-15-01, ANGTEL-15-01-04, ANGTEL-15-01-05, ETC.
7. INSTALL NEW HVAC EQUIPMENT AND COMPONENTS WITH ADEQUATE CLEARANCE SPACE,
FOR ACCESS AND MAINTENANCE, AS REQUIRED PER LOCAL CODE, ANG-ETL POLICIES,
UFC STANDARDS AND MANUFACTURERS REQUIREMENTS.
8. THE CONTRACTOR SHALL REPLACE/RESTORE ANY ITEM OR EQUIPMENT REQUIRED TO
REMAIN OPERATIONAL OR TEMPORARILY BEING RELOCATED/OFFSETED, OR THAT IS
DAMAGED DURING CONSTRUCTION. EXISTING PIPING, CONDUIT, WIRES, SUPPORT, ETC.
THAT IS REQUIRED TO BE OFFSET TO FACILITATE THE INSTALLATION OF NEW WORK
SHALL BE REINSTALLED AND RESTORED TO ITS ORIGINAL CONDITION. CONTRACTOR IS
REQUIRED TO FIELD VERIFY AREA OF WORK WHERE NEW EQUIPMENT ARE INSTALLED
BEFORE START OF WORK. THIS WORK IS PART OF THE CONTRACTOR'S CONTRACT
RESPONSIBILITIES.
9. MECHANICAL DEMOLITION WORK SHALL INCLUDE, BUT NOT BE LIMITED TO, THE REMOVAL
OF EXISTING AIR CONDITIONING EQUIPMENT, BOILERS, PUMPS, PIPING, SHEET METAL
DUCTWORK, HEATING COILS, AIR-COOLED CHILLER, ETC. AS INDICATED AND/OR
DESCRIBED ON DEMOLITION DRAWINGS. COMPLETELY REMOVE ALONG WITH CONTROLS,
PNEUMATIC TUBING, HANGERS, SUPPORTS AND ALL RELATED ACCESSORIES.
10. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING MECHANICAL SERVICES AND
UTILITIES BEING REUSED.
11. PATCH ALL OPENINGS IN FLOOR, CEILINGS AND WALLS CREATED BY DEMOLITION OR
NEW WORK AS REQUIRED TO MATCH EXISTING CONSTRUCTION.
12. ALL EQUIPMENT BEING REUSED AND/OR RELOCATED SHALL BE THOROUGHLY CLEANED
AND RECONDITIONED PRIOR TO START-UP.
13. CAP ALL BRANCH DUCTS FROM GRILLES, REGISTERS, DIFFUSERS, AND PIPING BEING
REMOVED, WHETHER INDICATED ON PLAN OR NOT.
14. PROVIDE TEMPORARY CAP ON ALL OPEN ENDED ACTIVE SUPPLY, RETURN AIR, EXHAUST
AIR DUCTWORK, REGISTERS AND GRILLES TO BE REUSED.
15. TEST AND BALANCE AIR & WATER VOLUMES TO FINAL DESIGN VALUES.
16. THE CONTRACTOR SHALL VERIFY WITH STRUCTURAL REQUIREMENT TO INSTALL NEW
EQUIPMENT ON ROOF, OR SUSPEND FROM EXISTING STRUCTURE.
B1
B
A1
A
Aa
Ab
Ac
Ad
B2
2a33a44a55a66a7 3a1
11a2
MATCHLINE - SEE SHEET MD101
T
T
TT
EX.AHU-5
EX.AHU-4
EX.AHU-8
EX.AHU-7
EX.AHU-9
EX
.18 x2
EX.OA DUCT
EX
.16 x1
EX
.16
"x
EX
.18 "Ø
EX.16"x18"
EX
.16 x1
EX.16x18
EX.SA DUCT
EX.32x20EX.36x20
EX.SUPPLY DUCT
TO REMAIN
EX.SD EX.SD EX.SG
EX.26x14
EX.SD
EX.28x20
EX. RELIEF AIR DUCT
EX. RELIEF AIR DUCT
EX. SDEX. SD
EX. ROOF
EX. RELIEF AIR DUCT
EX. RELIEF AIR DUCT
EX
.16 x1
EX.36x20
EX.SD
EX.SF
EX.RTU-2
EX.HV
DEMO
EX.AHU-6
EX.WALL
LOUVER
EX.AHU-10
EX.AHU-11
EX.SD
EX.SD
EX.SD
EX.SD
EX.SD EX.SD
EX.SD EX.SD
EX.SDEX.SD
EX.SD
EX.SD
EX.SD
EX.SD
EX.SD
EX.SD
EX.SD
EX.SD
EX.SD
EX.SD
EX.SD
EX.SD
EX.SDEX.SDEX.SD
EX.SD
EX.SD
EX.18x12
EX
.16
"Ø
EX. 20"ØEX. 18"Ø
EX.10"Ø
EX
.16
"Ø
EX.12"Ø
EX. 22"x14"
EX. 26"Ø
EX
.26
"Ø
EX
. 2 6"
Ø
EX
.1 8"
Ø
EX
. 1 8"
Ø
EX.14"ØEX.12"Ø
EX
.10
"Ø
EX.12"Ø
EX.12"Ø EX.10"Ø
EX.12"Ø EX.12"Ø
EX.8"Ø
EX.SD
EX
.10
"Ø
EX
.10
"Ø
EX
. 8
"Ø
EX
. 6
"Ø
EX
.10
"Ø
EX
.10 "Ø
EX
.10
"Ø
EX
.10
"Ø
EX.26"Ø
EX
.28 x1
EX.18"Ø
EX.12"Ø
EX
.12
"Ø
EX
.10 "Ø
EX
.18
"Ø
EX
.8"
Ø
EX
.8" Ø
EX.8x8
UP
EX
.10
"Ø
EX.10"Ø
EX
.10
"Ø
EX
.10 "Ø
EX
.10
"Ø
EX
.10 "Ø
EX
.8"
Ø
EX.8"Ø
EX.10"Ø
EX.SD
EX.10"Ø
EX
.18
"Ø
EX
.18 "Ø
EX
.26
"Ø
EX
.14 x1
EX.14x6
EX.10"Ø
EX.12"Ø
EX.14"Ø
EX
.10
"Ø
EX.EG
225 CFM
EX. EF
(ON ROOF)
EX.SDEX.SDEX.SD
EX.28x16EX.34x22EX.40x26EX.60x30
EX
.28 x1
EX
.28 x1
EX
.28 x1
EX
.28 x1
EX
.28 x1
EX.SDEX.SD
EX
.28 x1
EX
. 7
6" x3
8"
EX
.36 x2
EX.28x28 EX.28x16
EX
.24 x1
EX
.24 x1
EX
.24 x1
EX. 32"x32"
EX.SD
1740 CFM
EX.SD
1740 CFM
EX.SD
1740 CFM
EX.SD
1740 CFM
EX.SD
1740 CFM
EX.SD
1740 CFM
CAP, SEAL AND INSULATE
EX. WALL LOUVER
EX. RD EX. RD
EX.RD
EX.RD
EX. RD
EX.RD
EX. RD
EX.RD
EX.RD
EX.RD
EX.RD
EX.RD
EX.RD
EX. ROOF
VENT
EX. ROOF
VENT
EX.RD
EX. EF
EX. RELIEF
AIR DUCTS TO
REMAIN IN USE
EX.SD
EX. EG
100 CFM
EX. EG
75 CFM
EX.RD
EX.EFEX.SFEX.EF
EX.EF EX.EF
EX. 64x32
EX.24x20
EX.SG
EX.FD
EX.FD
EX.FDEX.FDEX.FD
EX.FD EX.FD
EX.SD
EX
.18 x1
EX. SDEX. ROOF
VENT
EX. ROOF
VENT
EX. ROOF
VENT
EX.RG
EX.RG EX.RG EX.RG
EX.SG
EX.FD
EX.16x18
EX.RD
EX.10"Ø
EX.10"Ø
EX.10"Ø EX.8"Ø
EX. ROOF
VENT
EX. ROOF
VENT
EX. ROOF
VENT
EX. RELIEF
AIR DUCTS TO
REMAIN IN USE
DEMO EX.
WINDOW AC DEMO EX.
WINDOW AC
EX.SD
EX. 26-12"x26-12"
ROOF OPENING
EX. 26-12"x26-12"
ROOF OPENING
EX. DUCT-MOUNTED
HW COIL
EX.RD
EX.ROOF VENT
EX.CUH TO
REMAIN
FIRST FLOOR
PLAN - EAST
MD102
HVAC DEMO
WORK
127th WING
BUILDING 1414
RENOVATION
http://www.AECOM.com
27777 Franklin Road, Suite 2000 Southfield, MI 48034 United States P: 248 204 5900 F: 248 204 5901
SCALE: 3 32" = 1'-0"
2a33a44a55a66a7
G F1
F E1
E D
C
C B1
B A1
A
Aa Ab
Ac Ad
D
11a2
DEMOLITION KEYED NOTES:
EXISTING RELIEF AIR DUCTS SHALL REMAIN IN USE WITH NEW HV-1 UNIT. CLEAN EXISTING
DUCTS THROUGHOUT FOR PROPER REUSE. REPAIR ANY DAMAGES PAINTING.
DEMOLISH EXISTING SUPPLY DUCT SECTION AND ASSOCIATED FIRE DAMPER IN AREA OF
WORK. PATCH EXITING WALL TO MATCH EXISTING CONSTRUCTION.
DEMOLISH EXISTING RETURN AIR WALL GRILLE (48"x24") AND ANY ASSOCIATED FIRE
DAMPER. PATCH EXISTING WALL TO MATCH EXISTING CONSTRUCTION. SEE
ARCHITECTURAL NOTES.
DEMOLISH EXISTING AIR HANDLING UNIT (HV) CURRENTLY HUNG FROM EXISTING
STRUCTURE WITH ASSOCIATED DUCT HEATING COIL, PIPING, CONTROLS, SUPPORTS AND
SERVICES. CAP AND SEAL EXISTING OUTSIDE AIR WALL LOUVER WITH SHEET METAL AND
INSULATION.
DEMOLISH EXISTING DUCTWORK IN WAREHOUSE AREA TO EXTENT SHOWN ON DRAWING.
FIELD VERIFY EXISTING CONDITIONS.
DEMOLISH EXISTING AIR HANDLING UNIT HUNG FROM EXISTING STRUCTURE WITH
ASSOCIATED DUCTWORK, PIPING, CONTROLS, SUPPORTS AND SERVICES.
DEMOLISH EXISTING SUPPLY AND RETURN DUCTWORK LOCATED IN CEILING SPACE WITH
ASSOCIATED INSULATION, HANGERS AND SUPPORTS TO EXTENT SHOWN ON DRAWING.
EXISTING SUPPLY AND RETURN DIFFUSERS SHALL REMAIN IN USE. ALL EXISTING
DIFFUSERS SHALL BE CLEANED THROUGHOUT FOR PROPER REUSE. THIS WORK IS
TYPICAL FOR ALL EXISTING DIFFUSERS SHOWN ON THIS DRAWING.
DEMOLISH EXISTING EXPOSED ROUND DIFFUSER AND CAP NECK AT MAIN.
DEMOLISH EXISTING ROOF VENT ON ROOF AND ANY ASSOCIATED DUCT CONNECTED TO
BELOW ROOF LINE. CAP AND SEAL EXISTING VENT CURB ON ROOF. SEE ARCHITECTURAL
NOTES.
TEMPORARILY DISCONNECT EXISTING EXHAUST DUCT FOR FUTURE CONNECTION TO NEW
EXHAUST FAN.
DEMOLISH EXISTING FAN ON ROOF WITH ASSOCIATED SERVICES AND CONTROLS. CAP
ROOF CURB ON ROOF. SEE ARCHITECTURAL NOTES.
DEMOLISH EXISTING FAN ON ROOF WITH ASSOCIATED SERVICES AND CONTROLS. REUSE
ROOF OPENING TO ROUTE NEW RETURN AIR DUCT DOWN FROM HV-1. FIELD VERIFY
EXISTING CONDITIONS. COORDINATE WITH STRUCTURAL DESIGN.
DEMOLISH EXISTING FAN ON ROOF WITH ASSOCIATED SERVICES AND CONTROLS. REUSE
ROOF OPENING TO INSTALL NEW RELIEF AIR DAMPER AND ASSOCIATED HOOD ON ROOF.
FIELD VERIFY EXISTING CONDITIONS. COORDINATE WITH STRUCTURAL DESIGN.
DEMOLISH EXISTING WINDOW AC UNIT WITH ASSOCIATED SERVICES AND CONTROLS.
PATCH WALL TO MATCH EXISTING CONSTRUCTION. SEE ARCHITECTURAL NOTES.
GENERAL ARCHITECTURAL NOTES:
1. SAWCUT AND REMOVE PORTION OF WALL AS REQUIRED FOR NEW WORK. TEMPORARILY SHORE OPENING AS
REQUIRED FOR INSTALLATION OF NEW WORK. PATCH EXISTING WALL IF DAMAGED BY NEW WORK, FIRE STOP
AND SEAL TO MAINTAIN EXISTING FIRE RATING.
2. PATCH AND FILL IN WALL PENETRATIONS IN KIND AS A RESULT OF DEMOLITION AND NEW WORK SCOPE.
MAINTAIN EXISTING FIRE RATING.
3. REMOVE, SALVAGE AND RE-INSTALL ALL CEILING TILES AS REQUIRED FOR DEMOLITION AND NEW WORK
SCOPE. REPLACE ANY DAMAGED AND/OR MISSING TILES IN KIND.
4. REMOVE PORTION OF ROOF AS REQUIRED FOR NEW WORK. COORDINATE LOCATION OF OPENINGS AND CURB SUPPORTS WITH STRUCTURE BELOW. PATCH EXISTING ROOFING IF DAMAGED BY NEW WORK IN KIND.
OVERLAP NEW AND EXISTING ROOFING MINIMUM 6" ON ALL SIDES.
5. ALL ROOFING WORK, INCLUDING EQUIPMENT CURBS, FLASHING, PATCHING, PENETRATIONS, REPAIRS, ETC.
SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST NRCA, NATIONAL ROOFING CONTRACTORS ASSOCIATION, ROOFING MANUALS AND DETAILS FOR LOW OR STEEP SLOPE SYSTEMS AND PER ROOFING
MANUFACTURER TO MAINTAIN EXISTING WARRANTIES.
1. CONTRACTOR SHALL INCLUDE THE ABATEMENT OF ALL ASBESTOS CONTAINING BUILDING
MATERIALS (ACBM) IN THEIR BID, THAT IS REQUIRED TO COMPLETE THE SCOPE OF WORK
INDICATED ON CONTRACT DOCUMENTS.
2. ASBESTOS ABATED IN THE COURSE OF THIS PROJECT MUST BE PROPERLY COLLECTED,
CONTAINERIZED AND DISPOSED OF IN A LANDFILL LICENSED TO ACCEPT ASBESTOS WASTE.
ALL ASBESTOS DISPOSAL MANIFESTS MUST BE COORDINATED WITH, AND SIGNED BY, 127TH
WING ENVIRONMENTAL MANAGEMENT OFFICE PERSONNEL.
3. CONTRACTOR SHALL UTILIZE SELFRIDGE ANG BASE (SANGB) FORM 23 FOR TRACKING
HAZARDOUS MATERIALS AND SANGB FORM 72 FOR SOLID WASTE TRACKING AND
DIVERSION.
4. CONTRACTOR SHALL ASSUME THE PRESENCE OF ASBESTOS CONTAINING DRY WALL JOINT
COMPOUND IN EXISTING WALLS ABOVE CEILING NOTED FOR PENETRATION BY NEW SUPPLY
AIR DUCTS.
1. IF SUSPECTED ASBESTOS CONTAINING BUILDING MATERIAL (ACBM) IS ENCOUNTERED, WORK IN
THE IMMEDIATE VICINITY MUST STOP AND THE OWNERS CONTRACTING OFFICER SHALL BE
NOTIFIED. AFTER CONSULTATION WITH BASE PERSONNEL, THE OWNERS CONTRACTING OFFICER
WILL DIRECT FURTHER ACTION TO BE TAKEN. WORK SHOULD PROCEED UNINTERRUPTED IN
UNAFFECTED AREAS OF THE PROJECT.
2. BASED ON THE AGE OF THE BUILDINGS AT SELFRIDGE ANG BASE, THERE IS THE POTENTIAL FOR
THE PRESENCE OF LEAD ON PAINTED SURFACES. BEST MANAGEMENT PRACTICES MUST BE
EMPLOYED TO MINIMIZE DUST AND ADEQUATELY PROTECT WORKERS FROM LEAD BASED PAINT
(LBP) EXPOSURE IN ACCORDANCE WITH OSHA AND MIOSHA STANDARDS.
3. IF ASBESTOS AND/OR LEAD IS SUSPECTED IT SHOULD BE TESTED FOR. IF EITHER ASBESTOS
AND/OR LEAD IS FOUND, FOLLOW APPLICABLE OSHA GUIDELINES FOR REMEDIATION.
4. FOR ADDITIONAL INFORMATION, CONTRACTOR TO REQUEST ASBESTOS INSPECTION REPORT
FROM SELFRIDGE AIR NATIONAL GUARD BASE.
GENERAL NOTES:
1. DO NOT SCALE DRAWINGS.
ALL DIMENSIONS ARE IN NOMINAL BRITISH IMPERIAL UNITS.
2. SEE ADDITIONAL GENERAL NOTES ON SHEET M000.
3. DRAWINGS ARE BASED UPON GOVERNMENT'S RECORD DRAWINGS AND FIELD
VERIFICATION. NOTIFY GOVERNMENT OF DISCREPANCIES OR CONDITIONS REQUIRING
SUPPLEMENTAL INSTRUCTIONS PRIOR TO CONTINUATION OF WORK.
4. VERIFY ALL DIMENSIONS, CONDITIONS AND LOCATION OF EXISTING EQUIPMENT,
CONTROLS, PUMPS, PIPING, DUCTWORK, DIFFUSERS, ETC. IN FIELD, AND NOTIFY THE
RESPECTIVE DISCIPLINE OF ANY DISCREPANCIES BEFORE COMMENCEMENT OF WORK.
5. REFER TO ELEC. DRAWINGS FOR ADDITIONAL INFORMATION OF ELECTRICAL
REQUIREMENTS.
6. ALL WORK SHALL COMPLY WITH LOCAL AND NATIONAL CODES, UFC STANDARDS,
MANUFACTURERS RECOMMENDATIONS, SANG AND ANG DESIGN POLICIES,
ANGTEL-15-01, ANGTEL-15-01-04, ANGTEL-15-01-05, ETC.
7. INSTALL NEW HVAC EQUIPMENT AND COMPONENTS WITH ADEQUATE CLEARANCE SPACE,
FOR ACCESS AND MAINTENANCE, AS REQUIRED PER LOCAL CODE, ANG-ETL POLICIES,
UFC STANDARDS AND MANUFACTURERS REQUIREMENTS.
8. THE CONTRACTOR SHALL REPLACE/RESTORE ANY ITEM OR EQUIPMENT REQUIRED TO
REMAIN OPERATIONAL OR TEMPORARILY BEING RELOCATED/OFFSETED, OR THAT IS
DAMAGED DURING CONSTRUCTION. EXISTING PIPING, CONDUIT, WIRES, SUPPORT, ETC.
THAT IS REQUIRED TO BE OFFSET TO FACILITATE THE INSTALLATION OF NEW WORK
SHALL BE REINSTALLED AND RESTORED TO ITS ORIGINAL CONDITION. CONTRACTOR IS
REQUIRED TO FIELD VERIFY AREA OF WORK WHERE NEW EQUIPMENT ARE INSTALLED
BEFORE START OF WORK. THIS WORK IS PART OF THE CONTRACTOR'S CONTRACT
RESPONSIBILITIES.
9. MECHANICAL DEMOLITION WORK SHALL INCLUDE, BUT NOT BE LIMITED TO, THE REMOVAL
OF EXISTING AIR CONDITIONING EQUIPMENT, BOILERS, PUMPS, PIPING, SHEET METAL
DUCTWORK, HEATING COILS, AIR-COOLED CHILLER, ETC. AS INDICATED AND/OR
DESCRIBED ON DEMOLITION DRAWINGS. COMPLETELY REMOVE ALONG WITH CONTROLS,
PNEUMATIC TUBING, HANGERS, SUPPORTS AND ALL RELATED ACCESSORIES.
10. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING MECHANICAL SERVICES AND
UTILITIES BEING REUSED.
11. PATCH ALL OPENINGS IN FLOOR, CEILINGS AND WALLS CREATED BY DEMOLITION OR
NEW WORK AS REQUIRED TO MATCH EXISTING CONSTRUCTION.
12. ALL EQUIPMENT BEING REUSED AND/OR RELOCATED SHALL BE THOROUGHLY CLEANED
AND RECONDITIONED PRIOR TO START-UP.
13. CAP ALL BRANCH DUCTS FROM GRILLES, REGISTERS, DIFFUSERS, AND PIPING BEING
REMOVED, WHETHER INDICATED ON PLAN OR NOT.
14. PROVIDE TEMPORARY CAP ON ALL OPEN ENDED ACTIVE SUPPLY, RETURN AIR, EXHAUST
AIR DUCTWORK, REGISTERS AND GRILLES TO BE REUSED.
15. TEST AND BALANCE AIR & WATER VOLUMES TO FINAL DESIGN VALUES.
F1
F
E1
E
D1
C1
C
B1
B
A1
A
Aa
Ab
Ac
Ad
D
11a2
C2
C3
B2
3a1
2a33a44a55a66a7 3a1
11a2
2a33a44a55a66a7
G
F1
F
E1
E
D1
C1
C
B1
B
A1
A
Aa
Ab
Ac
Ad
D
11a2
C2
C3
B2
3a1
2a33a44a55a66a7 3a1
11a2
G G
G G
G G
G G
G G
G G
G G
G G
G
G
EX. RTU-2
TO REMAIN
EX.ROOF VENT
(TYP FOR ALL)
EX. CAPPED
ROOF VENT
EX. HW BOILERS FLUE
STACK ROOF OPENING
(E) PLUMBING
VENT PIPE
(TYP FOR ALL)
(TYP)
(TYP)
EX.CU
(TO REMAIN)
EX.PLBG VENT
(TYP FOR ALL)
(TYP)
(TYP)
(TYP)
(TYP)
(TYP) (TYP)
(TYP)(TYP)
(TYP)
(TYP) (TYP)
(TYP) (TYP)
(TYP)
EX.2" GAS
LINE TO
EX.RTU-S
EX. RTU-1
TO REMAIN
(TYP)
(TYP)
(TYP)
(TYP)
(TYP)
EX.2" GAS LINE
DOWN TO 4"
EX. GAS MAIN
EX.1"GAS
EX. CU
GGGGG
EX. GAS
METER
CAPPED
EX.FAN
(TYP)
EX. ROOF DRAIN
(TYP FOR ALL)
(TYP)
(TYP)
EX.CAPPED
ROOF VENT (TYP)
EX.EF
(TOILETS)
EX.EF
(TOILETS)
EX.EF-1
(TO REMAIN)
(TYP)
EX.CAPPED
ROOF VENT
EX.ROOF VENT
(WAREHOUSE)
EX.EF
(WAREHOUSE)
EX.EF
(WAREHOUSE)
(TYP)
(TYP)
(TYP)
(TYP)
EX. EF
(WAREHOUSE)
EX. SF
(WAREHOUSE)
EX. SF
(WAREHOUSE)
EX. EF
(WAREHOUSE)EX. ROOF
VENT
ROOF PLAN -
HVAC DEMO
MD103
WORK
127th WING
BUILDING 1414
RENOVATION
http://www.AECOM.com
27777 Franklin Road, Suite 2000 Southfield, MI 48034 United States P: 248 204 5900 F: 248 204 5901
SCALE: 116"= 1'-0"
2a33a44a55a66a7
G F1
F E1
E D
C
C B1
B A1
A
Aa Ab
Ac Ad
D
11a2
2a33a44a55a66a7
G F1
F E1
E D
C
C B1
B A1
A
Aa Ab
Ac Ad
D
11a2
DEMOLITION KEYED NOTES:
DEMOLISH EXISTING ROOF VENT. CAP AND SEAL EX. ROOF CURB WITH SHEET METAL AND
INSULATION. SEE ARCHITECTURAL NOTES.
DEMOLISH EXISTING EXHAUST FAN. CAP AND SEAL EX. ROOF CURB WITH SHEET METAL AND
INSULATION. SEE ARCHITECTURAL NOTES.
DEMOLISH EXISTING EXHAUST FAN AND TEMPORARILY PROTECT ROOF OPENING TO
INSTALL NEW EXHAUST FAN.
DEMOLISH EXISTING EXHAUST FAN AND TEMPORARILY PROTECT ROOF OPENING FOR
REUSE TO ROUTE NEW RETURN AIR DUCT.
DEMOLISH EXISTING ROOF HOOD AND TEMPORARILY PROTECT ROOF OPENING TO INSTALL
NEW RELIEF AIR DAMPER AND ASSOCIATED ROOF HOOD.
DEMOLISH EXISTING 20" BOILER STACK AND TEMPORARILY PROTECT ROOF OPENING FOR
REUSE TO ROUTE NEW GAS LINE AND BOILER FLUE VENT.
EXISTING 4" GAS LINE ON OUTSIDE WALL ROUTED INSIDE TO MAIN MECHANICAL ROOM TO
REMAIN IN USE.
GENERAL ARCHITECTURAL NOTES:
1. SAWCUT AND REMOVE PORTION OF WALL AS REQUIRED FOR NEW WORK. TEMPORARILY SHORE OPENING AS
REQUIRED FOR INSTALLATION OF NEW WORK. PATCH EXISTING WALL IF DAMAGED BY NEW WORK, FIRE STOP
AND SEAL TO MAINTAIN EXISTING FIRE RATING.
2. PATCH AND FILL IN ROOF PENETRATIONS IN KIND AS A RESULT OF DEMOLITION AND NEW WORK SCOPE.
3. REMOVE PORTION OF ROOF AS REQUIRED FOR NEW WORK. COORDINATE LOCATION OF OPENINGS AND CURB SUPPORTS WITH STRUCTURE BELOW. PATCH EXISTING ROOFING IF DAMAGED BY NEW WORK IN KIND.
OVERLAP NEW AND EXISTING ROOFING MINIMUM 6" ON ALL SIDES.
4. ALL ROOFING WORK, INCLUDING EQUIPMENT CURBS, FLASHING, PATCHING, PENETRATIONS, REPAIRS, ETC.
SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST NRCA, NATIONAL ROOFING CONTRACTORS ASSOCIATION, ROOFING MANUALS AND DETAILS FOR LOW OR STEEP SLOPE SYSTEMS AND PER ROOFING
MANUFACTURER TO MAINTAIN EXISTING WARRANTIES.
GENERAL NOTES:
1. DO NOT SCALE DRAWINGS.
ALL DIMENSIONS ARE IN NOMINAL BRITISH IMPERIAL UNITS.
2. SEE ADDITIONAL GENERAL NOTES ON SHEET M000.
3. DRAWINGS ARE BASED UPON GOVERNMENT'S RECORD DRAWINGS AND FIELD
VERIFICATION. NOTIFY GOVERNMENT OF DISCREPANCIES OR CONDITIONS REQUIRING
SUPPLEMENTAL INSTRUCTIONS PRIOR TO CONTINUATION OF WORK.
4. VERIFY ALL DIMENSIONS, CONDITIONS AND LOCATION OF EXISTING EQUIPMENT,
CONTROLS, PUMPS, PIPING, DUCTWORK, DIFFUSERS, ETC. IN FIELD, AND NOTIFY THE
RESPECTIVE DISCIPLINE OF ANY DISCREPANCIES BEFORE COMMENCEMENT OF WORK.
5. REFER TO ELEC. DRAWINGS FOR ADDITIONAL INFORMATION OF ELECTRICAL
REQUIREMENTS.
6. ALL WORK SHALL COMPLY WITH LOCAL AND NATIONAL CODES, UFC STANDARDS,
MANUFACTURERS RECOMMENDATIONS, SANG AND ANG DESIGN POLICIES,
ANGTEL-15-01, ANGTEL-15-01-04, ANGTEL-15-01-05, ETC.
7. INSTALL NEW HVAC EQUIPMENT AND COMPONENTS WITH ADEQUATE CLEARANCE SPACE,
FOR ACCESS AND MAINTENANCE, AS REQUIRED PER LOCAL CODE, ANG-ETL POLICIES,
UFC STANDARDS AND MANUFACTURERS REQUIREMENTS.
8. THE CONTRACTOR SHALL REPLACE/RESTORE ANY ITEM OR EQUIPMENT REQUIRED TO
REMAIN OPERATIONAL OR TEMPORARILY BEING RELOCATED/OFFSETED, OR THAT IS
DAMAGED DURING CONSTRUCTION. EXISTING PIPING, CONDUIT, WIRES, SUPPORT, ETC.
THAT IS REQUIRED TO BE OFFSET TO FACILITATE THE INSTALLATION OF NEW WORK
SHALL BE REINSTALLED AND RESTORED TO ITS ORIGINAL CONDITION. CONTRACTOR IS
REQUIRED TO FIELD VERIFY AREA OF WORK WHERE NEW EQUIPMENT ARE INSTALLED
BEFORE START OF WORK. THIS WORK IS PART OF THE CONTRACTOR'S CONTRACT
RESPONSIBILITIES.
9. MECHANICAL DEMOLITION WORK SHALL INCLUDE, BUT NOT BE LIMITED TO, THE REMOVAL
OF EXISTING AIR CONDITIONING EQUIPMENT, BOILERS, PUMPS, PIPING, SHEET METAL
DUCTWORK, HEATING COILS, AIR-COOLED CHILLER, ETC. AS INDICATED AND/OR
DESCRIBED ON DEMOLITION DRAWINGS. COMPLETELY REMOVE ALONG WITH CONTROLS,
PNEUMATIC TUBING, HANGERS, SUPPORTS AND ALL RELATED ACCESSORIES.
10. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING MECHANICAL SERVICES AND
UTILITIES BEING REUSED.
11. PATCH ALL OPENINGS IN ROOF, FLOOR, CEILINGS AND WALLS CREATED BY DEMOLITION
OR NEW WORK AS REQUIRED TO MATCH EXISTING CONSTRUCTION.
12. ALL EQUIPMENT BEING REUSED AND/OR RELOCATED SHALL BE THOROUGHLY CLEANED
AND RECONDITIONED PRIOR TO START-UP.
13. CAP ALL BRANCH DUCTS FROM GRILLES, REGISTERS, DIFFUSERS, AND PIPING BEING
REMOVED, WHETHER INDICATED ON PLAN OR NOT.
14. PROVIDE TEMPORARY CAP ON ALL OPEN ENDED ACTIVE SUPPLY, RETURN AIR, EXHAUST
AIR DUCTWORK, REGISTERS AND GRILLES TO BE REUSED.
15. TEST AND BALANCE AIR & WATER VOLUMES TO FINAL DESIGN VALUES.
F1
F
E1
E
D1
C1
C
B1
D
11a2
C2
C3
B2
3a1
MATCHLINE - SEE SHEET MD105
EX.1"
EX.3 4"
EX. 3 4"
EX.3 4"
EX.1"
EX.3-12"
EX.3-12"
EX.1"
EX.3-12"
EX.4" CHW SUPPLY
& RETURN PIPING
LOOP
EX.1"
EX.1-12" HWS
& HWR LOOP
EX.AIR COOLED
CHILLER
EX.AHU-5
EX.AHU-4
EX.AHU-12
EX.HV-4
EX.AHU-7
EX.AHU-9
EX.AHU-2
EX.HWP
EX.HWP
(3) EX. HW
BOILERS
EX.RHB-1
EX.AHU-6
EX.CHWP
EX.UH-2
EX.UH-1
EX. EXPANSION
TANK
EX.DWHEX. AHU
(ABANDON IN PLACE)
EX.CAPPED
CHW PIPING
EX.3 4"
EX. ABANDONED HW SUPPLY
& RETURN PIPING LOOP
(OUT OF PROJECT AREA)
EX. ABANDONED HW SUPPLY
& RETURN PIPING LOOP
(OUT OF PROJECT AREA)
EX. ABANDONED HW SUPPLY
& RETURN PIPING LOOP
(OUT OF PROJECT AREA)
EX. CHW SUPPLY &
RETURN PIPING LOOP
EX. 2" HW REHEAT
RETURN PIPING LOOP
EX. 2" HW REHEAT
SUPPLY PIPING LOOP
EX. HW SUPPLY & RETURN
REHEAT PIPING TO EX. VAV BOXES
(OUT OF PROJECT AREA)
EX. HWS&R REHEAT
PIPING LOOP
(OUT OF PROJECT AREA)
EX. CP-1
HW RECIRC.
PUMP
EX.
CHEMICAL
FEEDER
EX. 4" CHW SUPPLY &
RETURN PIPING LOOP
EX. COMPRESSION
TANK
EX. HOUSEKEEPING
PAD TO REMAIN
EX. CW
MAKEUP LINE
EX. ABANDONED HW SUPPLY
& RETURN PIPING LOOP
(OUT OF PROJECT AREA)
EX. HW SUPPLY &
RETURN PIPING
LOOP
EX.AHU-8
EX.HWS
EX
.H
W S
EX
.H
W R
EX.HWR
EX.HWS
EX.HWR
EX
.H
W S
EX
.H
W R
EX.HWR
EX. ABANDONED HW SUPPLY
& RETURN PIPING LOOP
(OUT OF PROJECT AREA)
2"
EX. HWS&R REHEAT
PIPING TO EX.VAV BOXES
(OUT OF PROJECT AREA)
EX. 2" HWR
EX. HWS&R REHEAT
PIPING TO EX.VAV BOXES
(OUT OF PROJECT AREA)
FIRST FLOOR
PLAN-WEST
MD104
HVAC PIPING
DEMO WORK
127th WING
BUILDING 1414
RENOVATION
http://www.AECOM.com
27777 Franklin Road, Suite 2000 Southfield, MI 48034 United States P: 248 204 5900 F: 248 204 5901
SCALE: 3 32" = 1'-0"
2a33a44a55a66a7
G F1
F E1
E D
C
C B1
B A1
A
Aa Ab
Ac Ad
D
11a2
DEMOLITION KEYED NOTES:
ABANDON EXISTING AHU IN PLACE. DISCONNECT ALL EXISTING HOT AND CHILLED WATER
PIPING CONNECTIONS AND ASSOCIATED VALVES AND CONTROLS.
DEMOLISH EXISTING HOT WATER BOILERS WITH ASSOCIATED EXHAUST FLUE STACKS,
COMPRESSION TANK, PIPING, VALVES, SUPPORTS, WATER MAKEUP, GAS AND CONTROLS.
ALL EXISTING HOT WATER PIPING ASSOCIATED WITH DEMOLISHED HOT WATER SYSTEM
SHALL BE REMOVED IN ALL ACCESSIBLE AREAS OF WORK. EXISTING PIPING LOCATED OUT
OF WORK AREAS SHALL BE DRAINED, CAPPED AND ABANDONED.
DEMOLISH EXISTING HOT WATER RE-CIRCULATION PUMPS WITH ASSOCIATED PIPING
VALVES, SUPPORTS AND CONTROLS.
DEMOLISH EXISTING HW UNIT HEATER (1414 UH-2) WITH ASSOCIATED PIPING, VALVES AND
CONTROLS.
EXISTING HW UNIT HEATER (1414 UH-1) SHALL REMAIN IN USE. DISCONNECT EXISTING HW
PIPING AND CAP FOR FUTURE CONNECTION.
DEMOLISH EXISTING EXPANSION TANK AND RETURN TO OWNER. CAP EXISTING HW PIPE
FOR FUTURE CONNECTION TO NEW EXPANSION TANK.
DEMOLISH EXISTING HW REHEAT RECIRCULATION PUMP AND RETURN TO OWNER. CAP
EXISTING PIPING FOR FUTURE CONNECTION TO NEW PUMPS.
EXISTING TO REMAIN IN USE
DEMOLISH EXISTING HW AND CHW PIPING CONNECTIONS TO EXISTING INDOOR AHU WITH
ASSOCIATED VALVES, SUPPORTS AND CONTROLS.
DEMOLISH EXISTING AIR COOLED CHILLER LOCATED OUTSIDE WITH ASSOCIATED PIPING,
VALVES, CONTROLS AND SUPPORTS. CAPTURE REFRIGERANT GAS AS REQUIRED BY CODE
AND ANGB STANDARDS. PATCH EXTERIOR WALL PIPING PENETRATIONS IN KIND. SEE
ARCHITECTURAL NOTES.
DEMOLISH EXISTING CHILLED WATER RECIRCULATION PUMP WITH ASSOCIATED PIPING,
VALVES, CONTROLS, SUPPORTS AND ACCESSORIES.
DEMOLISH EXISTING CHILLED WATER SUPPLY AND RETURN DISTRIBUTION PIPING ROUTED
IN CEILING SPACE. REMOVE ALL EXISTING CHILLED WATER PIPING IN ACCESSIBLE AREA
OF WORK. DRAIN, CAP AND ABANDON EXISTING PIPING OUTSIDE AREA OF WORK.
EXISTING 1-12" HWS AND HWR REHEAT PIPING TO BE REUSED TO FEED NEW VAV REHEAT
COILS.
CAP AND SEAL EXTERIOR WALL PIPING PENETRATIONS TO MATCH EXISTING
CONSTRUCTION.
GENERAL ARCHITECTURAL
NOTES:
1. SAWCUT AND REMOVE PORTION OF WALL AS REQUIRED FOR NEW WORK. TEMPORARILY SHORE
OPENING AS REQUIRED FOR INSTALLATION OF NEW WORK. PATCH EXISTING WALL IF DAMAGED
BY NEW WORK, FIRE STOP AND SEAL TO MAINTAIN EXISTING FIRE RATING.
2. PATCH AND FILL IN WALL PENETRATIONS IN KIND AS A RESULT OF DEMOLITION AND NEW WORK
SCOPE. MAINTAIN EXISTING FIRE RATING.
3. REMOVE, SALVAGE AND RE-INSTALL ALL CEILING TILES AS REQUIRED FOR DEMOLITION AND NEW
WORK SCOPE. REPLACE ANY DAMAGED AND/OR MISSING TILES IN KIND.
4. REMOVE PORTION OF ROOF AS REQUIRED FOR NEW WORK. COORDINATE LOCATION OF
OPENINGS AND CURB SUPPORTS WITH STRUCTURE BELOW. PATCH EXISTING ROOFING IF
DAMAGED BY NEW WORK IN KIND. OVERLAP NEW AND EXISTING ROOFING MINIMUM 6" ON ALL
SIDES.
5. ALL ROOFING WORK, INCLUDING EQUIPMENT CURBS, FLASHING, PATCHING, PENETRATIONS, REPAIRS, ETC. SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST NRCA, NATIONAL
ROOFING CONTRACTORS ASSOCIATION, ROOFING MANUALS AND DETAILS FOR LOW OR STEEP
SLOPE SYSTEMS AND PER ROOFING MANUFACTURER TO MAINTAIN EXISTING WARRANTIES.
1. CONTRACTOR SHALL INCLUDE THE ABATEMENT OF ALL ASBESTOS CONTAINING BUILDING
MATERIALS (ACBM) IN THEIR BID, THAT IS REQUIRED TO COMPLETE THE SCOPE OF WORK
INDICATED ON CONTRACT DOCUMENTS.
2. ASBESTOS ABATED IN THE COURSE OF THIS PROJECT MUST BE PROPERLY COLLECTED,
CONTAINERIZED AND DISPOSED OF IN A LANDFILL LICENSED TO ACCEPT ASBESTOS WASTE. ALL
ASBESTOS DISPOSAL MANIFESTS MUST BE COORDINATED WITH, AND SIGNED BY, 127TH WING
ENVIRONMENTAL MANAGEMENT OFFICE PERSONNEL.
3. CONTRACTOR SHALL UTILIZE SELFRIDGE ANG BASE (SANGB) FORM 23 FOR TRACKING
HAZARDOUS MATERIALS AND SANGB FORM 72 FOR SOLID WASTE TRACKING AND DIVERSION.
4. CONTRACTOR SHALL ASSUME THE PRESENCE OF ASBESTOS CONTAINING DRY WALL JOINT
COMPOUND IN EXISTING WALLS ABOVE CEILING NOTED FOR PENETRATION BY NEW SUPPLY AIR
DUCTS.
1. IF SUSPECTED ASBESTOS CONTAINING BUILDING MATERIAL (ACBM) IS ENCOUNTERED, WORK IN
THE IMMEDIATE VICINITY MUST STOP AND THE OWNERS CONTRACTING OFFICER SHALL BE
NOTIFIED. AFTER CONSULTATION WITH BASE PERSONNEL, THE OWNERS CONTRACTING OFFICER
WILL DIRECT FURTHER ACTION TO BE TAKEN. WORK SHOULD PROCEED UNINTERRUPTED IN
UNAFFECTED AREAS OF THE PROJECT.
2. BASED ON THE AGE OF THE BUILDINGS AT SELFRIDGE ANG BASE, THERE IS THE POTENTIAL FOR
THE PRESENCE OF LEAD ON PAINTED SURFACES. BEST MANAGEMENT PRACTICES MUST BE
EMPLOYED TO MINIMIZE DUST AND ADEQUATELY PROTECT WORKERS FROM LEAD BASED PAINT
(LBP) EXPOSURE IN ACCORDANCE WITH OSHA AND MIOSHA STANDARDS.
3. IF ASBESTOS AND/OR LEAD IS SUSPECTED IT SHOULD BE TESTED FOR. IF EITHER ASBESTOS
AND/OR LEAD IS FOUND, FOLLOW APPLICABLE OSHA GUIDELINES FOR REMEDIATION.
4. FOR ADDITIONAL INFORMATION, CONTRACTOR TO REQUEST ASBESTOS INSPECTION REPORT
FROM SELFRIDGE AIR NATIONAL GUARD BASE.
GENERAL NOTES:
1. DO NOT SCALE DRAWINGS.
ALL DIMENSIONS ARE IN NOMINAL BRITISH IMPERIAL UNITS.
2. SEE ADDITIONAL GENERAL NOTES ON SHEET M000.
3. DRAWINGS ARE BASED UPON GOVERNMENT'S RECORD DRAWINGS AND FIELD
VERIFICATION. NOTIFY GOVERNMENT OF DISCREPANCIES OR CONDITIONS REQUIRING
SUPPLEMENTAL INSTRUCTIONS PRIOR TO CONTINUATION OF WORK.
4. VERIFY ALL DIMENSIONS, CONDITIONS AND LOCATION OF EXISTING EQUIPMENT,
CONTROLS, PUMPS, PIPING, DUCTWORK, DIFFUSERS, ETC. IN FIELD, AND NOTIFY THE
RESPECTIVE DISCIPLINE OF ANY DISCREPANCIES BEFORE COMMENCEMENT OF WORK.
5. REFER TO ELEC. DRAWINGS FOR ADDITIONAL INFORMATION OF ELECTRICAL
REQUIREMENTS.
6. ALL WORK SHALL COMPLY WITH LOCAL AND NATIONAL CODES, UFC STANDARDS,
MANUFACTURERS RECOMMENDATIONS, SANG AND ANG DESIGN POLICIES,
ANGTEL-15-01, ANGTEL-15-01-04, ANGTEL-15-01-05, ETC.
7. INSTALL NEW HVAC EQUIPMENT AND COMPONENTS WITH ADEQUATE CLEARANCE SPACE,
FOR ACCESS AND MAINTENANCE, AS REQUIRED PER LOCAL CODE, ANG-ETL POLICIES,
UFC STANDARDS AND MANUFACTURERS REQUIREMENTS.
8. THE CONTRACTOR SHALL REPLACE/RESTORE ANY ITEM OR EQUIPMENT REQUIRED TO
REMAIN OPERATIONAL OR TEMPORARILY BEING RELOCATED/OFFSETED, OR THAT IS
DAMAGED DURING CONSTRUCTION. EXISTING PIPING, CONDUIT, WIRES, SUPPORT, ETC.
THAT IS REQUIRED TO BE OFFSET TO FACILITATE THE INSTALLATION OF NEW WORK
SHALL BE REINSTALLED AND RESTORED TO ITS ORIGINAL CONDITION. CONTRACTOR IS
REQUIRED TO FIELD VERIFY AREA OF WORK WHERE NEW EQUIPMENT ARE INSTALLED
BEFORE START OF WORK. THIS WORK IS PART OF THE CONTRACTOR'S CONTRACT
RESPONSIBILITIES.
9. MECHANICAL DEMOLITION WORK SHALL INCLUDE, BUT NOT BE LIMITED TO, THE REMOVAL
OF EXISTING AIR CONDITIONING EQUIPMENT, BOILERS, PUMPS, PIPING, SHEET METAL
DUCTWORK, HEATING COILS, AIR-COOLED CHILLER, ETC. AS INDICATED AND/OR
DESCRIBED ON DEMOLITION DRAWINGS. COMPLETELY REMOVE ALONG WITH CONTROLS,
PNEUMATIC TUBING, HANGERS, SUPPORTS AND ALL RELATED ACCESSORIES.
10. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING MECHANICAL SERVICES AND
UTILITIES BEING REUSED.
11. PATCH ALL OPENINGS IN FLOOR, CEILINGS AND WALLS CREATED BY DEMOLITION OR
NEW WORK AS REQUIRED TO MATCH EXISTING CONSTRUCTION.
12. ALL EQUIPMENT BEING REUSED AND/OR RELOCATED SHALL BE THOROUGHLY CLEANED
AND RECONDITIONED PRIOR TO START-UP.
13. CAP AND TERMINATE ALL EXISTING PIPING NOT IN USE AND EXTEND OUT OF PROJECT
AREA. DRAIN ALL EXISTING PIPING, CAP AND SEAL.
14. PROVIDE TEMPORARY CAP ON ALL OPEN ENDED ACTIVE SUPPLY AND RETURN HOT
WATER PIPING TO BE REUSED.
15. TEST AND BALANCE AIR & WATER VOLUMES TO FINAL DESIGN VALUES.
C
B1
B
A1
A
Aa
Ab
Ac
Ad
B2
2a33a44a55a66a7 3a1
11a2
MATCHLINE - SEE SHEET MD104
EX.1"
EX.3 4"
EX. 3 4"
EX.3 4"
EX.1"
EX.3-12"
EX.1"
EX.1"
EX.AHU-5
EX.AHU-4
EX.AHU-7
EX.AHU-9
EX.HV UNIT
EX.AHU-6
EX.AHU-10
EX.AHU-11
EX.3 4"
EX. HW SUPPLY &
RETURN PIPING
EX. ABANDONED HW SUPPLY
& RETURN PIPING LOOP
(OUT OF PROJECT AREA)
EX. CHW SUPPLY &
RETURN PIPING LOOP
EX. SUPPLY & RETURN
CHW PIPING LOOP
EX. HW SUPPLY &
RETURN PIPING
TO HW DUCT COIL
EX.AHU-8
EX.CUH TO
REMAIN
FIRST FLOOR
PLAN - EAST
MD105
HVAC PIPING
DEMO WORK
127th WING
BUILDING 1414
RENOVATION
http://www.AECOM.com
27777 Franklin Road, Suite 2000 Southfield, MI 48034 United States P: 248 204 5900 F: 248 204 5901
SCALE: 3 32" = 1'-0"
2a33a44a55a66a7
G F1
F E1
E D
C
C B1
B A1
A
Aa Ab
Ac Ad
D
11a2
DEMOLITION KEYED NOTES:
DEMOLISH EXISTING DUCT-MOUNTED HOT WATER COIL WITH ASSOCIATED PIPING,
VALVES, CONTROLS AND SUPPORTS.
DEMOLISH EXISTING HOT WATER PIPING ASSOCIATED WITH DEMOLISHED HOT WATER
SYSTEM IN ALL ACCESSIBLE AREAS OF WORK. EXISTING PIPING LOCATED OUT OF WORK
AREAS SHALL BE DRAINED, CAPPED AND ABANDONED.
DEMOLISH EXISTING HW AND CHW PIPING CONNECTIONS TO EXISTING INDOOR AHU
WITH ASSOCIATED VALVES, SUPPORTS AND CONTROLS.
DEMOLISH EXISTING CHILLED WATER SUPPLY AND RETURN DISTRIBUTION PIPING
LOCATED IN CEILING SPACE. REMOVE ALL EXISTING PIPING IN AREA OF WORK. DRAIN,
CAP AND ABANDON EXISTING PIPING OUTSIDE AREA OF WORK.
GENERAL ARCHITECTURAL NOTES:
1. SAWCUT AND REMOVE PORTION OF WALL AS REQUIRED FOR NEW WORK. TEMPORARILY SHORE OPENING
AS REQUIRED FOR INSTALLATION OF NEW WORK. PATCH EXISTING WALL IF DAMAGED BY NEW WORK, FIRE STOP AND SEAL TO MAINTAIN EXISTING FIRE RATING.
2. PATCH AND FILL IN WALL PENETRATIONS IN KIND AS A RESULT OF DEMOLITION AND NEW WORK SCOPE.
MAINTAIN EXISTING FIRE RATING.
3. REMOVE, SALVAGE AND RE-INSTALL ALL CEILING TILES AS REQUIRED FOR DEMOLITION AND NEW WORK
SCOPE. REPLACE ANY DAMAGED AND/OR MISSING TILES IN KIND.
4. REMOVE PORTION OF ROOF AS REQUIRED FOR NEW WORK. COORDINATE LOCATION OF OPENINGS AND CURB SUPPORTS WITH STRUCTURE BELOW. PATCH EXISTING ROOFING IF DAMAGED BY NEW WORK IN
KIND. OVERLAP NEW AND EXISTING ROOFING MINIMUM 6" ON ALL SIDES.
5. ALL ROOFING WORK, INCLUDING EQUIPMENT CURBS, FLASHING, PATCHING, PENETRATIONS, REPAIRS, ETC. SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST NRCA, NATIONAL ROOFING
CONTRACTORS ASSOCIATION, ROOFING MANUALS AND DETAILS FOR LOW OR STEEP SLOPE SYSTEMS
AND PER ROOFING MANUFACTURER TO MAINTAIN EXISTING WARRANTIES.
1. CONTRACTOR SHALL INCLUDE THE ABATEMENT OF ALL ASBESTOS CONTAINING BUILDING
MATERIALS (ACBM) IN THEIR BID, THAT IS REQUIRED TO COMPLETE THE SCOPE OF WORK
INDICATED ON CONTRACT DOCUMENTS.
2. ASBESTOS ABATED IN THE COURSE OF THIS PROJECT MUST BE PROPERLY COLLECTED,
CONTAINERIZED AND DISPOSED OF IN A LANDFILL LICENSED TO ACCEPT ASBESTOS WASTE.
ALL ASBESTOS DISPOSAL MANIFESTS MUST BE COORDINATED WITH, AND SIGNED BY, 127TH
WING ENVIRONMENTAL MANAGEMENT OFFICE PERSONNEL.
3. CONTRACTOR SHALL UTILIZE SELFRIDGE ANG BASE (SANGB) FORM 23 FOR TRACKING
HAZARDOUS MATERIALS AND SANGB FORM 72 FOR SOLID WASTE TRACKING AND
DIVERSION.
4. CONTRACTOR SHALL ASSUME THE PRESENCE OF ASBESTOS CONTAINING DRY WALL JOINT
COMPOUND IN EXISTING WALLS ABOVE CEILING NOTED FOR PENETRATION BY NEW SUPPLY
AIR DUCTS.
1. IF SUSPECTED ASBESTOS CONTAINING BUILDING MATERIAL (ACBM) IS ENCOUNTERED, WORK IN
THE IMMEDIATE VICINITY MUST STOP AND THE OWNERS CONTRACTING OFFICER SHALL BE
NOTIFIED. AFTER CONSULTATION WITH BASE PERSONNEL, THE OWNERS CONTRACTING OFFICER
WILL DIRECT FURTHER ACTION TO BE TAKEN. WORK SHOULD PROCEED UNINTERRUPTED IN
UNAFFECTED AREAS OF THE PROJECT.
2. BASED ON THE AGE OF THE BUILDINGS AT SELFRIDGE ANG BASE, THERE IS THE POTENTIAL FOR
THE PRESENCE OF LEAD ON PAINTED SURFACES. BEST MANAGEMENT PRACTICES MUST BE
EMPLOYED TO MINIMIZE DUST AND ADEQUATELY PROTECT WORKERS FROM LEAD BASED PAINT
(LBP) EXPOSURE IN ACCORDANCE WITH OSHA AND MIOSHA STANDARDS.
3. IF ASBESTOS AND/OR LEAD IS SUSPECTED IT SHOULD BE TESTED FOR. IF EITHER ASBESTOS
AND/OR LEAD IS FOUND, FOLLOW APPLICABLE OSHA GUIDELINES FOR REMEDIATION.
4. FOR ADDITIONAL INFORMATION, CONTRACTOR TO REQUEST ASBESTOS INSPECTION REPORT
FROM SELFRIDGE AIR NATIONAL GUARD BASE.
GENERAL NOTES:
1. DO NOT SCALE DRAWINGS.
ALL DIMENSIONS ARE IN NOMINAL BRITISH IMPERIAL UNITS.
2. SEE ADDITIONAL GENERAL NOTES ON SHEET M000.
3. DRAWINGS ARE BASED UPON GOVERNMENT'S RECORD DRAWINGS AND FIELD
VERIFICATION. NOTIFY GOVERNMENT OF DISCREPANCIES OR CONDITIONS REQUIRING
SUPPLEMENTAL INSTRUCTIONS PRIOR TO CONTINUATION OF WORK.
4. VERIFY ALL DIMENSIONS, CONDITIONS AND LOCATION OF EXISTING EQUIPMENT,
CONTROLS, PUMPS, PIPING, DUCTWORK, DIFFUSERS, ETC. IN FIELD, AND NOTIFY THE
RESPECTIVE DISCIPLINE OF ANY DISCREPANCIES BEFORE COMMENCEMENT OF WORK.
5. REFER TO ELEC. DRAWINGS FOR ADDITIONAL INFORMATION OF ELECTRICAL
REQUIREMENTS.
6. ALL WORK SHALL COMPLY WITH LOCAL AND NATIONAL CODES, UFC STANDARDS,
MANUFACTURERS RECOMMENDATIONS, SANG AND ANG DESIGN POLICIES,
ANGTEL-15-01, ANGTEL-15-01-04, ANGTEL-15-01-05, ETC.
7. INSTALL NEW HVAC EQUIPMENT AND COMPONENTS WITH ADEQUATE CLEARANCE SPACE,
FOR ACCESS AND MAINTENANCE, AS REQUIRED PER LOCAL CODE, ANG-ETL POLICIES,
UFC STANDARDS AND MANUFACTURERS REQUIREMENTS.
8. THE CONTRACTOR SHALL REPLACE/RESTORE ANY ITEM OR EQUIPMENT REQUIRED TO
REMAIN OPERATIONAL OR TEMPORARILY BEING RELOCATED/OFFSETED, OR THAT IS
DAMAGED DURING CONSTRUCTION. EXISTING PIPING, CONDUIT, WIRES, SUPPORT, ETC.
THAT IS REQUIRED TO BE OFFSET TO FACILITATE THE INSTALLATION OF NEW WORK
SHALL BE REINSTALLED AND RESTORED TO ITS ORIGINAL CONDITION. CONTRACTOR IS
REQUIRED TO FIELD VERIFY AREA OF WORK WHERE NEW EQUIPMENT ARE INSTALLED
BEFORE START OF WORK. THIS WORK IS PART OF THE CONTRACTOR'S CONTRACT
RESPONSIBILITIES.
9. MECHANICAL DEMOLITION WORK SHALL INCLUDE, BUT NOT BE LIMITED TO, THE REMOVAL
OF EXISTING AIR CONDITIONING EQUIPMENT, BOILERS, PUMPS, PIPING, SHEET METAL
DUCTWORK, HEATING COILS, AIR-COOLED CHILLER, ETC. AS INDICATED AND/OR
DESCRIBED ON DEMOLITION DRAWINGS. COMPLETELY REMOVE ALONG WITH CONTROLS,
PNEUMATIC TUBING, HANGERS, SUPPORTS AND ALL RELATED ACCESSORIES.
10. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING MECHANICAL SERVICES AND
UTILITIES BEING REUSED.
11. PATCH ALL OPENINGS IN FLOOR, CEILINGS AND WALLS CREATED BY DEMOLITION OR
NEW WORK AS REQUIRED TO MATCH EXISTING CONSTRUCTION.
12. ALL EQUIPMENT BEING REUSED AND/OR RELOCATED SHALL BE THOROUGHLY CLEANED
AND RECONDITIONED PRIOR TO START-UP.
13. CAP AND TERMINATE ALL EXISTING PIPING NOT IN USE AND EXTEND OUT OF PROJECT
AREA. DRAIN ALL EXISTING PIPING, CAP AND SEAL.
14. PROVIDE TEMPORARY CAP ON ALL OPEN ENDED ACTIVE SUPPLY AND RETURN HOT
WATER PIPING TO BE REUSED.
15. TEST AND BALANCE AIR & WATER VOLUMES TO FINAL DESIGN VALUES.
F1
F
E1
E
D1
C1
C
B1
D
11a2
C2
C3
B2
3a1
MATCHLINE - SEE SHEET M102
T
EX. AHU
(ABANDON IN PLACE)
EX. OA
ROOF VENT
EX.EF-1
(ON ROOF)
EX.AC
EX.RTU-2
(ON ROOF)
EX.RHB-1
EX.12"Ø
EX
.16
"Ø
EX.12"Ø
EX.14"Ø
EX
.12
"Ø
EX
.10 "Ø
EX.RD
EX.10"Ø EX.10"Ø
EX.10"Ø
EX. 10"Ø
EX.8"Ø
EX.8"Ø EX.8"Ø
EX.8"Ø EX.8"Ø
EX.8"Ø
EX
. 1
2" Ø
EX.RTU-1
(ON ROOF)
EX
.18 x2
EX. CAPPED
ROOF VENT
(ON ROOF)
EX. 80x36
RETURN DUCT
EX.UH-1
CHEMICAL
FEEDER
EX.DWH
EX.AIR
COMPRESSOR
EX.DDC
PANEL
EX.4" GAS LINE
EX.1" NG
EX. GAS
METER
EX. ROOF
VENT
EX. RA
ROOF VENT
EX.78x36
SUPPLY
DUCT
EX.RD
VAV-27
VAV-26
VAV-29
VAV-31
VAV-32
VAV-34
VAV-33
VAV-30
EX.SD
400 CFM
EX.SD
400 CFM
SD-1
400 CFM
SD-1
400 CFM
SD-1
375 CFM
EX.SD
375 CFM
EX.SD
400 CFM
x1 x1 x1
28"x16" 22x16
16x16
"Ø
"Ø
"Ø
"Ø
"Ø
12"Ø
EX.SD
375 CFM
SD-1
375 CFM
EX.SD
140 CFM
EX.SD
140 CFM
14x1414x1212x1210"Ø 10"Ø
6" Ø
6" Ø
14x10
EX.SD
CFM
EX.SD
100 CFM
EX.SD
100 CFM
EX.SD
100 CFM
EX.SD
100 CFM
EX.SD
100 CFM
16x16 x1 x1 x1
EX.SD
400 CFM
EX.SD
400 CFM
EX.SD
400 CFM
EX.SD
400 CFM
12x12
"Ø
8x12
EX.SD
400 CFM
EX.SD
400 CFM
EX.SD
400 CFM
EX. SD
400 CFM
EX.SD
400 CFM EX.SD
400 CFM
EX.RD
140 CFM
EX.RD
140 CFM
EX.RD
800 CFM
EX.RD
800 CFM
EX.RD
750 CFM
RD-1
400 CFM
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.