This is a Facility Maintenance Plan template for fuel systems maintenance at Red River Army Depot in Texas. The document outlines maintenance requirements for permanently installed fuel facilities operated under Quality Assurance Evaluators' control.

The template details comprehensive maintenance schedules and inspection requirements for various fuel system components including above-ground storage tanks (ranging from 12,000-17,500 gallon capacity), underground storage tanks, filter separators, manual valves, meter registers, flow meters, control valves, pumps, monitoring equipment, alarms, and fire fighting equipment. It specifies daily, weekly, monthly, and annual inspection and maintenance tasks for each component type, covering security fencing, canopies, emergency eyewash stations, piping systems, dispensers, and ground rods. The facility handles multiple fuel types including Jet A, MOGAS, and diesel, with specific maintenance protocols for each system's components like nozzles, hoses, breakaways, and swivels. The template includes spaces for recording contact information for DLA, contractor, and USACE personnel responsible for facility oversight.

View the file

Other files

File Type Posted
Sources Sought FUELS - Programmatic Rev1 7 May 25.docx DOCX document
3.4 Appendix B - Attachment 4 - SO Tracker-20210628.xlsx XLSX spreadsheet
6.0 - Appendix E ISR 15-Bulk_Fuel_Facilities FY25.xlsx XLSX spreadsheet
2.0 Appendix A RM_SO Process_20241220_PgM Reviewed Incorporated.docx DOCX document
3.1 Appendix B - Attachment 1 - Three Week Look Ahead_20230420.xlsx XLSX spreadsheet
3.2 Appendix B - Attachment 2 - Monthly Report Format 20240910.docx DOCX document
2.2 Appendix A - Attachment 2 Contractor Travel Expense Report_20240910.xlsx XLSX spreadsheet
9.0 Appendix H - Minor Repairs Incidental to Maintenance Activities POJ 20231009.xlsx XLSX spreadsheet
7.0 CUID - v2.1.pdf PDF
8.0 Appendix G_UFC 3-460-03 Maintenance Table- v4.3.pdf PDF
6.0 Appendix E ISR 14_operational_fuel_facilities FY25.xlsx XLSX spreadsheet
3.0 Appendix B Reporting Requirements_20240910.docx DOCX document
4.0 Appendix C Task Order Specifications_202401216.docx DOCX document
5.0 Appendix D Antiterrorism and OPSEC 20230206.docx DOCX document
PWS LEX FMP Template - v2.2.xlsx XLSX spreadsheet
PWS VNC FMP Template - v2.2.xlsx XLSX spreadsheet
PWS KEQ FMP Template - v2.2.xlsx XLSX spreadsheet
PWS CVZ FMP Template - v2.2.xlsx XLSX spreadsheet
PWS SHP FMP Template - v2.2.xlsx XLSX spreadsheet
PWS PBA FMP Template - v2.2.xlsx XLSX spreadsheet
PWS GRB FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BRO FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BAR FMP Template - v2.2.xlsx XLSX spreadsheet
PWS EFS FMP Template - v2.2.xlsx XLSX spreadsheet
PWS LAU FMP Template - v2.2.xlsx XLSX spreadsheet
PWS CHF FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BEU FMP Template - v2.2.xlsx XLSX spreadsheet
PWS GDF FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BLI FMP Template - v2.2.xlsx XLSX spreadsheet
PWS TKR FMP Template - v2.2.xlsx XLSX spreadsheet
PWS RBN FMP Template - v2.2.xlsx XLSX spreadsheet
PWS MAA FMP Template - v2.2.xlsx XLSX spreadsheet
PWS FSH FMP Template - v2.2.xlsx XLSX spreadsheet
PWS FSO FMP Template - v2.2.xlsx XLSX spreadsheet
PWS LRG FMP Template - v2.2.xlsx XLSX spreadsheet
PWS ALT FMP Template - v2.2.xlsx XLSX spreadsheet
PWS TUL FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BL2 FMP Template - v2.2.xlsx XLSX spreadsheet
PWS ELL FMP Template - v2.2.xlsx XLSX spreadsheet
PWS WRF FMP Template - v2.2.xlsx XLSX spreadsheet
PWS LLD FMP Template - v2.2.xlsx XLSX spreadsheet
PWS DYE FMP Template - v2.2.xlsx XLSX spreadsheet
12.0 PWS Appendix K Real Property Data_20230420.xlsx XLSX spreadsheet
PWS RAN FMP Template - v2.2.xlsx XLSX spreadsheet
PWS FSM FMP Template - v2.2.xlsx XLSX spreadsheet
PWS _Fuels RMMR 20241220.docx DOCX document
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Administrative

LocationSite NameRed River Army Depot
RPSUID6955
DLA Site CodeRRT
Hours of Operation0800-1600
Address100 James Carlow Dr, Red River Army Depot, TX 75507
ContractContractor
Contract #
Local POCsQAE Name
QAE Phone
QAE Email
Alt QAE Name
Alt QAE Phone
Alt QAE Email
DLA/SCP POCsDLA PM Name
DLA PM Phone
DLA PM Email
SCP PM Name
SCP PM Phone
SCP PM Email
Contractor POCsContractor PM Name
Contractor PM Phone
Contractor PM Email
Contractor QC Name
Contractor QC Phone
Contractor QC Email
Contractor SM Name
Contractor SM Phone
Contractor SM Email
USACE POCsUSACE PM/COR Name
USACE PM/COR Phone
USACE PM/COR Email
USACE PE Name
USACE PE Phone
USACE PE Email
USACE KO Name
USACE KO Phone
USACE KO Email

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

This table shows the minimum information required. Additional details should be included based on site specific requirements. Additional POCs may be required.

General Facility Description Facility Description

Purpose:

This Facility Maintenance Plan provides guidance for Contractor personnel in the operation, inspection, and maintenance of permanently installed fuel facilities operated under the control of the Quality Assurance Evaluators. Federal, state, and local environmental laws and regulations shall be complied with if this plan is in conflict with them.

Scope:

The instructions prescribed by this plan outline general fuels maintenance information associated with fuel storage and dispensing systems and provides the minimum periodic contractor maintenance and inspection criteria requirements for the systems. This plan is to be used in conjunction with other existing directives governing fuel system operations and maintenance requirements. Conotractor will properly maintain and repair federally funded petroleum systems and facilities in order to provide compliance with applicable code, criteria, and federal, state, local and/or host nation regulations.

Fuels Facilities:

Organizational tanks, and associated dispensing equipment are maintained and operated by the owning organization. Fuel system maintenance contractors shall perform all maintenance and associated procurement actions on installed fuel systems.

Each installation under the Southwest Division contract are military land-based facilities who receive, store, distribute, and/or dispense liquid fuels.

Standard fuel system equipment includes:

a) Above Ground Sorage Stanks (AST), Underground Storage Tanks (UST)

b) Filter/separator and other filtration device maintenance access, particularly element removal.

c) Manual valves

d) Meter Registers, and Flow Meters.

e) Control Valves.

f) Pumps

g) Tank Monitoring Equipment and Instruments

h) Alarms

i) Fire Fighting Equipment

Site Specific General Information:

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

Include a general facility overview and description of each fuel system for the sites in accordance with UFC 3-460-01. Examples include: Bulk Storage Facilities, Aircraft Fueling Facilities, Marine and Dispensing Facilities, Ground Products Fueling Facilities, Alternate POL Facilities, and Support Facilities. Also include facility #s, facility names, fuel type, photos, and any other pertinent information.

Include Site Specific Conditions and Restrictions in this tab.

Communication Plan

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

Communication plan shall address in/out briefs, lines of communication, coordination for access, etc.

Safety

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

Site Specific Addendum and Activity Hazard Analysis, which are Attachments to the APP, specific to activities or tasks related to recurring maintenance for this site.

RM Schedule

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

Link RM schedule here

Task Matrix

Applicable Facility AssetsUFC System Level Maintenance FrequencySpecial Considerations
Real Property Unique Identifier
(RPUID)Real Property Facility #Real Property Facility NameOperational AreaComponent TypeBase Asset IDComponent Unique Identifier (CUID)MakeModelCapacity/SizeQSAUFC Section ReferenceAdditional Manufacturer RM RequirementsOperator/ equipment RequirementsSystem availabilityOther ContractComments
48515393Military Service StationSecurity FencingSecurity FencingN/AN/AN/AXX11-1.1No Manufacturer Requirements AvailableMonthly - Remove debris from around security fence. Inspect fence grounding points. Ensure connections are not loose or damage.
48515393Military Service StationCanopyDispenser CanopyN/AN/AN/A11-2.2No Manufacturer Requirements AvailableNo Operator Requirement
48515393Military Service StationEmergency EyewashHeated ShowerN/AN/AN/AXXX11-3Weekly - Equipment installed within 10 seconds from the hazard and on the same plane as the hazard Pathway is clear of obstructions Plumbed equipment activated to ensure compliant operation and to clear any sediment Self-contained equipment checked to determine if the flushing fluid needs to be changed or supplemented Equipment free of broken or missing parts Equipment protected against freezing User protected from scalding waterNo Operator Requirement
48515382Military Service StationAbove Ground Storage Tank 8, Shop FabricatedDieselUNKUNK17,500X12-2No Manufacturer Requirements AvailableMonthly - Monthly External Inspection (Identified as P in Table 8-2): Visually inspect for exterior signs of corrosion or coating deterioration. Visually inspect weld seams, tank-to-saddle connections, tank supports, tank anchors, foundation and anchor bolts, overfill valves and alarms, normal vents, emergency vents, leak detection probe or water/petroleum accumulation in the interstice on double-walled tanks, leaking valves, fittings, or components, spill containment systems and release prevention barriers. Leaking valves, fittings or components shall be repaired immediately or immediately removed from service and isolated to prevent further discharge. Any irregularities, (e.g., missing valve handles, bolts, nuts, screens) will be assessed for priority and repaired as soon as possible or as required depending on the nature of the defect (See Appendix E for an example of the STI SP001 Standard Monthly Inspection Checklist).

Annually - Annual External Inspection (Identified as P in Table 8-2): A more detailed examination of the tank and appurtenances shall be performed on an annual basis (See Appendix E for an example of the STI SP001 Standard Annual Inspection Checklist).

48515 392 Military Service Station Above Ground Storage Tank, Shop Fabricated Deactivated UNK UNK UNK X 12-2 No Manufacturer Requirements Available Monthly - Monthly External Inspection (Identified as P in Table 8-2): Visually inspect for exterior signs of corrosion or coating deterioration. Visually inspect weld seams, tank-to-saddle connections, tank supports, tank anchors, foundation and anchor bolts, overfill valves and alarms, normal vents, emergency vents, leak detection probe or water/petroleum accumulation in the interstice on double-walled tanks, leaking valves, fittings, or components, spill containment systems and release prevention barriers. Leaking valves, fittings or components shall be repaired immediately or immediately removed from service and isolated to prevent further discharge. Any irregularities, (e.g., missing valve handles, bolts, nuts, screens) will be assessed for priority and repaired as soon as possible or as required depending on the nature of the defect (See Appendix E for an example of the STI SP001 Standard Monthly Inspection Checklist).

Annually - Annual External Inspection (Identified as P in Table 8-2): A more detailed examination of the tank and appurtenances shall be performed on an annual basis (See Appendix E for an example of the STI SP001 Standard Annual Inspection Checklist).

48515 390 Military Service Station Above Ground Storage Tank, Shop Fabricated Deactivated UNK UNK UNK X 12-3 No Manufacturer Requirements Available Monthly - Monthly External Inspection (Identified as P in Table 8-2): Visually inspect for exterior signs of corrosion or coating deterioration. Visually inspect weld seams, tank-to-saddle connections, tank supports, tank anchors, foundation and anchor bolts, overfill valves and alarms, normal vents, emergency vents, leak detection probe or water/petroleum accumulation in the interstice on double-walled tanks, leaking valves, fittings, or components, spill containment systems and release prevention barriers. Leaking valves, fittings or components shall be repaired immediately or immediately removed from service and isolated to prevent further discharge. Any irregularities, (e.g., missing valve handles, bolts, nuts, screens) will be assessed for priority and repaired as soon as possible or as required depending on the nature of the defect (See Appendix E for an example of the STI SP001 Standard Monthly Inspection Checklist).

Annually - Annual External Inspection (Identified as P in Table 8-2): A more detailed examination of the tank and appurtenances shall be performed on an annual basis (See Appendix E for an example of the STI SP001 Standard Annual Inspection Checklist).

48515379Military Service StationBasket Strainers - 1StrainerUNKUNKUNKxxx3-6.4Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyDaily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.

Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly

48515379Military Service StationBasket Strainers - 2StrainerUNKUNKUNKxxx3-6.4Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyDaily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.

Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly

48515379Military Service StationBasket Strainers - 3StrainerUNKUNKUNKxxx3-6.4Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyDaily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.

Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly

48515379Military Service StationBasket Strainers - 4StrainerUNKUNKUNKxxx3-6.4Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyDaily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.

Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly

48515379Military Service StationBasket Strainers - 5StrainerUNKUNKUNKxxx3-6.4Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyDaily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.

Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly

48515379Military Service StationBasket Strainers - 6StrainerUNKUNKUNKxxx3-6.4Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyDaily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.

Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly

48515379Military Service StationBulk Diesel Ofloading MeterBulk Diesel Ofloading MeterTCS682-15-SPAAT40 - 120 GPMX3-7.2Calibrtate as required dependent on usage. Inspect temperature element operation of meters equipped with temperature compensation featureNo Operator Requirement
48515379Military Service StationJet Top Load MeterJet Top Load MeterTokhiem145024-120 GPMX3-7.2Calibrtate as required dependent on usage. Inspect temperature element operation of meters equipped with temperature compensation featureNo Operator Requirement
48515379Military Service StationMogas Topload MeterMogas Topload MeterTCS700-20SPA4AT10-100 GPMX3-7.2Calibrtate as required dependent on usage. Inspect temperature element operation of meters equipped with temperature compensation featureNo Operator Requirement
48515379Military Service StationCentrifugal Pump - 1Diesel DispenserGorman RuppO2K3X2-1PUNKXX3-8.1During routine pump inspections only the easy to monitor factors such as pressure, temperature, vibration etc can be checKed. But during quarterly inspections, shaft alignment and oil levels should also be checked. Change Oil AnnuallyNo Operator Requirement
48515379Military Service StationCentrifugal Pump - 2Jet A Loading PumpIngersal RandRA5W 58-46073UNKXX3-8.1During routine pump inspections only the easy to monitor factors such as pressure, temperature, vibration etc can be checKed. But during quarterly inspections, shaft alignment and oil levels should also be checked. Change Oil AnnuallyNo Operator Requirement
48515379Military Service StationCentrifugal Pump - 3MOGAS LoadGorman RuppModel 02K3X21PUNKXX3-8.1During routine pump inspections only the easy to monitor factors such as pressure, temperature, vibration etc can be checKed. But during quarterly inspections, shaft alignment and oil levels should also be checked. Change Oil AnnuallyNo Operator Requirement
48515379Military Service StationCentrifugal Pump - 4MOGAS LoadGorman RuppModel 02K3X21PUNKXX3-8.1During routine pump inspections only the easy to monitor factors such as pressure, temperature, vibration etc can be checKed. But during quarterly inspections, shaft alignment and oil levels should also be checked. Change Oil AnnuallyNo Operator Requirement
48515379Military Service StationVane Pump - 1Diesel DispenserBlackmearXL 1.25 cat.no B55807687UNKXX3-8.2.1Check for unusual noise, vibration, temperature and leaks. Change Oil AnnuallyNo Operator Requirement
48515379Military Service StationVane Pump - 2Jet A Loading PumpBlackmearXL 1.25 cat.no VL5007UNKXX3-8.2.1Check for unusual noise, vibration, temperature and leaks. Change Oil AnnuallyNo Operator Requirement
48515379Military Service StationVane Pump - 3Dyno PumpBlackmearFrame 143TXL 1.25XX3-8.2.1Check for unusual noise, vibration, temperature and leaks. Change Oil AnnuallyNo Operator Requirement
48515379Military Service StationVane Pump - 4Dyno PumpBlackmearFrame 143TXL 1.25XX3-8.2.1Check for unusual noise, vibration, temperature and leaks. Change Oil AnnuallyNo Operator Requirement
48515379Military Service StationGear PumpDiesel FillstandRoper3622 MOHBFRV TYPE 3 S/N 513975UNKXX3-8.2.2Replenish grease lubricated sleeve bearing grease per the O & M manual using the manual grease lubricator. Perform every 3 months while idle. Check for unusual noise, vibration, temperature and leaks. Anytime a pump is opened, inspect the running clearances and restore them to original specifications if the running clearances have doubled (install new wear rings). Anytime a pump is opened, inspect the impeller for corrosion or excessive wear. Change Oil AnnuallyNo Operator Requirement
48515379Military Service StationPilot Control ValveDyno AreaCla-ValB1066015 Code ZQ0-75 PSIXX4-3.2.1Daily for proper operation, visible signs of leaks and damage.No Operator Requirement
48515393Military Service StationEFSO -1Emergency Fuel Shut-OffN/AN/AN/AX4-4.2.9Proper operation, box seals for integrity. Electrical connections for continuity.No Operator Requirement
48515393Military Service StationEFSO -2Emergency Fuel Shut-OffN/AN/AN/AX4-4.2.9Proper operation, box seals for integrity. Electrical connections for continuity.No Operator Requirement
48515393Military Service StationEFSO -3Emergency Fuel Shut-OffN/AN/AN/AX4-4.2.9Proper operation, box seals for integrity. Electrical connections for continuity.No Operator Requirement
48515393Military Service StationEFSO -4Emergency Fuel Shut-OffN/AN/AN/AX4-4.2.9Proper operation, box seals for integrity. Electrical connections for continuity.No Operator Requirement
48515393Military Service StationEFSO -5Emergency Fuel Shut-OffN/AN/AN/AX4-4.2.9Proper operation, box seals for integrity. Electrical connections for continuity.No Operator Requirement
48515393Military Service StationEFSO -6Emergency Fuel Shut-OffN/AN/AN/AX4-4.2.9Proper operation, box seals for integrity. Electrical connections for continuity.No Operator Requirement
48515379Military Service StationAbove Ground PipingPipingN/AN/AN/AX6-1.3No Manufacturer Requirements AvailableWeekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection.
48515379Military Service StationGate Valve - 1Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 10Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 11Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 12Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 13Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 14Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 15Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 16Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 17Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 18Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 19Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 2Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 20Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 21Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 22Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 23Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 24Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 25Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 26Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 27Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 28Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 29Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 3Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 30Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 31Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 32Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 33Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 34Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 35Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 36Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 37Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 38Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 39Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 4Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 40Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 41Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 42Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 43Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 44Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 45Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 46Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 47Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 48Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 49Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 5Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 50Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 51Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 52Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 53Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 54Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 55Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 56Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 57Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 58Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 59Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 6Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 60Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 61Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 7Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 8Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationGate Valve - 9Gate ValveUNKUNKUNKXX6-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator Requirement
48515379Military Service StationBall Valve - 1Ball ValveUNKUNKUNKX6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator Requirement
48515379Military Service StationBall Valve - 10Ball ValveUNKUNKUNKX6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator Requirement
48515379Military Service StationBall Valve - 11Ball ValveUNKUNKUNKX6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator Requirement
48515379Military Service StationBall Valve - 12Ball ValveUNKUNKUNKX6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator Requirement
48515379Military Service StationBall Valve - 13Ball ValveUNKUNKUNKX6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator Requirement
48515379Military Service StationBall Valve - 14Ball ValveUNKUNKUNKX6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator Requirement
48515379Military Service StationBall Valve - 15Ball ValveUNKUNKUNKX6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator Requirement
48515379Military Service StationBall Valve - 16Ball ValveUNKUNKUNKX6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator Requirement
48515379Military Service StationBall Valve - 17Ball ValveUNKUNKUNKX6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator Requirement
48515379Military Service StationBall Valve - 18Ball ValveUNKUNKUNKX6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator Requirement
48515379Military Service StationBall Valve - 19Ball ValveUNKUNKUNKX6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator Requirement
48515379Military Service StationBall Valve - 2Ball ValveUNKUNKUNKX6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator Requirement
48515379Military Service StationBall Valve - 20Ball ValveUNKUNKUNKX6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator Requirement
48515379Military Service StationBall Valve - 21Ball ValveUNKUNKUNKX6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator Requirement
48515379Military Service StationBall Valve - 22Ball ValveUNKUNKUNKX6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator Requirement
48515379Military Service StationBall Valve - 23Ball ValveUNKUNKUNKX6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator Requirement
48515379Military Service StationBall Valve - 24Ball ValveUNKUNKUNKX6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator Requirement
48515379Military Service StationBall Valve - 25Ball ValveUNKUNKUNKX6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator Requirement
48515379Military Service StationBall Valve - 26Ball ValveUNKUNKUNKX6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator Requirement
48515379Military Service StationBall Valve - 3Ball ValveUNKUNKUNKX6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator Requirement
48515379Military Service StationBall Valve - 4Ball ValveUNKUNKUNKX6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator Requirement
48515379Military Service StationBall Valve - 5Ball ValveUNKUNKUNKX6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator Requirement
48515379Military Service StationBall Valve - 6Ball ValveUNKUNKUNKX6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator Requirement
48515379Military Service StationBall Valve - 7Ball ValveUNKUNKUNKX6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator Requirement
48515379Military Service StationBall Valve - 8Ball ValveUNKUNKUNKX6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator Requirement
48515379Military Service StationBall Valve - 9Ball ValveUNKUNKUNKX6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator Requirement
48515379Military Service StationPSI Gauge - 1Pressure GaugeUNKUNK0-250XXX6-7.1Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use.Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system.
48515379Military Service StationPSI Gauge - 2Pressure GaugeUNKUNK0-250XXX6-7.1Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use.Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system.
48515379Military Service StationPSI Gauge - 3Pressure GaugeUNKUNK0-250XXX6-7.1Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use.Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system.
48515379Military Service StationPSI Gauge - 4Pressure GaugeUNKUNK0-250XXX6-7.1Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use.Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system.
48515379Military Service StationPSI Gauge - 5Pressure GaugeUNKUNK0-250XXX6-7.1Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use.Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system.
48515393CMilitary Service StationDispenser Shear Valve - 1/2Dispenser ComponentOPW10 SeriesUNKX7-12Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. Inspect mechanical links of the valve for correct operation. Conduct test of valve to ensure it operates correctly.Monthly - Inspect stabilizer bar to ensure that it is securely mounted below the base of the dispenser. Inspect the mounting bolts that secure the emergency shutoff valve to the stabilizer bar. Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel.
48515393CMilitary Service StationDispenser Shear Valve - 11/12Dispenser ComponentOPW10 SeriesUNKX7-12Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. Inspect mechanical links of the valve for correct operation. Conduct test of valve to ensure it operates correctly.Monthly - Inspect stabilizer bar to ensure that it is securely mounted below the base of the dispenser. Inspect the mounting bolts that secure the emergency shutoff valve to the stabilizer bar. Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel.
48515393CMilitary Service StationDispenser Shear Valve - 3/4Dispenser ComponentOPW10 SeriesUNKX7-12Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. Inspect mechanical links of the valve for correct operation. Conduct test of valve to ensure it operates correctly.Monthly - Inspect stabilizer bar to ensure that it is securely mounted below the base of the dispenser. Inspect the mounting bolts that secure the emergency shutoff valve to the stabilizer bar. Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel.
48515393CMilitary Service StationDispenser Shear Valve - 9/10Dispenser ComponentOPW10 SeriesUNKX7-12Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel. Inspect mechanical links of the valve for correct operation. Conduct test of valve to ensure it operates correctly.Monthly - Inspect stabilizer bar to ensure that it is securely mounted below the base of the dispenser. Inspect the mounting bolts that secure the emergency shutoff valve to the stabilizer bar. Inspect fusible link and ensure it is not obstructed. Ensure valve body is clean and free of fuel.
48515393CMilitary Service StationDispenser Sump - 1/2Dispenser ComponentN/AN/AN/AX7-13nspect sump pipe transition fittings for tears, cracks, or other signs of deterioration. Test dispenser sumps and ensure they are liquid tight by using vacuum, pressure, or liquid testing in accordance with 40 CFR 280, Section 43.Monthly - Inspect for signs of water, fuel, trash, and debris inside sumps. Remove and properly dispose of collected water, fuel, trash, and debris. Visually inspect penetration fittings. If fuel or water is detected investigate the source and repair.
48515393CMilitary Service StationDispenser Sump - 11/12Dispenser ComponentN/AN/AN/AX7-13nspect sump pipe transition fittings for tears, cracks, or other signs of deterioration. Test dispenser sumps and ensure they are liquid tight by using vacuum, pressure, or liquid testing in accordance with 40 CFR 280, Section 43.Monthly - Inspect for signs of water, fuel, trash, and debris inside sumps. Remove and properly dispose of collected water, fuel, trash, and debris. Visually inspect penetration fittings. If fuel or water is detected investigate the source and repair.
48515393CMilitary Service StationDispenser Sump - 3/4Dispenser ComponentN/AN/AN/AX7-13nspect sump pipe transition fittings for tears, cracks, or other signs of deterioration. Test dispenser sumps and ensure they are liquid tight by using vacuum, pressure, or liquid testing in accordance with 40 CFR 280, Section 43.Monthly - Inspect for signs of water, fuel, trash, and debris inside sumps. Remove and properly dispose of collected water, fuel, trash, and debris. Visually inspect penetration fittings. If fuel or water is detected investigate the source and repair.
48515393CMilitary Service StationDispenser Sump - 9/10Dispenser ComponentN/AN/AN/AX7-13nspect sump pipe transition fittings for tears, cracks, or other signs of deterioration. Test dispenser sumps and ensure they are liquid tight by using vacuum, pressure, or liquid testing in accordance with 40 CFR 280, Section 43.Monthly - Inspect for signs of water, fuel, trash, and debris inside sumps. Remove and properly dispose of collected water, fuel, trash, and debris. Visually inspect penetration fittings. If fuel or water is detected investigate the source and repair.
48515393Military Service StationGround Rod - 1Static GroundUNKUNKUNKXX7-14Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location.No Operator Requirement
48515393Military Service StationGround Rod - 10Static GroundUNKUNKUNKXX7-14Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location.No Operator Requirement
48515393Military Service StationGround Rod - 11Static GroundUNKUNKUNKXX7-14Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location.No Operator Requirement
48515393Military Service StationGround Rod - 12Static GroundUNKUNKUNKXX7-14Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location.No Operator Requirement
48515393Military Service StationGround Rod - 13Static GroundUNKUNKUNKXX7-14Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location.No Operator Requirement
48515393Military Service StationGround Rod - 14Static GroundUNKUNKUNKXX7-14Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location.No Operator Requirement
48515393Military Service StationGround Rod - 15Static GroundUNKUNKUNKXX7-14Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location.No Operator Requirement
48515393Military Service StationGround Rod - 16Static GroundUNKUNKUNKXX7-14Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location.No Operator Requirement
48515393Military Service StationGround Rod - 17Static GroundUNKUNKUNKXX7-14Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location.No Operator Requirement
48515393Military Service StationGround Rod - 18Static GroundUNKUNKUNKXX7-14Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location.No Operator Requirement
48515393Military Service StationGround Rod - 19Static GroundUNKUNKUNKXX7-14Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location.No Operator Requirement
48515393Military Service StationGround Rod - 2Static GroundUNKUNKUNKXX7-14Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location.No Operator Requirement