This file is a Facility Maintenance Plan (FMP) template for fuel system maintenance at Vance Air Force Base in Enid, Oklahoma. The template details the maintenance and inspection requirements for fuel storage and dispensing systems operated under Quality Assurance Evaluators' control at the base.
The FMP covers maintenance for multiple facilities including Building 109 (Fill Stands), Building 116 (Fuels Lab), and Building 264 (Pump House). It provides detailed asset inventories and maintenance schedules for components like filter separators, pumps, valves, meters, emergency systems, and electrical equipment. Key systems include three fill stands with 600 GPM filter separators, Gorman-Rupp centrifugal pumps rated at 300 GPM, and various control valves and safety equipment. The plan specifies quarterly, semi-annual and annual maintenance requirements for each component, with particular focus on preventive maintenance of fuel handling equipment, safety systems, and containment areas. This template is designed to ensure compliance with federal, state and local environmental regulations while maintaining operational readiness of the fuel systems.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Administrative
| Location | Site Name | Vance AFB Site #1 |
| RPSUID | 3375 | |
| DLA Site Code | VNC | |
| Hours of Operation | 24 Hours of Operation | |
| Address | 1523 West Southgate Road, Enid, OK 73705 | |
| Contract | Contractor | |
| Contract # | ||
| Local POCs | QAE Name | |
| QAE Phone | ||
| QAE Email | ||
| Alt QAE Name | ||
| Alt QAE Phone | ||
| Alt QAE Email | ||
| DLA/SCP POCs | DLA PM Name | |
| DLA PM Phone | ||
| DLA PM Email | ||
| SCP PM Name | ||
| SCP PM Phone | ||
| SCP PM Email | ||
| Contractor POCs | Contractor PM Name | |
| Contractor PM Phone | ||
| Contractor PM Email | ||
| Contractor QC Name | ||
| Contractor QC Phone | ||
| Contractor QC Email | ||
| Contractor SM Name | ||
| Contractor SM Phone | ||
| Contractor SM Email | ||
| USACE POCs | USACE PM/COR Name | |
| USACE PM/COR Phone | ||
| USACE PM/COR Email | ||
| USACE PE Name | ||
| USACE PE Phone | ||
| USACE PE Email | ||
| USACE KO Name | ||
| USACE KO Phone | ||
| USACE KO Email |
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
This table shows the minimum information required. Additional details should be included based on site specific requirements. Additional POCs may be required.
General Facility Description Facility Description
Purpose:
This Facility Maintenance Plan provides guidance for Contractor personnel in the operation, inspection, and maintenance of permanently installed fuel facilities operated under the control of the Quality Assurance Evaluators. Federal, state, and local environmental laws and regulations shall be complied with if this plan is in conflict with them.
Scope:
The instructions prescribed by this plan outline general fuels maintenance information associated with fuel storage and dispensing systems and provides the minimum periodic contractor maintenance and inspection criteria requirements for the systems. This plan is to be used in conjunction with other existing directives governing fuel system operations and maintenance requirements. Conotractor will properly maintain and repair federally funded petroleum systems and facilities in order to provide compliance with applicable code, criteria, and federal, state, local and/or host nation regulations.
Fuels Facilities:
Organizational tanks, and associated dispensing equipment are maintained and operated by the owning organization. Fuel system maintenance contractors shall perform all maintenance and associated procurement actions on installed fuel systems.
Each installation under the Southwest Division contract are military land-based facilities who receive, store, distribute, and/or dispense liquid fuels.
Standard fuel system equipment includes:
a) Above Ground Sorage Stanks (AST), Underground Storage Tanks (UST)
b) Filter/separator and other filtration device maintenance access, particularly element removal.
c) Manual valves
d) Meter Registers, and Flow Meters.
e) Control Valves.
f) Pumps
g) Tank Monitoring Equipment and Instruments
h) Alarms
i) Fire Fighting Equipment
Site Specific General Information:
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Include a general facility overview and description of each fuel system for the sites in accordance with UFC 3-460-01. Examples include: Bulk Storage Facilities, Aircraft Fueling Facilities, Marine and Dispensing Facilities, Ground Products Fueling Facilities, Alternate POL Facilities, and Support Facilities. Also include facility #s, facility names, fuel type, photos, and any other pertinent information.
Include Site Specific Conditions and Restrictions in this tab.
Communication Plan
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Communication plan shall address in/out briefs, lines of communication, coordination for access, etc.
Safety
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Site Specific Addendum and Activity Hazard Analysis, which are Attachments to the APP, specific to activities or tasks related to recurring maintenance for this site.
RM Schedule
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Link RM schedule here
Task Matrix
| Applicable Facility Assets | UFC System Level Maintenance Frequency | Special Considerations | |||||||||||||||||
| Real Property Unique Identifier | |||||||||||||||||||
| (RPUID) | Real Property Facility # | Real Property Facility Name | Operational Area | Component Type | Base Asset ID | Component Unique Identifier (CUID) | Make | Model | Capacity/Size | Q | S | A | UFC Section Reference | Additional Manufacturer RM Requirements | Operator/ equipment Requirements | System availability | Other Contract | Comments | |
| 109 | Fill stands | 109 Fillstands | Canopies | Fillstand 1 canopy | N/A | N/A | N/A | X | X | 0 | 11-2.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | Canopy-F/S #1 | ||||
| 109 | Fill stands | 109 Fillstands | Canopies | Fillstand 2 canopy | N/A | N/A | N/A | X | X | 0 | 11-2.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | Canopy-F/S#2 | ||||
| 109 | Fill stands | 109 Fillstands | Canopies | Fillstand 3 canopy | N/A | N/A | N/A | X | X | 0 | 11-2.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | Canopy-F/S #3 | ||||
| 109 | Fill stands | 109 Fillstands | Emergency Eyewash/Showers | Emergency Eyewash-Fac 309 | Haws | Unmarked | 2.0 In. | X | X | X | 11-3 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | Emergency Eyewash-Fac 309 | ||||
| 109 | Fill stands | 109 Fillstands | Signage and Markings | Signage and markings | N/A | N/A | N/A | 0 | 0 | X | 2-7 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | Signage and markings | ||||
| 109 | Fill stands | 109 Fillstands | Air Eliminator Tanks | F/S 1 air eliminator | Armstrong | A11AV | 1.0 In. | X | X | X | 3-10.1 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | F/S 1 air eliminator | ||||
| 109 | Fill stands | 109 Fillstands | Air Eliminator Tanks | F/S 3 air eliminator | Armstrong | A11AV | 1.0 In. | X | X | X | 3-10.1 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | 109 fs3 | ||||
| 109 | Fill stands | 109 Fillstands | Filter Separators | F/S 1 | Facet | HCS-643-236 | 600 GPM GPM/SCFM Gallons | X | X | 0 | 3-6.2 | Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. Replace filter cartridges when the acceptable maximum differential pressure is reached, the maximum in-service duration has passed, or the fuel becomes visibly dirty or discolored. | Daily - Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. | Partial System OOS | F/S 1 | ||||
| 109 | Fill stands | 109 Fillstands | Filter Separators | F/S 3 | Facet | HCS-643-236 | 600 GPM GPM/SCFM Gallons | X | X | 0 | 3-6.2 | Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. Replace filter cartridges when the acceptable maximum differential pressure is reached, the maximum in-service duration has passed, or the fuel becomes visibly dirty or discolored. | Daily - Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. | Partial System OOS | Filter Separator #3 | ||||
| 109 | Fill stands | 109 Fillstands | Filter Separators | F/S 2 | Facet | HCS-643-236 | 600 GPM GPM/SCFM Gallons | X | X | 0 | 3-6.2 | Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. Replace filter cartridges when the acceptable maximum differential pressure is reached, the maximum in-service duration has passed, or the fuel becomes visibly dirty or discolored. | Daily - Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. | Partial System OOS | 109 fs2 | ||||
| 109 | Fill stands | 109 Fillstands | Positive Displacement Meters | Fillstand 2 meter register | Veeder-Root | 788700063 | 600 GPM GPM/SCFM | 0 | 0 | 0 | 3-7.1 | Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature | |||||||
| compensation feature | Monthly - Inspect counter head for unusual noises and smooth operation. | Partial System OOS | 109 fs2 | ||||||||||||||||
| 109 | Fill stands | 109 Fillstands | Positive Displacement Meters | Fillstand 3 meter register | Veeder-Root | 788700063 | 0-600 GPM/SCFM | 0 | 0 | 0 | 3-7.1 | Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature | |||||||
| compensation feature | Monthly - Inspect counter head for unusual noises and smooth operation. | Partial System OOS | fillstand 3 meter register | ||||||||||||||||
| 109 | Fill stands | 109 Fillstands | Positive Displacement Meters | Fillstand 1 meter register | Veeder-Root | 788700063 | 0-600 GPM/SCFM | 0 | 0 | 0 | 3-7.1 | Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature | |||||||
| compensation feature | Monthly - Inspect counter head for unusual noises and smooth operation. | Partial System OOS | Fillstand 1 meter register | ||||||||||||||||
| 109 | Fill stands | 109 Fillstands | Positive Displacement Meters | Fillstand 1 meter | LC | M-60-2 | 30-600 GPM/SCFM | 0 | 0 | 0 | 3-7.1 | Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature | |||||||
| compensation feature | Monthly - Inspect counter head for unusual noises and smooth operation. | Partial System OOS | Fillstand 1 meter | ||||||||||||||||
| 109 | Fill stands | 109 Fillstands | Positive Displacement Meters | Fillstand 3 meter | LC | M-60-2 | 30-600 GPM/SCFM | 0 | 0 | 0 | 3-7.1 | Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature | |||||||
| compensation feature | Monthly - Inspect counter head for unusual noises and smooth operation. | Partial System OOS | Meter-F/S#3 | ||||||||||||||||
| 109 | Fill stands | 109 Fillstands | Positive Displacement Meters | Fillstand 2 meter | LC | M-60-2 | 600 GPM GPM/SCFM | 0 | 0 | 0 | 3-7.1 | Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature | |||||||
| compensation feature | Monthly - Inspect counter head for unusual noises and smooth operation. | Partial System OOS | 109 fs2 | ||||||||||||||||
| 109 | Fill stands | 109 Fillstands | Loading Fuel Hoses | Fillstand 3 hose | Goodyear | G-200-8852 | 3.0 in. | X | X | X | 3-9.1 | Aircraft fueling hose shall be inspected before use each day. The hose shall be extended as it normally would be for fueling and checked for evidence of blistering, carcass saturation or separation, cuts, nicks, or abrasions that expose reinforcement material, and for slippage, misalignment, or leaks at couplings. | Weekly - Visually inspect hoses for loose covers, cracks, brittle surface coatings, exposed wire braids, exposed reinforcement, flattening, kinks, and bulges or soft spots which might indicate broken or displaced reinforcement. | ||||||
| Monthly - Pressurize hose to normal working pressure. Check flanged and threaded connections for leaks and inspect hose couplers for fluid seepage by pushing at the base of the coupling with your thumbs; a hose softened by fluid seepage must be replaced. | Partial System OOS | 108 fs1 | |||||||||||||||||
| 109 | Fill stands | 109 Fillstands | Loading Fuel Hoses | Fillstand 2 hose | Goodyear | G-200-8852 | 3.0 in. | X | X | X | 3-9.1 | Aircraft fueling hose shall be inspected before use each day. The hose shall be extended as it normally would be for fueling and checked for evidence of blistering, carcass saturation or separation, cuts, nicks, or abrasions that expose reinforcement material, and for slippage, misalignment, or leaks at couplings. | Weekly - Visually inspect hoses for loose covers, cracks, brittle surface coatings, exposed wire braids, exposed reinforcement, flattening, kinks, and bulges or soft spots which might indicate broken or displaced reinforcement. | ||||||
| Monthly - Pressurize hose to normal working pressure. Check flanged and threaded connections for leaks and inspect hose couplers for fluid seepage by pushing at the base of the coupling with your thumbs; a hose softened by fluid seepage must be replaced. | Partial System OOS | 109 fs2 | |||||||||||||||||
| 109 | Fill stands | 109 Fillstands | Loading Fuel Hoses | Fillstand 1 hose | Goodyear | G-200-8852 | 3.0 in. | X | X | X | 3-9.1 | Aircraft fueling hose shall be inspected before use each day. The hose shall be extended as it normally would be for fueling and checked for evidence of blistering, carcass saturation or separation, cuts, nicks, or abrasions that expose reinforcement material, and for slippage, misalignment, or leaks at couplings. | Weekly - Visually inspect hoses for loose covers, cracks, brittle surface coatings, exposed wire braids, exposed reinforcement, flattening, kinks, and bulges or soft spots which might indicate broken or displaced reinforcement. | ||||||
| Monthly - Pressurize hose to normal working pressure. Check flanged and threaded connections for leaks and inspect hose couplers for fluid seepage by pushing at the base of the coupling with your thumbs; a hose softened by fluid seepage must be replaced. | Partial System OOS | Fillstand 1 hose | |||||||||||||||||
| 109 | Fill stands | 109 Fillstands | General System Control Valves | F/S 2 flange float control | Cal-Val | Not Legible | N/A | X | X | X | 4-3.2.1 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | 108 fs2 | ||||
| 109 | Fill stands | 109 Fillstands | General System Control Valves | F/S 1 flange float control | Cal-Val | Not Legible | N/A | X | X | X | 4-3.2.1 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | F/S 1 flange float control | ||||
| 109 | Fill stands | 109 Fillstands | General System Control Valves | F/S 2 discharge control valve | Cal-Val | PN16 | 3.0 in. | X | X | X | 4-3.2.1 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | 109 fs2 | ||||
| 109 | Fill stands | 109 Fillstands | General System Control Valves | General system control-F/S#3 Down stream of meter | Cal-Val | Not Legible | 3.0 in. | X | X | X | 4-3.2.1 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | General system control-F/S#3 Down stream of meter | ||||
| 109 | Fill stands | 109 Fillstands | General System Control Valves | Fillstand 1 control valve | Cal-Val | 100 AF | 3.0 in. | X | X | X | 4-3.2.1 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | Fillstand 1 control valve | ||||
| 109 | Fill stands | 109 Fillstands | General System Control Valves | F/S 3 discharge control valve | Cal-Val | Not Legible | 6.0 in. | X | X | X | 4-3.2.1 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | 109 fs3 | ||||
| 109 | Fill stands | 109 Fillstands | General System Control Valves | F/S 3 flange float control | Cal-Val | Not Legible | N/A | X | X | X | 4-3.2.1 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | Float control-F/S #3 | ||||
| 109 | Fill stands | 109 Fillstands | Thermal and/or Pressure Relief Valves | F/S 3 PRV | Taylor | 82E5751311-10-10-0 | 1.0 in. 0 - 0 PSI | X | X | X | 6-6.3 | Thermal and pressure relief valves shall be validated for proper calibration by isolating the valve and using the test connection provided on the piping in conjunction with a hand pump and portable reservoir. The operating pressure shall be checked against the set pressure listed on the stamped information plate attached to the valve. The operating pressure shall be adjusted to the stamped set pressure if necessary. | No Operator/equipment Requirements | Partial System OOS | F/S 3 PRV range 226-450 psi | ||||
| 109 | Fill stands | 109 Fillstands | Thermal and/or Pressure Relief Valves | F/S 1 discharge PRV | Taylor | 82E3751311-10-10-0 | 1.0 in. 0 - 0 PSI | X | X | X | 6-6.3 | Thermal and pressure relief valves shall be validated for proper calibration by isolating the valve and using the test connection provided on the piping in conjunction with a hand pump and portable reservoir. The operating pressure shall be checked against the set pressure listed on the stamped information plate attached to the valve. The operating pressure shall be adjusted to the stamped set pressure if necessary. | No Operator/equipment Requirements | Partial System OOS | F/S 1 discharge PRV range 51-100psi | ||||
| 109 | Fill stands | 109 Fillstands | Thermal and/or Pressure Relief Valves | F/S 3 discharge PRV | Taylor | 82E3751311-10-10-0 | 1.0 in. 0 - 0 PSI | X | X | X | 6-6.3 | Thermal and pressure relief valves shall be validated for proper calibration by isolating the valve and using the test connection provided on the piping in conjunction with a hand pump and portable reservoir. The operating pressure shall be checked against the set pressure listed on the stamped information plate attached to the valve. The operating pressure shall be adjusted to the stamped set pressure if necessary. | No Operator/equipment Requirements | Partial System OOS | 109 fs3 | ||||
| 109 | Fill stands | 109 Fillstands | Thermal and/or Pressure Relief Valves | F/S 2 PRV | Taylor | 82E3751311-10-10-0 | 1.0 in. 0 - 0 PSI | X | X | X | 6-6.3 | Thermal and pressure relief valves shall be validated for proper calibration by isolating the valve and using the test connection provided on the piping in conjunction with a hand pump and portable reservoir. The operating pressure shall be checked against the set pressure listed on the stamped information plate attached to the valve. The operating pressure shall be adjusted to the stamped set pressure if necessary. | No Operator/equipment Requirements | Partial System OOS | 109 fs 2 range 226-450 set @ 275 | ||||
| 109 | Fill stands | 109 Fillstands | Thermal and/or Pressure Relief Valves | F/S 2 discharge PRV | Taylor | 02E3751311-10-10-0 | 1.0 in. 0 - 0 PSI | X | X | X | 6-6.3 | Thermal and pressure relief valves shall be validated for proper calibration by isolating the valve and using the test connection provided on the piping in conjunction with a hand pump and portable reservoir. The operating pressure shall be checked against the set pressure listed on the stamped information plate attached to the valve. The operating pressure shall be adjusted to the stamped set pressure if necessary. | No Operator/equipment Requirements | Partial System OOS | 109 fs2 51-100 set 80 | ||||
| 109 | Fill stands | 109 Fillstands | Thermal and/or Pressure Relief Valves | F/S 1 PRV | Taylor | 82E5751311-10-10-0 | 1.0 in. 0 - 0 PSI | X | X | X | 6-6.3 | Thermal and pressure relief valves shall be validated for proper calibration by isolating the valve and using the test connection provided on the piping in conjunction with a hand pump and portable reservoir. The operating pressure shall be checked against the set pressure listed on the stamped information plate attached to the valve. The operating pressure shall be adjusted to the stamped set pressure if necessary. | No Operator/equipment Requirements | Partial System OOS | 109 fs1 set 275. 226-450 | ||||
| 109 | Fill stands | 109 Fillstands | Filter Separator Control Valves | Fil sep control valve | Cal-Val | 104-661 | 6.0 in. | X | X | 0 | 4-4.2.2 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | 109 fs2 | ||||
| 109 | Fill stands | 109 Fillstands | Filter Separator Control Valves | F/S 1 control valve | Cal-Val | 100 AF | 6.0 in. | X | X | 0 | 4-4.2.2 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | F/S 1 control valve | ||||
| 109 | Fill stands | 109 Fillstands | Fueling Nozzles | Fillstand 2 nozzle | Carter | 64349 | 3.0 In. | X | X | 0 | 4-7.4 | Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand. | Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand. | Partial System OOS | 109 fs2 | ||||
| 109 | Fill stands | 109 Fillstands | Fueling Nozzles | Fillstand 3 nozzle | Carter | 64349 | 3.0 In. | X | X | 0 | 4-7.4 | Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand. | Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand. | Partial System OOS | 109 fs1 | ||||
| 109 | Fill stands | 109 Fillstands | Fueling Nozzles | Fillstand 1 nozzle | Carter | 64349 | 3.0 In. | X | X | 0 | 4-7.4 | Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand. | Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand. | Partial System OOS | Fillstand 1 fueling nozzle | ||||
| 109 | Fill stands | 109 Fillstands | Sight Flow Indicators | F/S 2 sight glass | N/A | N/A | .5 In. | 0 | 0 | 0 | 6-12.3 | Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Partial System OOS | 108 fs2 | ||||
| 109 | Fill stands | 109 Fillstands | Sight Flow Indicators | F/S 1 sight glass | N/A | N/A | .5 In. | 0 | 0 | 0 | 6-12.3 | Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Partial System OOS | F/S 1 sightglass | ||||
| 109 | Fill stands | 109 Fillstands | Sight Flow Indicators | F/S 3 sight glass | N/A | N/A | .5 In. | 0 | 0 | 0 | 6-12.3 | Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Partial System OOS | Sight glass-F/S #3 | ||||
| 109 | Fill stands | 109 Fillstands | Visual Monitoring | Fillstand 1 fall protection system | Fall Protection Systems | AR40 | N/A | 0 | 0 | 0 | 6-14.1 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | Fill stand 1 fall protection system | ||||
| 109 | Fill stands | 109 Fillstands | Ball Valves | Ball balve | Flow -Tek | RF-15 | 1.0 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | 109 fs 2 | ||||
| 109 | Fill stands | 109 Fillstands | Ball Valves | Ball valve | Flow -Tek | RF-15 | 1.0 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | 108 fs 2 | ||||
| 109 | Fill stands | 109 Fillstands | Ball Valves | Ball valve | Flow -Tek | RF-15 | 1.0 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | 109 fs2 | ||||
| 109 | Fill stands | 109 Fillstands | Ball Valves | Ball valve | Flow -Tek | RF-15 | 1.0 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | 109 fs2 | ||||
| 109 | Fill stands | 109 Fillstands | Ball Valves | Ball valve | Flow -Tek | RF-15 | 1.0 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | 108 fs2 | ||||
| 109 | Fill stands | 109 Fillstands | Ball Valves | Ball valve | Flow -Tek | RF-15 | 1.0 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | 109 fs2 | ||||
| 109 | Fill stands | 109 Fillstands | Ball Valves | F/S 1 air bleed valve | Flow -Tek | RF-15 | 0.75 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | F/S 1 air bleed valve | ||||
| 109 | Fill stands | 109 Fillstands | Ball Valves | F/S 1 air eliminator iso valve | Flow -Tek | RF-15 | 0.75 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | F/S 1 air eliminator iso valve | ||||
| 109 | Fill stands | 109 Fillstands | Ball Valves | F/S 1 PRV iso valve | Flow -Tek | RF-15 | 1.0 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | F/S 1 PRV iso valve | ||||
| 109 | Fill stands | 109 Fillstands | Ball Valves | F/S 1 sump drain valve | Flow -Tek | RF-15 | 1.0 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | F/S 1 sump drain valve | ||||
| 109 | Fill stands | 109 Fillstands | Ball Valves | F/S 1 sump drain valve | Flow -Tek | RF-15 | 1.0 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | F/S 1 sump drain valve | ||||
| 109 | Fill stands | 109 Fillstands | Ball Valves | F/S 1 air eliminator iso valve | Flow -Tek | RF-15 | 1.0 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | F/S 1 air eliminator iso valve | ||||
| 109 | Fill stands | 109 Fillstands | Ball Valves | Ball valve | Flow -Tek | RF-15 | 1.0 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | 109 fs2 | ||||
| 109 | Fill stands | 109 Fillstands | Ball Valves | Ball valve | Flow -Tek | RF-15 | 1.0 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | 109 fs2 | ||||
| 109 | Fill stands | 109 Fillstands | Ball Valves | Ball valve | Flow -Tek | RF15 | 0.75 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | 109 fs2 | ||||
| 109 | Fill stands | 109 Fillstands | Ball Valves | Ball valve | Flow -Tek | RF-15 | 0.25 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | F/S 1 test port valve discharges | ||||
| 109 | Fill stands | 109 Fillstands | Ball Valves | F/S 1 discharge PRV iso valve | Flow -Tek | RF-15 | 1.0 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | F/S 1 discharge PRV iso valve | ||||
| 109 | Fill stands | 109 Fillstands | Ball Valves | F/S 1 discharge PRV iso valve | Flow -Tek | RF-15 | 1.0 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | F/S 1 discharge PRV iso valve | ||||
| 109 | Fill stands | 109 Fillstands | Ball Valves | Fillstand 1 pressure gauge iso valve | Painted / Not Legible | Painted / Not Legible | 0.75 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | Fillstand 1 pressure gauge iso valve | ||||
| 109 | Fill stands | 109 Fillstands | Ball Valves | Ball valve | Flow -Tek | RF-15 | 1.0 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | 109 fs1 | ||||
| 109 | Fill stands | 109 Fillstands | Ball Valves | Ball valve | Flow -Tek | RF-15 | 1.0 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | 109 fs1 | ||||
| 109 | Fill stands | 109 Fillstands | Ball Valves | Ball valve | Flow -Tek | RF-15 | 1.0 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | 109 fs3 | ||||
| 109 | Fill stands | 109 Fillstands | Ball Valves | Ball valve | Flow -Tek | RF-15 | 1.0 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | 109 fs3 | ||||
| 109 | Fill stands | 109 Fillstands | Ball Valves | Ball valve | Flow -Tek | RF-15 | 1.0 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | 109 fs3 | ||||
| 109 | Fill stands | 109 Fillstands | Ball Valves | Ball valve | Flow -Tek | RF-15 | 1.0 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | 109 fs3 | ||||
| 109 | Fill stands | 109 Fillstands | Ball Valves | Ball valve | Flow -Tek | RF-15 | 1.0 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | 109 fs3 | ||||
| 109 | Fill stands | 109 Fillstands | Ball Valves | Ball Valve-F/S#3 | Flow -Tek | RF-15 | 1.0 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | Ball Valve-F/S#3 | ||||
| 109 | Fill stands | 109 Fillstands | Ball Valves | Ball Valve-F/S #3 | Flow -Tek | RF-15 | 0.5 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | Ball Valve-F/S #3 | ||||
| 109 | Fill stands | 109 Fillstands | Ball Valves | Test port ball valve | Gammon | GTP-1149 | 0.25 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | 109 fs2 | ||||
| 109 | Fill stands | 109 Fillstands | Ball Valves | Test port ball valve | Gammon | GTP-1149 | 0.25 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | 109 fs2 | ||||
| 109 | Fill stands | 109 Fillstands | Ball Valves | Test port ball valve | Gammon | GTP-1149 | 0.25 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | 109 fs2 | ||||
| 109 | Fill stands | 109 Fillstands | Ball Valves | Sample port ball valve | Gammon | GTP-1149 | 0.25 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | 109 fs1 | ||||
| 109 | Fill stands | 109 Fillstands | Ball Valves | Sample port inlet ball valve | Gammon | GTP-1149 | 0.25 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | 109 fs3 | ||||
| 109 | Fill stands | 109 Fillstands | Ball Valves | F/S 1 test port valve inlet | Gammon | GTP 1149 | 0.25 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | F/S 1 test port valve inlet | ||||
| 109 | Fill stands | 109 Fillstands | Ball Valves | F/S 1 discharge sample valve | Gammon | GTP 1149 | 0.25 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | F/S 1 discharge sample valve | ||||
| 109 | Fill stands | 109 Fillstands | Ball Valves | Fillstand 1 iso valve | WKM | Painted / Not Legible | 3.0 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | Fill stand 1 iso valve | ||||
| 109 | Fill stands | 109 Fillstands | Ball Valves | Ball valve | WKM | Painted / Not Legible | 3.0 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | 109 fs2 | ||||
| 109 | Fill stands | 109 Fillstands | Ball Valves | Ball valve-to pressure gauge inlet side Of meter-F/S#3 | Painted / Not Legible | Painted / Not Legible | 1.0 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | Ball valve-to pressure gauge inlet side |
Of meter-F/S#3
| 109 | Fill stands | 109 Fillstands | Ball Valves | Discharge sample port ball valve | Schultz | Unmarked | 0.25 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | 109 fs3 |
| 109 | Fill stands | 109 Fillstands | Ball Valves | Ball valve | Flow -Tek | Painted / Not Legible | 1.0 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | F/S 1 PRV iso valve |
| 109 | Fill stands | 109 Fillstands | Ball Valves | V-56 Ball valve-F/S#3 Downstream of meter | Dyna Seal | 3F-B111 | 3.0 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | V-56 Ball valve-F/S#3 Downstream of meter |
| 109 | Fill stands | 109 Fillstands | Double Block and Bleed Valves | Double block and bleed | Truseal | 1-306R | 6.0 in. | X | X | X | 6-6.2.5 | Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug. | No Operator Requirement | Partial System OOS | 109 fs2 |
| 109 | Fill stands | 109 Fillstands | Double Block and Bleed Valves | Fil sep outlet DBB valve | Truseal | 1-306R | 6.0 in. | X | X | X | 6-6.2.5 | Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug. | No Operator Requirement | Partial System OOS | 109 fs2 |
| 109 | Fill stands | 109 Fillstands | Double Block and Bleed Valves | F/S 1 Double block and bleed | TruSeal | 1-306R | 6.0 in. | X | X | X | 6-6.2.5 | Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug. | No Operator Requirement | Partial System OOS | F/S 1 inlet iso valve |
| 109 | Fill stands | 109 Fillstands | Double Block and Bleed Valves | Double block and bleed | Truseal | 1-306R | 6.0 in. | X | X | X | 6-6.2.5 | Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug. | No Operator Requirement | Partial System OOS | 109 fs2 |
| 109 | Fill stands | 109 Fillstands | Double Block and Bleed Valves | F/S 1 double block and bleed | TruSeal | 1-306R | 6.0 in. | X | X | X | 6-6.2.5 | Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug. | No Operator Requirement | Partial System OOS | F/S 1 discharge iso valve |
| 109 | Fill stands | 109 Fillstands | Double Block and Bleed Valves | Fillstand 1 double block and bleed | TruSeal | 1-306R | 6.0 in. | X | X | X | 6-6.2.5 | Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug. | No Operator Requirement | Partial System OOS | Full stand 1 inlet iso valve |
| 109 | Fill stands | 109 Fillstands | Double Block and Bleed Valves | V-55 Double block and bleed inlet side of meter | TruSeal | 1-306R | 3.0 in. | X | X | X | 6-6.2.5 | Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug. | No Operator Requirement | Partial System OOS | V-55 Double block and bleed inlet side of meter |
| 109 | Fill stands | 109 Fillstands | Double Block and Bleed Valves | Double block and bleed | Truseal | 1-306R | 6.0 in. | X | X | X | 6-6.2.5 | Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug. | No Operator Requirement | Partial System OOS | 109 fs1 |
| 109 | Fill stands | 109 Fillstands | Double Block and Bleed Valves | Double block and bleed | Truseal | 1-306R | 6.0 in. | X | X | X | 6-6.2.5 | Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug. | No Operator Requirement | Partial System OOS | 109 fs3 |
| 109 | Fill stands | 109 Fillstands | Globe Valves | F/S 2 globe valve | Kenco | Not Marked | 0.5 in. | X | X | 0 | 6-6.2.7 | 1. Regular inspection of the valve. ... |
2. If the valve is not operated regularly it is a good idea to cycle the valve to ensure the disc is not bedding itself in the seat.
3. Grease the crossbar by using a grease gun on the grease nipple provided
| 4. Slightly tighten the gland bolts if the packing needs adjustment. | No Operator Requirement | Partial System OOS | 109 fs2 | |||||||||||
| 109 | Fill stands | 109 Fillstands | Globe Valves | F/S 2 globe valve | Kenco | Not Marked | 0.5 in. | X | X | 0 | 6-6.2.7 | 1. Regular inspection of the valve. ... |
2. If the valve is not operated regularly it is a good idea to cycle the valve to ensure the disc is not bedding itself in the seat.
3. Grease the crossbar by using a grease gun on the grease nipple provided
| 4. Slightly tighten the gland bolts if the packing needs adjustment. | No Operator Requirement | Partial System OOS | 109 fs2 | |||||||||||
| 109 | Fill stands | 109 Fillstands | Globe Valves | F/S 3 globe valve | Kenco | Not Marked | 0.5 in. | X | X | 0 | 6-6.2.7 | 1. Regular inspection of the valve. ... |
2. If the valve is not operated regularly it is a good idea to cycle the valve to ensure the disc is not bedding itself in the seat.
3. Grease the crossbar by using a grease gun on the grease nipple provided
| 4. Slightly tighten the gland bolts if the packing needs adjustment. | No Operator Requirement | Partial System OOS | Globe valve-F/S#3 | |||||||||||
| 109 | Fill stands | 109 Fillstands | Globe Valves | F/S 3 globe valve | Kenco | Not Marked | 0.5 in. | X | X | 0 | 6-6.2.7 | 1. Regular inspection of the valve. ... |
2. If the valve is not operated regularly it is a good idea to cycle the valve to ensure the disc is not bedding itself in the seat.
3. Grease the crossbar by using a grease gun on the grease nipple provided
| 4. Slightly tighten the gland bolts if the packing needs adjustment. | No Operator Requirement | Partial System OOS | Globe valve-F/S#3 | ||||||||||||||
| 109 | Fill stands | 109 Fillstands | Pressure and Pressure/Vacuum Gauges | F/S 2 dp psi gauge | Not Labeled | Not Labeled | 0.25 in. 0 - 0 PSI | X | X | X | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. | Partial System OOS | 109 fs2 | ||
| 109 | Fill stands | 109 Fillstands | Pressure and Pressure/Vacuum Gauges | Fillstand 2 psi gauge | Wika | 233.53 | 0.25 in. 0 - 0 PSI | X | X | X | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. | Partial System OOS | 109 fs2 | ||
| 109 | Fill stands | 109 Fillstands | Pressure and Pressure/Vacuum Gauges | F/S 1 dp psi gauge | PFT Alexander | 800-696-1331 | 0.25 in. 0 - 0 PSI | X | X | X | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. | Partial System OOS | F/S 1 pressure gauge range 0-300 | ||
| 109 | Fill stands | 109 Fillstands | Pressure and Pressure/Vacuum Gauges | Fillstand 1 psi gauge | Wika | 233.53 | 0.5 in. 0 - 0 PSI | X | X | X | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. | Partial System OOS | Fill stand 1 pressure gauge | ||
| 109 | Fill stands | 109 Fillstands | Pressure and Pressure/Vacuum Gauges | Fillstand 3 psi gauge | Wika | 233.53 | 0.25 in. 0 - 0 PSI | X | X | X | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. | Partial System OOS | 109 fs3 0-200 | ||
| 109 | Fill stands | 109 Fillstands | Pressure and Pressure/Vacuum Gauges | Pressure gauge-inlet to meter F/S#3 | Wika | 233.54 | 1.0 in. 0 - 0 PSI | X | X | X | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. | Partial System OOS | Pressure gauge-inlet to meter F/S#3 | ||
| 109 | Fill stands | 109 Fillstands | Differential Pressure Gauges | F/S 2 DP gauge | Schultz | SC-5150-30 | 0 - 0 PSI | X | X | X | 6-7.2 | Periodic calibration of this instrument is unnecessary because the graduated scale is made to match the characteristics (load/deflection curve) of the spring. If the spring loses some of its strength for some reason, the ”free length” must be shortened. Afull length spring will always provide accurate readings. This is a fundamental truth about compression springs. This spring is at its “free full length” when there is zero differential pressure; the top of the piston is then in the “zero” band of the graduated scale. | Quarterly - Clean outside of gauge glass. | Partial System OOS | 109 fs2 | ||
| 109 | Fill stands | 109 Fillstands | Differential Pressure Gauges | F/S 3 DP gauge | Schultz | SC-5150-30 | 0 - 0 PSI | X | X | X | 6-7.2 | Periodic calibration of this instrument is unnecessary because the graduated scale is made to match the characteristics (load/deflection curve) of the spring. If the spring loses some of its strength for some reason, the ”free length” must be shortened. Afull length spring will always provide accurate readings. This is a fundamental truth about compression springs. This spring is at its “free full length” when there is zero differential pressure; the top of the piston is then in the “zero” band of the graduated scale. | Quarterly - Clean outside of gauge glass. | Partial System OOS | 109 fs3 | ||
| 109 | Fill stands | 109 Fillstands | EFSO Systems | EFSO bldg 109 | Unmarked | Unmarked | N/A | X | X | 0 | 7-16 | Proper operation, box seals for integrity. Electrical connections for continuity. | No Operator Requirement | Partial System OOS | EFSO-adjacent to Fac 109 | ||
| 109 | Fill stands | 109 Fillstands | EFSO Systems | Fillstand 2 e-stop button | Cooper Crouse Hines | DSD933 | N/A | X | X | 0 | 7-16 | Proper operation, box seals for integrity. Electrical connections for continuity. | No Operator Requirement | Partial System OOS | 109 fs2 | ||
| 109 | Fill stands | 109 Fillstands | EFSO Systems | Fillstand 3 e-stop button | Cooper Crouse Hines | DSD933 | N/A | X | X | 0 | 7-16 | Proper operation, box seals for integrity. Electrical connections for continuity. | No Operator Requirement | Partial System OOS | 109 fs1 | ||
| 109 | Fill stands | 109 Fillstands | EFSO Systems | Fillstand 3 EFSO switch | Cooper Crouse Hines | DSD933 | N/A | X | X | 0 | 7-16 | Proper operation, box seals for integrity. Electrical connections for continuity. | No Operator Requirement | Partial System OOS | 109 fs3 | ||
| 109 | Fill stands | 109 Fillstands | EFSO Systems | Fillstand 1 EFSO switch | Cooper Crouse Hines | DSD933 | N/A | X | X | 0 | 7-16 | Proper operation, box seals for integrity. Electrical connections for continuity. | No Operator Requirement | Partial System OOS | Fillstand 1 EFSO switch on/off | ||
| 109 | Fill stands | 109 Fillstands | EFSO Systems | Fillstand 1 e -stop button | Cooper Crouse Hines | DSD933 | N/A | X | X | 0 | 7-16 | Proper operation, box seals for integrity. Electrical connections for continuity. | No Operator Requirement | Partial System OOS | Fillstand 1 EFSO button | ||
| 109 | Fill stands | 109 Fillstands | EFSO Systems | EFSO rear of bldg 116 | Unmarked | Unmarked | N/A | X | X | 0 | 7-16 | Proper operation, box seals for integrity. Electrical connections for continuity. | No Operator Requirement | Partial System OOS | EFSO rear of 116 | ||
| 109 | Fill stands | 109 Fillstands | Automatic Line Leak Detector | Veeder Root-product recovery tank F/S area | Veeder-Root | TLS-300C | N/A | 0 | 0 | X | 7-19.1.2 | No Manufacturer Requirements Available | Daily - Ensure the monitoring panel associated with the detector(s) is powered on and no alarms are present. | Partial System OOS | Veeder Root-product recovery tank F/S area | ||
| 109 | Fill stands | 109 Fillstands | Swivels | Fillstand 1 hose swivel | OPW | 3950F00301-GL | 3.0 in. | 0 | 0 | 0 | 7-5 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect swivel for loose connections and signs of damage. Ensure swivel rotates easily and is clean and free of fuel. | ||||
| Monthly - Inspect swivel for expiration date established by manufacturer. Swivels must be replaced before the indicated expiration date. | Partial System OOS | 109 Fillstand 2 | |||||||||||||||
| 109 | Fill stands | 109 Fillstands | Swivels | Fillstand 3 hose swivel | OPW | 3950F00301-GL | 3.0 in. | 0 | 0 | 0 | 7-5 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect swivel for loose connections and signs of damage. Ensure swivel rotates easily and is clean and free of fuel. | ||||
| Monthly - Inspect swivel for expiration date established by manufacturer. Swivels must be replaced before the indicated expiration date. | Partial System OOS | Fillstand 3 Hose swivel | |||||||||||||||
| 109 | Fill stands | 109 Fillstands | Swivels | Fillstand 2 hose swivel | OPW | 3950F00301-GL | 3.0 in. | 0 | 0 | 0 | 7-5 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect swivel for loose connections and signs of damage. Ensure swivel rotates easily and is clean and free of fuel. | ||||
| Monthly - Inspect swivel for expiration date established by manufacturer. Swivels must be replaced before the indicated expiration date. | Partial System OOS | Fillstand 1 swivel joint | |||||||||||||||
| 109 | Fill stands | 109 Fillstands | Containment Systems | Protective bollards-adjacent to Fac 109 | N/A | N/A | N/A | 0 | 0 | 0 | 8-10.1 | No Manufacturer Requirements Available | Daily - Inspect containment systems for cleanliness, if accessible. | No Mission Impact | Protective bollards-adjacent to Fac 109 | ||
| 109 | Fill stands | 109 Fillstands | Electrical Equipment | E stop switch | Cooper Crouse Hines | DSD933 | N/A | X | X | 0 | 9-1.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | 109 fs2 | ||
| 109 | Fill stands | 109 Fillstands | Electrical Equipment | Explosion proof lighting-switch. Bldg 109 | Appleton Electric Co | Snap Switch | N/A | X | X | 0 | 9-1.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | Explosion proof lighting-switch. Bldg 109 | ||
| 109 | Fill stands | 109 Fillstands | Electrical Equipment | 109 Audible alarm | Veeder-Root | Unmarked | N/A | X | X | 0 | 9-1.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | Audible alarm | ||
| 109 | Fill stands | 109 Fillstands | Electrical Equipment | 109 audible alarm acknowledge/reset | Veeder-Root | Unmarked | N/A | X | X | 0 | 9-1.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | 109 audible alarm acknowledge/reset | ||
| 109 | Fill stands | 109 Fillstands | Electrical Equipment | Power Panel-Adjacent to Fac 109 | Square D | Unmarked | N/A | X | X | 0 | 9-1.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | Power Panel-Adjacent to Fac 109 | ||
| 109 | Fill stands | 109 Fillstands | Electrical Equipment | Electrical Box-adjacent to Fac 109 | Unmarked | Unmarked | N/A | X | X | 0 | 9-1.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | Electrical Box-adjacent to Fac 109 | ||
| 109 | Fill stands | 109 Fillstands | Electrical Equipment | Electrical Panel-Adjacent to Fac 109 | Unmarked | Unmarked | N/A | X | X | 0 | 9-1.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | Electrical Panel-Adjacent to Fac 109 | ||
| 109 | Fill stands | 109 Fillstands | Electrical Equipment | Electrical Panel-adjacent to Fac 109 | Unmarked | Unmarked | N/A | X | X | 0 | 9-1.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | Electrical Panel-adjacent to Fac 109 |