This is a Performance Work Statement template (FMP v2.2) for fuel facility maintenance at Ellington Field Site #2 in Houston, Texas. The template outlines recurring maintenance requirements for various fuel system components at multiple facilities including tanks, pump sheds, fillstands, and offload areas.

The template provides detailed specifications for maintenance of equipment including filter separators, meters, pumps, valves, gauges, grounding systems, and other fuel system components. It includes maintenance frequencies (daily, weekly, monthly, quarterly, annually), required operator qualifications, and impact levels for each component. Key facilities covered include Pump Shed/Fillstands (#161), Tank 164, Tank 165, Electrical Panels (#168), Pump Suction Line (#170), Operations Building (#171), and general facility areas. The document serves as a framework for contractors to develop site-specific maintenance plans but does not include actual performance requirements or pricing terms.

View the file

Other files

File Type Posted
Sources Sought FUELS - Programmatic Rev1 7 May 25.docx DOCX document
3.4 Appendix B - Attachment 4 - SO Tracker-20210628.xlsx XLSX spreadsheet
6.0 - Appendix E ISR 15-Bulk_Fuel_Facilities FY25.xlsx XLSX spreadsheet
2.0 Appendix A RM_SO Process_20241220_PgM Reviewed Incorporated.docx DOCX document
3.1 Appendix B - Attachment 1 - Three Week Look Ahead_20230420.xlsx XLSX spreadsheet
3.2 Appendix B - Attachment 2 - Monthly Report Format 20240910.docx DOCX document
2.2 Appendix A - Attachment 2 Contractor Travel Expense Report_20240910.xlsx XLSX spreadsheet
9.0 Appendix H - Minor Repairs Incidental to Maintenance Activities POJ 20231009.xlsx XLSX spreadsheet
7.0 CUID - v2.1.pdf PDF
8.0 Appendix G_UFC 3-460-03 Maintenance Table- v4.3.pdf PDF
6.0 Appendix E ISR 14_operational_fuel_facilities FY25.xlsx XLSX spreadsheet
3.0 Appendix B Reporting Requirements_20240910.docx DOCX document
4.0 Appendix C Task Order Specifications_202401216.docx DOCX document
5.0 Appendix D Antiterrorism and OPSEC 20230206.docx DOCX document
PWS LEX FMP Template - v2.2.xlsx XLSX spreadsheet
PWS VNC FMP Template - v2.2.xlsx XLSX spreadsheet
PWS KEQ FMP Template - v2.2.xlsx XLSX spreadsheet
PWS CVZ FMP Template - v2.2.xlsx XLSX spreadsheet
PWS SHP FMP Template - v2.2.xlsx XLSX spreadsheet
PWS PBA FMP Template - v2.2.xlsx XLSX spreadsheet
PWS GRB FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BRO FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BAR FMP Template - v2.2.xlsx XLSX spreadsheet
PWS LAU FMP Template - v2.2.xlsx XLSX spreadsheet
PWS CHF FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BEU FMP Template - v2.2.xlsx XLSX spreadsheet
PWS GDF FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BLI FMP Template - v2.2.xlsx XLSX spreadsheet
PWS TKR FMP Template - v2.2.xlsx XLSX spreadsheet
PWS RBN FMP Template - v2.2.xlsx XLSX spreadsheet
PWS MAA FMP Template - v2.2.xlsx XLSX spreadsheet
PWS FSH FMP Template - v2.2.xlsx XLSX spreadsheet
PWS FSO FMP Template - v2.2.xlsx XLSX spreadsheet
PWS LRG FMP Template - v2.2.xlsx XLSX spreadsheet
PWS RRT FMP Template - v2.2.xlsx XLSX spreadsheet
PWS ALT FMP Template - v2.2.xlsx XLSX spreadsheet
PWS TUL FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BL2 FMP Template - v2.2.xlsx XLSX spreadsheet
PWS ELL FMP Template - v2.2.xlsx XLSX spreadsheet
PWS WRF FMP Template - v2.2.xlsx XLSX spreadsheet
PWS LLD FMP Template - v2.2.xlsx XLSX spreadsheet
PWS DYE FMP Template - v2.2.xlsx XLSX spreadsheet
12.0 PWS Appendix K Real Property Data_20230420.xlsx XLSX spreadsheet
PWS RAN FMP Template - v2.2.xlsx XLSX spreadsheet
PWS FSM FMP Template - v2.2.xlsx XLSX spreadsheet
PWS _Fuels RMMR 20241220.docx DOCX document
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Administrative

LocationSite NameEllington Field Site #2
RPSUID190177
DLA Site CodeEFS
Hours of Operation24 Hours of Operation
Address12600 McLoughlin St, Houston, TX 77034
ContractContractor
Contract #
Local POCsQAE Name
QAE Phone
QAE Email
Alt QAE Name
Alt QAE Phone
Alt QAE Email
DLA/SCP POCsDLA PM Name
DLA PM Phone
DLA PM Email
SCP PM Name
SCP PM Phone
SCP PM Email
Contractor POCsContractor PM Name
Contractor PM Phone
Contractor PM Email
Contractor QC Name
Contractor QC Phone
Contractor QC Email
Contractor SM Name
Contractor SM Phone
Contractor SM Email
USACE POCsUSACE PM/COR Name
USACE PM/COR Phone
USACE PM/COR Email
USACE PE Name
USACE PE Phone
USACE PE Email
USACE KO Name
USACE KO Phone
USACE KO Email

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

This table shows the minimum information required. Additional details should be included based on site specific requirements. Additional POCs may be required.

General Facility Description Facility Description

Purpose:

This Facility Maintenance Plan provides guidance for Contractor personnel in the operation, inspection, and maintenance of permanently installed fuel facilities operated under the control of the Quality Assurance Evaluators. Federal, state, and local environmental laws and regulations shall be complied with if this plan is in conflict with them.

Scope:

The instructions prescribed by this plan outline general fuels maintenance information associated with fuel storage and dispensing systems and provides the minimum periodic contractor maintenance and inspection criteria requirements for the systems. This plan is to be used in conjunction with other existing directives governing fuel system operations and maintenance requirements. Conotractor will properly maintain and repair federally funded petroleum systems and facilities in order to provide compliance with applicable code, criteria, and federal, state, local and/or host nation regulations.

Fuels Facilities:

Organizational tanks, and associated dispensing equipment are maintained and operated by the owning organization. Fuel system maintenance contractors shall perform all maintenance and associated procurement actions on installed fuel systems.

Each installation under the Southwest Division contract are military land-based facilities who receive, store, distribute, and/or dispense liquid fuels.

Standard fuel system equipment includes:

a) Above Ground Sorage Stanks (AST), Underground Storage Tanks (UST)

b) Filter/separator and other filtration device maintenance access, particularly element removal.

c) Manual valves

d) Meter Registers, and Flow Meters.

e) Control Valves.

f) Pumps

g) Tank Monitoring Equipment and Instruments

h) Alarms

i) Fire Fighting Equipment

Site Specific General Information:

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

Include a general facility overview and description of each fuel system for the sites in accordance with UFC 3-460-01. Examples include: Bulk Storage Facilities, Aircraft Fueling Facilities, Marine and Dispensing Facilities, Ground Products Fueling Facilities, Alternate POL Facilities, and Support Facilities. Also include facility #s, facility names, fuel type, photos, and any other pertinent information.

Include Site Specific Conditions and Restrictions in this tab.

Communication Plan

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

Communication plan shall address in/out briefs, lines of communication, coordination for access, etc.

Safety

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

Site Specific Addendum and Activity Hazard Analysis, which are Attachments to the APP, specific to activities or tasks related to recurring maintenance for this site.

RM Schedule

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

Link RM schedule here

Task Matrix

Applicable Facility AssetsUFC System Level Maintenance FrequencySpecial Considerations
Real Property Unique Identifier
(RPUID)Real Property Facility #Real Property Facility NameOperational AreaComponent TypeBase Asset IDComponent Unique Identifier (CUID)MakeModelCapacity/SizeQSAUFC Section ReferenceAdditional Manufacturer RM RequirementsOperator/ equipment RequirementsSystem availabilityOther ContractComments
161Pump Shed / Fillstands / OffloadPump ShedCanopiesPump CanopyN/AN/AN/A00011-2.2No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
161Pump Shed / Fillstands / OffloadOil Water SeparatorOil/Water SeparatorsOWSUnknownUnknownUnknownXXX11-5No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
161Pump Shed / Fillstands / OffloadFillstand 2Signage and MarkingsFillstand 2N/AN/AN/A0002-7No Manufacturer Requirements AvailableMonthly - Check permanent signs and markings for adequacy and readability. Repair or replace deteriorated or illegible signs and markings.No Mission Impact
161Pump Shed / Fillstands / OffloadFillstand 1Signage and MarkingsFillstand 1N/AN/AN/A0002-7No Manufacturer Requirements AvailableMonthly - Check permanent signs and markings for adequacy and readability. Repair or replace deteriorated or illegible signs and markings.No Mission Impact
161Pump Shed / Fillstands / OffloadFillstand 1Signage and MarkingsWaste Oil TankN/AN/AN/A0002-7No Manufacturer Requirements AvailableMonthly - Check permanent signs and markings for adequacy and readability. Repair or replace deteriorated or illegible signs and markings.No Mission Impact
161Pump Shed / Fillstands / OffloadOffload Header 1Signage and MarkingsOffload Header 1N/AN/AN/A0002-7No Manufacturer Requirements AvailableMonthly - Check permanent signs and markings for adequacy and readability. Repair or replace deteriorated or illegible signs and markings.No Mission Impact
161Pump Shed / Fillstands / OffloadOffload Header 2Signage and MarkingsOffload Header 2N/AN/AN/A0002-7No Manufacturer Requirements AvailableMonthly - Check permanent signs and markings for adequacy and readability. Repair or replace deteriorated or illegible signs and markings.No Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedSignage and MarkingsSignageN/AN/AN/A0002-7No Manufacturer Requirements AvailableMonthly - Check permanent signs and markings for adequacy and readability. Repair or replace deteriorated or illegible signs and markings.No Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedAutomatic Air VentsPump 2 Air Eliminator Discharge SidePainted OverPainted OverN/A00X3-10.2No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedAutomatic Air VentsAir Eliminator Pump 1 Discharge sidePainted OverPainted OverN/A00X3-10.2No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedAutomatic Air VentsSeparator 2Armstrong11AV1.0 In.00X3-10.2No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedAutomatic Air VentsSeparator 1Armstrong11AV1.0 In.00X3-10.2No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedFilter SeparatorsSeparator 2ParkerHV2838275AILN600 GPMXX03-6.2Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. Replace filter cartridges when the acceptable maximum differential pressure is reached, the maximum in-service duration has passed, or the fuel becomes visibly dirty or discolored.Daily - Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges.Partial System OOS
161Pump Shed / Fillstands / OffloadPump ShedFilter SeparatorsIssue / Receipt 1ParkerHV2838275AILN600 GPMXX03-6.2Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. Replace filter cartridges when the acceptable maximum differential pressure is reached, the maximum in-service duration has passed, or the fuel becomes visibly dirty or discolored.Daily - Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges.Partial System OOS
161Pump Shed / Fillstands / OffloadPump ShedBasket StrainersPump 2 Suction SideOPWC1NO6.0 in.0003-6.4Periodically checking for leaks. Timely cleaning or replacement of screenDaily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBasket StrainersPump 1 Suction SideOPWC1NO6.0 in.0003-6.4Periodically checking for leaks. Timely cleaning or replacement of screenDaily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyNo Mission Impact
161Pump Shed / Fillstands / OffloadOffload Header 2Basket StrainersStrainerMuellerSpec Co4.0 in.0003-6.4Periodically checking for leaks. Timely cleaning or replacement of screenDaily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyNo Mission Impact
161Pump Shed / Fillstands / OffloadOffload Header 1Basket StrainersOffload HeaderMuellerSpec CO3.0 in.0003-6.4Periodically checking for leaks. Timely cleaning or replacement of screenDaily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyNo Mission Impact
161Pump Shed / Fillstands / OffloadOffload Header 1Basket StrainersBasket StrainerMcDonaldDubuque3.0 in.0003-6.4Periodically checking for leaks. Timely cleaning or replacement of screenDaily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyNo Mission Impact
161Pump Shed / Fillstands / OffloadFillstand 2Basket StrainersFillstand 2MuellerSteam4.0 in.0003-6.4Periodically checking for leaks. Timely cleaning or replacement of screenDaily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyNo Mission Impact
161Pump Shed / Fillstands / OffloadFillstand 1Basket StrainersFillstand 1Mueller40-125F150-014.0 in.0003-6.4Periodically checking for leaks. Timely cleaning or replacement of screenDaily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedPositive Displacement MetersReceipt Meter (Under Canopy)AdaletSP6-CB-PHL-D-4X200-2900 GPM0003-7.1Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature
compensation featureMonthly - Inspect counter head for unusual noises and smooth operation.Partial System OOS
161Pump Shed / Fillstands / OffloadFillstand 2Positive Displacement MetersFillstand 2Liquid ControlsM-60-230-600 GPM0003-7.1Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature
compensation featureMonthly - Inspect counter head for unusual noises and smooth operation.Partial System OOS
161Pump Shed / Fillstands / OffloadFillstand 1Positive Displacement MetersFillstand 1Liquid ControlsM-60-260-600 GPM0003-7.1Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature
compensation featureMonthly - Inspect counter head for unusual noises and smooth operation.Partial System OOS
161Pump Shed / Fillstands / OffloadPump ShedCentrifugal PumpsPump 2Painted OverPainted Over600 GPMXXX3-8.1During routine pump inspections only the easy to monitor factors such as pressure, temperature, vibration etc can be checKed. But during quarterly inspections, shaft alignment and oil levels should also be checked. Change Oil AnnuallyNo Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedCentrifugal PumpsPump 1 Suction SidePainted OverPainted Over600 GPMXXX3-8.1During routine pump inspections only the easy to monitor factors such as pressure, temperature, vibration etc can be checKed. But during quarterly inspections, shaft alignment and oil levels should also be checked. Change Oil AnnuallyNo Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadOffload Header 2Offloading Fuel HosesOffload Header 2CampbellS174.0 in.XXX3-9.2Aircraft fueling hose shall be inspected before use each day. The hose shall be extended as it normally would be for fueling and checked for evidence of blistering, carcass saturation or separation, cuts, nicks, or abrasions that expose reinforcement material, and for slippage, misalignment, or leaks at couplings.Weekly - Visually inspect hoses for cracks brittle surface coatings, exposed wire braids, exposed reinforcement, flattening, kinks, and bulges or soft spots which might indicate broken or displaced reinforcement.Partial System OOS
161Pump Shed / Fillstands / OffloadOffload Header 1Offloading Fuel HosesOffload Header 1CampbellFPS4004564.0 in.XXX3-9.2Aircraft fueling hose shall be inspected before use each day. The hose shall be extended as it normally would be for fueling and checked for evidence of blistering, carcass saturation or separation, cuts, nicks, or abrasions that expose reinforcement material, and for slippage, misalignment, or leaks at couplings.Weekly - Visually inspect hoses for cracks brittle surface coatings, exposed wire braids, exposed reinforcement, flattening, kinks, and bulges or soft spots which might indicate broken or displaced reinforcement.Partial System OOS20 Foot With Slinky
161Pump Shed / Fillstands / OffloadPump ShedGeneral System Control ValvesSeparator 2 Water SlugCla-ValCFF21-H26.0 in.XXX4-3.2.1No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
161Pump Shed / Fillstands / OffloadPump ShedGeneral System Control ValvesSeparator 1 Water SlugCla-ValCFF21-H26.0 in.XXX4-3.2.1No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
161Pump Shed / Fillstands / OffloadFillstand 2General System Control ValvesFillstand 2Cla-Val4 / 100MM4.0 in.XXX4-3.2.1No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
161Pump Shed / Fillstands / OffloadFillstand 1General System Control ValvesFillstand 1Cla-Val4 / 100MM4.0 in.XXX4-3.2.1No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
161Pump Shed / Fillstands / OffloadPump ShedFilter Separator Control ValvesSeparator 1Cla-Val150MM6.0 in.XX04-4.2.2No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
161Pump Shed / Fillstands / OffloadPump ShedFilter Separator Control ValvesSeparator 2Cla-ValG-100G6.0 in.XX04-4.2.2No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
161Pump Shed / Fillstands / OffloadFillstand 2Fixed PantographsFillstand 2CavotecME-9953-6090-1800507-05N/AXX04-7.1.1No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
161Pump Shed / Fillstands / OffloadFillstand 1Fixed PantographsFillstand 1CavotecME-9953-6090-1800507N/AXX04-7.1.1No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
161Pump Shed / Fillstands / OffloadFillstand 2Fueling NozzlesFillstand 2Cla-ValD-33.0 In.0004-7.4Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand.Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand.Partial System OOS
161Pump Shed / Fillstands / OffloadFillstand 1Fueling NozzlesFillstand 1Cla-ValD-33.0 In.0004-7.4Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand.Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand.Partial System OOS
161Pump Shed / Fillstands / OffloadPump ShedSight Flow IndicatorsSeparator 1 Sight GlassN/AN/AN/A0006-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Partial System OOS
161Pump Shed / Fillstands / OffloadPump ShedSight Flow IndicatorsSeparator 2 Sight GlassN/AN/AN/A0006-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Partial System OOS
161Pump Shed / Fillstands / OffloadPump ShedSight Flow IndicatorsPRT Sight GlassN/AN/AN/A0006-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Partial System OOS
161Pump Shed / Fillstands / OffloadOffload Header 2Sight Flow IndicatorsVisi-FlowVisi-Flow1522RFN/A0006-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Partial System OOS
161Pump Shed / Fillstands / OffloadOffload Header 1Sight Flow IndicatorsVisi-FlowVisi-Flow1522RFN/A0006-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Partial System OOS
161Pump Shed / Fillstands / OffloadPump ShedGate ValvesOil Drain Valve Pump 1UnknownUnknown0.5 in.XX06-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator RequirementPartial System OOS
161Pump Shed / Fillstands / OffloadOil Water SeparatorGate ValvesOWSBuriedBuried10.0 in.XX06-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator RequirementPartial System OOS
161Pump Shed / Fillstands / OffloadFillstand 1Ball ValvesPRV LinePainted OverPainted Over0.75 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadFillstand 1Ball ValvesPRV IsolationPlugorama31840783.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadOffload Header 1Ball ValvesOffload HeaderPainted OverPainted Over1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadOffload Header 2Ball ValvesHeader 2Painted OverPainted Over1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadOffload Header 2Ball ValvesSample CockPainted OverPainted Over0.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesCrossover ValveFlo-TiteRF158.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission ImpactDo not open with Valve 25
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesPressure Gauge Isolation Valve Pump Issue SidePainted OverPainted Over0.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesSample CockPainted OverPainted Over0.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesPH PR 9Painted OverPainted Over0.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesPressure Gauge Isolation Valve NOPainted OverPainted Over0.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesLine Drain Valve NCFlow-TekRF154.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesLine Drain ValveFlow-TekRF154.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesPump 1 Suction SideFlo-TiteRF156.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesPump 2 Suction SideFlo-TiteRF156.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesOil Drain Valve Pump 2UnknownUnknown0.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesPump 2 Air Eliminator Isolation Valve Discharge SidePainted OverPainted Over0.75 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesAir Eliminator Isolation ValvePainted OverPainted Over1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesPressure Relief Line ExpansionFlo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesPRT LineFlo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesPRT DrainNot LabeledNot Labeled0.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesPRT DrainVelan1000 WOG1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesPRV TransitionFlow-TekRF152.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesReceipt Line IsolationFlo-TiteF1506.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesPump 1 IsolationFlo-TiteSF1504.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesPressure Relief LinePainted OverPainted Over1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesPump 2 IsolationFlo-TiteSF1504.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesReceiptFlo-TiteF1506.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesReceipt IsolationFlo-TiteRF156.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall Valves23 NCFlo-TiteRF156.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesSeparator LineFlo-TiteRF156.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesPH OV5 NOPainted OverPainted Over0.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesSeparator Drain LineFlo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesSeparator Drain LineFlo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesSeparator Drain LineFlo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesSeparator Drain LineFlo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesPH HL22Painted OverPainted Over1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesLow PointFlo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesPressure Relief Isolation Valve NCPainted OverPainted Over0.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesSeparator Isolation 1/2Flo-TiteRF156.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesSeparator 2 DischargeFlo-TiteRF156.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesPH PR8 NCPainted OverPainted Over0.75 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesPRV LineFlo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesPRV LineFlo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesPH PR 3 NOPainted OverPainted Over1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesPRV LineFlo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesPRV LineFlo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesSeparator 2 PRV LineFlo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesSeparator 2 PRV LineFlo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesSeparator 2 PRV LineFlo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesSeparator 2 PRV DischargeFlo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesSeparator 2 PRV LineFlo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesPump 1 Discharge Side Isolation Valve NOPainted OverPainted Over1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesSeparator 2 DP Gauge InletGammonNot Labeled0.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesSeparator 3 DP Gauge DischargeGammonNot Labeled0.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesPH ML21 NOPainted OverPainted Over1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesSeparator 2 DrainFlo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesPH ML17 NCPainted OverPainted Over1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesSeparator 2 Drain IsolationFlo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesSeparator 1 PRV LineFlo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesSeparator 1Flo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesPH OV 1 NOUnknownUnknown0.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesSeparator 1 PRV LineFlo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesSeparator 1 PRV LineFlo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesSeparator 1 PRV LineFlo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesSeparator 1 Drain IsolationFlo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesSeparator 1 Sump DrainFlo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesDP Gauge InletGammonNot Labeled0.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesDP Gauge DischargeGammonNot Labeled0.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesM26 NCDeZurikCF8M4.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesSeparator 1 DischargeFlo-TiteRF156.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesIssue PipeFlo-TiteRF156.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedBall ValvesHigh Point Line Drain ValvePainted OverPainted Over1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadOffload Header 2Ball ValvesBasket Strainer IsolationFlo-TiteF1504.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadOffload Header 1Ball ValvesSample CockFlow-TekF150.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadOffload Header 1Ball ValvesBasket Strainer IsolationFlo-TiteSF1503.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadFillstand 2Ball ValvesFillstand 2 Panto IsolationFlow-Tek4-1504.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadFillstand 2Ball ValvesFillstand 2 PRV IsolationPlugoramaGeosource3.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadFillstand 2Ball ValvesFillstand 2Jamesbury191500.75 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadFillstand 2Ball ValvesPRV LineJamesbury191501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadFillstand 2Ball ValvesPRV LineJamesbury191501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadFillstand 1Ball ValvesFillstand 1 Sample CockGammonGTP-11490.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadFillstand 1Ball ValvesFillstand 1 Panto IsolationFlow-Tek4-1504.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadFillstand 1Ball ValvesPRV IsolationJamesburyF150.75 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadFillstand 1Ball ValvesPRV DischargeJamesburyF151.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadFillstand 1Ball ValvesPRV LineFlow-Tek1000 WOG0.75 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
161Pump Shed / Fillstands / OffloadPump ShedDouble Block and Bleed ValvesM25 NCGeneral Twin SealCF8M8.0 in.XXX6-6.2.5Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug.No Operator RequirementPartial System OOSDo not open this valve and valve 15 together
161Pump Shed / Fillstands / OffloadPump ShedDouble Block and Bleed ValvesIssue/Receipt LineFranklin valveD7118.0 in.XXX6-6.2.5Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug.No Operator RequirementPartial System OOS
161Pump Shed / Fillstands / OffloadOffload Header 1Double Block and Bleed ValvesOffload HeaderFranklin ValveD7113.0 in.XXX6-6.2.5Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug.No Operator RequirementPartial System OOS
161Pump Shed / Fillstands / OffloadFillstand 2Double Block and Bleed ValvesFillstand 2Franklin ValveD7114.0 in.XXX6-6.2.5Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug.No Operator RequirementPartial System OOS
161Pump Shed / Fillstands / OffloadFillstand 1Double Block and Bleed ValvesFillstand 1Franklin ValveClass 1504.0 in.XXX6-6.2.5Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug.No Operator RequirementPartial System OOS
161Pump Shed / Fillstands / OffloadPump ShedGlobe ValvesPRT Sight GlassNot LabeledNot Labeled0.5 in.XX06-6.2.71. Regular inspection of the valve. ...

2. If the valve is not operated regularly it is a good idea to cycle the valve to ensure the disc is not bedding itself in the seat.

3. Grease the crossbar by using a grease gun on the grease nipple provided

4. Slightly tighten the gland bolts if the packing needs adjustment.No Operator RequirementPartial System OOS
161Pump Shed / Fillstands / OffloadPump ShedGlobe ValvesPRT Sight GlassNot LabeledNot Labeled0.5 in.XX06-6.2.71. Regular inspection of the valve. ...

2. If the valve is not operated regularly it is a good idea to cycle the valve to ensure the disc is not bedding itself in the seat.

3. Grease the crossbar by using a grease gun on the grease nipple provided

4. Slightly tighten the gland bolts if the packing needs adjustment.No Operator RequirementPartial System OOS
161Pump Shed / Fillstands / OffloadPump ShedGlobe ValvesSeparator 2 Sight GlassKencoNot Labeled0.5 in.XX06-6.2.71. Regular inspection of the valve. ...

2. If the valve is not operated regularly it is a good idea to cycle the valve to ensure the disc is not bedding itself in the seat.

3. Grease the crossbar by using a grease gun on the grease nipple provided

4. Slightly tighten the gland bolts if the packing needs adjustment.No Operator RequirementPartial System OOS
161Pump Shed / Fillstands / OffloadPump ShedGlobe ValvesSeparator 2 Sight GlassKencoNot Labeled0.5 in.XX06-6.2.71. Regular inspection of the valve. ...

2. If the valve is not operated regularly it is a good idea to cycle the valve to ensure the disc is not bedding itself in the seat.

3. Grease the crossbar by using a grease gun on the grease nipple provided

4. Slightly tighten the gland bolts if the packing needs adjustment.No Operator RequirementPartial System OOS
161Pump Shed / Fillstands / OffloadPump ShedGlobe ValvesSeparator 1 Sight GlassKencoNot Labeled0.5 in.XX06-6.2.71. Regular inspection of the valve. ...

2. If the valve is not operated regularly it is a good idea to cycle the valve to ensure the disc is not bedding itself in the seat.

3. Grease the crossbar by using a grease gun on the grease nipple provided

4. Slightly tighten the gland bolts if the packing needs adjustment.No Operator RequirementPartial System OOS
161Pump Shed / Fillstands / OffloadPump ShedGlobe ValvesSeparator 1 Sight GlassKencoNot Labeled0.5 in.XX06-6.2.71. Regular inspection of the valve. ...

2. If the valve is not operated regularly it is a good idea to cycle the valve to ensure the disc is not bedding itself in the seat.

3. Grease the crossbar by using a grease gun on the grease nipple provided

4. Slightly tighten the gland bolts if the packing needs adjustment.No Operator RequirementPartial System OOS
161Pump Shed / Fillstands / OffloadPump ShedCheck ValvesPump 1OPW1175F4.0 in.XX06-6.2.8Visual for damage, leaks, tightness.No Operator RequirementPartial System OOS
161Pump Shed / Fillstands / OffloadPump ShedCheck ValvesPump 2 DischargeNibco134.0 in.XX06-6.2.8Visual for damage, leaks, tightness.No Operator RequirementPartial System OOS
161Pump Shed / Fillstands / OffloadPump ShedCheck ValvesPressure Relief LineTitanCF8M1.0 in.XX06-6.2.8Visual for damage, leaks, tightness.No Operator RequirementPartial System OOS
161Pump Shed / Fillstands / OffloadPump ShedCheck ValvesSeparator 2Not LabeledNot Labeled1.0 in.XX06-6.2.8Visual for damage, leaks, tightness.No Operator RequirementPartial System OOS
161Pump Shed / Fillstands / OffloadPump ShedCheck ValvesSeparator 1Not LabeledNot Labeled1.0 in.XX06-6.2.8Visual for damage, leaks, tightness.No Operator RequirementPartial System OOS
161Pump Shed / Fillstands / OffloadPump ShedCheck ValvesPressure Relief LineUnknownUnknown2.0 in.XX06-6.2.8Visual for damage, leaks, tightness.No Operator RequirementPartial System OOS
161Pump Shed / Fillstands / OffloadPump ShedThermal and/or Pressure Relief ValvesPRV 3HydrosealPainted Over1.0 in.XXX6-6.3Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended.Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced.