This file is a Facility Maintenance Plan (FMP) template for fuel system maintenance at Vance Air Force Base in Enid, Oklahoma. The template details the maintenance and inspection requirements for fuel storage and dispensing systems operated under Quality Assurance Evaluators' control at the base.

The FMP covers maintenance for multiple facilities including Building 109 (Fill Stands), Building 116 (Fuels Lab), and Building 264 (Pump House). It provides detailed asset inventories and maintenance schedules for components like filter separators, pumps, valves, meters, emergency systems, and electrical equipment. Key systems include three fill stands with 600 GPM filter separators, Gorman-Rupp centrifugal pumps rated at 300 GPM, and various control valves and safety equipment. The plan specifies quarterly, semi-annual and annual maintenance requirements for each component, with particular focus on preventive maintenance of fuel handling equipment, safety systems, and containment areas. This template is designed to ensure compliance with federal, state and local environmental regulations while maintaining operational readiness of the fuel systems.

View the file

Other files

File Type Posted
Sources Sought FUELS - Programmatic Rev1 7 May 25.docx DOCX document
3.4 Appendix B - Attachment 4 - SO Tracker-20210628.xlsx XLSX spreadsheet
6.0 - Appendix E ISR 15-Bulk_Fuel_Facilities FY25.xlsx XLSX spreadsheet
2.0 Appendix A RM_SO Process_20241220_PgM Reviewed Incorporated.docx DOCX document
3.1 Appendix B - Attachment 1 - Three Week Look Ahead_20230420.xlsx XLSX spreadsheet
3.2 Appendix B - Attachment 2 - Monthly Report Format 20240910.docx DOCX document
2.2 Appendix A - Attachment 2 Contractor Travel Expense Report_20240910.xlsx XLSX spreadsheet
9.0 Appendix H - Minor Repairs Incidental to Maintenance Activities POJ 20231009.xlsx XLSX spreadsheet
7.0 CUID - v2.1.pdf PDF
8.0 Appendix G_UFC 3-460-03 Maintenance Table- v4.3.pdf PDF
6.0 Appendix E ISR 14_operational_fuel_facilities FY25.xlsx XLSX spreadsheet
3.0 Appendix B Reporting Requirements_20240910.docx DOCX document
4.0 Appendix C Task Order Specifications_202401216.docx DOCX document
5.0 Appendix D Antiterrorism and OPSEC 20230206.docx DOCX document
PWS LEX FMP Template - v2.2.xlsx XLSX spreadsheet
PWS KEQ FMP Template - v2.2.xlsx XLSX spreadsheet
PWS CVZ FMP Template - v2.2.xlsx XLSX spreadsheet
PWS SHP FMP Template - v2.2.xlsx XLSX spreadsheet
PWS PBA FMP Template - v2.2.xlsx XLSX spreadsheet
PWS GRB FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BRO FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BAR FMP Template - v2.2.xlsx XLSX spreadsheet
PWS EFS FMP Template - v2.2.xlsx XLSX spreadsheet
PWS LAU FMP Template - v2.2.xlsx XLSX spreadsheet
PWS CHF FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BEU FMP Template - v2.2.xlsx XLSX spreadsheet
PWS GDF FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BLI FMP Template - v2.2.xlsx XLSX spreadsheet
PWS TKR FMP Template - v2.2.xlsx XLSX spreadsheet
PWS RBN FMP Template - v2.2.xlsx XLSX spreadsheet
PWS MAA FMP Template - v2.2.xlsx XLSX spreadsheet
PWS FSH FMP Template - v2.2.xlsx XLSX spreadsheet
PWS FSO FMP Template - v2.2.xlsx XLSX spreadsheet
PWS LRG FMP Template - v2.2.xlsx XLSX spreadsheet
PWS RRT FMP Template - v2.2.xlsx XLSX spreadsheet
PWS ALT FMP Template - v2.2.xlsx XLSX spreadsheet
PWS TUL FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BL2 FMP Template - v2.2.xlsx XLSX spreadsheet
PWS ELL FMP Template - v2.2.xlsx XLSX spreadsheet
PWS WRF FMP Template - v2.2.xlsx XLSX spreadsheet
PWS LLD FMP Template - v2.2.xlsx XLSX spreadsheet
PWS DYE FMP Template - v2.2.xlsx XLSX spreadsheet
12.0 PWS Appendix K Real Property Data_20230420.xlsx XLSX spreadsheet
PWS RAN FMP Template - v2.2.xlsx XLSX spreadsheet
PWS FSM FMP Template - v2.2.xlsx XLSX spreadsheet
PWS _Fuels RMMR 20241220.docx DOCX document
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Administrative

LocationSite NameVance AFB Site #1
RPSUID3375
DLA Site CodeVNC
Hours of Operation24 Hours of Operation
Address1523 West Southgate Road, Enid, OK 73705
ContractContractor
Contract #
Local POCsQAE Name
QAE Phone
QAE Email
Alt QAE Name
Alt QAE Phone
Alt QAE Email
DLA/SCP POCsDLA PM Name
DLA PM Phone
DLA PM Email
SCP PM Name
SCP PM Phone
SCP PM Email
Contractor POCsContractor PM Name
Contractor PM Phone
Contractor PM Email
Contractor QC Name
Contractor QC Phone
Contractor QC Email
Contractor SM Name
Contractor SM Phone
Contractor SM Email
USACE POCsUSACE PM/COR Name
USACE PM/COR Phone
USACE PM/COR Email
USACE PE Name
USACE PE Phone
USACE PE Email
USACE KO Name
USACE KO Phone
USACE KO Email

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

This table shows the minimum information required. Additional details should be included based on site specific requirements. Additional POCs may be required.

General Facility Description Facility Description

Purpose:

This Facility Maintenance Plan provides guidance for Contractor personnel in the operation, inspection, and maintenance of permanently installed fuel facilities operated under the control of the Quality Assurance Evaluators. Federal, state, and local environmental laws and regulations shall be complied with if this plan is in conflict with them.

Scope:

The instructions prescribed by this plan outline general fuels maintenance information associated with fuel storage and dispensing systems and provides the minimum periodic contractor maintenance and inspection criteria requirements for the systems. This plan is to be used in conjunction with other existing directives governing fuel system operations and maintenance requirements. Conotractor will properly maintain and repair federally funded petroleum systems and facilities in order to provide compliance with applicable code, criteria, and federal, state, local and/or host nation regulations.

Fuels Facilities:

Organizational tanks, and associated dispensing equipment are maintained and operated by the owning organization. Fuel system maintenance contractors shall perform all maintenance and associated procurement actions on installed fuel systems.

Each installation under the Southwest Division contract are military land-based facilities who receive, store, distribute, and/or dispense liquid fuels.

Standard fuel system equipment includes:

a) Above Ground Sorage Stanks (AST), Underground Storage Tanks (UST)

b) Filter/separator and other filtration device maintenance access, particularly element removal.

c) Manual valves

d) Meter Registers, and Flow Meters.

e) Control Valves.

f) Pumps

g) Tank Monitoring Equipment and Instruments

h) Alarms

i) Fire Fighting Equipment

Site Specific General Information:

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

Include a general facility overview and description of each fuel system for the sites in accordance with UFC 3-460-01. Examples include: Bulk Storage Facilities, Aircraft Fueling Facilities, Marine and Dispensing Facilities, Ground Products Fueling Facilities, Alternate POL Facilities, and Support Facilities. Also include facility #s, facility names, fuel type, photos, and any other pertinent information.

Include Site Specific Conditions and Restrictions in this tab.

Communication Plan

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

Communication plan shall address in/out briefs, lines of communication, coordination for access, etc.

Safety

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

Site Specific Addendum and Activity Hazard Analysis, which are Attachments to the APP, specific to activities or tasks related to recurring maintenance for this site.

RM Schedule

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

Link RM schedule here

Task Matrix

Applicable Facility AssetsUFC System Level Maintenance FrequencySpecial Considerations
Real Property Unique Identifier
(RPUID)Real Property Facility #Real Property Facility NameOperational AreaComponent TypeBase Asset IDComponent Unique Identifier (CUID)MakeModelCapacity/SizeQSAUFC Section ReferenceAdditional Manufacturer RM RequirementsOperator/ equipment RequirementsSystem availabilityOther ContractComments
109Fill stands109 FillstandsCanopiesFillstand 1 canopyN/AN/AN/AXX011-2.2No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission ImpactCanopy-F/S #1
109Fill stands109 FillstandsCanopiesFillstand 2 canopyN/AN/AN/AXX011-2.2No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission ImpactCanopy-F/S#2
109Fill stands109 FillstandsCanopiesFillstand 3 canopyN/AN/AN/AXX011-2.2No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission ImpactCanopy-F/S #3
109Fill stands109 FillstandsEmergency Eyewash/ShowersEmergency Eyewash-Fac 309HawsUnmarked2.0 In.XXX11-3No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission ImpactEmergency Eyewash-Fac 309
109Fill stands109 FillstandsSignage and MarkingsSignage and markingsN/AN/AN/A00X2-7No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission ImpactSignage and markings
109Fill stands109 FillstandsAir Eliminator TanksF/S 1 air eliminatorArmstrongA11AV1.0 In.XXX3-10.1No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission ImpactF/S 1 air eliminator
109Fill stands109 FillstandsAir Eliminator TanksF/S 3 air eliminatorArmstrongA11AV1.0 In.XXX3-10.1No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact109 fs3
109Fill stands109 FillstandsFilter SeparatorsF/S 1FacetHCS-643-236600 GPM GPM/SCFM GallonsXX03-6.2Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. Replace filter cartridges when the acceptable maximum differential pressure is reached, the maximum in-service duration has passed, or the fuel becomes visibly dirty or discolored.Daily - Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges.Partial System OOSF/S 1
109Fill stands109 FillstandsFilter SeparatorsF/S 3FacetHCS-643-236600 GPM GPM/SCFM GallonsXX03-6.2Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. Replace filter cartridges when the acceptable maximum differential pressure is reached, the maximum in-service duration has passed, or the fuel becomes visibly dirty or discolored.Daily - Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges.Partial System OOSFilter Separator #3
109Fill stands109 FillstandsFilter SeparatorsF/S 2FacetHCS-643-236600 GPM GPM/SCFM GallonsXX03-6.2Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. Replace filter cartridges when the acceptable maximum differential pressure is reached, the maximum in-service duration has passed, or the fuel becomes visibly dirty or discolored.Daily - Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges.Partial System OOS109 fs2
109Fill stands109 FillstandsPositive Displacement MetersFillstand 2 meter registerVeeder-Root788700063600 GPM GPM/SCFM0003-7.1Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature
compensation featureMonthly - Inspect counter head for unusual noises and smooth operation.Partial System OOS109 fs2
109Fill stands109 FillstandsPositive Displacement MetersFillstand 3 meter registerVeeder-Root7887000630-600 GPM/SCFM0003-7.1Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature
compensation featureMonthly - Inspect counter head for unusual noises and smooth operation.Partial System OOSfillstand 3 meter register
109Fill stands109 FillstandsPositive Displacement MetersFillstand 1 meter registerVeeder-Root7887000630-600 GPM/SCFM0003-7.1Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature
compensation featureMonthly - Inspect counter head for unusual noises and smooth operation.Partial System OOSFillstand 1 meter register
109Fill stands109 FillstandsPositive Displacement MetersFillstand 1 meterLCM-60-230-600 GPM/SCFM0003-7.1Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature
compensation featureMonthly - Inspect counter head for unusual noises and smooth operation.Partial System OOSFillstand 1 meter
109Fill stands109 FillstandsPositive Displacement MetersFillstand 3 meterLCM-60-230-600 GPM/SCFM0003-7.1Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature
compensation featureMonthly - Inspect counter head for unusual noises and smooth operation.Partial System OOSMeter-F/S#3
109Fill stands109 FillstandsPositive Displacement MetersFillstand 2 meterLCM-60-2600 GPM GPM/SCFM0003-7.1Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature
compensation featureMonthly - Inspect counter head for unusual noises and smooth operation.Partial System OOS109 fs2
109Fill stands109 FillstandsLoading Fuel HosesFillstand 3 hoseGoodyearG-200-88523.0 in.XXX3-9.1Aircraft fueling hose shall be inspected before use each day. The hose shall be extended as it normally would be for fueling and checked for evidence of blistering, carcass saturation or separation, cuts, nicks, or abrasions that expose reinforcement material, and for slippage, misalignment, or leaks at couplings.Weekly - Visually inspect hoses for loose covers, cracks, brittle surface coatings, exposed wire braids, exposed reinforcement, flattening, kinks, and bulges or soft spots which might indicate broken or displaced reinforcement.
Monthly - Pressurize hose to normal working pressure. Check flanged and threaded connections for leaks and inspect hose couplers for fluid seepage by pushing at the base of the coupling with your thumbs; a hose softened by fluid seepage must be replaced.Partial System OOS108 fs1
109Fill stands109 FillstandsLoading Fuel HosesFillstand 2 hoseGoodyearG-200-88523.0 in.XXX3-9.1Aircraft fueling hose shall be inspected before use each day. The hose shall be extended as it normally would be for fueling and checked for evidence of blistering, carcass saturation or separation, cuts, nicks, or abrasions that expose reinforcement material, and for slippage, misalignment, or leaks at couplings.Weekly - Visually inspect hoses for loose covers, cracks, brittle surface coatings, exposed wire braids, exposed reinforcement, flattening, kinks, and bulges or soft spots which might indicate broken or displaced reinforcement.
Monthly - Pressurize hose to normal working pressure. Check flanged and threaded connections for leaks and inspect hose couplers for fluid seepage by pushing at the base of the coupling with your thumbs; a hose softened by fluid seepage must be replaced.Partial System OOS109 fs2
109Fill stands109 FillstandsLoading Fuel HosesFillstand 1 hoseGoodyearG-200-88523.0 in.XXX3-9.1Aircraft fueling hose shall be inspected before use each day. The hose shall be extended as it normally would be for fueling and checked for evidence of blistering, carcass saturation or separation, cuts, nicks, or abrasions that expose reinforcement material, and for slippage, misalignment, or leaks at couplings.Weekly - Visually inspect hoses for loose covers, cracks, brittle surface coatings, exposed wire braids, exposed reinforcement, flattening, kinks, and bulges or soft spots which might indicate broken or displaced reinforcement.
Monthly - Pressurize hose to normal working pressure. Check flanged and threaded connections for leaks and inspect hose couplers for fluid seepage by pushing at the base of the coupling with your thumbs; a hose softened by fluid seepage must be replaced.Partial System OOSFillstand 1 hose
109Fill stands109 FillstandsGeneral System Control ValvesF/S 2 flange float controlCal-ValNot LegibleN/AXXX4-3.2.1No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS108 fs2
109Fill stands109 FillstandsGeneral System Control ValvesF/S 1 flange float controlCal-ValNot LegibleN/AXXX4-3.2.1No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOSF/S 1 flange float control
109Fill stands109 FillstandsGeneral System Control ValvesF/S 2 discharge control valveCal-ValPN163.0 in.XXX4-3.2.1No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS109 fs2
109Fill stands109 FillstandsGeneral System Control ValvesGeneral system control-F/S#3 Down stream of meterCal-ValNot Legible3.0 in.XXX4-3.2.1No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOSGeneral system control-F/S#3 Down stream of meter
109Fill stands109 FillstandsGeneral System Control ValvesFillstand 1 control valveCal-Val100 AF3.0 in.XXX4-3.2.1No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOSFillstand 1 control valve
109Fill stands109 FillstandsGeneral System Control ValvesF/S 3 discharge control valveCal-ValNot Legible6.0 in.XXX4-3.2.1No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS109 fs3
109Fill stands109 FillstandsGeneral System Control ValvesF/S 3 flange float controlCal-ValNot LegibleN/AXXX4-3.2.1No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOSFloat control-F/S #3
109Fill stands109 FillstandsThermal and/or Pressure Relief ValvesF/S 3 PRVTaylor82E5751311-10-10-01.0 in. 0 - 0 PSIXXX6-6.3Thermal and pressure relief valves shall be validated for proper calibration by isolating the valve and using the test connection provided on the piping in conjunction with a hand pump and portable reservoir. The operating pressure shall be checked against the set pressure listed on the stamped information plate attached to the valve. The operating pressure shall be adjusted to the stamped set pressure if necessary.No Operator/equipment RequirementsPartial System OOSF/S 3 PRV range 226-450 psi
109Fill stands109 FillstandsThermal and/or Pressure Relief ValvesF/S 1 discharge PRVTaylor82E3751311-10-10-01.0 in. 0 - 0 PSIXXX6-6.3Thermal and pressure relief valves shall be validated for proper calibration by isolating the valve and using the test connection provided on the piping in conjunction with a hand pump and portable reservoir. The operating pressure shall be checked against the set pressure listed on the stamped information plate attached to the valve. The operating pressure shall be adjusted to the stamped set pressure if necessary.No Operator/equipment RequirementsPartial System OOSF/S 1 discharge PRV range 51-100psi
109Fill stands109 FillstandsThermal and/or Pressure Relief ValvesF/S 3 discharge PRVTaylor82E3751311-10-10-01.0 in. 0 - 0 PSIXXX6-6.3Thermal and pressure relief valves shall be validated for proper calibration by isolating the valve and using the test connection provided on the piping in conjunction with a hand pump and portable reservoir. The operating pressure shall be checked against the set pressure listed on the stamped information plate attached to the valve. The operating pressure shall be adjusted to the stamped set pressure if necessary.No Operator/equipment RequirementsPartial System OOS109 fs3
109Fill stands109 FillstandsThermal and/or Pressure Relief ValvesF/S 2 PRVTaylor82E3751311-10-10-01.0 in. 0 - 0 PSIXXX6-6.3Thermal and pressure relief valves shall be validated for proper calibration by isolating the valve and using the test connection provided on the piping in conjunction with a hand pump and portable reservoir. The operating pressure shall be checked against the set pressure listed on the stamped information plate attached to the valve. The operating pressure shall be adjusted to the stamped set pressure if necessary.No Operator/equipment RequirementsPartial System OOS109 fs 2 range 226-450 set @ 275
109Fill stands109 FillstandsThermal and/or Pressure Relief ValvesF/S 2 discharge PRVTaylor02E3751311-10-10-01.0 in. 0 - 0 PSIXXX6-6.3Thermal and pressure relief valves shall be validated for proper calibration by isolating the valve and using the test connection provided on the piping in conjunction with a hand pump and portable reservoir. The operating pressure shall be checked against the set pressure listed on the stamped information plate attached to the valve. The operating pressure shall be adjusted to the stamped set pressure if necessary.No Operator/equipment RequirementsPartial System OOS109 fs2 51-100 set 80
109Fill stands109 FillstandsThermal and/or Pressure Relief ValvesF/S 1 PRVTaylor82E5751311-10-10-01.0 in. 0 - 0 PSIXXX6-6.3Thermal and pressure relief valves shall be validated for proper calibration by isolating the valve and using the test connection provided on the piping in conjunction with a hand pump and portable reservoir. The operating pressure shall be checked against the set pressure listed on the stamped information plate attached to the valve. The operating pressure shall be adjusted to the stamped set pressure if necessary.No Operator/equipment RequirementsPartial System OOS109 fs1 set 275. 226-450
109Fill stands109 FillstandsFilter Separator Control ValvesFil sep control valveCal-Val104-6616.0 in.XX04-4.2.2No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS109 fs2
109Fill stands109 FillstandsFilter Separator Control ValvesF/S 1 control valveCal-Val100 AF6.0 in.XX04-4.2.2No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOSF/S 1 control valve
109Fill stands109 FillstandsFueling NozzlesFillstand 2 nozzleCarter643493.0 In.XX04-7.4Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand.Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand.Partial System OOS109 fs2
109Fill stands109 FillstandsFueling NozzlesFillstand 3 nozzleCarter643493.0 In.XX04-7.4Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand.Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand.Partial System OOS109 fs1
109Fill stands109 FillstandsFueling NozzlesFillstand 1 nozzleCarter643493.0 In.XX04-7.4Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand.Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand.Partial System OOSFillstand 1 fueling nozzle
109Fill stands109 FillstandsSight Flow IndicatorsF/S 2 sight glassN/AN/A.5 In.0006-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Partial System OOS108 fs2
109Fill stands109 FillstandsSight Flow IndicatorsF/S 1 sight glassN/AN/A.5 In.0006-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Partial System OOSF/S 1 sightglass
109Fill stands109 FillstandsSight Flow IndicatorsF/S 3 sight glassN/AN/A.5 In.0006-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Partial System OOSSight glass-F/S #3
109Fill stands109 FillstandsVisual MonitoringFillstand 1 fall protection systemFall Protection SystemsAR40N/A0006-14.1No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission ImpactFill stand 1 fall protection system
109Fill stands109 FillstandsBall ValvesBall balveFlow -TekRF-151.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact109 fs 2
109Fill stands109 FillstandsBall ValvesBall valveFlow -TekRF-151.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact108 fs 2
109Fill stands109 FillstandsBall ValvesBall valveFlow -TekRF-151.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact109 fs2
109Fill stands109 FillstandsBall ValvesBall valveFlow -TekRF-151.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact109 fs2
109Fill stands109 FillstandsBall ValvesBall valveFlow -TekRF-151.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact108 fs2
109Fill stands109 FillstandsBall ValvesBall valveFlow -TekRF-151.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact109 fs2
109Fill stands109 FillstandsBall ValvesF/S 1 air bleed valveFlow -TekRF-150.75 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission ImpactF/S 1 air bleed valve
109Fill stands109 FillstandsBall ValvesF/S 1 air eliminator iso valveFlow -TekRF-150.75 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission ImpactF/S 1 air eliminator iso valve
109Fill stands109 FillstandsBall ValvesF/S 1 PRV iso valveFlow -TekRF-151.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission ImpactF/S 1 PRV iso valve
109Fill stands109 FillstandsBall ValvesF/S 1 sump drain valveFlow -TekRF-151.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission ImpactF/S 1 sump drain valve
109Fill stands109 FillstandsBall ValvesF/S 1 sump drain valveFlow -TekRF-151.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission ImpactF/S 1 sump drain valve
109Fill stands109 FillstandsBall ValvesF/S 1 air eliminator iso valveFlow -TekRF-151.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission ImpactF/S 1 air eliminator iso valve
109Fill stands109 FillstandsBall ValvesBall valveFlow -TekRF-151.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact109 fs2
109Fill stands109 FillstandsBall ValvesBall valveFlow -TekRF-151.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact109 fs2
109Fill stands109 FillstandsBall ValvesBall valveFlow -TekRF150.75 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact109 fs2
109Fill stands109 FillstandsBall ValvesBall valveFlow -TekRF-150.25 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission ImpactF/S 1 test port valve discharges
109Fill stands109 FillstandsBall ValvesF/S 1 discharge PRV iso valveFlow -TekRF-151.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission ImpactF/S 1 discharge PRV iso valve
109Fill stands109 FillstandsBall ValvesF/S 1 discharge PRV iso valveFlow -TekRF-151.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission ImpactF/S 1 discharge PRV iso valve
109Fill stands109 FillstandsBall ValvesFillstand 1 pressure gauge iso valvePainted / Not LegiblePainted / Not Legible0.75 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission ImpactFillstand 1 pressure gauge iso valve
109Fill stands109 FillstandsBall ValvesBall valveFlow -TekRF-151.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact109 fs1
109Fill stands109 FillstandsBall ValvesBall valveFlow -TekRF-151.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact109 fs1
109Fill stands109 FillstandsBall ValvesBall valveFlow -TekRF-151.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact109 fs3
109Fill stands109 FillstandsBall ValvesBall valveFlow -TekRF-151.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact109 fs3
109Fill stands109 FillstandsBall ValvesBall valveFlow -TekRF-151.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact109 fs3
109Fill stands109 FillstandsBall ValvesBall valveFlow -TekRF-151.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact109 fs3
109Fill stands109 FillstandsBall ValvesBall valveFlow -TekRF-151.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact109 fs3
109Fill stands109 FillstandsBall ValvesBall Valve-F/S#3Flow -TekRF-151.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission ImpactBall Valve-F/S#3
109Fill stands109 FillstandsBall ValvesBall Valve-F/S #3Flow -TekRF-150.5 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission ImpactBall Valve-F/S #3
109Fill stands109 FillstandsBall ValvesTest port ball valveGammonGTP-11490.25 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact109 fs2
109Fill stands109 FillstandsBall ValvesTest port ball valveGammonGTP-11490.25 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact109 fs2
109Fill stands109 FillstandsBall ValvesTest port ball valveGammonGTP-11490.25 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact109 fs2
109Fill stands109 FillstandsBall ValvesSample port ball valveGammonGTP-11490.25 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact109 fs1
109Fill stands109 FillstandsBall ValvesSample port inlet ball valveGammonGTP-11490.25 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact109 fs3
109Fill stands109 FillstandsBall ValvesF/S 1 test port valve inletGammonGTP 11490.25 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission ImpactF/S 1 test port valve inlet
109Fill stands109 FillstandsBall ValvesF/S 1 discharge sample valveGammonGTP 11490.25 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission ImpactF/S 1 discharge sample valve
109Fill stands109 FillstandsBall ValvesFillstand 1 iso valveWKMPainted / Not Legible3.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission ImpactFill stand 1 iso valve
109Fill stands109 FillstandsBall ValvesBall valveWKMPainted / Not Legible3.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact109 fs2
109Fill stands109 FillstandsBall ValvesBall valve-to pressure gauge inlet side Of meter-F/S#3Painted / Not LegiblePainted / Not Legible1.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission ImpactBall valve-to pressure gauge inlet side

Of meter-F/S#3

109Fill stands109 FillstandsBall ValvesDischarge sample port ball valveSchultzUnmarked0.25 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact109 fs3
109Fill stands109 FillstandsBall ValvesBall valveFlow -TekPainted / Not Legible1.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission ImpactF/S 1 PRV iso valve
109Fill stands109 FillstandsBall ValvesV-56 Ball valve-F/S#3 Downstream of meterDyna Seal3F-B1113.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission ImpactV-56 Ball valve-F/S#3 Downstream of meter
109Fill stands109 FillstandsDouble Block and Bleed ValvesDouble block and bleedTruseal1-306R6.0 in.XXX6-6.2.5Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug.No Operator RequirementPartial System OOS109 fs2
109Fill stands109 FillstandsDouble Block and Bleed ValvesFil sep outlet DBB valveTruseal1-306R6.0 in.XXX6-6.2.5Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug.No Operator RequirementPartial System OOS109 fs2
109Fill stands109 FillstandsDouble Block and Bleed ValvesF/S 1 Double block and bleedTruSeal1-306R6.0 in.XXX6-6.2.5Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug.No Operator RequirementPartial System OOSF/S 1 inlet iso valve
109Fill stands109 FillstandsDouble Block and Bleed ValvesDouble block and bleedTruseal1-306R6.0 in.XXX6-6.2.5Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug.No Operator RequirementPartial System OOS109 fs2
109Fill stands109 FillstandsDouble Block and Bleed ValvesF/S 1 double block and bleedTruSeal1-306R6.0 in.XXX6-6.2.5Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug.No Operator RequirementPartial System OOSF/S 1 discharge iso valve
109Fill stands109 FillstandsDouble Block and Bleed ValvesFillstand 1 double block and bleedTruSeal1-306R6.0 in.XXX6-6.2.5Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug.No Operator RequirementPartial System OOSFull stand 1 inlet iso valve
109Fill stands109 FillstandsDouble Block and Bleed ValvesV-55 Double block and bleed inlet side of meterTruSeal1-306R3.0 in.XXX6-6.2.5Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug.No Operator RequirementPartial System OOSV-55 Double block and bleed inlet side of meter
109Fill stands109 FillstandsDouble Block and Bleed ValvesDouble block and bleedTruseal1-306R6.0 in.XXX6-6.2.5Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug.No Operator RequirementPartial System OOS109 fs1
109Fill stands109 FillstandsDouble Block and Bleed ValvesDouble block and bleedTruseal1-306R6.0 in.XXX6-6.2.5Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug.No Operator RequirementPartial System OOS109 fs3
109Fill stands109 FillstandsGlobe ValvesF/S 2 globe valveKencoNot Marked0.5 in.XX06-6.2.71. Regular inspection of the valve. ...

2. If the valve is not operated regularly it is a good idea to cycle the valve to ensure the disc is not bedding itself in the seat.

3. Grease the crossbar by using a grease gun on the grease nipple provided

4. Slightly tighten the gland bolts if the packing needs adjustment.No Operator RequirementPartial System OOS109 fs2
109Fill stands109 FillstandsGlobe ValvesF/S 2 globe valveKencoNot Marked0.5 in.XX06-6.2.71. Regular inspection of the valve. ...

2. If the valve is not operated regularly it is a good idea to cycle the valve to ensure the disc is not bedding itself in the seat.

3. Grease the crossbar by using a grease gun on the grease nipple provided

4. Slightly tighten the gland bolts if the packing needs adjustment.No Operator RequirementPartial System OOS109 fs2
109Fill stands109 FillstandsGlobe ValvesF/S 3 globe valveKencoNot Marked0.5 in.XX06-6.2.71. Regular inspection of the valve. ...

2. If the valve is not operated regularly it is a good idea to cycle the valve to ensure the disc is not bedding itself in the seat.

3. Grease the crossbar by using a grease gun on the grease nipple provided

4. Slightly tighten the gland bolts if the packing needs adjustment.No Operator RequirementPartial System OOSGlobe valve-F/S#3
109Fill stands109 FillstandsGlobe ValvesF/S 3 globe valveKencoNot Marked0.5 in.XX06-6.2.71. Regular inspection of the valve. ...

2. If the valve is not operated regularly it is a good idea to cycle the valve to ensure the disc is not bedding itself in the seat.

3. Grease the crossbar by using a grease gun on the grease nipple provided

4. Slightly tighten the gland bolts if the packing needs adjustment.No Operator RequirementPartial System OOSGlobe valve-F/S#3
109Fill stands109 FillstandsPressure and Pressure/Vacuum GaugesF/S 2 dp psi gaugeNot LabeledNot Labeled0.25 in. 0 - 0 PSIXXX6-7.1Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use.Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system.Partial System OOS109 fs2
109Fill stands109 FillstandsPressure and Pressure/Vacuum GaugesFillstand 2 psi gaugeWika233.530.25 in. 0 - 0 PSIXXX6-7.1Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use.Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system.Partial System OOS109 fs2
109Fill stands109 FillstandsPressure and Pressure/Vacuum GaugesF/S 1 dp psi gaugePFT Alexander800-696-13310.25 in. 0 - 0 PSIXXX6-7.1Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use.Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system.Partial System OOSF/S 1 pressure gauge range 0-300
109Fill stands109 FillstandsPressure and Pressure/Vacuum GaugesFillstand 1 psi gaugeWika233.530.5 in. 0 - 0 PSIXXX6-7.1Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use.Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system.Partial System OOSFill stand 1 pressure gauge
109Fill stands109 FillstandsPressure and Pressure/Vacuum GaugesFillstand 3 psi gaugeWika233.530.25 in. 0 - 0 PSIXXX6-7.1Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use.Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system.Partial System OOS109 fs3 0-200
109Fill stands109 FillstandsPressure and Pressure/Vacuum GaugesPressure gauge-inlet to meter F/S#3Wika233.541.0 in. 0 - 0 PSIXXX6-7.1Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use.Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system.Partial System OOSPressure gauge-inlet to meter F/S#3
109Fill stands109 FillstandsDifferential Pressure GaugesF/S 2 DP gaugeSchultzSC-5150-300 - 0 PSIXXX6-7.2Periodic calibration of this instrument is unnecessary because the graduated scale is made to match the characteristics (load/deflection curve) of the spring. If the spring loses some of its strength for some reason, the ”free length” must be shortened. Afull length spring will always provide accurate readings. This is a fundamental truth about compression springs. This spring is at its “free full length” when there is zero differential pressure; the top of the piston is then in the “zero” band of the graduated scale.Quarterly - Clean outside of gauge glass.Partial System OOS109 fs2
109Fill stands109 FillstandsDifferential Pressure GaugesF/S 3 DP gaugeSchultzSC-5150-300 - 0 PSIXXX6-7.2Periodic calibration of this instrument is unnecessary because the graduated scale is made to match the characteristics (load/deflection curve) of the spring. If the spring loses some of its strength for some reason, the ”free length” must be shortened. Afull length spring will always provide accurate readings. This is a fundamental truth about compression springs. This spring is at its “free full length” when there is zero differential pressure; the top of the piston is then in the “zero” band of the graduated scale.Quarterly - Clean outside of gauge glass.Partial System OOS109 fs3
109Fill stands109 FillstandsEFSO SystemsEFSO bldg 109UnmarkedUnmarkedN/AXX07-16Proper operation, box seals for integrity. Electrical connections for continuity.No Operator RequirementPartial System OOSEFSO-adjacent to Fac 109
109Fill stands109 FillstandsEFSO SystemsFillstand 2 e-stop buttonCooper Crouse HinesDSD933N/AXX07-16Proper operation, box seals for integrity. Electrical connections for continuity.No Operator RequirementPartial System OOS109 fs2
109Fill stands109 FillstandsEFSO SystemsFillstand 3 e-stop buttonCooper Crouse HinesDSD933N/AXX07-16Proper operation, box seals for integrity. Electrical connections for continuity.No Operator RequirementPartial System OOS109 fs1
109Fill stands109 FillstandsEFSO SystemsFillstand 3 EFSO switchCooper Crouse HinesDSD933N/AXX07-16Proper operation, box seals for integrity. Electrical connections for continuity.No Operator RequirementPartial System OOS109 fs3
109Fill stands109 FillstandsEFSO SystemsFillstand 1 EFSO switchCooper Crouse HinesDSD933N/AXX07-16Proper operation, box seals for integrity. Electrical connections for continuity.No Operator RequirementPartial System OOSFillstand 1 EFSO switch on/off
109Fill stands109 FillstandsEFSO SystemsFillstand 1 e -stop buttonCooper Crouse HinesDSD933N/AXX07-16Proper operation, box seals for integrity. Electrical connections for continuity.No Operator RequirementPartial System OOSFillstand 1 EFSO button
109Fill stands109 FillstandsEFSO SystemsEFSO rear of bldg 116UnmarkedUnmarkedN/AXX07-16Proper operation, box seals for integrity. Electrical connections for continuity.No Operator RequirementPartial System OOSEFSO rear of 116
109Fill stands109 FillstandsAutomatic Line Leak DetectorVeeder Root-product recovery tank F/S areaVeeder-RootTLS-300CN/A00X7-19.1.2No Manufacturer Requirements AvailableDaily - Ensure the monitoring panel associated with the detector(s) is powered on and no alarms are present.Partial System OOSVeeder Root-product recovery tank F/S area
109Fill stands109 FillstandsSwivelsFillstand 1 hose swivelOPW3950F00301-GL3.0 in.0007-5Inspect for expiration date. Inspect for loose connections and signs of damage.Daily - Inspect swivel for loose connections and signs of damage. Ensure swivel rotates easily and is clean and free of fuel.
Monthly - Inspect swivel for expiration date established by manufacturer. Swivels must be replaced before the indicated expiration date.Partial System OOS109 Fillstand 2
109Fill stands109 FillstandsSwivelsFillstand 3 hose swivelOPW3950F00301-GL3.0 in.0007-5Inspect for expiration date. Inspect for loose connections and signs of damage.Daily - Inspect swivel for loose connections and signs of damage. Ensure swivel rotates easily and is clean and free of fuel.
Monthly - Inspect swivel for expiration date established by manufacturer. Swivels must be replaced before the indicated expiration date.Partial System OOSFillstand 3 Hose swivel
109Fill stands109 FillstandsSwivelsFillstand 2 hose swivelOPW3950F00301-GL3.0 in.0007-5Inspect for expiration date. Inspect for loose connections and signs of damage.Daily - Inspect swivel for loose connections and signs of damage. Ensure swivel rotates easily and is clean and free of fuel.
Monthly - Inspect swivel for expiration date established by manufacturer. Swivels must be replaced before the indicated expiration date.Partial System OOSFillstand 1 swivel joint
109Fill stands109 FillstandsContainment SystemsProtective bollards-adjacent to Fac 109N/AN/AN/A0008-10.1No Manufacturer Requirements AvailableDaily - Inspect containment systems for cleanliness, if accessible.No Mission ImpactProtective bollards-adjacent to Fac 109
109Fill stands109 FillstandsElectrical EquipmentE stop switchCooper Crouse HinesDSD933N/AXX09-1.2No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact109 fs2
109Fill stands109 FillstandsElectrical EquipmentExplosion proof lighting-switch. Bldg 109Appleton Electric CoSnap SwitchN/AXX09-1.2No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission ImpactExplosion proof lighting-switch. Bldg 109
109Fill stands109 FillstandsElectrical Equipment109 Audible alarmVeeder-RootUnmarkedN/AXX09-1.2No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission ImpactAudible alarm
109Fill stands109 FillstandsElectrical Equipment109 audible alarm acknowledge/resetVeeder-RootUnmarkedN/AXX09-1.2No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact109 audible alarm acknowledge/reset
109Fill stands109 FillstandsElectrical EquipmentPower Panel-Adjacent to Fac 109Square DUnmarkedN/AXX09-1.2No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission ImpactPower Panel-Adjacent to Fac 109
109Fill stands109 FillstandsElectrical EquipmentElectrical Box-adjacent to Fac 109UnmarkedUnmarkedN/AXX09-1.2No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission ImpactElectrical Box-adjacent to Fac 109
109Fill stands109 FillstandsElectrical EquipmentElectrical Panel-Adjacent to Fac 109UnmarkedUnmarkedN/AXX09-1.2No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission ImpactElectrical Panel-Adjacent to Fac 109
109Fill stands109 FillstandsElectrical EquipmentElectrical Panel-adjacent to Fac 109UnmarkedUnmarkedN/AXX09-1.2No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission ImpactElectrical Panel-adjacent to Fac 109