This is a facility maintenance plan template spreadsheet for fuel system operations at Fort Smith Military Air Port (MAP) in Arkansas. The document outlines detailed maintenance requirements and specifications for fuel storage and dispensing systems, including tanks, pumps, valves, piping, and associated equipment across multiple facilities (buildings 806-833). The template contains asset inventories and maintenance schedules for components like above-ground storage tanks, underground storage tanks, filter separators, manual valves, meter registers, flow meters, control valves, monitoring equipment, alarms and firefighting equipment.

The template includes sections for administrative information, general facility descriptions, communication plans, safety requirements, and detailed maintenance task matrices. For each component, it specifies maintenance frequencies (quarterly, semi-annual, annual), special considerations, operator requirements, and mission impact assessments. Key facilities covered include jet fuel storage tanks (30,000 gallon capacity), diesel tanks (10,000 gallon), motor gas tanks (10,000 gallon), loading/unloading stations, and dispensing systems. The document serves as a framework for contractors to properly maintain and repair federally funded petroleum systems in compliance with applicable codes and regulations.

View the file

Other files

File Type Posted
Sources Sought FUELS - Programmatic Rev1 7 May 25.docx DOCX document
3.4 Appendix B - Attachment 4 - SO Tracker-20210628.xlsx XLSX spreadsheet
6.0 - Appendix E ISR 15-Bulk_Fuel_Facilities FY25.xlsx XLSX spreadsheet
2.0 Appendix A RM_SO Process_20241220_PgM Reviewed Incorporated.docx DOCX document
3.1 Appendix B - Attachment 1 - Three Week Look Ahead_20230420.xlsx XLSX spreadsheet
3.2 Appendix B - Attachment 2 - Monthly Report Format 20240910.docx DOCX document
2.2 Appendix A - Attachment 2 Contractor Travel Expense Report_20240910.xlsx XLSX spreadsheet
9.0 Appendix H - Minor Repairs Incidental to Maintenance Activities POJ 20231009.xlsx XLSX spreadsheet
7.0 CUID - v2.1.pdf PDF
8.0 Appendix G_UFC 3-460-03 Maintenance Table- v4.3.pdf PDF
6.0 Appendix E ISR 14_operational_fuel_facilities FY25.xlsx XLSX spreadsheet
3.0 Appendix B Reporting Requirements_20240910.docx DOCX document
4.0 Appendix C Task Order Specifications_202401216.docx DOCX document
5.0 Appendix D Antiterrorism and OPSEC 20230206.docx DOCX document
PWS LEX FMP Template - v2.2.xlsx XLSX spreadsheet
PWS VNC FMP Template - v2.2.xlsx XLSX spreadsheet
PWS KEQ FMP Template - v2.2.xlsx XLSX spreadsheet
PWS CVZ FMP Template - v2.2.xlsx XLSX spreadsheet
PWS SHP FMP Template - v2.2.xlsx XLSX spreadsheet
PWS PBA FMP Template - v2.2.xlsx XLSX spreadsheet
PWS GRB FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BRO FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BAR FMP Template - v2.2.xlsx XLSX spreadsheet
PWS EFS FMP Template - v2.2.xlsx XLSX spreadsheet
PWS LAU FMP Template - v2.2.xlsx XLSX spreadsheet
PWS CHF FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BEU FMP Template - v2.2.xlsx XLSX spreadsheet
PWS GDF FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BLI FMP Template - v2.2.xlsx XLSX spreadsheet
PWS TKR FMP Template - v2.2.xlsx XLSX spreadsheet
PWS RBN FMP Template - v2.2.xlsx XLSX spreadsheet
PWS MAA FMP Template - v2.2.xlsx XLSX spreadsheet
PWS FSH FMP Template - v2.2.xlsx XLSX spreadsheet
PWS FSO FMP Template - v2.2.xlsx XLSX spreadsheet
PWS LRG FMP Template - v2.2.xlsx XLSX spreadsheet
PWS RRT FMP Template - v2.2.xlsx XLSX spreadsheet
PWS ALT FMP Template - v2.2.xlsx XLSX spreadsheet
PWS TUL FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BL2 FMP Template - v2.2.xlsx XLSX spreadsheet
PWS ELL FMP Template - v2.2.xlsx XLSX spreadsheet
PWS WRF FMP Template - v2.2.xlsx XLSX spreadsheet
PWS LLD FMP Template - v2.2.xlsx XLSX spreadsheet
PWS DYE FMP Template - v2.2.xlsx XLSX spreadsheet
12.0 PWS Appendix K Real Property Data_20230420.xlsx XLSX spreadsheet
PWS RAN FMP Template - v2.2.xlsx XLSX spreadsheet
PWS _Fuels RMMR 20241220.docx DOCX document
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Administrative

LocationSite NameFort Smith MAP Site 1
RPSUID2102
DLA Site CodeFSM
Hours of Operation24 Hours of Operation
Address800 Voodoo Rd, Ft Smith, AR 72903
ContractContractor
Contract #
Local POCsQAE Name
QAE Phone
QAE Email
Alt QAE Name
Alt QAE Phone
Alt QAE Email
DLA/SCP POCsDLA PM Name
DLA PM Phone
DLA PM Email
SCP PM Name
SCP PM Phone
SCP PM Email
Contractor POCsContractor PM Name
Contractor PM Phone
Contractor PM Email
Contractor QC Name
Contractor QC Phone
Contractor QC Email
Contractor SM Name
Contractor SM Phone
Contractor SM Email
USACE POCsUSACE PM/COR Name
USACE PM/COR Phone
USACE PM/COR Email
USACE PE Name
USACE PE Phone
USACE PE Email
USACE KO Name
USACE KO Phone
USACE KO Email

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

This table shows the minimum information required. Additional details should be included based on site specific requirements. Additional POCs may be required.

General Facility Description Facility Description

Purpose:

This Facility Maintenance Plan provides guidance for Contractor personnel in the operation, inspection, and maintenance of permanently installed fuel facilities operated under the control of the Quality Assurance Evaluators. Federal, state, and local environmental laws and regulations shall be complied with if this plan is in conflict with them.

Scope:

The instructions prescribed by this plan outline general fuels maintenance information associated with fuel storage and dispensing systems and provides the minimum periodic contractor maintenance and inspection criteria requirements for the systems. This plan is to be used in conjunction with other existing directives governing fuel system operations and maintenance requirements. Conotractor will properly maintain and repair federally funded petroleum systems and facilities in order to provide compliance with applicable code, criteria, and federal, state, local and/or host nation regulations.

Fuels Facilities:

Organizational tanks, and associated dispensing equipment are maintained and operated by the owning organization. Fuel system maintenance contractors shall perform all maintenance and associated procurement actions on installed fuel systems.

Each installation under the Southwest Division contract are military land-based facilities who receive, store, distribute, and/or dispense liquid fuels.

Standard fuel system equipment includes:

a) Above Ground Sorage Stanks (AST), Underground Storage Tanks (UST)

b) Filter/separator and other filtration device maintenance access, particularly element removal.

c) Manual valves

d) Meter Registers, and Flow Meters.

e) Control Valves.

f) Pumps

g) Tank Monitoring Equipment and Instruments

h) Alarms

i) Fire Fighting Equipment

Site Specific General Information:

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

Include a general facility overview and description of each fuel system for the sites in accordance with UFC 3-460-01. Examples include: Bulk Storage Facilities, Aircraft Fueling Facilities, Marine and Dispensing Facilities, Ground Products Fueling Facilities, Alternate POL Facilities, and Support Facilities. Also include facility #s, facility names, fuel type, photos, and any other pertinent information.

Include Site Specific Conditions and Restrictions in this tab.

Communication Plan

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

Communication plan shall address in/out briefs, lines of communication, coordination for access, etc.

Safety

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

Site Specific Addendum and Activity Hazard Analysis, which are Attachments to the APP, specific to activities or tasks related to recurring maintenance for this site.

RM Schedule

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

Link RM schedule here

Task Matrix

Applicable Facility AssetsUFC System Level Maintenance FrequencySpecial Considerations
Real Property Unique Identifier
(RPUID)Real Property Facility #Real Property Facility NameOperational AreaComponent TypeBase Asset IDComponent Unique Identifier (CUID)MakeModelCapacity/SizeQSAUFC Section ReferenceAdditional Manufacturer RM RequirementsOperator/ equipment RequirementsSystem availabilityOther ContractComments
130POL - ADMINFuel LaboratorySignage and MarkingsLab Outside DoorN/AN/AN/A00X2-7No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
130POL - ADMINFuel LaboratoryVentilation HoodsFume HoodLabconcoN/AN/AXXX11-4.1Daily visual inspection, check the fume hood for visible airflow blockage such as large items or containers near the slot opening. Other daily inspections include holding a tissue at the opening to observe inward airflow, maintaining clean surfaces inside the hood, and keeping the sash at an appropriate height when working and not working in the hood.No Operator RequirementNo Mission Impact
800Security FenceFenceEFSO SystemsFence SSTAAppletonNot LabledNot LabledXX07-16Proper operation, box seals for integrity. Electrical connections for continuity.No Operator RequirementPartial System OOS
800Security FenceFenceSignage and MarkingsWarning SignsN/AN/AN/A00X2-7No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
800Security FenceFenceSignage and MarkingsDanger SignsN/AN/AN/A00X2-7No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
804POL - EXTERIOR AREA LIGHTING - POLESPerimeter LightingLightingLight PolesN/AN/AN/AXXX9-1.8No Manufacturer Requirements AvailableNo Operator RequirementNo Mission ImpactSeven total lights in area
806POL - UNLOAD STAND - JET FUELOffload / FillstandAboveground PipingFillstand 1N/AN/A6.0 in.XXX6-1.3No Manufacturer Requirements AvailableWeekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection.No Mission Impact
806POL - UNLOAD STAND - JET FUELOffload / FillstandAboveground PipingFillstand 1N/AN/A4.0 in.XXX6-1.3No Manufacturer Requirements AvailableWeekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection.No Mission Impact
806POL - UNLOAD STAND - JET FUELOffload / FillstandAboveground PipingOffload 1, Pressure ReliefN/AN/A1.0 in.XXX6-1.3No Manufacturer Requirements AvailableWeekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection.No Mission Impact
806POL - UNLOAD STAND - JET FUELOffload / FillstandAboveground PipingOffload 1N/AN/A4.0 in.XXX6-1.3No Manufacturer Requirements AvailableWeekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection.No Mission Impact
806POL - UNLOAD STAND - JET FUELOffload / FillstandAir Eliminator TanksOffload 1Liquid ControlsFS4N/AXXX3-10.1No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
806POL - UNLOAD STAND - JET FUELOffload / FillstandBall ValvesOffload 1, Basket Strainer UpperIFCCF8M1.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
806POL - UNLOAD STAND - JET FUELOffload / FillstandBall ValvesFillstand 1, IssueFlowtekCF8M4.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
806POL - UNLOAD STAND - JET FUELOffload / FillstandBall ValvesOffload 1, Isolation ValveVelanCF8M0.75 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
806POL - UNLOAD STAND - JET FUELOffload / FillstandBall ValvesOffload 1, Pressure Gauge Isolation ValveVelanCF8M0.75 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
806POL - UNLOAD STAND - JET FUELOffload / FillstandBall ValvesOffload 1, Basket Strainer InletGTPCF8M0.5 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
806POL - UNLOAD STAND - JET FUELOffload / FillstandBall ValvesOffload 1FlowtekCF8M4.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
806POL - UNLOAD STAND - JET FUELOffload / FillstandBall ValvesOffload 1, Pressure Relief Isolation ValveVelanCF8M1.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
806POL - UNLOAD STAND - JET FUELOffload / FillstandBall ValvesOffload 1FlowtekCF8M4.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
806POL - UNLOAD STAND - JET FUELOffload / FillstandBall ValvesOffload 1, Basket Strainer OutletGTPCF8M0.5 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
806POL - UNLOAD STAND - JET FUELOffload / FillstandBall ValvesOffload 1, Basket Strainer LowerIFCCF8M1.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
806POL - UNLOAD STAND - JET FUELOffload / FillstandBall ValvesOffload 1FlowtekCF8M4.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
806POL - UNLOAD STAND - JET FUELOffload / FillstandBall ValvesOffload 1FlowtekCF8M4.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
806POL - UNLOAD STAND - JET FUELOffload / FillstandBall ValvesOffload 1, Isolation Ball Valve Pressure Relief LineIFCCF8M1.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
806POL - UNLOAD STAND - JET FUELOffload / FillstandBasket StrainersOffload 1Islip Flow Controls, INCB150FSBW14.0 in.XX03-6.4Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyDaily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyNo Mission Impact
806POL - UNLOAD STAND - JET FUELOffload / FillstandBasket StrainersIssue LineTitan125#4.0 in.XX03-6.4Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyDaily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyNo Mission Impact
806POL - UNLOAD STAND - JET FUELOffload / FillstandCentrifugal PumpsOffload 1Gorman-RuppRD3A31-BAR150 HP GPM/SCFMXXX3-8.1During routine pump inspections only the easy to monitor factors such as pressure, temperature, vibration etc can be checKed. But during quarterly inspections, shaft alignment and oil levels should also be checked. Change Oil AnnuallyNo Operator RequirementNo Mission Impact
806POL - UNLOAD STAND - JET FUELOffload / FillstandCoatings/Markings and SignageOffload 1N/AN/AN/AXX0Coatings/Markings and SignageNo Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
806POL - UNLOAD STAND - JET FUELOffload / FillstandCoatings/Markings and SignageFillstand 1N/AN/AN/AXX0Coatings/Markings and SignageNo Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
806POL - UNLOAD STAND - JET FUELOffload / FillstandCombination Dual Rate-of-Flow Control and Solenoid ValvesOffload 1Cla-Val40-36ACGS4.0 in.XX04-3.3.1No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
806POL - UNLOAD STAND - JET FUELOffload / FillstandDifferential Pressure GaugesOffload 1, Basket StrainerGammon Tech ProductsGTP-5340 - 15 PSIXXX6-7.2Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use.Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system.Partial System OOS
806POL - UNLOAD STAND - JET FUELOffload / FillstandEFSO SystemsOffload 1AppletonNot LabledNot LabledXX07-16Proper operation, box seals for integrity. Electrical connections for continuity.No Operator RequirementPartial System OOS
806POL - UNLOAD STAND - JET FUELOffload / FillstandElectric MotorsOffload 1Teco-WestinghouseAEHHXU150 HPXXX9-1.7(1) Inadequate ventilation or air flow

(2) Unbalanced voltage or an overload

(3) Bearing failure

(4) Insulation failure

(5) Shaft misalignmentNo Operator RequirementPartial System OOS
806POL - UNLOAD STAND - JET FUELOffload / FillstandFill PortsOffload 1, Header 2OPWCF8M3.0 In.XXX8-9.12Ensure fill port covers are installed and are not damaged or broken. Ensure fill port covers are identified by fuel type and are installed on the correct tank. Visually inspect the fill port spill bucket to ensure there are no cracks, budges, or holes.Daily - Ensure fill port covers are installed and are not damaged or broken. Ensure fill port covers are identified by fuel type and are installed on the correct tank. Visually inspect the fill port spill bucket to ensure there are no cracks, budges, or holes. Ensure the spill bucket is clean of dirt, trash, water, and fuel.Partial System OOS
806POL - UNLOAD STAND - JET FUELOffload / FillstandFill PortsOffload 1, Header 1OPWCF8M3.0 In.XXX8-9.12Ensure fill port covers are installed and are not damaged or broken. Ensure fill port covers are identified by fuel type and are installed on the correct tank. Visually inspect the fill port spill bucket to ensure there are no cracks, budges, or holes.Daily - Ensure fill port covers are installed and are not damaged or broken. Ensure fill port covers are identified by fuel type and are installed on the correct tank. Visually inspect the fill port spill bucket to ensure there are no cracks, budges, or holes. Ensure the spill bucket is clean of dirt, trash, water, and fuel.Partial System OOS
806POL - UNLOAD STAND - JET FUELOffload / FillstandPositive Displacement MetersFillstand 1Veeder-Root0788700-063100 GPM/SCFM0003-7.1Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature
compensation featureMonthly - Inspect counter head for unusual noises and smooth operation.Partial System OOS
806POL - UNLOAD STAND - JET FUELOffload / FillstandPositive Displacement MetersOffload 1Liquid ControlsM-30-2100 GPM/SCFM0003-7.1Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature
compensation featureMonthly - Inspect counter head for unusual noises and smooth operation.Partial System OOS
806POL - UNLOAD STAND - JET FUELOffload / FillstandPressure and Pressure/Vacuum GaugesOffload HeaderTrericeCF8M0.5 in. 0 - 160 PSIXXX6-7.1Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use.Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system.Partial System OOS
806POL - UNLOAD STAND - JET FUELOffload / FillstandPressure and Pressure/Vacuum GaugesOffload 1TrericeCF8M0.75 in. 0 - 160 PSIXXX6-7.1Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use.Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system.Partial System OOS
806POL - UNLOAD STAND - JET FUELOffload / FillstandPressure Control ValvesFillstand 1Cla-Val90AF4A-34.0 in.XX04-4.2.7No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
806POL - UNLOAD STAND - JET FUELOffload / FillstandSight Flow IndicatorsOffload 1, Pressure ReliefVisi Flow1471-F3.0 In.0006-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Partial System OOS
806POL - UNLOAD STAND - JET FUELOffload / FillstandSight Flow IndicatorsOffload 1, Pressure ReliefVisi Flow1471-F3.0 In.0006-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Partial System OOS
806POL - UNLOAD STAND - JET FUELOffload / FillstandStatic Grounding SystemsOffload 1Hannay ReelsHRHGR505060 FeetXXX9-1.6.2Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location.No Operator RequirementPartial System OOS
806POL - UNLOAD STAND - JET FUELOffload / FillstandStatic Grounding SystemsOffload 1Grounding StrapGrounding StrapN/AXXX9-1.6.2Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location.No Operator RequirementPartial System OOS
806POL - UNLOAD STAND - JET FUELOffload / FillstandThermal and/or Pressure Relief ValvesOffload HeaderUnable to ReadUnable to Read1.0 in.XXX6-6.3Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended.Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced.
Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked.Partial System OOS
806POL - UNLOAD STAND - JET FUELOffload / FillstandThermal and/or Pressure Relief ValvesOffload 1, Pressure ReliefUnable to ReadUnable to Read1.0 in.XXX6-6.3Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended.Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced.
Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked.Partial System OOS
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Aboveground PipingFillstand 2N/AN/A6.0 in.XXX6-1.3No Manufacturer Requirements AvailableWeekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection.No Mission Impact
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Aboveground PipingFillstand 2N/AN/A4.0 in.XXX6-1.3No Manufacturer Requirements AvailableWeekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection.No Mission Impact
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Aboveground PipingOffload 2, Pressure ReliefN/AN/A1.0 in.XXX6-1.3No Manufacturer Requirements AvailableWeekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection.No Mission Impact
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Aboveground PipingOffload 2N/AN/A4.0 in.XXX6-1.3No Manufacturer Requirements AvailableWeekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection.No Mission Impact
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Air Eliminator TanksOffload 2Liquid ControlsFS4N/AXXX3-10.1No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Ball ValvesFillstand 2FlowtekCF8M4.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Ball ValvesOffload 2, Isolation ValveVelanCF8M0.75 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Ball ValvesOffload 2, Pressure Gauge Isolation ValveVelanCF8M0.75 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Ball ValvesOffload 2FlowtekCF8M4.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Ball ValvesOffload 2, Pressure Relief Isolation ValveVelanCF8M1.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Ball ValvesOffload 2, Basket Strainer Differential Gauge OutletGTPCF8M0.5 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Ball ValvesOffload 2, Basket Strainer Differential Gauge InletGTPCF8M0.5 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Ball ValvesOffload 2, Basket Strainer LowerIFCCF8M1.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Ball ValvesOffload 2, Basket Strainer UpperIFCCF8M1.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Ball ValvesOffload 2FlowtekCF8M4.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Ball ValvesOffload 2FlowtekCF8M4.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Ball ValvesOffload 2FlowtekCF8M4.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Ball ValvesOffload 2, Isolation Ball Valve Pressure Relief LineIFCCF8M1.0 in.XX06-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Basket StrainersOffload 2Islip Flow Controls, INCB150FSBW14.0 in.XX03-6.4Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyDaily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyNo Mission Impact
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Basket StrainersFillstand 2Titan125#4.0 in.XX03-6.4Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyDaily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyNo Mission Impact
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Centrifugal PumpsOffload 2Gorman-RuppRD3A31-BAR150 HP GPM/SCFMXXX3-8.1During routine pump inspections only the easy to monitor factors such as pressure, temperature, vibration etc can be checKed. But during quarterly inspections, shaft alignment and oil levels should also be checked. Change Oil AnnuallyNo Operator RequirementNo Mission Impact
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Coatings/Markings and SignageOffload 2N/AN/AN/AXX0Coatings/Markings and SignageNo Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Coatings/Markings and SignageFillstand 2N/AN/AN/AXX0Coatings/Markings and SignageNo Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Combination Dual Rate-of-Flow Control and Solenoid ValvesOffload 2Cla-Val40-36ACGS4.0 in.XX04-3.3.1No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Differential Pressure GaugesOffload 2, Basket StrainerGammon Tech ProductsGTP-5340 - 20 PSIXXX6-7.2Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use.Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system.Partial System OOS
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2EFSO SystemsOffload 2AppletonNot LabledNot LabledXX07-16Proper operation, box seals for integrity. Electrical connections for continuity.No Operator RequirementPartial System OOS
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Electric MotorsOffload 2Teco-WestinghouseAEHHXU150 HPXXX9-1.7(1) Inadequate ventilation or air flow

(2) Unbalanced voltage or an overload

(3) Bearing failure

(4) Insulation failure

(5) Shaft misalignmentNo Operator RequirementPartial System OOS
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Fill PortsOffload 2, Header 2OPWCF8M3.0 In.XXX8-9.12Ensure fill port covers are installed and are not damaged or broken. Ensure fill port covers are identified by fuel type and are installed on the correct tank. Visually inspect the fill port spill bucket to ensure there are no cracks, budges, or holes.Daily - Ensure fill port covers are installed and are not damaged or broken. Ensure fill port covers are identified by fuel type and are installed on the correct tank. Visually inspect the fill port spill bucket to ensure there are no cracks, budges, or holes. Ensure the spill bucket is clean of dirt, trash, water, and fuel.Partial System OOS
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Fill PortsOffload 2, Header 1OPWCF8M3.0 In.XXX8-9.12Ensure fill port covers are installed and are not damaged or broken. Ensure fill port covers are identified by fuel type and are installed on the correct tank. Visually inspect the fill port spill bucket to ensure there are no cracks, budges, or holes.Daily - Ensure fill port covers are installed and are not damaged or broken. Ensure fill port covers are identified by fuel type and are installed on the correct tank. Visually inspect the fill port spill bucket to ensure there are no cracks, budges, or holes. Ensure the spill bucket is clean of dirt, trash, water, and fuel.Partial System OOS
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Positive Displacement MetersFillstand 2Veeder-Root0788700-063100 GPM/SCFM0003-7.1Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature
compensation featureMonthly - Inspect counter head for unusual noises and smooth operation.Partial System OOS
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Positive Displacement MetersOffload 2Liquid ControlsM-30-2100 GPM/SCFM0003-7.1Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature
compensation featureMonthly - Inspect counter head for unusual noises and smooth operation.Partial System OOS
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Pressure and Pressure/Vacuum GaugesOffload 2TrericeCF8M0.75 in. 0 - 160 PSIXXX6-7.1Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use.Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system.Partial System OOS
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Pressure and Pressure/Vacuum GaugesOffload 2TrericeCF8M0.75 in. 0 - 160 PSIXXX6-7.1Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use.Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system.Partial System OOS
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Pressure Control ValvesFillstand 2Cla-Val90AF4A-34.0 in.XX04-4.2.7No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Sight Flow IndicatorsOffload 2, Pressure ReliefVisi Flow1471-F3.0 In.0006-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Partial System OOS
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Sight Flow IndicatorsOffload 2, Pressure ReliefVisi Flow1471-F3.0 In.0006-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Partial System OOS
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Static Grounding SystemsOffload 2, Ground ReelsHannay ReelsHRHGR505060 FeetXXX9-1.6.2Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location.No Operator RequirementPartial System OOS
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Static Grounding SystemsOffload 2Grounding StrapGrounding StrapN/AXXX9-1.6.2Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location.No Operator RequirementPartial System OOS
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Thermal and/or Pressure Relief ValvesOffload 2, Pressure ReliefUnable to ReadUnable to Read1.0 in.XXX6-6.3Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended.Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced.
Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked.Partial System OOS
807POL - LOAD STAND, TRUCK - JET FUELOffload / Fillstand 2Thermal and/or Pressure Relief ValvesOffload 2Unable to ReadUnable to Read1.0 in.XXX6-6.3Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended.Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced.
Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked.Partial System OOS
808POL - EMERGENCY GENERATORGeneratorBack-Up Power GeneratorsPOL Back-up GeneratorN/AN/AN/AXX0Back-Up Power GeneratorsNo Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission ImpactMaintained by Base Power Production
809POL - FUEL-WATER SEPARATOROil Water SeparatorCathodic ProtectionOutside ContainmentBingham & TaylorCP TestN/AXXX9-2.1Must be performed under contractNo Operator RequirementCMPLocated In The Field Near O/W Separator Across From Retention Pond
809POL - FUEL-WATER SEPARATOROil Water SeparatorOil/Water SeparatorsOWSN/AN/AN/AXXX11-5No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
809POL - FUEL-WATER SEPARATOROil Water SeparatorRemote Spill ContainmentRetention PondN/AN/AN/AXXX11-1.2No Manufacturer Requirements AvailableAnnually - Secondary containment systems degrade and will collect debris which can clog drainage inlets or prevent drain valves from sealing properly. Test drain valves for leakage through the valve.Partial System OOS
810POL - Military Gas Station Operations BuildingBuildingEFSO SystemsSSTA BuildingAppletonNot LabledNot LabledXX07-16Proper operation, box seals for integrity. Electrical connections for continuity.No Operator RequirementPartial System OOS
810POL - Military Gas Station Operations BuildingBuildingExternally Mounted Level AlarmsSSTA BuildingVeeder-RootNot LegibleN/A0008-9.9.1Lift the manual test lever of internally mounted float valve (if equipped). Ensure that the HLSO closes when the float of the float valve is raised.No Operator RequirementPartial System OOS
810POL - Military Gas Station Operations BuildingBuildingSignage and MarkingsSSTA BuildingN/AN/AN/A00X2-7No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
816VEHICLE SHELTER AT FILL STANDCanopiesCanopiesFillstand 1 CanopyN/AN/AN/AXX011-2.2No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
816VEHICLE SHELTER AT FILL STANDCanopiesLightingFillstand 1 CanopyN/AN/AN/AXXX9-1.8No Manufacturer Requirements AvailableNo Operator RequirementNo Mission ImpactSix
816VEHICLE SHELTER AT FILL STANDCanopiesLightning Protection SystemsFillstand 1 CanopyN/AN/AN/A00X9-4Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location.No Operator RequirementNo Mission Impact
816VEHICLE SHELTER AT FILL STANDCanopiesStatic Grounding SystemsFillstand 1 Canopy, NE CornerGround WireGround WireN/AXXX9-1.6.2Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location.No Operator RequirementPartial System OOS
816VEHICLE SHELTER AT FILL STANDCanopiesStatic Grounding SystemsFillstand 1 Canopy, NW CornerGround WireGround WireN/AXXX9-1.6.2Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location.No Operator RequirementPartial System OOS
816VEHICLE SHELTER AT FILL STANDCanopiesStatic Grounding SystemsFillstand 1 Canopy, SE CornerGrounding StrapGrounding StrapN/AXXX9-1.6.2Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location.No Operator RequirementPartial System OOS
816VEHICLE SHELTER AT FILL STANDCanopiesStatic Grounding SystemsFillstand 1 Canopy, SW CornerGrounding StrapGrounding StrapN/AXXX9-1.6.2Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location.No Operator RequirementPartial System OOS
818SHELTER AT TRUCK UNLOADING AREACanopyCanopiesFillstand 2 CanopyN/AN/AN/AXX011-2.2No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
818SHELTER AT TRUCK UNLOADING AREACanopyEFSO SystemsFillstand 2 CanopyAppletonNot LabledNot LabledXX07-16Proper operation, box seals for integrity. Electrical connections for continuity.No Operator RequirementPartial System OOS
818SHELTER AT TRUCK UNLOADING AREACanopyLightingFillstand 2 CanopyN/AN/AN/AXXX9-1.8No Manufacturer Requirements AvailableNo Operator RequirementNo Mission ImpactSix
818SHELTER AT TRUCK UNLOADING AREACanopyLightning Protection SystemsFillstand 2 CanopyN/AN/AN/A00X9-4Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location.No Operator RequirementNo Mission Impact
818SHELTER AT TRUCK UNLOADING AREACanopyStatic Grounding SystemsFillstand 2 Canopy, NE CornerGrounding StrapGrounding StrapN/AXXX9-1.6.2Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location.No Operator RequirementPartial System OOS
818SHELTER AT TRUCK UNLOADING AREACanopyStatic Grounding SystemsFillstand 2 Canopy, NW CornerGrounding StrapGrounding StrapN/AXXX9-1.6.2Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location.No Operator RequirementPartial System OOS
818SHELTER AT TRUCK UNLOADING AREACanopyStatic Grounding SystemsFillstand 2 Canopy, SE CornerGrounding StrapGrounding StrapN/AXXX9-1.6.2Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location.No Operator RequirementPartial System OOS
818SHELTER AT TRUCK UNLOADING AREACanopyStatic Grounding SystemsFillstand 2 Canopy, SW CornerGrounding StrapGrounding StrapN/AXXX9-1.6.2Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location.No Operator RequirementPartial System OOS
828POL - VEHICLE FILLING STATIONDispenser IslandBreakawaysMOGAS DispenserOPW66V0.75 in.0007-4Inspect for expiration date. Inspect for loose connections and signs of damage.Daily - Inspect breakaways for loose connections and signs of damage to poppets. Ensure breakaways are clean and free of fuel.
Monthly - Inspect breakaway for an expiration date established by the manufacturer. Breakaways must be replaced before the indicated expiration date.No Mission Impact
828POL - VEHICLE FILLING STATIONDispenser IslandBreakawaysDS2 DispenserOPW66V1.0 in.0007-4Inspect for expiration date. Inspect for loose connections and signs of damage.Daily - Inspect breakaways for loose connections and signs of damage to poppets. Ensure breakaways are clean and free of fuel.
Monthly - Inspect breakaway for an expiration date established by the manufacturer. Breakaways must be replaced before the indicated expiration date.No Mission Impact
828POL - VEHICLE FILLING STATIONDispenser IslandCard and Key LocksSSTA VIL READERFuelMasterFMU 2500N/A00X9-3No Manufacturer Requirements AvailableNo Operator RequirementNo Mission Impact
828POL - VEHICLE FILLING STATIONDispenser IslandContainment SystemsSSTA IslandN/AN/AN/A00XGeneralNo Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact