PWS GDF FMP Template - v2.2.xlsx
XLSX spreadsheet 63 KB Posted
- Attached to
- Sources Sought - CEHNC FUELS PROGRAM
- Solicitation number
- PANHES-25-P-0000-001794
About this file
This is a Facility Maintenance Plan (FMP) template spreadsheet containing detailed maintenance requirements and schedules for fuel facilities at Goodfellow Air Force Base in San Angelo, TX. The template includes multiple tabs for tracking facility information, maintenance tasks, filter separator schedules, and component identifiers.
The FMP template provides comprehensive guidance for contractor personnel in the operation, inspection, and maintenance of permanently installed fuel facilities, covering components like above/underground storage tanks, filter separators, valves, meters, pumps, monitoring equipment, and fire fighting systems. It includes detailed maintenance schedules and requirements for specific equipment at the facility, such as air compressors, breakaways, canopies, dispensers, and emergency equipment. The template requires tracking of unique component identifiers, maintenance frequencies, manufacturer requirements, operator requirements, and system availability impacts. This appears to be version 2.2 of a standardized template rather than a completed maintenance plan for the specific facility.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Administrative
| Location | Site Name | Goodfellow AFB Site #1 |
| RPSUID | 2127 | |
| DLA Site Code | GDF | |
| Hours of Operation | 24 Hours of Operation | |
| Address | 351 Kearney Blvd, San Angelo, TX 76908 | |
| Contract | Contractor | |
| Contract # | ||
| Local POCs | QAE Name | |
| QAE Phone | ||
| QAE Email | ||
| Alt QAE Name | ||
| Alt QAE Phone | ||
| Alt QAE Email | ||
| DLA/SCP POCs | DLA PM Name | |
| DLA PM Phone | ||
| DLA PM Email | ||
| SCP PM Name | ||
| SCP PM Phone | ||
| SCP PM Email | ||
| Contractor POCs | Contractor PM Name | |
| Contractor PM Phone | ||
| Contractor PM Email | ||
| Contractor QC Name | ||
| Contractor QC Phone | ||
| Contractor QC Email | ||
| Contractor SM Name | ||
| Contractor SM Phone | ||
| Contractor SM Email | ||
| USACE POCs | USACE PM/COR Name | |
| USACE PM/COR Phone | ||
| USACE PM/COR Email | ||
| USACE PE Name | ||
| USACE PE Phone | ||
| USACE PE Email | ||
| USACE KO Name | ||
| USACE KO Phone | ||
| USACE KO Email |
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
This table shows the minimum information required. Additional details should be included based on site specific requirements. Additional POCs may be required.
General Facility Description Facility Description
Purpose:
This Facility Maintenance Plan provides guidance for Contractor personnel in the operation, inspection, and maintenance of permanently installed fuel facilities operated under the control of the Quality Assurance Evaluators. Federal, state, and local environmental laws and regulations shall be complied with if this plan is in conflict with them.
Scope:
The instructions prescribed by this plan outline general fuels maintenance information associated with fuel storage and dispensing systems and provides the minimum periodic contractor maintenance and inspection criteria requirements for the systems. This plan is to be used in conjunction with other existing directives governing fuel system operations and maintenance requirements. Conotractor will properly maintain and repair federally funded petroleum systems and facilities in order to provide compliance with applicable code, criteria, and federal, state, local and/or host nation regulations.
Fuels Facilities:
Organizational tanks, and associated dispensing equipment are maintained and operated by the owning organization. Fuel system maintenance contractors shall perform all maintenance and associated procurement actions on installed fuel systems.
Each installation under the Southwest Division contract are military land-based facilities who receive, store, distribute, and/or dispense liquid fuels.
Standard fuel system equipment includes:
a) Above Ground Sorage Stanks (AST), Underground Storage Tanks (UST)
b) Filter/separator and other filtration device maintenance access, particularly element removal.
c) Manual valves
d) Meter Registers, and Flow Meters.
e) Control Valves.
f) Pumps
g) Tank Monitoring Equipment and Instruments
h) Alarms
i) Fire Fighting Equipment
Site Specific General Information:
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Include a general facility overview and description of each fuel system for the sites in accordance with UFC 3-460-01. Examples include: Bulk Storage Facilities, Aircraft Fueling Facilities, Marine and Dispensing Facilities, Ground Products Fueling Facilities, Alternate POL Facilities, and Support Facilities. Also include facility #s, facility names, fuel type, photos, and any other pertinent information.
Include Site Specific Conditions and Restrictions in this tab.
Communication Plan
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Communication plan shall address in/out briefs, lines of communication, coordination for access, etc.
Safety
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Site Specific Addendum and Activity Hazard Analysis, which are Attachments to the APP, specific to activities or tasks related to recurring maintenance for this site.
RM Schedule
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Link RM schedule here
Task Matrix
| Applicable Facility Assets | UFC System Level Maintenance Frequency | Special Considerations | ||||||||||||||||
| Real Property Unique Identifier | ||||||||||||||||||
| (RPUID) | Real Property Facility # | Real Property Facility Name | Operational Area | Component Type | Base Asset ID | Component Unique Identifier (CUID) | Make | Model | Capacity/Size | Q | S | A | UFC Section Reference | Additional Manufacturer RM Requirements | Operator/ equipment Requirements | System availability | Other Contract | Comments |
| 3427 | Service Station | Operations Bldg | Air Compressors | Air Compressor | Quincy | 300648 1 | N/A | X | X | 0 | Air Compressors | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | ||||
| 3427 | Service Station | Dispensers | Ball Valves | Ball Valve/Airline | Conbraco | Apollo | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. | Partial System OOS | ||||
| 3427 | Service Station | Dispensers | Ball Valves | Ball Valve/Airline | Conbraco | Apollo | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | ||||
| 3427 | Service Station | Operations Bldg | Ball Valves | Ball Valve | MCD | WOG600 | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | ||||
| 3427 | Service Station | Operations Bldg | Ball Valves | Ball Valve | MCD | WOG600 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | ||||
| 3427 | Service Station | Dispensers | Breakaways | Mogas Dispenser 4 Breakaway | Husky | Unmarked | 0.75 in. | 0 | 0 | 0 | 7-4 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect breakaways for loose connections and signs of damage to poppets. Ensure breakaways are clean and free of fuel. | |||||
| Monthly - Inspect breakaway for an expiration date established by the manufacturer. Breakaways must be replaced before the indicated expiration date. | No Mission Impact | |||||||||||||||||
| 3427 | Service Station | Dispensers | Breakaways | DS2 Dispenser 3 Breakaway | Husky | Unmarked | 0.75 in. | 0 | 0 | 0 | 7-4 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect breakaways for loose connections and signs of damage to poppets. Ensure breakaways are clean and free of fuel. | |||||
| Monthly - Inspect breakaway for an expiration date established by the manufacturer. Breakaways must be replaced before the indicated expiration date. | No Mission Impact | |||||||||||||||||
| 3427 | Service Station | Dispensers | Breakaways | DS2 Dispenser 1 Breakaway | Husky | Unmarked | 0.75 in. | 0 | 0 | 0 | 7-4 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect breakaways for loose connections and signs of damage to poppets. Ensure breakaways are clean and free of fuel. | |||||
| Monthly - Inspect breakaway for an expiration date established by the manufacturer. Breakaways must be replaced before the indicated expiration date. | No Mission Impact | |||||||||||||||||
| 3427 | Service Station | Dispensers | Breakaways | Mogas Dispenser 2 Breakaway | Husky | Unmarked | 0.75 in. | 0 | 0 | 0 | 7-4 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect breakaways for loose connections and signs of damage to poppets. Ensure breakaways are clean and free of fuel. | |||||
| Monthly - Inspect breakaway for an expiration date established by the manufacturer. Breakaways must be replaced before the indicated expiration date. | No Mission Impact | |||||||||||||||||
| 3427 | Service Station | Dispensers | Canopies | Canopy | Unmarked | Unmarked | N/A | X | X | 0 | 11-2.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | ||||
| 3427 | Service Station | Dispensers | Dispenser Cabinet | Mogas Dispenser 4 | Wayne | 3/G7201D/29GHJ/H | N/A | 0 | 0 | X | 7-7 | Inspect for damage, ensure door panels and locks are functional. | Monthly - Inspect outside of cabinet and ensure it is free of damage. Inspect for fuel stains on the concrete island around the cabinet and on the outside of the cabinet. Ensure the cabinet is free of dirt and fuel. Open both sides of the cabinet and inspect the inside of the cabinet. Ensure the inside of the cabinet and all of the components inside the cabinet are clean and free of fuel. | Partial System OOS | ||||
| 3427 | Service Station | Dispensers | Dispenser Cabinet | DS2 Dispenser 3 | Wayne | 3/G7201D/29GHJ/H | N/A | 0 | 0 | X | 7-7 | Inspect for damage, ensure door panels and locks are functional. | Monthly - Inspect outside of cabinet and ensure it is free of damage. Inspect for fuel stains on the concrete island around the cabinet and on the outside of the cabinet. Ensure the cabinet is free of dirt and fuel. Open both sides of the cabinet and inspect the inside of the cabinet. Ensure the inside of the cabinet and all of the components inside the cabinet are clean and free of fuel. | Partial System OOS | ||||
| 3427 | Service Station | Dispensers | Dispenser Cabinet | Mogas Dispenser 2 | Wayne | 3/G7201D/29GHJ/H | N/A | 0 | 0 | X | 7-7 | Inspect for damage, ensure door panels and locks are functional. | Monthly - Inspect outside of cabinet and ensure it is free of damage. Inspect for fuel stains on the concrete island around the cabinet and on the outside of the cabinet. Ensure the cabinet is free of dirt and fuel. Open both sides of the cabinet and inspect the inside of the cabinet. Ensure the inside of the cabinet and all of the components inside the cabinet are clean and free of fuel. | Partial System OOS | ||||
| 3427 | Service Station | Dispensers | Dispenser Cabinet | DS2 Dispenser 1 | Wayne | 3/G7201D/29GHJ/H | N/A | 0 | 0 | X | 7-7 | Inspect for damage, ensure door panels and locks are functional. | Monthly - Inspect outside of cabinet and ensure it is free of damage. Inspect for fuel stains on the concrete island around the cabinet and on the outside of the cabinet. Ensure the cabinet is free of dirt and fuel. Open both sides of the cabinet and inspect the inside of the cabinet. Ensure the inside of the cabinet and all of the components inside the cabinet are clean and free of fuel. | Partial System OOS | ||||
| 3427 | Service Station | Dispensers | Dispenser Filters | Mogas Dispenser 4 Filter | PetroClear | 40530P-AD | 0.05 in. | 0 | 0 | X | 7-9 | Check exterior for damage | No Operator Requirement | Partial System OOS | ||||
| 3427 | Service Station | Dispensers | Dispenser Filters | DS2 Dispenser 1 Filter | PetroClear | 40530P-AD | 0.05 in. | 0 | 0 | X | 7-9 | Check exterior for damage | No Operator Requirement | Partial System OOS | ||||
| 3427 | Service Station | Dispensers | Dispenser Filters | DS2 Dispenser 3 Filter | PetroClear | 40530P-AD | 0.05 in. | 0 | 0 | X | 7-9 | Check exterior for damage | No Operator Requirement | Partial System OOS | ||||
| 3427 | Service Station | Dispensers | Dispenser Filters | Mogas Dispenser 2 Filter | PetroClear | 40530P-AD | 0.05 in. | 0 | 0 | X | 7-9 | Check exterior for damage | No Operator Requirement | Partial System OOS | ||||
| 3427 | Service Station | Dispensers | Dispenser Hoses | Mogas Dispenser 4 Hose | Flex-ing | 559N | 0.75 in. | 0 | 0 | 0 | 7-3 | Check for expiration date, and physical condition/damage leaks. | Daily - Inspect dispenser hoses and hose whips for gouges, cuts, blisters, or outside wear that may lead to rupture during use. Replace hose or hose whips that show signs of wear. Inspect connection points of hoses and hose whips to the dispenser, breakaways, swivels, and the nozzle and ensure the connection points are clean and free of fuel. | Partial System OOS | ||||
| 3427 | Service Station | Dispensers | Dispenser Hoses | DS2 Dispenser 3 Hose | Husky | EagleFlex | 0.75 in. | 0 | 0 | 0 | 7-3 | Check for expiration date, and physical condition/damage leaks. | Daily - Inspect dispenser hoses and hose whips for gouges, cuts, blisters, or outside wear that may lead to rupture during use. Replace hose or hose whips that show signs of wear. Inspect connection points of hoses and hose whips to the dispenser, breakaways, swivels, and the nozzle and ensure the connection points are clean and free of fuel. | Partial System OOS | ||||
| 3427 | Service Station | Dispensers | Dispenser Hoses | DS2 Dispenser 1 Hose | Husky | EagleFlex | 0.75 in. | 0 | 0 | 0 | 7-3 | Check for expiration date, and physical condition/damage leaks. | Daily - Inspect dispenser hoses and hose whips for gouges, cuts, blisters, or outside wear that may lead to rupture during use. Replace hose or hose whips that show signs of wear. Inspect connection points of hoses and hose whips to the dispenser, breakaways, swivels, and the nozzle and ensure the connection points are clean and free of fuel. | Partial System OOS | ||||
| 3427 | Service Station | Dispensers | Dispenser Hoses | Mogas Dispenser 2 Hose | Flex-Ing | 559N | 0.75 in. | 0 | 0 | 0 | 7-3 | Check for expiration date, and physical condition/damage leaks. | Daily - Inspect dispenser hoses and hose whips for gouges, cuts, blisters, or outside wear that may lead to rupture during use. Replace hose or hose whips that show signs of wear. Inspect connection points of hoses and hose whips to the dispenser, breakaways, swivels, and the nozzle and ensure the connection points are clean and free of fuel. | Partial System OOS | ||||
| 3427 | Service Station | Dispensers | Dispenser Meters | Mogas Dispenser 4 Meter | Wayne | DM1 | 0-15 GPM/SCFM | 0 | 0 | X | 7-8 | Inspect for damage, smooth operation and legibility. | Monthly - Inspect meter and ensure meter is clean and free of fuel. Ensure calibration mechanism is sealed. | Partial System OOS | ||||
| 3427 | Service Station | Dispensers | Dispenser Meters | DS2 Dispenser 3 Meter | Wayne | DM1 | 0-15 GPM/SCFM | 0 | 0 | X | 7-8 | Inspect for damage, smooth operation and legibility. | Monthly - Inspect meter and ensure meter is clean and free of fuel. Ensure calibration mechanism is sealed. | Partial System OOS | ||||
| 3427 | Service Station | Dispensers | Dispenser Meters | Mogas Dispenser 2 Meter | Wayne | DM1 | 0-15 GPM/SCFM | 0 | 0 | X | 7-8 | Inspect for damage, smooth operation and legibility. | Monthly - Inspect meter and ensure meter is clean and free of fuel. Ensure calibration mechanism is sealed. | Partial System OOS | ||||
| 3427 | Service Station | Dispensers | Dispenser Meters | DS2 Dispenser 1 Meter | Wayne | DM1 | 0-15 GPM/SCFM | 0 | 0 | X | 7-8 | Inspect for damage, smooth operation and legibility. | Monthly - Inspect meter and ensure meter is clean and free of fuel. Ensure calibration mechanism is sealed. | Partial System OOS | ||||
| 3427 | Service Station | Dispensers | Dispenser Nozzles | Mogas Dispenser 4 Nozzle | Husky | Unmarked | 0.75 in. | 0 | 0 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | |||||||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | Partial System OOS | |||||||||||||
| 3427 | Service Station | Dispensers | Dispenser Nozzles | Mogas Dispenser 2 Nozzle | Husky | Unmarked | 0.75 in. | 0 | 0 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | |||||||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | Partial System OOS | |||||||||||||
| 3427 | Service Station | Dispensers | Dispenser Nozzles | DS2 Dispenser 1 Nozzle | Husky | Unmarked | 0.75 in. | 0 | 0 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | |||||||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | Partial System OOS | |||||||||||||
| 3427 | Service Station | Dispensers | Dispenser Nozzles | DS2 Dispenser 3 Nozzle | Husky | Unmarked | 0.75 in. | 0 | 0 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | |||||||||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | Partial System OOS | |||||||||||||||
| 3427 | Service Station | Dispensers | Dispenser Sumps | Dispenser Sump | Unmarked | Unmarked | N/A | X | X | X | 7-13 | Inspect sump pipe transition fittings for tears, cracks, or other signs of deterioration. Test sumps and ensure they are liquid tight by using vacuum, pressure, or liquid testing in accordance with 40 CFR 280, Section 43. | Monthly - Inspect for signs of water, fuel, trash, and debris inside sumps. Remove and properly dispose of collected water, fuel, trash, and debris. Visually inspect penetration fittings. If fuel or water is detected investigate the source and repair. | Partial System OOS | ||
| 3427 | Service Station | Dispensers | Electrical Equipment | Emergency Fuel Shutoff | Power Integrity Corp | ESOCA/T/RD | N/A | X | X | 0 | 9-1.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | ||
| 3427 | Service Station | Operations Bldg | Electrical Equipment | Emergency Fuel Shutoff Button | Power Integrity Corp | ESOCA/T/RD | N/A | X | X | 0 | 9-1.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | ||
| 3427 | Service Station | Operations Bldg | Electronic Equipment | Automatic Tank Gauge | Ronan | X76CTM-4X | N/A | 0 | 0 | X | 9-1.9 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | ||
| 3427 | Service Station | Dispensers | Emergency Eyewash/Showers | Emergency Eyewash/Shower | Unmarked | Unmarked | N/A | X | X | X | 11-3 | Weekly - Equipment installed within 10 seconds from the hazard and on the same plane as the hazard Pathway is clear of obstructions Plumbed equipment activated to ensure compliant operation and to clear any sediment Self-contained equipment checked to determine if the flushing fluid needs to be changed or supplemented Equipment free of broken or missing parts Equipment protected against freezing User protected from scalding water | No Operator Requirement | No Mission Impact | ||
| 3427 | Service Station | Dispensers | Emergency Shutoff Valves | Shear Valve/Mogas Dispenser 4 | Unmarked | Unmarked | 1.5 in. | 0 | 0 | X | 7-12 | Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. Inspect mechanical links of the valve for correct operation. Conduct test of valve to ensure it operates correctly. | Monthly - Inspect stabilizer bar to ensure that it is securely mounted below the base of the dispenser. Inspect the mounting bolts that secure the emergency shutoff valve to the stabilizer bar. Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. | Partial System OOS | ||
| 3427 | Service Station | Dispensers | Emergency Shutoff Valves | Mogas Dispenser 2 Shear Valve | Unmarked | Unmarked | 1.5 in. | 0 | 0 | X | 7-12 | Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. Inspect mechanical links of the valve for correct operation. Conduct test of valve to ensure it operates correctly. | Monthly - Inspect stabilizer bar to ensure that it is securely mounted below the base of the dispenser. Inspect the mounting bolts that secure the emergency shutoff valve to the stabilizer bar. Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. | Partial System OOS | ||
| 3427 | Service Station | Dispensers | Emergency Shutoff Valves | DS2 Dispenser 1 Shear Valve | Unmarked | Unmarked | 1.5 in. | 0 | 0 | X | 7-12 | Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. Inspect mechanical links of the valve for correct operation. Conduct test of valve to ensure it operates correctly. | Monthly - Inspect stabilizer bar to ensure that it is securely mounted below the base of the dispenser. Inspect the mounting bolts that secure the emergency shutoff valve to the stabilizer bar. Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. | Partial System OOS | ||
| 3427 | Service Station | Dispensers | Emergency Shutoff Valves | DS2 Dispenser 3 Shear Valve | Unmarked | Unmarked | 1.5 in. | 0 | 0 | X | 7-12 | Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. Inspect mechanical links of the valve for correct operation. Conduct test of valve to ensure it operates correctly. | Monthly - Inspect stabilizer bar to ensure that it is securely mounted below the base of the dispenser. Inspect the mounting bolts that secure the emergency shutoff valve to the stabilizer bar. Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. | Partial System OOS | ||
| 3427 | Service Station | Operations Bldg | Externally Mounted Level Alarms | Level Alarm | Veeder Root | Unmarked | N/A | 0 | 0 | 0 | 8-9.9.1 | 1. Remove the installation crank and thumbscrew. |
2. When a transmitter or other auxiliary equipment is to be installed, ensure the equipment hole size and bolt pattern matches the 2500 ATG. Remove and discard the cap and red fiber washers from the back cover. Each transmitter’s slotted coupling should properly engage the sprocket sheave auxiliary drive pin. Use the cap screws to attach the transmitter to the back cover. Refer to the transmitter documentation for detailed installation, configuration, and operation.
3. Replace the back cover and its gasket.
4. Torque the back cover bolts to 6 ft-lb. Do not over-torque!
5. Replace the bolts, gaskets, and covers on the elbows.
6. Close the tank manholes and inspection covers.
| 7. Check the operation of the auxiliary unit as appropriate | Daily - Visually inspect the gauge to ensure the power is on, there are no warning alarms or lights and a liquid measurement is indicated and the tank level reading appears to be accurate. | Partial System OOS | ||||||||||||||
| 3427 | Service Station | Dispensers | Hose Retriever | Mogas Dispenser 4 Hose Retractor | CNI | Unmarked | N/A | 0 | 0 | 0 | 7-6 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | ||
| 3427 | Service Station | Dispensers | Hose Retriever | Mogas Dispenser 2 Retractor | CNI | Unmarked | N/A | 0 | 0 | 0 | 7-6 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | ||
| 3427 | Service Station | Dispensers | Hose Retriever | DS2 Dispenser 1 Retractor | CNI | Unmarked | N/A | 0 | 0 | 0 | 7-6 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | ||
| 3427 | Service Station | Dispensers | Hose Retriever | DS2 Dispenser 3 Retractor | CNI | Unmarked | N/A | 0 | 0 | 0 | 7-6 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | ||
| 3427 | Service Station | Dispensers | Lighting | Canopy Lighting | Unmarked | Unmarked | N/A | X | X | X | 9-1.8 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | ||
| 3427 | Service Station | Operations Bldg | Lighting | Area Lighting | Unmarked | Unmarked | N/A | X | X | X | 9-1.8 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | ||
| 3427 | Service Station | Dispensers | Lightning Protection Systems | Canopy Lightning Protection | Unmarked | Unmarked | N/A | 0 | 0 | X | 9-4 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | No Mission Impact | ||
| 3427 | Service Station | Operations Bldg | Pressure and Pressure/Vacuum Gauges | Pressure Gauge | Unmarked | Unmarked | 0.25 in. 0 - 300 PSI | X | X | X | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. | Partial System OOS | ||
| 3427 | Service Station | Dispensers | Static Grounding Systems | Ground Reel | Hannay | HGR 50-50 | N/A | X | X | X | 9-1.6.2 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | Partial System OOS | ||
| 3427 | Service Station | Dispensers | Swivels | Mogas Dispenser 2 Swivel | Husky | Unmarked | 0.75 in. | 0 | 0 | 0 | 7-5 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect swivel for loose connections and signs of damage. Ensure swivel rotates easily and is clean and free of fuel. | |||
| Monthly - Inspect swivel for expiration date established by manufacturer. Swivels must be replaced before the indicated expiration date. | Partial System OOS | |||||||||||||||
| 3427 | Service Station | Dispensers | Swivels | Mogas Dispenser 2 Swivel | Husky | GNF600 | 0.75 in. | 0 | 0 | 0 | 7-5 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect swivel for loose connections and signs of damage. Ensure swivel rotates easily and is clean and free of fuel. | |||
| Monthly - Inspect swivel for expiration date established by manufacturer. Swivels must be replaced before the indicated expiration date. | Partial System OOS | |||||||||||||||
| 3427 | Service Station | Dispensers | Swivels | DS2 Dispenser 1 Swivel | Husky | GKO140 | 0.75 in. | 0 | 0 | 0 | 7-5 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect swivel for loose connections and signs of damage. Ensure swivel rotates easily and is clean and free of fuel. | |||
| Monthly - Inspect swivel for expiration date established by manufacturer. Swivels must be replaced before the indicated expiration date. | Partial System OOS | |||||||||||||||
| 3427 | Service Station | Dispensers | Swivels | DS2 Dispenser 1 Swivel | Husky | GKO140 | 0.75 in. | 0 | 0 | 0 | 7-5 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect swivel for loose connections and signs of damage. Ensure swivel rotates easily and is clean and free of fuel. | |||
| Monthly - Inspect swivel for expiration date established by manufacturer. Swivels must be replaced before the indicated expiration date. | Partial System OOS | |||||||||||||||
| 3427 | Service Station | Dispensers | Swivels | DS2 Dispenser 3 Swivel | Husky | GKO140 | 0.75 in. | 0 | 0 | 0 | 7-5 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect swivel for loose connections and signs of damage. Ensure swivel rotates easily and is clean and free of fuel. | |||
| Monthly - Inspect swivel for expiration date established by manufacturer. Swivels must be replaced before the indicated expiration date. | Partial System OOS | |||||||||||||||
| 3427 | Service Station | Dispensers | Swivels | DS2 Dispenser 3 Swivel | Husky | DCV100 | 0.75 in. | 0 | 0 | 0 | 7-5 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect swivel for loose connections and signs of damage. Ensure swivel rotates easily and is clean and free of fuel. | |||
| Monthly - Inspect swivel for expiration date established by manufacturer. Swivels must be replaced before the indicated expiration date. | Partial System OOS | |||||||||||||||
| 3427 | Service Station | Dispensers | Swivels | Mogas Dispenser 4 Swivel | Husky | GNG630 | 0.75 in. | 0 | 0 | 0 | 7-5 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect swivel for loose connections and signs of damage. Ensure swivel rotates easily and is clean and free of fuel. | |||
| Monthly - Inspect swivel for expiration date established by manufacturer. Swivels must be replaced before the indicated expiration date. | Partial System OOS | |||||||||||||||
| 3427 | Service Station | Dispensers | Swivels | Mogas Dispenser 4 Swivel | Husky | GNG630 | 0.75 in. | 0 | 0 | 0 | 7-5 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect swivel for loose connections and signs of damage. Ensure swivel rotates easily and is clean and free of fuel. | |||
| Monthly - Inspect swivel for expiration date established by manufacturer. Swivels must be replaced before the indicated expiration date. | Partial System OOS | |||||||||||||||
| 3431 | Mogas Tank | Mogas Tank | Electronic Equipment | ATG | Ronan | Unmarked | N/A | 0 | 0 | X | 9-1.9 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | ||
| 3431 | Mogas Tank | Mogas Tank | Underground Double-walled Shop-Fabricated Tanks | Mogas Tank | Unmarked | Unmarked | 12,000 Gallons | X | X | X | 8-5.4.2 | No Manufacturer Requirements Available | Monthly - Monthly External Inspection (Identified as P in Table 8-4): Ensure all tank port covers are present, are in good condition, and seated firmly on the correct tank. Inspect tank stick gauge and ensure markings are legible and that the stick gauge is not warped or broken. Inspect tank for water using ATG or stick gauge with water-finding paste. Remove water found in tank. Open and inspect tank-top containment sumps and ensure no fuel or water is collected in the sumps. Check for and remove obstructions in tank fill pipe. | Partial System OOS | ||
| 3431 | Mogas Tank | Mogas Tank | Vertical Turbine/Submerged Turbine Pumps | Mogas Pump | Red Jacket | Illegible | 0-15 GPM/SCFM | X | X | X | 3-8.1.3 | During routine pump inspections only the easy to monitor factors such as pressure, temperature, vibration etc can be checKed. But during quarterly inspections, shaft alignment and oil levels should also be checked. Change Oil Annually | No Operator Requirements | Partial System OOS | ||
| 3432 | Diesel Tank | Diesel Tank | Electronic Equipment | ATG | Ronan | Unmarked | N/A | 0 | 0 | X | 9-1.9 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | ||
| 3432 | Diesel Tank | Diesel Tank | Underground Double-walled Shop-Fabricated Tanks | Diesel Tank | Unmarked | Unmarked | 12,000 Gallons | X | X | X | 8-5.4.2 | No Manufacturer Requirements Available | Monthly - Monthly External Inspection (Identified as P in Table 8-4): Ensure all tank port covers are present, are in good condition, and seated firmly on the correct tank. Inspect tank stick gauge and ensure markings are legible and that the stick gauge is not warped or broken. Inspect tank for water using ATG or stick gauge with water-finding paste. Remove water found in tank. Open and inspect tank-top containment sumps and ensure no fuel or water is collected in the sumps. Check for and remove obstructions in tank fill pipe. | Partial System OOS | ||
| 3432 | Diesel Tank | Diesel Tank | Vertical Turbine/Submerged Turbine Pumps | Diesel Pump | Red Jacket | Illegible | 0-15 GPM/SCFM | X | X | X | 3-8.1.3 | During routine pump inspections only the easy to monitor factors such as pressure, temperature, vibration etc can be checKed. But during quarterly inspections, shaft alignment and oil levels should also be checked. Change Oil Annually | No Operator Requirements | Partial System OOS |
&"Times New Roman,Bold"&14Facility Maintenance Plan
FMP v2.2 2
Instructions:
1. Input all data as indicated on the sheet.
2. Additional documents referred to in the Special Considerations column shall be included as an appendix to this FMP.
3. The contractor shall generate a Component Unique Identifier (CUID) for each component utilizing the Component Acronym Sheet within this Work Book. The unique identifier must use the following:
Three letter Site Code - Facility # - Component Acronym - Sequential number Example: AAD-00063A-RCVL-0001
If component acronym is not listed, the contractor shall request an acronym be established through the HNC Project Manager and Project Engineer via email. Contractors may utilize other means of tracking/labeling assets such as QR codes in addition to the required CUID however, tracking/labeling must correlate with the CUID. This CUID shall be the standard for all DLA capitalized equipment. Base Asset ID if used by site shall be cross referenced with CUID appropriately.
4. Utilize the UFC Section Reference Work Category as noted on the Component Acronym Sheet.
5. Enter any applicable manufacturer requirements not stated in the UFC. References are acceptable with attachments.
6. Enter any applicable operator support or government owned equipment required to complete the RM task.
7. Enter impact on system availability by performing the RM task. This could include shutdown, lockout, or similar impacts.
8. Enter contract information for any other contract, contractor, or government personnel performing the applicable task. This is applicable to other Centrally Managed Programs, SRM, MILCON, or Public Works/Civil Engineering projects.
9. Print Hard Copies as 11x17.
FS-PF Schedule
| FILTER SEPARATOR/PRE-FILTER MAINTENANCE SCHEDULES | |||||||||||||
| Applicable Facility Assets | Coalescer/Separator Information | Special Considerations | |||||||||||
| Real Property Unique Identifier | |||||||||||||
| (RPUID) | Real Property Facility # | Real Property Facility Name | Operational Area | Component Type | Base Asset ID | Component Unique Identifier (CUID) | Make | Model | Capacity (GPM) | UFC Section Reference | Number of Coalescer Cartridges | Number of | |
| Separator Cartridges | Coalescer Cartridges | ||||||||||||
| Model # | Separator Cartridge | ||||||||||||
| Model # | Clean or Replace | ||||||||||||
| Separator Cartridge | Gasket | ||||||||||||
| Model # | Date Last Replaced | Replacement Due Date | Operator/Equipment Requirements | System Availability | Site Self Performs | ||||||||
| (Y/N) | Comments |
&"Times New Roman,Bold"&14Facility Maintenance Plan
FMP v2.2 2
Instructions:
1. Input all data as indicated on the sheet.
2. Additional documents referred to in the Special Considerations column shall be included as an appendix to this FMP.
3. The contractor shall generate a Component Unique Identifier (CUID) for each component utilizing the Component Acronym Sheet within this Work Book. The unique identifier must use the following:
Three letter Site Code - Facility # - Component Acronym - Sequential number Example: AAD-00063A-RCVL-0001
If component acronym is not listed, the contractor shall request an acronym be established through the HNC Project Manager and Project Engineer via email. Contractors may utilize other means of tracking/labeling assets such as QR codes in addition to the required CUID however, tracking/labeling must correlate with the CUID. This CUID shall be the standard for all DLA capitalized equipment.
4. Utilize the UFC Section Reference Work Category as noted on the Component Acronym Sheet.
5. Enter any applicable manufacturer requirements not stated in the UFC. References are acceptable with attachments.
6. Enter any applicable operator support or government owned equipment required to complete the RM task.
7. Enter impact on system availability by performing the RM task. This could include shutdown, lockout, or similar impacts.
8. Filter Separators and Pre-Filters identified here shall also be provided in the Task Matrix Tab.
9. Print Hard Copies as 11x17.
Component Acronym
| Component Unique Identifier: | Site Code-Facility #-Component Acronym-Sequential # | ||
| Example: | AAD-00063A-RCVL-0001 | ||
| NOTE: If component acronym is not listed, the contractor shall request an acronym be established through the HNC Project Manager and Project Engineer via email. Contractors may utilize other means of tracking/labeling assets such as QR codes in addition to the required CUID however, tracking/labeling must correlate with the CUID. This CUID shall be the standard for all DLA capitalized equipment | |||
| DLA Work Type Category | UFC Section Reference Work Category | ||
| (Revised per Change 1, 29 April 2021) | Component Acronym | ||
| Air Compressors | Air Compressors | AIRC | |
| Alarms | Externally Mounted Level Alarms (Section 8-9.9.1) | EMLA | |
| Internally Mounted Level Alarms (Section 8-9.9.3) | IMLA | ||
| Bollard | Bollards | BLRD | |
| Building | Building HVAC | BHVAC | |
| Building Domestic Water System | BWTR | ||
| Building Waste Water | BWSW | ||
| Building - Lighting | BLTG | ||
| Building - Architectural | BARCH | ||
| Building - Fire Sprinkler System | BFIRE | ||
| Containment/Joints | Containment Systems (General) (Section 8-10.1) | CSGEN | |
| Concrete and Cement Brick Dike/Berm Walls (Section 8-10.2.1) | DKBW | ||
| Dike/Berm Floors (Section 8-10.2.2) | DKBF | ||
| Earthen Dike Walls (Section 8-10.3) | ETHDW | ||
| Self-Diking or Vaulted Tank Containment (Section 8-10.4) | SDVTCS | ||
| Flexible Membrane Liners (Section 8-10.5) | FXML | ||
| Fuel Truck and Rail Car Containment Areas (Section 11-1.1) | FTKRCC | ||
| Remote Spill Containment (Section 11-1.2) | RSCS | ||
| Piers and Wharves Fuel Containment Systems (Section 5-1.2) - Testing | FPWCT | ||
| Fuel Pier/Wharf Containment (PWS Section 3) | FPWC | ||
| Corrosion Control/Coatings | Aboveground Piping and Equipment Coatings (Section 6-10.1) | AGPCT | |
| Miscellaneous | Miscellaneous Deactivated Components (Section 12-5) | MDEAC | |
| Electrical/Lighting | Lighting (Section 9-1.8) | LIGHT | |
| Electrical/Power | Electrical Equipment (Section 9-1.2) | ELEQ | |
| Power Cables (Section 9-1.3) | PWRCBL | ||
| Motor Controls (Section 9-1.4) | MTRCT | ||
| Panelboards (Section 9-1.5) | PNLB | ||
| Electric Motors (Section 9-1.7) | ELEMT | ||
| Electronic Equipment (9-1.9) | ELTREQ | ||
| Card and Key Locks (Section 9-3) | CKLK | ||
| Electrical/Protection | Power Grounding Systems (Section 9-1.6.1) | PWRGS | |
| Static Grounding Systems (Section 9-1.6.2) | STGS | ||
| Cathodic Protection (Section 9-2.1) | CP | ||
| Lightning Surge Arresters (Section 9-2.2.1) | LSAR | ||
| Lightning Protection Systems (Section 9-4) | LPTS | ||
| Ground Verification System (Section 9-5) | GRVS | ||
| Electronic Overfill Protection Systems (Section 9-6) | EOPS | ||
| Eyewash/Shower | Emergency Eyewash/Showers (Section 11-3) | EMEWSH | |
| Fencing/ | |||
| Gates | Fencing | FENC | |
| Gates | GATE | ||
| Filtration | Pre-Filters (Section 3-6.1) | PFVSL | |
| Filter Separators (Section 3-6.2) | FLSP | ||
| Haypack Filters (Section 3-6.3) | HPKF | ||
| Basket Strainers (Section 3-6.4) | BSTR | ||
| Filter Separator Sump Heaters (Section 3-6.5) | FSSH | ||
| Sidestream Filtration Systems (Section 8-9.11) | SSFTS | ||
| Fire Suppression Equipment | Flame Arrestors (Section 8-9.5) | FLMARR | |
| Foam Fire Protection Systems (Section 8-9.15) | FFPS | ||
| Fire Protection Systems - Wet Pipe | FPRS | ||
| Fuel Laboratories | Ventilation Hoods (Section 11-4.1) | VENTHD | |
| Gauges | Pressure and Pressure/Vacuum Gauges (Section 6-7.1) | PVGA | |
| Differential Pressure Gauges (Section 6-7.2) | DPGA | ||
| Mechanical Tape Gauges (Section 8-9.7) | MTGA | ||
| Mechanically Operated Tape Gauge (Section 8-9.8.1) | MOTGA | ||
| Magnetostrictive Probes (Section 8-9.8.2) | MRPRB | ||
| Servo Gauge (Section 8-9.8.3) | SRVGA | ||
| Generators | Back-Up Power Generators | BGEN | |
| Heating Coils | Steam Type Heating Coils (Section 8-9.16.1) | STHC | |
| Thermal Fluid Type Heating Coils (Section 8-9.16.2) | TFTHC | ||
| Electric Rod Type Heating (Section 8-9.16.3) | ERTH | ||
| Hoses | Loading Fuel Hoses (Section 3-9.1) | LDHS | |
| Offloading Fuel Hoses (Section 3-9.2) | OLHS | ||
| Aircraft Fueling Hoses (Section 4-7.5) | ACFHS | ||
| Hydrazine | Hydrazine Charging Units (Section 10-3) | HDZCU | |
| Inspections | Trouble Shoot | TRBST | |
| API 510 Inspections | API510 | ||
| API 653 or STI Inspection | API653 | ||
| Coatings Condition Survey | CCS | ||
| Issue/Receive - Ground | Dispenser Nozzles (Section 7-2) | DSNZ | |
| Dispenser Hoses (Section 7-3) | DSHS | ||
| Breakaways (Section 7-4) | DSBW | ||
| Swivels (Section 7-5) | DSSW | ||
| Hose Retriever (Section 7-6) | HSRTV | ||
| Dispenser Cabinet (Section 7-7) | DSCB | ||
| Dispenser Meters (Section 7-8) | DSMTR | ||
| Dispenser Filters (Section 7-9) | DSFLR | ||
| Dispenser Strainers (Section 7-10) | DSSTR | ||
| Ground Vehicle Fuel Piping (Section 7-11) | GVFP | ||
| Emergency Shutoff Valves (Shear Valves) (Section 7-12) | ESHVL | ||
| Dispenser Sumps (Section 7-13) | DSSMP | ||
| Transition Sumps (Section 7-14) | TRSMP | ||
| Remote Dispenser Pumps (Section 7-15.1) | RDSP | ||
| Self-Contained Dispenser Pumps (Section 7-15.2) | SCDSP | ||
| EFSO Systems (Section 7-16) | EFSO | ||
| Stage I Vapor Recovery (Section 7-17.1) | SIVP | ||
| Stage II Vapor Recovery (Section 7-17.2) | SIIVP | ||
| Vapor Burners (Section 7-17.3) | VPBNR | ||
| Point Sensor - Dry (Section 7-19.1.1) | PSDRY | ||
| Automatic Line Leak Detector (Section 7-19.1.2) | ALLD | ||
| Visual Monitoring (Section 7-20.1) | VSLM | ||
| Issue/Receive - Marine | Marine Receipt (Section 5-2) | MRNRCP | |
| Marine Issue (Section 5-3) | MRNISU | ||
| Marine Loading Arms (Section 5-4) | MRNLA | ||
| Marine Transfer Hoses (Section 5-5.1) | MBTHS | ||
| Underwater Hoses (Section 5-5.2) | UWHS | ||
| Single Point Mooring Systems (Section 5-7.1) | SPMSS | ||
| Multi Point Mooring Systems (Section 5-7.2) | MPMSS | ||
| Submerged Piping Systems (Section 5-8) | SMPS | ||
| Boom Reels (Section 5-9) | BMRL | ||
| Liquefied Petroleum | Liquefied Petroleum Tanks (Section 10-1.1) | LPTANK | |
| Liquefied Petroleum Pipelines (Section 10-1.2) | LPPIPE | ||
| Liquefied Petroleum Vapor Lines (Section 10-1.3) | LPVPL | ||
| LPG Vaporizers (Section 10-1.4) | LPGVPZ | ||
| Petroleum Gas Regulators (Section 10-1.5) | PGREG | ||
| Liquefied Petroleum Gas Hoses (Section 10-1.6) | LPGHS | ||
| Meter/ | |||
| calibrations | Positive Displacement Meters (Section 3-7.1) | PDMT | |
| Turbine Flow Meters (Section 3-7.2) | TBFMT | ||
| Orifice Flow Meters (Section 3-7.3) | OFMT | ||
| Natural Disaster | Natural Disaster | ||
| Natural Gas | CNG Piping (Section 10-2.1) | NGPIPE | |
| CNG Compressors (Section 10-2.2) | NGCOMP | ||
| CNG Storage (Section 10-2.3) | NGSTOR | ||
| CNG Dispensers (Section 10-2.4) | NGDS | ||
| CNG Dispenser Hoses (Section 10-2.5) | NGDSHS | ||
| Nozzle | Hydrant Adapters (Section 4-7.2) | HADP | |
| Fueling Nozzles (Section 4-7.3) | FLNZ | ||
| Other | Fuel Additive Injectors (Section 3-11) | FAIJ | |
| Pantograph | Fixed Pantographs (Section 4-7.1.1) | FXPNT | |
| Detachable Pantographs (Section 4-7.1.2) | DTPNT | ||
| Piping | On-Base Pipelines (Section 6-1.1) | OBPL | |
| Non-DOT Regulated (Section 6-1.2.1) | NDPL | ||
| Aboveground Piping (Section 6-1.3) | AGPL | ||
| Double-Wall Piping (Section 6-1.4) | DWPL | ||
| Low Point Drains (Section 6-12.1) | LPDN | ||
| High Point Vents (Section 6-12.2) | HPVT | ||
| Sight Flow Indicators (Section 6-12.3) | SFND | ||
| Rope Sensor Systems (Section 6-13.1.1) | RPSS | ||
| Point Sensor - Dry (Section 6-13.1.2) | PSDRY | ||
| Visual Monitoring (Section 6-14.1) | VSLM | ||
| Pipe Penetrations (Section 8-10.6) | PPEN | ||
| Deactivated Petroleum Fuel Pipelines (Section 12-3) | DEACPL | ||
| Pressure/Temperature Control | Air Eliminator Tanks (Section 3-10.1) | AELT | |
| Automatic Air Vents (Section 3-10.2) | AAVT | ||
| Surge Suppressors (Section 4-7.4) | SRGSP | ||
| Thermal and Pressure Relief Valves (Section 6-6.3) | TPRVL | ||
| Pressure Transmitters (Section 6-7.3) | PRTR | ||
| Differential Pressure Transmitters (Section 6-7.4) | DPTR | ||
| Flexible Ball Joints (Section 6-8) | FBLJT | ||
| Dial Thermometer (Section 6-9.1) | DTHMR | ||
| Emergency Vents (Section 8-9.4) | EMGVT | ||
| Pump | Centrifugal Pumps (Section 3-8.1) | CENP | |
| Vertical Inline Pumps (Section 3-8.2) | VILP | ||
| Vertical Turbine/Submerged Turbine Pumps (Section 3-8.3) | VTSP | ||
| Sliding Vane Pumps (Section 3-8.5) | SLVP | ||
| Gear Pumps (Section 3-8.6) | GERP | ||
| Diaphragm Pumps (Section 3-8.7) | DIAP | ||
| Internal Combustion Drives (Section 3-8.8) | ICDR | ||
| Gearboxes (Section 3-8.9) | GRBX | ||
| Deactivated Petroleum Fuel Pumps (Section 12-4) | DEACP | ||
| Signage/Markings | Signage and Markings (Section 2-7) | SIGN | |
| Structures | Pumphouse/Filter Buildings (Section 11-2.1) | PFBLDG | |
| Canopies (Section 11-2.2) | CNPY | ||
| Cranes and Hoists (Section 11-6) | CRNHST | ||
| Tank | Aboveground Field-Erected Tanks (Section 8-4) | AGFET | |
| Geodesic Dome Roofs (Section 8-4.2) | GEODR | ||
| Foundations (Section 8-4.3) | FOUND | ||
| Aboveground Shop Fabricated Tanks (Section 8-5.1) | AGSFP | ||
| Self-Diking or Vaulted Tanks (Section 8-5.2) | SDVT | ||
| Rectangular Concrete-Encased Tanks (Section 8-5.3) | RCET | ||
| Single-Walled Underground Shop-Fabricated Tanks (Section 8-5.4.1) | UGSSFT | ||
| Double-Walled Underground Shop-Fabricated Tanks (Section 8-5.4.2) | UGDSFT | ||
| Underground Field-Constructed Tanks (Cut and Cover Tanks) (Section 8-6) | UGFET | ||
| Tank Cleaning (Section 8-7) | TCLEAN | ||
| Aluminum Honeycomb Floating Pans (Section 8-9.1.1) | AHFP | ||
| Steel Floating Pans (Section 8-9.1.2) | STLFP | ||
| Pontoon Floating Pans (Section 8-9.1.3) | PTNFP | ||
| Floating Roofs (Section 8-9.1.4) | FLTRF | ||
| Floating Roof and Pan Pressure/Vacuum Vents (Section 8-9.1.5) | FPPVV | ||
| Floating Roof and Pan Legs (Section 8-9.1.6) | FRPLG | ||
| Secondary Tank Bottoms (Section 8-9.2) | SNDTB | ||
| Tank Pressure/Vacuum Vents (Section 8-9.3) | TPVVT | ||
| Product Saver Tanks (Section 8-9.10) | PRDST | ||
| Fill Ports (Section 8-9.12) | FPRT | ||
| Point Sensor - Dry (Section 8-9.13.1) | PSDRY | ||
| Point Sensor - Wet (Section 8-9.13.2) | PSWET | ||
| Point Sensor - Pressure/Vacuum (Section 8-9.13.3) | PSPV | ||
| Visual Leak Detection (Section 8-9.13.4) | VSLLD | ||
| Floating Suction Lines (Section 8-9.14) | FLTSL | ||
| Stilling Wells (Section 8-9.17) | STGW | ||
| Deactivated Petroleum Fuel Tanks (Section 12-2) | DEACT | ||
| Testing | Pressure Testing | ||
| Underground Pits | Isolation Valve Pits (Section 6-11.1) | ISVLP | |
| Hydrant Fuel Pits (Section 6-11.2) | HDFP | ||
| High Point Vent Pits (Section 6-11.3) | HPVP | ||
| Low Point Drain Pits (Section 6-11.4) | LPDP | ||
| Lateral Control Pits (Section 6-11.5) | LTCP | ||
| Valves | General System Control Valves (Section 4-3.2.1) | GSCVL | |
| Refuel Control Valves (Section 4-3.2.5) | RCVL | ||
| Pressure Relief Valves (Section 4-3.2.6) | PRCVL | ||
| Defuel Control Valve (Section 4-3.2.7) | DFCVL | ||
| Dual Rate-of-Flow Control Valves (Section 4-3.2.8) | DRFCVL | ||
| Combination Dual Rate-of-Flow Control and Solenoid Valves (Section 4-3.3.1) | CFSCVL | ||
| Dual Pressure Relief, Solenoid Shutoff, and Check Valves (Section 4-3.3.2) | DPSCVL | ||
| Non-Surge Check Valves (Section 4-4.2.1) | NSCKVL | ||
| Filter Separator Control Valves (Section 4-4.2.2) | FSCVL | ||
| Defuel/Flush Valves (Section 4-4.2.3) | DFFCVL | ||
| Issue Venturi (Section 4-4.2.4) | ISVTR | ||
| Return Venturi (Section 4-4.2.5) | RTVTR | ||
| Back Pressure Control Valves (Section 4-4.2.6) | BPCVL | ||
| Pressure Control Valves (Section 4-4.2.7) | PCVL | ||
| Hydrant Control Valves (Section 4-4.2.8) | HCVL | ||
| Emergency Shut-off Valves (Section 4-4.2.9) | ESOVL | ||
| Pantograph Control Valves (Section 4-5.2.12) | PTCVL | ||
| Pantograph Pressure Control Valves (Section 4-5.2.13) | PTPCVL | ||
| Overfill Valve for Product Recovery Tanks (Section 4-8.1) | OVLPRT | ||
| Plug Valves - Lubricated (Section 6-6.2.1) | PLVL | ||
| Plug Valves - Non-lubricated (Section 6-6.2.2) | NPLVL | ||
| Gate Valves (Section 6-6.2.3) | GTVL | ||
| Ball Valves (Section 6-6.2.4) | BLVL | ||
| Double Block and Bleed Valves (Section 6-6.2.5) | DBBVL | ||
| Butterfly Valves (Section 6-6.2.6) | BFVL | ||
| Globe Valves (Section 6-6.2.7) | GLVL | ||
| Check Valves (Section 6-6.2.8) | CKVL | ||
| Line Blanks, Ring Spacers, and Spectacle Blinds (Section 6-6.2.9) | BLIND | ||
| Manual Valve Gear Operators (Section 6-6.2.10) | MVLGO | ||
| Fire Valves (Section 6-6.4.1) | FRVL | ||
| Fusible Link Butterfly Valves (Section 6-6.4.2) | FLBFVL | ||
| Truck Fill Valves (Section 6-6.5.1) | TFVL | ||
| Motor Operators (Section 6-6.6) | MTROP | ||
| External High Level Shutoff Valves (HLSO) (Section 8-9.6.1) | EHLSVL | ||
| Internal HLSO Valves (Section 8-9.6.2) | IHLSVL | ||
| Waste | Oil/Water Separators (Section 11-5) | OWS |
&"Times New Roman,Bold"&14APPENDIX F - Component Unique Identifier (CUID)
&P
Versions and Notes
| Version | Date | Description of changes |
| v2.0 | 8/18/21 | Updated Task Matrix to meet UFC 3-460-03 Change 1 , 29 April 2021 |
| Updated Component Acronym Tab to meet UFC 3-460-03 Change 1 , 29 April 2021 | ||
| v2.1 | 4/20/22 | Task Matrix Tab - Deleted all services facility # columns and combined into one. Renamed "Real Property Facility #" |
| Task Matrix Tab - Added "RPUID" to Real Property Unique Identifier column | ||
| Task Matrix Tab - Added "Real Property" to Facility Name | ||
| Task Matrix Tab - Added column for "Base Asset ID" | ||
| Task Matrix Tab - Added "Additional" and "RM" to Manufacturer Requirements | ||
| Task Matrix Tab - Changed Comment note for Filter Separator | ||
| Task Matrix Tab - Changed Note #3 To add "Base Asset ID if used by site shall be cross referenced with CUID appropriately." | ||
| Task Matrix Tab - Changed note #7 under instructions for Task Matrix to clarify this column | ||
| Task Matrix Tab - Changed note #8 under instructions for Task Matrix to clarify this column | ||
| Added new tab for RM schedule to be included | ||
| Added new Tab for Filter Separator/Pre-Filter Schedule with instructions |
This is the start of the file's text. The full file is on GovTribe.