This file is a Facility Maintenance Plan (FMP) template for recurring maintenance of fuel systems at Tinker Air Force Base in Oklahoma City. The template provides detailed maintenance requirements and schedules for fuel storage and dispensing systems, including above ground storage tanks, underground storage tanks, filter separators, valves, pumps, monitoring equipment, alarms, and firefighting equipment.
The template contains extensive technical specifications organized by facility asset type, including maintenance frequencies (quarterly, monthly, weekly, daily), UFC system references, manufacturer requirements, operator requirements, and mission impact assessments. Key systems covered include Jet A fuel tanks, receipt pads, pipelines, containment systems, pressure relief valves, grounding systems, and associated electrical/control components. The template appears designed to ensure proper maintenance and repair of federally funded petroleum systems in compliance with applicable codes, criteria, and federal/state/local regulations, though it does not specify actual services being procured.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Administrative
| Location | Site Name | Tinker AFB Site #1 |
| RPSUID | 3342 | |
| DLA Site Code | TKR | |
| Hours of Operation | 24 Hours of Operation | |
| Address | 3175 F Street, Oklahoma City, OK 73145 | |
| Contract | Contractor | |
| Contract # | ||
| Local POCs | QAE Name | |
| QAE Phone | ||
| QAE Email | ||
| Alt QAE Name | ||
| Alt QAE Phone | ||
| Alt QAE Email | ||
| DLA/SCP POCs | DLA PM Name | |
| DLA PM Phone | ||
| DLA PM Email | ||
| SCP PM Name | ||
| SCP PM Phone | ||
| SCP PM Email | ||
| Contractor POCs | Contractor PM Name | |
| Contractor PM Phone | ||
| Contractor PM Email | ||
| Contractor QC Name | ||
| Contractor QC Phone | ||
| Contractor QC Email | ||
| Contractor SM Name | ||
| Contractor SM Phone | ||
| Contractor SM Email | ||
| USACE POCs | USACE PM/COR Name | |
| USACE PM/COR Phone | ||
| USACE PM/COR Email | ||
| USACE PE Name | ||
| USACE PE Phone | ||
| USACE PE Email | ||
| USACE KO Name | ||
| USACE KO Phone | ||
| USACE KO Email |
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
This table shows the minimum information required. Additional details should be included based on site specific requirements. Additional POCs may be required.
General Facility Description Facility Description
Purpose:
This Facility Maintenance Plan provides guidance for Contractor personnel in the operation, inspection, and maintenance of permanently installed fuel facilities operated under the control of the Quality Assurance Evaluators. Federal, state, and local environmental laws and regulations shall be complied with if this plan is in conflict with them.
Scope:
The instructions prescribed by this plan outline general fuels maintenance information associated with fuel storage and dispensing systems and provides the minimum periodic contractor maintenance and inspection criteria requirements for the systems. This plan is to be used in conjunction with other existing directives governing fuel system operations and maintenance requirements. Conotractor will properly maintain and repair federally funded petroleum systems and facilities in order to provide compliance with applicable code, criteria, and federal, state, local and/or host nation regulations.
Fuels Facilities:
Organizational tanks, and associated dispensing equipment are maintained and operated by the owning organization. Fuel system maintenance contractors shall perform all maintenance and associated procurement actions on installed fuel systems.
Each installation under the Southwest Division contract are military land-based facilities who receive, store, distribute, and/or dispense liquid fuels.
Standard fuel system equipment includes:
a) Above Ground Sorage Stanks (AST), Underground Storage Tanks (UST)
b) Filter/separator and other filtration device maintenance access, particularly element removal.
c) Manual valves
d) Meter Registers, and Flow Meters.
e) Control Valves.
f) Pumps
g) Tank Monitoring Equipment and Instruments
h) Alarms
i) Fire Fighting Equipment
Site Specific General Information:
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Include a general facility overview and description of each fuel system for the sites in accordance with UFC 3-460-01. Examples include: Bulk Storage Facilities, Aircraft Fueling Facilities, Marine and Dispensing Facilities, Ground Products Fueling Facilities, Alternate POL Facilities, and Support Facilities. Also include facility #s, facility names, fuel type, photos, and any other pertinent information.
Include Site Specific Conditions and Restrictions in this tab.
Communication Plan
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Communication plan shall address in/out briefs, lines of communication, coordination for access, etc.
Safety
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Site Specific Addendum and Activity Hazard Analysis, which are Attachments to the APP, specific to activities or tasks related to recurring maintenance for this site.
RM Schedule
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Link RM schedule here
Task Matrix
| Applicable Facility Assets | UFC System Level Maintenance Frequency | Special Considerations | |||||||||||||||||
| Real Property Unique Identifier | |||||||||||||||||||
| (RPUID) | Real Property Facility # | Real Property Facility Name | Operational Area | Component Type | Base Asset ID | Component Unique Identifier (CUID) | Make | Model | Capacity/Size | Q | S | A | UFC Section Reference | Additional Manufacturer RM Requirements | Operator/ equipment Requirements | System availability | Other Contract | Comments | |
| 250 | 250 Fuels Lab | 250 Fuels Lab | Emergency Eyewash/Showers | 250 Lab Emergency Eyewash/Shower | Bradely | 114-049 | 2.0 In. | X | X | X | 11-3 | Weekly - Equipment installed within 10 seconds from the hazard and on the same plane as the hazard Pathway is clear of obstructions Plumbed equipment activated to ensure compliant operation and to clear any sediment Self-contained equipment checked to determine if the flushing fluid needs to be changed or supplemented Equipment free of broken or missing parts Equipment protected against freezing User protected from scalding water | No Operator Requirement | No Mission Impact | |||||
| 250 | 250 Fuels Lab | 250 Fuels Lab | Ventilation Hoods | 250 Lab Vent Hood | Unmarked | Unmarked | N/A | X | X | X | 11-4.1 | Daily visual inspection, check the fume hood for visible airflow blockage such as large items or containers near the slot opening. Other daily inspections include holding a tissue at the opening to observe inward airflow, maintaining clean surfaces inside the hood, and keeping the sash at an appropriate height when working and not working in the hood. | No Operator Requirement | No Mission Impact | No nomenclature | ||||
| 270 | Offload Header 2 | Offload Header 2 | Basket Strainers | Offload Header 2 | Titan | 4-150 | 4.0 in. | 0 | 0 | 0 | 3-6.4 | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | |||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | ||||||||||||||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | No Mission Impact | ||||||||||||||||||
| 270 | Offload Header 2 | Offload Header 2 | Offloading Fuel Hoses | Offload Header 2 | Parker Velcon | SW344 | 4.0 in. | X | 0 | X | 3-9.2 | Aircraft fueling hose shall be inspected before use each day. The hose shall be extended as it normally would be for fueling and checked for evidence of blistering, carcass saturation or separation, cuts, nicks, or abrasions that expose reinforcement material, and for slippage, misalignment, or leaks at couplings. | Weekly - Visually inspect hoses for cracks brittle surface coatings, exposed wire braids, exposed reinforcement, flattening, kinks, and bulges or soft spots which might indicate broken or displaced reinforcement. | Partial System OOS | |||||
| 270 | Offload Header 2 | Offload Header 2 | Sight Flow Indicators | Offload Header 2 | Kenco | FVSF-F-4.00-S4 | FVSF-F-4.00-S5 | 0 | 0 | 0 | 6-12.3 | Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Partial System OOS | |||||
| 270 | Offload Header 2 | Offload Header 2 | Ball Valves | Offload Header 2 Sample Cock | Gammon Techical Products | GTP-1149 | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 270 | Offload Header 2 | Offload Header 2 | Ball Valves | Offload Header 2 DP Gauge | Gammon Techical Products | GTP-1149 | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 270 | Offload Header 2 | Offload Header 2 | Ball Valves | Offload Header 2 DP Gauge | Gammon Techical Products | GTP-1149 | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 270 | Offload Header 2 | Offload Header 2 | Ball Valves | Offload Header 2 Basket Drain | Flow-Tek | RPTFE | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 270 | Offload Header 2 | Offload Header 2 | Ball Valves | Offload Header 2 Drain | Flo-Tite | T12SS | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 270 | Offload Header 2 | Offload Header 2 | Double Block and Bleed Valves | 010-NC | Franklin | WCB | 4.0 in. | X | 0 | X | 6-6.2.5 | Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug. | No Operator Requirement | Partial System OOS | |||||
| 270 | Offload Header 2 | Offload Header 2 | Check Valves | Offload Header 2 | Illegible | 150 | 4.0 in. | X | 0 | 0 | 6-6.2.8 | Visual for damage, leaks, tightness. | No Operator Requirement | Partial System OOS | |||||
| 270 | Offload Header 2 | Offload Header 2 | Pressure and Pressure/Vacuum Gauges | Offload Header 2 | Wika | 316 SS | 0.25 in. 0 - 300 PSI | X | X | X | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. | Partial System OOS | |||||
| 270 | Offload Header 2 | Offload Header 2 | Differential Pressure Gauges | Offload Header 2 | AFTEC | 704-521-1205 | 0 - 30 PSI | X | 0 | X | 6-7.2 | Periodic calibration of this instrument is unnecessary because the graduated scale is made to match the characteristics (load/deflection curve) of the spring. If the spring loses some of its strength for some reason, the ”free length” must be shortened. Afull length spring will always provide accurate readings. This is a fundamental truth about compression springs. This spring is at its “free full length” when there is zero differential pressure; the top of the piston is then in the “zero” band of the graduated scale. | Quarterly - Clean outside of gauge glass. | Partial System OOS | |||||
| 271 | 271 PRT | 271 PRT | Automatic Air Vents | 271 PRT Vent | Illegible | Illegible | 2.0 In. | 0 | 0 | X | 3-10.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||||
| 271 | 271 PRT | 271 PRT | Sliding Vane Pumps | 271 PRT Pump | Blackmer | H1RS0112E0000H | 50 GPM GPM/SCFM | X | 0 | X | 3-8.2.1 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||||
| 271 | 271 PRT | 271 PRT | Ball Valves | 271 PRT Top Inlet | Magnetrol | F42KRB37-HF1 | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 271 | 271 PRT | 271 PRT | Ball Valves | 271 PRT Test Port Isolation | Gammon Techical Products | GTP-1149 | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 271 | 271 PRT | 271 PRT | Ball Valves | A15 sep PRV line | Flow-Tek | RPTFE | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 271 | 271 PRT | 271 PRT | Ball Valves | 271 PRT Pressure Gauge Isolation | Flow-Tek | RPTFE | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 271 | 271 PRT | 271 PRT | Ball Valves | 217 PRT Line Drain Isolation | Flow-Tek | RPTFE | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 271 | 271 PRT | 271 PRT | Ball Valves | 271 PRT High Point | Flow-Tek | RPTFE | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 271 | 271 PRT | 271 PRT | Ball Valves | 271 PRT PRV Isolation | Flow-Tek | RPTFE | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 271 | 271 PRT | 271 PRT | Ball Valves | 271 PRT Inlet Line | Flow-Tek | RPTFE | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 271 | 271 PRT | 271 PRT | Ball Valves | 271 PRT Containment Drain Isolation | Apollo | 2000WOG | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 271 | 271 PRT | 271 PRT | Ball Valves | 271 PRT Inlet Line | Apollo | 1000WOG | 0.75 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 271 | 271 PRT | 271 PRT | Check Valves | 271 PRT Check Valve | Velan | A | 2.0 in. | X | 0 | 0 | 6-6.2.8 | Visual for damage, leaks, tightness. | No Operator Requirement | Partial System OOS | |||||
| 271 | 271 PRT | 271 PRT | Check Valves | 271 PRT PRV Line Check Valve | Velan | B | 1.0 in. | X | 0 | 0 | 6-6.2.8 | Visual for damage, leaks, tightness. | No Operator Requirement | Partial System OOS | |||||
| 271 | 271 PRT | 271 PRT | Thermal and/or Pressure Relief Valves | 271 PRT PRV | Taylor | 82E4751511-10-10-0 | 1.0 in. 101 - 225 PSI | X | 0 | X | 6-6.3 | Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended. | Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced. | ||||||
| Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked. | Partial System OOS | ||||||||||||||||||
| 271 | 271 PRT | 271 PRT | Pressure and Pressure/Vacuum Gauges | 271 PRT Press Gauge | Winters | Unmarked | 0.5 in. 0 - 300 PSI | X | X | X | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. | Partial System OOS | |||||
| 271 | 271 PRT | 271 PRT | Containment Systems | 271 PRT Containment | N/A | N/A | N/A | 0 | 0 | X | 8-10.1 | No Manufacturer Requirements Available | Daily - Inspect containment systems for cleanliness, if accessible. | No Mission Impact | |||||
| 271 | 271 PRT | 271 PRT | Product Saver Tanks | 271 PRT | Bendel Tank & Heat Exchanger | 14845-5/8 job#4857 | 500 Gallons | X | 0 | 0 | 8-9.10 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | Partial System OOS | |||||
| 271 | 271 PRT | 271 PRT | Panelboards | 271 PRT Pump Panel | Adalet | 182408 | N/A | 0 | 0 | X | 9-1.5 | No Manufacturer Requirements Available | Quarterly - Verify that there are no physical obstructions blocking access to the panelboard. Remove physical obstructions. | Partial System OOS | |||||
| 271 | 271 PRT | 271 PRT | Static Grounding Systems | 271 PRT Ground | N/A | N/A | N/A | X | 0 | X | 9-1.6.2 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | Partial System OOS | |||||
| 271 | 271 PRT | 271 PRT | Electric Motors | 271 PRT Motor | Taco Westinghouse | AEHHXG | N/A | X | X | X | 9-1.7 | (1) Inadequate ventilation or air flow |
(2) Unbalanced voltage or an overload
(3) Bearing failure
(4) Insulation failure
| (5) Shaft misalignment | No Operator Requirement | Partial System OOS | |||||||||||||||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Liquefied Petroleum Pipelines | Tank 273 Receipt Line | N/A | N/A | 6.0 in. | 0 | X | 0 | 10-1.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Jet A Tank | Liquefied Petroleum Pipelines | Tank 273 Issue Pipeline | N/A | N/A | 10.0 in. | 0 | X | 0 | 10-1.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Jet A Tank | Liquefied Petroleum Pipelines | Tank 273 Transfer Pipeline | N/A | N/A | 6.0 in. | 0 | X | 0 | 10-1.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Remote Spill Containment | Offload Area | N/A | N/A | N/A | X | 0 | 0 | 11-1.2 | No Manufacturer Requirements Available | Annually - Secondary containment systems degrade and will collect debris which can clog drainage inlets or prevent drain valves from sealing properly. Test drain valves for leakage through the valve. | Partial System OOS | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Emergency Eyewash/Showers | Receipt Pad Eyewash/Shower | Unmarked | Unmarked | 2.0 In. | X | X | X | 11-3 | Weekly - Equipment installed within 10 seconds from the hazard and on the same plane as the hazard Pathway is clear of obstructions Plumbed equipment activated to ensure compliant operation and to clear any sediment Self-contained equipment checked to determine if the flushing fluid needs to be changed or supplemented Equipment free of broken or missing parts Equipment protected against freezing User protected from scalding water | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Signage and Markings | Receipt Separator Pad | N/A | N/A | N/A | 0 | 0 | 0 | 2-7 | No Manufacturer Requirements Available | Monthly - Check permanent signs and markings for adequacy and readability. Repair or replace deteriorated or illegible signs and markings. | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Jet A Tank | Signage and Markings | Tank and Piping | N/A | N/A | N/A | 0 | 0 | 0 | 2-7 | No Manufacturer Requirements Available | Monthly - Check permanent signs and markings for adequacy and readability. Repair or replace deteriorated or illegible signs and markings. | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Automatic Air Vents | A25 Air Eliminator | Armstrong | 11AV | .5 In | 0 | 0 | X | 3-10.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Automatic Air Vents | Pump 2 Air Eliminator | Armstrong | 11AV | .5 In | 0 | 0 | X | 3-10.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Automatic Air Vents | Receipt Pump 1 Air Eliminator | Armstrong | 11AV | .5 In | 0 | 0 | X | 3-10.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Automatic Air Vents | A24 Air Eliminator | Armstrong | 11AV | .5 In | 0 | 0 | X | 3-10.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Filter Separators | A25 Filter Separator | Parker Velcon | HV2838275B1LNX1 | 600 GPM GPM/SCFM Gallons | X | 0 | 0 | 3-6.2 | Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. Replace filter cartridges when the acceptable maximum differential pressure is reached, the maximum in-service duration has passed, or the fuel becomes visibly dirty or discolored. | Daily - Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. | Partial System OOS | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Filter Separators | A25 Filter Separator | Parker Velcon | HV2838275B1LNX1 | 600 GPM GPM/SCFM Gallons | X | 0 | 0 | 3-6.2 | Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. Replace filter cartridges when the acceptable maximum differential pressure is reached, the maximum in-service duration has passed, or the fuel becomes visibly dirty or discolored. | Daily - Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. | Partial System OOS | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Basket Strainers | Pump 2 | SWP | 6 Inch | 6.0 in. | 0 | 0 | 0 | 3-6.4 | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | |||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | ||||||||||||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | No Mission Impact | ||||||||||||||||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Basket Strainers | Receipt Pad Pump 1 Basket Strainer | Mueller | 123F | 6.0 in. | 0 | 0 | 0 | 3-6.4 | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | |||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | ||||||||||||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | No Mission Impact | ||||||||||||||||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Centrifugal Pumps | Receipt Pump 1 | Century | CE4B | 300 GPM GPM/SCFM | X | 0 | X | 3-8.1 | During routine pump inspections only the easy to monitor factors such as pressure, temperature, vibration etc can be checKed. But during quarterly inspections, shaft alignment and oil levels should also be checked. Change Oil Annually | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Centrifugal Pumps | Pump 2 | Illegible | Illegible | 300 gpm GPM/SCFM | X | 0 | X | 3-8.1 | During routine pump inspections only the easy to monitor factors such as pressure, temperature, vibration etc can be checKed. But during quarterly inspections, shaft alignment and oil levels should also be checked. Change Oil Annually | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Jet A Tank | Centrifugal Pumps | PRT Pump | Blackmer | XLF1.25B | 0-15 GPM/SCFM | X | 0 | X | 3-8.1 | During routine pump inspections only the easy to monitor factors such as pressure, temperature, vibration etc can be checKed. But during quarterly inspections, shaft alignment and oil levels should also be checked. Change Oil Annually | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | General System Control Valves | A25 Control Valve | Cla-Val | 100AFMVB | 4.0 in. | X | 0 | X | 4-3.2.1 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator/equipment Requirements | Partial System OOS | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | General System Control Valves | A24 Control Valve | Cla-Val | 100AFMVB | 4.0 in. | X | 0 | X | 4-3.2.1 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator/equipment Requirements | Partial System OOS | |||
| 273 | 273 Jet A Tank | 273 Jet A Tank | Back Pressure Control Valves | A3 | Cla-Val | 100AFMVB | 6.0 in. | X | 0 | 0 | 4-4.2.6 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator/equipment Requirements | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Aboveground Piping | Receipt Separator Pad | N/A | N/A | 6.0 in. | 0 | 0 | X | 6-1.3 | No Manufacturer Requirements Available | Weekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection. | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Aboveground Piping | PRV Lines | N/A | N/A | 1.0 in. | 0 | 0 | X | 6-1.3 | No Manufacturer Requirements Available | Weekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection. | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Sight Flow Indicators | A25 Sight Glass | Kenco | Unmarked | .5 In. | 0 | 0 | 0 | 6-12.3 | Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Partial System OOS | No data | ||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Sight Flow Indicators | A24 Sight Glass | Kenco | Unmarked | .5 In. | 0 | 0 | 0 | 6-12.3 | Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Partial System OOS | No data | ||
| 273 | 273 Jet A Tank | 273 Jet A Tank | Sight Flow Indicators | PRT Sight Glass | N/A | N/A | N/A | 0 | 0 | 0 | 6-12.3 | Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Partial System OOS | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Gate Valves | Receipt Lone Transfer Valve 1 | ULine | CF8M | 6.0 in. | X | X | 0 | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | Partial System OOS | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Gate Valves | Tank 273 Receipt Line Valve 2 | ULine | CF8M | 6.0 in. | X | X | 0 | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | Partial System OOS | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Gate Valves | Tank 283 Receipt Pad Pump 1 Outlet 273-LF-O-023 | ULine | Unmarked | 6.0 in. | X | X | 0 | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | Partial System OOS | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Gate Valves | Tank 273 Dike Drain Valve | Illegible | Illegible | 4.0 in. | X | X | 0 | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | Partial System OOS | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Gate Valves | Tank 273 Receipt Pad Bypass Valve M25NO | Franklin | A216WCB | 6.0 in. | X | X | 0 | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | Partial System OOS | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Gate Valves | Tank 273 Receipt Pad Isolation Valve | Franklin | D711 | 6.0 in. | X | X | 0 | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | Partial System OOS | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | Low Point | Flo-Tite | F-150 | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | Low Point | Flo-Tite | F-150 | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | Low Point | Flo-Tite | F-150 | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | Low Point | Flo-Tite | F-150 | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | Low Point | Flo-Tite | F-150 | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | Low Point | Flo-Tite | F-150 | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | Low Point | Flo-Tite | F-150 | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | Low Point | Flo-Tite | F-150 | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | Low Point | Flo-Tite | F-150 | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | Low Point | Flo-Tite | F-150 | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | Low Point | Flo-Tite | F-150 | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | Low Point | Flo-Tite | F-150 | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | Low Point | Flo-Tite | F-150 | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | Low Point | Flo-Tite | F-150 | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | Low Point | Flo-Tite | F-150 | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | Low Point | Flo-Tite | F-150 | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | Low Point | Flo-Tite | F-150 | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | Low Point | Flo-Tite | F-150 | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | Low Point | Flo-Tite | F-150 | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | Low Point | Flo-Tite | F-150 | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | Low Point | Flo-Tite | F-150 | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | Low Point | Flo-Tite | F-150 | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | Low Point | Flo-Tite | F-150 | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | Low Point | Flo-Tite | F-150 | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | Low Point | Flo-Tite | F-150 | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | Low Point | Flo-Tite | F-150 | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | Low Point | Flo-Tite | F-150 | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | Low Point | Flo-Tite | F-150 | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | Low Point | Flo-Tite | F-150 | 3.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | Low Point | Flo-Tite | F-150 | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | High Point | Flo-Tite | F-150 | 1.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | High Point | Flo-Tite | F-150 | 1.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | High Point | Flo-Tite | F-150 | 1.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | High Point | Flo-Tite | F-150 | 1.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | High Point | Flo-Tite | F-150 | 1.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | High Point | Flo-Tite | F-150 | 1.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | High Point | Flo-Tite | F-150 | 1.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | High Point | Flo-Tite | F-150 | 1.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | High Point | Flo-Tite | F-150 | 1.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | High Point | Flo-Tite | F-150 | 1.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | High Point | Flo-Tite | F-150 | 1.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | High Point | Flo-Tite | F-150 | 1.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | High Point | Flo-Tite | F-150 | 1.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | High Point | Flo-Tite | F-150 | 1.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | High Point | Flo-Tite | F-150 | 1.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | High Point | Flo-Tite | F-150 | 1.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | High Point | Flo-Tite | F-150 | 1.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | High Point | Flo-Tite | F150 | 1.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | High Point | Flo-Tite | F150 | 1.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | High Point | Flo-Tite | F150 | 1.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | High Point | Flo-Tite | F150 | 1.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | High Point | Flo-Tite | F150 | 1.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | High Point | Flo-Tite | F150 | 1.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | High Point | Flo-Tite | F150 | 1.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | High Point | Flo-Tite | F150 | 1.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | High Point | Flo-Tite | F150 | 1.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Base Transfer Pipeline | Ball Valves | High Point | Flo-Tite | F150 | 1.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Ball Valves | Remote Spill Isolation | Zurik | Unmarked | 6.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Ball Valves | Isolation Valve | Tufline | Unmarked | 6.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Ball Valves | M21-NO | ULine | Illegible | 6.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Ball Valves | M20-NO | True Line | Illegible | 6.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Ball Valves | Pump 1 Issue Line | True Line | F15 | 6.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Ball Valves | A25 DP Gauge Isolation | Swagelok | SS-43GF4 | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Ball Valves | A25 DP Gauge Isolation | Swagelok | SS-43GF4 | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Ball Valves | A25 DP Isolation | Swagelok | SS-43GF4 | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Ball Valves | A24 DP Isolation | Swagelok | SS-43GF4 | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Jet A Tank | Ball Valves | PRT Drain Valve | Schultz | 1000WOG | 0.75 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Ball Valves | Receipt Pump 1 High Point | Milvaco | Illegible | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Ball Valves | Pump 2 Line Drain | Illegible | Illegible | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Ball Valves | Pump 2 Basket Strainer Drain | Illegible | Illegible | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Ball Valves | Dike Drain | Illegible | Illegible | 6.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Jet A Tank | Ball Valves | High Level Pressure Bypass Line | Ham-Let | GTP-1149 | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Ball Valves | A25 Test Port Isolation | Gammon Techical Products | GTP-1149 | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Ball Valves | A25 Test Port Isolation | Gammon Techical Products | GTP-1149 | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Ball Valves | A24 Test Port | Gammon Techical Products | GTP-1149 | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Ball Valves | A24 Test Port | Gammon Techical Products | GTP-1149 | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Jet A Tank | Ball Valves | Issue Drain Line | Flow-Tek | RPTFE | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Jet A Tank | Ball Valves | Issue Drain Line | Flow-Tek | RPTFE | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Jet A Tank | Ball Valves | Issue Line PRV Inlet Isolation Valve | Flow-Tek | RPTFE | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Ball Valves | A25 Sump Drain | Flow-Tek | RPTFE | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Jet A Tank | Ball Valves | Issue Line PRV Outlet Isolation Valve | Flow-Tek | RPTFE | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Ball Valves | A25 Sump Drain | Flow-Tek | RPTFE | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Ball Valves | A25 Sump Drain | Flow-Tek | RPTFE | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Jet A Tank | Ball Valves | Low Level Lower Isolation Valve | Flow-Tek | RPTFE | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Jet A Tank | Ball Valves | Low Level Bottom Isolation Valve | Flow-Tek | RPTFE | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Ball Valves | A25 Air Eliminator Isolation | Flow-Tek | RPTFE | 0.75 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Ball Valves | A25 Air Eliminator Isolation | Flow-Tek | RPTFE | 0.75 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Jet A Tank | Ball Valves | Low Level Upper Isolation Valve | Flow-Tek | RPTFE | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Jet A Tank | Ball Valves | Low Level Top Isolation Valve | Flow-Tek | RPTFE | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Ball Valves | A25 PRV Isolation | Flow-Tek | RPTFE | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Ball Valves | A25 High Point | Flow-Tek | RPTFE | 0.75 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Ball Valves | A25 PRV Isolation | Flow-Tek | RPTFE | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Ball Valves | A25 PRT/Low Point | Flow-Tek | RPTFE | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Ball Valves | A24 PRT/Low Point Drain | Flow-Tek | RPTFE | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Jet A Tank | Ball Valves | High Level Lower Left Isolation Valve | Flow-Tek | RPTFE | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Jet A Tank | Ball Valves | High Level Bottom Isolation Valve | Flow-Tek | RPTFE | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Jet A Tank | Ball Valves | High Level Upper Left Isolation Valve | Flow-Tek | RPTFE | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Jet A Tank | Ball Valves | High Level Top Isolation Valve | Flow-Tek | RPTFE | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Ball Valves | A24 PRV Isolation | Flow-Tek | CF8M | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Ball Valves | A24 PRV Isolation | Flow-Tek | RPTFE | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 273 | 273 Jet A Tank | 273 Receipt Pad | Ball Valves | A24 Air Eliminator Iso | Flow-Tek | RPTFE | 0.75 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact |