PWS MAA FMP Template - v2.2.xlsx
XLSX spreadsheet 68 KB Posted
- Attached to
- Sources Sought - CEHNC FUELS PROGRAM
- Solicitation number
- PANHES-25-P-0000-001794
About this file
This is a Facility Maintenance Plan (FMP) template spreadsheet containing detailed maintenance requirements and schedules for fuel facilities at McAlester Army Ammunition Plant (AAP). The template includes sections for administrative information, general facility description, communication plans, safety requirements, recurring maintenance schedules, and component tracking for fuel system assets like storage tanks, pipelines, dispensers, and related equipment.
The template provides standardized formats for documenting maintenance activities across multiple facilities including the Top Load Facility, Service Station #1, and Service Station #2. Key components tracked include above-ground storage tanks, fuel dispensers, piping systems, valves, pumps, filters, and safety equipment. For each component, the template captures details like make/model, capacity, maintenance frequencies (daily/weekly/monthly/annual), UFC reference codes, special considerations, and system availability impacts. The document serves as a framework for contractors to develop site-specific maintenance plans but does not contain actual maintenance requirements or schedules.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Administrative
| Location | Site Name | McAlester AAP |
| RPSUID | 6120 | |
| DLA Site Code | MAA | |
| Hours of Operation | 0800-1600 | |
| Address | 1 Industral Area, Fuel Farm Rd, McAlester, OK 74502 | |
| Contract | Contractor | |
| Contract # | ||
| Local POCs | QAE Name | |
| QAE Phone | ||
| QAE Email | ||
| Alt QAE Name | ||
| Alt QAE Phone | ||
| Alt QAE Email | ||
| DLA/SCP POCs | DLA PM Name | |
| DLA PM Phone | ||
| DLA PM Email | ||
| SCP PM Name | ||
| SCP PM Phone | ||
| SCP PM Email | ||
| Contractor POCs | Contractor PM Name | |
| Contractor PM Phone | ||
| Contractor PM Email | ||
| Contractor QC Name | ||
| Contractor QC Phone | ||
| Contractor QC Email | ||
| Contractor SM Name | ||
| Contractor SM Phone | ||
| Contractor SM Email | ||
| USACE POCs | USACE PM/COR Name | |
| USACE PM/COR Phone | ||
| USACE PM/COR Email | ||
| USACE PE Name | ||
| USACE PE Phone | ||
| USACE PE Email | ||
| USACE KO Name | ||
| USACE KO Phone | ||
| USACE KO Email |
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
This table shows the minimum information required. Additional details should be included based on site specific requirements. Additional POCs may be required.
General Facility Description Facility Description
Purpose:
This Facility Maintenance Plan provides guidance for Contractor personnel in the operation, inspection, and maintenance of permanently installed fuel facilities operated under the control of the Quality Assurance Evaluators. Federal, state, and local environmental laws and regulations shall be complied with if this plan is in conflict with them.
Scope:
The instructions prescribed by this plan outline general fuels maintenance information associated with fuel storage and dispensing systems and provides the minimum periodic contractor maintenance and inspection criteria requirements for the systems. This plan is to be used in conjunction with other existing directives governing fuel system operations and maintenance requirements. Conotractor will properly maintain and repair federally funded petroleum systems and facilities in order to provide compliance with applicable code, criteria, and federal, state, local and/or host nation regulations.
Fuels Facilities:
Organizational tanks, and associated dispensing equipment are maintained and operated by the owning organization. Fuel system maintenance contractors shall perform all maintenance and associated procurement actions on installed fuel systems.
Each installation under the Southwest Division contract are military land-based facilities who receive, store, distribute, and/or dispense liquid fuels.
Standard fuel system equipment includes:
a) Above Ground Sorage Stanks (AST), Underground Storage Tanks (UST)
b) Filter/separator and other filtration device maintenance access, particularly element removal.
c) Manual valves
d) Meter Registers, and Flow Meters.
e) Control Valves.
f) Pumps
g) Tank Monitoring Equipment and Instruments
h) Alarms
i) Fire Fighting Equipment
Site Specific General Information:
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Include a general facility overview and description of each fuel system for the sites in accordance with UFC 3-460-01. Examples include: Bulk Storage Facilities, Aircraft Fueling Facilities, Marine and Dispensing Facilities, Ground Products Fueling Facilities, Alternate POL Facilities, and Support Facilities. Also include facility #s, facility names, fuel type, photos, and any other pertinent information.
Include Site Specific Conditions and Restrictions in this tab.
Communication Plan
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Communication plan shall address in/out briefs, lines of communication, coordination for access, etc.
Safety
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Site Specific Addendum and Activity Hazard Analysis, which are Attachments to the APP, specific to activities or tasks related to recurring maintenance for this site.
RM Schedule
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Link RM schedule here
Task Matrix
| Applicable Facility Assets | UFC System Level Maintenance Frequency | Special Considerations | ||||||||||||||||
| Real Property Unique Identifier | ||||||||||||||||||
| (RPUID) | Real Property Facility # | Real Property Facility Name | Operational Area | Component Type | Base Asset ID | Component Unique Identifier (CUID) | Make | Model | Capacity/Size | Q | S | A | UFC Section Reference | Additional Manufacturer RM Requirements | Operator/ equipment Requirements | System availability | Other Contract | Comments |
| 40520 | 00629B | Top Load Facility | Aboveground Shop Fabricated Tanks | Temp Tank (FRAC) Diesel | Southern FRAC Tank MTG | N/A | 21,000 gallons | X | 8-5.1 | No Manufacturer Requirements Available | Monthly - Monthly External Inspection (Identified as P in Table 8-2): Visually inspect for exterior signs of corrosion or coating deterioration. Visually inspect weld seams, tank-to-saddle connections, tank supports, tank anchors, foundation and anchor bolts, overfill valves and alarms, normal vents, emergency vents, leak detection probe or water/petroleum accumulation in the interstice on double-walled tanks, leaking valves, fittings, or components, spill containment systems and release prevention barriers. Leaking valves, fittings or components shall be repaired immediately or immediately removed from service and isolated to prevent further discharge. Any irregularities, (e.g., missing valve handles, bolts, nuts, screens) will be assessed for priority and repaired as soon as possible or as required depending on the nature of the defect (See Appendix E for an example of the STI SP001 Standard Monthly Inspection Checklist). | |||||||
| Annually - Annual External Inspection (Identified as P in Table 8-2): A more detailed examination of the tank and appurtenances shall be performed on an annual basis (See Appendix E for an example of the STI SP001 Standard Annual Inspection Checklist). | No Mission Impact | |||||||||||||||||
| 40520 | 00629B | Top Load Facility | Aboveground Piping | Aboveground Piping | N/A | N/A | N/A | X | 6-1.3 | No Manufacturer Requirements Available | Weekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection. | No Mission Impact | ||||||
| 40520 | 00629B | Top Load Facility | Aboveground Piping and Equipment Coatings | Aboveground Piping and Equipment Coatings | N/A | N/A | N/A | X | 6-10.1 | No Manufacturer Requirements Available | No Operator Requirement | No Mission Impact | ||||||
| 40520 | 00629B | Top Load Facility | Ball Valves | Ball Valves | GRAINGER APPROVED | SSV-200NLH | 2" | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | ||||||
| 40520 | 00629B | Top Load Facility | Ball Valves | Ball Valves | GRAINGER APPROVED | SSV-200NLH | 2" | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | ||||||
| 40520 | 00629B | Top Load Facility | Ball Valves | Ball Valves | GRAINGER APPROVED | SSV-200NLH | 2" | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | ||||||
| 40520 | 00629B | Top Load Facility | Ball Valves | Ball Valves | GRAINGER APPROVED | SSV-200NLH | 2" | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | ||||||
| 40520 | 00629B | Top Load Facility | Ball Valves | Ball Valves | NIBCO | NL95X0A | 1" | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | ||||||
| 40520 | 00629B | Top Load Facility | Ball Valves | Ball Valves | GRAINGER APPROVED | G-SSV-75 | 3/4" | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | ||||||
| 40520 | 00629B | Top Load Facility | Static Grounding Systems | Ground | N/A | N/A | N/A | X | X | 9-1.6.2 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | No Mission Impact | |||||
| 40520 | 00629B | Top Load Facility | Pressure and Pressure/Vacuum Gauges | Pressure and Pressure/Vacuum Gauges | Ashcroft | Unk | 0-300 | X | X | X | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. | No Mission Impact | ||||
| 40520 | 00629B | Top Load Facility | Pressure and Pressure/Vacuum Gauges | Pressure and Pressure/Vacuum Gauges | Ashcroft | Unk | 0-300 | X | X | X | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. | No Mission Impact | ||||
| 40520 | 00629B | Top Load Facility | Pressure and Pressure/Vacuum Gauges | Pressure and Pressure/Vacuum Gauges | Ashcroft | Unk | 0-300 | X | X | X | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. | No Mission Impact | ||||
| 40520 | 00629B | Top Load Facility | Static Grounding Systems | Ground Reel | Hannay | GR75 | 3/16" x 75" L | X | X | 9-1.6.2 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | No Mission Impact | |||||
| 40520 | 00629B | Top Load Facility | Pressure Relief Valves | Pressure Relief Valves | Taylor | T-8200-1 | 1' | X | 4-3.2.6 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | ||||||
| 40520 | 00629B | Top Load Facility | Positive Displacement Meters | Meter | Liquid Control | M-25-1 | 350 gpm | X | 3-7.1 | Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature | ||||||||
| compensation feature | Monthly - Inspect counter head for unusual noises and smooth operation. | Partial System OOS | ||||||||||||||||
| 40520 | 00629B | Top Load Facility | Dispenser Filters | Filter | Cim Tek | 800 Series | 5.06 W x 16 | X | 7-9 | Check exterior for damage | No Operator Requirement | Temporary System OOS | ||||||
| 40520 | 00629B | Top Load Facility | Pre-Filter Vessels | Pre-Filter | Quantek | 01020-7 | 250 psig | X | 3-6.1 | For Parker Velcon: See Standard Filter/Separator Installation and Operation Manual, Page 31, Appendix F: Cartridge Changeout Curve | Daily - Open drains under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure in filter cartridges. | Partial System OOS | ||||||
| 40520 | 00629B | Top Load Facility | Vertical Inline Pumps | Pump | Goulds | 3196 | 300 GPM | X | X | 3-8.1.2 | Routinely inspect for unusual noise, vibration, temperature, leaks in pump or piping. Inspect for general condition, mechanical seal for leakage. Anytime a pump is opened, inspect the running clearances and restore them to original specifications if the running clearances have doubled. Change Oil Annually | No Operator Requirement | No Mission Impact | |||||
| 40520 | 00629B | Top Load Facility | Basket Strainers | Y-Strainer | Banjo | NPT Y Strainers | 3 in. - 4 to 50 Mesh | 3-6.4 | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | |||||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | |||||||||||||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | Partial System OOS if Required | |||||||||||||||||
| 40520 | 00629B | Top Load Facility | EFSO Systems | Emergency Stop | Appleton | EFDB150-UM1 | 1/2" | X | 7-16 | Proper operation, box seals for integrity. Electrical connections for continuity. | No Operator Requirement | Temporary System Impact | ||||||
| 40520 | 00629B | Top Load Facility | Electric Motor | Motor | US Electrical | AB39E | 3535 RPMs | X | X | X | 9-1.7 | (1) Inadequate ventilation or air flow |
(2) Unbalanced voltage or an overload
(3) Bearing failure
(4) Insulation failure
| (5) Shaft misalignment | No Operator Requirement | Temporary System OOS | |||||||||||||
| 40520 | 00631A | Service Station #1 | Aboveground Shop Fabricated Tanks | Bulk Gasoline Storage Tank | Containment Solutions | SCAT tank | 12,000 gallons | X | 8-5.1 | No Manufacturer Requirements Available | Monthly - Monthly External Inspection (Identified as P in Table 8-2): Visually inspect for exterior signs of corrosion or coating deterioration. Visually inspect weld seams, tank-to-saddle connections, tank supports, tank anchors, foundation and anchor bolts, overfill valves and alarms, normal vents, emergency vents, leak detection probe or water/petroleum accumulation in the interstice on double-walled tanks, leaking valves, fittings, or components, spill containment systems and release prevention barriers. Leaking valves, fittings or components shall be repaired immediately or immediately removed from service and isolated to prevent further discharge. Any irregularities, (e.g., missing valve handles, bolts, nuts, screens) will be assessed for priority and repaired as soon as possible or as required depending on the nature of the defect (See Appendix E for an example of the STI SP001 Standard Monthly Inspection Checklist). | ||||
| Annually - Annual External Inspection (Identified as P in Table 8-2): A more detailed examination of the tank and appurtenances shall be performed on an annual basis (See Appendix E for an example of the STI SP001 Standard Annual Inspection Checklist). | No Mission Impact | ||||||||||||||
| 40520 | 00631A | Service Station #1 | EFSO Systems | Emergency Stop | Appleton | EFDB150-UM1 | 1/2" | X | 7-16 | Proper operation, box seals for integrity. Electrical connections for continuity. | No Operator Requirement | Temporary System Impact | |||
| 40520 | 00631A | Service Station #1 | Fill Ports | Fill Port | N/A | N/A | N/A | X | X | 8-9.12 | Ensure fill port covers are installed and are not damaged or broken. Ensure fill port covers are identified by fuel type and are installed on the correct tank. Visually inspect the fill port spill bucket to ensure there are no cracks, budges, or holes. | Daily - Ensure fill port covers are installed and are not damaged or broken. Ensure fill port covers are identified by fuel type and are installed on the correct tank. Visually inspect the fill port spill bucket to ensure there are no cracks, budges, or holes. Ensure the spill bucket is clean of dirt, trash, water, and fuel. | No Mission Impact | ||
| 40520 | 00631A | Service Station #1 | Stage I Vapor Recovery | Vapor Recovery | N/A | N/A | N/A | X | 7-17 | Ensure valves are in place and intact, fill adaptor cap fits tightly, dry break poppet depresses and seats tightly and dry break cap seals tightly. | Daily or before each use - Inspect vapor recovery hoses for gouges, cuts or outside wear that may result in vapor leaks. | No Mission Impact | |||
| 40520 | 00631A | Service Station #1 | Dispenser Cabinet | Gasoline Dispenser | Wayne | FWAT019420 | X | 7-7 | Inspect for damage, ensure door panels and locks are functional. | Monthly - Inspect outside of cabinet and ensure it is free of damage. Inspect for fuel stains on the concrete island around the cabinet and on the outside of the cabinet. Ensure the cabinet is free of dirt and fuel. Open both sides of the cabinet and inspect the inside of the cabinet. Ensure the inside of the cabinet and all of the components inside the cabinet are clean and free of fuel. | No Mission Impact | ||||
| 40520 | 00631A | Service Station #1 | Dispenser Hoses | Gasoline Dispenser Hose | Husky | 3/4" gasoline hose | 3/4" | 7-3 | Check for expiration date, and physical condition/damage leaks. | Daily - Inspect dispenser hoses and hose whips for gouges, cuts, blisters, or outside wear that may lead to rupture during use. Replace hose or hose whips that show signs of wear. Inspect connection points of hoses and hose whips to the dispenser, breakaways, swivels, and the nozzle and ensure the connection points are clean and free of fuel. | No Mission Impact | ||||
| 40520 | 00631A | Service Station #1 | Dispenser Nozzles | Gasoline Dispenser Nozzle | OPW | 11 | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | ||||||||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | No Mission Impact | ||||||||||||||
| 40520 | 00631A | Service Station #1 | Self-Contained Dispenser Pumps | Gasoline Dispenser Pump | Fil-Rite | 700 series | X | 7-15.2 | Inspect for damage, signs of leaks, unusual noise, excessive heat or vibration. | No Operator Requirement | No Mission Impact | ||||
| 40520 | 00631A | Service Station #1 | Breakaways | Gasoline Dispenser Breakaway | OPW | 66REC | 3/4" | 7-4 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect breakaways for loose connections and signs of damage to poppets. Ensure breakaways are clean and free of fuel. | |||||
| Monthly - Inspect breakaway for an expiration date established by the manufacturer. Breakaways must be replaced before the indicated expiration date. | No Mission Impact | ||||||||||||||
| 40520 | 00631A | Service Station #1 | Dispenser Meters | Gasoline Dispenser Meter | Wayne | N/A | N/A | X | 7-8 | Inspect for damage, smooth operation and legibility. | Monthly - Inspect meter and ensure meter is clean and free of fuel. Ensure calibration mechanism is sealed. | Temporary System OOS | |||
| 40520 | 00631A | Service Station #1 | Dispenser Filters | Gasoline Dispenser Filter | CIM Tek | 70059 | 10 Micron | X | 7-9 | Check exterior for damage | No Operator Requirement | Temporary System OOS | |||
| 40520 | 00631A | Service Station #1 | Swivels | Swivel | OPW | 241TPS | 3/4" | 7-5 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect swivel for loose connections and signs of damage. Ensure swivel rotates easily and is clean and free of fuel. | |||||
| Monthly - Inspect swivel for expiration date established by manufacturer. Swivels must be replaced before the indicated expiration date. | No Mission Impact | ||||||||||||||
| 40520 | 00631A | Service Station #1 | Dispenser Sumps | Sump | FlexWorks | DP-1123F | 15" x 27" | X | 7-13 | nspect sump pipe transition fittings for tears, cracks, or other signs of deterioration. Test dispenser sumps and ensure they are liquid tight by using vacuum, pressure, or liquid testing in accordance with 40 CFR 280, Section 43. | Monthly - Inspect for signs of water, fuel, trash, and debris inside sumps. Remove and properly dispose of collected water, fuel, trash, and debris. Visually inspect penetration fittings. If fuel or water is detected investigate the source and repair. | No Mission Impact | |||
| 40520 | 00631A | Service Station #1 | Signage and Markings | Signage and Markings | N/A | N/A | N/A | 2-7 | No Manufacturer Requirements Available | Monthly - Check permanent signs and markings for adequacy and readability. Repair or replace deteriorated or illegible signs and markings. | No Mission Impact | ||||
| 40520 | 00631A | Service Station #1 | Ball Valves | Ball Valves | KECKLEY | BVF1RF4RCSRGSL-075 | 3/4" | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 40520 | 00631A | Service Station #1 | Ball Valves | Ball Valves | KECKLEY | BVF1RF4RCSRGSL-075 | 3/4" | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 40520 | 00631A | Service Station #1 | Ball Valves | Ball Valves | KECKLEY | BVF1RF4RCSRGSL-075 | 3/4" | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||
| 40520 | 00631A | Service Station #1 | Butterfly Valves | Butterfly Valves | ASAHI | 728020 | 2" | X | 6-6.2.6 | 1. Check (and adjust if necessary) that the valve is operating properly in the full closed and full open position. |
2. Visually inspect the valve and around the valve for any signs of leakage.
| 3. Visually inspect bolts, piping, wiring, and any other related equipment for problems that could hinder operation (such as loosening or corrosion). | No Operator Requirement | No Mission Impact | ||||||||||||||
| 40520 | 00631A | Service Station #1 | Static Grounding Systems | Ground | N/A | N/A | N/A | X | X | 9-1.6.2 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | No Mission Impact | |||
| 40520 | 00631A | Service Station #1 | Static Grounding Systems | Ground | N/A | N/A | N/A | X | X | 9-1.6.2 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | No Mission Impact | |||
| 40520 | 00631A | Service Station #1 | Static Grounding Systems | Ground Reel | Hannay | GR75 | 3/16" x 75" L | X | X | 9-1.6.2 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | No Mission Impact | |||
| 40520 | 00631A | Service Station #1 | Card and Key Locks | Fuel Master Unit | FuelMaster | FMU-3505 | N/A | X | 9-3 | No Manufacturer Requirements Available | No Operator Requirement | No Mission Impact | ||||
| 40520 | 0476A | Service Station #2 | Aboveground Shop Fabricated Tanks | Diesel Service Station Tank | Unknown | Unknown | 20,000 Gallon tank | X | 8-5.1 | No Manufacturer Requirements Available | Monthly - Monthly External Inspection (Identified as P in Table 8-2): Visually inspect for exterior signs of corrosion or coating deterioration. Visually inspect weld seams, tank-to-saddle connections, tank supports, tank anchors, foundation and anchor bolts, overfill valves and alarms, normal vents, emergency vents, leak detection probe or water/petroleum accumulation in the interstice on double-walled tanks, leaking valves, fittings, or components, spill containment systems and release prevention barriers. Leaking valves, fittings or components shall be repaired immediately or immediately removed from service and isolated to prevent further discharge. Any irregularities, (e.g., missing valve handles, bolts, nuts, screens) will be assessed for priority and repaired as soon as possible or as required depending on the nature of the defect (See Appendix E for an example of the STI SP001 Standard Monthly Inspection Checklist). | |||||
| Annually - Annual External Inspection (Identified as P in Table 8-2): A more detailed examination of the tank and appurtenances shall be performed on an annual basis (See Appendix E for an example of the STI SP001 Standard Annual Inspection Checklist). | No Mission Impact | |||||||||||||||
| 40520 | 0476A | Service Station #2 | Emergency Vents | Vent | Morrison Brothers | 244O | Unknown | X | 8-9.4 | No Manufacturer Requirements Available | No Operator Requirement | Temporary System OOS | ||||
| 40520 | 0476A | Service Station #2 | Emergency Vents | Vent | Morrison Brothers | 244O | Unknown | X | 8-9.4 | No Manufacturer Requirements Available | No Operator Requirement | Temporary System OOS | ||||
| 40520 | 0476A | Service Station #2 | Flame Arrestors | Vent | Morrison Brothers | 351S & 748A | N/A | X | 8-9.5 | No Manufacturer Requirements Available | No Operator Requirement | No Mission Impact | ||||
| 40520 | 0476A | Service Station #2 | Gate Valve | Gate Valve | Morrison Bros. | 235DI Series | 3" | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | No Mission Impact | |||
| 40520 | 0476A | Service Station #2 | Gate Valve | Gate Valve | Morrison Bros. | 235DI Series | 3" | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | No Mission Impact | |||
| 40520 | 0476A | Service Station #2 | Gate Valve | Gate Valve | Morrison Bros. | 235DI Series | 3" | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | No Mission Impact | |||
| 40520 | 0476A | Service Station #2 | Ball Valve | Ball Valve | GRAINGER APPROVED | SSV-200NLH | 2" | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | ||||
| 40520 | 0476A | Service Station #2 | Ball Valve | Ball Valve | GRAINGER APPROVED | SSV-200NLH | 2" | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | ||||
| 40520 | 0476A | Service Station #2 | Basket Strainer | Basket Strainer | TITAN | 125 | 3" | 3-6.4 | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | |||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | |||||||||||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | Partial System OOS if Required | |||||||||||||||
| 40520 | 0476A | Service Station #2 | Containment Systems (General) | Containment | N/A | N/A | N/A | X | 8-10.1 | No Manufacturer Requirements Available | Daily - Inspect containment systems for cleanliness, if accessible. | No Mission Impact | ||||
| 40520 | 0476A | Service Station #2 | Static Grounding Systems | Ground Reel | Hannay | GR75 | 3/16" x 75" L | X | X | 9-1.6.2 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | No Mission Impact | |||
| 40520 | 0476A | Service Station #2 | Aboveground Piping | Aboveground Piping | N/A | N/A | N/A | X | 6-1.3 | No Manufacturer Requirements Available | Weekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection. | No Mission Impact | ||||
| 40520 | 0476A | Service Station #2 | Aboveground Piping and Equipment Coatings | Aboveground Piping and Equipment Coatings | N/A | N/A | N/A | X | 6-10.1 | No Manufacturer Requirements Available | No Operator Requirement | No Mission Impact | ||||
| 40520 | 0476A | Service Station #2 | Dispenser Cabinet | Diesel Dispenser | Wayne/Dresser | G6201P/2GJK | 96836B H12 | X | 7-7 | Inspect for damage, ensure door panels and locks are functional. | Monthly - Inspect outside of cabinet and ensure it is free of damage. Inspect for fuel stains on the concrete island around the cabinet and on the outside of the cabinet. Ensure the cabinet is free of dirt and fuel. Open both sides of the cabinet and inspect the inside of the cabinet. Ensure the inside of the cabinet and all of the components inside the cabinet are clean and free of fuel. | No Mission Impact | ||||
| 40520 | 0476A | Service Station #2 | Dispenser Hoses | Diesel Dispenser Hose | Husky | 1" gasoline hose | 1" | 7-3 | Check for expiration date, and physical condition/damage leaks. | Daily - Inspect dispenser hoses and hose whips for gouges, cuts, blisters, or outside wear that may lead to rupture during use. Replace hose or hose whips that show signs of wear. Inspect connection points of hoses and hose whips to the dispenser, breakaways, swivels, and the nozzle and ensure the connection points are clean and free of fuel. | No Mission Impact | |||||
| 40520 | 0476A | Service Station #2 | Dispenser Nozzles | Diesel Dispenser Nozzle | OPW | 11A | 1" | X | 7-2 | Start flow into approved test container; place nozzle |
in low clip position. Immerse nozzle spout tip in the gasoline in the approved test container. The nozzle tip must be at least three (3) inches from the bottom of the container
| to prevent back-pressure in the spout. Nozzle must shut off five consective tests. | Daily - Inspect dispenser nozzle spout. Ensure it is tight, round, has no cracks, or excessive wear. Inspect automatic shutoff hole. Ensure the hole is open and free of obstructions. Inspect nozzle hold-open latch. Ensure the latch is straight, moves freely, and the return spring operates correctly. Inspect body of nozzle. Ensure the body is in good condition and that the valve stem is clean and free of fuel. Inspect the nozzle to hose connection and ensure it is clean and free of fuel. | |||||||||||||||
| Monthly - Dispenser nozzle handles shall be inspected for an expiration date established by the manufacturer. Nozzles must be replaced before the indicated expiration date. | No Mission Impact | |||||||||||||||
| 40520 | 0476A | Service Station #2 | Swivels | Diesel Dispenser Swivel | OPW | 241TPS Series | 1" | 7-5 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect swivel for loose connections and signs of damage. Ensure swivel rotates easily and is clean and free of fuel. | ||||||
| Monthly - Inspect swivel for expiration date established by manufacturer. Swivels must be replaced before the indicated expiration date. | No Mission Impact | |||||||||||||||
| 40520 | 0476A | Service Station #2 | Breakaways | Diesel Dispenser Breakaway | OPW | 68EZR | 1" | 7-4 | Inspect for expiration date. Inspect for loose connections and signs of damage. | Daily - Inspect breakaways for loose connections and signs of damage to poppets. Ensure breakaways are clean and free of fuel. | ||||||
| Monthly - Inspect breakaway for an expiration date established by the manufacturer. Breakaways must be replaced before the indicated expiration date. | No Mission Impact | |||||||||||||||
| 40520 | 0476A | Service Station #2 | Dispenser Meters | Diesel Dispenser Meter | Wayne/Dresser | N/A | N/A | X | 7-8 | Inspect for damage, smooth operation and legibility. | Monthly - Inspect meter and ensure meter is clean and free of fuel. Ensure calibration mechanism is sealed. | Temporary System OOS | ||||
| 40520 | 0476A | Service Station #2 | Dispenser Filters | Diesel Dispenser Filter | CIM Tek | 70074 | ||||||||||
| 800MG-30 | X | 7-9 | Check exterior for damage | No Operator Requirement | Temporary System OOS | |||||||||||
| 40520 | 0476A | Service Station #2 | Self-Contained Dispenser Pumps | Pump | Wayne/Dresser | N/A | N/A | X | 7-15.2 | Inspect for damage, signs of leaks, unusual noise, excessive heat or vibration. | No Operator Requirement | No Mission Impact | ||||
| 40520 | 0476A | Service Station #2 | EFSO Systems | Emergency Stop | Appleton | EFDB110-UM1 | 1 | X | 7-16 | Proper operation, box seals for integrity. Electrical connections for continuity. | No Operator Requirement | Temporary System Impact | ||||
| 40520 | 0476A | Service Station #2 | Fill Ports | Fill Port | N/A | N/A | N/A | X | X | 8-9.12 | Ensure fill port covers are installed and are not damaged or broken. Ensure fill port covers are identified by fuel type and are installed on the correct tank. Visually inspect the fill port spill bucket to ensure there are no cracks, budges, or holes. | Daily - Ensure fill port covers are installed and are not damaged or broken. Ensure fill port covers are identified by fuel type and are installed on the correct tank. Visually inspect the fill port spill bucket to ensure there are no cracks, budges, or holes. Ensure the spill bucket is clean of dirt, trash, water, and fuel. | No Mission Impact | |||
| 40520 | 0476A | Service Station #2 | Fill Ports | Fill Port | N/A | N/A | N/A | X | X | 8-9.12 | Ensure fill port covers are installed and are not damaged or broken. Ensure fill port covers are identified by fuel type and are installed on the correct tank. Visually inspect the fill port spill bucket to ensure there are no cracks, budges, or holes. | Daily - Ensure fill port covers are installed and are not damaged or broken. Ensure fill port covers are identified by fuel type and are installed on the correct tank. Visually inspect the fill port spill bucket to ensure there are no cracks, budges, or holes. Ensure the spill bucket is clean of dirt, trash, water, and fuel. | No Mission Impact | |||
| 40520 | 0476A | Service Station #2 | Static Grounding Systems | Ground | N/A | N/A | N/A | X | X | 9-1.6.2 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | No Mission Impact | |||
| 40520 | 0476A | Service Station #2 | Static Grounding Systems | Ground Reel | Hannay | GR75 | 3/16" x 75" L | X | X | 9-1.6.2 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | No Mission Impact | |||
| 40520 | 0476A | Service Station #2 | Signage and Markings | Signage and Markings | N/A | N/A | N/A | 2-7 | No Manufacturer Requirements Available | Monthly - Check permanent signs and markings for adequacy and readability. Repair or replace deteriorated or illegible signs and markings. | No Mission Impact | |||||
| 40520 | 0476A | Service Station #2 | Card and Key Locks | Fuel Master Unit | FuelMaster | FMU-3505 | N/A | X | 9-3 | No Manufacturer Requirements Available | No Operator Requirement | No Mission Impact | ||||
| 40520 | 672 | Decommisioned | Above Ground Storage Tank- Diesel | |||||||||||||
| 40520 | 725 | Decommisioned | Operations Support Building (FUEL) | |||||||||||||
| 40520 | 725A | Decommisioned | TRUCK LOAD/UNLOAD FACILITY | |||||||||||||
| 40520 | 730 | Decommisioned | STANDBY GENERATOR | |||||||||||||
| 40520 | 85112 | Decommisioned | Roads Other Than C & B Roads | |||||||||||||
| 40520 | 85216 | Decommisioned | NONNORG PK UNPAVED | |||||||||||||
| 40520 | FOS 629B | Decommisioned | FOS TRK LD/UNLD | |||||||||||||
| 40520 | FOS1.2.25 | Decommisioned | FOS-POLL CATCH BASIN | |||||||||||||
| 40520 | FOS1.2.34 | Decommisioned | FOS-OVERHEAD PROTECTION | |||||||||||||
| 40520 | FOS1.2.42 | Decommisioned | FOS-VEH FUEL DIESEL | |||||||||||||
| 40520 | FOS1.2.55 | Decommisioned | Exterior Lighting | |||||||||||||
| 40520 | 00629B | Decommisioned | Operations Support Building (FUEL) | |||||||||||||
| 40520 | 00629B | Decommisioned | Above Ground Storage Tank - MOGAS | |||||||||||||
| 40520 | 00629B | Decommisioned | MOGAS STR ABV (GAS STORAGE TANK) Tank 631 | |||||||||||||
| 40520 | 00629B | Decommisioned | Above Ground Storage Tank - MOGAS | |||||||||||||
| 40520 | 00629B | Decommisioned | Above Ground Storage Tank - MOGAS | Above Ground Storage Tank - MOGAS | ||||||||||||
| 40520 | 00629B | Decommisioned | MOGAS STR ABV | |||||||||||||
| 40520 | Decommisioned | DIESEL STR ABV | ||||||||||||||
| 40520 | 0476A | Decommisioned | Operations Support Building (FUEL) | N/A | N/A | N/A | ||||||||||
| 40520 | 666 | Decommisioned | TRUCK LOAD/UNLOAD FACILITY AT FUEL FARM | N/A | N/A | N/A | ||||||||||
| 40520 | 666A | Decommisioned | Overhead Protection | N/A | N/A | N/A | ||||||||||
| 40520 | 0629A | Decommisioned | POL PUMP STATION | N/A | N/A | N/A | ||||||||||
| 40520 | 0629B | Decommisioned | LAND VEHICLE FUELING DIESEL | |||||||||||||
| 40520 | 0629C | Decommisioned | POL PUMP STATION | N/A | N/A | N/A | ||||||||||
| 40520 | 0629E | Decommisioned | TK TRK LD/UNLD | |||||||||||||
| 40520 | 0629F | Decommisioned | LAND VEHICLE FUELING DIESEL | |||||||||||||
| 40520 | 0850A | Decommisioned | LAND VEHICLE FUELING MOGAS | |||||||||||||
| 40520 | 0850C | Decommisioned | TK TRK LD/UNLD | |||||||||||||
| 40520 | 0851A | Decommisioned | LAND VEHICLE FUELING DIESEL | |||||||||||||
| 40520 | 0851C | Decommisioned | TK TRK LD/UNLD | |||||||||||||
| 40520 | 12510 | Decommisioned | POL PIPE ABOVEGROUND | N/A | N/A | N/A | ||||||||||
| 40520 | 12520 | Decommisioned | POL PIPE UNDERGROUND | N/A | N/A | N/A | ||||||||||
| 40520 | 629D | Decommisioned | Overhead Protection | N/A | N/A | N/A |
&"Times New Roman,Bold"&14Facility Maintenance Plan
FMP v2.2 2
Instructions:
1. Input all data as indicated on the sheet.
2. Additional documents referred to in the Special Considerations column shall be included as an appendix to this FMP.
3. The contractor shall generate a Component Unique Identifier (CUID) for each component utilizing the Component Acronym Sheet within this Work Book. The unique identifier must use the following:
Three letter Site Code - Facility # - Component Acronym - Sequential number Example: AAD-00063A-RCVL-0001
If component acronym is not listed, the contractor shall request an acronym be established through the HNC Project Manager and Project Engineer via email. Contractors may utilize other means of tracking/labeling assets such as QR codes in addition to the required CUID however, tracking/labeling must correlate with the CUID. This CUID shall be the standard for all DLA capitalized equipment. Base Asset ID if used by site shall be cross referenced with CUID appropriately.
4. Utilize the UFC Section Reference Work Category as noted on the Component Acronym Sheet.
5. Enter any applicable manufacturer requirements not stated in the UFC. References are acceptable with attachments.
6. Enter any applicable operator support or government owned equipment required to complete the RM task.
7. Enter impact on system availability by performing the RM task. This could include shutdown, lockout, or similar impacts.
8. Enter contract information for any other contract, contractor, or government personnel performing the applicable task. This is applicable to other Centrally Managed Programs, SRM, MILCON, or Public Works/Civil Engineering projects.
9. Print Hard Copies as 11x17.
FS-PF Schedule
| FILTER SEPARATOR/PRE-FILTER MAINTENANCE SCHEDULES | ||||||||||||||
| Applicable Facility Assets | Coalescer/Separator Information | Special Considerations | ||||||||||||
| Real Property Unique Identifier | ||||||||||||||
| (RPUID) | Real Property Facility # | Real Property Facility Name | Operational Area | Component Type | Base Asset ID | Component Unique Identifier (CUID) | Make | Model | Capacity (GPM) | UFC Section Reference | Number of Coalescer Cartridges | Number of | ||
| Separator Cartridges | Coalescer Cartridges | |||||||||||||
| Model # | Separator Cartridge | |||||||||||||
| Model # | Clean or Replace | |||||||||||||
| Separator Cartridge | Gasket | |||||||||||||
| Model # | Date Last Replaced | Replacement Due Date | Operator/Equipment Requirements | System Availability | Site Self Performs | |||||||||
| (Y/N) | Comments | |||||||||||||
| 40520 | 00629B | Top Load Facility | Pre-Filter Vessels | Pre-Filter | Quantek | 01020-7 | 250 psig | 3-6.1 | Y |
&"Times New Roman,Bold"&14Facility Maintenance Plan
FMP v2.2 2
Instructions:
1. Input all data as indicated on the sheet.
2. Additional documents referred to in the Special Considerations column shall be included as an appendix to this FMP.
3. The contractor shall generate a Component Unique Identifier (CUID) for each component utilizing the Component Acronym Sheet within this Work Book. The unique identifier must use the following:
Three letter Site Code - Facility # - Component Acronym - Sequential number Example: AAD-00063A-RCVL-0001
If component acronym is not listed, the contractor shall request an acronym be established through the HNC Project Manager and Project Engineer via email. Contractors may utilize other means of tracking/labeling assets such as QR codes in addition to the required CUID however, tracking/labeling must correlate with the CUID. This CUID shall be the standard for all DLA capitalized equipment.
4. Utilize the UFC Section Reference Work Category as noted on the Component Acronym Sheet.
5. Enter any applicable manufacturer requirements not stated in the UFC. References are acceptable with attachments.
6. Enter any applicable operator support or government owned equipment required to complete the RM task.
7. Enter impact on system availability by performing the RM task. This could include shutdown, lockout, or similar impacts.
8. Filter Separators and Pre-Filters identified here shall also be provided in the Task Matrix Tab.
9. Print Hard Copies as 11x17.
Component Acronym
| Component Unique Identifier: | Site Code-Facility #-Component Acronym-Sequential # | ||
| Example: | AAD-00063A-RCVL-0001 | ||
| NOTE: If component acronym is not listed, the contractor shall request an acronym be established through the HNC Project Manager and Project Engineer via email. Contractors may utilize other means of tracking/labeling assets such as QR codes in addition to the required CUID however, tracking/labeling must correlate with the CUID. This CUID shall be the standard for all DLA capitalized equipment | |||
| DLA Work Type Category | UFC Section Reference Work Category | ||
| (Revised per Change 1, 29 April 2021) | Component Acronym | ||
| Air Compressors | Air Compressors | AIRC | |
| Alarms | Externally Mounted Level Alarms (Section 8-9.9.1) | EMLA | |
| Internally Mounted Level Alarms (Section 8-9.9.3) | IMLA | ||
| Bollard | Bollards | BLRD | |
| Building | Building HVAC | BHVAC | |
| Building Domestic Water System | BWTR | ||
| Building Waste Water | BWSW | ||
| Building - Lighting | BLTG | ||
| Building - Architectural | BARCH | ||
| Building - Fire Sprinkler System | BFIRE | ||
| Containment/Joints | Containment Systems (General) (Section 8-10.1) | CSGEN | |
| Concrete and Cement Brick Dike/Berm Walls (Section 8-10.2.1) | DKBW | ||
| Dike/Berm Floors (Section 8-10.2.2) | DKBF | ||
| Earthen Dike Walls (Section 8-10.3) | ETHDW | ||
| Self-Diking or Vaulted Tank Containment (Section 8-10.4) | SDVTCS | ||
| Flexible Membrane Liners (Section 8-10.5) | FXML | ||
| Fuel Truck and Rail Car Containment Areas (Section 11-1.1) | FTKRCC | ||
| Remote Spill Containment (Section 11-1.2) | RSCS | ||
| Piers and Wharves Fuel Containment Systems (Section 5-1.2) - Testing | FPWCT | ||
| Fuel Pier/Wharf Containment (PWS Section 3) | FPWC | ||
| Corrosion Control/Coatings | Aboveground Piping and Equipment Coatings (Section 6-10.1) | AGPCT | |
| Miscellaneous | Miscellaneous Deactivated Components (Section 12-5) | MDEAC | |
| Electrical/Lighting | Lighting (Section 9-1.8) | LIGHT | |
| Electrical/Power | Electrical Equipment (Section 9-1.2) | ELEQ | |
| Power Cables (Section 9-1.3) | PWRCBL | ||
| Motor Controls (Section 9-1.4) | MTRCT | ||
| Panelboards (Section 9-1.5) | PNLB | ||
| Electric Motors (Section 9-1.7) | ELEMT | ||
| Electronic Equipment (9-1.9) | ELTREQ | ||
| Card and Key Locks (Section 9-3) | CKLK | ||
| Electrical/Protection | Power Grounding Systems (Section 9-1.6.1) | PWRGS | |
| Static Grounding Systems (Section 9-1.6.2) | STGS | ||
| Cathodic Protection (Section 9-2.1) | CP | ||
| Lightning Surge Arresters (Section 9-2.2.1) | LSAR | ||
| Lightning Protection Systems (Section 9-4) | LPTS | ||
| Ground Verification System (Section 9-5) | GRVS | ||
| Electronic Overfill Protection Systems (Section 9-6) | EOPS | ||
| Eyewash/Shower | Emergency Eyewash/Showers (Section 11-3) | EMEWSH | |
| Fencing/ | |||
| Gates | Fencing | FENC | |
| Gates | GATE | ||
| Filtration | Pre-Filters (Section 3-6.1) | PFVSL | |
| Filter Separators (Section 3-6.2) | FLSP | ||
| Haypack Filters (Section 3-6.3) | HPKF | ||
| Basket Strainers (Section 3-6.4) | BSTR | ||
| Filter Separator Sump Heaters (Section 3-6.5) | FSSH | ||
| Sidestream Filtration Systems (Section 8-9.11) | SSFTS | ||
| Fire Suppression Equipment | Flame Arrestors (Section 8-9.5) | FLMARR | |
| Foam Fire Protection Systems (Section 8-9.15) | FFPS | ||
| Fire Protection Systems - Wet Pipe | FPRS | ||
| Fuel Laboratories | Ventilation Hoods (Section 11-4.1) | VENTHD | |
| Gauges | Pressure and Pressure/Vacuum Gauges (Section 6-7.1) | PVGA | |
| Differential Pressure Gauges (Section 6-7.2) | DPGA | ||
| Mechanical Tape Gauges (Section 8-9.7) | MTGA | ||
| Mechanically Operated Tape Gauge (Section 8-9.8.1) | MOTGA | ||
| Magnetostrictive Probes (Section 8-9.8.2) | MRPRB | ||
| Servo Gauge (Section 8-9.8.3) | SRVGA | ||
| Generators | Back-Up Power Generators | BGEN | |
| Heating Coils | Steam Type Heating Coils (Section 8-9.16.1) | STHC | |
| Thermal Fluid Type Heating Coils (Section 8-9.16.2) | TFTHC | ||
| Electric Rod Type Heating (Section 8-9.16.3) | ERTH | ||
| Hoses | Loading Fuel Hoses (Section 3-9.1) | LDHS | |
| Offloading Fuel Hoses (Section 3-9.2) | OLHS | ||
| Aircraft Fueling Hoses (Section 4-7.5) | ACFHS | ||
| Hydrazine | Hydrazine Charging Units (Section 10-3) | HDZCU | |
| Inspections | Trouble Shoot | TRBST | |
| API 510 Inspections | API510 | ||
| API 653 or STI Inspection | API653 | ||
| Coatings Condition Survey | CCS | ||
| Issue/Receive - Ground | Dispenser Nozzles (Section 7-2) | DSNZ | |
| Dispenser Hoses (Section 7-3) | DSHS | ||
| Breakaways (Section 7-4) | DSBW | ||
| Swivels (Section 7-5) | DSSW | ||
| Hose Retriever (Section 7-6) | HSRTV | ||
| Dispenser Cabinet (Section 7-7) | DSCB | ||
| Dispenser Meters (Section 7-8) | DSMTR | ||
| Dispenser Filters (Section 7-9) | DSFLR | ||
| Dispenser Strainers (Section 7-10) | DSSTR | ||
| Ground Vehicle Fuel Piping (Section 7-11) | GVFP | ||
| Emergency Shutoff Valves (Shear Valves) (Section 7-12) | ESHVL | ||
| Dispenser Sumps (Section 7-13) | DSSMP | ||
| Transition Sumps (Section 7-14) | TRSMP | ||
| Remote Dispenser Pumps (Section 7-15.1) | RDSP | ||
| Self-Contained Dispenser Pumps (Section 7-15.2) | SCDSP | ||
| EFSO Systems (Section 7-16) | EFSO | ||
| Stage I Vapor Recovery (Section 7-17.1) | SIVP | ||
| Stage II Vapor Recovery (Section 7-17.2) | SIIVP | ||
| Vapor Burners (Section 7-17.3) | VPBNR | ||
| Point Sensor - Dry (Section 7-19.1.1) | PSDRY | ||
| Automatic Line Leak Detector (Section 7-19.1.2) | ALLD | ||
| Visual Monitoring (Section 7-20.1) | VSLM | ||
| Issue/Receive - Marine | Marine Receipt (Section 5-2) | MRNRCP | |
| Marine Issue (Section 5-3) | MRNISU | ||
| Marine Loading Arms (Section 5-4) | MRNLA | ||
| Marine Transfer Hoses (Section 5-5.1) | MBTHS | ||
| Underwater Hoses (Section 5-5.2) | UWHS | ||
| Single Point Mooring Systems (Section 5-7.1) | SPMSS | ||
| Multi Point Mooring Systems (Section 5-7.2) | MPMSS | ||
| Submerged Piping Systems (Section 5-8) | SMPS | ||
| Boom Reels (Section 5-9) | BMRL | ||
| Liquefied Petroleum | Liquefied Petroleum Tanks (Section 10-1.1) | LPTANK | |
| Liquefied Petroleum Pipelines (Section 10-1.2) | LPPIPE | ||
| Liquefied Petroleum Vapor Lines (Section 10-1.3) | LPVPL | ||
| LPG Vaporizers (Section 10-1.4) | LPGVPZ | ||
| Petroleum Gas Regulators (Section 10-1.5) | PGREG | ||
| Liquefied Petroleum Gas Hoses (Section 10-1.6) | LPGHS | ||
| Meter/ | |||
| calibrations | Positive Displacement Meters (Section 3-7.1) | PDMT | |
| Turbine Flow Meters (Section 3-7.2) | TBFMT | ||
| Orifice Flow Meters (Section 3-7.3) | OFMT | ||
| Natural Disaster | Natural Disaster | ||
| Natural Gas | CNG Piping (Section 10-2.1) | NGPIPE | |
| CNG Compressors (Section 10-2.2) | NGCOMP | ||
| CNG Storage (Section 10-2.3) | NGSTOR | ||
| CNG Dispensers (Section 10-2.4) | NGDS | ||
| CNG Dispenser Hoses (Section 10-2.5) | NGDSHS | ||
| Nozzle | Hydrant Adapters (Section 4-7.2) | HADP | |
| Fueling Nozzles (Section 4-7.3) | FLNZ | ||
| Other | Fuel Additive Injectors (Section 3-11) | FAIJ | |
| Pantograph | Fixed Pantographs (Section 4-7.1.1) | FXPNT | |
| Detachable Pantographs (Section 4-7.1.2) | DTPNT | ||
| Piping | On-Base Pipelines (Section 6-1.1) | OBPL | |
| Non-DOT Regulated (Section 6-1.2.1) | NDPL | ||
| Aboveground Piping (Section 6-1.3) | AGPL | ||
| Double-Wall Piping (Section 6-1.4) | DWPL | ||
| Low Point Drains (Section 6-12.1) | LPDN | ||
| High Point Vents (Section 6-12.2) | HPVT | ||
| Sight Flow Indicators (Section 6-12.3) | SFND | ||
| Rope Sensor Systems (Section 6-13.1.1) | RPSS | ||
| Point Sensor - Dry (Section 6-13.1.2) | PSDRY | ||
| Visual Monitoring (Section 6-14.1) | VSLM | ||
| Pipe Penetrations (Section 8-10.6) | PPEN | ||
| Deactivated Petroleum Fuel Pipelines (Section 12-3) | DEACPL | ||
| Pressure/Temperature Control | Air Eliminator Tanks (Section 3-10.1) | AELT | |
| Automatic Air Vents (Section 3-10.2) | AAVT | ||
| Surge Suppressors (Section 4-7.4) | SRGSP | ||
| Thermal and Pressure Relief Valves (Section 6-6.3) | TPRVL | ||
| Pressure Transmitters (Section 6-7.3) | PRTR | ||
| Differential Pressure Transmitters (Section 6-7.4) | DPTR | ||
| Flexible Ball Joints (Section 6-8) | FBLJT | ||
| Dial Thermometer (Section 6-9.1) | DTHMR | ||
| Emergency Vents (Section 8-9.4) | EMGVT | ||
| Pump | Centrifugal Pumps (Section 3-8.1) | CENP | |
| Vertical Inline Pumps (Section 3-8.2) | VILP | ||
| Vertical Turbine/Submerged Turbine Pumps (Section 3-8.3) | VTSP | ||
| Sliding Vane Pumps (Section 3-8.5) | SLVP | ||
| Gear Pumps (Section 3-8.6) | GERP | ||
| Diaphragm Pumps (Section 3-8.7) | DIAP | ||
| Internal Combustion Drives (Section 3-8.8) | ICDR | ||
| Gearboxes (Section 3-8.9) | GRBX | ||
| Deactivated Petroleum Fuel Pumps (Section 12-4) | DEACP | ||
| Signage/Markings | Signage and Markings (Section 2-7) | SIGN | |
| Structures | Pumphouse/Filter Buildings (Section 11-2.1) | PFBLDG | |
| Canopies (Section 11-2.2) | CNPY |