About this file

This is a Facility Maintenance Plan (FMP) template and asset tracking spreadsheet for fuel systems maintenance at Fort Sill, Oklahoma. The document details maintenance requirements for various fuel system components at the Bulk Fill Area and Bulk Storage facilities, including tanks, pumps, valves, meters, and filtration equipment.

The spreadsheet catalogs specific maintenance tasks for each piece of equipment, including inspection frequencies (daily, weekly, monthly, quarterly, semi-annual, and annual), manufacturer specifications, UFC requirements, and mission impact classifications. Key systems covered include jet fuel separators, diesel separators, loading/fueling equipment, emergency vents, pressure relief valves, and automated fuel management systems. The facility operates from 0800-1600 at 2200 Randolph Rd, Ft Sill, OK 73503, with maintenance focused on ensuring compliance with federal, state, and local environmental regulations while maintaining operational readiness of fuel storage and dispensing systems.

View the file

Other files

File Type Posted
Sources Sought FUELS - Programmatic Rev1 7 May 25.docx DOCX document
3.4 Appendix B - Attachment 4 - SO Tracker-20210628.xlsx XLSX spreadsheet
6.0 - Appendix E ISR 15-Bulk_Fuel_Facilities FY25.xlsx XLSX spreadsheet
2.0 Appendix A RM_SO Process_20241220_PgM Reviewed Incorporated.docx DOCX document
3.1 Appendix B - Attachment 1 - Three Week Look Ahead_20230420.xlsx XLSX spreadsheet
3.2 Appendix B - Attachment 2 - Monthly Report Format 20240910.docx DOCX document
2.2 Appendix A - Attachment 2 Contractor Travel Expense Report_20240910.xlsx XLSX spreadsheet
9.0 Appendix H - Minor Repairs Incidental to Maintenance Activities POJ 20231009.xlsx XLSX spreadsheet
7.0 CUID - v2.1.pdf PDF
8.0 Appendix G_UFC 3-460-03 Maintenance Table- v4.3.pdf PDF
6.0 Appendix E ISR 14_operational_fuel_facilities FY25.xlsx XLSX spreadsheet
3.0 Appendix B Reporting Requirements_20240910.docx DOCX document
4.0 Appendix C Task Order Specifications_202401216.docx DOCX document
5.0 Appendix D Antiterrorism and OPSEC 20230206.docx DOCX document
PWS LEX FMP Template - v2.2.xlsx XLSX spreadsheet
PWS VNC FMP Template - v2.2.xlsx XLSX spreadsheet
PWS KEQ FMP Template - v2.2.xlsx XLSX spreadsheet
PWS CVZ FMP Template - v2.2.xlsx XLSX spreadsheet
PWS SHP FMP Template - v2.2.xlsx XLSX spreadsheet
PWS PBA FMP Template - v2.2.xlsx XLSX spreadsheet
PWS GRB FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BRO FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BAR FMP Template - v2.2.xlsx XLSX spreadsheet
PWS EFS FMP Template - v2.2.xlsx XLSX spreadsheet
PWS LAU FMP Template - v2.2.xlsx XLSX spreadsheet
PWS CHF FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BEU FMP Template - v2.2.xlsx XLSX spreadsheet
PWS GDF FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BLI FMP Template - v2.2.xlsx XLSX spreadsheet
PWS TKR FMP Template - v2.2.xlsx XLSX spreadsheet
PWS RBN FMP Template - v2.2.xlsx XLSX spreadsheet
PWS MAA FMP Template - v2.2.xlsx XLSX spreadsheet
PWS FSH FMP Template - v2.2.xlsx XLSX spreadsheet
PWS LRG FMP Template - v2.2.xlsx XLSX spreadsheet
PWS RRT FMP Template - v2.2.xlsx XLSX spreadsheet
PWS ALT FMP Template - v2.2.xlsx XLSX spreadsheet
PWS TUL FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BL2 FMP Template - v2.2.xlsx XLSX spreadsheet
PWS ELL FMP Template - v2.2.xlsx XLSX spreadsheet
PWS WRF FMP Template - v2.2.xlsx XLSX spreadsheet
PWS LLD FMP Template - v2.2.xlsx XLSX spreadsheet
PWS DYE FMP Template - v2.2.xlsx XLSX spreadsheet
12.0 PWS Appendix K Real Property Data_20230420.xlsx XLSX spreadsheet
PWS RAN FMP Template - v2.2.xlsx XLSX spreadsheet
PWS FSM FMP Template - v2.2.xlsx XLSX spreadsheet
PWS _Fuels RMMR 20241220.docx DOCX document
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Administrative

LocationSite NameFort Sill
RPSUID5050
DLA Site CodeFSO
Hours of Operation0800-1600
Address2200 Randolph Rd, Ft Sill, OK 73503
ContractContractor
Contract #
Local POCsQAE Name
QAE Phone
QAE Email
Alt QAE Name
Alt QAE Phone
Alt QAE Email
DLA/SCP POCsDLA PM Name
DLA PM Phone
DLA PM Email
SCP PM Name
SCP PM Phone
SCP PM Email
Contractor POCsContractor PM Name
Contractor PM Phone
Contractor PM Email
Contractor QC Name
Contractor QC Phone
Contractor QC Email
Contractor SM Name
Contractor SM Phone
Contractor SM Email
USACE POCsUSACE PM/COR Name
USACE PM/COR Phone
USACE PM/COR Email
USACE PE Name
USACE PE Phone
USACE PE Email
USACE KO Name
USACE KO Phone
USACE KO Email

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

This table shows the minimum information required. Additional details should be included based on site specific requirements. Additional POCs may be required.

General Facility Description Facility Description

Purpose:

This Facility Maintenance Plan provides guidance for Contractor personnel in the operation, inspection, and maintenance of permanently installed fuel facilities operated under the control of the Quality Assurance Evaluators. Federal, state, and local environmental laws and regulations shall be complied with if this plan is in conflict with them.

Scope:

The instructions prescribed by this plan outline general fuels maintenance information associated with fuel storage and dispensing systems and provides the minimum periodic contractor maintenance and inspection criteria requirements for the systems. This plan is to be used in conjunction with other existing directives governing fuel system operations and maintenance requirements. Conotractor will properly maintain and repair federally funded petroleum systems and facilities in order to provide compliance with applicable code, criteria, and federal, state, local and/or host nation regulations.

Fuels Facilities:

Organizational tanks, and associated dispensing equipment are maintained and operated by the owning organization. Fuel system maintenance contractors shall perform all maintenance and associated procurement actions on installed fuel systems.

Each installation under the Southwest Division contract are military land-based facilities who receive, store, distribute, and/or dispense liquid fuels.

Standard fuel system equipment includes:

a) Above Ground Sorage Stanks (AST), Underground Storage Tanks (UST)

b) Filter/separator and other filtration device maintenance access, particularly element removal.

c) Manual valves

d) Meter Registers, and Flow Meters.

e) Control Valves.

f) Pumps

g) Tank Monitoring Equipment and Instruments

h) Alarms

i) Fire Fighting Equipment

Site Specific General Information:

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

Include a general facility overview and description of each fuel system for the sites in accordance with UFC 3-460-01. Examples include: Bulk Storage Facilities, Aircraft Fueling Facilities, Marine and Dispensing Facilities, Ground Products Fueling Facilities, Alternate POL Facilities, and Support Facilities. Also include facility #s, facility names, fuel type, photos, and any other pertinent information.

Include Site Specific Conditions and Restrictions in this tab.

Communication Plan

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

Communication plan shall address in/out briefs, lines of communication, coordination for access, etc.

Safety

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

Site Specific Addendum and Activity Hazard Analysis, which are Attachments to the APP, specific to activities or tasks related to recurring maintenance for this site.

RM Schedule

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

Link RM schedule here

Task Matrix

Applicable Facility AssetsUFC System Level Maintenance FrequencySpecial Considerations
Real Property Unique Identifier
(RPUID)Real Property Facility #Real Property Facility NameOperational AreaComponent TypeBase Asset IDComponent Unique Identifier (CUID)MakeModelCapacity/SizeQSAUFC Section ReferenceAdditional Manufacturer RM RequirementsOperator/ equipment RequirementsSystem availabilityOther ContractComments
407552245Bulk Fill AreaBasket StrainersBasket Strainers, DieselUnkUnk3"3-6.4Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyDaily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.

Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly

407552245Bulk Fill AreaPositive Displacement MeterDiesel Fill Stand MeterVeeder RootN/A0-600X3-7.1Inspect counter head for unusual noises and smooth operation. Inspect temperature element operation of meters equipped with temperature
compensation featureMonthly - Inspect counter head for unusual noises and smooth operation.Temporary Mission Impact
407552245Bulk Fill AreaLoading Fueling HosesHosesUnkUnk4"XX3-9.1Aircraft fueling hose shall be inspected before use each day. The hose shall be extended as it normally would be for fueling and checked for evidence of blistering, carcass saturation or separation, cuts, nicks, or abrasions that expose reinforcement material, and for slippage, misalignment, or leaks at couplings.Weekly - Visually inspect hoses for loose covers, cracks, brittle surface coatings, exposed wire braids, exposed reinforcement, flattening, kinks, and bulges or soft spots which might indicate broken or displaced reinforcement.
Monthly - Pressurize hose to normal working pressure. Check flanged and threaded connections for leaks and inspect hose couplers for fluid seepage by pushing at the base of the coupling with your thumbs; a hose softened by fluid seepage must be replaced.OOS during Hydrostatic Test
407552245Bulk Fill AreaCombination Dual Rate-of-Flow Control and Solenoid ValvesDiesel Fill StandCLA-VALUnkN/AX4-3.3.1No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementNo Mission Impact
407552245Bulk Fill AreaFueling NozzlesSingle Point Nozzle D-3CLA-VALD-33"X4-7.4Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand.Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand.No Mission Impact
407552245Bulk Fill AreaBall ValvesBall ValveUnkUnk2"X6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
407552245Bulk Fill AreaBall ValvesBall ValveUnkUnk3"X6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
407552245Bulk Fill AreaBall ValvesBall ValveUnkUnk3"X6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
407552245Bulk Fill AreaBall ValvesBall ValveUnkUnk3"X6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
407552245Bulk Fill AreaDouble Block and Bleed ValvesDouble Block and Bleed ValvesUnkUnk3"XX6-6.2.5Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug.No Operator RequirementNo Mission Impact
407552245Bulk Fill AreaThermal and/or Pressure Relief ValvesPressure Relief ValvesTaylorUnk0-150XX6-6.3Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended.Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced.
Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked.Partial System OOS
407552245Bulk Fill AreaThermal and/or Pressure Relief ValvesPressure Relief ValvesTaylorUnk0-150XX6-6.3Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended.Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced.
Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked.Partial System OOS
407552245Bulk Fill AreaThermal and/or Pressure Relief ValvesPressure Relief ValvesTaylorUnk0-150XX6-6.3Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended.Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced.
Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked.Partial System OOS
407552245Bulk Fill AreaThermal and/or Pressure Relief ValvesPressure Relief ValvesTaylorUnk0-150XX6-6.3Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended.Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced.
Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked.Partial System OOS
407552245Bulk Fill AreaFire ValvesFire ValvesUnkUnk3"XX6-6.4.1NFPA requires annual inspection from floor level. Pipe and fittings shall also be inspected annually from the floor level.
Manufacturer: Check for leaks, corrosion, physical damage.No Operator RequirementPartial System OOS
407552245Bulk Fill AreaPressure and Pressure/Vacuum GaugesPressure GaugesAshcroftUnk0-200XXX6-7.1Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use.Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system.No Mission Impact
407552245Bulk Fill AreaPressure and Pressure/Vacuum GaugesPressure/Vacuum GaugesUnkUnk0-200XXX6-7.1Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use.Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system.No Mission Impact
407552245Bulk Fill AreaPressure and Pressure/Vacuum GaugesPressure/Vacuum GaugesUnkUnk0-200XXX6-7.1Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use.Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system.No Mission Impact
407552245Bulk Fill AreaSight Flow IndicatorsSight Flow IndicatorsN/AN/AN/A6-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.No Mission Impact
407552245Bulk Fill AreaSight Flow IndicatorsSight Flow IndicatorsN/AN/AN/A6-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.No Mission Impact
407552245Bulk Fill AreaSight Flow IndicatorsSight Flow IndicatorsN/AN/AN/A6-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.No Mission Impact
407552245Bulk Fill AreaSight Flow IndicatorsSight Flow IndicatorsN/AN/AN/A6-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.No Mission Impact
407552245Bulk Fill AreaEFSO SystemsE-StopN/AN/AN/AX7-16Proper operation, box seals for integrity. Electrical connections for continuity.No Operator RequirementTemporary Mission Impact
407552245Bulk Fill AreaPower Grounding SystemsScully Ground Hog VerificationScullyIntelletrolN/AXX9-1.6.1Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location.No Operator RequirementNo Mission Impact
407552245Bulk Fill AreaCard and Key LocksFuel Master Unit, DieselVILMASTERUnkN/AX9-3No Manufacturer Requirements AvailableNo Operator RequirementNo Mission Impact
407552245Bulk Fill AreaBasket StrainersBasket Strainers, Jet #1UnkUnk3"3-6.4Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyDaily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.

Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly

407552245Bulk Fill AreaLoading Fueling HosesHosesUnkUnk3"XX3-9.1Aircraft fueling hose shall be inspected before use each day. The hose shall be extended as it normally would be for fueling and checked for evidence of blistering, carcass saturation or separation, cuts, nicks, or abrasions that expose reinforcement material, and for slippage, misalignment, or leaks at couplings.Weekly - Visually inspect hoses for loose covers, cracks, brittle surface coatings, exposed wire braids, exposed reinforcement, flattening, kinks, and bulges or soft spots which might indicate broken or displaced reinforcement.
Monthly - Pressurize hose to normal working pressure. Check flanged and threaded connections for leaks and inspect hose couplers for fluid seepage by pushing at the base of the coupling with your thumbs; a hose softened by fluid seepage must be replaced.OOS during Hydrostatic Test
407552245Bulk Fill AreaCombination Dual Rate-of-Flow Control and Solenoid ValvesJet Fill Stand #1CLA-VALUnkN/AX4-3.3.1No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementNo Mission Impact
407552245Bulk Fill AreaFueling NozzlesSingle Point Nozzle D-1CLA-VALD-13"X4-7.4Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand.Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand.No Mission Impact
407552245Bulk Fill AreaBall ValvesBall ValveUnkUnk3"X6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
407552245Bulk Fill AreaBall ValvesBall ValveUnkUnk3"X6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
407552245Bulk Fill AreaBall ValvesBall ValveUnkUnk3"X6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
407552245Bulk Fill AreaBall ValvesBall ValveUnkUnk3"X6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
407552245Bulk Fill AreaDouble Block and Bleed ValvesDouble Block and Bleed ValvesUnkUnk3"XX6-6.2.5Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug.No Operator RequirementNo Mission Impact
407552245Bulk Fill AreaThermal and/or Pressure Relief ValvesPressure Relief ValvesTaylorUnk0-150XX6-6.3Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended.Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced.
Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked.Partial System OOS
407552245Bulk Fill AreaThermal and/or Pressure Relief ValvesPressure Relief ValvesTaylorUnk0-150XX6-6.3Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended.Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced.
Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked.Partial System OOS
407552245Bulk Fill AreaThermal and/or Pressure Relief ValvesPressure Relief ValvesTaylorUnk0-150XX6-6.3Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended.Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced.
Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked.Partial System OOS
407552245Bulk Fill AreaThermal and/or Pressure Relief ValvesPressure Relief ValvesTaylorUnk0-150XX6-6.3Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended.Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced.
Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked.Partial System OOS
407552245Bulk Fill AreaFire ValvesFire ValvesUnkUnk3"XX6-6.4.1NFPA requires annual inspection from floor level. Pipe and fittings shall also be inspected annually from the floor level.
Manufacturer: Check for leaks, corrosion, physical damage.No Operator RequirementPartial System OOS
407552245Bulk Fill AreaPressure and Pressure/Vacuum GaugesPressure GaugesAshcroftUnk0-200XXX6-7.1Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use.Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system.No Mission Impact
407552245Bulk Fill AreaPressure and Pressure/Vacuum GaugesPressure GaugesAshcroftUnk0-200XXX6-7.1Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use.Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system.No Mission Impact
407552245Bulk Fill AreaPressure and Pressure/Vacuum GaugesPressure GaugesAshcroftUnk0-200XXX6-7.1Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use.Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system.No Mission Impact
407552245Bulk Fill AreaSight Flow IndicatorsSight Flow IndicatorsN/AN/AN/A6-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.No Mission Impact
407552245Bulk Fill AreaSight Flow IndicatorsSight Flow IndicatorsN/AN/AN/A6-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.No Mission Impact
407552245Bulk Fill AreaSight Flow IndicatorsSight Flow IndicatorsN/AN/AN/A6-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.No Mission Impact
407552245Bulk Fill AreaSight Flow IndicatorsSight Flow IndicatorsN/AN/AN/A6-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.No Mission Impact
407552245Bulk Fill AreaEFSO SystemsE-StopN/AN/AN/AX7-16Proper operation, box seals for integrity. Electrical connections for continuity.No Operator RequirementTemporary Mission Impact
407552245Bulk Fill AreaPower Grounding SystemsScully Ground Hog VerificationScullyIntellitrolN/AXX9-1.6.1Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location.No Operator RequirementNo Mission Impact
407552245Bulk Fill AreaCard and Key LocksFuel Master Unit, Jet A #1VILMASTERUnkN/AX9-3No Manufacturer Requirements AvailableNo Operator RequirementNo Mission Impact
407552245Bulk Fill AreaBasket StrainersBasket Strainers, MOGASUnkUnk3"3-6.4Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyDaily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.

Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly

407552245Bulk Fill AreaLoading Fueling HosesHosesUnkUnk3"XX3-9.1Aircraft fueling hose shall be inspected before use each day. The hose shall be extended as it normally would be for fueling and checked for evidence of blistering, carcass saturation or separation, cuts, nicks, or abrasions that expose reinforcement material, and for slippage, misalignment, or leaks at couplings.Weekly - Visually inspect hoses for loose covers, cracks, brittle surface coatings, exposed wire braids, exposed reinforcement, flattening, kinks, and bulges or soft spots which might indicate broken or displaced reinforcement.
Monthly - Pressurize hose to normal working pressure. Check flanged and threaded connections for leaks and inspect hose couplers for fluid seepage by pushing at the base of the coupling with your thumbs; a hose softened by fluid seepage must be replaced.OOS during Hydrostatic Test
407552245Bulk Fill AreaCombination Dual Rate-of-Flow Control and Solenoid ValvesMOGAS Fill StandCLA-VALUnkN/AX4-3.3.1No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementNo Mission Impact
407552245Bulk Fill AreaFueling NozzlesSingle Point Nozzle D-1CLA-VALD-13"X4-7.4Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand.Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand.No Mission Impact
407552245Bulk Fill AreaBall ValvesBall ValveUnkUnk3"X6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
407552245Bulk Fill AreaBall ValvesBall ValveUnkUnk3"X6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
407552245Bulk Fill AreaBall ValvesBall ValveUnkUnk3"X6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
407552245Bulk Fill AreaBall ValvesBall ValveUnkUnk3"X6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
407552245Bulk Fill AreaDouble Block and Bleed ValvesDouble Block and Bleed ValvesUnkUnk3"XX6-6.2.5Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug.No Operator RequirementNo Mission Impact
407552245Bulk Fill AreaThermal and/or Pressure Relief ValvesPressure Relief ValvesTaylorUnk0-150XX6-6.3Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended.Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced.
Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked.Partial System OOS
407552245Bulk Fill AreaThermal and/or Pressure Relief ValvesPressure Relief ValvesTaylorUnk0-150XX6-6.3Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended.Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced.
Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked.Partial System OOS
407552245Bulk Fill AreaThermal and/or Pressure Relief ValvesPressure Relief ValvesTaylorUnk0-150XX6-6.3Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended.Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced.
Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked.Partial System OOS
407552245Bulk Fill AreaThermal and/or Pressure Relief ValvesPressure Relief ValvesTaylorUnk0-150XX6-6.3Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended.Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced.
Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked.Partial System OOS
407552245Bulk Fill AreaFire ValvesFire ValvesUnkUnk3"XX6-6.4.1NFPA requires annual inspection from floor level. Pipe and fittings shall also be inspected annually from the floor level.
Manufacturer: Check for leaks, corrosion, physical damage.No Operator RequirementPartial System OOS
407552245Bulk Fill AreaPressure and Pressure/Vacuum GaugesPressure GaugesAshcroftUnk0-200XXX6-7.1Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use.Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system.No Mission Impact
407552245Bulk Fill AreaPressure and Pressure/Vacuum GaugesPressure/Vacuum GaugesUnkUnk0-200XXX6-7.1Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use.Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system.No Mission Impact
407552245Bulk Fill AreaPressure and Pressure/Vacuum GaugesPressure/Vacuum GaugesUnkUnk0-200XXX6-7.1Check operation of gauge. Ensure gauge is indicating pressure of the system. Inspect liquid level, and clean exterior glass. Calibrate as required dependent on use.Monthly - Check operation of gauge. Ensure gauge is indicating pressure of the system.No Mission Impact
407552245Bulk Fill AreaSight Flow IndicatorsSight Flow IndicatorsN/AN/AN/A6-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.No Mission Impact
407552245Bulk Fill AreaSight Flow IndicatorsSight Flow IndicatorsN/AN/AN/A6-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.No Mission Impact
407552245Bulk Fill AreaSight Flow IndicatorsSight Flow IndicatorsN/AN/AN/A6-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.No Mission Impact
407552245Bulk Fill AreaSight Flow IndicatorsSight Flow IndicatorsN/AN/AN/A6-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.No Mission Impact
407552245Bulk Fill AreaEFSO SystemsE-StopN/AN/AN/AX7-16Proper operation, box seals for integrity. Electrical connections for continuity.No Operator RequirementTemporary Mission Impact
407552245Bulk Fill AreaPower Grounding SystemsScully Ground Hog VerificationScullyIntelletrolN/AXX9-1.6.1Measure the ground resistance with an instrument designed specifically to measure and document earth/ground resistance, soil resistivity, and current flow. Conduct the test by using the fall-of-potential method as described in the Institute of Electronic and Electrical Engineers (IEEE) Standard 81.If fall-of-potential tests cannot be performed, it is acceptable to measure resistance at each accessible ground rod using a clamp-on ground resistance tester. Provide the Engineer with written, certified test results for each testing location.No Operator RequirementNo Mission Impact
407552245Bulk Fill AreaCard and Key LocksFuel Master Unit, MOGASVILMASTERUnkN/AX9-3No Manufacturer Requirements AvailableNo Operator RequirementNo Mission Impact
407552245Bulk Fill AreaBasket StrainersBasket Strainers, Jet #2UnkUnk3"3-6.4Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyDaily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.

Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly

407552245Bulk Fill AreaLoading Fueling HosesHosesUnkN/A3"XX3-9.1Aircraft fueling hose shall be inspected before use each day. The hose shall be extended as it normally would be for fueling and checked for evidence of blistering, carcass saturation or separation, cuts, nicks, or abrasions that expose reinforcement material, and for slippage, misalignment, or leaks at couplings.Weekly - Visually inspect hoses for loose covers, cracks, brittle surface coatings, exposed wire braids, exposed reinforcement, flattening, kinks, and bulges or soft spots which might indicate broken or displaced reinforcement.
Monthly - Pressurize hose to normal working pressure. Check flanged and threaded connections for leaks and inspect hose couplers for fluid seepage by pushing at the base of the coupling with your thumbs; a hose softened by fluid seepage must be replaced.OOS during Hydrostatic Test
407552245Bulk Fill AreaCombination Dual Rate-of-Flow Control and Solenoid ValvesJet Fill Stand #2CLA-VALUnkN/AX4-3.3.1No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementNo Mission Impact
407552245Bulk Fill AreaFueling NozzlesSingle Point Nozzle D-1CLA-VALD-13"X4-7.4Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand.Quarterly - Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. Test leak resistance of poppet valve against full pump pressure. Inspect storage racks for moisture or dirt accumulation. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. Tests nozzle interlocks. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand.No Mission Impact
407552245Bulk Fill AreaBall ValvesBall ValveUnkUnk3"X6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
407552245Bulk Fill AreaBall ValvesBall ValveUnkUnk3"X6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
407552245Bulk Fill AreaBall ValvesBall ValveUnkUnk3"X6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
407552245Bulk Fill AreaBall ValvesBall ValveUnkUnk3"X6-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
407552245Bulk Fill AreaDouble Block and Bleed ValvesDouble Block and Bleed ValvesUnkUnk3"XX6-6.2.5Valve design must permit sealing slips to be replaced from the bottom with the valve mounted in the piping. Valves must operate from fully open to fully closed by rotation of the handwheel to lift and turn the plug.No Operator RequirementNo Mission Impact
407552245Bulk Fill AreaThermal and/or Pressure Relief ValvesPressure Relief ValvesTaylorUnk0-150XX6-6.3Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended.Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced.
Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked.Partial System OOS
407552245Bulk Fill AreaThermal and/or Pressure Relief ValvesPressure Relief ValvesTaylorUnk0-150XX6-6.3Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended.Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced.
Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked.Partial System OOS
407552245Bulk Fill AreaThermal and/or Pressure Relief ValvesPressure Relief ValvesTaylorUnk0-150XX6-6.3Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended.Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced.
Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked.Partial System OOS
407552245Bulk Fill AreaThermal and/or Pressure Relief ValvesPressure Relief ValvesTaylorUnk0-150XX6-6.3Thermal and pressure relief valves shall be inspected for signs of leaks. Inspect valve exterior of thermal and pressure relief valves for corrosion. Repaint as required. Adjustment not reccomended.Monthly for Army, Navy, USMC; Quarterly for AF - Thermal and pressure relief valves shall be inspected for signs of leak-by. Inspect relief valves for leaks by visually inspecting downstream flow indicators (if installed) for flow. If no flow indicators are installed listen for possible leaks. If suspect: isolate and test the relief valve; check opening pressure; and verify re-seating. Malfunctioning valves shall be repaired or replaced.
Monthly for Army, Navy, USMC; Quarterly for AF - Ensure manual isolation valves installed upstream and downstream of thermal and pressure relief valves are open with valve handles are removed, wired open or locked.Partial System OOS
407552245Bulk Fill AreaFire ValvesFire ValvesUnkUnk3"XX6-6.4.1NFPA requires annual inspection from floor level. Pipe and fittings shall also be inspected annually from the floor level.
Manufacturer: Check for leaks, corrosion, physical damage.No Operator RequirementPartial System OOS

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .