This is a Facility Maintenance Plan (FMP) template and asset tracking spreadsheet for fuel systems maintenance at Fort Sill, Oklahoma. The document details maintenance requirements for various fuel system components at the Bulk Fill Area and Bulk Storage facilities, including tanks, pumps, valves, meters, and filtration equipment.
The spreadsheet catalogs specific maintenance tasks for each piece of equipment, including inspection frequencies (daily, weekly, monthly, quarterly, semi-annual, and annual), manufacturer specifications, UFC requirements, and mission impact classifications. Key systems covered include jet fuel separators, diesel separators, loading/fueling equipment, emergency vents, pressure relief valves, and automated fuel management systems. The facility operates from 0800-1600 at 2200 Randolph Rd, Ft Sill, OK 73503, with maintenance focused on ensuring compliance with federal, state, and local environmental regulations while maintaining operational readiness of fuel storage and dispensing systems.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Administrative
| Location | Site Name | Fort Sill |
| RPSUID | 5050 | |
| DLA Site Code | FSO | |
| Hours of Operation | 0800-1600 | |
| Address | 2200 Randolph Rd, Ft Sill, OK 73503 | |
| Contract | Contractor | |
| Contract # | ||
| Local POCs | QAE Name | |
| QAE Phone | ||
| QAE Email | ||
| Alt QAE Name | ||
| Alt QAE Phone | ||
| Alt QAE Email | ||
| DLA/SCP POCs | DLA PM Name | |
| DLA PM Phone | ||
| DLA PM Email | ||
| SCP PM Name | ||
| SCP PM Phone | ||
| SCP PM Email | ||
| Contractor POCs | Contractor PM Name | |
| Contractor PM Phone | ||
| Contractor PM Email | ||
| Contractor QC Name | ||
| Contractor QC Phone | ||
| Contractor QC Email | ||
| Contractor SM Name | ||
| Contractor SM Phone | ||
| Contractor SM Email | ||
| USACE POCs | USACE PM/COR Name | |
| USACE PM/COR Phone | ||
| USACE PM/COR Email | ||
| USACE PE Name | ||
| USACE PE Phone | ||
| USACE PE Email | ||
| USACE KO Name | ||
| USACE KO Phone | ||
| USACE KO Email |
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
This table shows the minimum information required. Additional details should be included based on site specific requirements. Additional POCs may be required.
General Facility Description Facility Description
Purpose:
This Facility Maintenance Plan provides guidance for Contractor personnel in the operation, inspection, and maintenance of permanently installed fuel facilities operated under the control of the Quality Assurance Evaluators. Federal, state, and local environmental laws and regulations shall be complied with if this plan is in conflict with them.
Scope:
The instructions prescribed by this plan outline general fuels maintenance information associated with fuel storage and dispensing systems and provides the minimum periodic contractor maintenance and inspection criteria requirements for the systems. This plan is to be used in conjunction with other existing directives governing fuel system operations and maintenance requirements. Conotractor will properly maintain and repair federally funded petroleum systems and facilities in order to provide compliance with applicable code, criteria, and federal, state, local and/or host nation regulations.
Fuels Facilities:
Organizational tanks, and associated dispensing equipment are maintained and operated by the owning organization. Fuel system maintenance contractors shall perform all maintenance and associated procurement actions on installed fuel systems.
Each installation under the Southwest Division contract are military land-based facilities who receive, store, distribute, and/or dispense liquid fuels.
Standard fuel system equipment includes:
a) Above Ground Sorage Stanks (AST), Underground Storage Tanks (UST)
b) Filter/separator and other filtration device maintenance access, particularly element removal.
c) Manual valves
d) Meter Registers, and Flow Meters.
e) Control Valves.
f) Pumps
g) Tank Monitoring Equipment and Instruments
h) Alarms
i) Fire Fighting Equipment
Site Specific General Information:
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Include a general facility overview and description of each fuel system for the sites in accordance with UFC 3-460-01. Examples include: Bulk Storage Facilities, Aircraft Fueling Facilities, Marine and Dispensing Facilities, Ground Products Fueling Facilities, Alternate POL Facilities, and Support Facilities. Also include facility #s, facility names, fuel type, photos, and any other pertinent information.
Include Site Specific Conditions and Restrictions in this tab.
Communication Plan
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Communication plan shall address in/out briefs, lines of communication, coordination for access, etc.
Safety
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Site Specific Addendum and Activity Hazard Analysis, which are Attachments to the APP, specific to activities or tasks related to recurring maintenance for this site.
RM Schedule
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Link RM schedule here
Task Matrix
| Applicable Facility Assets | UFC System Level Maintenance Frequency | Special Considerations | ||||||||||||||||
| Real Property Unique Identifier | ||||||||||||||||||
| (RPUID) | Real Property Facility # | Real Property Facility Name | Operational Area | Component Type | Base Asset ID | Component Unique Identifier (CUID) | Make | Model | Capacity/Size | Q | S | A | UFC Section Reference | Additional Manufacturer RM Requirements | Operator/ equipment Requirements | System availability | Other Contract | Comments |
| 40755 | 2245 | Bulk Fill Area | Basket Strainers | Basket Strainers, Diesel | Unk | Unk | 3" | 3-6.4 | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | |||||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. |
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly
| 40755 | 2245 | Bulk Fill Area | Positive Displacement Meter | Diesel Fill Stand Meter | Veeder Root | N/A | 0-600 | X | 3-7.1 | Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature | ||||||
| compensation feature | Monthly - Inspect counter head for unusual noises and smooth operation. | Temporary Mission Impact | ||||||||||||||
| 40755 | 2245 | Bulk Fill Area | Loading Fueling Hoses | Hoses | Unk | Unk | 4" | X | X | 3-9.1 | Aircraft fueling hose shall be inspected before use each day. The hose shall be extended as it normally would be for fueling and checked for evidence of blistering, carcass saturation or separation, cuts, nicks, or abrasions that expose reinforcement material, and for slippage, misalignment, or leaks at couplings. | Weekly - Visually inspect hoses for loose covers, cracks, brittle surface coatings, exposed wire braids, exposed reinforcement, flattening, kinks, and bulges or soft spots which might indicate broken or displaced reinforcement. | ||||
| Monthly - Pressurize hose to normal working pressure. Check flanged and threaded connections for leaks and inspect hose couplers for fluid seepage by pushing at the base of the coupling with your thumbs; a hose softened by fluid seepage must be replaced. | OOS during Hydrostatic Test | |||||||||||||||
| 40755 | 2245 | Bulk Fill Area | Combination Dual Rate-of-Flow Control and Solenoid Valves | Diesel Fill Stand | CLA-VAL | Unk | N/A | X | 4-3.3.1 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | No Mission Impact | ||||
| 40755 | 2245 | Bulk Fill Area | Fueling Nozzles | Single Point Nozzle D-3 | CLA-VAL | D-3 | 3" | X | 4-7.4 | Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand. | Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand. | No Mission Impact | ||||
| 40755 | 2245 | Bulk Fill Area | Ball Valves | Ball Valve | Unk | Unk | 2" | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | ||||
| 40755 | 2245 | Bulk Fill Area | Ball Valves | Ball Valve | Unk | Unk | 3" | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | ||||
| 40755 | 2245 | Bulk Fill Area | Ball Valves | Ball Valve | Unk | Unk | 3" | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | ||||
| 40755 | 2245 | Bulk Fill Area | Ball Valves | Ball Valve | Unk | Unk | 3" | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | ||||
| 40755 | 2245 | Bulk Fill Area | Double Block and Bleed Valves | Double Block and Bleed Valves | Unk | Unk | 3" | X | X | 6-6.2.5 | Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug. | No Operator Requirement | No Mission Impact | |||
| 40755 | 2245 | Bulk Fill Area | Thermal and/or Pressure Relief Valves | Pressure Relief Valves | Taylor | Unk | 0-150 | X | X | 6-6.3 | Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended. | Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced. | ||||
| Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked. | Partial System OOS | |||||||||||||||
| 40755 | 2245 | Bulk Fill Area | Thermal and/or Pressure Relief Valves | Pressure Relief Valves | Taylor | Unk | 0-150 | X | X | 6-6.3 | Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended. | Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced. | ||||
| Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked. | Partial System OOS | |||||||||||||||
| 40755 | 2245 | Bulk Fill Area | Thermal and/or Pressure Relief Valves | Pressure Relief Valves | Taylor | Unk | 0-150 | X | X | 6-6.3 | Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended. | Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced. | ||||
| Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked. | Partial System OOS | |||||||||||||||
| 40755 | 2245 | Bulk Fill Area | Thermal and/or Pressure Relief Valves | Pressure Relief Valves | Taylor | Unk | 0-150 | X | X | 6-6.3 | Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended. | Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced. | ||||
| Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked. | Partial System OOS | |||||||||||||||
| 40755 | 2245 | Bulk Fill Area | Fire Valves | Fire Valves | Unk | Unk | 3" | X | X | 6-6.4.1 | NFPA requires annual inspection from floor level. Pipe and fittings shall also be inspected annually from the floor level. | |||||
| Manufacturer: Check for leaks, corrosion, physical damage. | No Operator Requirement | Partial System OOS | ||||||||||||||
| 40755 | 2245 | Bulk Fill Area | Pressure and Pressure/Vacuum Gauges | Pressure Gauges | Ashcroft | Unk | 0-200 | X | X | X | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. | No Mission Impact | ||
| 40755 | 2245 | Bulk Fill Area | Pressure and Pressure/Vacuum Gauges | Pressure/Vacuum Gauges | Unk | Unk | 0-200 | X | X | X | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. | No Mission Impact | ||
| 40755 | 2245 | Bulk Fill Area | Pressure and Pressure/Vacuum Gauges | Pressure/Vacuum Gauges | Unk | Unk | 0-200 | X | X | X | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. | No Mission Impact | ||
| 40755 | 2245 | Bulk Fill Area | Sight Flow Indicators | Sight Flow Indicators | N/A | N/A | N/A | 6-12.3 | Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | No Mission Impact | |||||
| 40755 | 2245 | Bulk Fill Area | Sight Flow Indicators | Sight Flow Indicators | N/A | N/A | N/A | 6-12.3 | Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | No Mission Impact | |||||
| 40755 | 2245 | Bulk Fill Area | Sight Flow Indicators | Sight Flow Indicators | N/A | N/A | N/A | 6-12.3 | Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | No Mission Impact | |||||
| 40755 | 2245 | Bulk Fill Area | Sight Flow Indicators | Sight Flow Indicators | N/A | N/A | N/A | 6-12.3 | Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | No Mission Impact | |||||
| 40755 | 2245 | Bulk Fill Area | EFSO Systems | E-Stop | N/A | N/A | N/A | X | 7-16 | Proper operation, box seals for integrity. Electrical connections for continuity. | No Operator Requirement | Temporary Mission Impact | ||||
| 40755 | 2245 | Bulk Fill Area | Power Grounding Systems | Scully Ground Hog Verification | Scully | Intelletrol | N/A | X | X | 9-1.6.1 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | No Mission Impact | |||
| 40755 | 2245 | Bulk Fill Area | Card and Key Locks | Fuel Master Unit, Diesel | VILMASTER | Unk | N/A | X | 9-3 | No Manufacturer Requirements Available | No Operator Requirement | No Mission Impact | ||||
| 40755 | 2245 | Bulk Fill Area | Basket Strainers | Basket Strainers, Jet #1 | Unk | Unk | 3" | 3-6.4 | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | |||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. |
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly
| 40755 | 2245 | Bulk Fill Area | Loading Fueling Hoses | Hoses | Unk | Unk | 3" | X | X | 3-9.1 | Aircraft fueling hose shall be inspected before use each day. The hose shall be extended as it normally would be for fueling and checked for evidence of blistering, carcass saturation or separation, cuts, nicks, or abrasions that expose reinforcement material, and for slippage, misalignment, or leaks at couplings. | Weekly - Visually inspect hoses for loose covers, cracks, brittle surface coatings, exposed wire braids, exposed reinforcement, flattening, kinks, and bulges or soft spots which might indicate broken or displaced reinforcement. | ||||
| Monthly - Pressurize hose to normal working pressure. Check flanged and threaded connections for leaks and inspect hose couplers for fluid seepage by pushing at the base of the coupling with your thumbs; a hose softened by fluid seepage must be replaced. | OOS during Hydrostatic Test | |||||||||||||||
| 40755 | 2245 | Bulk Fill Area | Combination Dual Rate-of-Flow Control and Solenoid Valves | Jet Fill Stand #1 | CLA-VAL | Unk | N/A | X | 4-3.3.1 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | No Mission Impact | ||||
| 40755 | 2245 | Bulk Fill Area | Fueling Nozzles | Single Point Nozzle D-1 | CLA-VAL | D-1 | 3" | X | 4-7.4 | Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand. | Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand. | No Mission Impact | ||||
| 40755 | 2245 | Bulk Fill Area | Ball Valves | Ball Valve | Unk | Unk | 3" | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | ||||
| 40755 | 2245 | Bulk Fill Area | Ball Valves | Ball Valve | Unk | Unk | 3" | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | ||||
| 40755 | 2245 | Bulk Fill Area | Ball Valves | Ball Valve | Unk | Unk | 3" | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | ||||
| 40755 | 2245 | Bulk Fill Area | Ball Valves | Ball Valve | Unk | Unk | 3" | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | ||||
| 40755 | 2245 | Bulk Fill Area | Double Block and Bleed Valves | Double Block and Bleed Valves | Unk | Unk | 3" | X | X | 6-6.2.5 | Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug. | No Operator Requirement | No Mission Impact | |||
| 40755 | 2245 | Bulk Fill Area | Thermal and/or Pressure Relief Valves | Pressure Relief Valves | Taylor | Unk | 0-150 | X | X | 6-6.3 | Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended. | Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced. | ||||
| Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked. | Partial System OOS | |||||||||||||||
| 40755 | 2245 | Bulk Fill Area | Thermal and/or Pressure Relief Valves | Pressure Relief Valves | Taylor | Unk | 0-150 | X | X | 6-6.3 | Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended. | Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced. | ||||
| Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked. | Partial System OOS | |||||||||||||||
| 40755 | 2245 | Bulk Fill Area | Thermal and/or Pressure Relief Valves | Pressure Relief Valves | Taylor | Unk | 0-150 | X | X | 6-6.3 | Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended. | Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced. | ||||
| Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked. | Partial System OOS | |||||||||||||||
| 40755 | 2245 | Bulk Fill Area | Thermal and/or Pressure Relief Valves | Pressure Relief Valves | Taylor | Unk | 0-150 | X | X | 6-6.3 | Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended. | Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced. | ||||
| Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked. | Partial System OOS | |||||||||||||||
| 40755 | 2245 | Bulk Fill Area | Fire Valves | Fire Valves | Unk | Unk | 3" | X | X | 6-6.4.1 | NFPA requires annual inspection from floor level. Pipe and fittings shall also be inspected annually from the floor level. | |||||
| Manufacturer: Check for leaks, corrosion, physical damage. | No Operator Requirement | Partial System OOS | ||||||||||||||
| 40755 | 2245 | Bulk Fill Area | Pressure and Pressure/Vacuum Gauges | Pressure Gauges | Ashcroft | Unk | 0-200 | X | X | X | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. | No Mission Impact | ||
| 40755 | 2245 | Bulk Fill Area | Pressure and Pressure/Vacuum Gauges | Pressure Gauges | Ashcroft | Unk | 0-200 | X | X | X | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. | No Mission Impact | ||
| 40755 | 2245 | Bulk Fill Area | Pressure and Pressure/Vacuum Gauges | Pressure Gauges | Ashcroft | Unk | 0-200 | X | X | X | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. | No Mission Impact | ||
| 40755 | 2245 | Bulk Fill Area | Sight Flow Indicators | Sight Flow Indicators | N/A | N/A | N/A | 6-12.3 | Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | No Mission Impact | |||||
| 40755 | 2245 | Bulk Fill Area | Sight Flow Indicators | Sight Flow Indicators | N/A | N/A | N/A | 6-12.3 | Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | No Mission Impact | |||||
| 40755 | 2245 | Bulk Fill Area | Sight Flow Indicators | Sight Flow Indicators | N/A | N/A | N/A | 6-12.3 | Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | No Mission Impact | |||||
| 40755 | 2245 | Bulk Fill Area | Sight Flow Indicators | Sight Flow Indicators | N/A | N/A | N/A | 6-12.3 | Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | No Mission Impact | |||||
| 40755 | 2245 | Bulk Fill Area | EFSO Systems | E-Stop | N/A | N/A | N/A | X | 7-16 | Proper operation, box seals for integrity. Electrical connections for continuity. | No Operator Requirement | Temporary Mission Impact | ||||
| 40755 | 2245 | Bulk Fill Area | Power Grounding Systems | Scully Ground Hog Verification | Scully | Intellitrol | N/A | X | X | 9-1.6.1 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | No Mission Impact | |||
| 40755 | 2245 | Bulk Fill Area | Card and Key Locks | Fuel Master Unit, Jet A #1 | VILMASTER | Unk | N/A | X | 9-3 | No Manufacturer Requirements Available | No Operator Requirement | No Mission Impact | ||||
| 40755 | 2245 | Bulk Fill Area | Basket Strainers | Basket Strainers, MOGAS | Unk | Unk | 3" | 3-6.4 | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | |||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. |
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly
| 40755 | 2245 | Bulk Fill Area | Loading Fueling Hoses | Hoses | Unk | Unk | 3" | X | X | 3-9.1 | Aircraft fueling hose shall be inspected before use each day. The hose shall be extended as it normally would be for fueling and checked for evidence of blistering, carcass saturation or separation, cuts, nicks, or abrasions that expose reinforcement material, and for slippage, misalignment, or leaks at couplings. | Weekly - Visually inspect hoses for loose covers, cracks, brittle surface coatings, exposed wire braids, exposed reinforcement, flattening, kinks, and bulges or soft spots which might indicate broken or displaced reinforcement. | ||||
| Monthly - Pressurize hose to normal working pressure. Check flanged and threaded connections for leaks and inspect hose couplers for fluid seepage by pushing at the base of the coupling with your thumbs; a hose softened by fluid seepage must be replaced. | OOS during Hydrostatic Test | |||||||||||||||
| 40755 | 2245 | Bulk Fill Area | Combination Dual Rate-of-Flow Control and Solenoid Valves | MOGAS Fill Stand | CLA-VAL | Unk | N/A | X | 4-3.3.1 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | No Mission Impact | ||||
| 40755 | 2245 | Bulk Fill Area | Fueling Nozzles | Single Point Nozzle D-1 | CLA-VAL | D-1 | 3" | X | 4-7.4 | Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand. | Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand. | No Mission Impact | ||||
| 40755 | 2245 | Bulk Fill Area | Ball Valves | Ball Valve | Unk | Unk | 3" | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | ||||
| 40755 | 2245 | Bulk Fill Area | Ball Valves | Ball Valve | Unk | Unk | 3" | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | ||||
| 40755 | 2245 | Bulk Fill Area | Ball Valves | Ball Valve | Unk | Unk | 3" | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | ||||
| 40755 | 2245 | Bulk Fill Area | Ball Valves | Ball Valve | Unk | Unk | 3" | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | ||||
| 40755 | 2245 | Bulk Fill Area | Double Block and Bleed Valves | Double Block and Bleed Valves | Unk | Unk | 3" | X | X | 6-6.2.5 | Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug. | No Operator Requirement | No Mission Impact | |||
| 40755 | 2245 | Bulk Fill Area | Thermal and/or Pressure Relief Valves | Pressure Relief Valves | Taylor | Unk | 0-150 | X | X | 6-6.3 | Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended. | Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced. | ||||
| Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked. | Partial System OOS | |||||||||||||||
| 40755 | 2245 | Bulk Fill Area | Thermal and/or Pressure Relief Valves | Pressure Relief Valves | Taylor | Unk | 0-150 | X | X | 6-6.3 | Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended. | Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced. | ||||
| Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked. | Partial System OOS | |||||||||||||||
| 40755 | 2245 | Bulk Fill Area | Thermal and/or Pressure Relief Valves | Pressure Relief Valves | Taylor | Unk | 0-150 | X | X | 6-6.3 | Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended. | Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced. | ||||
| Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked. | Partial System OOS | |||||||||||||||
| 40755 | 2245 | Bulk Fill Area | Thermal and/or Pressure Relief Valves | Pressure Relief Valves | Taylor | Unk | 0-150 | X | X | 6-6.3 | Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended. | Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced. | ||||
| Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked. | Partial System OOS | |||||||||||||||
| 40755 | 2245 | Bulk Fill Area | Fire Valves | Fire Valves | Unk | Unk | 3" | X | X | 6-6.4.1 | NFPA requires annual inspection from floor level. Pipe and fittings shall also be inspected annually from the floor level. | |||||
| Manufacturer: Check for leaks, corrosion, physical damage. | No Operator Requirement | Partial System OOS | ||||||||||||||
| 40755 | 2245 | Bulk Fill Area | Pressure and Pressure/Vacuum Gauges | Pressure Gauges | Ashcroft | Unk | 0-200 | X | X | X | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. | No Mission Impact | ||
| 40755 | 2245 | Bulk Fill Area | Pressure and Pressure/Vacuum Gauges | Pressure/Vacuum Gauges | Unk | Unk | 0-200 | X | X | X | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. | No Mission Impact | ||
| 40755 | 2245 | Bulk Fill Area | Pressure and Pressure/Vacuum Gauges | Pressure/Vacuum Gauges | Unk | Unk | 0-200 | X | X | X | 6-7.1 | Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use. | Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system. | No Mission Impact | ||
| 40755 | 2245 | Bulk Fill Area | Sight Flow Indicators | Sight Flow Indicators | N/A | N/A | N/A | 6-12.3 | Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | No Mission Impact | |||||
| 40755 | 2245 | Bulk Fill Area | Sight Flow Indicators | Sight Flow Indicators | N/A | N/A | N/A | 6-12.3 | Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | No Mission Impact | |||||
| 40755 | 2245 | Bulk Fill Area | Sight Flow Indicators | Sight Flow Indicators | N/A | N/A | N/A | 6-12.3 | Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | No Mission Impact | |||||
| 40755 | 2245 | Bulk Fill Area | Sight Flow Indicators | Sight Flow Indicators | N/A | N/A | N/A | 6-12.3 | Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | No Mission Impact | |||||
| 40755 | 2245 | Bulk Fill Area | EFSO Systems | E-Stop | N/A | N/A | N/A | X | 7-16 | Proper operation, box seals for integrity. Electrical connections for continuity. | No Operator Requirement | Temporary Mission Impact | ||||
| 40755 | 2245 | Bulk Fill Area | Power Grounding Systems | Scully Ground Hog Verification | Scully | Intelletrol | N/A | X | X | 9-1.6.1 | Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location. | No Operator Requirement | No Mission Impact | |||
| 40755 | 2245 | Bulk Fill Area | Card and Key Locks | Fuel Master Unit, MOGAS | VILMASTER | Unk | N/A | X | 9-3 | No Manufacturer Requirements Available | No Operator Requirement | No Mission Impact | ||||
| 40755 | 2245 | Bulk Fill Area | Basket Strainers | Basket Strainers, Jet #2 | Unk | Unk | 3" | 3-6.4 | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | |||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. |
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly
| 40755 | 2245 | Bulk Fill Area | Loading Fueling Hoses | Hoses | Unk | N/A | 3" | X | X | 3-9.1 | Aircraft fueling hose shall be inspected before use each day. The hose shall be extended as it normally would be for fueling and checked for evidence of blistering, carcass saturation or separation, cuts, nicks, or abrasions that expose reinforcement material, and for slippage, misalignment, or leaks at couplings. | Weekly - Visually inspect hoses for loose covers, cracks, brittle surface coatings, exposed wire braids, exposed reinforcement, flattening, kinks, and bulges or soft spots which might indicate broken or displaced reinforcement. | ||||
| Monthly - Pressurize hose to normal working pressure. Check flanged and threaded connections for leaks and inspect hose couplers for fluid seepage by pushing at the base of the coupling with your thumbs; a hose softened by fluid seepage must be replaced. | OOS during Hydrostatic Test | |||||||||||||||
| 40755 | 2245 | Bulk Fill Area | Combination Dual Rate-of-Flow Control and Solenoid Valves | Jet Fill Stand #2 | CLA-VAL | Unk | N/A | X | 4-3.3.1 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | No Mission Impact | ||||
| 40755 | 2245 | Bulk Fill Area | Fueling Nozzles | Single Point Nozzle D-1 | CLA-VAL | D-1 | 3" | X | 4-7.4 | Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand. | Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand. | No Mission Impact | ||||
| 40755 | 2245 | Bulk Fill Area | Ball Valves | Ball Valve | Unk | Unk | 3" | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | ||||
| 40755 | 2245 | Bulk Fill Area | Ball Valves | Ball Valve | Unk | Unk | 3" | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | ||||
| 40755 | 2245 | Bulk Fill Area | Ball Valves | Ball Valve | Unk | Unk | 3" | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | ||||
| 40755 | 2245 | Bulk Fill Area | Ball Valves | Ball Valve | Unk | Unk | 3" | X | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | ||||
| 40755 | 2245 | Bulk Fill Area | Double Block and Bleed Valves | Double Block and Bleed Valves | Unk | Unk | 3" | X | X | 6-6.2.5 | Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug. | No Operator Requirement | No Mission Impact | |||
| 40755 | 2245 | Bulk Fill Area | Thermal and/or Pressure Relief Valves | Pressure Relief Valves | Taylor | Unk | 0-150 | X | X | 6-6.3 | Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended. | Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced. | ||||
| Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked. | Partial System OOS | |||||||||||||||
| 40755 | 2245 | Bulk Fill Area | Thermal and/or Pressure Relief Valves | Pressure Relief Valves | Taylor | Unk | 0-150 | X | X | 6-6.3 | Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended. | Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced. | ||||
| Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked. | Partial System OOS | |||||||||||||||
| 40755 | 2245 | Bulk Fill Area | Thermal and/or Pressure Relief Valves | Pressure Relief Valves | Taylor | Unk | 0-150 | X | X | 6-6.3 | Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended. | Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced. | ||||
| Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked. | Partial System OOS | |||||||||||||||
| 40755 | 2245 | Bulk Fill Area | Thermal and/or Pressure Relief Valves | Pressure Relief Valves | Taylor | Unk | 0-150 | X | X | 6-6.3 | Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended. | Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced. | ||||
| Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked. | Partial System OOS | |||||||||||||||
| 40755 | 2245 | Bulk Fill Area | Fire Valves | Fire Valves | Unk | Unk | 3" | X | X | 6-6.4.1 | NFPA requires annual inspection from floor level. Pipe and fittings shall also be inspected annually from the floor level. | |||||
| Manufacturer: Check for leaks, corrosion, physical damage. | No Operator Requirement | Partial System OOS |