This is a Facility Maintenance Plan (FMP) template for fuel system maintenance at Dyess Air Force Base in Abilene, TX. The template provides detailed guidance for contractor personnel regarding the operation, inspection, and maintenance of permanently installed fuel facilities under Quality Assurance Evaluator control.
The plan outlines maintenance requirements for various fuel system components including above/underground storage tanks, filter separators, valves, meters, pumps, monitoring equipment, alarms, and fire fighting equipment. It contains specific maintenance schedules and procedures for the Bravo Fillstand, RTB Header/Alpha facility, Fuels Operations building, Refueler Parking Yard, and Hydrants Operations areas. The template includes sections for administrative information, communication protocols, safety requirements, and a detailed task matrix listing all maintainable assets with their specifications, maintenance frequencies, and operational impact considerations. The document is structured as a working template where site-specific details and requirements can be added.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Administrative
| Location | Site Name | Dyess Air Force Base Site #1 |
| RPSUID | 1672 | |
| DLA Site Code | DYE | |
| Hours of Operation | 24 Hours of Operation | |
| Address | 710 South Third St., Abilene, TX 79607 | |
| Contract | Contractor | |
| Contract # | ||
| Local POCs | QAE Name | |
| QAE Phone | ||
| QAE Email | ||
| Alt QAE Name | ||
| Alt QAE Phone | ||
| Alt QAE Email | ||
| DLA/SCP POCs | DLA PM Name | |
| DLA PM Phone | ||
| DLA PM Email | ||
| SCP PM Name | ||
| SCP PM Phone | ||
| SCP PM Email | ||
| Contractor POCs | Contractor PM Name | |
| Contractor PM Phone | ||
| Contractor PM Email | ||
| Contractor QC Name | ||
| Contractor QC Phone | ||
| Contractor QC Email | ||
| Contractor SM Name | ||
| Contractor SM Phone | ||
| Contractor SM Email | ||
| USACE POCs | USACE PM/COR Name | |
| USACE PM/COR Phone | ||
| USACE PM/COR Email | ||
| USACE PE Name | ||
| USACE PE Phone | ||
| USACE PE Email | ||
| USACE KO Name | ||
| USACE KO Phone | ||
| USACE KO Email |
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
This table shows the minimum information required. Additional details should be included based on site specific requirements. Additional POCs may be required.
General Facility Description Facility Description
Purpose:
This Facility Maintenance Plan provides guidance for Contractor personnel in the operation, inspection, and maintenance of permanently installed fuel facilities operated under the control of the Quality Assurance Evaluators. Federal, state, and local environmental laws and regulations shall be complied with if this plan is in conflict with them.
Scope:
The instructions prescribed by this plan outline general fuels maintenance information associated with fuel storage and dispensing systems and provides the minimum periodic contractor maintenance and inspection criteria requirements for the systems. This plan is to be used in conjunction with other existing directives governing fuel system operations and maintenance requirements. Conotractor will properly maintain and repair federally funded petroleum systems and facilities in order to provide compliance with applicable code, criteria, and federal, state, local and/or host nation regulations.
Fuels Facilities:
Organizational tanks, and associated dispensing equipment are maintained and operated by the owning organization. Fuel system maintenance contractors shall perform all maintenance and associated procurement actions on installed fuel systems.
Each installation under the Southwest Division contract are military land-based facilities who receive, store, distribute, and/or dispense liquid fuels.
Standard fuel system equipment includes:
a) Above Ground Sorage Stanks (AST), Underground Storage Tanks (UST)
b) Filter/separator and other filtration device maintenance access, particularly element removal.
c) Manual valves
d) Meter Registers, and Flow Meters.
e) Control Valves.
f) Pumps
g) Tank Monitoring Equipment and Instruments
h) Alarms
i) Fire Fighting Equipment
Site Specific General Information:
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Include a general facility overview and description of each fuel system for the sites in accordance with UFC 3-460-01. Examples include: Bulk Storage Facilities, Aircraft Fueling Facilities, Marine and Dispensing Facilities, Ground Products Fueling Facilities, Alternate POL Facilities, and Support Facilities. Also include facility #s, facility names, fuel type, photos, and any other pertinent information.
Include Site Specific Conditions and Restrictions in this tab.
Communication Plan
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Communication plan shall address in/out briefs, lines of communication, coordination for access, etc.
Safety
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Site Specific Addendum and Activity Hazard Analysis, which are Attachments to the APP, specific to activities or tasks related to recurring maintenance for this site.
RM Schedule
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Link RM schedule here
Task Matrix
| Applicable Facility Assets | UFC System Level Maintenance Frequency | Special Considerations | |||||||||||||||||
| Real Property Unique Identifier | |||||||||||||||||||
| (RPUID) | Real Property Facility # | Real Property Facility Name | Operational Area | Component Type | Base Asset ID | Component Unique Identifier (CUID) | Make | Model | Capacity/Size | Q | S | A | UFC Section Reference | Additional Manufacturer RM Requirements | Operator/ equipment Requirements | System availability | Other Contract | Comments | |
| 909 | Oil Water Separator | Oil Water Separator | Oil/Water Separators | Oil Water Separator | Unmarked | Unmarked | Unmarked Gallons | X | 0 | X | 11-5 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||||
| 909 | Oil Water Separator | Oil Water Separator | Electrical Equipment | Automatic Tank Gauge | Incon | TS-1000 | N/A | X | 0 | 0 | 9-1.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||||
| 1003 | Bravo Fillstand | Bravo Fillstand | Canopies | Fillstand Bravo Canopy | Unmarked | Unmarked | N/A | 0 | 0 | 0 | 11-2.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | Fillstand Bravo canop | ||||
| 1003 | Bravo Fillstand | Bravo Fillstand | Positive Displacement Meters | Meter | LC | Unmarked | 30-600 GPM/SCFM | 0 | X | 0 | 3-7.1 | Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature | |||||||
| compensation feature | Monthly - Inspect counter head for unusual noises and smooth operation. | Partial System OOS | |||||||||||||||||
| 1003 | Bravo Fillstand | Bravo Fillstand | Fueling Nozzles | Nozzle | Cla-Val | D3 | N/A | 0 | 0 | 0 | 4-7.4 | Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand. | Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand. | Partial System OOS | Fillstand Bravo | ||||
| 1003 | Bravo Fillstand | Bravo Fillstand | Sight Flow Indicators | Visi-Flo | Visi-Flo | 1571 F 1 | 1.0 in. | 0 | 0 | 0 | 6-12.3 | Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Partial System OOS | Fillstand Bravo | ||||
| 1003 | Bravo Fillstand | Bravo Fillstand | EFSO Systems | Fillstand Bravo EFSO | Killark | XCS-0MMR3 | N/A | X | 0 | 0 | 7-16 | Proper operation, box seals for integrity. Electrical connections for continuity. | No Operator Requirement | Partial System OOS | Fillstand Bravo | ||||
| 1003 | Bravo Fillstand | Bravo Fillstand | Electronic Overfill Protection Systems | Scully | Scully | Intellitrol | N/A | X | 0 | 0 | 9-6 | Proof Test : Confirm that the control module is indicating a dry condition (output relay closed). Bypass the safety function and take appropriate action to avoid a false trip Remove power from the WX system relay. Confirm that the relay opens within |
one (1) second. Reconnect power. Disconnect one of the wires to the sensor. Confirm that the relay opens within one (1) second. Reconnect power. Short the two sensor wires together. Confirm that the relay opens within one (1)
| second. Remove short. Remove the bypass and otherwise restore normal operation | No Operator Requirement | Partial System OOS | CMP | Fillstand Bravo | |||||||||||||
| 1003 | Bravo Fillstand | Bravo Fillstand | Fuel Truck Containment Areas | Fillstand Bravo truck containment | Unmarked | Unmarked | N/A | X | 0 | X | 11-1.1 | No Manufacturer Requirements Available | Monthly - Remove debris from around security fence. Inspect fence grounding points. Ensure connections are not loose or damage. | No Mission Impact | Fillstand Bravo truck Containment | ||
| 1003 | Bravo Fillstand | Bravo Fillstand | Pressure Control Valves | Cla-Val | Cla-Val | 4-90AF4H-02 | 4.0 in. | X | 0 | 0 | 4-4.2.7 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | |||
| 1003 | Bravo Fillstand | Bravo Fillstand | Fixed Pantographs | Fillstand Bravo Pantograph | Meyerinck | Unmarked | N/A | X | 0 | 0 | 4-7.1.1 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | Fillstand Bravo | ||
| 1003 | Bravo Fillstand | Bravo Fillstand | Ball Valves | Ball Valve | Velan | HB 2000 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | Fillstand Bravo | ||
| 1003 | Bravo Fillstand | Bravo Fillstand | Ball Valves | Ball Valve | Velan | HB 2000 | 0.75 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 1003 | Bravo Fillstand | Bravo Fillstand | Ball Valves | Low Point Drain | Jamesbury | CF8M | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 1003 | Bravo Fillstand | Bravo Fillstand | Ball Valves | Ball Valve | Velan | CF8M | 4.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 1003 | Bravo Fillstand | Bravo Fillstand | Ball Valves | Ball Valve | Velan | CF8M | 4.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 1003 | Bravo Fillstand | Bravo Fillstand | Ball Valves | Ball Valve | Conbraco | Apollo | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 1003 | Bravo Fillstand | Bravo Fillstand | Thermal and/or Pressure Relief Valves | PRV | Taylor | T-8200-1 | 0.75 in. 51 - 100 PSI | X | 0 | X | 6-6.3 | Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended. | Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced. | ||||
| Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked. | Partial System OOS | Fillstand Bravo | |||||||||||||||
| 1003 | Bravo Fillstand | Bravo Fillstand | Pressure and Pressure/Vacuum Gauges | Pressure Gauge | Tube and Socket | Unmarked | 0.5 in. 0 - 300 PSI | X | X | X | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. | Partial System OOS | Fillstand Bravo | ||
| 1003 | Bravo Fillstand | Bravo Fillstand | Pressure and Pressure/Vacuum Gauges | Pressure Gauge | Tube and Socket | 316 | 0.5 in. 0 - 300 PSI | X | X | X | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. | Partial System OOS | |||
| 1003 | Bravo Fillstand | Bravo Fillstand | Static Grounding Systems | Ground | N/A | N/A | N/A | X | 0 | X | 9-1.6.2 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | Partial System OOS | |||
| 1003 | Bravo Fillstand | Bravo Fillstand | Lighting | Fillstand Bravo canopy lighting | Unmarked | Unmarked | N/A | X | 0 | X | 9-1.8 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | Fillstand Bravo | ||
| 1004 | RTB Header/Alpha | RTB Header/Alpha | EFSO Systems | Emergency Fuel Shutoff Button | Unmarked | Unmarked | N/A | X | 0 | 0 | 7-16 | Proper operation, box seals for integrity. Electrical connections for continuity. | No Operator Requirement | Partial System OOS | RTB Header/A | ||
| 1004 | RTB Header/Alpha | RTB Header/Alpha | Fuel Truck Containment Areas | RTB Header/A truck containment | Unmarked | Unmarked | N/A | X | 0 | X | 11-1.1 | No Manufacturer Requirements Available | Monthly - Remove debris from around security fence. Inspect fence grounding points. Ensure connections are not loose or damage. | No Mission Impact | RTB Header/A | ||
| 1004 | RTB Header/Alpha | RTB Header/Alpha | Pressure Control Valves | Cla-Val | Cla-Val | Illegible | 6.0 in. | X | 0 | 0 | 4-4.2.7 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | RTB Header/A | ||
| 1004 | RTB Header/Alpha | RTB Header/Alpha | Hydrant Adapters | Hydrant adapter | Cla-Val | 870324 | 6.0 in. | X | 0 | 0 | 4-7.3 | Inspect hydrant adapter for proper operation, damage, and wear. Test operation of dry break system. | No Operator Requirement | Partial System OOS | RTB Header/A | ||
| 1004 | RTB Header/Alpha | RTB Header/Alpha | Ball Valves | Ball Valve | Conbraco | Apollo | 0.75 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | RTB Header/A | ||
| 1004 | RTB Header/Alpha | RTB Header/Alpha | Ball Valves | Ball Valve | BMC Corps | I-SS-R-SS | 6.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 1004 | RTB Header/Alpha | RTB Header/Alpha | Ball Valves | Ball Valve | BMC Corps | I-SS-R-SS | 6.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 1004 | RTB Header/Alpha | RTB Header/Alpha | Ball Valves | Ball Valve | BMC Corps | I-SS-R-SS | 6.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 1004 | RTB Header/Alpha | RTB Header/Alpha | Butterfly Valves | Butterfly Valve | FlowSeal | Unmarked | 6.0 in. | X | 0 | 0 | 6-6.2.6 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 1004 | RTB Header/Alpha | RTB Header/Alpha | Static Grounding Systems | Ground | N/A | N/A | N/A | X | 0 | X | 9-1.6.2 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | Partial System OOS | |||
| 4111 | Fuels Operations building | Fuels Lab | Emergency Eyewash/Showers | Emergency Eyewash/Shower | Haws | Unmarked | N/A | X | X | X | 11-3 | Weekly - Equipment installed within 10 seconds from the hazard and on the same plane as the hazard Pathway is clear of obstructions Plumbed equipment activated to ensure compliant operation and to clear any sediment Self-contained equipment checked to determine if the flushing fluid needs to be changed or supplemented Equipment free of broken or missing parts Equipment protected against freezing User protected from scalding water | No Operator Requirement | No Mission Impact | Emergency eyewash | ||
| 4111 | Fuels Operations building | Fuels Lab | Ventilation Hoods | Vent hood | Labconco | Unmarked | N/A | X | X | X | 11-4.1 | Daily visual inspection, check the fume hood for visible airflow blockage such as large items or containers near the slot opening. Other daily inspections include holding a tissue at the opening to observe inward airflow, maintaining clean surfaces inside the hood, and keeping the sash at an appropriate height when working and not working in the hood. | No Operator Requirement | Delay in Performing Analysis | Lab vent hood | ||
| 4111 | Fuels Operations building | Generator | Static Grounding Systems | Ground | N/A | N/A | N/A | X | 0 | X | 9-1.6.2 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | Partial System OOS | |||
| 4111 | Fuels Operations building | Fuels Lab | Static Grounding Systems | Lab ground | Unmarked | Unmarked | N/A | X | 0 | X | 9-1.6.2 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | Partial System OOS | Fuels lab grounding | ||
| 4111 | Fuels Operations building | Generator | Back-Up Power Generators | Emergency Generator | Cummins | DKAE-5659777 | N/A | X | X | 0 | Back-Up Power Generators | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 4160 | Refueler Parking Yard | Refueler Parking Yard | Air Compressors | Air compressor | Ingersoll Rand | Unmarked | N/A | X | X | 0 | Air Compressors | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | Compressor | ||
| 4160 | Refueler Parking Yard | Refueler Parking Yard | Emergency Eyewash/Showers | Emergency Eyewash | Unmarked | Unmarked | N/A | X | X | X | 11-3 | Weekly - Equipment installed within 10 seconds from the hazard and on the same plane as the hazard Pathway is clear of obstructions Plumbed equipment activated to ensure compliant operation and to clear any sediment Self-contained equipment checked to determine if the flushing fluid needs to be changed or supplemented Equipment free of broken or missing parts Equipment protected against freezing User protected from scalding water | No Operator Requirement | No Mission Impact | Emergency eyewash | ||
| 4160 | Refueler Parking Yard | Refueler Parking Yard | Fuel Truck Containment Areas | Truck parking | Unmarked | Unmarked | N/A | X | 0 | X | 11-1.1 | No Manufacturer Requirements Available | Monthly - Remove debris from around security fence. Inspect fence grounding points. Ensure connections are not loose or damage. | No Mission Impact | Truck containment | ||
| 4160 | Refueler Parking Yard | Refueler Parking Yard | Lighting | Lighting | Unmarked | Unmarked | N/A | X | 0 | X | 9-1.8 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | Truck parking lighting | ||
| 5212 | Hydrants Ops | Bravo Pump House | Canopies | Bravo Pump House Canopy | Unmarked | Unmarked | N/A | 0 | 0 | 0 | 11-2.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 5212 | Hydrants Ops | Bravo Pump House | Automatic Air Vents | Air Eliminator | Armstrong | Unmarked | 0.75 in. | 0 | 0 | X | 3-10.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | Receipt Filter Separator 2 | ||
| 5212 | Hydrants Ops | Bravo Pump House | Automatic Air Vents | Air Eliminator | Armstrong | Unmarked | 0.75 in. | 0 | 0 | X | 3-10.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | Receipt Filter Separator 3 | ||
| 5212 | Hydrants Ops | Bravo Pump House | Automatic Air Vents | Air Eliminator | Armstrong | Unmarked | 0.75 in. | 0 | 0 | X | 3-10.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | Issue Filter Separator 9 | ||
| 5212 | Hydrants Ops | Bravo Pump House | Automatic Air Vents | Air Eliminator | Armstrong | Unmarked | 0.75 in. | 0 | 0 | X | 3-10.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | Issue Filter Separator 10 | ||
| 5212 | Hydrants Ops | Bravo Pump House | Automatic Air Vents | Air Eliminator | Armstrong | Unmarked | 0.75 in. | 0 | 0 | X | 3-10.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | Issue Filter Separator 11 | ||
| 5212 | Hydrants Ops | Bravo Pump House | Automatic Air Vents | Air Eliminator | Armstrong | Unmarked | 0.75 in. | 0 | 0 | X | 3-10.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | Issue Filter Separator 12 | ||
| 5212 | Hydrants Ops | Bravo Pump House | Automatic Air Vents | Air Eliminator | Armstrong | Unmarked | 0.75 in. | 0 | 0 | X | 3-10.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | Issue Filter Separator 13 | ||
| 5212 | Hydrants Ops | Bravo Pump House | Basket Strainers | Basket Strainer | Mueller | B529A | 8.0 in. | 0 | 0 | 0 | 3-6.4 | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | |||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | ||||||||||||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | No Mission Impact | ||||||||||||||||
| 5212 | Hydrants Ops | Bravo Pump House | Basket Strainers | Basket Strainer | Mueller | 600 8WP | 1.0 in. | 0 | 0 | 0 | 3-6.4 | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | |||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | ||||||||||||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | No Mission Impact | Issue Filter Separator 13 | |||||||||||||||
| 5212 | Hydrants Ops | Bravo Pump House | Basket Strainers | Basket Strainer | Mueller | 600 8WP | 1.0 in. | 0 | 0 | 0 | 3-6.4 | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | |||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | ||||||||||||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | No Mission Impact | Issue Filter Separator 12 | |||||||||||||||
| 5212 | Hydrants Ops | Bravo Pump House | Basket Strainers | Basket Strainer | Mueller | 600 8WP | 1.0 in. | 0 | 0 | 0 | 3-6.4 | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | |||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | ||||||||||||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | No Mission Impact | Issue Filter Separator 11 | |||||||||||||||
| 5212 | Hydrants Ops | Bravo Pump House | Basket Strainers | Basket Strainer | Mueller | 600 8WP | 1.0 in. | 0 | 0 | 0 | 3-6.4 | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | |||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | ||||||||||||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | No Mission Impact | Issue Filter Separator 10 | |||||||||||||||
| 5212 | Hydrants Ops | Bravo Pump House | Basket Strainers | Basket Strainer | Mueller | 600 8WP | 1.0 in. | 0 | 0 | 0 | 3-6.4 | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | |||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | ||||||||||||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | No Mission Impact | Issue Filter Separator 9 | |||||||||||||||
| 5212 | Hydrants Ops | Bravo Pump House | Basket Strainers | Basket Strainer | Mueller | 600 8WP | 1.0 in. | 0 | 0 | 0 | 3-6.4 | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | |||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | ||||||||||||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | No Mission Impact | Receipt Filter Separator 3 | |||||||||||||||
| 5212 | Hydrants Ops | Bravo Pump House | Basket Strainers | Basket Strainer | Mueller | 600 8WP | 1.0 in. | 0 | 0 | 0 | 3-6.4 | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | |||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | ||||||||||||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | No Mission Impact | Receipt Filter Separator 2 | |||||||||||||||
| 5212 | Hydrants Ops | Bravo Pits | Hydrant Fuel Pits | Fuel Pit | Unmarked | Unmarked | N/A | 0 | 0 | 0 | 6-11.2 | No Manufacturer Requirements Available | Monthly, or more often based on local conditions - Hydrant fuel pits shall be inspected to ensure that they are dry and clean and that all fueling components within the pit are clean and in good working order. Check pipe penetrations through pit walls or bottom to ensure that mechanical and boot seals are in good working condition and are allowing no water seepage into the pits. Check for fuel leaks at all flanged and pipe connections.Check pit lids to ensure that seals are in good working order and are preventing water entry into the pits. Inspect hydrant fuel pit bonding cables for corrosion and ensure electrical continuity between bonded equipment. | Partial System OOS | B22 | ||
| 5212 | Hydrants Ops | Bravo Pits | Hydrant Fuel Pits | Fuel Pit | Unmarked | Unmarked | N/A | 0 | 0 | 0 | 6-11.2 | No Manufacturer Requirements Available | Monthly, or more often based on local conditions - Hydrant fuel pits shall be inspected to ensure that they are dry and clean and that all fueling components within the pit are clean and in good working order. Check pipe penetrations through pit walls or bottom to ensure that mechanical and boot seals are in good working condition and are allowing no water seepage into the pits. Check for fuel leaks at all flanged and pipe connections.Check pit lids to ensure that seals are in good working order and are preventing water entry into the pits. Inspect hydrant fuel pit bonding cables for corrosion and ensure electrical continuity between bonded equipment. | Partial System OOS | B21 | ||
| 5212 | Hydrants Ops | Bravo Pits | Hydrant Fuel Pits | Fuel Pit | Unmarked | Unmarked | N/A | 0 | 0 | 0 | 6-11.2 | No Manufacturer Requirements Available | Monthly, or more often based on local conditions - Hydrant fuel pits shall be inspected to ensure that they are dry and clean and that all fueling components within the pit are clean and in good working order. Check pipe penetrations through pit walls or bottom to ensure that mechanical and boot seals are in good working condition and are allowing no water seepage into the pits. Check for fuel leaks at all flanged and pipe connections.Check pit lids to ensure that seals are in good working order and are preventing water entry into the pits. Inspect hydrant fuel pit bonding cables for corrosion and ensure electrical continuity between bonded equipment. | Partial System OOS | B20 | ||
| 5212 | Hydrants Ops | Bravo Pits | Hydrant Fuel Pits | Fuel Pit | Unmarked | Unmarked | N/A | 0 | 0 | 0 | 6-11.2 | No Manufacturer Requirements Available | Monthly, or more often based on local conditions - Hydrant fuel pits shall be inspected to ensure that they are dry and clean and that all fueling components within the pit are clean and in good working order. Check pipe penetrations through pit walls or bottom to ensure that mechanical and boot seals are in good working condition and are allowing no water seepage into the pits. Check for fuel leaks at all flanged and pipe connections.Check pit lids to ensure that seals are in good working order and are preventing water entry into the pits. Inspect hydrant fuel pit bonding cables for corrosion and ensure electrical continuity between bonded equipment. | Partial System OOS | B19 | ||
| 5212 | Hydrants Ops | Bravo Pits | Hydrant Fuel Pits | Fuel Pit | Unmarked | Unmarked | N/A | 0 | 0 | 0 | 6-11.2 | No Manufacturer Requirements Available | Monthly, or more often based on local conditions - Hydrant fuel pits shall be inspected to ensure that they are dry and clean and that all fueling components within the pit are clean and in good working order. Check pipe penetrations through pit walls or bottom to ensure that mechanical and boot seals are in good working condition and are allowing no water seepage into the pits. Check for fuel leaks at all flanged and pipe connections.Check pit lids to ensure that seals are in good working order and are preventing water entry into the pits. Inspect hydrant fuel pit bonding cables for corrosion and ensure electrical continuity between bonded equipment. | Partial System OOS | B18 | ||
| 5212 | Hydrants Ops | Bravo Pits | Hydrant Fuel Pits | Fuel Pit | Unmarked | Unmarked | N/A | 0 | 0 | 0 | 6-11.2 | No Manufacturer Requirements Available | Monthly, or more often based on local conditions - Hydrant fuel pits shall be inspected to ensure that they are dry and clean and that all fueling components within the pit are clean and in good working order. Check pipe penetrations through pit walls or bottom to ensure that mechanical and boot seals are in good working condition and are allowing no water seepage into the pits. Check for fuel leaks at all flanged and pipe connections.Check pit lids to ensure that seals are in good working order and are preventing water entry into the pits. Inspect hydrant fuel pit bonding cables for corrosion and ensure electrical continuity between bonded equipment. | Partial System OOS | B17 | ||
| 5212 | Hydrants Ops | Bravo Pits | Hydrant Fuel Pits | Fuel Pit | Unmarked | Unmarked | N/A | 0 | 0 | 0 | 6-11.2 | No Manufacturer Requirements Available | Monthly, or more often based on local conditions - Hydrant fuel pits shall be inspected to ensure that they are dry and clean and that all fueling components within the pit are clean and in good working order. Check pipe penetrations through pit walls or bottom to ensure that mechanical and boot seals are in good working condition and are allowing no water seepage into the pits. Check for fuel leaks at all flanged and pipe connections.Check pit lids to ensure that seals are in good working order and are preventing water entry into the pits. Inspect hydrant fuel pit bonding cables for corrosion and ensure electrical continuity between bonded equipment. | Partial System OOS | B16 | ||
| 5212 | Hydrants Ops | Bravo Pits | Hydrant Fuel Pits | Fuel Pit | Unmarked | Unmarked | N/A | 0 | 0 | 0 | 6-11.2 | No Manufacturer Requirements Available | Monthly, or more often based on local conditions - Hydrant fuel pits shall be inspected to ensure that they are dry and clean and that all fueling components within the pit are clean and in good working order. Check pipe penetrations through pit walls or bottom to ensure that mechanical and boot seals are in good working condition and are allowing no water seepage into the pits. Check for fuel leaks at all flanged and pipe connections.Check pit lids to ensure that seals are in good working order and are preventing water entry into the pits. Inspect hydrant fuel pit bonding cables for corrosion and ensure electrical continuity between bonded equipment. | Partial System OOS | B15 | ||
| 5212 | Hydrants Ops | Bravo Pits | Hydrant Fuel Pits | Fuel Pit | Unmarked | Unmarked | N/A | 0 | 0 | 0 | 6-11.2 | No Manufacturer Requirements Available | Monthly, or more often based on local conditions - Hydrant fuel pits shall be inspected to ensure that they are dry and clean and that all fueling components within the pit are clean and in good working order. Check pipe penetrations through pit walls or bottom to ensure that mechanical and boot seals are in good working condition and are allowing no water seepage into the pits. Check for fuel leaks at all flanged and pipe connections.Check pit lids to ensure that seals are in good working order and are preventing water entry into the pits. Inspect hydrant fuel pit bonding cables for corrosion and ensure electrical continuity between bonded equipment. | Partial System OOS | B14 | ||
| 5212 | Hydrants Ops | Bravo Pits | Hydrant Fuel Pits | Fuel Pit | Unmarked | Unmarked | N/A | 0 | 0 | 0 | 6-11.2 | No Manufacturer Requirements Available | Monthly, or more often based on local conditions - Hydrant fuel pits shall be inspected to ensure that they are dry and clean and that all fueling components within the pit are clean and in good working order. Check pipe penetrations through pit walls or bottom to ensure that mechanical and boot seals are in good working condition and are allowing no water seepage into the pits. Check for fuel leaks at all flanged and pipe connections.Check pit lids to ensure that seals are in good working order and are preventing water entry into the pits. Inspect hydrant fuel pit bonding cables for corrosion and ensure electrical continuity between bonded equipment. | Partial System OOS | B13 | ||
| 5212 | Hydrants Ops | Bravo Pits | Hydrant Fuel Pits | Fuel Pit | Unmarked | Unmarked | N/A | 0 | 0 | 0 | 6-11.2 | No Manufacturer Requirements Available | Monthly, or more often based on local conditions - Hydrant fuel pits shall be inspected to ensure that they are dry and clean and that all fueling components within the pit are clean and in good working order. Check pipe penetrations through pit walls or bottom to ensure that mechanical and boot seals are in good working condition and are allowing no water seepage into the pits. Check for fuel leaks at all flanged and pipe connections.Check pit lids to ensure that seals are in good working order and are preventing water entry into the pits. Inspect hydrant fuel pit bonding cables for corrosion and ensure electrical continuity between bonded equipment. | Partial System OOS | B12 | ||
| 5212 | Hydrants Ops | Bravo Pits | Hydrant Fuel Pits | Fuel pit | Unmarked | Unmarked | N/A | 0 | 0 | 0 | 6-11.2 | No Manufacturer Requirements Available | Monthly, or more often based on local conditions - Hydrant fuel pits shall be inspected to ensure that they are dry and clean and that all fueling components within the pit are clean and in good working order. Check pipe penetrations through pit walls or bottom to ensure that mechanical and boot seals are in good working condition and are allowing no water seepage into the pits. Check for fuel leaks at all flanged and pipe connections.Check pit lids to ensure that seals are in good working order and are preventing water entry into the pits. Inspect hydrant fuel pit bonding cables for corrosion and ensure electrical continuity between bonded equipment. | Partial System OOS | B11 | ||
| 5212 | Hydrants Ops | Bravo Pits | Hydrant Fuel Pits | Fuel pit | Unmarked | Unmarked | N/A | 0 | 0 | 0 | 6-11.2 | No Manufacturer Requirements Available | Monthly, or more often based on local conditions - Hydrant fuel pits shall be inspected to ensure that they are dry and clean and that all fueling components within the pit are clean and in good working order. Check pipe penetrations through pit walls or bottom to ensure that mechanical and boot seals are in good working condition and are allowing no water seepage into the pits. Check for fuel leaks at all flanged and pipe connections.Check pit lids to ensure that seals are in good working order and are preventing water entry into the pits. Inspect hydrant fuel pit bonding cables for corrosion and ensure electrical continuity between bonded equipment. | Partial System OOS | B10 | ||
| 5212 | Hydrants Ops | Bravo Pits | Hydrant Fuel Pits | Fuel pit | Unmarked | Unmarked | N/A | 0 | 0 | 0 | 6-11.2 | No Manufacturer Requirements Available | Monthly, or more often based on local conditions - Hydrant fuel pits shall be inspected to ensure that they are dry and clean and that all fueling components within the pit are clean and in good working order. Check pipe penetrations through pit walls or bottom to ensure that mechanical and boot seals are in good working condition and are allowing no water seepage into the pits. Check for fuel leaks at all flanged and pipe connections.Check pit lids to ensure that seals are in good working order and are preventing water entry into the pits. Inspect hydrant fuel pit bonding cables for corrosion and ensure electrical continuity between bonded equipment. | Partial System OOS | B9 | ||
| 5212 | Hydrants Ops | Bravo Pits | Hydrant Fuel Pits | Fuel pit | Unmarked | Unmarked | N/A | 0 | 0 | 0 | 6-11.2 | No Manufacturer Requirements Available | Monthly, or more often based on local conditions - Hydrant fuel pits shall be inspected to ensure that they are dry and clean and that all fueling components within the pit are clean and in good working order. Check pipe penetrations through pit walls or bottom to ensure that mechanical and boot seals are in good working condition and are allowing no water seepage into the pits. Check for fuel leaks at all flanged and pipe connections.Check pit lids to ensure that seals are in good working order and are preventing water entry into the pits. Inspect hydrant fuel pit bonding cables for corrosion and ensure electrical continuity between bonded equipment. | Partial System OOS | B8 | ||
| 5212 | Hydrants Ops | Bravo Pits | Hydrant Fuel Pits | Fuel pit | Unmarked | Unmarked | N/A | 0 | 0 | 0 | 6-11.2 | No Manufacturer Requirements Available | Monthly, or more often based on local conditions - Hydrant fuel pits shall be inspected to ensure that they are dry and clean and that all fueling components within the pit are clean and in good working order. Check pipe penetrations through pit walls or bottom to ensure that mechanical and boot seals are in good working condition and are allowing no water seepage into the pits. Check for fuel leaks at all flanged and pipe connections.Check pit lids to ensure that seals are in good working order and are preventing water entry into the pits. Inspect hydrant fuel pit bonding cables for corrosion and ensure electrical continuity between bonded equipment. | Partial System OOS | B7 | ||
| 5212 | Hydrants Ops | Bravo Pits | Hydrant Fuel Pits | Fuel pit | Unmarked | Unmarked | N/A | 0 | 0 | 0 | 6-11.2 | No Manufacturer Requirements Available | Monthly, or more often based on local conditions - Hydrant fuel pits shall be inspected to ensure that they are dry and clean and that all fueling components within the pit are clean and in good working order. Check pipe penetrations through pit walls or bottom to ensure that mechanical and boot seals are in good working condition and are allowing no water seepage into the pits. Check for fuel leaks at all flanged and pipe connections.Check pit lids to ensure that seals are in good working order and are preventing water entry into the pits. Inspect hydrant fuel pit bonding cables for corrosion and ensure electrical continuity between bonded equipment. | Partial System OOS | B6 | ||
| 5212 | Hydrants Ops | Bravo Pits | Hydrant Fuel Pits | Fuel pit | Unmarked | Unmarked | N/A | 0 | 0 | 0 | 6-11.2 | No Manufacturer Requirements Available | Monthly, or more often based on local conditions - Hydrant fuel pits shall be inspected to ensure that they are dry and clean and that all fueling components within the pit are clean and in good working order. Check pipe penetrations through pit walls or bottom to ensure that mechanical and boot seals are in good working condition and are allowing no water seepage into the pits. Check for fuel leaks at all flanged and pipe connections.Check pit lids to ensure that seals are in good working order and are preventing water entry into the pits. Inspect hydrant fuel pit bonding cables for corrosion and ensure electrical continuity between bonded equipment. | Partial System OOS | B5 | ||
| 5212 | Hydrants Ops | Bravo Pits | Hydrant Fuel Pits | Fuel pit | Unmarked | Unmarked | N/A | 0 | 0 | 0 | 6-11.2 | No Manufacturer Requirements Available | Monthly, or more often based on local conditions - Hydrant fuel pits shall be inspected to ensure that they are dry and clean and that all fueling components within the pit are clean and in good working order. Check pipe penetrations through pit walls or bottom to ensure that mechanical and boot seals are in good working condition and are allowing no water seepage into the pits. Check for fuel leaks at all flanged and pipe connections.Check pit lids to ensure that seals are in good working order and are preventing water entry into the pits. Inspect hydrant fuel pit bonding cables for corrosion and ensure electrical continuity between bonded equipment. | Partial System OOS | B4 | ||
| 5212 | Hydrants Ops | Bravo Pits | Hydrant Fuel Pits | Fuel pit | Unmarked | Unmarked | N/A | 0 | 0 | 0 | 6-11.2 | No Manufacturer Requirements Available | Monthly, or more often based on local conditions - Hydrant fuel pits shall be inspected to ensure that they are dry and clean and that all fueling components within the pit are clean and in good working order. Check pipe penetrations through pit walls or bottom to ensure that mechanical and boot seals are in good working condition and are allowing no water seepage into the pits. Check for fuel leaks at all flanged and pipe connections.Check pit lids to ensure that seals are in good working order and are preventing water entry into the pits. Inspect hydrant fuel pit bonding cables for corrosion and ensure electrical continuity between bonded equipment. | Partial System OOS | B3 | ||
| 5212 | Hydrants Ops | Bravo Pits | Hydrant Fuel Pits | Fuel pit | Unmarked | Unmarked | N/A | 0 | 0 | 0 | 6-11.2 | No Manufacturer Requirements Available | Monthly, or more often based on local conditions - Hydrant fuel pits shall be inspected to ensure that they are dry and clean and that all fueling components within the pit are clean and in good working order. Check pipe penetrations through pit walls or bottom to ensure that mechanical and boot seals are in good working condition and are allowing no water seepage into the pits. Check for fuel leaks at all flanged and pipe connections.Check pit lids to ensure that seals are in good working order and are preventing water entry into the pits. Inspect hydrant fuel pit bonding cables for corrosion and ensure electrical continuity between bonded equipment. | Partial System OOS | B2 | ||
| 5212 | Hydrants Ops | Bravo Pump House | Sight Flow Indicators | Visi-Flo | Visi-Flo | 1571 F 1 | 1.0 in. | 0 | 0 | 0 | 6-12.3 | Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Partial System OOS | Issue Filter Separator 13 |
1� 5212 Hydrants Ops Bravo Pump House Sight Flow Indicators Visi-Flo Visi-Flo 1571 F 1 1.0 in. 0 0 0 6-12.3 Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. Partial System OOS Issue Filter Separator 13 1� 5212 Hydrants Ops Bravo Pump House Sight Flow Indicators Visi-Flo Visi-Flo 1571 F 1 1.0 in. 0 0 0 6-12.3 Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. Partial System OOS Issue Filter Separator 12 1� 5212 Hydrants Ops Bravo Pump House Sight Flow Indicators Visi-Flo Visi-Flo 1571 F 1 1.0 in. 0 0 0 6-12.3 Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. Partial System OOS Issue Filter Separator 12 1� 5212 Hydrants Ops Bravo Pump House Sight Flow Indicators Visi-Flo Visi-Flo 1571 F 1 1.0 in. 0 0 0 6-12.3 Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. Partial System OOS Issue Filter Separator 11 1� 5212 Hydrants Ops Bravo Pump House Sight Flow Indicators Visi-Flo Visi-Flo 1571 F 1 1.0 in. 0 0 0 6-12.3 Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. Partial System OOS Issue Filter Separator 11 1� 5212 Hydrants Ops Bravo Pump House Sight Flow Indicators Visi-Flo Visi-Flo 1571 F 1 1.0 in. 0 0 0 6-12.3 Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. Partial System OOS Issue Filter Separator 10 1� 5212 Hydrants Ops Bravo Pump House Sight Flow Indicators Visi-Flo Visi-Flo 1571 F 1 1.0 in. 0 0 0 6-12.3 Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. Partial System OOS Issue Filter Separator 10 1� 5212 Hydrants Ops Bravo Pump House Sight Flow Indicators Visi-Flo Visi-Flo 1571 F 1 1.0 in. 0 0 0 6-12.3 Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. Partial System OOS Issue Filter Separator 9 1� 5212 Hydrants Ops Bravo Pump House Sight Flow Indicators Visi-Flo Visi-Flo 1571 F 1 1.0 in. 0 0 0 6-12.3 Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. Partial System OOS Issue Filter Separator 9 1� 5212 Hydrants Ops Bravo Pump House Sight Flow Indicators Visi-Flo Visi-Flo 1571 F 1 1.0 in. 0 0 0 6-12.3 Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. Partial System OOS Receipt Filter Separator 2 1� 5212 Hydrants Ops Bravo Pump House Sight Flow Indicators Visi-Flo Visi-Flo 1571 F 1 1.0 in. 0 0 0 6-12.3 Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. Partial System OOS Receipt Filter Separator 2 1� 5212 Hydrants Ops Bravo Pump House Sight Flow Indicators Visi-Flo Visi-Flo 1571 F 1 1.0 in. 0 0 0 6-12.3 Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. Partial System OOS Receipt Filter Separator 3 1� 5212 Hydrants Ops Bravo Pump House Sight Flow Indicators Visi-Flo Visi-Flo 1571 F 1 1.0 in. 0 0 0 6-12.3 Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. Partial System OOS Receipt Filter Separator 3 1�