PWS LLD FMP Template - v2.2.xlsx
XLSX spreadsheet 64 KB Posted
- Attached to
- Sources Sought - CEHNC FUELS PROGRAM
- Solicitation number
- PANHES-25-P-0000-001794
About this file
This file is a Facility Maintenance Plan (FMP) template spreadsheet for tracking maintenance requirements at fuel facilities. The template contains multiple tabs for documenting administrative information, facility descriptions, communication plans, safety requirements, recurring maintenance schedules, and detailed component tracking.
The template is specifically designed for DLA fuel facilities and includes sheets for tracking maintenance of components like storage tanks, dispensers, piping, valves, meters, and safety equipment. It requires detailed documentation of component specifications, maintenance frequencies, manufacturer requirements, operational impacts, and special considerations. Key sections include a task matrix for listing all facility assets and their maintenance requirements, a filter separator maintenance schedule, and a component acronym list that establishes standardized identifiers for tracking equipment. The template appears to be version 2.2 with updates made through October 2022 to improve tracking of administrative contacts, facility identifiers, and maintenance documentation requirements.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Administrative
| Location | Site Name | JBSA-Lackland Site #1 |
| RPSUID | 2461 | |
| DLA Site Code | LLD | |
| Hours of Operation | 24 Hours of Operation | |
| Address | 1701 Kenly Avenue, San Antonio, TX 78236 | |
| Contract | Contractor | |
| Contract # | ||
| Local POCs | QAE Name | |
| QAE Phone | ||
| QAE Email | ||
| Alt QAE Name | ||
| Alt QAE Phone | ||
| Alt QAE Email | ||
| DLA/SCP POCs | DLA PM Name | |
| DLA PM Phone | ||
| DLA PM Email | ||
| SCP PM Name | ||
| SCP PM Phone | ||
| SCP PM Email | ||
| Contractor POCs | Contractor PM Name | |
| Contractor PM Phone | ||
| Contractor PM Email | ||
| Contractor QC Name | ||
| Contractor QC Phone | ||
| Contractor QC Email | ||
| Contractor SM Name | ||
| Contractor SM Phone | ||
| Contractor SM Email | ||
| USACE POCs | USACE PM/COR Name | |
| USACE PM/COR Phone | ||
| USACE PM/COR Email | ||
| USACE PE Name | ||
| USACE PE Phone | ||
| USACE PE Email | ||
| USACE KO Name | ||
| USACE KO Phone | ||
| USACE KO Email |
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
This table shows the minimum information required. Additional details should be included based on site specific requirements. Additional POCs may be required.
General Facility Description Facility Description
Purpose:
This Facility Maintenance Plan provides guidance for Contractor personnel in the operation, inspection, and maintenance of permanently installed fuel facilities operated under the control of the Quality Assurance Evaluators. Federal, state, and local environmental laws and regulations shall be complied with if this plan is in conflict with them.
Scope:
The instructions prescribed by this plan outline general fuels maintenance information associated with fuel storage and dispensing systems and provides the minimum periodic contractor maintenance and inspection criteria requirements for the systems. This plan is to be used in conjunction with other existing directives governing fuel system operations and maintenance requirements. Conotractor will properly maintain and repair federally funded petroleum systems and facilities in order to provide compliance with applicable code, criteria, and federal, state, local and/or host nation regulations.
Fuels Facilities:
Organizational tanks, and associated dispensing equipment are maintained and operated by the owning organization. Fuel system maintenance contractors shall perform all maintenance and associated procurement actions on installed fuel systems.
Each installation under the Southwest Division contract are military land-based facilities who receive, store, distribute, and/or dispense liquid fuels.
Standard fuel system equipment includes:
a) Above Ground Sorage Stanks (AST), Underground Storage Tanks (UST)
b) Filter/separator and other filtration device maintenance access, particularly element removal.
c) Manual valves
d) Meter Registers, and Flow Meters.
e) Control Valves.
f) Pumps
g) Tank Monitoring Equipment and Instruments
h) Alarms
i) Fire Fighting Equipment
Site Specific General Information:
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Include a general facility overview and description of each fuel system for the sites in accordance with UFC 3-460-01. Examples include: Bulk Storage Facilities, Aircraft Fueling Facilities, Marine and Dispensing Facilities, Ground Products Fueling Facilities, Alternate POL Facilities, and Support Facilities. Also include facility #s, facility names, fuel type, photos, and any other pertinent information.
Include Site Specific Conditions and Restrictions in this tab.
Communication Plan
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Communication plan shall address in/out briefs, lines of communication, coordination for access, etc.
Safety
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Site Specific Addendum and Activity Hazard Analysis, which are Attachments to the APP, specific to activities or tasks related to recurring maintenance for this site.
RM Schedule
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Link RM schedule here
Task Matrix
| Applicable Facility Assets | UFC System Level Maintenance Frequency | Special Considerations | ||||||||||||||||
| Real Property Unique Identifier | ||||||||||||||||||
| (RPUID) | Real Property Facility # | Real Property Facility Name | Operational Area | Component Type | Base Asset ID | Component Unique Identifier (CUID) | Make | Model | Capacity/Size | Q | S | A | UFC Section Reference | Additional Manufacturer RM Requirements | Operator/ equipment Requirements | System availability | Other Contract | Comments |
| 5006 | Lackland Service Station | Operations Building | Pumphouse/Filter Buildings | Control Room | N/A | N/A | N/A | X | X | X | 11-2.1 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | ||||
| 5006 | Lackland Service Station | Lackland Service Station | Canopies | Bldg 5006 canopy | N/A | N/A | N/A | X | X | 0 | 11-2.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | ||||
| 5006 | Lackland Service Station | Lackland Service Station | Emergency Eyewash/Showers | Bldg 5006 canopy eyewash/shower | Haws | 8300-8309 | 2.0 In. | X | X | X | 11-3 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | ||||
| 5006 | Lackland Service Station | Lackland Service Station | Signage and Markings | Canopy | N/A | N/A | N/A | 0 | 0 | X | 2-7 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | ||||
| 5006 | Lackland Service Station | Lackland Service Station | Emergency Shutoff Valves | Dispenser 1-2 | OPW | 10 Series | 1.5 in. | 0 | 0 | X | 7-12 | Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. Inspect mechanical links of the valve for correct operation. Conduct test of valve to ensure it operates correctly. | Monthly - Inspect stabilizer bar to ensure that it is securely mounted below the base of the dispenser. Inspect the mounting bolts that secure the emergency shutoff valve to the stabilizer bar. Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. | Partial System OOS | ||||
| 5006 | Lackland Service Station | Lackland Service Station | Emergency Shutoff Valves | Dispenser 9/10 | OPW | 10 Series | 1.5 in. | 0 | 0 | X | 7-12 | Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. Inspect mechanical links of the valve for correct operation. Conduct test of valve to ensure it operates correctly. | Monthly - Inspect stabilizer bar to ensure that it is securely mounted below the base of the dispenser. Inspect the mounting bolts that secure the emergency shutoff valve to the stabilizer bar. Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. | Partial System OOS | ||||
| 5006 | Lackland Service Station | Lackland Service Station | Emergency Shutoff Valves | Dispenser 3/4 | OPW | 10 Series | 1.5 in. | 0 | 0 | X | 7-12 | Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. Inspect mechanical links of the valve for correct operation. Conduct test of valve to ensure it operates correctly. | Monthly - Inspect stabilizer bar to ensure that it is securely mounted below the base of the dispenser. Inspect the mounting bolts that secure the emergency shutoff valve to the stabilizer bar. Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. | Partial System OOS | ||||
| 5006 | Lackland Service Station | Lackland Service Station | Dispenser Sumps | Dispenser 1/2 | Wayne | E3/G7202D/2GHJ/HKX | N/A | X | X | X | 7-13 | Inspect sump pipe transition fittings for tears, cracks, or other signs of deterioration. Test sumps and ensure they are liquid tight by using vacuum, pressure, or liquid testing in accordance with 40 CFR 280, Section 43. | Monthly - Inspect for signs of water, fuel, trash, and debris inside sumps. Remove and properly dispose of collected water, fuel, trash, and debris. Visually inspect penetration fittings. If fuel or water is detected investigate the source and repair. | Partial System OOS | ||||
| 5006 | Lackland Service Station | Lackland Service Station | Dispenser Sumps | Dispenser 9/10 | Wayne | E3/G7202D/2GHJ/HKX | N/A | X | X | X | 7-13 | Inspect sump pipe transition fittings for tears, cracks, or other signs of deterioration. Test sumps and ensure they are liquid tight by using vacuum, pressure, or liquid testing in accordance with 40 CFR 280, Section 43. | Monthly - Inspect for signs of water, fuel, trash, and debris inside sumps. Remove and properly dispose of collected water, fuel, trash, and debris. Visually inspect penetration fittings. If fuel or water is detected investigate the source and repair. | Partial System OOS | ||||
| 5006 | Lackland Service Station | Lackland Service Station | Dispenser Sumps | Dispenser 3/4 | Wayne | E3/G7202D/2GHJ/HKX | N/A | X | X | X | 7-13 | Inspect sump pipe transition fittings for tears, cracks, or other signs of deterioration. Test sumps and ensure they are liquid tight by using vacuum, pressure, or liquid testing in accordance with 40 CFR 280, Section 43. | Monthly - Inspect for signs of water, fuel, trash, and debris inside sumps. Remove and properly dispose of collected water, fuel, trash, and debris. Visually inspect penetration fittings. If fuel or water is detected investigate the source and repair. | Partial System OOS | ||||
| 5006 | Lackland Service Station | Lackland Service Station | EFSO Systems | West Exit | Not Listed | Not Listed | Not Listed | X | X | 0 | 7-16 | Proper operation, box seals for integrity. Electrical connections for continuity. | No Operator Requirement | Partial System OOS | ||||
| 5006 | Lackland Service Station | Operations Building | EFSO Systems | Control Room | Not Listed | Not Listed | Not Listed | X | X | 0 | 7-16 | Proper operation, box seals for integrity. Electrical connections for continuity. | No Operator Requirement | Partial System OOS | ||||
| 5006 | Lackland Service Station | Lackland Service Station | Dispenser Nozzles | Dispenser 10 | OPW | 7H | 1.0 in. | 0 | 0 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | |||||||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | Partial System OOS | |||||||||||||
| 5006 | Lackland Service Station | Lackland Service Station | Dispenser Nozzles | Dispenser 9 | Husky | 7H | 1.0 in. | 0 | 0 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | |||||||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | Partial System OOS | |||||||||||||
| 5006 | Lackland Service Station | Lackland Service Station | Dispenser Nozzles | Dispenser 3 | Catlow | 11AP | 0.75 in. | 0 | 0 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | |||||||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | Partial System OOS | |||||||||||||
| 5006 | Lackland Service Station | Lackland Service Station | Dispenser Nozzles | Dispenser 2 | OPW | 11AP | 0.75 in. | 0 | 0 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | |||||||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | Partial System OOS | |||||||||||||
| 5006 | Lackland Service Station | Lackland Service Station | Dispenser Nozzles | Dispenser 1 | OPW | 11AP | 0.75 in. | 0 | 0 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | |||||||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | Partial System OOS | |||||||||||||
| 5006 | Lackland Service Station | Lackland Service Station | Dispenser Nozzles | Dispenser 4 | Catlow | 11AP | 0.75 in. | 0 | 0 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | ||||||||||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | Partial System OOS | ||||||||||||||||
| 5006 | Lackland Service Station | Lackland Service Station | Dispenser Hoses | Dispenser 9 | Irpco | 123201C | 1.0 in. | 0 | 0 | 0 | 7-3 | Check for expiration date, and physical condition/damage leaks. | Daily - Inspect dispenser hoses and hose whips for gouges, cuts, blisters, or outside wear that may lead to rupture during use. Replace hose or hose whips that show signs of wear. Inspect connection points of hoses and hose whips to the dispenser, breakaways, swivels, and the nozzle and ensure the connection points are clean and free of fuel. | Partial System OOS | |||
| 5006 | Lackland Service Station | Lackland Service Station | Dispenser Hoses | Dispenser 2 | Irpco | 123201C | 0.75 in. | 0 | 0 | 0 | 7-3 | Check for expiration date, and physical condition/damage leaks. | Daily - Inspect dispenser hoses and hose whips for gouges, cuts, blisters, or outside wear that may lead to rupture during use. Replace hose or hose whips that show signs of wear. Inspect connection points of hoses and hose whips to the dispenser, breakaways, swivels, and the nozzle and ensure the connection points are clean and free of fuel. | Partial System OOS | |||
| 5006 | Lackland Service Station | Lackland Service Station | Dispenser Hoses | Dispenser 1 | Irpco | 559N | 0.75 in. | 0 | 0 | 0 | 7-3 | Check for expiration date, and physical condition/damage leaks. | Daily - Inspect dispenser hoses and hose whips for gouges, cuts, blisters, or outside wear that may lead to rupture during use. Replace hose or hose whips that show signs of wear. Inspect connection points of hoses and hose whips to the dispenser, breakaways, swivels, and the nozzle and ensure the connection points are clean and free of fuel. | Partial System OOS | |||
| 5006 | Lackland Service Station | Lackland Service Station | Dispenser Hoses | Dispenser 4 | Futura | 559N | 0.75 in. | 0 | 0 | 0 | 7-3 | Check for expiration date, and physical condition/damage leaks. | Daily - Inspect dispenser hoses and hose whips for gouges, cuts, blisters, or outside wear that may lead to rupture during use. Replace hose or hose whips that show signs of wear. Inspect connection points of hoses and hose whips to the dispenser, breakaways, swivels, and the nozzle and ensure the connection points are clean and free of fuel. | Partial System OOS | |||
| 5006 | Lackland Service Station | Lackland Service Station | Dispenser Hoses | Dispenser 10 | Irpco | 123201C | 1.0 in. | 0 | 0 | 0 | 7-3 | Check for expiration date, and physical condition/damage leaks. | Daily - Inspect dispenser hoses and hose whips for gouges, cuts, blisters, or outside wear that may lead to rupture during use. Replace hose or hose whips that show signs of wear. Inspect connection points of hoses and hose whips to the dispenser, breakaways, swivels, and the nozzle and ensure the connection points are clean and free of fuel. | Partial System OOS | |||
| 5006 | Lackland Service Station | Lackland Service Station | Dispenser Hoses | Dispenser 3 | Futura | 559N | 0.75 in. | 0 | 0 | 0 | 7-3 | Check for expiration date, and physical condition/damage leaks. | Daily - Inspect dispenser hoses and hose whips for gouges, cuts, blisters, or outside wear that may lead to rupture during use. Replace hose or hose whips that show signs of wear. Inspect connection points of hoses and hose whips to the dispenser, breakaways, swivels, and the nozzle and ensure the connection points are clean and free of fuel. | Partial System OOS | |||
| 5006 | Lackland Service Station | Lackland Service Station | Breakaways | Dispenser 9 | Catlow | 66V | 1.0 in. | 0 | 0 | 0 | 7-4 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect breakaways for loose connections and signs of damage to poppets. Ensure breakaways are clean and free of fuel. | ||||
| Monthly - Inspect breakaway for an expiration date established by the manufacturer. Breakaways must be replaced before the indicated expiration date. | No Mission Impact | ||||||||||||||||
| 5006 | Lackland Service Station | Lackland Service Station | Breakaways | Dispenser 10 | Catlow | 66V | 1.0 in. | 0 | 0 | 0 | 7-4 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect breakaways for loose connections and signs of damage to poppets. Ensure breakaways are clean and free of fuel. | ||||
| Monthly - Inspect breakaway for an expiration date established by the manufacturer. Breakaways must be replaced before the indicated expiration date. | No Mission Impact | ||||||||||||||||
| 5006 | Lackland Service Station | Lackland Service Station | Breakaways | Dispenser 2 | OPW | 66V | 0.75 in. | 0 | 0 | 0 | 7-4 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect breakaways for loose connections and signs of damage to poppets. Ensure breakaways are clean and free of fuel. | ||||
| Monthly - Inspect breakaway for an expiration date established by the manufacturer. Breakaways must be replaced before the indicated expiration date. | No Mission Impact | ||||||||||||||||
| 5006 | Lackland Service Station | Lackland Service Station | Breakaways | Dispenser 4 | Futura | 66V | 0.75 in. | 0 | 0 | 0 | 7-4 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect breakaways for loose connections and signs of damage to poppets. Ensure breakaways are clean and free of fuel. | ||||
| Monthly - Inspect breakaway for an expiration date established by the manufacturer. Breakaways must be replaced before the indicated expiration date. | No Mission Impact | ||||||||||||||||
| 5006 | Lackland Service Station | Lackland Service Station | Breakaways | Dispenser 3 | Catlow | 66V | 0.75 in. | 0 | 0 | 0 | 7-4 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect breakaways for loose connections and signs of damage to poppets. Ensure breakaways are clean and free of fuel. | ||||
| Monthly - Inspect breakaway for an expiration date established by the manufacturer. Breakaways must be replaced before the indicated expiration date. | No Mission Impact | ||||||||||||||||
| 5006 | Lackland Service Station | Lackland Service Station | Breakaways | Dispenser 1 | OPW | 66V | 0.75 in. | 0 | 0 | 0 | 7-4 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect breakaways for loose connections and signs of damage to poppets. Ensure breakaways are clean and free of fuel. | ||||
| Monthly - Inspect breakaway for an expiration date established by the manufacturer. Breakaways must be replaced before the indicated expiration date. | No Mission Impact | ||||||||||||||||
| 5006 | Lackland Service Station | Lackland Service Station | Swivels | Dispenser 10 | OPW | 45-5075 | 1.0 in. | 0 | 0 | 0 | 7-5 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect swivel for loose connections and signs of damage. Ensure swivel rotates easily and is clean and free of fuel. | ||||
| Monthly - Inspect swivel for expiration date established by manufacturer. Swivels must be replaced before the indicated expiration date. | Partial System OOS | ||||||||||||||||
| 5006 | Lackland Service Station | Lackland Service Station | Swivels | Dispenser 4 | Catlow | C720 75 | 0.75 in. | 0 | 0 | 0 | 7-5 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect swivel for loose connections and signs of damage. Ensure swivel rotates easily and is clean and free of fuel. | ||||
| Monthly - Inspect swivel for expiration date established by manufacturer. Swivels must be replaced before the indicated expiration date. | Partial System OOS | ||||||||||||||||
| 5006 | Lackland Service Station | Lackland Service Station | Swivels | Dispenser 9 | Eaton | C720 1 | 1.0 in. | 0 | 0 | 0 | 7-5 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect swivel for loose connections and signs of damage. Ensure swivel rotates easily and is clean and free of fuel. | ||||
| Monthly - Inspect swivel for expiration date established by manufacturer. Swivels must be replaced before the indicated expiration date. | Partial System OOS | ||||||||||||||||
| 5006 | Lackland Service Station | Lackland Service Station | Swivels | Dispenser 3 | Catlow | C720 75 | 0.75 in. | 0 | 0 | 0 | 7-5 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect swivel for loose connections and signs of damage. Ensure swivel rotates easily and is clean and free of fuel. | ||||
| Monthly - Inspect swivel for expiration date established by manufacturer. Swivels must be replaced before the indicated expiration date. | Partial System OOS | ||||||||||||||||
| 5006 | Lackland Service Station | Lackland Service Station | Swivels | Dispenser 2 | OPW | 45-5060 | 0.75 in. | 0 | 0 | 0 | 7-5 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect swivel for loose connections and signs of damage. Ensure swivel rotates easily and is clean and free of fuel. | ||||
| Monthly - Inspect swivel for expiration date established by manufacturer. Swivels must be replaced before the indicated expiration date. | Partial System OOS | ||||||||||||||||
| 5006 | Lackland Service Station | Lackland Service Station | Swivels | Dispenser 1 | OPW | 45-5060 | 0.75 in. | 0 | 0 | 0 | 7-5 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect swivel for loose connections and signs of damage. Ensure swivel rotates easily and is clean and free of fuel. | ||||
| Monthly - Inspect swivel for expiration date established by manufacturer. Swivels must be replaced before the indicated expiration date. | Partial System OOS | ||||||||||||||||
| 5006 | Lackland Service Station | Lackland Service Station | Hose Retriever | Dispenser 10 | Wayne | Internal Design | N/A | 0 | 0 | 0 | 7-6 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 5006 | Lackland Service Station | Lackland Service Station | Hose Retriever | Dispenser 4 | Wayne | Internal Design | N/A | 0 | 0 | 0 | 7-6 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 5006 | Lackland Service Station | Lackland Service Station | Hose Retriever | Dispenser 3 | Wayne | Internal Design | N/A | 0 | 0 | 0 | 7-6 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 5006 | Lackland Service Station | Lackland Service Station | Hose Retriever | Dispenser 2 | Wayne | Internal Design | N/A | 0 | 0 | 0 | 7-6 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 5006 | Lackland Service Station | Lackland Service Station | Hose Retriever | Dispenser 1 | Wayne | Internal Design | N/A | 0 | 0 | 0 | 7-6 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 5006 | Lackland Service Station | Lackland Service Station | Hose Retriever | Dispenser 9 | Wayne | Internal Design | N/A | 0 | 0 | 0 | 7-6 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 5006 | Lackland Service Station | Lackland Service Station | Dispenser Cabinet | Dispenser 1/2 | Wayne | 3/37242D/2GHJ/HK | N/A | 0 | 0 | X | 7-7 | Inspect for damage, ensure door panels and locks are functional. | Monthly - Inspect outside of cabinet and ensure it is free of damage. Inspect for fuel stains on the concrete island around the cabinet and on the outside of the cabinet. Ensure the cabinet is free of dirt and fuel. Open both sides of the cabinet and inspect the inside of the cabinet. Ensure the inside of the cabinet and all of the components inside the cabinet are clean and free of fuel. | Partial System OOS | |||
| 5006 | Lackland Service Station | Lackland Service Station | Dispenser Cabinet | Dispenser 9/10 | Wayne | Cen-2699703 | N/A | 0 | 0 | X | 7-7 | Inspect for damage, ensure door panels and locks are functional. | Monthly - Inspect outside of cabinet and ensure it is free of damage. Inspect for fuel stains on the concrete island around the cabinet and on the outside of the cabinet. Ensure the cabinet is free of dirt and fuel. Open both sides of the cabinet and inspect the inside of the cabinet. Ensure the inside of the cabinet and all of the components inside the cabinet are clean and free of fuel. | Partial System OOS | |||
| 5006 | Lackland Service Station | Lackland Service Station | Dispenser Cabinet | Dispenser 3/4 E-85 | Wayne | E3/G7202D/2GHJ/HKX | N/A | 0 | 0 | X | 7-7 | Inspect for damage, ensure door panels and locks are functional. | Monthly - Inspect outside of cabinet and ensure it is free of damage. Inspect for fuel stains on the concrete island around the cabinet and on the outside of the cabinet. Ensure the cabinet is free of dirt and fuel. Open both sides of the cabinet and inspect the inside of the cabinet. Ensure the inside of the cabinet and all of the components inside the cabinet are clean and free of fuel. | Partial System OOS | |||
| 5006 | Lackland Service Station | Lackland Service Station | Dispenser Meters | Dsipenser 9 | Wayne | Not Labeled | 0-15 GPM/SCFM | 0 | 0 | X | 7-8 | Inspect for damage, smooth operation and legibility. | Monthly - Inspect meter and ensure meter is clean and free of fuel. Ensure calibration mechanism is sealed. | Partial System OOS | No info | ||
| 5006 | Lackland Service Station | Lackland Service Station | Dispenser Meters | Dispenser 10 | Wayne | Not Labeled | 0-15 GPM/SCFM | 0 | 0 | X | 7-8 | Inspect for damage, smooth operation and legibility. | Monthly - Inspect meter and ensure meter is clean and free of fuel. Ensure calibration mechanism is sealed. | Partial System OOS | |||
| 5006 | Lackland Service Station | Lackland Service Station | Dispenser Meters | Dispenser 3 | Wayne | Not Labeled | 0-15 GPM/SCFM | 0 | 0 | X | 7-8 | Inspect for damage, smooth operation and legibility. | Monthly - Inspect meter and ensure meter is clean and free of fuel. Ensure calibration mechanism is sealed. | Partial System OOS | |||
| 5006 | Lackland Service Station | Lackland Service Station | Dispenser Meters | Dispenser 4 | Wayne | Not Labeled | 0-15 GPM/SCFM | 0 | 0 | X | 7-8 | Inspect for damage, smooth operation and legibility. | Monthly - Inspect meter and ensure meter is clean and free of fuel. Ensure calibration mechanism is sealed. | Partial System OOS | No data tag in this side, might be same meter for both sides of dispenser | ||
| 5006 | Lackland Service Station | Lackland Service Station | Dispenser Meters | Dispenser 2 | Wayne | Not Labeled | 0-15 GPM/SCFM | 0 | 0 | X | 7-8 | Inspect for damage, smooth operation and legibility. | Monthly - Inspect meter and ensure meter is clean and free of fuel. Ensure calibration mechanism is sealed. | Partial System OOS | |||
| 5006 | Lackland Service Station | Lackland Service Station | Dispenser Meters | Dispenser 1 | Wayne | Not Labeled | 0-15 GPM/SCFM | 0 | 0 | X | 7-8 | Inspect for damage, smooth operation and legibility. | Monthly - Inspect meter and ensure meter is clean and free of fuel. Ensure calibration mechanism is sealed. | Partial System OOS | |||
| 5006 | Lackland Service Station | Lackland Service Station | Dispenser Filters | Dispenser 9 | Cimtek | 400HA-01 | N/A | 0 | 0 | X | 7-9 | Check exterior for damage | No Operator Requirement | Partial System OOS | |||
| 5006 | Lackland Service Station | Lackland Service Station | Dispenser Filters | Dispenser 3/4 | Bio-Tek | 400BHA-01 | N/A | 0 | 0 | X | 7-9 | Check exterior for damage | No Operator Requirement | Partial System OOS | |||
| 5006 | Lackland Service Station | Lackland Service Station | Dispenser Filters | Dispenser 10 | Cimtek | 400HA-01 | N/A | 0 | 0 | X | 7-9 | Check exterior for damage | No Operator Requirement | Partial System OOS | |||
| 5006 | Lackland Service Station | Lackland Service Station | Dispenser Filters | Dispenser 1 | Cimtek | 400MB-30 | N/A | 0 | 0 | X | 7-9 | Check exterior for damage | No Operator Requirement | Partial System OOS | |||
| 5006 | Lackland Service Station | Lackland Service Station | Dispenser Filters | Dispenser 2 | Cimtek | 400MB-30 | N/A | 0 | 0 | X | 7-9 | Check exterior for damage | No Operator Requirement | Partial System OOS | |||
| 5006 | Lackland Service Station | Operations Building | Externally Mounted Level Alarms | Control Room | Veeder Root | 790091-001 | N/A | 0 | 0 | 0 | 8-9.9.1 | Lift the manual test lever of internally mounted float valve (if equipped). Ensure that the HLSO closes when the float of the float valve is raised. | No Operator Requirement | Partial System OOS | |||
| 5006 | Lackland Service Station | Lackland Service Station | Static Grounding Systems | Bldg 5006 Canopy Ground West Column | N/A | N/A | N/A | X | X | X | 9-1.6.2 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | Partial System OOS | |||
| 5006 | Lackland Service Station | Lackland Service Station | Static Grounding Systems | Bldg 5006 Canopy Ground North Column | N/A | N/A | N/A | X | X | X | 9-1.6.2 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | Partial System OOS | |||
| 5006 | Lackland Service Station | Lackland Service Station | Static Grounding Systems | Bldg 5006 Canopy Ground East Column | N/A | N/A | N/A | X | X | X | 9-1.6.2 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | Partial System OOS | |||
| 5006 | Lackland Service Station | Lackland Service Station | Static Grounding Systems | Bldg 5006 Canopy Ground South Column | N/A | N/A | N/A | X | X | X | 9-1.6.2 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | Partial System OOS | |||
| 5006 | Lackland Service Station | Lackland Service Station | Lighting | Bldg 5006 canopy lighting | N/A | N/A | N/A | X | X | X | 9-1.8 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 5006 | Lackland Service Station | Lackland Service Station | Card and Key Locks | Dispenser Island | FuelMaster | FMU 2500 | N/A | 0 | 0 | X | 9-3 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 5006 | Lackland Service Station | Lackland Service Station | Lightning Protection Systems | Bldg 5006 canopy lightning protection | N/A | N/A | N/A | 0 | 0 | X | 9-4 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | Partial System OOS | |||
| 5023 | Vaulted Tanks | Vaulted Tanks Above Ground | Emergency Eyewash/Showers | Eyewash/shower | Haws | 8300-8309 | 2.0 In. | X | X | X | 11-3 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 5023 | Vaulted Tanks | Vaulted Tanks Above Ground | Signage and Markings | Above Ground | N/A | N/A | N/A | 0 | 0 | X | 2-7 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 5023 | Vaulted Tanks | Vaulted Tanks Above Ground | Ball Valves | Eyewash ISO Valve | Watts | BVS 150 | 1.5 in. | X | X | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 5023 | Vaulted Tanks | Tank 2 MOGAS (5023A) | Remote Dispenser Pumps | Red Jacket | Red Jacket | 30913 | GPM/SCFM | X | X | 0 | 7-15.1 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 5023 | Vaulted Tanks | Tank 5 Diesel (5023E) | Remote Dispenser Pumps | Red Jacket | Red Jacket | 30913 | GPM/SCFM | X | X | 0 | 7-15.1 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 5023 | Vaulted Tanks | Tank 1 MOGAS (5023B) | Remote Dispenser Pumps | Red Jacket | Red Jacket | 30913 | GPM/SCFM | X | X | 0 | 7-15.1 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 5023 | Vaulted Tanks | Vaulted Tanks Above Ground | EFSO Systems | Eyewash EFSO | Not Listed | Not Listed | Not Listed | X | X | 0 | 7-16 | Proper operation, box seals for integrity. Electrical connections for continuity. | No Operator Requirement | Partial System OOS | |||
| 5023 | Vaulted Tanks | Tank 5 Diesel (5023E) | Aboveground Shop Fabricated Tanks | Vaulted Tank 5 | UNK | UNK | 12,000 Gallons | X | X | X | 8-5.1 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | ||||
| Confined Space Entry required | No Mission Impact | Confined Space Entry Required | |||||||||||||||
| 5023 | Vaulted Tanks | Tank 2 MOGAS (5023A) | Aboveground Shop Fabricated Tanks | Vaulted Tank 2 | UNK | UNK | 12,000 Gallons | X | X | X | 8-5.1 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | ||||
| Confined Space Entry Required | No Mission Impact | Confined Space Entry Required | |||||||||||||||
| 5023 | Vaulted Tanks | Tank 1 MOGAS (5023B) | Aboveground Shop Fabricated Tanks | Vaulted Tank 1 | UNK | UNK | 12,000 Gallons | X | X | X | 8-5.1 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | ||||
| Confined Space Entry Required | No Mission Impact | Confined Space Required | |||||||||||||||
| 5023 | Vaulted Tanks | Tank 5 Diesel (5023E) | Fill Ports | Tank 5 Fill Port | OPW 61SO Non Testable | Overfill Prevention | 3.0 In. | X | X | X | 8-9.12 | Ensure fill port covers are installed and are not damaged or broken. Ensure fill port covers are identified by fuel type and are installed on the correct tank. Visually inspect the fill port spill bucket to ensure there are no cracks, budges, or holes. | Daily - Ensure fill port covers are installed and are not damaged or broken. Ensure fill port covers are identified by fuel type and are installed on the correct tank. Visually inspect the fill port spill bucket to ensure there are no cracks, budges, or holes. Ensure the spill bucket is clean of dirt, trash, water, and fuel. | Partial System OOS | |||
| 5023 | Vaulted Tanks | Tank 2 MOGAS (5023A) | Fill Ports | Tank 2 Fill Port | OPW 61SO Non Testable | Overfill Prevention | 3.0 In. | X | X | X | 8-9.12 | Ensure fill port covers are installed and are not damaged or broken. Ensure fill port covers are identified by fuel type and are installed on the correct tank. Visually inspect the fill port spill bucket to ensure there are no cracks, budges, or holes. | Daily - Ensure fill port covers are installed and are not damaged or broken. Ensure fill port covers are identified by fuel type and are installed on the correct tank. Visually inspect the fill port spill bucket to ensure there are no cracks, budges, or holes. Ensure the spill bucket is clean of dirt, trash, water, and fuel. | Partial System OOS | |||
| 5023 | Vaulted Tanks | Tank 1 MOGAS (5023B) | Fill Ports | Tank 1 Fill Port | OPW 61SO Non Testable | Overfill Prevention | 3.0 In. | X | X | X | 8-9.12 | Ensure fill port covers are installed and are not damaged or broken. Ensure fill port covers are identified by fuel type and are installed on the correct tank. Visually inspect the fill port spill bucket to ensure there are no cracks, budges, or holes. | Daily - Ensure fill port covers are installed and are not damaged or broken. Ensure fill port covers are identified by fuel type and are installed on the correct tank. Visually inspect the fill port spill bucket to ensure there are no cracks, budges, or holes. Ensure the spill bucket is clean of dirt, trash, water, and fuel. | Partial System OOS | |||
| 5023 | Vaulted Tanks | Tank 2 MOGAS (5023A) | Tank Pressure/ Vacuum Vents | Tank 1 | OPW | 23-0033 | 2.0 In. | 0 | 0 | X | 8-9.3 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 5023 | Vaulted Tanks | Tank 1 MOGAS (5023B) | Tank Pressure/ Vacuum Vents | Tank 2 | OPW | 23-0033 | 2.0 In. | 0 | 0 | X | 8-9.3 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 5023 | Vaulted Tanks | Tank 5 Diesel (5023E) | Tank Pressure/ Vacuum Vents | Tank 5 | OPW | 23-0033 | 2.0 In. | 0 | 0 | X | 8-9.3 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 5023 | Vaulted Tanks | Vaulted Tanks Above Ground | Externally Mounted Level Alarms | Eyewash alarm | Electraray | 225XST (Strobe Light) | N/A | 0 | 0 | 0 | 8-9.9.1 | Lift the manual test lever of internally mounted float valve (if equipped). Ensure that the HLSO closes when the float of the float valve is raised. | No Operator Requirement | Partial System OOS | Light and sound alarm inop per base personnel | ||
| 5023 | Vaulted Tanks | Vaulted Tanks Above Ground | Externally Mounted Level Alarms | High level alarm tanks 1, 2, 5 | SJE Rhombus | Not Listed | N/A | 0 | 0 | 0 | 8-9.9.1 | Lift the manual test lever of internally mounted float valve (if equipped). Ensure that the HLSO closes when the float of the float valve is raised. | No Operator Requirement | Partial System OOS | |||
| 5023 | Vaulted Tanks | Vaulted Tanks Above Ground | Static Grounding Systems | TT Offload Ground | N/A | N/A | N/A | X | X | X | 9-1.6.2 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | Partial System OOS | |||
| 5023 | Vaulted Tanks | Tank 2 MOGAS (5023A) | Static Grounding Systems | Tank Ground 1 | N/A | N/A | N/A | X | X | X | 9-1.6.2 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | Partial System OOS | |||
| 5023 | Vaulted Tanks | Tank 2 MOGAS (5023A) | Static Grounding Systems | Tank Ground 2 | N/A | N/A | N/A | X | X | X | 9-1.6.2 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | Partial System OOS | |||
| 5023 | Vaulted Tanks | Tank 1 MOGAS (5023B) | Static Grounding Systems | Tank Ground 1 | N/A | N/A | N/A | X | X | X | 9-1.6.2 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | Partial System OOS | |||
| 5023 | Vaulted Tanks | Tank 1 MOGAS (5023B) | Static Grounding Systems | Tank Ground 2 | N/A | N/A | N/A | X | X | X | 9-1.6.2 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | Partial System OOS | |||
| 5023 | Vaulted Tanks | Tank 5 Diesel (5023E) | Static Grounding Systems | Tank Ground 1 | N/A | N/A | N/A | X | X | X | 9-1.6.2 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | Partial System OOS | |||
| 5023 | Vaulted Tanks | Tank 5 Diesel (5023E) | Static Grounding Systems | Tank Ground 2 | N/A | N/A | N/A | X | X | X | 9-1.6.2 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | Partial System OOS |
&"Times New Roman,Bold"&14Facility Maintenance Plan
FMP v2.2 2
Instructions:
1. Input all data as indicated on the sheet.
2. Additional documents referred to in the Special Considerations column shall be included as an appendix to this FMP.
3. The contractor shall generate a Component Unique Identifier (CUID) for each component utilizing the Component Acronym Sheet within this Work Book. The unique identifier must use the following:
Three letter Site Code - Facility # - Component Acronym - Sequential number Example: AAD-00063A-RCVL-0001
If component acronym is not listed, the contractor shall request an acronym be established through the HNC Project Manager and Project Engineer via email. Contractors may utilize other means of tracking/labeling assets such as QR codes in addition to the required CUID however, tracking/labeling must correlate with the CUID. This CUID shall be the standard for all DLA capitalized equipment. Base Asset ID if used by site shall be cross referenced with CUID appropriately.
4. Utilize the UFC Section Reference Work Category as noted on the Component Acronym Sheet.
5. Enter any applicable manufacturer requirements not stated in the UFC. References are acceptable with attachments.
6. Enter any applicable operator support or government owned equipment required to complete the RM task.
7. Enter impact on system availability by performing the RM task. This could include shutdown, lockout, or similar impacts.
8. Enter contract information for any other contract, contractor, or government personnel performing the applicable task. This is applicable to other Centrally Managed Programs, SRM, MILCON, or Public Works/Civil Engineering projects.
9. Print Hard Copies as 11x17.
FS-PF Schedule
| FILTER SEPARATOR/PRE-FILTER MAINTENANCE SCHEDULES | |||||||||||||
| Applicable Facility Assets | Coalescer/Separator Information | Special Considerations | |||||||||||
| Real Property Unique Identifier | |||||||||||||
| (RPUID) | Real Property Facility # | Real Property Facility Name | Operational Area | Component Type | Base Asset ID | Component Unique Identifier (CUID) | Make | Model | Capacity (GPM) | UFC Section Reference | Number of Coalescer Cartridges | Number of | |
| Separator Cartridges | Coalescer Cartridges | ||||||||||||
| Model # | Separator Cartridge | ||||||||||||
| Model # | Clean or Replace | ||||||||||||
| Separator Cartridge | Gasket | ||||||||||||
| Model # | Date Last Replaced | Replacement Due Date | Operator/Equipment Requirements | System Availability | Site Self Performs | ||||||||
| (Y/N) | Comments |
&"Times New Roman,Bold"&14Facility Maintenance Plan
FMP v2.2 2
Instructions:
1. Input all data as indicated on the sheet.
2. Additional documents referred to in the Special Considerations column shall be included as an appendix to this FMP.
3. The contractor shall generate a Component Unique Identifier (CUID) for each component utilizing the Component Acronym Sheet within this Work Book. The unique identifier must use the following:
Three letter Site Code - Facility # - Component Acronym - Sequential number Example: AAD-00063A-RCVL-0001
If component acronym is not listed, the contractor shall request an acronym be established through the HNC Project Manager and Project Engineer via email. Contractors may utilize other means of tracking/labeling assets such as QR codes in addition to the required CUID however, tracking/labeling must correlate with the CUID.