PWS LAU FMP Template - v2.2.xlsx
XLSX spreadsheet 160 KB Posted
- Attached to
- Sources Sought - CEHNC FUELS PROGRAM
- Solicitation number
- PANHES-25-P-0000-001794
About this file
This is a Facility Maintenance Plan (FMP) template for fuel facilities at Laughlin Air Force Base in Texas. The document details maintenance and inspection requirements for permanently installed fuel facilities operated under Quality Assurance Evaluators' control at 561 East Liberty Drive.
The template provides comprehensive maintenance specifications for various fuel system components including above ground storage tanks, underground storage tanks, filter/separators, manual valves, meter registers, flow meters, control valves, pumps, tank monitoring equipment, instruments, alarms, and firefighting equipment. It contains detailed maintenance schedules and procedures organized by facility asset, including specific requirements for components like ventilation hoods, emergency eyewash stations, basket strainers, centrifugal pumps, control valves, pressure gauges, grounding systems, and lighting. The document serves as a planning tool to ensure proper maintenance and repair of federally funded petroleum systems in compliance with applicable codes, criteria, and federal/state/local regulations.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Administrative
| Location | Site Name | Laughlin AFB Site #1 |
| RPSUID | 2483 | |
| DLA Site Code | LAU | |
| Hours of Operation | 24 Hours of Operation | |
| Address | 561 East Liberty Drive, Laughlin AFB, TX 78843 | |
| Contract | Contractor | |
| Contract # | ||
| Local POCs | QAE Name | |
| QAE Phone | ||
| QAE Email | ||
| Alt QAE Name | ||
| Alt QAE Phone | ||
| Alt QAE Email | ||
| DLA/SCP POCs | DLA PM Name | |
| DLA PM Phone | ||
| DLA PM Email | ||
| SCP PM Name | ||
| SCP PM Phone | ||
| SCP PM Email | ||
| Contractor POCs | Contractor PM Name | |
| Contractor PM Phone | ||
| Contractor PM Email | ||
| Contractor QC Name | ||
| Contractor QC Phone | ||
| Contractor QC Email | ||
| Contractor SM Name | ||
| Contractor SM Phone | ||
| Contractor SM Email | ||
| USACE POCs | USACE PM/COR Name | |
| USACE PM/COR Phone | ||
| USACE PM/COR Email | ||
| USACE PE Name | ||
| USACE PE Phone | ||
| USACE PE Email | ||
| USACE KO Name | ||
| USACE KO Phone | ||
| USACE KO Email |
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
This table shows the minimum information required. Additional details should be included based on site specific requirements. Additional POCs may be required.
General Facility Description Facility Description
Purpose:
This Facility Maintenance Plan provides guidance for Contractor personnel in the operation, inspection, and maintenance of permanently installed fuel facilities operated under the control of the Quality Assurance Evaluators. Federal, state, and local environmental laws and regulations shall be complied with if this plan is in conflict with them.
Scope:
The instructions prescribed by this plan outline general fuels maintenance information associated with fuel storage and dispensing systems and provides the minimum periodic contractor maintenance and inspection criteria requirements for the systems. This plan is to be used in conjunction with other existing directives governing fuel system operations and maintenance requirements. Conotractor will properly maintain and repair federally funded petroleum systems and facilities in order to provide compliance with applicable code, criteria, and federal, state, local and/or host nation regulations.
Fuels Facilities:
Organizational tanks, and associated dispensing equipment are maintained and operated by the owning organization. Fuel system maintenance contractors shall perform all maintenance and associated procurement actions on installed fuel systems.
Each installation under the Southwest Division contract are military land-based facilities who receive, store, distribute, and/or dispense liquid fuels.
Standard fuel system equipment includes:
a) Above Ground Sorage Stanks (AST), Underground Storage Tanks (UST)
b) Filter/separator and other filtration device maintenance access, particularly element removal.
c) Manual valves
d) Meter Registers, and Flow Meters.
e) Control Valves.
f) Pumps
g) Tank Monitoring Equipment and Instruments
h) Alarms
i) Fire Fighting Equipment
Site Specific General Information:
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Include a general facility overview and description of each fuel system for the sites in accordance with UFC 3-460-01. Examples include: Bulk Storage Facilities, Aircraft Fueling Facilities, Marine and Dispensing Facilities, Ground Products Fueling Facilities, Alternate POL Facilities, and Support Facilities. Also include facility #s, facility names, fuel type, photos, and any other pertinent information.
Include Site Specific Conditions and Restrictions in this tab.
Communication Plan
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Communication plan shall address in/out briefs, lines of communication, coordination for access, etc.
Safety
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Site Specific Addendum and Activity Hazard Analysis, which are Attachments to the APP, specific to activities or tasks related to recurring maintenance for this site.
RM Schedule
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Link RM schedule here
Task Matrix
| Applicable Facility Assets | UFC System Level Maintenance Frequency | Special Considerations | |||||||||||||||||
| Real Property Unique Identifier | |||||||||||||||||||
| (RPUID) | Real Property Facility # | Real Property Facility Name | Operational Area | Component Type | Base Asset ID | Component Unique Identifier (CUID) | Make | Model | Capacity/Size | Q | S | A | UFC Section Reference | Additional Manufacturer RM Requirements | Operator/ equipment Requirements | System availability | Other Contract | Comments | |
| 8 | Fuels Management Building | Fuels Lab | Ventilation Hoods | Fuels Lab Ventilation Hood | Mott | 7361040 | N/A | X | X | X | 11-4.1 | Daily visual inspection, check the fume hood for visible airflow blockage such as large items or containers near the slot opening. Other daily inspections include holding a tissue at the opening to observe inward airflow, maintaining clean surfaces inside the hood, and keeping the sash at an appropriate height when working and not working in the hood. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Pumphouse/Filter Buildings | Control Room | N/A | N/A | N/A | X | X | X | 11-2.1 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Canopies | Small Canopy | N/A | N/A | N/A | X | X | X | 11-2.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Emergency Eyewash/Showers | Fillstand Pump Shed Eyewash | Bradley | S19314EW | N/A | X | X | X | 11-3 | Weekly - Equipment installed within 10 seconds from the hazard and on the same plane as the hazard Pathway is clear of obstructions Plumbed equipment activated to ensure compliant operation and to clear any sediment Self-contained equipment checked to determine if the flushing fluid needs to be changed or supplemented Equipment free of broken or missing parts Equipment protected against freezing User protected from scalding water | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Cranes and Hoists | Hoist | Chester | 1 Ton | N/A | X | X | X | 11-6 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Signage and Markings | Pump Shed | N/A | N/A | N/A | X | X | X | 2-7 | No Manufacturer Requirements Available | Monthly - Check permanent signs and markings for adequacy and readability. Repair or replace deteriorated or illegible signs and markings. | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Basket Strainers | Pump 6 | Titan-FCI | 150 WCB | 6.0 in. | X | X | X | 3-6.4 | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | |||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | ||||||||||||||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | No Mission Impact | ||||||||||||||||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Basket Strainers | Pump 4 basket strainer | Titan | H028 | 6.0 in. | X | X | X | 3-6.4 | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | |||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | ||||||||||||||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | No Mission Impact | ||||||||||||||||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Basket Strainers | Pump 5 | Titan | BS85 | 6.0 in. | X | X | X | 3-6.4 | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | |||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | ||||||||||||||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | No Mission Impact | ||||||||||||||||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Basket Strainers | Pump 3 | Titan | H028 | 6.0 in. | X | X | X | 3-6.4 | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | |||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | ||||||||||||||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | No Mission Impact | ||||||||||||||||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Centrifugal Pumps | Pump 4 pump | Union | FP-4 | 600 GPM GPM/SCFM | X | X | X | 3-8.1 | During routine pump inspections only the easy to monitor factors such as pressure, temperature, vibration etc can be checKed. But during quarterly inspections, shaft alignment and oil levels should also be checked. Change Oil Annually | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Centrifugal Pumps | Pump 3 | Union | FP-4 | 600 GPM GPM/SCFM | X | X | X | 3-8.1 | During routine pump inspections only the easy to monitor factors such as pressure, temperature, vibration etc can be checKed. But during quarterly inspections, shaft alignment and oil levels should also be checked. Change Oil Annually | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Centrifugal Pumps | Pump 5 | Union | FP-4 | 600 GPM GPM/SCFM | 0 | 0 | X | 3-8.1 | During routine pump inspections only the easy to monitor factors such as pressure, temperature, vibration etc can be checKed. But during quarterly inspections, shaft alignment and oil levels should also be checked. Change Oil Annually | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Centrifugal Pumps | Pump 6 | Union | FP-4 | 600 GPM GPM/SCFM | X | X | 0 | 3-8.1 | During routine pump inspections only the easy to monitor factors such as pressure, temperature, vibration etc can be checKed. But during quarterly inspections, shaft alignment and oil levels should also be checked. Change Oil Annually | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | General System Control Valves | Pump 6 | Cla-Val | 150/PN16 | 4.0 in. | X | X | 0 | 4-3.2.1 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | General System Control Valves | Pump 4 control valve | Cla-Val | 150/PNT8 | 4.0 in. | X | X | 0 | 4-3.2.1 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | General System Control Valves | Pump 5 Issue | Cla-Val | 160/PN16 | 4.0 in. | X | X | 0 | 4-3.2.1 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | General System Control Valves | Pump 3 | Cla-Val | 150/PNT8 | 4.0 in. | X | X | 0 | 4-3.2.1 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Pressure Control Valves | Pump 4 CRL | Cla-Val | Not Legible | 0.5 in. | X | X | 0 | 4-4.2.7 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Pressure Control Valves | Pump 6 CRD | Cla-Val | Not Legible | 0.5 in. | X | X | 0 | 4-4.2.7 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Pressure Control Valves | Pump 6 CRL | Cla-Val | Not Legible | 0.5 in. | X | 0 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | 4-4.2.7 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Pressure Control Valves | Pump 3 CRL | Cla-Val | Not Legible | 0.5 in. | X | 0 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | 4-4.2.7 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Pressure Control Valves | Pump 5 CRL | Cla-Val | Not Legible | 0.5 in. | X | 0 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | 4-4.2.7 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Pressure Control Valves | Pump 4 CRL | Cla-Val | Not Legible | 0.375 (3/8) in. | X | 0 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | 4-4.2.7 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Pressure Control Valves | Pump 3 CRL | Cla-Val | Not Legible | 1.0 in. | X | 0 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | 4-4.2.7 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Pressure Control Valves | Pump 5 CRD | Cla-Val | Not Legible | 0.375 (3/8) in. | X | 0 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | 4-4.2.7 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | |||||
| 106 | Above Ground (Bulk Storage) | Issue Lines | Aboveground Piping | Bldg 106 Above Ground Piping | N/A | N/A | 14.0 in. | X | X | No Manufacturer Requirements Available | 6-1.3 | No Manufacturer Requirements Available | Weekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection. | No Mission Impact | |||||
| 106 | Above Ground (Bulk Storage) | Issue Lines | Aboveground Piping | Bldg 106 Piping | N/A | N/A | 4.0 in. | X | X | No Manufacturer Requirements Available | 6-1.3 | No Manufacturer Requirements Available | Weekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection. | No Mission Impact | |||||
| 106 | Above Ground (Bulk Storage) | Issue Lines | Aboveground Piping | Bldg 106 Above Ground Piping | N/A | N/A | 2.0 in. | X | X | No Manufacturer Requirements Available | 6-1.3 | No Manufacturer Requirements Available | Weekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection. | No Mission Impact | |||||
| 106 | Above Ground (Bulk Storage) | Issue Lines | Aboveground Piping | Bldg 106 Piping | N/A | N/A | 1.0 in. | X | X | No Manufacturer Requirements Available | 6-1.3 | No Manufacturer Requirements Available | Weekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection. | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Gate Valves | Pump 4 gate valve | FTI | SF 150 | 4.0 in. | X | 0 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | Partial System OOS | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Gate Valves | Pump 6 | FTI | SF150-CS | 4.0 in. | X | 0 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | Partial System OOS | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Gate Valves | Pump 5 | FTI | F-150-CS | 4.0 in. | X | 0 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | Partial System OOS | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Gate Valves | Pump 3 | FTI | ANSI 150 | 4.0 in. | X | 0 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | Partial System OOS | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Pump 3 DP Gauge Discharge | Ham-Let | H-700-SS | 0.25 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Pump 4 Basket Strainer | FTI | T75 | 1.0 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Pump 3 Issue Gauge | FTI | F150-SS | 1.0 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Pump 4 DP Gauge Discharge | Ham-Let | H700 | 0.25 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Pump 4 DP Gauge Inlet | Ham-Let | H700 | 0.25 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Pump 4 Basket Strainer Drain | FTI | T75 | 1.0 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Pump 4 Issue Line | CF fluid controls | Rx17 | 8.0 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Pump 4 Above Pump | FTI | F150 | 1.0 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Pump 4 PRV Isolation | FTI | 150 | 1.0 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Pump 5 DP Gauge Discharge | Ham-Let | H-700-SS | 0.25 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Pump 5 DP Gauge Inlet | Ham-Let | H-700-SS | 0.25 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Fillstand Upstream Pump | FTI | SF150-SS | 2.0 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Fillstand Inlet | FTI | Sf150 | 2.0 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Pump 6 | Ham-Let | 1V208 | 0.25 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Pump 6 | Ham-Let | 1V208 | 0.25 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Fillstand Pump Shed Outlet | Flow-Tek | F15 | 1.0 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Pump 6 | FTI | T75-SS | 1.0 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Pump 6 | FTI | T75-SS | 1.0 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Pump 3 DP Gauge Inlet | Ham-Let | H-700-SS | 0.25 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Pump 6 | FTI | F150-SS | 1.0 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Pump 6 | FTI | 275 WOG | 1.0 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Pump 6 | FTI | F150-SS | 1.0 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Pump 3 | FTI | F150-SS | 1.0 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Pump Room High Point | FTI | F150 SS | 2.0 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | High side bv above pump 4 | FTI | 150 | 1.0 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | PRV Line 17 | FTI | F150-SS | 1.0 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Fillstand Pump Shed Inlet PRV Line | FTI | F150-SS | 1.0 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Fillstand Pump Shed Inlet PRV Line | FTI | F150-SS | 1.0 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Fillstand Pump Shed Inlet Drain | FTI | SF150-SS | 2.0 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Fillstand Pump Shed Outlet | FTI | F1500-SS | 1.0 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Fillstand Pump Shed Outlet | FTI | SF150-SS | 2.0 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Fillstand Pump Shed Outlet PRV Line | FTI | F150-SS | 1.0 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Containment Drain | Velan | 1000 WOG | 1.0 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Pump 3 Basket Strainer Top | FTI | 150 | 1.0 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Pump 5 Basket Stainer Top | FTI | F-150 SS | 1.0 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Pump 5 | FTI | F-150 SS | 1.0 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Pump 5 Issue Gauge Isolation | FTI | F-150 | 1.0 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Pump 5 Isolation | FTI | F150 -CS | 8.0 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Pump 3 PRV Isolation | FTI | F150-SS | 1.0 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Pump 3 | FTI | 150-CD | 8.0 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Pump 6 | FTI | F150-CS | 8.0 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Ball Valves | Pump 3 | FTI | 1000 WOG | 1.0 in. | X | 0 | Operate from fully open to fully closed with 90 degree rotation of the ball. | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Double Block and Bleed Valves | Fillstand Pump Shed Inlet | General Twin Seal | Twin Seal | 14.0 in. | X | X | Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug. | 6-6.2.5 | Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug. | No Operator Requirement | Partial System OOS | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Double Block and Bleed Valves | Fillstand Pump Shed Outlet | General Twin Seal | Twin Seal | 12.0 in. | X | X | Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug. | 6-6.2.5 | Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug. | No Operator Requirement | Partial System OOS | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Thermal and/or Pressure Relief Valves | Fillstand Pump Shed Inlet PRV Line | Taylor | T-8200-1 | 1.0 in. 0 - 0 PSI | X | X | Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended. | 6-6.3 | Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended. | Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced. | ||||||
| Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked. | Partial System OOS | 26-50 set at 50 | |||||||||||||||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Thermal and/or Pressure Relief Valves | Pump 3 Issue | Taylor | T-8200-1 | 1.0 in. 0 - 0 PSI | X | X | Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended. | 6-6.3 | Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended. | Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced. | ||||||
| Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked. | Partial System OOS | 101-225 | |||||||||||||||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Thermal and/or Pressure Relief Valves | Pump 6 | Taylor | T-8200-1 | 1.0 in. 0 - 0 PSI | X | X | Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended. | 6-6.3 | Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended. | Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced. | ||||||
| Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked. | Partial System OOS | 101-225 set at 225 | |||||||||||||||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Thermal and/or Pressure Relief Valves | Pump 4 PRV | Taylor | T8200-1 | 1.0 in. 0 - 0 PSI | X | X | Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended. | 6-6.3 | Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended. | Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced. | ||||||
| Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked. | Partial System OOS | ||||||||||||||||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Thermal and/or Pressure Relief Valves | Fillstand Pump Shed Outlet | Taylor | T-8200-1 | 1.0 in. 0 - 0 PSI | X | X | Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended. | 6-6.3 | Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended. | Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced. | ||||||
| Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked. | Partial System OOS | 51-100 set at 100 | |||||||||||||||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Thermal and/or Pressure Relief Valves | Pump 5 Issue | Taylor | T-8200-1 | 1.0 in. 0 - 0 PSI | X | X | Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended. | 6-6.3 | Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended. | Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced. | ||||||
| Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked. | Partial System OOS | 101-225 set 225 | |||||||||||||||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Thermal and/or Pressure Relief Valves | Fillstand Pump Shed Outlet PRV Line | Taylor | T-8200-1 | 1.0 in. 0 - 0 PSI | X | X | Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended. | 6-6.3 | Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended. | Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced. | ||||||
| Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked. | Partial System OOS | 100-225 set at 225 | |||||||||||||||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Pressure and Pressure/Vacuum Gauges | Pump 5 | Wika | Not Labeled | 0.25 in. | X | X | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. | Partial System OOS | 0-300 | ||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Pressure and Pressure/Vacuum Gauges | Pump 3 | Not Labeled | Not Labeled | 0.25 in. | X | X | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. | Partial System OOS | -30 - 0 | ||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Pressure and Pressure/Vacuum Gauges | Pump 6 | Not Labeled | Not Labeled | 0.25 in. | X | X | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. | Partial System OOS | Vacuum pressure -30 - 0 | ||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Pressure and Pressure/Vacuum Gauges | Pump 3 Issue Line | Wika | Not Labeled | 0.25 in. | X | X | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. | Partial System OOS | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Pressure and Pressure/Vacuum Gauges | Pump 4 gauge | Not Labeled | Not Labeled | 0.25 in. | X | X | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. | Partial System OOS | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Pressure and Pressure/Vacuum Gauges | Pump 6 | Not Labeled | Not Labeled | 0.25 in. | X | X | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. | Partial System OOS | 0-300 | ||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Pressure and Pressure/Vacuum Gauges | Pump 4 gauge w/ test tee, above pump | Not Labeled | Not Labeled | 0.25 in. | X | X | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. | Partial System OOS | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Pressure and Pressure/Vacuum Gauges | Pump 5 DP Gauge | Not Labeled | Not Labeled | 0.25 in. | X | X | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. | Partial System OOS | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Pressure and Pressure/Vacuum Gauges | Fillstand Pump Shed Outlet | Not Labeled | Not Labeled | 0.25 in. | X | X | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. | Partial System OOS | 0-300 | ||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Differential Pressure Gauges | Pump 3 | Gammon | 534-30 | 0 - 300 PSI | X | X | Periodic calibration of this instrument is unnecessary because the graduated scale is made to match the characteristics (load/deflection curve) of the spring. If the spring loses some of its strength for some reason, the ”free length” must be shortened. Afull length spring will always provide accurate readings. This is a fundamental truth about compression springs. This spring is at its “free full length” when there is zero differential pressure; the top of the piston is then in the “zero” band of the graduated scale. | 6-7.2 | Periodic calibration of this instrument is unnecessary because the graduated scale is made to match the characteristics (load/deflection curve) of the spring. If the spring loses some of its strength for some reason, the ”free length” must be shortened. Afull length spring will always provide accurate readings. This is a fundamental truth about compression springs. This spring is at its “free full length” when there is zero differential pressure; the top of the piston is then in the “zero” band of the graduated scale. | Quarterly - Clean outside of gauge glass. | Partial System OOS | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Differential Pressure Gauges | Pump 6 | Gammon | 534-30 | 0 - 300 PSI | X | X | Periodic calibration of this instrument is unnecessary because the graduated scale is made to match the characteristics (load/deflection curve) of the spring. If the spring loses some of its strength for some reason, the ”free length” must be shortened. Afull length spring will always provide accurate readings. This is a fundamental truth about compression springs. This spring is at its “free full length” when there is zero differential pressure; the top of the piston is then in the “zero” band of the graduated scale. | 6-7.2 | Periodic calibration of this instrument is unnecessary because the graduated scale is made to match the characteristics (load/deflection curve) of the spring. If the spring loses some of its strength for some reason, the ”free length” must be shortened. Afull length spring will always provide accurate readings. This is a fundamental truth about compression springs. This spring is at its “free full length” when there is zero differential pressure; the top of the piston is then in the “zero” band of the graduated scale. | Quarterly - Clean outside of gauge glass. | Partial System OOS | 0-30 | ||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Differential Pressure Gauges | Pump 4 | Gammon | 534-30 | 0 - 300 PSI | X | X | Periodic calibration of this instrument is unnecessary because the graduated scale is made to match the characteristics (load/deflection curve) of the spring. If the spring loses some of its strength for some reason, the ”free length” must be shortened. Afull length spring will always provide accurate readings. This is a fundamental truth about compression springs. This spring is at its “free full length” when there is zero differential pressure; the top of the piston is then in the “zero” band of the graduated scale. | 6-7.2 | Periodic calibration of this instrument is unnecessary because the graduated scale is made to match the characteristics (load/deflection curve) of the spring. If the spring loses some of its strength for some reason, the ”free length” must be shortened. Afull length spring will always provide accurate readings. This is a fundamental truth about compression springs. This spring is at its “free full length” when there is zero differential pressure; the top of the piston is then in the “zero” band of the graduated scale. | Quarterly - Clean outside of gauge glass. | Partial System OOS | |||||
| 106 | Fillstand Pump Shed | Fillstand Pump Shed | Differential Pressure Gauges | Pump 5 | Gammon | 534-30 | 0 - 300 PSI | X | X | Periodic calibration of this instrument is unnecessary because the graduated scale is made to match the characteristics (load/deflection curve) of the spring. If the spring loses some of its strength for some reason, the ”free length” must be shortened. Afull length spring will always provide accurate readings. This is a fundamental truth about compression springs. This spring is at its “free full length” when there is zero differential pressure; the top of the piston is then in the “zero” band of the graduated scale. | 6-7.2 | Periodic calibration of this instrument is unnecessary because the graduated scale is made to match the characteristics (load/deflection curve) of the spring. If the spring loses some of its strength for some reason, the ”free length” must be shortened. Afull length spring will always provide accurate readings. This is a fundamental truth about compression springs. This spring is at its “free full length” when there is zero differential pressure; the top of the piston is then in the “zero” band of the graduated scale. | Quarterly - Clean outside of gauge glass. | Partial System OOS |