This is a Facility Maintenance Plan template for fuel systems maintenance at Red River Army Depot in Texas. The document outlines maintenance requirements for permanently installed fuel facilities operated under Quality Assurance Evaluators' control.
The template details comprehensive maintenance schedules and inspection requirements for various fuel system components including above-ground storage tanks (ranging from 12,000-17,500 gallon capacity), underground storage tanks, filter separators, manual valves, meter registers, flow meters, control valves, pumps, monitoring equipment, alarms, and fire fighting equipment. It specifies daily, weekly, monthly, and annual inspection and maintenance tasks for each component type, covering security fencing, canopies, emergency eyewash stations, piping systems, dispensers, and ground rods. The facility handles multiple fuel types including Jet A, MOGAS, and diesel, with specific maintenance protocols for each system's components like nozzles, hoses, breakaways, and swivels. The template includes spaces for recording contact information for DLA, contractor, and USACE personnel responsible for facility oversight.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Administrative
| Location | Site Name | Red River Army Depot |
| RPSUID | 6955 | |
| DLA Site Code | RRT | |
| Hours of Operation | 0800-1600 | |
| Address | 100 James Carlow Dr, Red River Army Depot, TX 75507 | |
| Contract | Contractor | |
| Contract # | ||
| Local POCs | QAE Name | |
| QAE Phone | ||
| QAE Email | ||
| Alt QAE Name | ||
| Alt QAE Phone | ||
| Alt QAE Email | ||
| DLA/SCP POCs | DLA PM Name | |
| DLA PM Phone | ||
| DLA PM Email | ||
| SCP PM Name | ||
| SCP PM Phone | ||
| SCP PM Email | ||
| Contractor POCs | Contractor PM Name | |
| Contractor PM Phone | ||
| Contractor PM Email | ||
| Contractor QC Name | ||
| Contractor QC Phone | ||
| Contractor QC Email | ||
| Contractor SM Name | ||
| Contractor SM Phone | ||
| Contractor SM Email | ||
| USACE POCs | USACE PM/COR Name | |
| USACE PM/COR Phone | ||
| USACE PM/COR Email | ||
| USACE PE Name | ||
| USACE PE Phone | ||
| USACE PE Email | ||
| USACE KO Name | ||
| USACE KO Phone | ||
| USACE KO Email |
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
This table shows the minimum information required. Additional details should be included based on site specific requirements. Additional POCs may be required.
General Facility Description Facility Description
Purpose:
This Facility Maintenance Plan provides guidance for Contractor personnel in the operation, inspection, and maintenance of permanently installed fuel facilities operated under the control of the Quality Assurance Evaluators. Federal, state, and local environmental laws and regulations shall be complied with if this plan is in conflict with them.
Scope:
The instructions prescribed by this plan outline general fuels maintenance information associated with fuel storage and dispensing systems and provides the minimum periodic contractor maintenance and inspection criteria requirements for the systems. This plan is to be used in conjunction with other existing directives governing fuel system operations and maintenance requirements. Conotractor will properly maintain and repair federally funded petroleum systems and facilities in order to provide compliance with applicable code, criteria, and federal, state, local and/or host nation regulations.
Fuels Facilities:
Organizational tanks, and associated dispensing equipment are maintained and operated by the owning organization. Fuel system maintenance contractors shall perform all maintenance and associated procurement actions on installed fuel systems.
Each installation under the Southwest Division contract are military land-based facilities who receive, store, distribute, and/or dispense liquid fuels.
Standard fuel system equipment includes:
a) Above Ground Sorage Stanks (AST), Underground Storage Tanks (UST)
b) Filter/separator and other filtration device maintenance access, particularly element removal.
c) Manual valves
d) Meter Registers, and Flow Meters.
e) Control Valves.
f) Pumps
g) Tank Monitoring Equipment and Instruments
h) Alarms
i) Fire Fighting Equipment
Site Specific General Information:
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Include a general facility overview and description of each fuel system for the sites in accordance with UFC 3-460-01. Examples include: Bulk Storage Facilities, Aircraft Fueling Facilities, Marine and Dispensing Facilities, Ground Products Fueling Facilities, Alternate POL Facilities, and Support Facilities. Also include facility #s, facility names, fuel type, photos, and any other pertinent information.
Include Site Specific Conditions and Restrictions in this tab.
Communication Plan
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Communication plan shall address in/out briefs, lines of communication, coordination for access, etc.
Safety
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Site Specific Addendum and Activity Hazard Analysis, which are Attachments to the APP, specific to activities or tasks related to recurring maintenance for this site.
RM Schedule
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Link RM schedule here
Task Matrix
| Applicable Facility Assets | UFC System Level Maintenance Frequency | Special Considerations | ||||||||||||||||
| Real Property Unique Identifier | ||||||||||||||||||
| (RPUID) | Real Property Facility # | Real Property Facility Name | Operational Area | Component Type | Base Asset ID | Component Unique Identifier (CUID) | Make | Model | Capacity/Size | Q | S | A | UFC Section Reference | Additional Manufacturer RM Requirements | Operator/ equipment Requirements | System availability | Other Contract | Comments |
| 48515 | 393 | Military Service Station | Security Fencing | Security Fencing | N/A | N/A | N/A | X | X | 11-1.1 | No Manufacturer Requirements Available | Monthly - Remove debris from around security fence. Inspect fence grounding points. Ensure connections are not loose or damage. | ||||||
| 48515 | 393 | Military Service Station | Canopy | Dispenser Canopy | N/A | N/A | N/A | 11-2.2 | No Manufacturer Requirements Available | No Operator Requirement | ||||||||
| 48515 | 393 | Military Service Station | Emergency Eyewash | Heated Shower | N/A | N/A | N/A | X | X | X | 11-3 | Weekly - Equipment installed within 10 seconds from the hazard and on the same plane as the hazard Pathway is clear of obstructions Plumbed equipment activated to ensure compliant operation and to clear any sediment Self-contained equipment checked to determine if the flushing fluid needs to be changed or supplemented Equipment free of broken or missing parts Equipment protected against freezing User protected from scalding water | No Operator Requirement | |||||
| 48515 | 382 | Military Service Station | Above Ground Storage Tank 8, Shop Fabricated | Diesel | UNK | UNK | 17,500 | X | 12-2 | No Manufacturer Requirements Available | Monthly - Monthly External Inspection (Identified as P in Table 8-2): Visually inspect for exterior signs of corrosion or coating deterioration. Visually inspect weld seams, tank-to-saddle connections, tank supports, tank anchors, foundation and anchor bolts, overfill valves and alarms, normal vents, emergency vents, leak detection probe or water/petroleum accumulation in the interstice on double-walled tanks, leaking valves, fittings, or components, spill containment systems and release prevention barriers. Leaking valves, fittings or components shall be repaired immediately or immediately removed from service and isolated to prevent further discharge. Any irregularities, (e.g., missing valve handles, bolts, nuts, screens) will be assessed for priority and repaired as soon as possible or as required depending on the nature of the defect (See Appendix E for an example of the STI SP001 Standard Monthly Inspection Checklist). |
Annually - Annual External Inspection (Identified as P in Table 8-2): A more detailed examination of the tank and appurtenances shall be performed on an annual basis (See Appendix E for an example of the STI SP001 Standard Annual Inspection Checklist).
48515 392 Military Service Station Above Ground Storage Tank, Shop Fabricated Deactivated UNK UNK UNK X 12-2 No Manufacturer Requirements Available Monthly - Monthly External Inspection (Identified as P in Table 8-2): Visually inspect for exterior signs of corrosion or coating deterioration. Visually inspect weld seams, tank-to-saddle connections, tank supports, tank anchors, foundation and anchor bolts, overfill valves and alarms, normal vents, emergency vents, leak detection probe or water/petroleum accumulation in the interstice on double-walled tanks, leaking valves, fittings, or components, spill containment systems and release prevention barriers. Leaking valves, fittings or components shall be repaired immediately or immediately removed from service and isolated to prevent further discharge. Any irregularities, (e.g., missing valve handles, bolts, nuts, screens) will be assessed for priority and repaired as soon as possible or as required depending on the nature of the defect (See Appendix E for an example of the STI SP001 Standard Monthly Inspection Checklist).
Annually - Annual External Inspection (Identified as P in Table 8-2): A more detailed examination of the tank and appurtenances shall be performed on an annual basis (See Appendix E for an example of the STI SP001 Standard Annual Inspection Checklist).
48515 390 Military Service Station Above Ground Storage Tank, Shop Fabricated Deactivated UNK UNK UNK X 12-3 No Manufacturer Requirements Available Monthly - Monthly External Inspection (Identified as P in Table 8-2): Visually inspect for exterior signs of corrosion or coating deterioration. Visually inspect weld seams, tank-to-saddle connections, tank supports, tank anchors, foundation and anchor bolts, overfill valves and alarms, normal vents, emergency vents, leak detection probe or water/petroleum accumulation in the interstice on double-walled tanks, leaking valves, fittings, or components, spill containment systems and release prevention barriers. Leaking valves, fittings or components shall be repaired immediately or immediately removed from service and isolated to prevent further discharge. Any irregularities, (e.g., missing valve handles, bolts, nuts, screens) will be assessed for priority and repaired as soon as possible or as required depending on the nature of the defect (See Appendix E for an example of the STI SP001 Standard Monthly Inspection Checklist).
Annually - Annual External Inspection (Identified as P in Table 8-2): A more detailed examination of the tank and appurtenances shall be performed on an annual basis (See Appendix E for an example of the STI SP001 Standard Annual Inspection Checklist).
| 48515 | 379 | Military Service Station | Basket Strainers - 1 | Strainer | UNK | UNK | UNK | x | x | x | 3-6.4 | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | ||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. |
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly
| 48515 | 379 | Military Service Station | Basket Strainers - 2 | Strainer | UNK | UNK | UNK | x | x | x | 3-6.4 | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | ||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. |
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly
| 48515 | 379 | Military Service Station | Basket Strainers - 3 | Strainer | UNK | UNK | UNK | x | x | x | 3-6.4 | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | ||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. |
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly
| 48515 | 379 | Military Service Station | Basket Strainers - 4 | Strainer | UNK | UNK | UNK | x | x | x | 3-6.4 | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | ||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. |
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly
| 48515 | 379 | Military Service Station | Basket Strainers - 5 | Strainer | UNK | UNK | UNK | x | x | x | 3-6.4 | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | ||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. |
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly
| 48515 | 379 | Military Service Station | Basket Strainers - 6 | Strainer | UNK | UNK | UNK | x | x | x | 3-6.4 | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | ||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. |
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly
| 48515 | 379 | Military Service Station | Bulk Diesel Ofloading Meter | Bulk Diesel Ofloading Meter | TCS | 682-15-SPAAT | 40 - 120 GPM | X | 3-7.2 | Calibrtate as required dependent on usage. Inspect temperature element operation of meters equipped with temperature compensation feature | No Operator Requirement | ||
| 48515 | 379 | Military Service Station | Jet Top Load Meter | Jet Top Load Meter | Tokhiem | 1450 | 24-120 GPM | X | 3-7.2 | Calibrtate as required dependent on usage. Inspect temperature element operation of meters equipped with temperature compensation feature | No Operator Requirement | ||
| 48515 | 379 | Military Service Station | Mogas Topload Meter | Mogas Topload Meter | TCS | 700-20SPA4AT | 10-100 GPM | X | 3-7.2 | Calibrtate as required dependent on usage. Inspect temperature element operation of meters equipped with temperature compensation feature | No Operator Requirement | ||
| 48515 | 379 | Military Service Station | Centrifugal Pump - 1 | Diesel Dispenser | Gorman Rupp | O2K3X2-1P | UNK | X | X | 3-8.1 | During routine pump inspections only the easy to monitor factors such as pressure, temperature, vibration etc can be checKed. But during quarterly inspections, shaft alignment and oil levels should also be checked. Change Oil Annually | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Centrifugal Pump - 2 | Jet A Loading Pump | Ingersal Rand | RA5W 58-46073 | UNK | X | X | 3-8.1 | During routine pump inspections only the easy to monitor factors such as pressure, temperature, vibration etc can be checKed. But during quarterly inspections, shaft alignment and oil levels should also be checked. Change Oil Annually | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Centrifugal Pump - 3 | MOGAS Load | Gorman Rupp | Model 02K3X21P | UNK | X | X | 3-8.1 | During routine pump inspections only the easy to monitor factors such as pressure, temperature, vibration etc can be checKed. But during quarterly inspections, shaft alignment and oil levels should also be checked. Change Oil Annually | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Centrifugal Pump - 4 | MOGAS Load | Gorman Rupp | Model 02K3X21P | UNK | X | X | 3-8.1 | During routine pump inspections only the easy to monitor factors such as pressure, temperature, vibration etc can be checKed. But during quarterly inspections, shaft alignment and oil levels should also be checked. Change Oil Annually | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Vane Pump - 1 | Diesel Dispenser | Blackmear | XL 1.25 cat.no B55807687 | UNK | X | X | 3-8.2.1 | Check for unusual noise, vibration, temperature and leaks. Change Oil Annually | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Vane Pump - 2 | Jet A Loading Pump | Blackmear | XL 1.25 cat.no VL5007 | UNK | X | X | 3-8.2.1 | Check for unusual noise, vibration, temperature and leaks. Change Oil Annually | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Vane Pump - 3 | Dyno Pump | Blackmear | Frame 143T | XL 1.25 | X | X | 3-8.2.1 | Check for unusual noise, vibration, temperature and leaks. Change Oil Annually | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Vane Pump - 4 | Dyno Pump | Blackmear | Frame 143T | XL 1.25 | X | X | 3-8.2.1 | Check for unusual noise, vibration, temperature and leaks. Change Oil Annually | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gear Pump | Diesel Fillstand | Roper | 3622 MOHBFRV TYPE 3 S/N 513975 | UNK | X | X | 3-8.2.2 | Replenish grease lubricated sleeve bearing grease per the O & M manual using the manual grease lubricator. Perform every 3 months while idle. Check for unusual noise, vibration, temperature and leaks. Anytime a pump is opened, inspect the running clearances and restore them to original specifications if the running clearances have doubled (install new wear rings). Anytime a pump is opened, inspect the impeller for corrosion or excessive wear. Change Oil Annually | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Pilot Control Valve | Dyno Area | Cla-Val | B1066015 Code ZQ | 0-75 PSI | X | X | 4-3.2.1 | Daily for proper operation, visible signs of leaks and damage. | No Operator Requirement | |
| 48515 | 393 | Military Service Station | EFSO -1 | Emergency Fuel Shut-Off | N/A | N/A | N/A | X | 4-4.2.9 | Proper operation, box seals for integrity. Electrical connections for continuity. | No Operator Requirement | ||
| 48515 | 393 | Military Service Station | EFSO -2 | Emergency Fuel Shut-Off | N/A | N/A | N/A | X | 4-4.2.9 | Proper operation, box seals for integrity. Electrical connections for continuity. | No Operator Requirement | ||
| 48515 | 393 | Military Service Station | EFSO -3 | Emergency Fuel Shut-Off | N/A | N/A | N/A | X | 4-4.2.9 | Proper operation, box seals for integrity. Electrical connections for continuity. | No Operator Requirement | ||
| 48515 | 393 | Military Service Station | EFSO -4 | Emergency Fuel Shut-Off | N/A | N/A | N/A | X | 4-4.2.9 | Proper operation, box seals for integrity. Electrical connections for continuity. | No Operator Requirement | ||
| 48515 | 393 | Military Service Station | EFSO -5 | Emergency Fuel Shut-Off | N/A | N/A | N/A | X | 4-4.2.9 | Proper operation, box seals for integrity. Electrical connections for continuity. | No Operator Requirement | ||
| 48515 | 393 | Military Service Station | EFSO -6 | Emergency Fuel Shut-Off | N/A | N/A | N/A | X | 4-4.2.9 | Proper operation, box seals for integrity. Electrical connections for continuity. | No Operator Requirement | ||
| 48515 | 379 | Military Service Station | Above Ground Piping | Piping | N/A | N/A | N/A | X | 6-1.3 | No Manufacturer Requirements Available | Weekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection. | ||
| 48515 | 379 | Military Service Station | Gate Valve - 1 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 10 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 11 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 12 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 13 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 14 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 15 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 16 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 17 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 18 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 19 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 2 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 20 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 21 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 22 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 23 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 24 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 25 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 26 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 27 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 28 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 29 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 3 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 30 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 31 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 32 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 33 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 34 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 35 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 36 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 37 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 38 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 39 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 4 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 40 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 41 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 42 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 43 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 44 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 45 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 46 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 47 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 48 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 49 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 5 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 50 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 51 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 52 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 53 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 54 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 55 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 56 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 57 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 58 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 59 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 6 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 60 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 61 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 7 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 8 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Gate Valve - 9 | Gate Valve | UNK | UNK | UNK | X | X | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | |
| 48515 | 379 | Military Service Station | Ball Valve - 1 | Ball Valve | UNK | UNK | UNK | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | ||
| 48515 | 379 | Military Service Station | Ball Valve - 10 | Ball Valve | UNK | UNK | UNK | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | ||
| 48515 | 379 | Military Service Station | Ball Valve - 11 | Ball Valve | UNK | UNK | UNK | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | ||
| 48515 | 379 | Military Service Station | Ball Valve - 12 | Ball Valve | UNK | UNK | UNK | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | ||
| 48515 | 379 | Military Service Station | Ball Valve - 13 | Ball Valve | UNK | UNK | UNK | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | ||
| 48515 | 379 | Military Service Station | Ball Valve - 14 | Ball Valve | UNK | UNK | UNK | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | ||
| 48515 | 379 | Military Service Station | Ball Valve - 15 | Ball Valve | UNK | UNK | UNK | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | ||
| 48515 | 379 | Military Service Station | Ball Valve - 16 | Ball Valve | UNK | UNK | UNK | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | ||
| 48515 | 379 | Military Service Station | Ball Valve - 17 | Ball Valve | UNK | UNK | UNK | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | ||
| 48515 | 379 | Military Service Station | Ball Valve - 18 | Ball Valve | UNK | UNK | UNK | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | ||
| 48515 | 379 | Military Service Station | Ball Valve - 19 | Ball Valve | UNK | UNK | UNK | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | ||
| 48515 | 379 | Military Service Station | Ball Valve - 2 | Ball Valve | UNK | UNK | UNK | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | ||
| 48515 | 379 | Military Service Station | Ball Valve - 20 | Ball Valve | UNK | UNK | UNK | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | ||
| 48515 | 379 | Military Service Station | Ball Valve - 21 | Ball Valve | UNK | UNK | UNK | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | ||
| 48515 | 379 | Military Service Station | Ball Valve - 22 | Ball Valve | UNK | UNK | UNK | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | ||
| 48515 | 379 | Military Service Station | Ball Valve - 23 | Ball Valve | UNK | UNK | UNK | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | ||
| 48515 | 379 | Military Service Station | Ball Valve - 24 | Ball Valve | UNK | UNK | UNK | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | ||
| 48515 | 379 | Military Service Station | Ball Valve - 25 | Ball Valve | UNK | UNK | UNK | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | ||
| 48515 | 379 | Military Service Station | Ball Valve - 26 | Ball Valve | UNK | UNK | UNK | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | ||
| 48515 | 379 | Military Service Station | Ball Valve - 3 | Ball Valve | UNK | UNK | UNK | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | ||
| 48515 | 379 | Military Service Station | Ball Valve - 4 | Ball Valve | UNK | UNK | UNK | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | ||
| 48515 | 379 | Military Service Station | Ball Valve - 5 | Ball Valve | UNK | UNK | UNK | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | ||
| 48515 | 379 | Military Service Station | Ball Valve - 6 | Ball Valve | UNK | UNK | UNK | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | ||
| 48515 | 379 | Military Service Station | Ball Valve - 7 | Ball Valve | UNK | UNK | UNK | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | ||
| 48515 | 379 | Military Service Station | Ball Valve - 8 | Ball Valve | UNK | UNK | UNK | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | ||
| 48515 | 379 | Military Service Station | Ball Valve - 9 | Ball Valve | UNK | UNK | UNK | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | ||
| 48515 | 379 | Military Service Station | PSI Gauge - 1 | Pressure Gauge | UNK | UNK | 0-250 | X | X | X | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. |
| 48515 | 379 | Military Service Station | PSI Gauge - 2 | Pressure Gauge | UNK | UNK | 0-250 | X | X | X | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. |
| 48515 | 379 | Military Service Station | PSI Gauge - 3 | Pressure Gauge | UNK | UNK | 0-250 | X | X | X | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. |
| 48515 | 379 | Military Service Station | PSI Gauge - 4 | Pressure Gauge | UNK | UNK | 0-250 | X | X | X | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. |
| 48515 | 379 | Military Service Station | PSI Gauge - 5 | Pressure Gauge | UNK | UNK | 0-250 | X | X | X | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. |
| 48515 | 393C | Military Service Station | Dispenser Shear Valve - 1/2 | Dispenser Component | OPW | 10 Series | UNK | X | 7-12 | Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. Inspect mechanical links of the valve for correct operation. Conduct test of valve to ensure it operates correctly. | Monthly - Inspect stabilizer bar to ensure that it is securely mounted below the base of the dispenser. Inspect the mounting bolts that secure the emergency shutoff valve to the stabilizer bar. Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. | ||
| 48515 | 393C | Military Service Station | Dispenser Shear Valve - 11/12 | Dispenser Component | OPW | 10 Series | UNK | X | 7-12 | Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. Inspect mechanical links of the valve for correct operation. Conduct test of valve to ensure it operates correctly. | Monthly - Inspect stabilizer bar to ensure that it is securely mounted below the base of the dispenser. Inspect the mounting bolts that secure the emergency shutoff valve to the stabilizer bar. Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. | ||
| 48515 | 393C | Military Service Station | Dispenser Shear Valve - 3/4 | Dispenser Component | OPW | 10 Series | UNK | X | 7-12 | Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. Inspect mechanical links of the valve for correct operation. Conduct test of valve to ensure it operates correctly. | Monthly - Inspect stabilizer bar to ensure that it is securely mounted below the base of the dispenser. Inspect the mounting bolts that secure the emergency shutoff valve to the stabilizer bar. Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. | ||
| 48515 | 393C | Military Service Station | Dispenser Shear Valve - 9/10 | Dispenser Component | OPW | 10 Series | UNK | X | 7-12 | Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. Inspect mechanical links of the valve for correct operation. Conduct test of valve to ensure it operates correctly. | Monthly - Inspect stabilizer bar to ensure that it is securely mounted below the base of the dispenser. Inspect the mounting bolts that secure the emergency shutoff valve to the stabilizer bar. Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. | ||
| 48515 | 393C | Military Service Station | Dispenser Sump - 1/2 | Dispenser Component | N/A | N/A | N/A | X | 7-13 | nspect sump pipe transition fittings for tears, cracks, or other signs of deterioration. Test dispenser sumps and ensure they are liquid tight by using vacuum, pressure, or liquid testing in accordance with 40 CFR 280, Section 43. | Monthly - Inspect for signs of water, fuel, trash, and debris inside sumps. Remove and properly dispose of collected water, fuel, trash, and debris. Visually inspect penetration fittings. If fuel or water is detected investigate the source and repair. | ||
| 48515 | 393C | Military Service Station | Dispenser Sump - 11/12 | Dispenser Component | N/A | N/A | N/A | X | 7-13 | nspect sump pipe transition fittings for tears, cracks, or other signs of deterioration. Test dispenser sumps and ensure they are liquid tight by using vacuum, pressure, or liquid testing in accordance with 40 CFR 280, Section 43. | Monthly - Inspect for signs of water, fuel, trash, and debris inside sumps. Remove and properly dispose of collected water, fuel, trash, and debris. Visually inspect penetration fittings. If fuel or water is detected investigate the source and repair. | ||
| 48515 | 393C | Military Service Station | Dispenser Sump - 3/4 | Dispenser Component | N/A | N/A | N/A | X | 7-13 | nspect sump pipe transition fittings for tears, cracks, or other signs of deterioration. Test dispenser sumps and ensure they are liquid tight by using vacuum, pressure, or liquid testing in accordance with 40 CFR 280, Section 43. | Monthly - Inspect for signs of water, fuel, trash, and debris inside sumps. Remove and properly dispose of collected water, fuel, trash, and debris. Visually inspect penetration fittings. If fuel or water is detected investigate the source and repair. | ||
| 48515 | 393C | Military Service Station | Dispenser Sump - 9/10 | Dispenser Component | N/A | N/A | N/A | X | 7-13 | nspect sump pipe transition fittings for tears, cracks, or other signs of deterioration. Test dispenser sumps and ensure they are liquid tight by using vacuum, pressure, or liquid testing in accordance with 40 CFR 280, Section 43. | Monthly - Inspect for signs of water, fuel, trash, and debris inside sumps. Remove and properly dispose of collected water, fuel, trash, and debris. Visually inspect penetration fittings. If fuel or water is detected investigate the source and repair. | ||
| 48515 | 393 | Military Service Station | Ground Rod - 1 | Static Ground | UNK | UNK | UNK | X | X | 7-14 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | |
| 48515 | 393 | Military Service Station | Ground Rod - 10 | Static Ground | UNK | UNK | UNK | X | X | 7-14 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | |
| 48515 | 393 | Military Service Station | Ground Rod - 11 | Static Ground | UNK | UNK | UNK | X | X | 7-14 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | |
| 48515 | 393 | Military Service Station | Ground Rod - 12 | Static Ground | UNK | UNK | UNK | X | X | 7-14 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | |
| 48515 | 393 | Military Service Station | Ground Rod - 13 | Static Ground | UNK | UNK | UNK | X | X | 7-14 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | |
| 48515 | 393 | Military Service Station | Ground Rod - 14 | Static Ground | UNK | UNK | UNK | X | X | 7-14 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | |
| 48515 | 393 | Military Service Station | Ground Rod - 15 | Static Ground | UNK | UNK | UNK | X | X | 7-14 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | |
| 48515 | 393 | Military Service Station | Ground Rod - 16 | Static Ground | UNK | UNK | UNK | X | X | 7-14 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | |
| 48515 | 393 | Military Service Station | Ground Rod - 17 | Static Ground | UNK | UNK | UNK | X | X | 7-14 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | |
| 48515 | 393 | Military Service Station | Ground Rod - 18 | Static Ground | UNK | UNK | UNK | X | X | 7-14 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | |
| 48515 | 393 | Military Service Station | Ground Rod - 19 | Static Ground | UNK | UNK | UNK | X | X | 7-14 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | |
| 48515 | 393 | Military Service Station | Ground Rod - 2 | Static Ground | UNK | UNK | UNK | X | X | 7-14 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .