PWS BEU FMP Template - v2.2.xlsx
XLSX spreadsheet 63 KB Posted
- Attached to
- Sources Sought - CEHNC FUELS PROGRAM
- Solicitation number
- PANHES-25-P-0000-001794
About this file
This is a Facility Maintenance Plan (FMP) template for Camp Beauregard's fuel facilities, specifically focused on documenting maintenance schedules, inspections, and component tracking. The template includes detailed spreadsheets for tracking maintenance of fuel system components including above-ground storage tanks, underground storage tanks, filter separators, dispensers, valves, pumps, and associated equipment.
The template contains multiple worksheets covering administrative information, general facility description, communication plans, safety requirements, recurring maintenance schedules, and component unique identifier tracking. Key sections include a comprehensive task matrix that maps maintenance requirements to UFC specifications, filter separator maintenance schedules, and a detailed component acronym list. The template is designed to standardize maintenance documentation across DLA fuel facilities and requires specific information about equipment specifications, maintenance frequencies, special considerations, operator requirements, and system availability impacts. This appears to be version 2.2 of the template, with the most recent updates made on 10/31/22 to enhance POC tracking and facility description requirements.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Administrative
| Location | Site Name | Camp Beauregard |
| RPSUID | 7302 | |
| DLA Site Code | BEU | |
| Hours of Operation | 0800-1600 | |
| Address | 556 9th Street, Camp Beauregard, LA 71359 | |
| Contract | Contractor | |
| Contract # | ||
| Local POCs | QAE Name | |
| QAE Phone | ||
| QAE Email | ||
| Alt QAE Name | ||
| Alt QAE Phone | ||
| Alt QAE Email | ||
| DLA/SCP POCs | DLA PM Name | |
| DLA PM Phone | ||
| DLA PM Email | ||
| SCP PM Name | ||
| SCP PM Phone | ||
| SCP PM Email | ||
| Contractor POCs | Contractor PM Name | |
| Contractor PM Phone | ||
| Contractor PM Email | ||
| Contractor QC Name | ||
| Contractor QC Phone | ||
| Contractor QC Email | ||
| Contractor SM Name | ||
| Contractor SM Phone | ||
| Contractor SM Email | ||
| USACE POCs | USACE PM/COR Name | |
| USACE PM/COR Phone | ||
| USACE PM/COR Email | ||
| USACE PE Name | ||
| USACE PE Phone | ||
| USACE PE Email | ||
| USACE KO Name | ||
| USACE KO Phone | ||
| USACE KO Email |
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
This table shows the minimum information required. Additional details should be included based on site specific requirements. Additional POCs may be required.
General Facility Description Facility Description
Purpose:
This Facility Maintenance Plan provides guidance for Contractor personnel in the operation, inspection, and maintenance of permanently installed fuel facilities operated under the control of the Quality Assurance Evaluators. Federal, state, and local environmental laws and regulations shall be complied with if this plan is in conflict with them.
Scope:
The instructions prescribed by this plan outline general fuels maintenance information associated with fuel storage and dispensing systems and provides the minimum periodic contractor maintenance and inspection criteria requirements for the systems. This plan is to be used in conjunction with other existing directives governing fuel system operations and maintenance requirements. Conotractor will properly maintain and repair federally funded petroleum systems and facilities in order to provide compliance with applicable code, criteria, and federal, state, local and/or host nation regulations.
Fuels Facilities:
Organizational tanks, and associated dispensing equipment are maintained and operated by the owning organization. Fuel system maintenance contractors shall perform all maintenance and associated procurement actions on installed fuel systems.
Each installation under the Southwest Division contract are military land-based facilities who receive, store, distribute, and/or dispense liquid fuels.
Standard fuel system equipment includes:
a) Above Ground Sorage Stanks (AST), Underground Storage Tanks (UST)
b) Filter/separator and other filtration device maintenance access, particularly element removal.
c) Manual valves
d) Meter Registers, and Flow Meters.
e) Control Valves.
f) Pumps
g) Tank Monitoring Equipment and Instruments
h) Alarms
i) Fire Fighting Equipment
Site Specific General Information:
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Include a general facility overview and description of each fuel system for the sites in accordance with UFC 3-460-01. Examples include: Bulk Storage Facilities, Aircraft Fueling Facilities, Marine and Dispensing Facilities, Ground Products Fueling Facilities, Alternate POL Facilities, and Support Facilities. Also include facility #s, facility names, fuel type, photos, and any other pertinent information.
Include Site Specific Conditions and Restrictions in this tab.
Communication Plan
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Communication plan shall address in/out briefs, lines of communication, coordination for access, etc.
Safety
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Site Specific Addendum and Activity Hazard Analysis, which are Attachments to the APP, specific to activities or tasks related to recurring maintenance for this site.
RM Schedule
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Link RM schedule here
Task Matrix
| Applicable Facility Assets | UFC System Level Maintenance Frequency | Special Considerations | ||||||||||||||||
| Real Property Unique Identifier | ||||||||||||||||||
| (RPUID) | Real Property Facility # | Real Property Facility Name | Operational Area | Component Type | Base Asset ID | Component Unique Identifier (CUID) | Make | Model | Capacity/Size | Q | S | A | UFC Section Reference | Additional Manufacturer RM Requirements | Operator/ equipment Requirements | System availability | Other Contract | Comments |
| 22C50 | 00826 | Mogas Disp 1 | MOGAS Dispenser Cabinet -3 | 7-7 | ||||||||||||||
| 22C50 | 00826 | Mogas Disp 1 | MOGAS Shear Valve - 3 | OPW | 10 Series | N/A | 7-12 | |||||||||||
| 22C50 | 00826 | Mogas Disp 1 | MOGAS Dispenser Nozzles- 3 | Gasboy | 9140AXCX | N/A | 7-2 | |||||||||||
| 22C50 | 00826 | Mogas Disp 1 | MOGAS Dispenser Hoses -3 | 7-3 | ||||||||||||||
| 22C50 | 00826 | Mogas Disp 1 | MOGAS Swivels - 3 | 7-5 | ||||||||||||||
| 22C50 | 00826 | Mogas Disp 1 | MOGAS Hose Retriever - 3 | 7-6 | ||||||||||||||
| 22C50 | 00826 | Mogas Disp 1 | MOGAS Dispenser Meter - 3 | UNK | UNK | N/A | 7-8 | |||||||||||
| 22C50 | 00826 | Mogas Disp 1 | MOGAS Dispenser Filters - 3 | 7-9 | ||||||||||||||
| 22C50 | 00826 | Filter Separator | Filter Separator | Velcon | 2nd stage: I63385TB Qty 3 2nd Stage: SO-436C | 300 GPM | 3-6.2 | |||||||||||
| 22C50 | 00826 | Filter Separator | Filter Separator Control Valve | 4-4.2.2 | ||||||||||||||
| 22C50 | 00826 | Filter Separator | Valves, Butterfly - 1 | 6-6.2.6 | ||||||||||||||
| 22C50 | 00826 | Filter Separator | Valves, Butterfly - 2 | 6-6.2.6 | ||||||||||||||
| 22C50 | 00826 | Filter Separator | Check Valve - Jet A | 6-6.2.8 | ||||||||||||||
| 22C50 | 00826 | Filter Separator | Pressure Relief Valve - 2 | Taylor | 8200 | 0-250 | 6-6.3 | |||||||||||
| 22C50 | 00826 | Filter Separator | Pressure Gauge | Ashcroft | AS/451279 | 0-100 | 6-7.1 | |||||||||||
| 22C50 | 00826 | Filter Separator | Differential Pressure Gauge | Gammon | 534-30A | 0-30 | 6-7.2 | |||||||||||
| 22C50 | 00826 | Jet Dispenser 6 | JP8 Dispenser Cabinet -2 | 7-7 | ||||||||||||||
| 22C50 | 00826 | Jet Dispenser 7 | JP8 Shear Valve - 2 | OPW | 10 Series | N/A | 7-12 | |||||||||||
| 22C50 | 00826 | Jet Dispenser 8 | JP8 Dispenser Nozzles- 2 | Gasboy | 9140AXCX | N/A | 7-2 | |||||||||||
| 22C50 | 00826 | Jet Dispenser 9 | JP8 Dispenser Hoses -2 | 7-3 | ||||||||||||||
| 22C50 | 00826 | Jet Dispenser 10 | JP8 Breakaways - 2 | 7-4 | ||||||||||||||
| 22C50 | 00826 | Jet Dispenser 11 | JP8 Swivels - 2 | 7-5 | ||||||||||||||
| 22C50 | 00826 | Jet Dispenser 12 | JP8 Hose Retriever - 2 | 7-6 | ||||||||||||||
| 22C50 | 00826 | Jet Dispenser 13 | JP8 Dispenser Meter - 2 | UNK | UNK | N/A | 7-8 | |||||||||||
| 22C50 | 00826 | Jet Dispenser 14 | JP8 Dispenser Filters - 2 | 7-9 | ||||||||||||||
| 22C50 | 00826 | Fillstand | Positive Displacement Meter | Liquid Controls | M-15-1 | N/A | 3-7.1 | |||||||||||
| 22C50 | 00826 | Fillstand | Issue Pump | Gorman-Rupp | 82E3-B | 150 GPM | 3-8.2.1 | |||||||||||
| 22C50 | 00826 | Fillstand | Loading Hose | 3-9.1 | ||||||||||||||
| 22C50 | 00826 | Fillstand | Aboveground Piping and Equipment Coatings | 6-10.1 | ||||||||||||||
| 22C50 | 00826 | Fillstand | Pressure Relief Valve - 1 | Taylor | 8200 | 0-250 | 6-6.3 | |||||||||||
| 22C50 | 00826 | Fillstand | EFSO Systems | 7-16 | ||||||||||||||
| 22C51 | 00827 | Fillstand | Electric Motors | 9-1.7 | ||||||||||||||
| 22C50 | 00826 | Fillstand | Fueling Nozzles | 4-7.4 | ||||||||||||||
| 22C50 | 00826 | Fillstand | Ground Vehicle Fuel Piping | 7-11 | ||||||||||||||
| 22C50 | 00826 | Containment | Fuel Point Area Pad, Containment Systems (General) | N/A | N/A | N/A | 8-10.1 | |||||||||||
| 22C50 | 00826 | Containment | Valves, Ball - 1 (Dike Drain) | 6-6.2.4 | ||||||||||||||
| 22C50 | 00826 | Containment | Valves, Ball - 2 (Dike Drain) | 6-6.2.4 | ||||||||||||||
| 22C50 | 00826 | Containment | Valves, Ball - 3 (Dike Drain) | 6-6.2.4 | ||||||||||||||
| 22C50 | 00826 | Containment | Valves, Ball - 4 (Dike Drain) | 6-6.2.4 | ||||||||||||||
| 22C50 | 00826 | Containment | Emergency Shower/Eye Wash | UNK | UNK | UNK | 11-3 | |||||||||||
| 22C50 | 00826 | Containment | Exterior Lighting | N/A | N/A | N/A | 9-1.8 | |||||||||||
| 22C50 | 00826 | Containment | Back Up Generator | Denyo | DH-07501 | 70KVA | See PWS | |||||||||||
| 22C50 | 00826 | Containment | Signage and Markings | 2-7 | ||||||||||||||
| 22C50 | 00826 | Mogas Disp 2 | MOGAS Dispenser Cabinet -4 | 7-7 | ||||||||||||||
| 22C50 | 00826 | Mogas disp 2 | MOGAS Shear Valve - 4 | OPW | 10 Series | N/A | 7-12 | |||||||||||
| 22C50 | 00826 | Mogas Disp 2 | MOGAS Breakaways - 4 | 7-4 | ||||||||||||||
| 22C50 | 00826 | Mogas Disp 2 | MOGAS Dispenser Hoses -4 | 7-3 | ||||||||||||||
| 22C50 | 00826 | Mogas Disp 2 | MOGAS Dispenser Filters - 4 | 7-9 | ||||||||||||||
| 22C50 | 00826 | Mogas Disp 2 | MOGAS Dispenser Meter - 4 | UNK | UNK | N/A | 7-8 | |||||||||||
| 22C50 | 00826 | Mogas Disp 2 | MOGAS Dispenser Nozzles- 4 | Gasboy | 9140AXCX | N/A | 7-2 | |||||||||||
| 22C50 | 00826 | Mogas Disp 2 | MOGAS Hose Retriever - 4 | 7-6 | ||||||||||||||
| 22C50 | 00826 | Mogas Disp 2 | MOGAS Swivels - 4 | 7-5 | ||||||||||||||
| 22C50 | 00826 | Jet A Tank | Valves, Ball Jet A-13 | 6-6.2.4 | ||||||||||||||
| 22C50 | 00826 | Jet Tank | Above Ground Storage Tank - JP8 | Modern Welding Company | 12,000 | 12,000 | 8-5.1 | |||||||||||
| 22C50 | 00826 | Jet A Tank | Submersible JP8 Pump | Red Jacket | UNK | 3/4 Horse | 3-8.1.3 | |||||||||||
| 22C50 | 00826 | Jet A Tank | Valves, Ball Jet A-9 | 6-6.2.4 | ||||||||||||||
| 22C50 | 00826 | Jet A Tank | Valves, Ball Jet A-10 | 6-6.2.4 | ||||||||||||||
| 22C50 | 00826 | Jet A Tank | Valves, Ball Jet A-11 | 6-6.2.4 | ||||||||||||||
| 22C50 | 00826 | Jet A Tank | Valves, Ball Jet A-12 | 6-6.2.4 | ||||||||||||||
| 22C50 | 00826 | Jet A Tank | Tank Foundation, JP8 | UNK | UNK | UNK | 8-4.3 | |||||||||||
| 22C50 | 00826 | Jet A Tank | Pressure Vacuum Vent | 8-9.3 | ||||||||||||||
| 22C50 | 00826 | Jet A Tank | Pressure Vacuum Vent | 8-9.3 | ||||||||||||||
| 22C51 | 00827 | Jet A Tank | Motor Controls | 9-1.4 | ||||||||||||||
| 22C50 | 00826 | Jet A Tank | Valves, Ball Jet A-1 | 6-6.2.4 | ||||||||||||||
| 22C52 | 00828 | Jet A Tank | Panel Boards | 9-1.5 | ||||||||||||||
| 22C50 | 00826 | Jet A Tank | Grounding Rod Jet - NE | Galvan | 6260 | N/A | 9-1.6.2 | |||||||||||
| 22C50 | 00826 | Jet A Tank | Grounding Rod Jet - NW | Galvan | 6260 | N/A | 9-1.6.2 | |||||||||||
| 22C50 | 00826 | Jet A Tank | Grounding Rod Jet - SE | Galvan | 6260 | N/A | 9-1.6.2 | |||||||||||
| 22C50 | 00826 | Jet A Tank | Grounding Rod Jet - SW | Galvan | 6260 | N/A | 9-1.6.2 | |||||||||||
| 22C50 | 00826 | Jet A Tank | Ground Reel Jet - SE | Hannay | SSMHGR50-50 | 75 Foot | 9-1.6.2 | |||||||||||
| 22C50 | 00826 | Jet A Tank | Ground Reel Jet - SW | Hannay | SSMHGR50-50 | 75 Foot | 9-1.6.2 | |||||||||||
| 22C50 | 00826 | Jet A Tank | Electrical Equipment | 9-1.2 | ||||||||||||||
| 22C50 | 00826 | Jet A Tank | Card and Key Locks | N/A | N/A | N/A | 9-3 | |||||||||||
| 22C50 | 00826 | Jet A Tank | Valves, Ball Jet A-2 | 6-6.2.4 | ||||||||||||||
| 22C50 | 00826 | Jet A Tank | Valves, Ball Jet A-3 | 6-6.2.4 | ||||||||||||||
| 22C50 | 00826 | Jet A Tank | Valves, Ball Jet A-4 | 6-6.2.4 | ||||||||||||||
| 22C50 | 00826 | Jet A Tank | Valves, Ball Jet A-5 | 6-6.2.4 | ||||||||||||||
| 22C50 | 00826 | Jet A Tank | Valves, Ball Jet A-6 | 6-6.2.4 | ||||||||||||||
| 22C50 | 00826 | Jet A Tank | Valves, Ball Jet A-7 | 6-6.2.4 | ||||||||||||||
| 22C50 | 00826 | Jet A Tank | Valves, Ball Jet A-8 | 6-6.2.4 | ||||||||||||||
| 22C50 | 00826 | Jet Dispencer 5 | JP8 Dispenser Cabinet -1 | 7-7 | ||||||||||||||
| 22C50 | 00826 | Jet Dispencer 5 | JP8 Shear Valve - 1 | OPW | 10 Series | N/A | 7-12 | |||||||||||
| 22C50 | 00826 | Jet Dispencer 5 | JP8 Dispenser Nozzles- 1 | Gasboy | 9140AXCX | N/A | 7-2 | |||||||||||
| 22C50 | 00826 | Jet Dispencer 5 | JP8 Dispenser Hoses -1 | 7-3 | ||||||||||||||
| 22C50 | 00826 | Jet Dispencer 5 | JP8 Breakaways - 1 | 7-4 | ||||||||||||||
| 22C50 | 00826 | Jet Dispencer 5 | JP8 Swivels - 1 | 7-5 | ||||||||||||||
| 22C50 | 00826 | Jet Dispencer 5 | JP8 Hose Retriever - 1 | 7-6 | ||||||||||||||
| 22C50 | 00826 | Jet Dispencer 5 | JP8 Dispenser Meter - 1 | UNK | UNK | N/A | 7-8 | |||||||||||
| 22C50 | 00826 | Jet Dispencer 5 | JP8 Dispenser Filters - 1 | 7-9 | ||||||||||||||
| 22C50 | 00826 | Mogas Tank | Above Ground Storage Tank - MOGAS | Modern Welding Company | 8000 GAL | 8,000 | 8-5.1 | |||||||||||
| 22C50 | 00826 | Mogas Tank | Submersible MOGAS Pump | Red Jacket | UNK | 3/4 Horse | 3-8.1.3 | |||||||||||
| 22C50 | 00826 | Mogas Tank | Grounding Rod MOGAS - SW | Galvan | 6260 | N/A | 9-1.6.2 | |||||||||||
| 22C50 | 00826 | Mogas Tank | Grounding Rod MOGAS - SE | Galvan | 6260 | N/A | 9-1.6.2 | |||||||||||
| 22C50 | 00826 | Mogas Tank | Grounding Rod MOGAS - SW | Galvan | 6260 | N/A | 9-1.6.2 | |||||||||||
| 22C50 | 00826 | Mogas Tank | Ground Reel MOGAS - SE | Hannay | SSMHGR50-50 | 75 Foot | 9-1.6.2 | |||||||||||
| 22C50 | 00826 | Mogas Tank | Ground Reel MOGAS - SW | Hannay | SSMHGR50-50 | 75 Foot | 9-1.6.2 | |||||||||||
| 22C50 | 00826 | Mogas Tank | Valves, Ball MOGAS - 1 | 6-6.2.4 | ||||||||||||||
| 22C50 | 00826 | Mogas Tank | Valves, Ball MOGAS - 2 | 6-6.2.4 | ||||||||||||||
| 22C50 | 00826 | Mogas Tank | Valves, Ball MOGAS - 3 | 6-6.2.4 | ||||||||||||||
| 22C50 | 00826 | Mogas Tank | Valves, Ball MOGAS - 4 | 6-6.2.4 | ||||||||||||||
| 22C50 | 00826 | Mogas Tank | Valves, Ball MOGAS - 5 | 6-6.2.4 | ||||||||||||||
| 22C50 | 00826 | Mogas Tank | Check Valve - MOGAS Offload | 6-6.2.8 | ||||||||||||||
| 22C50 | 00826 | Mogas Tank | Tank Foundation, MOGAS | UNK | UNK | UNK | 8-4.3 | |||||||||||
| 22C50 | 00826 | Mogas Tank | Grounding Rod MOGAS - NE | Galvan | 6260 | N/A | 9-1.6.2 | |||||||||||
| 22C50 | 00826 | Jet Dispenser 5 | JP8 Dispenser Strainers - 1 | 7-10 | ||||||||||||||
| 22C50 | 00826 | JP8 Dispenser Strainers - 2 | 7-10 | |||||||||||||||
| 22C50 | 00826 | MOGAS Dispenser Strainers - 3 | 7-10 | |||||||||||||||
| 22C50 | 00826 | MOGAS Breakaways - 3 | 7-4 | |||||||||||||||
| 22C50 | 00826 | 7-10 |
&"Times New Roman,Bold"&14Facility Maintenance Plan
FMP v2.2 2
Instructions:
1. Input all data as indicated on the sheet.
2. Additional documents referred to in the Special Considerations column shall be included as an appendix to this FMP.
3. The contractor shall generate a Component Unique Identifier (CUID) for each component utilizing the Component Acronym Sheet within this Work Book. The unique identifier must use the following:
Three letter Site Code - Facility # - Component Acronym - Sequential number Example: AAD-00063A-RCVL-0001
If component acronym is not listed, the contractor shall request an acronym be established through the HNC Project Manager and Project Engineer via email. Contractors may utilize other means of tracking/labeling assets such as QR codes in addition to the required CUID however, tracking/labeling must correlate with the CUID. This CUID shall be the standard for all DLA capitalized equipment. Base Asset ID if used by site shall be cross referenced with CUID appropriately.
4. Utilize the UFC Section Reference Work Category as noted on the Component Acronym Sheet.
5. Enter any applicable manufacturer requirements not stated in the UFC. References are acceptable with attachments.
6. Enter any applicable operator support or government owned equipment required to complete the RM task.
7. Enter impact on system availability by performing the RM task. This could include shutdown, lockout, or similar impacts.
8. Enter contract information for any other contract, contractor, or government personnel performing the applicable task. This is applicable to other Centrally Managed Programs, SRM, MILCON, or Public Works/Civil Engineering projects.
9. Print Hard Copies as 11x17.
FS-PF Schedule
| FILTER SEPARATOR/PRE-FILTER MAINTENANCE SCHEDULES | ||||||||||||||||||||
| Applicable Facility Assets | Coalescer/Separator Information | Special Considerations | ||||||||||||||||||
| Real Property Unique Identifier | ||||||||||||||||||||
| (RPUID) | Real Property Facility # | Real Property Facility Name | Operational Area | Component Type | Base Asset ID | Component Unique Identifier (CUID) | Make | Model | Capacity (GPM) | UFC Section Reference | Number of Coalescer Cartridges | Number of | ||||||||
| Separator Cartridges | Coalescer Cartridges | |||||||||||||||||||
| Model # | Separator Cartridge | |||||||||||||||||||
| Model # | Clean or Replace | |||||||||||||||||||
| Separator Cartridge | Gasket | |||||||||||||||||||
| Model # | Date Last Replaced | Replacement Due Date | Operator/Equipment Requirements | System Availability | Site Self Performs | |||||||||||||||
| (Y/N) | Comments | |||||||||||||||||||
| 22C50 | 00826 | Filter Separator | Filter Separator | Velcon | 2nd stage: I63385TB Qty 3 2nd Stage: SO-436C | 300 GPM | 3-6.2 | 4 | 2 | 1-638MMTB | S0-430V5 | Replace | Aug-23 | N | RMMR Contractor to perform |
&"Times New Roman,Bold"&14Facility Maintenance Plan
FMP v2.2 2
Instructions:
1. Input all data as indicated on the sheet.
2. Additional documents referred to in the Special Considerations column shall be included as an appendix to this FMP.
3. The contractor shall generate a Component Unique Identifier (CUID) for each component utilizing the Component Acronym Sheet within this Work Book. The unique identifier must use the following:
Three letter Site Code - Facility # - Component Acronym - Sequential number Example: AAD-00063A-RCVL-0001
If component acronym is not listed, the contractor shall request an acronym be established through the HNC Project Manager and Project Engineer via email. Contractors may utilize other means of tracking/labeling assets such as QR codes in addition to the required CUID however, tracking/labeling must correlate with the CUID. This CUID shall be the standard for all DLA capitalized equipment.
4. Utilize the UFC Section Reference Work Category as noted on the Component Acronym Sheet.
5. Enter any applicable manufacturer requirements not stated in the UFC. References are acceptable with attachments.
6. Enter any applicable operator support or government owned equipment required to complete the RM task.
7. Enter impact on system availability by performing the RM task. This could include shutdown, lockout, or similar impacts.
8. Filter Separators and Pre-Filters identified here shall also be provided in the Task Matrix Tab.
9. Print Hard Copies as 11x17.
Component Acronym
| Component Unique Identifier: | Site Code-Facility #-Component Acronym-Sequential # | ||
| Example: | AAD-00063A-RCVL-0001 | ||
| NOTE: If component acronym is not listed, the contractor shall request an acronym be established through the HNC Project Manager and Project Engineer via email. Contractors may utilize other means of tracking/labeling assets such as QR codes in addition to the required CUID however, tracking/labeling must correlate with the CUID. This CUID shall be the standard for all DLA capitalized equipment | |||
| DLA Work Type Category | UFC Section Reference Work Category | ||
| (Revised per Change 1, 29 April 2021) | Component Acronym | ||
| Air Compressors | Air Compressors | AIRC | |
| Alarms | Externally Mounted Level Alarms (Section 8-9.9.1) | EMLA | |
| Internally Mounted Level Alarms (Section 8-9.9.3) | IMLA | ||
| Bollard | Bollards | BLRD | |
| Building | Building HVAC | BHVAC | |
| Building Domestic Water System | BWTR | ||
| Building Waste Water | BWSW | ||
| Building - Lighting | BLTG | ||
| Building - Architectural | BARCH | ||
| Building - Fire Sprinkler System | BFIRE | ||
| Containment/Joints | Containment Systems (General) (Section 8-10.1) | CSGEN | |
| Concrete and Cement Brick Dike/Berm Walls (Section 8-10.2.1) | DKBW | ||
| Dike/Berm Floors (Section 8-10.2.2) | DKBF | ||
| Earthen Dike Walls (Section 8-10.3) | ETHDW | ||
| Self-Diking or Vaulted Tank Containment (Section 8-10.4) | SDVTCS | ||
| Flexible Membrane Liners (Section 8-10.5) | FXML | ||
| Fuel Truck and Rail Car Containment Areas (Section 11-1.1) | FTKRCC | ||
| Remote Spill Containment (Section 11-1.2) | RSCS | ||
| Piers and Wharves Fuel Containment Systems (Section 5-1.2) - Testing | FPWCT | ||
| Fuel Pier/Wharf Containment (PWS Section 3) | FPWC | ||
| Corrosion Control/Coatings | Aboveground Piping and Equipment Coatings (Section 6-10.1) | AGPCT | |
| Miscellaneous | Miscellaneous Deactivated Components (Section 12-5) | MDEAC | |
| Electrical/Lighting | Lighting (Section 9-1.8) | LIGHT | |
| Electrical/Power | Electrical Equipment (Section 9-1.2) | ELEQ | |
| Power Cables (Section 9-1.3) | PWRCBL | ||
| Motor Controls (Section 9-1.4) | MTRCT | ||
| Panelboards (Section 9-1.5) | PNLB | ||
| Electric Motors (Section 9-1.7) | ELEMT | ||
| Electronic Equipment (9-1.9) | ELTREQ | ||
| Card and Key Locks (Section 9-3) | CKLK | ||
| Electrical/Protection | Power Grounding Systems (Section 9-1.6.1) | PWRGS | |
| Static Grounding Systems (Section 9-1.6.2) | STGS | ||
| Cathodic Protection (Section 9-2.1) | CP | ||
| Lightning Surge Arresters (Section 9-2.2.1) | LSAR | ||
| Lightning Protection Systems (Section 9-4) | LPTS | ||
| Ground Verification System (Section 9-5) | GRVS | ||
| Electronic Overfill Protection Systems (Section 9-6) | EOPS | ||
| Eyewash/Shower | Emergency Eyewash/Showers (Section 11-3) | EMEWSH | |
| Fencing/ | |||
| Gates | Fencing | FENC | |
| Gates | GATE | ||
| Filtration | Pre-Filters (Section 3-6.1) | PFVSL | |
| Filter Separators (Section 3-6.2) | FLSP | ||
| Haypack Filters (Section 3-6.3) | HPKF | ||
| Basket Strainers (Section 3-6.4) | BSTR | ||
| Filter Separator Sump Heaters (Section 3-6.5) | FSSH | ||
| Sidestream Filtration Systems (Section 8-9.11) | SSFTS | ||
| Fire Suppression Equipment | Flame Arrestors (Section 8-9.5) | FLMARR | |
| Foam Fire Protection Systems (Section 8-9.15) | FFPS | ||
| Fire Protection Systems - Wet Pipe | FPRS | ||
| Fuel Laboratories | Ventilation Hoods (Section 11-4.1) | VENTHD | |
| Gauges | Pressure and Pressure/Vacuum Gauges (Section 6-7.1) | PVGA | |
| Differential Pressure Gauges (Section 6-7.2) | DPGA | ||
| Mechanical Tape Gauges (Section 8-9.7) | MTGA | ||
| Mechanically Operated Tape Gauge (Section 8-9.8.1) | MOTGA | ||
| Magnetostrictive Probes (Section 8-9.8.2) | MRPRB | ||
| Servo Gauge (Section 8-9.8.3) | SRVGA | ||
| Generators | Back-Up Power Generators | BGEN | |
| Heating Coils | Steam Type Heating Coils (Section 8-9.16.1) | STHC | |
| Thermal Fluid Type Heating Coils (Section 8-9.16.2) | TFTHC | ||
| Electric Rod Type Heating (Section 8-9.16.3) | ERTH | ||
| Hoses | Loading Fuel Hoses (Section 3-9.1) | LDHS | |
| Offloading Fuel Hoses (Section 3-9.2) | OLHS | ||
| Aircraft Fueling Hoses (Section 4-7.5) | ACFHS | ||
| Hydrazine | Hydrazine Charging Units (Section 10-3) | HDZCU | |
| Inspections | Trouble Shoot | TRBST | |
| API 510 Inspections | API510 | ||
| API 653 or STI Inspection | API653 | ||
| Coatings Condition Survey | CCS | ||
| Issue/Receive - Ground | Dispenser Nozzles (Section 7-2) | DSNZ | |
| Dispenser Hoses (Section 7-3) | DSHS | ||
| Breakaways (Section 7-4) | DSBW | ||
| Swivels (Section 7-5) | DSSW | ||
| Hose Retriever (Section 7-6) | HSRTV | ||
| Dispenser Cabinet (Section 7-7) | DSCB | ||
| Dispenser Meters (Section 7-8) | DSMTR | ||
| Dispenser Filters (Section 7-9) | DSFLR | ||
| Dispenser Strainers (Section 7-10) | DSSTR | ||
| Ground Vehicle Fuel Piping (Section 7-11) | GVFP | ||
| Emergency Shutoff Valves (Shear Valves) (Section 7-12) | ESHVL | ||
| Dispenser Sumps (Section 7-13) | DSSMP | ||
| Transition Sumps (Section 7-14) | TRSMP | ||
| Remote Dispenser Pumps (Section 7-15.1) | RDSP | ||
| Self-Contained Dispenser Pumps (Section 7-15.2) | SCDSP | ||
| EFSO Systems (Section 7-16) | EFSO | ||
| Stage I Vapor Recovery (Section 7-17.1) | SIVP | ||
| Stage II Vapor Recovery (Section 7-17.2) | SIIVP | ||
| Vapor Burners (Section 7-17.3) | VPBNR | ||
| Point Sensor - Dry (Section 7-19.1.1) | PSDRY | ||
| Automatic Line Leak Detector (Section 7-19.1.2) | ALLD | ||
| Visual Monitoring (Section 7-20.1) | VSLM | ||
| Issue/Receive - Marine | Marine Receipt (Section 5-2) | MRNRCP | |
| Marine Issue (Section 5-3) | MRNISU | ||
| Marine Loading Arms (Section 5-4) | MRNLA | ||
| Marine Transfer Hoses (Section 5-5.1) | MBTHS | ||
| Underwater Hoses (Section 5-5.2) | UWHS | ||
| Single Point Mooring Systems (Section 5-7.1) | SPMSS | ||
| Multi Point Mooring Systems (Section 5-7.2) | MPMSS | ||
| Submerged Piping Systems (Section 5-8) | SMPS | ||
| Boom Reels (Section 5-9) | BMRL | ||
| Liquefied Petroleum | Liquefied Petroleum Tanks (Section 10-1.1) | LPTANK | |
| Liquefied Petroleum Pipelines (Section 10-1.2) | LPPIPE | ||
| Liquefied Petroleum Vapor Lines (Section 10-1.3) | LPVPL | ||
| LPG Vaporizers (Section 10-1.4) | LPGVPZ | ||
| Petroleum Gas Regulators (Section 10-1.5) | PGREG | ||
| Liquefied Petroleum Gas Hoses (Section 10-1.6) | LPGHS | ||
| Meter/ | |||
| calibrations | Positive Displacement Meters (Section 3-7.1) | PDMT | |
| Turbine Flow Meters (Section 3-7.2) | TBFMT | ||
| Orifice Flow Meters (Section 3-7.3) | OFMT | ||
| Natural Disaster | Natural Disaster | ||
| Natural Gas | CNG Piping (Section 10-2.1) | NGPIPE | |
| CNG Compressors (Section 10-2.2) | NGCOMP | ||
| CNG Storage (Section 10-2.3) | NGSTOR | ||
| CNG Dispensers (Section 10-2.4) | NGDS | ||
| CNG Dispenser Hoses (Section 10-2.5) | NGDSHS | ||
| Nozzle | Hydrant Adapters (Section 4-7.2) | HADP | |
| Fueling Nozzles (Section 4-7.3) | FLNZ | ||
| Other | Fuel Additive Injectors (Section 3-11) | FAIJ | |
| Pantograph | Fixed Pantographs (Section 4-7.1.1) | FXPNT | |
| Detachable Pantographs (Section 4-7.1.2) | DTPNT | ||
| Piping | On-Base Pipelines (Section 6-1.1) | OBPL | |
| Non-DOT Regulated (Section 6-1.2.1) | NDPL | ||
| Aboveground Piping (Section 6-1.3) | AGPL | ||
| Double-Wall Piping (Section 6-1.4) | DWPL | ||
| Low Point Drains (Section 6-12.1) | LPDN | ||
| High Point Vents (Section 6-12.2) | HPVT | ||
| Sight Flow Indicators (Section 6-12.3) | SFND | ||
| Rope Sensor Systems (Section 6-13.1.1) | RPSS | ||
| Point Sensor - Dry (Section 6-13.1.2) | PSDRY | ||
| Visual Monitoring (Section 6-14.1) | VSLM | ||
| Pipe Penetrations (Section 8-10.6) | PPEN | ||
| Deactivated Petroleum Fuel Pipelines (Section 12-3) | DEACPL | ||
| Pressure/Temperature Control | Air Eliminator Tanks (Section 3-10.1) | AELT | |
| Automatic Air Vents (Section 3-10.2) | AAVT | ||
| Surge Suppressors (Section 4-7.4) | SRGSP | ||
| Thermal and Pressure Relief Valves (Section 6-6.3) | TPRVL | ||
| Pressure Transmitters (Section 6-7.3) | PRTR | ||
| Differential Pressure Transmitters (Section 6-7.4) | DPTR | ||
| Flexible Ball Joints (Section 6-8) | FBLJT | ||
| Dial Thermometer (Section 6-9.1) | DTHMR | ||
| Emergency Vents (Section 8-9.4) | EMGVT | ||
| Pump | Centrifugal Pumps (Section 3-8.1) | CENP | |
| Vertical Inline Pumps (Section 3-8.2) | VILP | ||
| Vertical Turbine/Submerged Turbine Pumps (Section 3-8.3) | VTSP | ||
| Sliding Vane Pumps (Section 3-8.5) | SLVP | ||
| Gear Pumps (Section 3-8.6) | GERP | ||
| Diaphragm Pumps (Section 3-8.7) | DIAP | ||
| Internal Combustion Drives (Section 3-8.8) | ICDR | ||
| Gearboxes (Section 3-8.9) | GRBX | ||
| Deactivated Petroleum Fuel Pumps (Section 12-4) | DEACP | ||
| Signage/Markings | Signage and Markings (Section 2-7) | SIGN | |
| Structures | Pumphouse/Filter Buildings (Section 11-2.1) | PFBLDG | |
| Canopies (Section 11-2.2) | CNPY | ||
| Cranes and Hoists (Section 11-6) | CRNHST | ||
| Tank | Aboveground Field-Erected Tanks (Section 8-4) | AGFET | |
| Geodesic Dome Roofs (Section 8-4.2) | GEODR | ||
| Foundations (Section 8-4.3) | FOUND | ||
| Aboveground Shop Fabricated Tanks (Section 8-5.1) | AGSFP | ||
| Self-Diking or Vaulted Tanks (Section 8-5.2) | SDVT | ||
| Rectangular Concrete-Encased Tanks (Section 8-5.3) | RCET | ||
| Single-Walled Underground Shop-Fabricated Tanks (Section 8-5.4.1) | UGSSFT | ||
| Double-Walled Underground Shop-Fabricated Tanks (Section 8-5.4.2) | UGDSFT | ||
| Underground Field-Constructed Tanks (Cut and Cover Tanks) (Section 8-6) | UGFET | ||
| Tank Cleaning (Section 8-7) | TCLEAN | ||
| Aluminum Honeycomb Floating Pans (Section 8-9.1.1) | AHFP | ||
| Steel Floating Pans (Section 8-9.1.2) | STLFP | ||
| Pontoon Floating Pans (Section 8-9.1.3) | PTNFP | ||
| Floating Roofs (Section 8-9.1.4) | FLTRF | ||
| Floating Roof and Pan Pressure/Vacuum Vents (Section 8-9.1.5) | FPPVV | ||
| Floating Roof and Pan Legs (Section 8-9.1.6) | FRPLG | ||
| Secondary Tank Bottoms (Section 8-9.2) | SNDTB | ||
| Tank Pressure/Vacuum Vents (Section 8-9.3) | TPVVT | ||
| Product Saver Tanks (Section 8-9.10) | PRDST | ||
| Fill Ports (Section 8-9.12) | FPRT | ||
| Point Sensor - Dry (Section 8-9.13.1) | PSDRY | ||
| Point Sensor - Wet (Section 8-9.13.2) | PSWET | ||
| Point Sensor - Pressure/Vacuum (Section 8-9.13.3) | PSPV | ||
| Visual Leak Detection (Section 8-9.13.4) | VSLLD | ||
| Floating Suction Lines (Section 8-9.14) | FLTSL | ||
| Stilling Wells (Section 8-9.17) | STGW | ||
| Deactivated Petroleum Fuel Tanks (Section 12-2) | DEACT | ||
| Testing | Pressure Testing | ||
| Underground Pits | Isolation Valve Pits (Section 6-11.1) | ISVLP | |
| Hydrant Fuel Pits (Section 6-11.2) | HDFP | ||
| High Point Vent Pits (Section 6-11.3) | HPVP | ||
| Low Point Drain Pits (Section 6-11.4) | LPDP | ||
| Lateral Control Pits (Section 6-11.5) | LTCP | ||
| Valves | General System Control Valves (Section 4-3.2.1) | GSCVL | |
| Refuel Control Valves (Section 4-3.2.5) | RCVL | ||
| Pressure Relief Valves (Section 4-3.2.6) | PRCVL | ||
| Defuel Control Valve (Section 4-3.2.7) | DFCVL | ||
| Dual Rate-of-Flow Control Valves (Section 4-3.2.8) | DRFCVL | ||
| Combination Dual Rate-of-Flow Control and Solenoid Valves (Section 4-3.3.1) | CFSCVL | ||
| Dual Pressure Relief, Solenoid Shutoff, and Check Valves (Section 4-3.3.2) | DPSCVL | ||
| Non-Surge Check Valves (Section 4-4.2.1) | NSCKVL | ||
| Filter Separator Control Valves (Section 4-4.2.2) | FSCVL | ||
| Defuel/Flush Valves (Section 4-4.2.3) | DFFCVL | ||
| Issue Venturi (Section 4-4.2.4) | ISVTR | ||
| Return Venturi (Section 4-4.2.5) | RTVTR | ||
| Back Pressure Control Valves (Section 4-4.2.6) | BPCVL | ||
| Pressure Control Valves (Section 4-4.2.7) | PCVL | ||
| Hydrant Control Valves (Section 4-4.2.8) | HCVL | ||
| Emergency Shut-off Valves (Section 4-4.2.9) | ESOVL | ||
| Pantograph Control Valves (Section 4-5.2.12) | PTCVL | ||
| Pantograph Pressure Control Valves (Section 4-5.2.13) | PTPCVL | ||
| Overfill Valve for Product Recovery Tanks (Section 4-8.1) | OVLPRT | ||
| Plug Valves - Lubricated (Section 6-6.2.1) | PLVL | ||
| Plug Valves - Non-lubricated (Section 6-6.2.2) | NPLVL | ||
| Gate Valves (Section 6-6.2.3) | GTVL | ||
| Ball Valves (Section 6-6.2.4) | BLVL | ||
| Double Block and Bleed Valves (Section 6-6.2.5) | DBBVL | ||
| Butterfly Valves (Section 6-6.2.6) | BFVL | ||
| Globe Valves (Section 6-6.2.7) | GLVL | ||
| Check Valves (Section 6-6.2.8) | CKVL | ||
| Line Blanks, Ring Spacers, and Spectacle Blinds (Section 6-6.2.9) | BLIND | ||
| Manual Valve Gear Operators (Section 6-6.2.10) | MVLGO | ||
| Fire Valves (Section 6-6.4.1) | FRVL | ||
| Fusible Link Butterfly Valves (Section 6-6.4.2) | FLBFVL | ||
| Truck Fill Valves (Section 6-6.5.1) | TFVL | ||
| Motor Operators (Section 6-6.6) | MTROP | ||
| External High Level Shutoff Valves (HLSO) (Section 8-9.6.1) | EHLSVL | ||
| Internal HLSO Valves (Section 8-9.6.2) | IHLSVL | ||
| Waste | Oil/Water Separators (Section 11-5) | OWS |
&"Times New Roman,Bold"&14APPENDIX F - Component Unique Identifier (CUID)
&P
Versions and Notes
| Version | Date | Description of changes |
| v2.0 | 8/18/21 | Updated Task Matrix to meet UFC 3-460-03 Change 1 , 29 April 2021 |
| Updated Component Acronym Tab to meet UFC 3-460-03 Change 1 , 29 April 2021 | ||
| v2.1 | 4/20/22 | Task Matrix Tab - Deleted all services facility # columns and combined into one. Renamed "Real Property Facility #" |
| Task Matrix Tab - Added "RPUID" to Real Property Unique Identifier column | ||
| Task Matrix Tab - Added "Real Property" to Facility Name | ||
| Task Matrix Tab - Added column for "Base Asset ID" | ||
| Task Matrix Tab - Added "Additional" and "RM" to Manufacturer Requirements | ||
| Task Matrix Tab - Changed Comment note for Filter Separator | ||
| Task Matrix Tab - Changed Note #3 To add "Base Asset ID if used by site shall be cross referenced with CUID appropriately." | ||
| Task Matrix Tab - Changed note #7 under instructions for Task Matrix to clarify this column | ||
| Task Matrix Tab - Changed note #8 under instructions for Task Matrix to clarify this column | ||
| Added new tab for RM schedule to be included | ||
| Added new Tab for Filter Separator/Pre-Filter Schedule with instructions | ||
| Administrative Tab - changed Installation to Site and added Site Code to comply with new requirements as the three letter DLA site code is obsolete | ||
| General Facility Description - Changed the Instructions | ||
| Reversed columns 'Base Asset ID' and 'CUID' to match RM report for all tabs | ||
| Added FMP version to footer | ||
| v2.2 | 10/31/22 | Administrative Tab - Added rows for POC Name for all |
| Administrative Tab - Added RPSUID in cell B2 | ||
| General Facility Description Tab - Added "fuel type" | ||
| Communication Plan Tab - added "coordination for access" | ||
| Safety Tab - Changed instructions to read "Site Specific Addendum and Activity Hazard Analysis, which are Attachments to the APP, specific to activities or tasks related to recurring maintenance for this site." | ||
| Changed footer for tabs to FMP v2.2 | ||
| Task Matrix and FS/PF Schedule added not to print as 11x17. Also changed in page layout. |
File details come from the government source that posted it. Updated .