This file is a Facility Maintenance Plan (FMP) template spreadsheet containing detailed maintenance requirements for fuel storage and dispensing systems at Ellington Field in Houston, TX. The template includes tabs for administrative information, general facility description, communication plans, safety requirements, recurring maintenance schedules, and component tracking.
The document provides comprehensive maintenance tracking for fuel system components including above-ground storage tanks (10,000 gallon capacities for both MOGAS and diesel), ball valves, breakaways, card readers, containment systems, dispenser cabinets, filters, hoses, meters, nozzles, pumps, static grounding systems, and associated equipment. For each component, it specifies inspection frequencies (daily/weekly/monthly/annual), maintenance requirements per UFC 3-460-03, manufacturer requirements, operator requirements, and system availability impacts. The template is designed to ensure compliance with federal, state and local environmental regulations while maintaining proper operation of permanently installed fuel facilities under Quality Assurance Evaluator control.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Administrative
| Location | Site Name | Ellington Field Site #1 |
| RPSUID | 1708 | |
| DLA Site Code | ELL | |
| Hours of Operation | 24 Hours of Operation | |
| Address | 14657 Sneider Street, Houston, TX 77034 | |
| Contract | Contractor | |
| Contract # | ||
| Local POCs | QAE Name | |
| QAE Phone | ||
| QAE Email | ||
| Alt QAE Name | ||
| Alt QAE Phone | ||
| Alt QAE Email | ||
| DLA/SCP POCs | DLA PM Name | |
| DLA PM Phone | ||
| DLA PM Email | ||
| SCP PM Name | ||
| SCP PM Phone | ||
| SCP PM Email | ||
| Contractor POCs | Contractor PM Name | |
| Contractor PM Phone | ||
| Contractor PM Email | ||
| Contractor QC Name | ||
| Contractor QC Phone | ||
| Contractor QC Email | ||
| Contractor SM Name | ||
| Contractor SM Phone | ||
| Contractor SM Email | ||
| USACE POCs | USACE PM/COR Name | |
| USACE PM/COR Phone | ||
| USACE PM/COR Email | ||
| USACE PE Name | ||
| USACE PE Phone | ||
| USACE PE Email | ||
| USACE KO Name | ||
| USACE KO Phone | ||
| USACE KO Email |
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
This table shows the minimum information required. Additional details should be included based on site specific requirements. Additional POCs may be required.
General Facility Description Facility Description
Purpose:
This Facility Maintenance Plan provides guidance for Contractor personnel in the operation, inspection, and maintenance of permanently installed fuel facilities operated under the control of the Quality Assurance Evaluators. Federal, state, and local environmental laws and regulations shall be complied with if this plan is in conflict with them.
Scope:
The instructions prescribed by this plan outline general fuels maintenance information associated with fuel storage and dispensing systems and provides the minimum periodic contractor maintenance and inspection criteria requirements for the systems. This plan is to be used in conjunction with other existing directives governing fuel system operations and maintenance requirements. Conotractor will properly maintain and repair federally funded petroleum systems and facilities in order to provide compliance with applicable code, criteria, and federal, state, local and/or host nation regulations.
Fuels Facilities:
Organizational tanks, and associated dispensing equipment are maintained and operated by the owning organization. Fuel system maintenance contractors shall perform all maintenance and associated procurement actions on installed fuel systems.
Each installation under the Southwest Division contract are military land-based facilities who receive, store, distribute, and/or dispense liquid fuels.
Standard fuel system equipment includes:
a) Above Ground Sorage Stanks (AST), Underground Storage Tanks (UST)
b) Filter/separator and other filtration device maintenance access, particularly element removal.
c) Manual valves
d) Meter Registers, and Flow Meters.
e) Control Valves.
f) Pumps
g) Tank Monitoring Equipment and Instruments
h) Alarms
i) Fire Fighting Equipment
Site Specific General Information:
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Include a general facility overview and description of each fuel system for the sites in accordance with UFC 3-460-01. Examples include: Bulk Storage Facilities, Aircraft Fueling Facilities, Marine and Dispensing Facilities, Ground Products Fueling Facilities, Alternate POL Facilities, and Support Facilities. Also include facility #s, facility names, fuel type, photos, and any other pertinent information.
Include Site Specific Conditions and Restrictions in this tab.
Communication Plan
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Communication plan shall address in/out briefs, lines of communication, coordination for access, etc.
Safety
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Site Specific Addendum and Activity Hazard Analysis, which are Attachments to the APP, specific to activities or tasks related to recurring maintenance for this site.
RM Schedule
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Link RM schedule here
Task Matrix
| Applicable Facility Assets | UFC System Level Maintenance Frequency | Special Considerations | |||||||||||||||||
| Real Property Unique Identifier | |||||||||||||||||||
| (RPUID) | Real Property Facility # | Real Property Facility Name | Operational Area | Component Type | Base Asset ID | Component Unique Identifier (CUID) | Make | Model | Capacity/Size | Q | S | A | UFC Section Reference | Additional Manufacturer RM Requirements | Operator/ equipment Requirements | System availability | Other Contract | Comments | |
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Aboveground Piping | MOGAS Offload | N/A | N/A | 3.0 in. | X | X | X | 6-1.3 | No Manufacturer Requirements Available | Weekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection. | No Mission Impact | |||||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Aboveground Piping | MOGAS Issue | N/A | N/A | 2.0 in. | X | X | X | 6-1.3 | No Manufacturer Requirements Available | Weekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection. | No Mission Impact | |||||
| 15011 | SSTA Above Ground Piping | SSTA Above Ground Piping | Aboveground Piping | Dispenser Piping | N/A | N/A | 2.0 in. | X | X | X | 6-1.3 | No Manufacturer Requirements Available | Weekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection. | No Mission Impact | |||||
| 15011 | SSTA Above Ground Piping | SSTA Above Ground Piping | Aboveground Piping | Offload Piping | N/A | N/A | 3.0 in. | X | X | X | 6-1.3 | No Manufacturer Requirements Available | Weekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection. | No Mission Impact | |||||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Aboveground Shop Fabricated Tanks | Diesel Tank | Southwest Research Institute | 96040-03-03 | 10,000 Gallons | X | X | X | 8-5.1 | No Manufacturer Requirements Available | Monthly - Visually inspect for evidence of leaks; shell distortions; signs of settlement; corrosion, condition of tank foundation, condition of coating, insulation systems, and appurtenances. Inspection shall include all components and equipment located inside the containment area such as piping, pipe supports, containment valves, and product saver tanks. Items noted during the inspection will be documented for follow-up action by an authorized inspector. See Appendix F for the Field-Erected Tank Monthly Inspection Checklist. Visually inspect chime to ringwall sealant. Seal should be maintained in good working order to prevent corrosion of the underside of the tank bottom. | Partial System OOS | |||||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Aboveground Shop Fabricated Tanks | MOGAS Tank | Southwest Research Institute | 96040-03-03 | 10,000 Gallons | X | X | X | 8-5.1 | No Manufacturer Requirements Available | Monthly - Visually inspect for evidence of leaks; shell distortions; signs of settlement; corrosion, condition of tank foundation, condition of coating, insulation systems, and appurtenances. Inspection shall include all components and equipment located inside the containment area such as piping, pipe supports, containment valves, and product saver tanks. Items noted during the inspection will be documented for follow-up action by an authorized inspector. See Appendix F for the Field-Erected Tank Monthly Inspection Checklist. Visually inspect chime to ringwall sealant. Seal should be maintained in good working order to prevent corrosion of the underside of the tank bottom. | Partial System OOS | |||||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Ball Valves | Dispenser 3 Issue Line | Not Legible | Not Legible | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Ball Valves | Dispenser 4 Issue Line | Not Legible | Not Legible | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Ball Valves | MOGAS Sample Cock | Gammon | GTP-1149 | 0.66 (1/8th) in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Ball Valves | MOGAS Offload | Not Legible | Not Legible | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Ball Valves | Dispenser 3 Sump Drain Valve | FNW | 200A | 0.75 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Ball Valves | Dispenser 4 Sump Drain Valve | FNW | 200A | 0.75 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Ball Valves | Diesel Offload | RB | DN80 | 3.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Ball Valves | O NC | RB | DN80 | 3.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Ball Valves | Diesel Sample Cock | Gammon | Unknown | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Ball Valves | Diesel Offload | Dover Corp | Not Labeled | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Ball Valves | Dispenser 1 Isolation | Painted | Painted | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Ball Valves | Dispenser 2 Isolation | Painted | Painted | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Ball Valves | Dispenser 2 Sump Drain | FNW | CF8M | 0.75 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Ball Valves | Dispenser 1 Sump Drain | FNW | CF8M | 0.75 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Breakaways | Dispenser 4 | OPW | 68EZR-7575 | 0.75 in. | 0 | 0 | 0 | 7-4 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect breakaways for loose connections and signs of damage to poppets. Ensure breakaways are clean and free of fuel. | ||||||
| Monthly - Inspect breakaway for an expiration date established by the manufacturer. Breakaways must be replaced before the indicated expiration date. | No Mission Impact | ||||||||||||||||||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Breakaways | Dispenser 2 | OPW | 66V | 1.0 in. | 0 | 0 | 0 | 7-4 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect breakaways for loose connections and signs of damage to poppets. Ensure breakaways are clean and free of fuel. | ||||||
| Monthly - Inspect breakaway for an expiration date established by the manufacturer. Breakaways must be replaced before the indicated expiration date. | No Mission Impact | ||||||||||||||||||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Breakaways | Dispenser 1 | OPW | 66V | 1.0 in. | 0 | 0 | 0 | 7-4 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect breakaways for loose connections and signs of damage to poppets. Ensure breakaways are clean and free of fuel. | ||||||
| Monthly - Inspect breakaway for an expiration date established by the manufacturer. Breakaways must be replaced before the indicated expiration date. | No Mission Impact | ||||||||||||||||||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Breakaways | Dispenser 3 | OPW | 68EZR-7575 | 0.75 in. | 0 | 0 | 0 | 7-4 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect breakaways for loose connections and signs of damage to poppets. Ensure breakaways are clean and free of fuel. | ||||||
| Monthly - Inspect breakaway for an expiration date established by the manufacturer. Breakaways must be replaced before the indicated expiration date. | No Mission Impact | ||||||||||||||||||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Card and Key Locks | Dispensers | Fuel Master | FMU 2400 | Faded | 0 | 0 | X | 9-3 | No Manufacturer Requirements Available | No Operator Requirement | No Mission Impact | |||||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Containment Systems | MOGAS Dispensers | N/A | N/A | N/A | 0 | 0 | 0 | 8-10.1 | No Manufacturer Requirements Available | Daily - Inspect containment systems for cleanliness, if accessible. | No Mission Impact | |||||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Containment Systems | Diesel Dispensers | N/A | N/A | N/A | 0 | 0 | 0 | 8-10.1 | No Manufacturer Requirements Available | Daily - Inspect containment systems for cleanliness, if accessible. | No Mission Impact | |||||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Dispenser Cabinet | Dispenser 4 | Wayne | 3/07203P/289HJ/JW | 39384D | 0 | 0 | X | 7-7 | Inspect for damage, ensure door panels and locks are functional. | Monthly - Inspect outside of cabinet and ensure it is free of damage. Inspect for fuel stains on the concrete island around the cabinet and on the outside of the cabinet. Ensure the cabinet is free of dirt and fuel. Open both sides of the cabinet and inspect the inside of the cabinet. Ensure the inside of the cabinet and all of the components inside the cabinet are clean and free of fuel. | Partial System OOS | |||||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Dispenser Cabinet | Dispenser 2 | Wayne | 3/G7203P/289HJ/JW | 39386D | 0 | 0 | X | 7-7 | Inspect for damage, ensure door panels and locks are functional. | Monthly - Inspect outside of cabinet and ensure it is free of damage. Inspect for fuel stains on the concrete island around the cabinet and on the outside of the cabinet. Ensure the cabinet is free of dirt and fuel. Open both sides of the cabinet and inspect the inside of the cabinet. Ensure the inside of the cabinet and all of the components inside the cabinet are clean and free of fuel. | Partial System OOS | |||||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Dispenser Cabinet | Dispenser 1 | Wayne | 3/G7203P/289HJ/JW | 39387D | 0 | 0 | X | 7-7 | Inspect for damage, ensure door panels and locks are functional. | Monthly - Inspect outside of cabinet and ensure it is free of damage. Inspect for fuel stains on the concrete island around the cabinet and on the outside of the cabinet. Ensure the cabinet is free of dirt and fuel. Open both sides of the cabinet and inspect the inside of the cabinet. Ensure the inside of the cabinet and all of the components inside the cabinet are clean and free of fuel. | Partial System OOS | |||||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Dispenser Cabinet | Dispenser 3 | Wayne | 3/G7203P/289HJ/JW | 39385DA18 | 0 | 0 | X | 7-7 | Inspect for damage, ensure door panels and locks are functional. | Monthly - Inspect outside of cabinet and ensure it is free of damage. Inspect for fuel stains on the concrete island around the cabinet and on the outside of the cabinet. Ensure the cabinet is free of dirt and fuel. Open both sides of the cabinet and inspect the inside of the cabinet. Ensure the inside of the cabinet and all of the components inside the cabinet are clean and free of fuel. | Partial System OOS | |||||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Dispenser Filters | Dispenser 1 | CIM-TEK | 50109 | Series 800 | 0 | 0 | X | 7-9 | Check exterior for damage | No Operator Requirement | Partial System OOS | |||||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Dispenser Filters | Dispenser 4 | CIM-TEK | 70012 | 300-30 | 0 | 0 | X | 7-9 | Check exterior for damage | No Operator Requirement | Partial System OOS | |||||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Dispenser Filters | Dispenser 2 | CIM-TEK | 50109 | Series 800 | 0 | 0 | X | 7-9 | Check exterior for damage | No Operator Requirement | Partial System OOS | |||||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Dispenser Filters | Dispenser 3 | Bio Tek | 70122 | 300MB-10 | 0 | 0 | X | 7-9 | Check exterior for damage | No Operator Requirement | Partial System OOS | |||||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Dispenser Hoses | Dispenser 3 | Unmarked | 559N | 0.75 in. | 0 | 0 | 0 | 7-3 | Check for expiration date, and physical condition/damage leaks. | Daily - Inspect dispenser hoses and hose whips for gouges, cuts, blisters, or outside wear that may lead to rupture during use. Replace hose or hose whips that show signs of wear. Inspect connection points of hoses and hose whips to the dispenser, breakaways, swivels, and the nozzle and ensure the connection points are clean and free of fuel. | Partial System OOS | Worn and needs to be replaced | ||||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Dispenser Hoses | Dispenser 4 | Unmarked | 559N | 0.75 in. | 0 | 0 | 0 | 7-3 | Check for expiration date, and physical condition/damage leaks. | Daily - Inspect dispenser hoses and hose whips for gouges, cuts, blisters, or outside wear that may lead to rupture during use. Replace hose or hose whips that show signs of wear. Inspect connection points of hoses and hose whips to the dispenser, breakaways, swivels, and the nozzle and ensure the connection points are clean and free of fuel. | Partial System OOS | |||||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Dispenser Hoses | Dispenser 2 | Not Labeled | 559N | 1.0 in. | 0 | 0 | 0 | 7-3 | Check for expiration date, and physical condition/damage leaks. | Daily - Inspect dispenser hoses and hose whips for gouges, cuts, blisters, or outside wear that may lead to rupture during use. Replace hose or hose whips that show signs of wear. Inspect connection points of hoses and hose whips to the dispenser, breakaways, swivels, and the nozzle and ensure the connection points are clean and free of fuel. | Partial System OOS | |||||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Dispenser Hoses | Dispenser 1 | Not Labeled | 559N | 1.0 in. | 0 | 0 | 0 | 7-3 | Check for expiration date, and physical condition/damage leaks. | Daily - Inspect dispenser hoses and hose whips for gouges, cuts, blisters, or outside wear that may lead to rupture during use. Replace hose or hose whips that show signs of wear. Inspect connection points of hoses and hose whips to the dispenser, breakaways, swivels, and the nozzle and ensure the connection points are clean and free of fuel. | Partial System OOS | |||||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Dispenser Meters | Dispenser 3 | Wayne | DM1 | 1-1 LPM - 72 LPM | 0 | 0 | X | 7-8 | Inspect for damage, smooth operation and legibility. | Monthly - Inspect meter and ensure meter is clean and free of fuel. Ensure calibration mechanism is sealed. | Partial System OOS | |||||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Dispenser Meters | Dispenser 4 | Wayne | DM1 | 1-1 LPM - 72 LPM | 0 | 0 | X | 7-8 | Inspect for damage, smooth operation and legibility. | Monthly - Inspect meter and ensure meter is clean and free of fuel. Ensure calibration mechanism is sealed. | Partial System OOS | |||||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Dispenser Meters | Dispenser 2 | Wayne | DM1 | 1-1 LPM - 72 LPM | 0 | 0 | X | 7-8 | Inspect for damage, smooth operation and legibility. | Monthly - Inspect meter and ensure meter is clean and free of fuel. Ensure calibration mechanism is sealed. | Partial System OOS | Dual Dispensing / Second Meter Disabled | ||||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Dispenser Meters | Dispenser 1 | Wayne | DM1 | 1-1 LPM - 72 LPM | 0 | 0 | X | 7-8 | Inspect for damage, smooth operation and legibility. | Monthly - Inspect meter and ensure meter is clean and free of fuel. Ensure calibration mechanism is sealed. | Partial System OOS | Dual Dispensing / One Meter Disabled | ||||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Dispenser Nozzles | Dispenser 3 | OPW | 11 BP | 1.0 in. | 0 | 0 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | |||||||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | Partial System OOS | |||||||||||||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Dispenser Nozzles | Dispenser 2 | OPW | 7-HB | 1.0 in. | 0 | 0 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | |||||||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | Partial System OOS | |||||||||||||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Dispenser Nozzles | Dispenser 4 | OPW | 11 BP | 0.75 in. | 0 | 0 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | |||||||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | Partial System OOS | |||||||||||||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Dispenser Nozzles | Dispenser 1 | Husky | Not Labeled | 1.0 in. | 0 | 0 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | |||||||||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | Partial System OOS | |||||||||||||||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Dispenser Sumps | Dispenser 3 | Wayne | Not Labeled | Not Labeled | X | X | X | 7-13 | Inspect sump pipe transition fittings for tears, cracks, or other signs of deterioration. Test sumps and ensure they are liquid tight by using vacuum, pressure, or liquid testing in accordance with 40 CFR 280, Section 43. | Monthly - Inspect for signs of water, fuel, trash, and debris inside sumps. Remove and properly dispose of collected water, fuel, trash, and debris. Visually inspect penetration fittings. If fuel or water is detected investigate the source and repair. | Partial System OOS | ||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Dispenser Sumps | Dispenser 4 | Wayne | Not Labeled | Not Labeled | X | X | X | 7-13 | Inspect sump pipe transition fittings for tears, cracks, or other signs of deterioration. Test sumps and ensure they are liquid tight by using vacuum, pressure, or liquid testing in accordance with 40 CFR 280, Section 43. | Monthly - Inspect for signs of water, fuel, trash, and debris inside sumps. Remove and properly dispose of collected water, fuel, trash, and debris. Visually inspect penetration fittings. If fuel or water is detected investigate the source and repair. | Partial System OOS | ||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Dispenser Sumps | Dispenser 2 | Wayne | Not Labeled | Not Labeled | X | X | X | 7-13 | Inspect sump pipe transition fittings for tears, cracks, or other signs of deterioration. Test sumps and ensure they are liquid tight by using vacuum, pressure, or liquid testing in accordance with 40 CFR 280, Section 43. | Monthly - Inspect for signs of water, fuel, trash, and debris inside sumps. Remove and properly dispose of collected water, fuel, trash, and debris. Visually inspect penetration fittings. If fuel or water is detected investigate the source and repair. | Partial System OOS | ||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Dispenser Sumps | Dispenser 1 | Wayne | Not Labeled | Not Labeled | X | X | X | 7-13 | Inspect sump pipe transition fittings for tears, cracks, or other signs of deterioration. Test sumps and ensure they are liquid tight by using vacuum, pressure, or liquid testing in accordance with 40 CFR 280, Section 43. | Monthly - Inspect for signs of water, fuel, trash, and debris inside sumps. Remove and properly dispose of collected water, fuel, trash, and debris. Visually inspect penetration fittings. If fuel or water is detected investigate the source and repair. | Partial System OOS | ||
| 1146 | Diesel Tank / SSTA | Electrical Panels | EFSO Systems | Emergency Shut-Off | Federal Signal | Not Labeled | Not Labeled | X | X | 0 | 7-16 | Proper operation, box seals for integrity. Electrical connections for continuity. | No Operator Requirement | Partial System OOS | ||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Electric Motors | Dispenser 1 | Bluffton | 1111017470 | Not Legible | X | X | X | 9-1.7 | (1) Inadequate ventilation or air flow |
(2) Unbalanced voltage or an overload
(3) Bearing failure
(4) Insulation failure
| (5) Shaft misalignment | No Operator Requirement | Partial System OOS | ||||||||||||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Electric Motors | Dispenser 2 | Bluffton | 1111017470 | Not Legible | X | X | X | 9-1.7 | (1) Inadequate ventilation or air flow |
(2) Unbalanced voltage or an overload
(3) Bearing failure
(4) Insulation failure
| (5) Shaft misalignment | No Operator Requirement | Partial System OOS | ||||||||||||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Electric Motors | Dispenser 4 | Bluffton | 1111017470 | Not Legible | X | X | X | 9-1.7 | (1) Inadequate ventilation or air flow |
(2) Unbalanced voltage or an overload
(3) Bearing failure
(4) Insulation failure
| (5) Shaft misalignment | No Operator Requirement | Partial System OOS | ||||||||||||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Electric Motors | Dispenser 3 | Bluffton | 1111017470 | Not Legible | X | X | X | 9-1.7 | (1) Inadequate ventilation or air flow |
(2) Unbalanced voltage or an overload
(3) Bearing failure
(4) Insulation failure
| (5) Shaft misalignment | No Operator Requirement | Partial System OOS | |||||||||||||||
| 35011 | Refueler Parking Yard | Refueler Parking Yard | Emergency Eyewash/Showers | Refueler Parking | Haws | Not Labeled | Not Labeled | X | X | X | 11-3 | Weekly - Equipment installed within 10 seconds from the hazard and on the same plane as the hazard Pathway is clear of obstructions Plumbed equipment activated to ensure compliant operation and to clear any sediment Self-contained equipment checked to determine if the flushing fluid needs to be changed or supplemented Equipment free of broken or missing parts Equipment protected against freezing User protected from scalding water | No Operator/equipment Requirements | No Mission Impact | |||
| 1250 | Fuels Management Building | Fuels Management Building | Emergency Eyewash/Showers | Emergency Shower | Bradley | Not Labeled | Not Labeled | X | X | X | 11-3 | Weekly - Equipment installed within 10 seconds from the hazard and on the same plane as the hazard Pathway is clear of obstructions Plumbed equipment activated to ensure compliant operation and to clear any sediment Self-contained equipment checked to determine if the flushing fluid needs to be changed or supplemented Equipment free of broken or missing parts Equipment protected against freezing User protected from scalding water | No Operator/equipment Requirements | No Mission Impact | |||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Emergency Shutoff Valves | Dispenser 3 MOGAS Tank Top | Not accessible | No Fall Protection | 2.0 in. | 0 | 0 | X | 7-12 | Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. Inspect mechanical links of the valve for correct operation. Conduct test of valve to ensure it operates correctly. | Monthly - Inspect stabilizer bar to ensure that it is securely mounted below the base of the dispenser. Inspect the mounting bolts that secure the emergency shutoff valve to the stabilizer bar. Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. | Partial System OOS | |||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Emergency Shutoff Valves | Dispenser 4 MOGAS Tank Top | Not accessible | No Fall Protection | 2.0 in. | 0 | 0 | X | 7-12 | Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. Inspect mechanical links of the valve for correct operation. Conduct test of valve to ensure it operates correctly. | Monthly - Inspect stabilizer bar to ensure that it is securely mounted below the base of the dispenser. Inspect the mounting bolts that secure the emergency shutoff valve to the stabilizer bar. Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. | Partial System OOS | |||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Emergency Shutoff Valves | Dispenser 1 / Top of Tank | Not accessible | No Fall Protection | 2.0 in. | 0 | 0 | X | 7-12 | Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. Inspect mechanical links of the valve for correct operation. Conduct test of valve to ensure it operates correctly. | Monthly - Inspect stabilizer bar to ensure that it is securely mounted below the base of the dispenser. Inspect the mounting bolts that secure the emergency shutoff valve to the stabilizer bar. Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. | Partial System OOS | |||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Emergency Shutoff Valves | Dispenser 2 / Top of Tank | Not accessible | No Fall Protection | 2.0 in. | 0 | 0 | X | 7-12 | Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. Inspect mechanical links of the valve for correct operation. Conduct test of valve to ensure it operates correctly. | Monthly - Inspect stabilizer bar to ensure that it is securely mounted below the base of the dispenser. Inspect the mounting bolts that secure the emergency shutoff valve to the stabilizer bar. Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. | Partial System OOS | |||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Emergency Vents | MOGAS Tank Top | Morrison Brothers | FIg 244 | Not Legible | 0 | 0 | X | 8-9.4 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Emergency Vents | Diesel Tank | Morrison Brothers | FIg 244 | Not Legible | 0 | 0 | X | 8-9.4 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 1146 | Diesel Tank / SSTA | Electrical Panels | Externally Mounted Level Alarms | High Level Alarms | Veeder-Root | 790091-001 | Not Labled | 0 | 0 | 0 | 8-9.9.1 | Lift the manual test lever of internally mounted float valve (if equipped). Ensure that the HLSO closes when the float of the float valve is raised. | No Operator Requirement | Partial System OOS | |||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Fill Ports | MOGAS Offload | OPW | 523 | Not Labled | X | X | X | 8-9.12 | Ensure fill port covers are installed and are not damaged or broken. Ensure fill port covers are identified by fuel type and are installed on the correct tank. Visually inspect the fill port spill bucket to ensure there are no cracks, budges, or holes. | Daily - Ensure fill port covers are installed and are not damaged or broken. Ensure fill port covers are identified by fuel type and are installed on the correct tank. Visually inspect the fill port spill bucket to ensure there are no cracks, budges, or holes. Ensure the spill bucket is clean of dirt, trash, water, and fuel. | Partial System OOS | |||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Fill Ports | Diesel Tank | Dover Corp | Not Labeled | Not Labled | X | X | X | 8-9.12 | Ensure fill port covers are installed and are not damaged or broken. Ensure fill port covers are identified by fuel type and are installed on the correct tank. Visually inspect the fill port spill bucket to ensure there are no cracks, budges, or holes. | Daily - Ensure fill port covers are installed and are not damaged or broken. Ensure fill port covers are identified by fuel type and are installed on the correct tank. Visually inspect the fill port spill bucket to ensure there are no cracks, budges, or holes. Ensure the spill bucket is clean of dirt, trash, water, and fuel. | Partial System OOS | |||
| 35011 | Refueler Parking Yard | Refueler Parking Yard | Fuel Truck Containment Areas | Refueler Parking | N/A | N/A | N/A | X | X | X | 11-1.1 | No Manufacturer Requirements Available | Monthly - Remove debris from around security fence. Inspect fence grounding points. Ensure connections are not loose or damage. | No Mission Impact | |||
| 35005 | Vehicle Parking Area | Vehicle Parking Area | Fuel Truck Containment Areas | Vehicle Parking Yard | N/A | N/A | N/A | X | X | X | 11-1.1 | No Manufacturer Requirements Available | Monthly - Remove debris from around security fence. Inspect fence grounding points. Ensure connections are not loose or damage. | No Mission Impact | |||
| 25020 | SSTA Catch Basin | SSTA Catch Basin | Gate Valves | Catch Basin Drain | Mueller | 1256 | 6.0 in. | X | X | 0 | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | Partial System OOS | |||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Hose Retriever | Dispenser 4 | Zeppini | ZS4 | Not Labeled | 0 | 0 | 0 | 7-6 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Hose Retriever | Dispenser 2 | Zeppini | ZS4 | Not Labeled | 0 | 0 | 0 | 7-6 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Hose Retriever | Dispenser 1 | Zeppini | ZS4 | Not Labeled | 0 | 0 | 0 | 7-6 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Hose Retriever | Dispenser 3 | Zeppini | ZS4 | Not Labeled | 0 | 0 | 0 | 7-6 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 35011 | Refueler Parking Yard | Refueler Parking Yard | Lighting | Refueler Parking | Not Labeled | Not Labeled | Not Labeled | X | X | X | 9-1.8 | No Manufacturer Requirements Available | No Operator Requirement | No Mission Impact | 11 light Poles | ||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Lighting | MOGAS Dispensers | Not Labeled | Not Labeled | Not Labeled | X | X | X | 9-1.8 | No Manufacturer Requirements Available | No Operator Requirement | No Mission Impact | |||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Lighting | Diesel Dispensers | Not Labeled | Not Labeled | Not Labeled | X | X | X | 9-1.8 | No Manufacturer Requirements Available | No Operator Requirement | No Mission Impact | |||
| 15008 | Oil Water Separator | Oil Water Separator | Oil/Water Separators | Refueler Parking Yard | Enquip | Not Labeled | Not Labeled | X | X | X | 11-5 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 1146 | Diesel Tank / SSTA | Electrical Panels | Panelboards | Panel Boards | Not Labeled | Not Labeled | Not Labeled | X | X | X | 9-1.5 | No Manufacturer Requirements Available | Quarterly - Verify that there are no physical obstructions blocking access to the panelboard. Remove physical obstructions. | Partial System OOS | |||
| 1250 | Fuels Management Building | Fuels Management Building | Pumphouse/Filter Buildings | Fuels Management Buiding | N/A | N/A | N/A | X | X | X | 11-2.1 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 25020 | SSTA Catch Basin | SSTA Catch Basin | Remote Spill Containment | SSTA Catch Basin | N/A | N/A | N/A | X | X | X | 11-1.2 | No Manufacturer Requirements Available | Annually - Secondary containment systems degrade and will collect debris which can clog drainage inlets or prevent drain valves from sealing properly. Test drain valves for leakage through the valve. | Partial System OOS | |||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Self-Contained Dispenser Pumps | Dispenser 3 | Wayne | W71048018 | 1-1 LPM - 72 LPM | X | X | 0 | 7-15.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | Two pumps but one not used. | ||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Self-Contained Dispenser Pumps | Dispenser 4 | Wayne | W71048018 | 1-1 LPM - 72 LPM | X | X | 0 | 7-15.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Self-Contained Dispenser Pumps | Dispenser 2 | Wayne | W71048018 | 1-1 LPM - 72 LPM | X | X | 0 | 7-15.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Self-Contained Dispenser Pumps | Dispenser 1 | Wayne | W71048018 | 1-1 LPM - 72 LPM | X | X | 0 | 7-15.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Sight Flow Indicators | MOGAS Offload | Visi Flow | E-78-D1 | Faded | 0 | 0 | 0 | 6-12.3 | Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Partial System OOS | |||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Sight Flow Indicators | Diesel Offload | Visi-Flow | E-78-D1 | Faded | 0 | 0 | 0 | 6-12.3 | Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Partial System OOS | |||
| 35011 | Refueler Parking Yard | Refueler Parking Yard | Signage and Markings | Refueler Parking Fence | N/A | N/A | N/A | 0 | 0 | X | 2-7 | No Manufacturer Requirements Available | Monthly - Check permanent signs and markings for adequacy and readability. Repair or replace deteriorated or illegible signs and markings. | No Mission Impact | |||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Signage and Markings | MOGAS Tank and Piping | N/A | N/A | N/A | 0 | 0 | X | 2-7 | No Manufacturer Requirements Available | Monthly - Check permanent signs and markings for adequacy and readability. Repair or replace deteriorated or illegible signs and markings. | No Mission Impact | |||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Signage and Markings | Diesel Tank | N/A | N/A | N/A | 0 | 0 | X | 2-7 | No Manufacturer Requirements Available | Monthly - Check permanent signs and markings for adequacy and readability. Repair or replace deteriorated or illegible signs and markings. | No Mission Impact | |||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Static Grounding Systems | MOGAS / Tank Foot Offload Side | N/A | N/A | N/A | X | X | X | 9-1.6.2 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | Partial System OOS | |||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Static Grounding Systems | MOGAS Tank Foot / East | N/A | N/A | N/A | X | X | X | 9-1.6.2 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | Partial System OOS | |||
| 1146 | Diesel Tank / SSTA | Electrical Panels | Static Grounding Systems | Panel | N/A | N/A | N/A | X | X | X | 9-1.6.2 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | Partial System OOS | |||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Static Grounding Systems | Diesel Tank Foot / East | N/A | N/A | N/A | X | X | X | 9-1.6.2 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | Partial System OOS | |||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Static Grounding Systems | Diesel Tank Foot /Offload Side | N/A | N/A | N/A | X | X | X | 9-1.6.2 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | Partial System OOS | |||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Static Grounding Systems | Tank Grounds #2 | N/A | N/A | N/A | X | X | X | 9-1.6.2 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | Partial System OOS | |||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Static Grounding Systems | Tank Grounds #1 | N/A | N/A | N/A | X | X | X | 9-1.6.2 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | Partial System OOS | |||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Swivels | Dispenser 4 | OPW | 24TTPS | 0.75 in. | 0 | 0 | 0 | 7-5 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect swivel for loose connections and signs of damage. Ensure swivel rotates easily and is clean and free of fuel. | ||||
| Monthly - Inspect swivel for expiration date established by manufacturer. Swivels must be replaced before the indicated expiration date. | Partial System OOS | ||||||||||||||||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Swivels | Dispenser 2 | OPW | 24 ITPS | 1.0 in. | 0 | 0 | 0 | 7-5 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect swivel for loose connections and signs of damage. Ensure swivel rotates easily and is clean and free of fuel. | ||||
| Monthly - Inspect swivel for expiration date established by manufacturer. Swivels must be replaced before the indicated expiration date. | Partial System OOS | ||||||||||||||||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Swivels | Dispenser 1 | OPW | 24 ITPS | 1.0 in. | 0 | 0 | 0 | 7-5 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect swivel for loose connections and signs of damage. Ensure swivel rotates easily and is clean and free of fuel. | ||||
| Monthly - Inspect swivel for expiration date established by manufacturer. Swivels must be replaced before the indicated expiration date. | Partial System OOS | ||||||||||||||||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Swivels | Dispenser 3 | OPW | 24TTPS | 0.75 in. | 0 | 0 | 0 | 7-5 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect swivel for loose connections and signs of damage. Ensure swivel rotates easily and is clean and free of fuel. | ||||
| Monthly - Inspect swivel for expiration date established by manufacturer. Swivels must be replaced before the indicated expiration date. | Partial System OOS | Remove by 10-2022 | |||||||||||||||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Tank Pressure/ Vacuum Vents | Diesel Tank | Dover Corp | OPW Division | 10.0 In. | 0 | 0 | X | 8-9.3 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Tank Pressure/ Vacuum Vents | MOGAS Tank | OPW | 523 | 10.0 In. | 0 | 0 | X | 8-9.3 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 1250 | Fuels Management Building | Fuels Management Building | Ventilation Hoods | Fume Hood | Labconco | 47711 | N/A | X | X | X | 11-4.1 | Daily visual inspection, check the fume hood for visible airflow blockage such as large items or containers near the slot opening. Other daily inspections include holding a tissue at the opening to observe inward airflow, maintaining clean surfaces inside the hood, and keeping the sash at an appropriate height when working and not working in the hood. | No Operator Requirement | No Mission Impact | |||
| 1146 | Diesel Tank / SSTA | Diesel Tank / SSTA | Visual Leak Detection | Diesel Tank / Interstitial Monitor Well | N/A | N/A | N/A | X | X | 0 | 8-9.13.4 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||
| 1145 | MOGAS Tank / SSTA | MOGAS Tank / SSTA | Visual Leak Detection | MOGAS / Interstitial Monitor Well | N/A | N/A | N/A | X | X | 0 | 8-9.13.4 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact |
&"Times New Roman,Bold"&14Facility Maintenance Plan
FMP v2.2 2
Instructions:
1. Input all data as indicated on the sheet.
2. Additional documents referred to in the Special Considerations column shall be included as an appendix to this FMP.
3. The contractor shall generate a Component Unique Identifier (CUID) for each component utilizing the Component Acronym Sheet within this Work Book. The unique identifier must use the following:
Three letter Site Code - Facility # - Component Acronym - Sequential number Example: AAD-00063A-RCVL-0001
If component acronym is not listed, the contractor shall request an acronym be established through the HNC Project Manager and Project Engineer via email. Contractors may utilize other means of tracking/labeling assets such as QR codes in addition to the required CUID however, tracking/labeling must correlate with the CUID. This CUID shall be the standard for all DLA capitalized equipment. Base Asset ID if used by site shall be cross referenced with CUID appropriately.
4. Utilize the UFC Section Reference Work Category as noted on the Component Acronym Sheet.
5. Enter any applicable manufacturer requirements not stated in the UFC. References are acceptable with attachments.
6. Enter any applicable operator support or government owned equipment required to complete the RM task.
7. Enter impact on system availability by performing the RM task. This could include shutdown, lockout, or similar impacts.
8. Enter contract information for any other contract, contractor, or government personnel performing the…