This file is a Performance Work Statement template for fuel facility maintenance that contains detailed asset inventories and maintenance requirements for multiple fuel system facilities at Altus Air Force Base. The template includes comprehensive equipment lists with maintenance frequencies and specifications for facilities including a military service station (#354), bulk storage tanks (#378, #379, #381), and associated components like pumps, valves, meters, and safety systems.
The document provides detailed technical specifications for maintaining each piece of equipment, including manufacturer data, model numbers, sizes, and specific maintenance procedures required at daily, weekly, monthly, quarterly and annual intervals. Key systems covered include above-ground storage tanks up to 1,060,000 gallons, emergency shutoff systems, containment systems, fuel dispensers, filtration equipment, control valves, and fire protection systems. The template appears designed to standardize recurring maintenance procedures across fuel facilities but does not include specific contract terms, pricing, or performance requirements.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Administrative
| Location | Site Name | ALTUS AIR FORCE BASE SITE # 1 |
| RPSUID | 1361 | |
| DLA Site Code | ALT | |
| Hours of Operation | 24 Hours Operation | |
| Address | 401 North L Avenue, Altus, OK 73523 | |
| Contract | Contractor | |
| Contract # | ||
| Local POCs | QAE Name | |
| QAE Phone | ||
| QAE Email | ||
| Alt QAE Name | ||
| Alt QAE Phone | ||
| Alt QAE Email | ||
| DLA/SCP POCs | DLA PM Name | |
| DLA PM Phone | ||
| DLA PM Email | ||
| SCP PM Name | ||
| SCP PM Phone | ||
| SCP PM Email | ||
| Contractor POCs | Contractor PM Name | |
| Contractor PM Phone | ||
| Contractor PM Email | ||
| Contractor QC Name | ||
| Contractor QC Phone | ||
| Contractor QC Email | ||
| Contractor SM Name | ||
| Contractor SM Phone | ||
| Contractor SM Email | ||
| USACE POCs | USACE PM/COR Name | |
| USACE PM/COR Phone | ||
| USACE PM/COR Email | ||
| USACE PE Name | ||
| USACE PE Phone | ||
| USACE PE Email | ||
| USACE KO Name | ||
| USACE KO Phone | ||
| USACE KO Email |
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
This table shows the minimum information required. Additional details should be included based on site specific requirements. Additional POCs may be required.
General Facility Description Facility Description
| Standard Fuel System Equipment Includes: |
| a) Aboveground Storage Tanks (AST), Underground Storage Tanks (UST) b) Filter/separator and other filtration device maintenance access, particularly element removal. c) Manual valves d) Meter Registers, and Flow Meters. e) Control Valves. f) Pumps g) Tank Monitoring Equipment and Instruments h) Alarms i) Fire Fighting Equipment. |
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Include a general facility overview and description of each fuel system for the sites in accordance with UFC 3-460-01. Examples include: Bulk Storage Facilities, Aircraft Fueling Facilities, Marine and Dispensing Facilities, Ground Products Fueling Facilities, Alternate POL Facilities, and Support Facilities. Also include facility #s, facility names, fuel type, photos, and any other pertinent information.
Include Site Specific Conditions and Restrictions in this tab.
Communication Plan
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Communication plan shall address in/out briefs, lines of communication, coordination for access, etc.
Safety
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Site Specific Addendum and Activity Hazard Analysis, which are Attachments to the APP, specific to activities or tasks related to recurring maintenance for this site.
RM Schedule
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Link RM schedule here
Task Matrix
| Applicable Facility Assets | UFC System Level Maintenance Frequency | Special Considerations | ||||||||||||||||
| Real Property Unique Identifier | ||||||||||||||||||
| (RPUID) | Real Property Facility # | Real Property Facility Name | Operational Area | Component Type | Base Asset ID | Component Unique Identifier (CUID) | Make | Model | Capacity/Size | Q | S | A | UFC Section Reference | Additional Manufacturer RM Requirements | Operator/ equipment Requirements | System availability | Other Contract | Comments |
| 354 | 354 Military service station | 354 Military service station | Emergency Eyewash/Showers | 354 eyewas/showe | Speakman | Therma Flow | 2.0 In. | X | X | X | 11-3 | Weekly - Equipment installed within 10 seconds from the hazard and on the same plane as the hazard Pathway is clear of obstructions Plumbed equipment activated to ensure compliant operation and to clear any sediment Self-contained equipment checked to determine if the flushing fluid needs to be changed or supplemented Equipment free of broken or missing parts Equipment protected against freezing User protected from scalding water | No Operator Requirement | No Mission Impact | ||||
| 354 | 354 Military service station | 354 Military service station | Ball Valves | 835 mogas vapor eliminator ball valve | Velan | CF8M | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | ||||
| 354 | 354 Military service station | 354 Military service station | Dispenser Strainers | 354 Diesel dispenser strainer | Vacuo Maximo | 200427 | N/A | 0 | 0 | X | 7-10 | Inspect strainer cover gasket for cracks, distortion, and dry rot. | No Operator Requirement | Partial System OOS | ||||
| 354 | 354 Military service station | 354 Military service station | Dispenser Strainers | 354 Mogas dispenser strainer | Vacuo Maximo | 200427 | N/A | 0 | 0 | X | 7-10 | Inspect strainer cover gasket for cracks, distortion, and dry rot. | No Operator Requirement | Partial System OOS | ||||
| 354 | 354 Military service station | 354 Military service station | Emergency Shutoff Valves | 354 Mogas dispenser fire valve | OPW | Not Legible | 1.5 in. | 0 | 0 | X | 7-12 | Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. Inspect mechanical links of the valve for correct operation. Conduct test of valve to ensure it operates correctly. | Monthly - Inspect stabilizer bar to ensure that it is securely mounted below the base of the dispenser. Inspect the mounting bolts that secure the emergency shutoff valve to the stabilizer bar. Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. | Partial System OOS | ||||
| 354 | 354 Military service station | 354 Military service station | Emergency Shutoff Valves | 354 Diesel dispenser shear valve | OPW | Not Legible | 1.5 in. | 0 | 0 | X | 7-12 | Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. Inspect mechanical links of the valve for correct operation. Conduct test of valve to ensure it operates correctly. | Monthly - Inspect stabilizer bar to ensure that it is securely mounted below the base of the dispenser. Inspect the mounting bolts that secure the emergency shutoff valve to the stabilizer bar. Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. | Partial System OOS | ||||
| 354 | 354 Military service station | 354 Military service station | Dispenser Sumps | 354 Mogas dispenser sump | Wayne | Wayne | N/A | X | X | X | 7-13 | Inspect sump pipe transition fittings for tears, cracks, or other signs of deterioration. Test sumps and ensure they are liquid tight by using vacuum, pressure, or liquid testing in accordance with 40 CFR 280, Section 43. | Monthly - Inspect for signs of water, fuel, trash, and debris inside sumps. Remove and properly dispose of collected water, fuel, trash, and debris. Visually inspect penetration fittings. If fuel or water is detected investigate the source and repair. | Partial System OOS | ||||
| 354 | 354 Military service station | 354 Military service station | Dispenser Sumps | 354 Diesel dispenser sump | Wayne | Wayne | N/A | X | X | X | 7-13 | Inspect sump pipe transition fittings for tears, cracks, or other signs of deterioration. Test sumps and ensure they are liquid tight by using vacuum, pressure, or liquid testing in accordance with 40 CFR 280, Section 43. | Monthly - Inspect for signs of water, fuel, trash, and debris inside sumps. Remove and properly dispose of collected water, fuel, trash, and debris. Visually inspect penetration fittings. If fuel or water is detected investigate the source and repair. | Partial System OOS | ||||
| 354 | 354 Military service station | 354 Military service station | EFSO Systems | 354 EFSO switch Mogas side | Not Labled | Not Labled | N/A | X | X | 0 | 7-16 | Proper operation, box seals for integrity. Electrical connections for continuity. | No Operator Requirement | Partial System OOS | ||||
| 354 | 354 Military service station | 354 Military service station | EFSO Systems | EFSO switch diesel side | Not Labled | Not Labled | N/A | X | X | 0 | 7-16 | Proper operation, box seals for integrity. Electrical connections for continuity. | No Operator Requirement | Partial System OOS | ||||
| 354 | 354 Military service station | 354 Military service station | EFSO Systems | 354 EFSO switch building mount | Not Labled | Not Labled | N/A | X | X | 0 | 7-16 | Proper operation, box seals for integrity. Electrical connections for continuity. | No Operator Requirement | Partial System OOS | ||||
| 354 | 354 Military service station | 354 Military service station | Dispenser Nozzles | 354 diesel dispenser nozzle | OPW | 7-HB | 1.0 in. | 0 | 0 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | |||||||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | Partial System OOS | |||||||||||||
| 354 | 354 Military service station | 354 Military service station | Dispenser Nozzles | 354 Mogas dispenser mozzle | OPW | 11BP | 0.75 in. | 0 | 0 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | ||||||||||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | Partial System OOS | ||||||||||||||||
| 354 | 354 Military service station | 354 Military service station | Dispenser Hoses | 364 Mogas dispenser hose | Husky | MH20477 | 0.75 in. | 0 | 0 | 0 | 7-3 | Check for expiration date, and physical condition/damage leaks. | Daily - Inspect dispenser hoses and hose whips for gouges, cuts, blisters, or outside wear that may lead to rupture during use. Replace hose or hose whips that show signs of wear. Inspect connection points of hoses and hose whips to the dispenser, breakaways, swivels, and the nozzle and ensure the connection points are clean and free of fuel. | Partial System OOS | |||
| 354 | 354 Military service station | 354 Military service station | Dispenser Hoses | 354 diesel dispenser hose | Husky | Eagle flex | 2.0 in. | 0 | 0 | 0 | 7-3 | Check for expiration date, and physical condition/damage leaks. | Daily - Inspect dispenser hoses and hose whips for gouges, cuts, blisters, or outside wear that may lead to rupture during use. Replace hose or hose whips that show signs of wear. Inspect connection points of hoses and hose whips to the dispenser, breakaways, swivels, and the nozzle and ensure the connection points are clean and free of fuel. | Partial System OOS | |||
| 354 | 354 Military service station | 354 Military service station | Breakaways | 354 Mogas dispenser breakaway | OPW | 66V | 0.75 in. | 0 | 0 | 0 | 7-4 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect breakaways for loose connections and signs of damage to poppets. Ensure breakaways are clean and free of fuel. | ||||
| Monthly - Inspect breakaway for an expiration date established by the manufacturer. Breakaways must be replaced before the indicated expiration date. | No Mission Impact | ||||||||||||||||
| 354 | 354 Military service station | 354 Military service station | Swivels | 354 Mogas dispenser swivel | OPW | 241TPS | 0.75 in. | 0 | 0 | 0 | 7-5 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect swivel for loose connections and signs of damage. Ensure swivel rotates easily and is clean and free of fuel. | ||||
| Monthly - Inspect swivel for expiration date established by manufacturer. Swivels must be replaced before the indicated expiration date. | Partial System OOS | ||||||||||||||||
| 354 | 354 Military service station | 354 Military service station | Hose Retriever | 354 Mogas dispenser hose retriever | OPW | Not Labeled | N/A | 0 | 0 | 0 | 7-6 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 354 | 354 Military service station | 354 Military service station | Hose Retriever | 354 Diesel dispenser retriever | Wayne | Not Labeled | N/A | 0 | 0 | 0 | 7-6 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 354 | 354 Military service station | 354 Military service station | Dispenser Cabinet | 354 diesel dispenser | Wayne | G6201/2JGKWI | N/A | 0 | 0 | X | 7-7 | Inspect for damage, ensure door panels and locks are functional. | Monthly - Inspect outside of cabinet and ensure it is free of damage. Inspect for fuel stains on the concrete island around the cabinet and on the outside of the cabinet. Ensure the cabinet is free of dirt and fuel. Open both sides of the cabinet and inspect the inside of the cabinet. Ensure the inside of the cabinet and all of the components inside the cabinet are clean and free of fuel. | Partial System OOS | |||
| 354 | 354 Military service station | 354 Military service station | Dispenser Cabinet | 354 Dispenser caninet | Wayne | G6201D/2GJK/W1 | N/A | 0 | 0 | X | 7-7 | Inspect for damage, ensure door panels and locks are functional. | Monthly - Inspect outside of cabinet and ensure it is free of damage. Inspect for fuel stains on the concrete island around the cabinet and on the outside of the cabinet. Ensure the cabinet is free of dirt and fuel. Open both sides of the cabinet and inspect the inside of the cabinet. Ensure the inside of the cabinet and all of the components inside the cabinet are clean and free of fuel. | Partial System OOS | |||
| 354 | 354 Military service station | 354 Military service station | Dispenser Meters | 354 Mogas dispenser meter | Wayne | 2PM-6 | 0-15 GPM/SCFM | 0 | 0 | X | 7-8 | Inspect for damage, smooth operation and legibility. | Monthly - Inspect meter and ensure meter is clean and free of fuel. Ensure calibration mechanism is sealed. | Partial System OOS | |||
| 354 | 354 Military service station | 354 Military service station | Dispenser Meters | 354 Diesel dispenser meter | Dresser wayne | 2PM-6 | 0-15 GPM/SCFM | 0 | 0 | X | 7-8 | Inspect for damage, smooth operation and legibility. | Monthly - Inspect meter and ensure meter is clean and free of fuel. Ensure calibration mechanism is sealed. | Partial System OOS | |||
| 354 | 354 Military service station | 354 Military service station | Dispenser Filters | 354 diesel dispenser filter | Wix | 24029 | .05 In. | 0 | 0 | X | 7-9 | Check exterior for damage | No Operator Requirement | Partial System OOS | |||
| 354 | 354 Military service station | 354 Military service station | Dispenser Filters | 354 Mogas dispenser filter | Wayne | 70104 | .05 In. | 0 | 0 | X | 7-9 | Check exterior for damage | No Operator Requirement | Partial System OOS | |||
| 354 | 354 Military service station | 354 Military service station | Containment Systems | 354 tank fill area | N/A | N/A | N/A | 0 | 0 | 0 | 8-10.1 | No Manufacturer Requirements Available | Daily - Inspect containment systems for cleanliness, if accessible. | No Mission Impact | |||
| 354 | 354 Military service station | 354 Military service station | Electrical Equipment | 354 veeder root | Veeder-Root | TLS-350 | N/A | X | X | 0 | 9-1.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 354 | 354 Military service station | 354 Military service station | Electrical Equipment | 354 Veeder root IQ control box | Veeder-Root | Not Legible | N/A | X | X | 0 | 9-1.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 354 | 354 Military service station | 354 Military service station | Electrical Equipment | 354 Smart stop controller | Franklin fueling system | Not Legible | N/A | X | X | 0 | 9-1.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 354 | 354 Military service station | 354 Military service station | Electrical Equipment | 354 ATG system control box | Barton | RTU 8130 | N/A | X | X | 0 | 9-1.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 354 | 354 Military service station | 354 Military service station | Lighting | 354 Area lighting | N/A | N/A | N/A | X | X | X | 9-1.8 | No Manufacturer Requirements Available | No Operator Requirement | No Mission Impact | 2 lights/ one pole on each side of tanks | ||
| 354 | 354 Military service station | 354 Military service station | Containment Systems | 354 bollards | N/A | N/A | N/A | 0 | 0 | X | General | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | 18 bollards covered with yellow plastic sleeves | ||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Air Eliminator Tanks | Basket Strainer Air Eliminator | Covered in paint | Covered in paint | Covered in paint | X | X | X | 3-10.1 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Air Eliminator Tanks | In-line Air eliminator | Covered in paint | Covered in paint | Covered in paint | X | X | X | 3-10.1 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Air Eliminator Tanks | Air eliminator- Inlet to Pump#10 | Covered in paint | Covered in paint | Covered in paint | X | X | X | 3-10.1 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Air Eliminator Tanks | DS-2 f/s 9 air eliminator tank | Liquid Controls | A8170 | N/A | X | X | X | 3-10.1 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | 378 DS-2 tank | ||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Basket Strainers | Inlet strainer -Pump#9 | No manufacturer data | No manufacturer data | 6.0 in. | X | X | 0 | 3-6.4 | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | |||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | ||||||||||||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | No Mission Impact | ||||||||||||||||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Basket Strainers | DS2 pump 10 basket strainer | WCB | A216 | 6.0 in. | X | X | 0 | 3-6.4 | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | |||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | ||||||||||||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | No Mission Impact | ||||||||||||||||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Basket Strainers | DS-2 f/s 10 basket strainer | Mueller | B1406 | 3.0 in. | X | X | 0 | 3-6.4 | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | |||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | ||||||||||||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | No Mission Impact | 378 DS-2 tank | |||||||||||||||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Basket Strainers | DS-2 f/s 9 receipt strainer | Titan | FC-I | 4.0 in. | X | X | 0 | 3-6.4 | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | |||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | ||||||||||||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | No Mission Impact | 378 DS-2 tank | |||||||||||||||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Positive Displacement Meters | DS-2 f/s 10 digital meter register | Total Control Systems | TCS 3000 | 0-600 GPM/SCFM | 0 | 0 | 0 | 3-7.1 | Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature | |||||
| compensation feature | Monthly - Inspect counter head for unusual noises and smooth operation. | Partial System OOS | 378 DS-2 tank | ||||||||||||||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Positive Displacement Meters | DS-2 f/s 10 issue meter | Liquid Controls | M-15-2 | 600 GPM GPM/SCFM | 0 | 0 | 0 | 3-7.1 | Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature | |||||
| compensation feature | Monthly - Inspect counter head for unusual noises and smooth operation. | Partial System OOS | 378 DS-2 tank | ||||||||||||||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Positive Displacement Meters | DS-2 f/s 9 receipt meter register | Liquid Controls | E3659 | 35-350 GPM/SCFM | 0 | 0 | 0 | 3-7.1 | Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature | |||||
| compensation feature | Monthly - Inspect counter head for unusual noises and smooth operation. | Partial System OOS | 378 DS-2 tank | ||||||||||||||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Positive Displacement Meters | DS-2 tank f/s 9 receipt meter | Liquid Controls | M-30-1 | 35-350 GPM/SCFM | 0 | 0 | 0 | 3-7.1 | Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature | |||||
| compensation feature | Monthly - Inspect counter head for unusual noises and smooth operation. | Partial System OOS | 378 DS-2 tank | ||||||||||||||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Centrifugal Pumps | Pump#9 | Ingresoll-Dresser | 4X3X10 | 300 gpm GPM/SCFM | X | X | X | 3-8.1 | During routine pump inspections only the easy to monitor factors such as pressure, temperature, vibration etc can be checKed. But during quarterly inspections, shaft alignment and oil levels should also be checked. Change Oil Annually | No Operator Requirement | No Mission Impact | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Centrifugal Pumps | Pump#10 | Ingersoll-Dresser | Data plate illegible | 300 gpm GPM/SCFM | X | X | X | 3-8.1 | During routine pump inspections only the easy to monitor factors such as pressure, temperature, vibration etc can be checKed. But during quarterly inspections, shaft alignment and oil levels should also be checked. Change Oil Annually | No Operator Requirement | No Mission Impact | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Sliding Vane Pumps | DS2 PRT hand pump | Blackmer | 414 | 0-15 GPM/SCFM | X | X | X | 3-8.2.1 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Loading Fuel Hoses | DS-2 issue hose | Hewitt | 5500 JacRiser | 3.0 in. | X | X | X | 3-9.1 | Aircraft fueling hose shall be inspected before use each day. The hose shall be extended as it normally would be for fueling and checked for evidence of blistering, carcass saturation or separation, cuts, nicks, or abrasions that expose reinforcement material, and for slippage, misalignment, or leaks at couplings. | Weekly - Visually inspect hoses for loose covers, cracks, brittle surface coatings, exposed wire braids, exposed reinforcement, flattening, kinks, and bulges or soft spots which might indicate broken or displaced reinforcement. | ||||
| Monthly - Pressurize hose to normal working pressure. Check flanged and threaded connections for leaks and inspect hose couplers for fluid seepage by pushing at the base of the coupling with your thumbs; a hose softened by fluid seepage must be replaced. | Partial System OOS | 378 DS-2 tank | |||||||||||||||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Loading Fuel Hoses | DS-2 f/s 9 hose | PT | 54030330 | 2.5 in. | X | X | X | 3-9.1 | Aircraft fueling hose shall be inspected before use each day. The hose shall be extended as it normally would be for fueling and checked for evidence of blistering, carcass saturation or separation, cuts, nicks, or abrasions that expose reinforcement material, and for slippage, misalignment, or leaks at couplings. | Weekly - Visually inspect hoses for loose covers, cracks, brittle surface coatings, exposed wire braids, exposed reinforcement, flattening, kinks, and bulges or soft spots which might indicate broken or displaced reinforcement. | ||||
| Monthly - Pressurize hose to normal working pressure. Check flanged and threaded connections for leaks and inspect hose couplers for fluid seepage by pushing at the base of the coupling with your thumbs; a hose softened by fluid seepage must be replaced. | Partial System OOS | 378 DS-2 tank | |||||||||||||||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | General System Control Valves | Cla-Val | Covered in paint | 3.0 in. | X | X | X | 4-3.2.1 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | ||||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | General System Control Valves | DS-2 f/s 9 receipt control valve | Cla-Val | 40-32ACGS | 4.0 in. | X | X | X | 4-3.2.1 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | 378 DS-2 tank | ||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | General System Control Valves | DS2 high level shut off valve | ACC | 3099-10 | 4.0 in. | X | X | X | 4-3.2.1 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Sight Flow Indicators | DS-2 f/s 9 visi flow | Visi-Flo | 1581 | 1.0 In. | 0 | 0 | 0 | 6-12.3 | Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Partial System OOS | 378 DS-2 tank | ||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Sight Flow Indicators | DS2 PRT site glass | N/A | N/A | 1.0 In. | 0 | 0 | 0 | 6-12.3 | Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Partial System OOS | 3/4� threads | ||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Gate Valves | DS2 Tank containment drain | Not Legible | IP-71 | 6.0 in. | X | X | 0 | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | Partial System OOS | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Gate Valves | DS2 PRT vent | Milwaukee Valve | 105 | 1.0 in. | X | X | 0 | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | Partial System OOS | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Ball Valves | Outlet-Pump#9 | Covered in paint | Covered in paint | 3.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Ball Valves | Inlet-prior to control valve | Covered in paint | Covered in paint | 3.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Ball Valves | Downstream of Pump#10 | Covered in paint | Covered in paint | 3.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Ball Valves | DS-2 f/s 10 issue ball valve before hose | N&J | 3-150 | 3.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | 378 DS-2 tank | ||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Ball Valves | DS-2 f/s 10 inlet PRV ball valve | Flow-Tek | RF-15 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | 378 DS-2 tank | ||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Ball Valves | Strainer ball valve | Watts | Covered in paint | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Ball Valves | DS-2 f/s 9 sample port ball valve | Gammon | GTP-1149 | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | 378 DS-2 tank | ||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Ball Valves | DS-2 f/s 9 ball valve | Unk | 4-150 | 4.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | 378 DS-2 tank | ||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Ball Valves | Inlet to pump pad | Coated in paint | Coated in paint | 4.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Ball Valves | DS-2 tank f/s 9 ball valve | UNK | 6-150 | 6.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | 378 DS-2 tank | ||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Ball Valves | Inlet to pump #9 | Illegible -covered in paint | Illegible -covered in paint | 6.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Ball Valves | DS2 PRT inlet iso | Apollo | CF8M | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Ball Valves | DS2 PRT drain iso | Apollo | CF8M | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Ball Valves | Inlet to in-line Air eliminator | Watts | Illegible | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Ball Valves | Inlet to pressure gauge | Watts | Covered in paint | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Ball Valves | DS-2 f/s 9 receipt ball valve before strainer | UNK | 4-150 | 4.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | 378 DS-2 tank | ||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Ball Valves | DS-2 f/s 10 issue ball valve | Watts | CF8M | 4.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | 378 DS-2 tank | ||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Ball Valves | Control valve inlet | Watts | CF8M | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Ball Valves | DS2 pump pad containment drain | Apollo | CF8M | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Ball Valves | DS2 pump 10 basket strainer vent iso | Apollo | CF8M | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Ball Valves | DS2 f/s10 strainer drain | Apollo | CF8M | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Ball Valves | DS2 f/s10 iso valve | Watts | 2501313A | 4.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Ball Valves | DS2 pump 10 inlet iso | Watts | 2501212A | 6.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Ball Valves | DS-2 f/s 10 hose ball valve | Dover Corp | 8473569 | 3.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | 378 DS-2 tank | ||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Ball Valves | DS-2 f/s 10 PRV discharge | Flow-Tek | RF-15 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | 378 DS-2 tank | ||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Ball Valves | DS-2 tank f/s 10 PRV test tee ball valve | Flow-Tek | Rf-15 | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | 378 DS-2 tank | ||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Ball Valves | Control valve-outlet | Watts | Illegible | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Ball Valves | DS-2 receipt strainer ball valve | Flow-Tek | RF-15 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | 378 DS-2 tank | ||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Ball Valves | DS2 issue PRV iso | Flow-Tek | RF-15 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Ball Valves | DS2 PRV iso | Flow-Tek | RF-15 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Ball Valves | DS2 PRV test iso | Flow-Tek | RF-15 | 0.75 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Ball Valves | DS2 issue PRV iso | Flow-Tek | RF-15 | 0.75 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Ball Valves | DS2 receipt PRV iso | Flow-Tek | RF-15 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Ball Valves | DS2 receipt PRV iso | Flow-Tek | RF-15 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Ball Valves | DS2 receipt PRV test iso | Flow-Tek | RF-15 | 0.75 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Ball Valves | DS2 receipt PRV iso | Flow-Tek | RF-15 | 0.75 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Double Block and Bleed Valves | DS2 tank issue | Franklin Valve | 711 | 6.0 in. | X | X | X | 6-6.2.5 | Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug. | No Operator Requirement | Partial System OOS | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Double Block and Bleed Valves | DS2 receipt iso | Franklin valve | 711 | 4.0 in. | X | X | X | 6-6.2.5 | Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug. | No Operator Requirement | Partial System OOS | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Check Valves | DS2 PRT discharge | Painted / Not Legible | Painted / Not Legible | 0.75 in. | X | X | 0 | 6-6.2.8 | Visual for damage, leaks, tightness. | No Operator Requirement | Partial System OOS | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Check Valves | DS-2 f/s 9 check valve | Walworth | G3845 | 4.0 in. | X | X | 0 | 6-6.2.8 | Visual for damage, leaks, tightness. | No Operator Requirement | Partial System OOS | 378 DS-2 tank | ||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Thermal and/or Pressure Relief Valves | DS2 receipt PRV | Taylor | 82E2751311-90-10-0 | 1.0 in. 26 - 50 PSI | X | X | X | 6-6.3 | Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended. | Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced. | ||||
| Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked. | Partial System OOS | ||||||||||||||||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Thermal and/or Pressure Relief Valves | DS2 issue PRV | Taylor | 82E2751311-90-10-0 | 1.0 in. 26 - 50 PSI | X | X | X | 6-6.3 | Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended. | Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced. | ||||
| Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked. | Partial System OOS | ||||||||||||||||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Thermal and/or Pressure Relief Valves | DS-2 f/s 10 issue PRV | Taylor | 82E3751311-00-10-0 | 0.75 in. 51 - 100 PSI | X | X | X | 6-6.3 | Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended. | Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced. | ||||
| Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked. | Partial System OOS | 378 DS-2 tank | |||||||||||||||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Pressure and Pressure/Vacuum Gauges | Pressure gauge | Dixon | No Manufacturer Data | 0.5 in. 0 - 300 PSI | X | X | X | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. | Partial System OOS | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Pressure and Pressure/Vacuum Gauges | DS-2 f/s 10 psi/vac gauge top of strainer | Wika | No Manufacturer Data | 1.0 in. -30 - 100 PSI | X | X | X | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. | Partial System OOS | 378 DS-2 tank | ||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Differential Pressure Gauges | DS-2 receipt strainer DP gauge | Schultz | SC-5150-30 | 0 - 30 PSI | X | X | X | 6-7.2 | Periodic calibration of this instrument is unnecessary because the graduated scale is made to match the characteristics (load/deflection curve) of the spring. If the spring loses some of its strength for some reason, the ”free length” must be shortened. Afull length spring will always provide accurate readings. This is a fundamental truth about compression springs. This spring is at its “free full length” when there is zero differential pressure; the top of the piston is then in the “zero” band of the graduated scale. | Quarterly - Clean outside of gauge glass. | Partial System OOS | 378 DS-2 tank | ||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | EFSO Systems | EFSO Fac#378 | Cooper Crouse-Hinds | Not Labled | N/A | X | X | 0 | 7-16 | Proper operation, box seals for integrity. Electrical connections for continuity. | No Operator Requirement | Partial System OOS | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | EFSO Systems | EFSO | Cooper Crouse-Hinds | Not Labled | N/A | X | X | 0 | 7-16 | Proper operation, box seals for integrity. Electrical connections for continuity. | No Operator Requirement | Partial System OOS | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | EFSO Systems | EFSO-North Gate | Cooper Crouse-Hinds | Not Labled | N/A | X | X | 0 | 7-16 | Proper operation, box seals for integrity. Electrical connections for continuity. | No Operator Requirement | Partial System OOS | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Containment Systems | DS2 pump pad containment | N/A | N/A | N/A | 0 | 0 | 0 | 8-10.1 | No Manufacturer Requirements Available | Daily - Inspect containment systems for cleanliness, if accessible. | No Mission Impact | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Concrete and Cement Brick Dike/Berm Walls and Floors | DS2 bulk tank containment | N/A | N/A | N/A | 0 | 0 | 0 | 8-10.2 | No Manufacturer Requirements Available | Daily - Inspect for vegetation that has taken root in seals or cracks. All vegetation shall be removed in all cases to prevent penetration of seals, joints or cracks in the concrete. Inspect walls constructed of bricks for signs of deterioration (e.g., spalling caused by freeze-thaw conditions, cracks, and joint cracks between bricks). Walls constructed of bricks shall be patched immediately to prevent further penetration of the wall structure. | No Mission Impact | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Aboveground Field-Erected Tanks | 378 DS-2 tank | International Production Specialist | International Production Specialist | 10,000 Gallons | 0 | 0 | X | 8-4 | No Manufacturer Requirements Available | Monthly - Visually inspect for evidence of leaks; shell distortions; signs of settlement; corrosion, condition of tank foundation, condition of coating, insulation systems, and appurtenances. Inspection shall include all components and equipment located inside the containment area such as piping, pipe supports, containment valves, and product saver tanks. Items noted during the inspection will be documented for follow-up action by an authorized inspector. See Appendix F for the Field-Erected Tank Monthly Inspection Checklist. Visually inspect chime to ringwall sealant. Seal should be maintained in good working order to prevent corrosion of the underside of the tank bottom. | Partial System OOS | DS-2 bulk tank | ||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Product Saver Tanks | DS2 PRT | Not Labeled | Not Labeled | 50 Gallons | X | X | 0 | 8-9.10 | No Manufacturer Requirements Available | No Operator Requirement | Partial System OOS | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Tank Pressure/ Vacuum Vents | DS2 bulk tank vent | Unmarked | Unmarked | 3.0 In. | 0 | 0 | X | 8-9.3 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Tank Pressure/ Vacuum Vents | DS-2 f/s 9 air eliminator vent | Shand & Jurs | 94020-120742001 | 3.0 In. | 0 | 0 | X | 8-9.3 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | 378 DS-2 tank | ||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Electrical Equipment | DS2 bulk tank Veeder-Root control box | Veeder-Root | Not Labeled | N/A | X | X | 0 | 9-1.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Motor Controls | Motor Controls | Curler Manufacturing | Illegible-weather faded | Not Labeled | X | X | X | 9-1.4 | Moving parts should operate easily without excessive friction. Check operation of contactors and relays by hand, feeling for any binding or sticking. Look for loose pins, bolts, or bearings. If the control is dirty, it should be wiped or blown clean. |
Contact inspection. Check contacts for pitting and signs of overheating, such as discoloration of metal, charred insulation, or odor. Be sure contact pressure is adequate and the same on all poles; verify with manufacturer's specification. Watch for frayed flexible leads.
Contact resistance testing. On essential controls, perform contact-resistance tests with a low-resistance ohmmeter on a regular basis. Proper contact resistance should be about 50 micro-ohms. Record readings for future comparison. This will indicate trends in the condition of contacts.
| Overload relay inspection. Overload relays should receive a thorough inspection and cleaning. You also should check for proper setting. | No Operator Requirement | Partial System OOS | ||||||||||||||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Static Grounding Systems | DS2 F/S 10 | Hannay Reels | GR75 | N/A | X | X | X | 9-1.6.2 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | Partial System OOS | ||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Static Grounding Systems | DS2 tank ground | N/A | N/A | N/A | X | X | X | 9-1.6.2 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | Partial System OOS | ||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Static Grounding Systems | DS2 tank ground | N/A | N/A | N/A | X | X | X | 9-1.6.2 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | Partial System OOS | ||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Static Grounding Systems | DS2 tank ground | N/A | N/A | N/A | X | X | X | 9-1.6.2 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | Partial System OOS | ||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Static Grounding Systems | DS2 tank ground | N/A | N/A | N/A | X | X | X | 9-1.6.2 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | Partial System OOS | ||
| 378 | DS-2 Bulk | 378 DS-2 Bulk | Static Grounding Systems | DS2 tank stairs ground | N/A | N/A | N/A | X | X | X | 9-1.6.2 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | Partial System OOS |