This is a Performance Work Statement template (FMP v2.2) for fuel facility maintenance at Ellington Field Site #2 in Houston, Texas. The template outlines recurring maintenance requirements for various fuel system components at multiple facilities including tanks, pump sheds, fillstands, and offload areas.
The template provides detailed specifications for maintenance of equipment including filter separators, meters, pumps, valves, gauges, grounding systems, and other fuel system components. It includes maintenance frequencies (daily, weekly, monthly, quarterly, annually), required operator qualifications, and impact levels for each component. Key facilities covered include Pump Shed/Fillstands (#161), Tank 164, Tank 165, Electrical Panels (#168), Pump Suction Line (#170), Operations Building (#171), and general facility areas. The document serves as a framework for contractors to develop site-specific maintenance plans but does not include actual performance requirements or pricing terms.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Administrative
| Location | Site Name | Ellington Field Site #2 |
| RPSUID | 190177 | |
| DLA Site Code | EFS | |
| Hours of Operation | 24 Hours of Operation | |
| Address | 12600 McLoughlin St, Houston, TX 77034 | |
| Contract | Contractor | |
| Contract # | ||
| Local POCs | QAE Name | |
| QAE Phone | ||
| QAE Email | ||
| Alt QAE Name | ||
| Alt QAE Phone | ||
| Alt QAE Email | ||
| DLA/SCP POCs | DLA PM Name | |
| DLA PM Phone | ||
| DLA PM Email | ||
| SCP PM Name | ||
| SCP PM Phone | ||
| SCP PM Email | ||
| Contractor POCs | Contractor PM Name | |
| Contractor PM Phone | ||
| Contractor PM Email | ||
| Contractor QC Name | ||
| Contractor QC Phone | ||
| Contractor QC Email | ||
| Contractor SM Name | ||
| Contractor SM Phone | ||
| Contractor SM Email | ||
| USACE POCs | USACE PM/COR Name | |
| USACE PM/COR Phone | ||
| USACE PM/COR Email | ||
| USACE PE Name | ||
| USACE PE Phone | ||
| USACE PE Email | ||
| USACE KO Name | ||
| USACE KO Phone | ||
| USACE KO Email |
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
This table shows the minimum information required. Additional details should be included based on site specific requirements. Additional POCs may be required.
General Facility Description Facility Description
Purpose:
This Facility Maintenance Plan provides guidance for Contractor personnel in the operation, inspection, and maintenance of permanently installed fuel facilities operated under the control of the Quality Assurance Evaluators. Federal, state, and local environmental laws and regulations shall be complied with if this plan is in conflict with them.
Scope:
The instructions prescribed by this plan outline general fuels maintenance information associated with fuel storage and dispensing systems and provides the minimum periodic contractor maintenance and inspection criteria requirements for the systems. This plan is to be used in conjunction with other existing directives governing fuel system operations and maintenance requirements. Conotractor will properly maintain and repair federally funded petroleum systems and facilities in order to provide compliance with applicable code, criteria, and federal, state, local and/or host nation regulations.
Fuels Facilities:
Organizational tanks, and associated dispensing equipment are maintained and operated by the owning organization. Fuel system maintenance contractors shall perform all maintenance and associated procurement actions on installed fuel systems.
Each installation under the Southwest Division contract are military land-based facilities who receive, store, distribute, and/or dispense liquid fuels.
Standard fuel system equipment includes:
a) Above Ground Sorage Stanks (AST), Underground Storage Tanks (UST)
b) Filter/separator and other filtration device maintenance access, particularly element removal.
c) Manual valves
d) Meter Registers, and Flow Meters.
e) Control Valves.
f) Pumps
g) Tank Monitoring Equipment and Instruments
h) Alarms
i) Fire Fighting Equipment
Site Specific General Information:
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Include a general facility overview and description of each fuel system for the sites in accordance with UFC 3-460-01. Examples include: Bulk Storage Facilities, Aircraft Fueling Facilities, Marine and Dispensing Facilities, Ground Products Fueling Facilities, Alternate POL Facilities, and Support Facilities. Also include facility #s, facility names, fuel type, photos, and any other pertinent information.
Include Site Specific Conditions and Restrictions in this tab.
Communication Plan
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Communication plan shall address in/out briefs, lines of communication, coordination for access, etc.
Safety
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Site Specific Addendum and Activity Hazard Analysis, which are Attachments to the APP, specific to activities or tasks related to recurring maintenance for this site.
RM Schedule
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Link RM schedule here
Task Matrix
| Applicable Facility Assets | UFC System Level Maintenance Frequency | Special Considerations | |||||||||||||||||
| Real Property Unique Identifier | |||||||||||||||||||
| (RPUID) | Real Property Facility # | Real Property Facility Name | Operational Area | Component Type | Base Asset ID | Component Unique Identifier (CUID) | Make | Model | Capacity/Size | Q | S | A | UFC Section Reference | Additional Manufacturer RM Requirements | Operator/ equipment Requirements | System availability | Other Contract | Comments | |
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Canopies | Pump Canopy | N/A | N/A | N/A | 0 | 0 | 0 | 11-2.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Oil Water Separator | Oil/Water Separators | OWS | Unknown | Unknown | Unknown | X | X | X | 11-5 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Fillstand 2 | Signage and Markings | Fillstand 2 | N/A | N/A | N/A | 0 | 0 | 0 | 2-7 | No Manufacturer Requirements Available | Monthly - Check permanent signs and markings for adequacy and readability. Repair or replace deteriorated or illegible signs and markings. | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Fillstand 1 | Signage and Markings | Fillstand 1 | N/A | N/A | N/A | 0 | 0 | 0 | 2-7 | No Manufacturer Requirements Available | Monthly - Check permanent signs and markings for adequacy and readability. Repair or replace deteriorated or illegible signs and markings. | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Fillstand 1 | Signage and Markings | Waste Oil Tank | N/A | N/A | N/A | 0 | 0 | 0 | 2-7 | No Manufacturer Requirements Available | Monthly - Check permanent signs and markings for adequacy and readability. Repair or replace deteriorated or illegible signs and markings. | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Offload Header 1 | Signage and Markings | Offload Header 1 | N/A | N/A | N/A | 0 | 0 | 0 | 2-7 | No Manufacturer Requirements Available | Monthly - Check permanent signs and markings for adequacy and readability. Repair or replace deteriorated or illegible signs and markings. | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Offload Header 2 | Signage and Markings | Offload Header 2 | N/A | N/A | N/A | 0 | 0 | 0 | 2-7 | No Manufacturer Requirements Available | Monthly - Check permanent signs and markings for adequacy and readability. Repair or replace deteriorated or illegible signs and markings. | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Signage and Markings | Signage | N/A | N/A | N/A | 0 | 0 | 0 | 2-7 | No Manufacturer Requirements Available | Monthly - Check permanent signs and markings for adequacy and readability. Repair or replace deteriorated or illegible signs and markings. | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Automatic Air Vents | Pump 2 Air Eliminator Discharge Side | Painted Over | Painted Over | N/A | 0 | 0 | X | 3-10.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Automatic Air Vents | Air Eliminator Pump 1 Discharge side | Painted Over | Painted Over | N/A | 0 | 0 | X | 3-10.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Automatic Air Vents | Separator 2 | Armstrong | 11AV | 1.0 In. | 0 | 0 | X | 3-10.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Automatic Air Vents | Separator 1 | Armstrong | 11AV | 1.0 In. | 0 | 0 | X | 3-10.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Filter Separators | Separator 2 | Parker | HV2838275AILN | 600 GPM | X | X | 0 | 3-6.2 | Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. Replace filter cartridges when the acceptable maximum differential pressure is reached, the maximum in-service duration has passed, or the fuel becomes visibly dirty or discolored. | Daily - Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. | Partial System OOS | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Filter Separators | Issue / Receipt 1 | Parker | HV2838275AILN | 600 GPM | X | X | 0 | 3-6.2 | Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. Replace filter cartridges when the acceptable maximum differential pressure is reached, the maximum in-service duration has passed, or the fuel becomes visibly dirty or discolored. | Daily - Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. | Partial System OOS | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Basket Strainers | Pump 2 Suction Side | OPW | C1NO | 6.0 in. | 0 | 0 | 0 | 3-6.4 | Periodically checking for leaks. Timely cleaning or replacement of screen | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | ||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | No Mission Impact | ||||||||||||||||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Basket Strainers | Pump 1 Suction Side | OPW | C1NO | 6.0 in. | 0 | 0 | 0 | 3-6.4 | Periodically checking for leaks. Timely cleaning or replacement of screen | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | ||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | No Mission Impact | ||||||||||||||||||
| 161 | Pump Shed / Fillstands / Offload | Offload Header 2 | Basket Strainers | Strainer | Mueller | Spec Co | 4.0 in. | 0 | 0 | 0 | 3-6.4 | Periodically checking for leaks. Timely cleaning or replacement of screen | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | ||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | No Mission Impact | ||||||||||||||||||
| 161 | Pump Shed / Fillstands / Offload | Offload Header 1 | Basket Strainers | Offload Header | Mueller | Spec CO | 3.0 in. | 0 | 0 | 0 | 3-6.4 | Periodically checking for leaks. Timely cleaning or replacement of screen | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | ||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | No Mission Impact | ||||||||||||||||||
| 161 | Pump Shed / Fillstands / Offload | Offload Header 1 | Basket Strainers | Basket Strainer | McDonald | Dubuque | 3.0 in. | 0 | 0 | 0 | 3-6.4 | Periodically checking for leaks. Timely cleaning or replacement of screen | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | ||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | No Mission Impact | ||||||||||||||||||
| 161 | Pump Shed / Fillstands / Offload | Fillstand 2 | Basket Strainers | Fillstand 2 | Mueller | Steam | 4.0 in. | 0 | 0 | 0 | 3-6.4 | Periodically checking for leaks. Timely cleaning or replacement of screen | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | ||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | No Mission Impact | ||||||||||||||||||
| 161 | Pump Shed / Fillstands / Offload | Fillstand 1 | Basket Strainers | Fillstand 1 | Mueller | 40-125F150-01 | 4.0 in. | 0 | 0 | 0 | 3-6.4 | Periodically checking for leaks. Timely cleaning or replacement of screen | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | ||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | No Mission Impact | ||||||||||||||||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Positive Displacement Meters | Receipt Meter (Under Canopy) | Adalet | SP6-CB-PHL-D-4X | 200-2900 GPM | 0 | 0 | 0 | 3-7.1 | Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature | |||||||
| compensation feature | Monthly - Inspect counter head for unusual noises and smooth operation. | Partial System OOS | |||||||||||||||||
| 161 | Pump Shed / Fillstands / Offload | Fillstand 2 | Positive Displacement Meters | Fillstand 2 | Liquid Controls | M-60-2 | 30-600 GPM | 0 | 0 | 0 | 3-7.1 | Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature | |||||||
| compensation feature | Monthly - Inspect counter head for unusual noises and smooth operation. | Partial System OOS | |||||||||||||||||
| 161 | Pump Shed / Fillstands / Offload | Fillstand 1 | Positive Displacement Meters | Fillstand 1 | Liquid Controls | M-60-2 | 60-600 GPM | 0 | 0 | 0 | 3-7.1 | Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature | |||||||
| compensation feature | Monthly - Inspect counter head for unusual noises and smooth operation. | Partial System OOS | |||||||||||||||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Centrifugal Pumps | Pump 2 | Painted Over | Painted Over | 600 GPM | X | X | X | 3-8.1 | During routine pump inspections only the easy to monitor factors such as pressure, temperature, vibration etc can be checKed. But during quarterly inspections, shaft alignment and oil levels should also be checked. Change Oil Annually | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Centrifugal Pumps | Pump 1 Suction Side | Painted Over | Painted Over | 600 GPM | X | X | X | 3-8.1 | During routine pump inspections only the easy to monitor factors such as pressure, temperature, vibration etc can be checKed. But during quarterly inspections, shaft alignment and oil levels should also be checked. Change Oil Annually | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Offload Header 2 | Offloading Fuel Hoses | Offload Header 2 | Campbell | S17 | 4.0 in. | X | X | X | 3-9.2 | Aircraft fueling hose shall be inspected before use each day. The hose shall be extended as it normally would be for fueling and checked for evidence of blistering, carcass saturation or separation, cuts, nicks, or abrasions that expose reinforcement material, and for slippage, misalignment, or leaks at couplings. | Weekly - Visually inspect hoses for cracks brittle surface coatings, exposed wire braids, exposed reinforcement, flattening, kinks, and bulges or soft spots which might indicate broken or displaced reinforcement. | Partial System OOS | |||||
| 161 | Pump Shed / Fillstands / Offload | Offload Header 1 | Offloading Fuel Hoses | Offload Header 1 | Campbell | FPS400456 | 4.0 in. | X | X | X | 3-9.2 | Aircraft fueling hose shall be inspected before use each day. The hose shall be extended as it normally would be for fueling and checked for evidence of blistering, carcass saturation or separation, cuts, nicks, or abrasions that expose reinforcement material, and for slippage, misalignment, or leaks at couplings. | Weekly - Visually inspect hoses for cracks brittle surface coatings, exposed wire braids, exposed reinforcement, flattening, kinks, and bulges or soft spots which might indicate broken or displaced reinforcement. | Partial System OOS | 20 Foot With Slinky | ||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | General System Control Valves | Separator 2 Water Slug | Cla-Val | CFF21-H2 | 6.0 in. | X | X | X | 4-3.2.1 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | General System Control Valves | Separator 1 Water Slug | Cla-Val | CFF21-H2 | 6.0 in. | X | X | X | 4-3.2.1 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | |||||
| 161 | Pump Shed / Fillstands / Offload | Fillstand 2 | General System Control Valves | Fillstand 2 | Cla-Val | 4 / 100MM | 4.0 in. | X | X | X | 4-3.2.1 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | |||||
| 161 | Pump Shed / Fillstands / Offload | Fillstand 1 | General System Control Valves | Fillstand 1 | Cla-Val | 4 / 100MM | 4.0 in. | X | X | X | 4-3.2.1 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Filter Separator Control Valves | Separator 1 | Cla-Val | 150MM | 6.0 in. | X | X | 0 | 4-4.2.2 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Filter Separator Control Valves | Separator 2 | Cla-Val | G-100G | 6.0 in. | X | X | 0 | 4-4.2.2 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | |||||
| 161 | Pump Shed / Fillstands / Offload | Fillstand 2 | Fixed Pantographs | Fillstand 2 | Cavotec | ME-9953-6090-1800507-05 | N/A | X | X | 0 | 4-7.1.1 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Fillstand 1 | Fixed Pantographs | Fillstand 1 | Cavotec | ME-9953-6090-1800507 | N/A | X | X | 0 | 4-7.1.1 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Fillstand 2 | Fueling Nozzles | Fillstand 2 | Cla-Val | D-3 | 3.0 In. | 0 | 0 | 0 | 4-7.4 | Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand. | Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand. | Partial System OOS | |||||
| 161 | Pump Shed / Fillstands / Offload | Fillstand 1 | Fueling Nozzles | Fillstand 1 | Cla-Val | D-3 | 3.0 In. | 0 | 0 | 0 | 4-7.4 | Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand. | Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand. | Partial System OOS | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Sight Flow Indicators | Separator 1 Sight Glass | N/A | N/A | N/A | 0 | 0 | 0 | 6-12.3 | Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Partial System OOS | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Sight Flow Indicators | Separator 2 Sight Glass | N/A | N/A | N/A | 0 | 0 | 0 | 6-12.3 | Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Partial System OOS | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Sight Flow Indicators | PRT Sight Glass | N/A | N/A | N/A | 0 | 0 | 0 | 6-12.3 | Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Partial System OOS | |||||
| 161 | Pump Shed / Fillstands / Offload | Offload Header 2 | Sight Flow Indicators | Visi-Flow | Visi-Flow | 1522RF | N/A | 0 | 0 | 0 | 6-12.3 | Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Partial System OOS | |||||
| 161 | Pump Shed / Fillstands / Offload | Offload Header 1 | Sight Flow Indicators | Visi-Flow | Visi-Flow | 1522RF | N/A | 0 | 0 | 0 | 6-12.3 | Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Partial System OOS | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Gate Valves | Oil Drain Valve Pump 1 | Unknown | Unknown | 0.5 in. | X | X | 0 | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | Partial System OOS | |||||
| 161 | Pump Shed / Fillstands / Offload | Oil Water Separator | Gate Valves | OWS | Buried | Buried | 10.0 in. | X | X | 0 | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | Partial System OOS | |||||
| 161 | Pump Shed / Fillstands / Offload | Fillstand 1 | Ball Valves | PRV Line | Painted Over | Painted Over | 0.75 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Fillstand 1 | Ball Valves | PRV Isolation | Plugorama | 3184078 | 3.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Offload Header 1 | Ball Valves | Offload Header | Painted Over | Painted Over | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Offload Header 2 | Ball Valves | Header 2 | Painted Over | Painted Over | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Offload Header 2 | Ball Valves | Sample Cock | Painted Over | Painted Over | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Crossover Valve | Flo-Tite | RF15 | 8.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | Do not open with Valve 25 | ||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Pressure Gauge Isolation Valve Pump Issue Side | Painted Over | Painted Over | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Sample Cock | Painted Over | Painted Over | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | PH PR 9 | Painted Over | Painted Over | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Pressure Gauge Isolation Valve NO | Painted Over | Painted Over | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Line Drain Valve NC | Flow-Tek | RF15 | 4.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Line Drain Valve | Flow-Tek | RF15 | 4.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Pump 1 Suction Side | Flo-Tite | RF15 | 6.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Pump 2 Suction Side | Flo-Tite | RF15 | 6.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Oil Drain Valve Pump 2 | Unknown | Unknown | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Pump 2 Air Eliminator Isolation Valve Discharge Side | Painted Over | Painted Over | 0.75 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Air Eliminator Isolation Valve | Painted Over | Painted Over | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Pressure Relief Line Expansion | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | PRT Line | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | PRT Drain | Not Labeled | Not Labeled | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | PRT Drain | Velan | 1000 WOG | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | PRV Transition | Flow-Tek | RF15 | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Receipt Line Isolation | Flo-Tite | F150 | 6.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Pump 1 Isolation | Flo-Tite | SF150 | 4.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Pressure Relief Line | Painted Over | Painted Over | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Pump 2 Isolation | Flo-Tite | SF150 | 4.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Receipt | Flo-Tite | F150 | 6.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Receipt Isolation | Flo-Tite | RF15 | 6.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | 23 NC | Flo-Tite | RF15 | 6.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Separator Line | Flo-Tite | RF15 | 6.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | PH OV5 NO | Painted Over | Painted Over | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Separator Drain Line | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Separator Drain Line | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Separator Drain Line | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Separator Drain Line | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | PH HL22 | Painted Over | Painted Over | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Low Point | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Pressure Relief Isolation Valve NC | Painted Over | Painted Over | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Separator Isolation 1/2 | Flo-Tite | RF15 | 6.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Separator 2 Discharge | Flo-Tite | RF15 | 6.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | PH PR8 NC | Painted Over | Painted Over | 0.75 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | PRV Line | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | PRV Line | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | PH PR 3 NO | Painted Over | Painted Over | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | PRV Line | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | PRV Line | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Separator 2 PRV Line | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Separator 2 PRV Line | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Separator 2 PRV Line | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Separator 2 PRV Discharge | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Separator 2 PRV Line | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Pump 1 Discharge Side Isolation Valve NO | Painted Over | Painted Over | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Separator 2 DP Gauge Inlet | Gammon | Not Labeled | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Separator 3 DP Gauge Discharge | Gammon | Not Labeled | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | PH ML21 NO | Painted Over | Painted Over | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Separator 2 Drain | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | PH ML17 NC | Painted Over | Painted Over | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Separator 2 Drain Isolation | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Separator 1 PRV Line | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Separator 1 | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | PH OV 1 NO | Unknown | Unknown | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Separator 1 PRV Line | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Separator 1 PRV Line | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Separator 1 PRV Line | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Separator 1 Drain Isolation | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Separator 1 Sump Drain | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | DP Gauge Inlet | Gammon | Not Labeled | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | DP Gauge Discharge | Gammon | Not Labeled | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | M26 NC | DeZurik | CF8M | 4.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Separator 1 Discharge | Flo-Tite | RF15 | 6.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | Issue Pipe | Flo-Tite | RF15 | 6.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Ball Valves | High Point Line Drain Valve | Painted Over | Painted Over | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Offload Header 2 | Ball Valves | Basket Strainer Isolation | Flo-Tite | F150 | 4.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Offload Header 1 | Ball Valves | Sample Cock | Flow-Tek | F15 | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Offload Header 1 | Ball Valves | Basket Strainer Isolation | Flo-Tite | SF150 | 3.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Fillstand 2 | Ball Valves | Fillstand 2 Panto Isolation | Flow-Tek | 4-150 | 4.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Fillstand 2 | Ball Valves | Fillstand 2 PRV Isolation | Plugorama | Geosource | 3.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Fillstand 2 | Ball Valves | Fillstand 2 | Jamesbury | 19150 | 0.75 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Fillstand 2 | Ball Valves | PRV Line | Jamesbury | 19150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Fillstand 2 | Ball Valves | PRV Line | Jamesbury | 19150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Fillstand 1 | Ball Valves | Fillstand 1 Sample Cock | Gammon | GTP-1149 | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Fillstand 1 | Ball Valves | Fillstand 1 Panto Isolation | Flow-Tek | 4-150 | 4.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Fillstand 1 | Ball Valves | PRV Isolation | Jamesbury | F15 | 0.75 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Fillstand 1 | Ball Valves | PRV Discharge | Jamesbury | F15 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Fillstand 1 | Ball Valves | PRV Line | Flow-Tek | 1000 WOG | 0.75 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Double Block and Bleed Valves | M25 NC | General Twin Seal | CF8M | 8.0 in. | X | X | X | 6-6.2.5 | Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug. | No Operator Requirement | Partial System OOS | Do not open this valve and valve 15 together | ||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Double Block and Bleed Valves | Issue/Receipt Line | Franklin valve | D711 | 8.0 in. | X | X | X | 6-6.2.5 | Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug. | No Operator Requirement | Partial System OOS | |||||
| 161 | Pump Shed / Fillstands / Offload | Offload Header 1 | Double Block and Bleed Valves | Offload Header | Franklin Valve | D711 | 3.0 in. | X | X | X | 6-6.2.5 | Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug. | No Operator Requirement | Partial System OOS | |||||
| 161 | Pump Shed / Fillstands / Offload | Fillstand 2 | Double Block and Bleed Valves | Fillstand 2 | Franklin Valve | D711 | 4.0 in. | X | X | X | 6-6.2.5 | Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug. | No Operator Requirement | Partial System OOS | |||||
| 161 | Pump Shed / Fillstands / Offload | Fillstand 1 | Double Block and Bleed Valves | Fillstand 1 | Franklin Valve | Class 150 | 4.0 in. | X | X | X | 6-6.2.5 | Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug. | No Operator Requirement | Partial System OOS | |||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Globe Valves | PRT Sight Glass | Not Labeled | Not Labeled | 0.5 in. | X | X | 0 | 6-6.2.7 | 1. Regular inspection of the valve. ... |
2. If the valve is not operated regularly it is a good idea to cycle the valve to ensure the disc is not bedding itself in the seat.
3. Grease the crossbar by using a grease gun on the grease nipple provided
| 4. Slightly tighten the gland bolts if the packing needs adjustment. | No Operator Requirement | Partial System OOS | ||||||||||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Globe Valves | PRT Sight Glass | Not Labeled | Not Labeled | 0.5 in. | X | X | 0 | 6-6.2.7 | 1. Regular inspection of the valve. ... |
2. If the valve is not operated regularly it is a good idea to cycle the valve to ensure the disc is not bedding itself in the seat.
3. Grease the crossbar by using a grease gun on the grease nipple provided
| 4. Slightly tighten the gland bolts if the packing needs adjustment. | No Operator Requirement | Partial System OOS | ||||||||||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Globe Valves | Separator 2 Sight Glass | Kenco | Not Labeled | 0.5 in. | X | X | 0 | 6-6.2.7 | 1. Regular inspection of the valve. ... |
2. If the valve is not operated regularly it is a good idea to cycle the valve to ensure the disc is not bedding itself in the seat.
3. Grease the crossbar by using a grease gun on the grease nipple provided
| 4. Slightly tighten the gland bolts if the packing needs adjustment. | No Operator Requirement | Partial System OOS | ||||||||||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Globe Valves | Separator 2 Sight Glass | Kenco | Not Labeled | 0.5 in. | X | X | 0 | 6-6.2.7 | 1. Regular inspection of the valve. ... |
2. If the valve is not operated regularly it is a good idea to cycle the valve to ensure the disc is not bedding itself in the seat.
3. Grease the crossbar by using a grease gun on the grease nipple provided
| 4. Slightly tighten the gland bolts if the packing needs adjustment. | No Operator Requirement | Partial System OOS | ||||||||||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Globe Valves | Separator 1 Sight Glass | Kenco | Not Labeled | 0.5 in. | X | X | 0 | 6-6.2.7 | 1. Regular inspection of the valve. ... |
2. If the valve is not operated regularly it is a good idea to cycle the valve to ensure the disc is not bedding itself in the seat.
3. Grease the crossbar by using a grease gun on the grease nipple provided
| 4. Slightly tighten the gland bolts if the packing needs adjustment. | No Operator Requirement | Partial System OOS | ||||||||||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Globe Valves | Separator 1 Sight Glass | Kenco | Not Labeled | 0.5 in. | X | X | 0 | 6-6.2.7 | 1. Regular inspection of the valve. ... |
2. If the valve is not operated regularly it is a good idea to cycle the valve to ensure the disc is not bedding itself in the seat.
3. Grease the crossbar by using a grease gun on the grease nipple provided
| 4. Slightly tighten the gland bolts if the packing needs adjustment. | No Operator Requirement | Partial System OOS | |||||||||||||||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Check Valves | Pump 1 | OPW | 1175F | 4.0 in. | X | X | 0 | 6-6.2.8 | Visual for damage, leaks, tightness. | No Operator Requirement | Partial System OOS | |||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Check Valves | Pump 2 Discharge | Nibco | 13 | 4.0 in. | X | X | 0 | 6-6.2.8 | Visual for damage, leaks, tightness. | No Operator Requirement | Partial System OOS | |||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Check Valves | Pressure Relief Line | Titan | CF8M | 1.0 in. | X | X | 0 | 6-6.2.8 | Visual for damage, leaks, tightness. | No Operator Requirement | Partial System OOS | |||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Check Valves | Separator 2 | Not Labeled | Not Labeled | 1.0 in. | X | X | 0 | 6-6.2.8 | Visual for damage, leaks, tightness. | No Operator Requirement | Partial System OOS | |||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Check Valves | Separator 1 | Not Labeled | Not Labeled | 1.0 in. | X | X | 0 | 6-6.2.8 | Visual for damage, leaks, tightness. | No Operator Requirement | Partial System OOS | |||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Check Valves | Pressure Relief Line | Unknown | Unknown | 2.0 in. | X | X | 0 | 6-6.2.8 | Visual for damage, leaks, tightness. | No Operator Requirement | Partial System OOS | |||
| 161 | Pump Shed / Fillstands / Offload | Pump Shed | Thermal and/or Pressure Relief Valves | PRV 3 | Hydroseal | Painted Over | 1.0 in. | X | X | X | 6-6.3 | Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended. | Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced. |