PWS BAR FMP Template - v2.2.xlsx
XLSX spreadsheet 200 KB Posted
- Attached to
- Sources Sought - CEHNC FUELS PROGRAM
- Solicitation number
- PANHES-25-P-0000-001794
About this file
This file is a Facility Maintenance Plan (FMP) template for fuel system maintenance at Barksdale Air Force Base. The template outlines maintenance and inspection requirements for permanently installed fuel facilities operated under Quality Assurance Evaluators, including detailed inspection schedules and procedures for components like fuel storage tanks, filter separators, dispensers, nozzles, hoses, meters, and emergency equipment.
The document provides specific maintenance requirements for multiple facilities including the Main Motor Service Station (MSS), East MSS, Tank Truck Offload, and Bulk Storage areas. It covers maintenance of various fuel types including MOGAS, diesel, Jet A, and E-85 across 22 dispenser positions. Key components requiring regular inspection include emergency shutoff valves, breakaways, dispenser nozzles, hoses, meters, and filters. The plan mandates daily, weekly, monthly and annual inspection schedules depending on the component, with detailed procedures for each inspection type. The facility operates from 0800-1600 at 109 East Barksdale Boulevard, Barksdale AFB, LA 71111.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Administrative
| Location | Site Name | BARKSDALE AIR FORCE BASE SITE # 1 |
| RPSUID | 1431 | |
| DLA Site Code | BAR | |
| Hours of Operation | 0800-1600 | |
| Address | 109 East Barksdale Boulevard, Barksdale AFB, LA 71111 | |
| Contract | Contractor | |
| Contract # | ||
| Local POCs | QAE Name | |
| QAE Phone | ||
| QAE Email | ||
| Alt QAE Name | ||
| Alt QAE Phone | ||
| Alt QAE Email | ||
| DLA/SCP POCs | DLA PM Name | |
| DLA PM Phone | ||
| DLA PM Email | ||
| SCP PM Name | ||
| SCP PM Phone | ||
| SCP PM Email | ||
| Contractor POCs | Contractor PM Name | |
| Contractor PM Phone | ||
| Contractor PM Email | ||
| Contractor QC Name | ||
| Contractor QC Phone | ||
| Contractor QC Email | ||
| Contractor SM Name | ||
| Contractor SM Phone | ||
| Contractor SM Email | ||
| USACE POCs | USACE PM/COR Name | |
| USACE PM/COR Phone | ||
| USACE PM/COR Email | ||
| USACE PE Name | ||
| USACE PE Phone | ||
| USACE PE Email | ||
| USACE KO Name | ||
| USACE KO Phone | ||
| USACE KO Email |
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
This table shows the minimum information required. Additional details should be included based on site specific requirements. Additional POCs may be required.
General Facility Description Facility Description
Purpose:
This Facility Maintenance Plan provides guidance for Contractor personnel in the operation, inspection, and maintenance of permanently installed fuel facilities operated under the control of the Quality Assurance Evaluators. Federal, state, and local environmental laws and regulations shall be complied with if this plan is in conflict with them.
Scope:
The instructions prescribed by this plan outline general fuels maintenance information associated with fuel storage and dispensing systems and provides the minimum periodic contractor maintenance and inspection criteria requirements for the systems. This plan is to be used in conjunction with other existing directives governing fuel system operations and maintenance requirements. Conotractor will properly maintain and repair federally funded petroleum systems and facilities in order to provide compliance with applicable code, criteria, and federal, state, local and/or host nation regulations.
Fuels Facilities:
Organizational tanks, and associated dispensing equipment are maintained and operated by the owning organization. Fuel system maintenance contractors shall perform all maintenance and associated procurement actions on installed fuel systems.
Each installation under the Southwest Division contract are military land-based facilities who receive, store, distribute, and/or dispense liquid fuels.
Standard fuel system equipment includes:
a) Above Ground Sorage Stanks (AST), Underground Storage Tanks (UST)
b) Filter/separator and other filtration device maintenance access, particularly element removal.
c) Manual valves
d) Meter Registers, and Flow Meters.
e) Control Valves.
f) Pumps
g) Tank Monitoring Equipment and Instruments
h) Alarms
i) Fire Fighting Equipment
Site Specific General Information:
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Include a general facility overview and description of each fuel system for the sites in accordance with UFC 3-460-01. Examples include: Bulk Storage Facilities, Aircraft Fueling Facilities, Marine and Dispensing Facilities, Ground Products Fueling Facilities, Alternate POL Facilities, and Support Facilities. Also include facility #s, facility names, fuel type, photos, and any other pertinent information.
Include Site Specific Conditions and Restrictions in this tab.
Communication Plan
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Communication plan shall address in/out briefs, lines of communication, coordination for access, etc.
Safety
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Site Specific Addendum and Activity Hazard Analysis, which are Attachments to the APP, specific to activities or tasks related to recurring maintenance for this site.
RM Schedule
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Link RM schedule here
Task Matrix
| Applicable Facility Assets | UFC System Level Maintenance Frequency | Special Considerations | |||||||||||||||||
| Real Property Unique Identifier | |||||||||||||||||||
| (RPUID) | Real Property Facility # | Real Property Facility Name | Operational Area | Component Type | Base Asset ID | Component Unique Identifier (CUID) | Make | Model | Capacity/Size | Q | S | A | UFC Section Reference | Additional Manufacturer RM Requirements | Operator/ equipment Requirements | System availability | Other Contract | Comments | |
| 7200 | 7200 | East MSS | Automatic Air Vents | EAST GAS STATION TANK, MOGAS | X | 3-10.2 | No Manufacturer Requirements Available | No Operator Requirement | New Asset Identified | ||||||||||
| 7200 | 7200 | East MSS | Automatic Air Vents | EAST GAS STATION TANK, DIESEL | X | 3-10.2 | No Manufacturer Requirements Available | No Operator Requirement | New Asset Identified | ||||||||||
| 6434 | 6434 | Main MSS | Positive Displacement Meter | Offload - Inactive | Veeder Root | SN# 0506328112 | 0-600 | X | 3-7.1 | Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature | |||||||||
| compensation feature | Monthly - Inspect counter head for unusual noises and smooth operation. | Partial System OOS | New Asset Identified | ||||||||||||||||
| 6434 | 6434 | Main MSS | Positive Displacement Meter | Offload - Inactive | Veeder Root | SN# 9306644698 | 0-600 | X | 3-7.1 | Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature | |||||||||
| compensation feature | Monthly - Inspect counter head for unusual noises and smooth operation. | Partial System OOS | New Asset Identified | ||||||||||||||||
| 6434 | 6434 | Main MSS | Positive Displacement Meter | Offload - Issue | Veeder Root | SN# 9606644666 | 0-600 | X | 3-7.1 | Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature | |||||||||
| compensation feature | Monthly - Inspect counter head for unusual noises and smooth operation. | Partial System OOS | New Asset Identified | ||||||||||||||||
| 6350 | 6350 | Tank Truck Offload | Positive Displacement Meter | 345566 | X | 3-7.1 | Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature | ||||||||||||
| compensation feature | Monthly - Inspect counter head for unusual noises and smooth operation. | Partial System OOS | New Asset Identified | ||||||||||||||||
| 6350 | 6350 | Tank Truck Offload | Positive Displacement Meter | 345565 | X | 3-7.1 | Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature | ||||||||||||
| compensation feature | Monthly - Inspect counter head for unusual noises and smooth operation. | Partial System OOS | New Asset Identified | ||||||||||||||||
| 5942 | 5942 | Bulk Storage | Positive Displacement Meter | 432030 | X | 3-7.1 | Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature | ||||||||||||
| compensation feature | Monthly - Inspect counter head for unusual noises and smooth operation. | Partial System OOS | New Asset Identified | ||||||||||||||||
| 5942 | 5942 | Bulk Storage | Positive Displacement Meter | 432064 | X | 3-7.1 | Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature | ||||||||||||
| compensation feature | Monthly - Inspect counter head for unusual noises and smooth operation. | Partial System OOS | New Asset Identified | ||||||||||||||||
| 5942 | 5942 | Bulk Storage | Positive Displacement Meter | 432065 | X | 3-7.1 | Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature | ||||||||||||
| compensation feature | Monthly - Inspect counter head for unusual noises and smooth operation. | Partial System OOS | New Asset Identified | ||||||||||||||||
| 6350 | 6350 | Tank Truck Offload | Combination Dual Rate-of-Flow Control and Solenoid Valves | Filter Separator Pad | CLA-VAL | 40-36 | 4" | X | 4-3.3.1 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | New Asset Identified | ||||||
| 6350 | 6350 | Tank Truck Offload | Combination Dual Rate-of-Flow Control and Solenoid Valves | Filter Separator Pad | CLA-VAL | 40-36 | 4" | X | 4-3.3.1 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | New Asset Identified | ||||||
| 6350 | 6350 | Tank Truck Offload | Combination Dual Rate-of-Flow Control and Solenoid Valves | Filter Separator Pad | CLA-VAL | 40-36 | 6" | X | 4-3.3.1 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | New Asset Identified | ||||||
| 6434 | 6434 | Main MSS | Dispenser Strainers | MOGAS Dispenser 1 | X | 7-10 | Inspect strainer cover gasket for cracks, distortion, and dry rot. | No Operator Requirement | Partial System OOS | New Asset Identified | |||||||||
| 6434 | 6434 | Main MSS | Dispenser Strainers | Diesel Dispenser 3 | X | 7-10 | Inspect strainer cover gasket for cracks, distortion, and dry rot. | No Operator Requirement | Partial System OOS | New Asset Identified | |||||||||
| 6434 | 6434 | Main MSS | Dispenser Strainers | Diesel Dispenser 4 | X | 7-10 | Inspect strainer cover gasket for cracks, distortion, and dry rot. | No Operator Requirement | Partial System OOS | New Asset Identified | |||||||||
| 6434 | 6434 | Main MSS | Dispenser Strainers | MOGAS Dispenser 5 / 6 | X | 7-10 | Inspect strainer cover gasket for cracks, distortion, and dry rot. | No Operator Requirement | Partial System OOS | New Asset Identified | |||||||||
| 6434 | 6434 | Main MSS | Dispenser Strainers | Diesel Dispenser 7 | X | 7-10 | Inspect strainer cover gasket for cracks, distortion, and dry rot. | No Operator Requirement | Partial System OOS | New Asset Identified | |||||||||
| 6434 | 6434 | Main MSS | Dispenser Strainers | Diesel Dispenser 8 | X | 7-10 | Inspect strainer cover gasket for cracks, distortion, and dry rot. | No Operator Requirement | Partial System OOS | New Asset Identified | |||||||||
| 6434 | 6434 | Main MSS | Dispenser Strainers | E-85 Dispenser 9 / 10 | X | 7-10 | Inspect strainer cover gasket for cracks, distortion, and dry rot. | No Operator Requirement | Partial System OOS | New Asset Identified | |||||||||
| 6434 | 6434 | Main MSS | Dispenser Strainers | E-85 Dispenser 11 / 12 | X | 7-10 | Inspect strainer cover gasket for cracks, distortion, and dry rot. | No Operator Requirement | Partial System OOS | New Asset Identified | |||||||||
| 7200 | 7200 | East MSS | Dispenser Strainers | Diesel Dispenser 13 / 14 | X | 7-10 | Inspect strainer cover gasket for cracks, distortion, and dry rot. | No Operator Requirement | Partial System OOS | New Asset Identified | |||||||||
| 7200 | 7200 | East MSS | Dispenser Strainers | MOGAS Dispenser 15 | X | 7-10 | Inspect strainer cover gasket for cracks, distortion, and dry rot. | No Operator Requirement | Partial System OOS | New Asset Identified | |||||||||
| 6434 | 6434 | Main MSS | Dispenser Strainers | Jet A Dispenser 17/18 | X | 7-10 | Inspect strainer cover gasket for cracks, distortion, and dry rot. | No Operator Requirement | Partial System OOS | New Asset Identified | |||||||||
| 6434 | 6434 | Main MSS | Dispenser Strainers | Jet A Dispenser 19 / 20 | X | 7-10 | Inspect strainer cover gasket for cracks, distortion, and dry rot. | No Operator Requirement | Partial System OOS | New Asset Identified | |||||||||
| 6434 | 6434 | Main MSS | Dispenser Strainers | MOGAS Dispenser 21 / 22 | X | 7-10 | Inspect strainer cover gasket for cracks, distortion, and dry rot. | No Operator Requirement | Partial System OOS | New Asset Identified | |||||||||
| 6434 | 6434 | Main MSS | Emergency Shutoff Valves (Shear Valves) | MOGAS Dispenser 1 / 2 | X | 7-12 | Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. Inspect mechanical links of the valve for correct operation. Conduct test of valve to ensure it operates correctly. | Monthly - Inspect stabilizer bar to ensure that it is securely mounted below the base of the dispenser. Inspect the mounting bolts that secure the emergency shutoff valve to the stabilizer bar. Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. | Partial System OOS | New Asset Identified | |||||||||
| 6434 | 6434 | Main MSS | Emergency Shutoff Valves (Shear Valves) | Diesel Dispenser 3 | X | 7-12 | Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. Inspect mechanical links of the valve for correct operation. Conduct test of valve to ensure it operates correctly. | Monthly - Inspect stabilizer bar to ensure that it is securely mounted below the base of the dispenser. Inspect the mounting bolts that secure the emergency shutoff valve to the stabilizer bar. Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. | Partial System OOS | New Asset Identified | |||||||||
| 6434 | 6434 | Main MSS | Emergency Shutoff Valves (Shear Valves) | Diesel Dispenser 4 | X | 7-12 | Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. Inspect mechanical links of the valve for correct operation. Conduct test of valve to ensure it operates correctly. | Monthly - Inspect stabilizer bar to ensure that it is securely mounted below the base of the dispenser. Inspect the mounting bolts that secure the emergency shutoff valve to the stabilizer bar. Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. | Partial System OOS | New Asset Identified | |||||||||
| 6434 | 6434 | Main MSS | Emergency Shutoff Valves (Shear Valves) | MOGAS Dispenser 5 / 6 | X | 7-12 | Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. Inspect mechanical links of the valve for correct operation. Conduct test of valve to ensure it operates correctly. | Monthly - Inspect stabilizer bar to ensure that it is securely mounted below the base of the dispenser. Inspect the mounting bolts that secure the emergency shutoff valve to the stabilizer bar. Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. | Partial System OOS | New Asset Identified | |||||||||
| 6434 | 6434 | Main MSS | Emergency Shutoff Valves (Shear Valves) | Diesel Dispenser 7 | X | 7-12 | Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. Inspect mechanical links of the valve for correct operation. Conduct test of valve to ensure it operates correctly. | Monthly - Inspect stabilizer bar to ensure that it is securely mounted below the base of the dispenser. Inspect the mounting bolts that secure the emergency shutoff valve to the stabilizer bar. Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. | Partial System OOS | New Asset Identified | |||||||||
| 6434 | 6434 | Main MSS | Emergency Shutoff Valves (Shear Valves) | Diesel Dispenser 8 | X | 7-12 | Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. Inspect mechanical links of the valve for correct operation. Conduct test of valve to ensure it operates correctly. | Monthly - Inspect stabilizer bar to ensure that it is securely mounted below the base of the dispenser. Inspect the mounting bolts that secure the emergency shutoff valve to the stabilizer bar. Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. | Partial System OOS | New Asset Identified | |||||||||
| 6434 | 6434 | Main MSS | Emergency Shutoff Valves (Shear Valves) | E-85 Dispenser 9 / 10 | X | 7-12 | Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. Inspect mechanical links of the valve for correct operation. Conduct test of valve to ensure it operates correctly. | Monthly - Inspect stabilizer bar to ensure that it is securely mounted below the base of the dispenser. Inspect the mounting bolts that secure the emergency shutoff valve to the stabilizer bar. Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. | Partial System OOS | New Asset Identified | |||||||||
| 6434 | 6434 | Main MSS | Emergency Shutoff Valves (Shear Valves) | E-85 Dispenser 11 / 12 | X | 7-12 | Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. Inspect mechanical links of the valve for correct operation. Conduct test of valve to ensure it operates correctly. | Monthly - Inspect stabilizer bar to ensure that it is securely mounted below the base of the dispenser. Inspect the mounting bolts that secure the emergency shutoff valve to the stabilizer bar. Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. | Partial System OOS | New Asset Identified | |||||||||
| 7200 | 7200 | East MSS | Emergency Shutoff Valves (Shear Valves) | Diesel Dispenser 13 / 14 | X | 7-12 | Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. Inspect mechanical links of the valve for correct operation. Conduct test of valve to ensure it operates correctly. | Monthly - Inspect stabilizer bar to ensure that it is securely mounted below the base of the dispenser. Inspect the mounting bolts that secure the emergency shutoff valve to the stabilizer bar. Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. | Partial System OOS | New Asset Identified | |||||||||
| 7200 | 7200 | East MSS | Emergency Shutoff Valves (Shear Valves) | MOGAS Dispenser 15 / 16 | X | 7-12 | Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. Inspect mechanical links of the valve for correct operation. Conduct test of valve to ensure it operates correctly. | Monthly - Inspect stabilizer bar to ensure that it is securely mounted below the base of the dispenser. Inspect the mounting bolts that secure the emergency shutoff valve to the stabilizer bar. Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. | Partial System OOS | New Asset Identified | |||||||||
| 6434 | 6434 | Main MSS | Emergency Shutoff Valves (Shear Valves) | Jet A Dispenser 17/18 | X | 7-12 | Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. Inspect mechanical links of the valve for correct operation. Conduct test of valve to ensure it operates correctly. | Monthly - Inspect stabilizer bar to ensure that it is securely mounted below the base of the dispenser. Inspect the mounting bolts that secure the emergency shutoff valve to the stabilizer bar. Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. | Partial System OOS | New Asset Identified | |||||||||
| 6434 | 6434 | Main MSS | Emergency Shutoff Valves (Shear Valves) | Jet A Dispenser 19 / 20 | X | 7-12 | Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. Inspect mechanical links of the valve for correct operation. Conduct test of valve to ensure it operates correctly. | Monthly - Inspect stabilizer bar to ensure that it is securely mounted below the base of the dispenser. Inspect the mounting bolts that secure the emergency shutoff valve to the stabilizer bar. Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. | Partial System OOS | New Asset Identified | |||||||||
| 6350 | 6350 | Tank Truck Offload | Sight Flow Indicators | Offload Rack #1 | Visi-Flow | SER-4F | 3" | ||||||||||||
| 6350 | 6350 | Tank Truck Offload | Static Grounding Systems | Offload Rack #1 / Ground Reel | Gammon | 30 Foot | |||||||||||||
| 6350 | 6350 | Tank Truck Offload | Offloading Fuel Hoses | Offload Rack #1 | Unk | Unk | 10' x 4" | ||||||||||||
| 6350 | 6350 | Tank Truck Offload | Offloading Fuel Hoses | Offload Rack #1 | Unk | Unk | 10' x 4" | ||||||||||||
| 6434 | 6434 | Main MSS | Emergency Shutoff Valves (Shear Valves) | MOGAS Dispenser 21 / 22 | X | 7-12 | Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. Inspect mechanical links of the valve for correct operation. Conduct test of valve to ensure it operates correctly. | Monthly - Inspect stabilizer bar to ensure that it is securely mounted below the base of the dispenser. Inspect the mounting bolts that secure the emergency shutoff valve to the stabilizer bar. Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. | Partial System OOS | New Asset Identified | |||||||||
| 6434 | 6434 | Main MSS | Dispenser Nozzles | MOGAS Dispenser 1 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | ||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | Partial System OOS | New Asset Identified | |||||||
| 6434 | 6434 | Main MSS | Dispenser Nozzles | MOGAS Dispenser 2 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | |||||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | Partial System OOS | New Asset Identified | ||||||||||
| 6350 | 6350 | Tank Truck Offload | Sight Flow Indicators | Offload Rack #4 | Visi-Flow | SER-4F | 3" | |||||
| 6350 | 6350 | Tank Truck Offload | Static Grounding Systems | Offload Rack #4 / Ground Reel | Gammon | 30 Foot | ||||||
| 6350 | 6350 | Tank Truck Offload | Offloading Fuel Hoses | Offload Rack #4 | Unk | Unk | 10' x 4" | |||||
| 6350 | 6350 | Tank Truck Offload | Offloading Fuel Hoses | Offload Rack #4 | Unk | Unk | 10' x 4" | |||||
| 6434 | 6434 | Main MSS | Dispenser Nozzles | Diesel Dispenser 3 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | ||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | Partial System OOS | New Asset Identified | |||||||
| 6434 | 6434 | Main MSS | Dispenser Nozzles | Diesel Dispenser 4 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | ||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | Partial System OOS | New Asset Identified | |||||||
| 6434 | 6434 | Main MSS | Dispenser Nozzles | MOGAS Dispenser 5 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | |||||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | Partial System OOS | New Asset Identified | ||||||||||
| 6350 | 6350 | Tank Truck Offload | Sight Flow Indicators | Offload Rack #5 | Visi-Flow | SER-4F | 3" | |||||
| 6350 | 6350 | Tank Truck Offload | Static Grounding Systems | Offload Rack #5 / Ground Reel | Gammon | 30 Foot | ||||||
| 6350 | 6350 | Tank Truck Offload | Offloading Fuel Hoses | Offload Rack #5 | Unk | Unk | 10' x 4" | |||||
| 6350 | 6350 | Tank Truck Offload | Offloading Fuel Hoses | Offload Rack #5 | Unk | Unk | 10' x 4" | |||||
| 6434 | 6434 | Main MSS | Dispenser Nozzles | MOGAS Dispenser 6 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | ||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | Partial System OOS | New Asset Identified | |||||||
| 6434 | 6434 | Main MSS | Dispenser Nozzles | Diesel Dispenser 7 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | ||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | Partial System OOS | New Asset Identified | |||||||
| 6434 | 6434 | Main MSS | Dispenser Nozzles | Diesel Dispenser 8 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | |||||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | Partial System OOS | New Asset Identified | ||||||||||
| 6350 | 6350 | Tank Truck Offload | Sight Flow Indicators | Offload Rack #6 | Visi-Flow | SER-4F | 3" | |||||
| 6350 | 6350 | Tank Truck Offload | Static Grounding Systems | Offload Rack #6 / Ground Reel | Gammon | 30 Foot | ||||||
| 6350 | 6350 | Tank Truck Offload | Offloading Fuel Hoses | Offload Rack #6 | Unk | Unk | 10' x 4" | |||||
| 6350 | 6350 | Tank Truck Offload | Offloading Fuel Hoses | Offload Rack #6 | Unk | Unk | 10' x 4" | |||||
| 6434 | 6434 | Main MSS | Dispenser Nozzles | E-85 Dispenser 9 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | ||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | Partial System OOS | New Asset Identified | |||||||
| 6350 | 6350 | Tank Truck Offload | |||||||
| 6350 | 6350 | Tank Truck Offload | |||||||
| 6350 | 6350 | Tank Truck Offload | |||||||
| 6350 | 6350 | Tank Truck Offload | |||||||
| 6350 | 6350 | Tank Truck Offload | |||||||
| 6350 | 6350 | Tank Truck Offload | |||||||
| 6350 | 6350 | Tank Truck Offload | |||||||
| 6350 | 6350 | Tank Truck Offload | |||||||
| 6350 | 6350 | Tank Truck Offload | |||||||
| 6350 | 6350 | Tank Truck Offload | |||||||
| 6350 | 6350 | Tank Truck Offload | |||||||
| 6350 | 6350 | Tank Truck Offload | |||||||
| 6350 | 6350 | Tank Truck Offload | |||||||
| 6350 | 6350 | Tank Truck Offload | |||||||
| 6350 | 6350 | Tank Truck Offload | |||||||
| 6350 | 6350 | Tank Truck Offload | |||||||
| 6350 | 6350 | Tank Truck Offload | |||||||
| 6434 | 6434 | Main MSS | Dispenser Nozzles | E-85 Dispenser 10 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | ||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | Partial System OOS | New Asset Identified | |||||||
| 6434 | 6434 | Main MSS | Dispenser Nozzles | E-85 Dispenser 11 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | ||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | Partial System OOS | New Asset Identified | |||||||
| 6434 | 6434 | Main MSS | Dispenser Nozzles | E-85 Dispenser 12 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | ||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | Partial System OOS | New Asset Identified | |||||||
| 7200 | 7200 | East MSS | Dispenser Nozzles | Diesel Dispenser 13 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | ||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | Partial System OOS | New Asset Identified | |||||||
| 7200 | 7200 | East MSS | Dispenser Nozzles | Diesel Dispenser 14 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | ||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | Partial System OOS | New Asset Identified | |||||||
| 7200 | 7200 | East MSS | Dispenser Nozzles | MOGAS Dispenser 15 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | ||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | Partial System OOS | New Asset Identified | |||||||
| 7200 | 7200 | East MSS | Dispenser Nozzles | MOGAS Dispenser 16 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | ||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | Partial System OOS | New Asset Identified | |||||||
| 6434 | 6434 | Main MSS | Dispenser Nozzles | Jet A Dispenser 17 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | ||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | Partial System OOS | New Asset Identified | |||||||
| 6434 | 6434 | Main MSS | Dispenser Nozzles | Jet A Dispenser 18 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | ||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | Partial System OOS | New Asset Identified | |||||||
| 6434 | 6434 | Main MSS | Dispenser Nozzles | Jet A Dispenser 19 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | ||||||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | Partial System OOS | New Asset Identified | |||||||||||
| 6350 | 6350 | Tank Truck Offload | Positive Displacement Meter | Fillstand #2 | Liquid Control | M-60-1 / SN: 345566 | 60-600 GPM/150 PSI | X | 3-7.1 | Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature | |||
| compensation feature | Monthly - Inspect counter head for unusual noises and smooth operation. | Partial System OOS | |||||||||||
| 6434 | 6434 | Main MSS | Dispenser Nozzles | Jet A Dispenser 20 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | ||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | Partial System OOS | New Asset Identified | |||||||
| 6434 | 6434 | Main MSS | Dispenser Nozzles | MOGAS Dispenser 21 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | ||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | Partial System OOS | New Asset Identified | |||||||
| 6434 | 6434 | Main MSS | Dispenser Nozzles | MOGAS Dispenser 22 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | ||||||||||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | Partial System OOS | New Asset Identified | |||||||||||||||
| 6434 | 6434 | Main MSS | Dispenser Hoses | MOGAS Dispenser 1 | 7-3 | Check for expiration date, and physical condition/damage leaks. | Daily - Inspect dispenser hoses and hose whips for gouges, cuts, blisters, or outside wear that may lead to rupture during use. Replace hose or hose whips that show signs of wear. Inspect connection points of hoses and hose whips to the dispenser, breakaways, swivels, and the nozzle and ensure the connection points are clean and free of fuel. | Partial System OOS | New Asset Identified | ||||||||
| 6434 | 6434 | Main MSS | Dispenser Hoses | MOGAS Dispenser 2 | 7-3 | Check for expiration date, and physical condition/damage leaks. | Daily - Inspect dispenser hoses and hose whips for gouges, cuts, blisters, or outside wear that may lead to rupture during use. Replace hose or hose whips that show signs of wear. Inspect connection points of hoses and hose whips to the dispenser, breakaways, swivels, and the nozzle and ensure the connection points are clean and free of fuel. | Partial System OOS | New Asset Identified | ||||||||
| 6434 | 6434 | Main MSS | Dispenser Hoses | Diesel Dispenser 3 | 7-3 | Check for expiration date, and physical condition/damage leaks. | Daily - Inspect dispenser hoses and hose whips for gouges, cuts, blisters, or outside wear that may lead to rupture during use. Replace hose or hose whips that show signs of wear. Inspect connection points of hoses and hose whips to the dispenser, breakaways, swivels, and the nozzle and ensure the connection points are clean and free of fuel. | Partial System OOS | New Asset Identified | ||||||||
| 6434 | 6434 | Main MSS | Dispenser Hoses | Diesel Dispenser 4 | 7-3 | Check for expiration date, and physical condition/damage leaks. | Daily - Inspect dispenser hoses and hose whips for gouges, cuts, blisters, or outside wear that may lead to rupture during use. Replace hose or hose whips that show signs of wear. Inspect connection points of hoses and hose whips to the dispenser, breakaways, swivels, and the nozzle and ensure the connection points are clean and free of fuel. | Partial System OOS | New Asset Identified | ||||||||
| 6434 | 6434 | Main MSS | Dispenser Hoses | MOGAS Dispenser 5 | 7-3 | Check for expiration date, and physical condition/damage leaks. | Daily - Inspect dispenser hoses and hose whips for gouges, cuts, blisters, or outside wear that may lead to rupture during use. Replace hose or hose whips that show signs of wear. Inspect connection points of hoses and hose whips to the dispenser, breakaways, swivels, and the nozzle and ensure the connection points are clean and free of fuel. | Partial System OOS | New Asset Identified | ||||||||
| 6434 | 6434 | Main MSS | Dispenser Hoses | MOGAS Dispenser 6 | 7-3 | Check for expiration date, and physical condition/damage leaks. | Daily - Inspect dispenser hoses and hose whips for gouges, cuts, blisters, or outside wear that may lead to rupture during use. Replace hose or hose whips that show signs of wear. Inspect connection points of hoses and hose whips to the dispenser, breakaways, swivels, and the nozzle and ensure the connection points are clean and free of fuel. | Partial System OOS | New Asset Identified | ||||||||
| 6434 | 6434 | Main MSS | Dispenser Hoses | Diesel Dispenser 7 | 7-3 | Check for expiration date, and physical condition/damage leaks. | Daily - Inspect dispenser hoses and hose whips for gouges, cuts, blisters, or outside wear that may lead to rupture during use. Replace hose or hose whips that show signs of wear. Inspect connection points of hoses and hose whips to the dispenser, breakaways, swivels, and the nozzle and ensure the connection points are clean and free of fuel. | Partial System OOS | New Asset Identified |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .