PWS TKR FMP Template - v2.2.xlsx

XLSX spreadsheet 536 KB Posted

Attached to
Sources Sought - CEHNC FUELS PROGRAM
Solicitation number
PANHES-25-P-0000-001794
Issued by

About this file

This file is a Facility Maintenance Plan (FMP) template for recurring maintenance of fuel systems at Tinker Air Force Base in Oklahoma City. The template provides detailed maintenance requirements and schedules for fuel storage and dispensing systems, including above ground storage tanks, underground storage tanks, filter separators, valves, pumps, monitoring equipment, alarms, and firefighting equipment.

The template contains extensive technical specifications organized by facility asset type, including maintenance frequencies (quarterly, monthly, weekly, daily), UFC system references, manufacturer requirements, operator requirements, and mission impact assessments. Key systems covered include Jet A fuel tanks, receipt pads, pipelines, containment systems, pressure relief valves, grounding systems, and associated electrical/control components. The template appears designed to ensure proper maintenance and repair of federally funded petroleum systems in compliance with applicable codes, criteria, and federal/state/local regulations, though it does not specify actual services being procured.

View the file

Other files

File Type Posted
Sources Sought FUELS - Programmatic Rev1 7 May 25.docx DOCX document
3.4 Appendix B - Attachment 4 - SO Tracker-20210628.xlsx XLSX spreadsheet
6.0 - Appendix E ISR 15-Bulk_Fuel_Facilities FY25.xlsx XLSX spreadsheet
2.0 Appendix A RM_SO Process_20241220_PgM Reviewed Incorporated.docx DOCX document
3.1 Appendix B - Attachment 1 - Three Week Look Ahead_20230420.xlsx XLSX spreadsheet
3.2 Appendix B - Attachment 2 - Monthly Report Format 20240910.docx DOCX document
2.2 Appendix A - Attachment 2 Contractor Travel Expense Report_20240910.xlsx XLSX spreadsheet
9.0 Appendix H - Minor Repairs Incidental to Maintenance Activities POJ 20231009.xlsx XLSX spreadsheet
7.0 CUID - v2.1.pdf PDF
8.0 Appendix G_UFC 3-460-03 Maintenance Table- v4.3.pdf PDF
6.0 Appendix E ISR 14_operational_fuel_facilities FY25.xlsx XLSX spreadsheet
3.0 Appendix B Reporting Requirements_20240910.docx DOCX document
4.0 Appendix C Task Order Specifications_202401216.docx DOCX document
5.0 Appendix D Antiterrorism and OPSEC 20230206.docx DOCX document
PWS LEX FMP Template - v2.2.xlsx XLSX spreadsheet
PWS VNC FMP Template - v2.2.xlsx XLSX spreadsheet
PWS KEQ FMP Template - v2.2.xlsx XLSX spreadsheet
PWS CVZ FMP Template - v2.2.xlsx XLSX spreadsheet
PWS SHP FMP Template - v2.2.xlsx XLSX spreadsheet
PWS PBA FMP Template - v2.2.xlsx XLSX spreadsheet
PWS GRB FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BRO FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BAR FMP Template - v2.2.xlsx XLSX spreadsheet
PWS EFS FMP Template - v2.2.xlsx XLSX spreadsheet
PWS LAU FMP Template - v2.2.xlsx XLSX spreadsheet
PWS CHF FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BEU FMP Template - v2.2.xlsx XLSX spreadsheet
PWS GDF FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BLI FMP Template - v2.2.xlsx XLSX spreadsheet
PWS RBN FMP Template - v2.2.xlsx XLSX spreadsheet
PWS MAA FMP Template - v2.2.xlsx XLSX spreadsheet
PWS FSH FMP Template - v2.2.xlsx XLSX spreadsheet
PWS FSO FMP Template - v2.2.xlsx XLSX spreadsheet
PWS LRG FMP Template - v2.2.xlsx XLSX spreadsheet
PWS RRT FMP Template - v2.2.xlsx XLSX spreadsheet
PWS ALT FMP Template - v2.2.xlsx XLSX spreadsheet
PWS TUL FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BL2 FMP Template - v2.2.xlsx XLSX spreadsheet
PWS ELL FMP Template - v2.2.xlsx XLSX spreadsheet
PWS WRF FMP Template - v2.2.xlsx XLSX spreadsheet
PWS LLD FMP Template - v2.2.xlsx XLSX spreadsheet
PWS DYE FMP Template - v2.2.xlsx XLSX spreadsheet
12.0 PWS Appendix K Real Property Data_20230420.xlsx XLSX spreadsheet
PWS RAN FMP Template - v2.2.xlsx XLSX spreadsheet
PWS FSM FMP Template - v2.2.xlsx XLSX spreadsheet
PWS _Fuels RMMR 20241220.docx DOCX document
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Administrative

LocationSite NameTinker AFB Site #1
RPSUID3342
DLA Site CodeTKR
Hours of Operation24 Hours of Operation
Address3175 F Street, Oklahoma City, OK 73145
ContractContractor
Contract #
Local POCsQAE Name
QAE Phone
QAE Email
Alt QAE Name
Alt QAE Phone
Alt QAE Email
DLA/SCP POCsDLA PM Name
DLA PM Phone
DLA PM Email
SCP PM Name
SCP PM Phone
SCP PM Email
Contractor POCsContractor PM Name
Contractor PM Phone
Contractor PM Email
Contractor QC Name
Contractor QC Phone
Contractor QC Email
Contractor SM Name
Contractor SM Phone
Contractor SM Email
USACE POCsUSACE PM/COR Name
USACE PM/COR Phone
USACE PM/COR Email
USACE PE Name
USACE PE Phone
USACE PE Email
USACE KO Name
USACE KO Phone
USACE KO Email

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

This table shows the minimum information required. Additional details should be included based on site specific requirements. Additional POCs may be required.

General Facility Description Facility Description

Purpose:

This Facility Maintenance Plan provides guidance for Contractor personnel in the operation, inspection, and maintenance of permanently installed fuel facilities operated under the control of the Quality Assurance Evaluators. Federal, state, and local environmental laws and regulations shall be complied with if this plan is in conflict with them.

Scope:

The instructions prescribed by this plan outline general fuels maintenance information associated with fuel storage and dispensing systems and provides the minimum periodic contractor maintenance and inspection criteria requirements for the systems. This plan is to be used in conjunction with other existing directives governing fuel system operations and maintenance requirements. Conotractor will properly maintain and repair federally funded petroleum systems and facilities in order to provide compliance with applicable code, criteria, and federal, state, local and/or host nation regulations.

Fuels Facilities:

Organizational tanks, and associated dispensing equipment are maintained and operated by the owning organization. Fuel system maintenance contractors shall perform all maintenance and associated procurement actions on installed fuel systems.

Each installation under the Southwest Division contract are military land-based facilities who receive, store, distribute, and/or dispense liquid fuels.

Standard fuel system equipment includes:

a) Above Ground Sorage Stanks (AST), Underground Storage Tanks (UST)

b) Filter/separator and other filtration device maintenance access, particularly element removal.

c) Manual valves

d) Meter Registers, and Flow Meters.

e) Control Valves.

f) Pumps

g) Tank Monitoring Equipment and Instruments

h) Alarms

i) Fire Fighting Equipment

Site Specific General Information:

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

Include a general facility overview and description of each fuel system for the sites in accordance with UFC 3-460-01. Examples include: Bulk Storage Facilities, Aircraft Fueling Facilities, Marine and Dispensing Facilities, Ground Products Fueling Facilities, Alternate POL Facilities, and Support Facilities. Also include facility #s, facility names, fuel type, photos, and any other pertinent information.

Include Site Specific Conditions and Restrictions in this tab.

Communication Plan

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

Communication plan shall address in/out briefs, lines of communication, coordination for access, etc.

Safety

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

Site Specific Addendum and Activity Hazard Analysis, which are Attachments to the APP, specific to activities or tasks related to recurring maintenance for this site.

RM Schedule

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

Link RM schedule here

Task Matrix

Applicable Facility AssetsUFC System Level Maintenance FrequencySpecial Considerations
Real Property Unique Identifier
(RPUID)Real Property Facility #Real Property Facility NameOperational AreaComponent TypeBase Asset IDComponent Unique Identifier (CUID)MakeModelCapacity/SizeQSAUFC Section ReferenceAdditional Manufacturer RM RequirementsOperator/ equipment RequirementsSystem availabilityOther ContractComments
250250 Fuels Lab250 Fuels LabEmergency Eyewash/Showers250 Lab Emergency Eyewash/ShowerBradely114-0492.0 In.XXX11-3Weekly - Equipment installed within 10 seconds from the hazard and on the same plane as the hazard Pathway is clear of obstructions Plumbed equipment activated to ensure compliant operation and to clear any sediment Self-contained equipment checked to determine if the flushing fluid needs to be changed or supplemented Equipment free of broken or missing parts Equipment protected against freezing User protected from scalding waterNo Operator RequirementNo Mission Impact
250250 Fuels Lab250 Fuels LabVentilation Hoods250 Lab Vent HoodUnmarkedUnmarkedN/AXXX11-4.1Daily visual inspection, check the fume hood for visible airflow blockage such as large items or containers near the slot opening. Other daily inspections include holding a tissue at the opening to observe inward airflow, maintaining clean surfaces inside the hood, and keeping the sash at an appropriate height when working and not working in the hood.No Operator RequirementNo Mission ImpactNo nomenclature
270Offload Header 2Offload Header 2Basket StrainersOffload Header 2Titan4-1504.0 in.0003-6.4Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyDaily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyNo Mission Impact
270Offload Header 2Offload Header 2Offloading Fuel HosesOffload Header 2Parker VelconSW3444.0 in.X0X3-9.2Aircraft fueling hose shall be inspected before use each day. The hose shall be extended as it normally would be for fueling and checked for evidence of blistering, carcass saturation or separation, cuts, nicks, or abrasions that expose reinforcement material, and for slippage, misalignment, or leaks at couplings.Weekly - Visually inspect hoses for cracks brittle surface coatings, exposed wire braids, exposed reinforcement, flattening, kinks, and bulges or soft spots which might indicate broken or displaced reinforcement.Partial System OOS
270Offload Header 2Offload Header 2Sight Flow IndicatorsOffload Header 2KencoFVSF-F-4.00-S4FVSF-F-4.00-S50006-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Partial System OOS
270Offload Header 2Offload Header 2Ball ValvesOffload Header 2 Sample CockGammon Techical ProductsGTP-11490.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
270Offload Header 2Offload Header 2Ball ValvesOffload Header 2 DP GaugeGammon Techical ProductsGTP-11490.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
270Offload Header 2Offload Header 2Ball ValvesOffload Header 2 DP GaugeGammon Techical ProductsGTP-11490.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
270Offload Header 2Offload Header 2Ball ValvesOffload Header 2 Basket DrainFlow-TekRPTFE1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
270Offload Header 2Offload Header 2Ball ValvesOffload Header 2 DrainFlo-TiteT12SS0.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
270Offload Header 2Offload Header 2Double Block and Bleed Valves010-NCFranklinWCB4.0 in.X0X6-6.2.5Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug.No Operator RequirementPartial System OOS
270Offload Header 2Offload Header 2Check ValvesOffload Header 2Illegible1504.0 in.X006-6.2.8Visual for damage, leaks, tightness.No Operator RequirementPartial System OOS
270Offload Header 2Offload Header 2Pressure and Pressure/Vacuum GaugesOffload Header 2Wika316 SS0.25 in. 0 - 300 PSIXXX6-7.1Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use.Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system.Partial System OOS
270Offload Header 2Offload Header 2Differential Pressure GaugesOffload Header 2AFTEC704-521-12050 - 30 PSIX0X6-7.2Periodic calibration of this instrument is unnecessary because the graduated scale is made to match the characteristics (load/deflection curve) of the spring. If the spring loses some of its strength for some reason, the ”free length” must be shortened. Afull length spring will always provide accurate readings. This is a fundamental truth about compression springs. This spring is at its “free full length” when there is zero differential pressure; the top of the piston is then in the “zero” band of the graduated scale.Quarterly - Clean outside of gauge glass.Partial System OOS
271271 PRT271 PRTAutomatic Air Vents271 PRT VentIllegibleIllegible2.0 In.00X3-10.2No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
271271 PRT271 PRTSliding Vane Pumps271 PRT PumpBlackmerH1RS0112E0000H50 GPM GPM/SCFMX0X3-8.2.1No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
271271 PRT271 PRTBall Valves271 PRT Top InletMagnetrolF42KRB37-HF12.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
271271 PRT271 PRTBall Valves271 PRT Test Port IsolationGammon Techical ProductsGTP-11490.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
271271 PRT271 PRTBall ValvesA15 sep PRV lineFlow-TekRPTFE1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
271271 PRT271 PRTBall Valves271 PRT Pressure Gauge IsolationFlow-TekRPTFE0.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
271271 PRT271 PRTBall Valves217 PRT Line Drain IsolationFlow-TekRPTFE2.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
271271 PRT271 PRTBall Valves271 PRT High PointFlow-TekRPTFE0.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
271271 PRT271 PRTBall Valves271 PRT PRV IsolationFlow-TekRPTFE1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
271271 PRT271 PRTBall Valves271 PRT Inlet LineFlow-TekRPTFE2.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
271271 PRT271 PRTBall Valves271 PRT Containment Drain IsolationApollo2000WOG2.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
271271 PRT271 PRTBall Valves271 PRT Inlet LineApollo1000WOG0.75 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
271271 PRT271 PRTCheck Valves271 PRT Check ValveVelanA2.0 in.X006-6.2.8Visual for damage, leaks, tightness.No Operator RequirementPartial System OOS
271271 PRT271 PRTCheck Valves271 PRT PRV Line Check ValveVelanB1.0 in.X006-6.2.8Visual for damage, leaks, tightness.No Operator RequirementPartial System OOS
271271 PRT271 PRTThermal and/or Pressure Relief Valves271 PRT PRVTaylor82E4751511-10-10-01.0 in. 101 - 225 PSIX0X6-6.3Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended.Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced.
Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked.Partial System OOS
271271 PRT271 PRTPressure and Pressure/Vacuum Gauges271 PRT Press GaugeWintersUnmarked0.5 in. 0 - 300 PSIXXX6-7.1Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use.Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system.Partial System OOS
271271 PRT271 PRTContainment Systems271 PRT ContainmentN/AN/AN/A00X8-10.1No Manufacturer Requirements AvailableDaily - Inspect containment systems for cleanliness, if accessible.No Mission Impact
271271 PRT271 PRTProduct Saver Tanks271 PRTBendel Tank & Heat Exchanger14845-5/8 job#4857500 GallonsX008-9.10No Additional Manufacturer RequirementsNo Operator/equipment RequirementsPartial System OOS
271271 PRT271 PRTPanelboards271 PRT Pump PanelAdalet182408N/A00X9-1.5No Manufacturer Requirements AvailableQuarterly - Verify that there are no physical obstructions blocking access to the panelboard. Remove physical obstructions.Partial System OOS
271271 PRT271 PRTStatic Grounding Systems271 PRT GroundN/AN/AN/AX0X9-1.6.2Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location.No Operator RequirementPartial System OOS
271271 PRT271 PRTElectric Motors271 PRT MotorTaco WestinghouseAEHHXGN/AXXX9-1.7(1) Inadequate ventilation or air flow

(2) Unbalanced voltage or an overload

(3) Bearing failure

(4) Insulation failure

(5) Shaft misalignmentNo Operator RequirementPartial System OOS
273273 Jet A Tank273 Receipt PadLiquefied Petroleum PipelinesTank 273 Receipt LineN/AN/A6.0 in.0X010-1.2No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
273273 Jet A Tank273 Jet A TankLiquefied Petroleum PipelinesTank 273 Issue PipelineN/AN/A10.0 in.0X010-1.2No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
273273 Jet A Tank273 Jet A TankLiquefied Petroleum PipelinesTank 273 Transfer PipelineN/AN/A6.0 in.0X010-1.2No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
273273 Jet A Tank273 Receipt PadRemote Spill ContainmentOffload AreaN/AN/AN/AX0011-1.2No Manufacturer Requirements AvailableAnnually - Secondary containment systems degrade and will collect debris which can clog drainage inlets or prevent drain valves from sealing properly. Test drain valves for leakage through the valve.Partial System OOS
273273 Jet A Tank273 Receipt PadEmergency Eyewash/ShowersReceipt Pad Eyewash/ShowerUnmarkedUnmarked2.0 In.XXX11-3Weekly - Equipment installed within 10 seconds from the hazard and on the same plane as the hazard Pathway is clear of obstructions Plumbed equipment activated to ensure compliant operation and to clear any sediment Self-contained equipment checked to determine if the flushing fluid needs to be changed or supplemented Equipment free of broken or missing parts Equipment protected against freezing User protected from scalding waterNo Operator RequirementNo Mission Impact
273273 Jet A Tank273 Receipt PadSignage and MarkingsReceipt Separator PadN/AN/AN/A0002-7No Manufacturer Requirements AvailableMonthly - Check permanent signs and markings for adequacy and readability. Repair or replace deteriorated or illegible signs and markings.No Mission Impact
273273 Jet A Tank273 Jet A TankSignage and MarkingsTank and PipingN/AN/AN/A0002-7No Manufacturer Requirements AvailableMonthly - Check permanent signs and markings for adequacy and readability. Repair or replace deteriorated or illegible signs and markings.No Mission Impact
273273 Jet A Tank273 Receipt PadAutomatic Air VentsA25 Air EliminatorArmstrong11AV.5 In00X3-10.2No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
273273 Jet A Tank273 Receipt PadAutomatic Air VentsPump 2 Air EliminatorArmstrong11AV.5 In00X3-10.2No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
273273 Jet A Tank273 Receipt PadAutomatic Air VentsReceipt Pump 1 Air EliminatorArmstrong11AV.5 In00X3-10.2No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
273273 Jet A Tank273 Receipt PadAutomatic Air VentsA24 Air EliminatorArmstrong11AV.5 In00X3-10.2No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
273273 Jet A Tank273 Receipt PadFilter SeparatorsA25 Filter SeparatorParker VelconHV2838275B1LNX1600 GPM GPM/SCFM GallonsX003-6.2Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. Replace filter cartridges when the acceptable maximum differential pressure is reached, the maximum in-service duration has passed, or the fuel becomes visibly dirty or discolored.Daily - Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges.Partial System OOS
273273 Jet A Tank273 Receipt PadFilter SeparatorsA25 Filter SeparatorParker VelconHV2838275B1LNX1600 GPM GPM/SCFM GallonsX003-6.2Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. Replace filter cartridges when the acceptable maximum differential pressure is reached, the maximum in-service duration has passed, or the fuel becomes visibly dirty or discolored.Daily - Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges.Partial System OOS
273273 Jet A Tank273 Receipt PadBasket StrainersPump 2SWP6 Inch6.0 in.0003-6.4Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyDaily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyNo Mission Impact
273273 Jet A Tank273 Receipt PadBasket StrainersReceipt Pad Pump 1 Basket StrainerMueller123F6.0 in.0003-6.4Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyDaily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyNo Mission Impact
273273 Jet A Tank273 Receipt PadCentrifugal PumpsReceipt Pump 1CenturyCE4B300 GPM GPM/SCFMX0X3-8.1During routine pump inspections only the easy to monitor factors such as pressure, temperature, vibration etc can be checKed. But during quarterly inspections, shaft alignment and oil levels should also be checked. Change Oil AnnuallyNo Operator RequirementNo Mission Impact
273273 Jet A Tank273 Receipt PadCentrifugal PumpsPump 2IllegibleIllegible300 gpm GPM/SCFMX0X3-8.1During routine pump inspections only the easy to monitor factors such as pressure, temperature, vibration etc can be checKed. But during quarterly inspections, shaft alignment and oil levels should also be checked. Change Oil AnnuallyNo Operator RequirementNo Mission Impact
273273 Jet A Tank273 Jet A TankCentrifugal PumpsPRT PumpBlackmerXLF1.25B0-15 GPM/SCFMX0X3-8.1During routine pump inspections only the easy to monitor factors such as pressure, temperature, vibration etc can be checKed. But during quarterly inspections, shaft alignment and oil levels should also be checked. Change Oil AnnuallyNo Operator RequirementNo Mission Impact
273273 Jet A Tank273 Receipt PadGeneral System Control ValvesA25 Control ValveCla-Val100AFMVB4.0 in.X0X4-3.2.1No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator/equipment RequirementsPartial System OOS
273273 Jet A Tank273 Receipt PadGeneral System Control ValvesA24 Control ValveCla-Val100AFMVB4.0 in.X0X4-3.2.1No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator/equipment RequirementsPartial System OOS
273273 Jet A Tank273 Jet A TankBack Pressure Control ValvesA3Cla-Val100AFMVB6.0 in.X004-4.2.6No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator/equipment RequirementsNo Mission Impact
273273 Jet A Tank273 Receipt PadAboveground PipingReceipt Separator PadN/AN/A6.0 in.00X6-1.3No Manufacturer Requirements AvailableWeekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection.No Mission Impact
273273 Jet A Tank273 Receipt PadAboveground PipingPRV LinesN/AN/A1.0 in.00X6-1.3No Manufacturer Requirements AvailableWeekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection.No Mission Impact
273273 Jet A Tank273 Receipt PadSight Flow IndicatorsA25 Sight GlassKencoUnmarked.5 In.0006-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Partial System OOSNo data
273273 Jet A Tank273 Receipt PadSight Flow IndicatorsA24 Sight GlassKencoUnmarked.5 In.0006-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Partial System OOSNo data
273273 Jet A Tank273 Jet A TankSight Flow IndicatorsPRT Sight GlassN/AN/AN/A0006-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Partial System OOS
273273 Jet A Tank273 Receipt PadGate ValvesReceipt Lone Transfer Valve 1ULineCF8M6.0 in.XX06-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator RequirementPartial System OOS
273273 Jet A Tank273 Receipt PadGate ValvesTank 273 Receipt Line Valve 2ULineCF8M6.0 in.XX06-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator RequirementPartial System OOS
273273 Jet A Tank273 Receipt PadGate ValvesTank 283 Receipt Pad Pump 1 Outlet 273-LF-O-023ULineUnmarked6.0 in.XX06-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator RequirementPartial System OOS
273273 Jet A Tank273 Receipt PadGate ValvesTank 273 Dike Drain ValveIllegibleIllegible4.0 in.XX06-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator RequirementPartial System OOS
273273 Jet A Tank273 Receipt PadGate ValvesTank 273 Receipt Pad Bypass Valve M25NOFranklinA216WCB6.0 in.XX06-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator RequirementPartial System OOS
273273 Jet A Tank273 Receipt PadGate ValvesTank 273 Receipt Pad Isolation ValveFranklinD7116.0 in.XX06-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator RequirementPartial System OOS
273273 Jet A Tank273 Base Transfer PipelineBall ValvesLow PointFlo-TiteF-1502.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesLow PointFlo-TiteF-1502.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesLow PointFlo-TiteF-1502.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesLow PointFlo-TiteF-1502.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesLow PointFlo-TiteF-1502.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesLow PointFlo-TiteF-1502.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesLow PointFlo-TiteF-1502.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesLow PointFlo-TiteF-1502.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesLow PointFlo-TiteF-1502.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesLow PointFlo-TiteF-1502.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesLow PointFlo-TiteF-1502.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesLow PointFlo-TiteF-1502.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesLow PointFlo-TiteF-1502.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesLow PointFlo-TiteF-1502.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesLow PointFlo-TiteF-1502.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesLow PointFlo-TiteF-1502.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesLow PointFlo-TiteF-1502.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesLow PointFlo-TiteF-1502.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesLow PointFlo-TiteF-1502.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesLow PointFlo-TiteF-1502.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesLow PointFlo-TiteF-1502.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesLow PointFlo-TiteF-1502.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesLow PointFlo-TiteF-1502.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesLow PointFlo-TiteF-1502.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesLow PointFlo-TiteF-1502.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesLow PointFlo-TiteF-1502.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesLow PointFlo-TiteF-1502.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesLow PointFlo-TiteF-1502.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesLow PointFlo-TiteF-1503.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesLow PointFlo-TiteF-1502.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesHigh PointFlo-TiteF-1501.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesHigh PointFlo-TiteF-1501.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesHigh PointFlo-TiteF-1501.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesHigh PointFlo-TiteF-1501.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesHigh PointFlo-TiteF-1501.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesHigh PointFlo-TiteF-1501.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesHigh PointFlo-TiteF-1501.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesHigh PointFlo-TiteF-1501.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesHigh PointFlo-TiteF-1501.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesHigh PointFlo-TiteF-1501.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesHigh PointFlo-TiteF-1501.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesHigh PointFlo-TiteF-1501.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesHigh PointFlo-TiteF-1501.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesHigh PointFlo-TiteF-1501.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesHigh PointFlo-TiteF-1501.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesHigh PointFlo-TiteF-1501.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesHigh PointFlo-TiteF-1501.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesHigh PointFlo-TiteF1501.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesHigh PointFlo-TiteF1501.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesHigh PointFlo-TiteF1501.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesHigh PointFlo-TiteF1501.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesHigh PointFlo-TiteF1501.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesHigh PointFlo-TiteF1501.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesHigh PointFlo-TiteF1501.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesHigh PointFlo-TiteF1501.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesHigh PointFlo-TiteF1501.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Base Transfer PipelineBall ValvesHigh PointFlo-TiteF1501.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Receipt PadBall ValvesRemote Spill IsolationZurikUnmarked6.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Receipt PadBall ValvesIsolation ValveTuflineUnmarked6.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Receipt PadBall ValvesM21-NOULineIllegible6.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Receipt PadBall ValvesM20-NOTrue LineIllegible6.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Receipt PadBall ValvesPump 1 Issue LineTrue LineF156.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Receipt PadBall ValvesA25 DP Gauge IsolationSwagelokSS-43GF40.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Receipt PadBall ValvesA25 DP Gauge IsolationSwagelokSS-43GF40.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Receipt PadBall ValvesA25 DP IsolationSwagelokSS-43GF40.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Receipt PadBall ValvesA24 DP IsolationSwagelokSS-43GF40.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Jet A TankBall ValvesPRT Drain ValveSchultz1000WOG0.75 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Receipt PadBall ValvesReceipt Pump 1 High PointMilvacoIllegible0.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Receipt PadBall ValvesPump 2 Line DrainIllegibleIllegible0.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Receipt PadBall ValvesPump 2 Basket Strainer DrainIllegibleIllegible1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Receipt PadBall ValvesDike DrainIllegibleIllegible6.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Jet A TankBall ValvesHigh Level Pressure Bypass LineHam-LetGTP-11490.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Receipt PadBall ValvesA25 Test Port IsolationGammon Techical ProductsGTP-11490.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Receipt PadBall ValvesA25 Test Port IsolationGammon Techical ProductsGTP-11490.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Receipt PadBall ValvesA24 Test PortGammon Techical ProductsGTP-11490.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Receipt PadBall ValvesA24 Test PortGammon Techical ProductsGTP-11490.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Jet A TankBall ValvesIssue Drain LineFlow-TekRPTFE1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Jet A TankBall ValvesIssue Drain LineFlow-TekRPTFE1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Jet A TankBall ValvesIssue Line PRV Inlet Isolation ValveFlow-TekRPTFE1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Receipt PadBall ValvesA25 Sump DrainFlow-TekRPTFE1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Jet A TankBall ValvesIssue Line PRV Outlet Isolation ValveFlow-TekRPTFE1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Receipt PadBall ValvesA25 Sump DrainFlow-TekRPTFE1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Receipt PadBall ValvesA25 Sump DrainFlow-TekRPTFE1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Jet A TankBall ValvesLow Level Lower Isolation ValveFlow-TekRPTFE1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Jet A TankBall ValvesLow Level Bottom Isolation ValveFlow-TekRPTFE1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Receipt PadBall ValvesA25 Air Eliminator IsolationFlow-TekRPTFE0.75 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Receipt PadBall ValvesA25 Air Eliminator IsolationFlow-TekRPTFE0.75 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Jet A TankBall ValvesLow Level Upper Isolation ValveFlow-TekRPTFE1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Jet A TankBall ValvesLow Level Top Isolation ValveFlow-TekRPTFE1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Receipt PadBall ValvesA25 PRV IsolationFlow-TekRPTFE1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Receipt PadBall ValvesA25 High PointFlow-TekRPTFE0.75 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Receipt PadBall ValvesA25 PRV IsolationFlow-TekRPTFE1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Receipt PadBall ValvesA25 PRT/Low PointFlow-TekRPTFE1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Receipt PadBall ValvesA24 PRT/Low Point DrainFlow-TekRPTFE1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Jet A TankBall ValvesHigh Level Lower Left Isolation ValveFlow-TekRPTFE1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Jet A TankBall ValvesHigh Level Bottom Isolation ValveFlow-TekRPTFE1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Jet A TankBall ValvesHigh Level Upper Left Isolation ValveFlow-TekRPTFE1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Jet A TankBall ValvesHigh Level Top Isolation ValveFlow-TekRPTFE1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Receipt PadBall ValvesA24 PRV IsolationFlow-TekCF8M1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Receipt PadBall ValvesA24 PRV IsolationFlow-TekRPTFE1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
273273 Jet A Tank273 Receipt PadBall ValvesA24 Air Eliminator IsoFlow-TekRPTFE0.75 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact