This is a Facility Maintenance Plan (FMP) template for recurring maintenance of fuel systems at Little Rock Air Force Base in Arkansas. The template details maintenance requirements for fuel storage and dispensing equipment at a 24-hour facility located at 1250 West Thomas Avenue, including 8 underground storage tanks of 50,000 gallons each, filter separators, pumps, valves, gauges, and electrical components.

The document provides detailed specifications for quarterly, monthly, and annual maintenance tasks for each piece of equipment, including 8 Johnston vertical turbine pumps rated at 600 GPM, Facet filter separators, Cla-Val control valves, various ball/gate/globe valves, pressure gauges, and electrical motors/controls. It includes manufacturer requirements, inspection frequencies, and operational impacts for each component. The template is structured as a comprehensive asset inventory and maintenance scheduling tool, with sections for administrative information, safety protocols, communications plans, and detailed equipment specifications. This appears to be version 2.2 of a standardized template rather than a completed maintenance plan.

View the file

Other files

File Type Posted
Sources Sought FUELS - Programmatic Rev1 7 May 25.docx DOCX document
3.4 Appendix B - Attachment 4 - SO Tracker-20210628.xlsx XLSX spreadsheet
6.0 - Appendix E ISR 15-Bulk_Fuel_Facilities FY25.xlsx XLSX spreadsheet
2.0 Appendix A RM_SO Process_20241220_PgM Reviewed Incorporated.docx DOCX document
3.1 Appendix B - Attachment 1 - Three Week Look Ahead_20230420.xlsx XLSX spreadsheet
3.2 Appendix B - Attachment 2 - Monthly Report Format 20240910.docx DOCX document
2.2 Appendix A - Attachment 2 Contractor Travel Expense Report_20240910.xlsx XLSX spreadsheet
9.0 Appendix H - Minor Repairs Incidental to Maintenance Activities POJ 20231009.xlsx XLSX spreadsheet
7.0 CUID - v2.1.pdf PDF
8.0 Appendix G_UFC 3-460-03 Maintenance Table- v4.3.pdf PDF
6.0 Appendix E ISR 14_operational_fuel_facilities FY25.xlsx XLSX spreadsheet
3.0 Appendix B Reporting Requirements_20240910.docx DOCX document
4.0 Appendix C Task Order Specifications_202401216.docx DOCX document
5.0 Appendix D Antiterrorism and OPSEC 20230206.docx DOCX document
PWS LEX FMP Template - v2.2.xlsx XLSX spreadsheet
PWS VNC FMP Template - v2.2.xlsx XLSX spreadsheet
PWS KEQ FMP Template - v2.2.xlsx XLSX spreadsheet
PWS CVZ FMP Template - v2.2.xlsx XLSX spreadsheet
PWS SHP FMP Template - v2.2.xlsx XLSX spreadsheet
PWS PBA FMP Template - v2.2.xlsx XLSX spreadsheet
PWS GRB FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BRO FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BAR FMP Template - v2.2.xlsx XLSX spreadsheet
PWS EFS FMP Template - v2.2.xlsx XLSX spreadsheet
PWS LAU FMP Template - v2.2.xlsx XLSX spreadsheet
PWS CHF FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BEU FMP Template - v2.2.xlsx XLSX spreadsheet
PWS GDF FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BLI FMP Template - v2.2.xlsx XLSX spreadsheet
PWS TKR FMP Template - v2.2.xlsx XLSX spreadsheet
PWS RBN FMP Template - v2.2.xlsx XLSX spreadsheet
PWS MAA FMP Template - v2.2.xlsx XLSX spreadsheet
PWS FSH FMP Template - v2.2.xlsx XLSX spreadsheet
PWS FSO FMP Template - v2.2.xlsx XLSX spreadsheet
PWS RRT FMP Template - v2.2.xlsx XLSX spreadsheet
PWS ALT FMP Template - v2.2.xlsx XLSX spreadsheet
PWS TUL FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BL2 FMP Template - v2.2.xlsx XLSX spreadsheet
PWS ELL FMP Template - v2.2.xlsx XLSX spreadsheet
PWS WRF FMP Template - v2.2.xlsx XLSX spreadsheet
PWS LLD FMP Template - v2.2.xlsx XLSX spreadsheet
PWS DYE FMP Template - v2.2.xlsx XLSX spreadsheet
12.0 PWS Appendix K Real Property Data_20230420.xlsx XLSX spreadsheet
PWS RAN FMP Template - v2.2.xlsx XLSX spreadsheet
PWS FSM FMP Template - v2.2.xlsx XLSX spreadsheet
PWS _Fuels RMMR 20241220.docx DOCX document
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Administrative

LocationSite NameLittle Rock AFB Site #1
RPSUID2496
DLA Site CodeLRG
Hours of Operation24 Hours of Operation
Address1250 West Thomas Avenue, Little Rock AFB, AR 72136
ContractContractor
Contract #
Local POCsQAE Name
QAE Phone
QAE Email
Alt QAE Name
Alt QAE Phone
Alt QAE Email
DLA/SCP POCsDLA PM Name
DLA PM Phone
DLA PM Email
SCP PM Name
SCP PM Phone
SCP PM Email
Contractor POCsContractor PM Name
Contractor PM Phone
Contractor PM Email
Contractor QC Name
Contractor QC Phone
Contractor QC Email
Contractor SM Name
Contractor SM Phone
Contractor SM Email
USACE POCsUSACE PM/COR Name
USACE PM/COR Phone
USACE PM/COR Email
USACE PE Name
USACE PE Phone
USACE PE Email
USACE KO Name
USACE KO Phone
USACE KO Email

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

This table shows the minimum information required. Additional details should be included based on site specific requirements. Additional POCs may be required.

General Facility Description Facility Description

Purpose:

This Facility Maintenance Plan provides guidance for Contractor personnel in the operation, inspection, and maintenance of permanently installed fuel facilities operated under the control of the Quality Assurance Evaluators. Federal, state, and local environmental laws and regulations shall be complied with if this plan is in conflict with them.

Scope:

The instructions prescribed by this plan outline general fuels maintenance information associated with fuel storage and dispensing systems and provides the minimum periodic contractor maintenance and inspection criteria requirements for the systems. This plan is to be used in conjunction with other existing directives governing fuel system operations and maintenance requirements. Conotractor will properly maintain and repair federally funded petroleum systems and facilities in order to provide compliance with applicable code, criteria, and federal, state, local and/or host nation regulations.

Fuels Facilities:

Organizational tanks, and associated dispensing equipment are maintained and operated by the owning organization. Fuel system maintenance contractors shall perform all maintenance and associated procurement actions on installed fuel systems.

Each installation under the Southwest Division contract are military land-based facilities who receive, store, distribute, and/or dispense liquid fuels.

Standard fuel system equipment includes:

a) Above Ground Sorage Stanks (AST), Underground Storage Tanks (UST)

b) Filter/separator and other filtration device maintenance access, particularly element removal.

c) Manual valves

d) Meter Registers, and Flow Meters.

e) Control Valves.

f) Pumps

g) Tank Monitoring Equipment and Instruments

h) Alarms

i) Fire Fighting Equipment

Site Specific General Information:

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

Include a general facility overview and description of each fuel system for the sites in accordance with UFC 3-460-01. Examples include: Bulk Storage Facilities, Aircraft Fueling Facilities, Marine and Dispensing Facilities, Ground Products Fueling Facilities, Alternate POL Facilities, and Support Facilities. Also include facility #s, facility names, fuel type, photos, and any other pertinent information.

Include Site Specific Conditions and Restrictions in this tab.

Communication Plan

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

Communication plan shall address in/out briefs, lines of communication, coordination for access, etc.

Safety

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

Site Specific Addendum and Activity Hazard Analysis, which are Attachments to the APP, specific to activities or tasks related to recurring maintenance for this site.

RM Schedule

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

Link RM schedule here

Task Matrix

Applicable Facility AssetsUFC System Level Maintenance FrequencySpecial Considerations
Real Property Unique Identifier
(RPUID)Real Property Facility #Real Property Facility NameOperational AreaComponent TypeBase Asset IDComponent Unique Identifier (CUID)MakeModelCapacity/SizeQSAUFC Section ReferenceAdditional Manufacturer RM RequirementsOperator/ equipment RequirementsSystem availabilityOther ContractComments
10Pump House 1Pump PadPumphouse/Filter BuildingsPumphouse #1N/AN/AN/AXXX11-2.1No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
10Pump House 1Pump PadCanopiesPumphouse CanopyN/AN/AN/AXX011-2.2No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
10Pump House 1Pump PadEmergency Eyewash/ShowersEmergency Shower/EyewashHaws CorpNot LabeledNot LabeledXXX11-3Weekly - Equipment installed within 10 seconds from the hazard and on the same plane as the hazard Pathway is clear of obstructions Plumbed equipment activated to ensure compliant operation and to clear any sediment Self-contained equipment checked to determine if the flushing fluid needs to be changed or supplemented Equipment free of broken or missing parts Equipment protected against freezing User protected from scalding waterNo Operator RequirementNo Mission Impact
10Pump House 1Pump PadSignage and MarkingsPH1 SignageN/AN/AN/A00X2-7No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
10Pump House 1Pump PadAir Eliminator TanksAir EliminatorArmstrong11AV1.0 In.XXX3-10.1No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
10Pump House 1Pump PadAir Eliminator TanksAir EliminatorArmstrong11AV1.0 In.XXX3-10.1No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
10Pump House 1Pump PadAir Eliminator TanksAir EliminatorArmstrong11AV1.0 In.XXX3-10.1No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
10Pump House 1Pump PadAir Eliminator TanksAir EliminatorArmstrong11AV1.0 In.XXX3-10.1No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
10Pump House 1Pump PadAir Eliminator TanksAir EliminatorArmstrong11AV1.0 In.XXX3-10.1No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
10Pump House 1Pump PadAir Eliminator TanksAir EliminatorArmstrong11AV1.0 In.XXX3-10.1No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
10Pump House 1Pump PadAir Eliminator TanksAir EliminatorArmstrong11AV1.0 In.XXX3-10.1No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
10Pump House 1Pump PadAir Eliminator TanksAir EliminatorArmstrong11AV1.0 In.XXX3-10.1No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
10Pump House 1Pump PadFilter SeparatorsFilter Separator 1FacetVCS-543-236600 GPM GPM/SCFM 100 GallonsXX03-6.2Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. Replace filter cartridges when the acceptable maximum differential pressure is reached, the maximum in-service duration has passed, or the fuel becomes visibly dirty or discolored.Daily - Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges.Partial System OOS
10Pump House 1Pump PadFilter SeparatorsFilter Separator 2FacetVCS-543-236600 GPM GPM/SCFM 100 GallonsXX03-6.2Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. Replace filter cartridges when the acceptable maximum differential pressure is reached, the maximum in-service duration has passed, or the fuel becomes visibly dirty or discolored.Daily - Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges.Partial System OOS
10Pump House 1Pump PadFilter SeparatorsFilter Separator 3FacetVCS-543-236600 GPM GPM/SCFM 100 GallonsXX03-6.2Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. Replace filter cartridges when the acceptable maximum differential pressure is reached, the maximum in-service duration has passed, or the fuel becomes visibly dirty or discolored.Daily - Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges.Partial System OOS
10Pump House 1Pump PadFilter SeparatorsFilter Separator 4FacetVCS-543-236600 GPM GPM/SCFM 100 GallonsXX03-6.2Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. Replace filter cartridges when the acceptable maximum differential pressure is reached, the maximum in-service duration has passed, or the fuel becomes visibly dirty or discolored.Daily - Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges.Partial System OOS
10Pump House 1Pump PadFilter SeparatorsFilter Separator 5FacetVGS-543-236600 GPM GPM/SCFM 100 GallonsXX03-6.2Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. Replace filter cartridges when the acceptable maximum differential pressure is reached, the maximum in-service duration has passed, or the fuel becomes visibly dirty or discolored.Daily - Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges.Partial System OOS
10Pump House 1Pump PadFilter SeparatorsFilter Separator 6FacetVCS-543-236600 GPM GPM/SCFM 100 GallonsXX03-6.2Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. Replace filter cartridges when the acceptable maximum differential pressure is reached, the maximum in-service duration has passed, or the fuel becomes visibly dirty or discolored.Daily - Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges.Partial System OOS
10Pump House 1Pump PadFilter SeparatorsFilter Separator 7FacetVCS-543-236600 GPM GPM/SCFM 100 GallonsXX03-6.2Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. Replace filter cartridges when the acceptable maximum differential pressure is reached, the maximum in-service duration has passed, or the fuel becomes visibly dirty or discolored.Daily - Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges.Partial System OOS
10Pump House 1Pump PadFilter SeparatorsFilter Separator 8FacetVCS-543-236600 GPM GPM/SCFM 100 GallonsXX03-6.2Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. Replace filter cartridges when the acceptable maximum differential pressure is reached, the maximum in-service duration has passed, or the fuel becomes visibly dirty or discolored.Daily - Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges.Partial System OOS
10Pump House 1Pump PadBasket StrainersBasket StrainerZurn4-1504.0 in.XX03-6.4Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyDaily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyNo Mission Impact
10Pump House 1Pump PadBasket StrainersBasket StrainerZurn272-15-24.0 in.XX03-6.4Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyDaily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyNo Mission Impact
10Pump House 1Pump PadBasket StrainersBasket StrainerZurn272-15-24.0 in.XX03-6.4Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyDaily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyNo Mission Impact
10Pump House 1Pump PadBasket StrainersBasket StrainerZurn272-15-24.0 in.XX03-6.4Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyDaily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyNo Mission Impact
10Pump House 1Pump PadBasket StrainersBasket StrainerZurn272-15-24.0 in.XX03-6.4Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyDaily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyNo Mission Impact
10Pump House 1Pump PadBasket StrainersBasket StrainerZurn272-15-24.0 in.XX03-6.4Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyDaily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyNo Mission Impact
10Pump House 1Pump PadBasket StrainersBasket StrainerZurn272-15-24.0 in.XX03-6.4Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyDaily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyNo Mission Impact
10Pump House 1Pump PadBasket StrainersBasket StrainerZurn24366-26.0 in.XX03-6.4Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyDaily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyNo Mission Impact
10Pump House 1Pump PadBasket StrainersBasket StrainerZurn24366-26.0 in.XX03-6.4Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyDaily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyNo Mission Impact
10Pump House 1Pump PadBasket StrainersBasket StrainerZurn4-51504.0 in.XX03-6.4Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyDaily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyNo Mission Impact
10Pump House 1Pump PadVertical Turbine/Submerged Turbine PumpsPump #3JohnstonModel # Unavailable/No Data Plate600 GPM GPM/SCFMXXX3-8.1.3During routine pump inspections only the easy to monitor factors such as pressure, temperature, vibration etc can be checKed. But during quarterly inspections, shaft alignment and oil levels should also be checked. Change Oil AnnuallyNo Operator/equipment RequirementsNo Mission Impact
10Pump House 1Pump PadVertical Turbine/Submerged Turbine PumpsPump #2JohnstonModel # Unavailable/No Data Plate600 GPM GPM/SCFMXXX3-8.1.3During routine pump inspections only the easy to monitor factors such as pressure, temperature, vibration etc can be checKed. But during quarterly inspections, shaft alignment and oil levels should also be checked. Change Oil AnnuallyNo Operator/equipment RequirementsNo Mission Impact
10Pump House 1Pump PadVertical Turbine/Submerged Turbine PumpsPump #1JohnstonModel # Unavailable/No Data Plate600 GPM GPM/SCFMXXX3-8.1.3During routine pump inspections only the easy to monitor factors such as pressure, temperature, vibration etc can be checKed. But during quarterly inspections, shaft alignment and oil levels should also be checked. Change Oil AnnuallyNo Operator/equipment RequirementsNo Mission Impact
10Pump House 1Pump PadVertical Turbine/Submerged Turbine PumpsPump #6JohnstonModel # Unavailable/No Data Plate600 GPM GPM/SCFMXXX3-8.1.3During routine pump inspections only the easy to monitor factors such as pressure, temperature, vibration etc can be checKed. But during quarterly inspections, shaft alignment and oil levels should also be checked. Change Oil AnnuallyNo Operator/equipment RequirementsNo Mission Impact
10Pump House 1Pump PadVertical Turbine/Submerged Turbine PumpsPump #7JohnstonModel # Unavailable/No Data Plate600 GPM GPM/SCFMXXX3-8.1.3During routine pump inspections only the easy to monitor factors such as pressure, temperature, vibration etc can be checKed. But during quarterly inspections, shaft alignment and oil levels should also be checked. Change Oil AnnuallyNo Operator/equipment RequirementsNo Mission Impact
10Pump House 1Pump PadVertical Turbine/Submerged Turbine PumpsPump #8JohnstonModel # Unavailable/No Data Plate600 GPM GPM/SCFMXXX3-8.1.3During routine pump inspections only the easy to monitor factors such as pressure, temperature, vibration etc can be checKed. But during quarterly inspections, shaft alignment and oil levels should also be checked. Change Oil AnnuallyNo Operator/equipment RequirementsNo Mission Impact
10Pump House 1Pump PadVertical Turbine/Submerged Turbine PumpsPump #4JohnstonModel # Unavailable/No Data Plate600 GPM GPM/SCFMXXX3-8.1.3During routine pump inspections only the easy to monitor factors such as pressure, temperature, vibration etc can be checKed. But during quarterly inspections, shaft alignment and oil levels should also be checked. Change Oil AnnuallyNo Operator/equipment RequirementsNo Mission Impact
10Pump House 1Pump PadVertical Turbine/Submerged Turbine PumpsPump #5JohnstonModel # Unavailable/No Data Plate600 GPM GPM/SCFMXXX3-8.1.3During routine pump inspections only the easy to monitor factors such as pressure, temperature, vibration etc can be checKed. But during quarterly inspections, shaft alignment and oil levels should also be checked. Change Oil AnnuallyNo Operator/equipment RequirementsNo Mission Impact
10Pump House 1Pump PadGeneral System Control ValvesControl ValveCla-Val150/PN164.0 in.XXX4-3.2.1No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
10Pump House 1Pump PadGeneral System Control ValvesControl ValveCla-Val150/PN166.0 in.XXX4-3.2.1No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
10Pump House 1Pump PadGeneral System Control ValvesControl ValveCla-Val150/PN164.0 in.XXX4-3.2.1No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
10Pump House 1Pump PadGeneral System Control ValvesControl ValveCla-Val150/PN166.0 in.XXX4-3.2.1No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
10Pump House 1Pump PadGeneral System Control ValvesControl ValveCla-Val150/PN164.0 in.XXX4-3.2.1No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
10Pump House 1Pump PadGeneral System Control ValvesControl ValveCla-Val150/PN166.0 in.XXX4-3.2.1No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
10Pump House 1Pump PadGeneral System Control ValvesControl ValveCla-Val150/PN164.0 in.XXX4-3.2.1No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
10Pump House 1Pump PadGeneral System Control ValvesControl ValveCla-Val150/PN166.0 in.XXX4-3.2.1No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
10Pump House 1Pump PadGeneral System Control ValvesControl ValveCla-Val150/PN166.0 in.XXX4-3.2.1No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
10Pump House 1Pump PadGeneral System Control ValvesControl ValveCla-Val150/PN164.0 in.XXX4-3.2.1No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
10Pump House 1Pump PadGeneral System Control ValvesControl ValveCla-Val150/PN166.0 in.XXX4-3.2.1No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
10Pump House 1Pump PadGeneral System Control ValvesControl ValveCla-Val150/PN164.0 in.XXX4-3.2.1No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
10Pump House 1Pump PadGeneral System Control ValvesControl ValveCla-Val150/PN164.0 in.XXX4-3.2.1No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
10Pump House 1Pump PadGeneral System Control ValvesControl ValveCla-Val150/PN166.0 in.XXX4-3.2.1No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
10Pump House 1Pump PadGeneral System Control ValvesControl ValveCla-Val150/PN166.0 in.XXX4-3.2.1No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
10Pump House 1Pump PadFilter Separator Control ValvesFSCVCla-Val150/PN166.0 in.XX04-4.2.2No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
10Pump House 1Pump PadFilter Separator Control ValvesFSCVCla-Val150/PN166.0 in.XX04-4.2.2No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
10Pump House 1Pump PadFilter Separator Control ValvesFSCVCla-Val150/PN166.0 in.XX04-4.2.2No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
10Pump House 1Pump PadFilter Separator Control ValvesFSCVCla-Val150/PN166.0 in.XX04-4.2.2No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
10Pump House 1Pump PadFilter Separator Control ValvesFSCVCla-Val150/PN166.0 in.XX04-4.2.2No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
10Pump House 1Pump PadFilter Separator Control ValvesFSCVCla-Val150/PN166.0 in.XX04-4.2.2No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
10Pump House 1Pump PadFilter Separator Control ValvesFSCVCla-Val150/PN166.0 in.XX04-4.2.2No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
10Pump House 1Pump PadFilter Separator Control ValvesFSCVCla-Val150/PN164.0 in.XX04-4.2.2No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
10FillstandFillstand 6Fueling NozzlesFillstand NozzleCla-ValD-23.0 In.XX04-7.4Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand.Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand.Partial System OOS
10FillstandFillstand 5Fueling NozzlesFillstand NozzleCla-ValD-13.0 In.XX04-7.4Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand.Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand.Partial System OOS
10Pump House 1Pump PadSight Flow IndicatorsVisi-FloVisi-FloModel Unavailable/Paint3.0 In.0006-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Partial System OOS
10Pump House 1Pump PadSight Flow IndicatorsVisi-FloVisi-FloModel Unavailable/Paint3.0 In.0006-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Partial System OOS
10Pump House 1Pump PadSight Flow IndicatorsVisi-FloVisi-FloModel Unavailable/Paint3.0 In.0006-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Partial System OOS
10Pump House 1Pump PadSight Flow IndicatorsVisi-FloVisi-FloA217-WC3.0 In.0006-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Partial System OOS
10Pump House 1Pump PadSight Flow IndicatorsVisi-FloVisi-FloModel Unavailable/Paint3.0 In.0006-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Partial System OOS
10Pump House 1Pump PadSight Flow IndicatorsVisi-FloVisi-FloModel Unavailable/Paint3.0 In.0006-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Partial System OOS
10Pump House 1Pump PadSight Flow IndicatorsVisi-FloVisi-FloModel Unavailable/Paint3.0 In.0006-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Partial System OOS
10Pump House 1Pump PadSight Flow IndicatorsVisi-FloVisi-FloModel Unavailable/Paint3.0 In.0006-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Partial System OOS
10Pump House 1Pump PadGate ValvesGate ValveVelan4-1504.0 in.XX06-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator RequirementPartial System OOS
10Pump House 1Pump PadGate ValvesGate ValveVelan4-1504.0 in.XX06-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator RequirementPartial System OOS
10Pump House 1Pump PadGate ValvesGate ValveVelan4-1504.0 in.XX06-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator RequirementPartial System OOS
10Pump House 1Pump PadGate ValvesGate ValveVelan4-1504.0 in.XX06-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator RequirementPartial System OOS
10Pump House 1Pump PadBall ValvesBall ValveJamesburyCF8M4.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveApolloRF151.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveVelanCF8M1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveApolloCF8M2.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveSmith6-1506.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveValenCF8M1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveJamesburyCF8M4.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveApolloRF151.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveVelanCF8M1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveApolloCF8M2.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveVelanCF8M1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveVelan3/4-1500.75 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveJamesbury6-1506.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveJamesburyCF8M4.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveApollo4-1504.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveApolloRF151.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveVelanCF8M1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveApolloCF8M2.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveJamesbury6-1506.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveVelan3/4-1500.75 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveApolloCF8M4.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveApolloCF8M0.75 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveVelanRF150.75 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveApolloCF8M2.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveJamesbury6-1506.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveSmith6-1506.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveVelanRF150.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveApollo2-1502.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveSmith6-1506.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveVelanRF150.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveSmith6-1506.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveVelanRF152.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveBalonCF8M2.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveBalonCF8M2.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveJamesburyCF8M4.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveJamesburyCF8M4.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveNibcoCF8M0.75 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveApollo6-1506.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveSmith6-1506.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveGammonGT-11490.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveJamesburyCF8M4.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveGammonGT-11490.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveApolloCF8M2.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveJamesburyCF8M4.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveVelanRF150.75 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadBall ValvesBall ValveVelan3/4-1500.75 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
10Pump House 1Pump PadDouble Block and Bleed ValvesDouble Block and Bleed Isolation ValveUnavailable6-1506.0 in.XXX6-6.2.5Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug.No Operator RequirementPartial System OOS
10Pump House 1Pump PadDouble Block and Bleed ValvesDouble Block and Bleed Isolation ValveUnavailable6-1506.0 in.XXX6-6.2.5Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug.No Operator RequirementPartial System OOS
10Pump House 1Pump PadDouble Block and Bleed ValvesDouble Block and Bleed Isolation ValveUnavailable8-1508.0 in.XXX6-6.2.5Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug.No Operator RequirementPartial System OOS
10Pump House 1Pump PadDouble Block and Bleed ValvesDouble Block and Bleed Isolation ValveGeneralTru Seal8.0 in.XXX6-6.2.5Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug.No Operator RequirementPartial System OOS
10Pump House 1Pump PadDouble Block and Bleed ValvesDouble Block and Bleed Isolation ValveUnavailable4-1504.0 in.XXX6-6.2.5Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug.No Operator RequirementPartial System OOS
10Pump House 1Pump PadDouble Block and Bleed ValvesDouble Block and BleedGeneral4-1504.0 in.XXX6-6.2.5Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug.No Operator RequirementPartial System OOS
10Pump House 1Pump PadDouble Block and Bleed ValvesDouble Block and Bleed Isolation ValveGeneral6-1506.0 in.XXX6-6.2.5Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug.No Operator RequirementPartial System OOS
10Pump House 1Pump PadDouble Block and Bleed ValvesDouble Block and Bleed Isolation ValveGeneral Twin Seal8-1508.0 in.XXX6-6.2.5Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug.No Operator RequirementPartial System OOS
10Pump House 1Pump PadGlobe ValvesGlobe ValveKencoNot Labeled0.5 in.XX06-6.2.71. Regular inspection of the valve. ...

2. If the valve is not operated regularly it is a good idea to cycle the valve to ensure the disc is not bedding itself in the seat.

3. Grease the crossbar by using a grease gun on the grease nipple provided

4. Slightly tighten the gland bolts if the packing needs adjustment.No Operator RequirementPartial System OOSFilter separator sight glass
10Pump House 1Pump PadGlobe ValvesGlobe ValveKencoNot Labeled0.5 in.XX06-6.2.71. Regular inspection of the valve. ...

2. If the valve is not operated regularly it is a good idea to cycle the valve to ensure the disc is not bedding itself in the seat.

3. Grease the crossbar by using a grease gun on the grease nipple provided

4. Slightly tighten the gland bolts if the packing needs adjustment.No Operator RequirementPartial System OOSFilter Separator Sight Glass
10FillstandTransfer Separator padGlobe ValvesGlobe ValveKencoNot Labeled0.5 in.XX06-6.2.71. Regular inspection of the valve. ...

2. If the valve is not operated regularly it is a good idea to cycle the valve to ensure the disc is not bedding itself in the seat.

3. Grease the crossbar by using a grease gun on the grease nipple provided

4. Slightly tighten the gland bolts if the packing needs adjustment.No Operator RequirementPartial System OOSF/S Sight Glass
10Pump House 1Pump PadGlobe ValvesGlobe ValveKencoNot Labeled0.5 in.XX06-6.2.71. Regular inspection of the valve. ...

2. If the valve is not operated regularly it is a good idea to cycle the valve to ensure the disc is not bedding itself in the seat.

3. Grease the crossbar by using a grease gun on the grease nipple provided

4. Slightly tighten the gland bolts if the packing needs adjustment.No Operator RequirementPartial System OOSFilter separator sight glass
10Pump House 1Pump PadGlobe ValvesGlobe ValveKencoNot Labeled0.5 in.XX06-6.2.71. Regular inspection of the valve. ...

2. If the valve is not operated regularly it is a good idea to cycle the valve to ensure the disc is not bedding itself in the seat.

3. Grease the crossbar by using a grease gun on the grease nipple provided

4. Slightly tighten the gland bolts if the packing needs adjustment.No Operator RequirementPartial System OOSFilter separator sight glass
10Pump House 1Pump PadGlobe ValvesGlobe ValveKencoNot Labeled0.5 in.XX06-6.2.71. Regular inspection of the valve. ...

2. If the valve is not operated regularly it is a good idea to cycle the valve to ensure the disc is not bedding itself in the seat.

3. Grease the crossbar by using a grease gun on the grease nipple provided

4. Slightly tighten the gland bolts if the packing needs adjustment.No Operator RequirementPartial System OOSFilter separator sight glass
10Pump House 1Pump PadGlobe ValvesGlobe ValveKencoNot Labeled0.5 in.XX06-6.2.71. Regular inspection of the valve. ...

2. If the valve is not operated regularly it is a good idea to cycle the valve to ensure the disc is not bedding itself in the seat.

3. Grease the crossbar by using a grease gun on the grease nipple provided

4. Slightly tighten the gland bolts if the packing needs adjustment.No Operator RequirementPartial System OOSFilter separator sight glass
10Pump House 1Pump PadGlobe ValvesGlobe ValveKencoNot Labeled0.5 in.XX06-6.2.71. Regular inspection of the valve. ...

2. If the valve is not operated regularly it is a good idea to cycle the valve to ensure the disc is not bedding itself in the seat.