This file is a Facility Maintenance Plan (FMP) template for fuel system maintenance at JBSA-Kelly Field Annex in San Antonio, TX. The template outlines maintenance requirements for permanently installed fuel facilities operated under Quality Assurance Evaluators' control, including above/underground storage tanks, filter separators, valves, meters, pumps, monitoring equipment, alarms, and firefighting equipment.
The template contains detailed maintenance schedules and requirements for various components including ball valves, check valves, pressure relief valves, filter separators, and pumps. It specifies inspection frequencies (quarterly, semi-annual, annual) and maintenance procedures for each component type. The plan requires contractors to maintain compliance with federal, state, local and host nation regulations while performing maintenance and repairs on petroleum systems. The facility operates 24 hours and includes bulk storage, aircraft fueling, ground products fueling, and support facilities. This appears to be a standardized template rather than a completed maintenance plan, as it contains instructional notes and placeholder fields for site-specific information.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Administrative
| Location | Site Name | JBSA-Kelly Field Annex |
| RPSUID | 2334 | |
| DLA Site Code | KEQ | |
| Hours of Operation | 24 Hours of Operation | |
| Address | 102 Hall Boulevard, San Antonio, TX 78236 | |
| Contract | Contractor | |
| Contract # | ||
| Local POCs | QAE Name | |
| QAE Phone | ||
| QAE Email | ||
| Alt QAE Name | ||
| Alt QAE Phone | ||
| Alt QAE Email | ||
| DLA/SCP POCs | DLA PM Name | |
| DLA PM Phone | ||
| DLA PM Email | ||
| SCP PM Name | ||
| SCP PM Phone | ||
| SCP PM Email | ||
| Contractor POCs | Contractor PM Name | |
| Contractor PM Phone | ||
| Contractor PM Email | ||
| Contractor QC Name | ||
| Contractor QC Phone | ||
| Contractor QC Email | ||
| Contractor SM Name | ||
| Contractor SM Phone | ||
| Contractor SM Email | ||
| USACE POCs | USACE PM/COR Name | |
| USACE PM/COR Phone | ||
| USACE PM/COR Email | ||
| USACE PE Name | ||
| USACE PE Phone | ||
| USACE PE Email | ||
| USACE KO Name | ||
| USACE KO Phone | ||
| USACE KO Email |
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
This table shows the minimum information required. Additional details should be included based on site specific requirements. Additional POCs may be required.
General Facility Description Facility Description
Purpose:
This Facility Maintenance Plan provides guidance for Contractor personnel in the operation, inspection, and maintenance of permanently installed fuel facilities operated under the control of the Quality Assurance Evaluators. Federal, state, and local environmental laws and regulations shall be complied with if this plan is in conflict with them.
Scope:
The instructions prescribed by this plan outline general fuels maintenance information associated with fuel storage and dispensing systems and provides the minimum periodic contractor maintenance and inspection criteria requirements for the systems. This plan is to be used in conjunction with other existing directives governing fuel system operations and maintenance requirements. Conotractor will properly maintain and repair federally funded petroleum systems and facilities in order to provide compliance with applicable code, criteria, and federal, state, local and/or host nation regulations.
Fuels Facilities:
Organizational tanks, and associated dispensing equipment are maintained and operated by the owning organization. Fuel system maintenance contractors shall perform all maintenance and associated procurement actions on installed fuel systems.
Each installation under the Southwest Division contract are military land-based facilities who receive, store, distribute, and/or dispense liquid fuels.
Standard fuel system equipment includes:
a) Above Ground Sorage Stanks (AST), Underground Storage Tanks (UST)
b) Filter/separator and other filtration device maintenance access, particularly element removal.
c) Manual valves
d) Meter Registers, and Flow Meters.
e) Control Valves.
f) Pumps
g) Tank Monitoring Equipment and Instruments
h) Alarms
i) Fire Fighting Equipment
Site Specific General Information:
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Include a general facility overview and description of each fuel system for the sites in accordance with UFC 3-460-01. Examples include: Bulk Storage Facilities, Aircraft Fueling Facilities, Marine and Dispensing Facilities, Ground Products Fueling Facilities, Alternate POL Facilities, and Support Facilities. Also include facility #s, facility names, fuel type, photos, and any other pertinent information.
Include Site Specific Conditions and Restrictions in this tab.
Communication Plan
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Communication plan shall address in/out briefs, lines of communication, coordination for access, etc.
Safety
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Site Specific Addendum and Activity Hazard Analysis, which are Attachments to the APP, specific to activities or tasks related to recurring maintenance for this site.
RM Schedule
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Link RM schedule here
Task Matrix
| Applicable Facility Assets | UFC System Level Maintenance Frequency | Special Considerations | |||||||||||||||||
| Real Property Unique Identifier | |||||||||||||||||||
| (RPUID) | Real Property Facility # | Real Property Facility Name | Operational Area | Component Type | Base Asset ID | Component Unique Identifier (CUID) | Make | Model | Capacity/Size | Q | S | A | UFC Section Reference | Additional Manufacturer RM Requirements | Operator/ equipment Requirements | System availability | Other Contract | Comments | |
| 980 | Operations Building / General Facility | Operations Building | Signage and Markings | Bldg 980 OPs bldg entire bulk area fencing | N/A | N/A | N/A | 0 | 0 | X | 2-7 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||||
| 980 | Operations Building / General Facility | Operations Building | Signage and Markings | Bldg 980 fencing signage | N/A | N/A | N/A | 0 | 0 | X | 2-7 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Canopies | Issue Pad Canopy | N/A | N/A | N/A | X | X | 0 | 11-2.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Emergency Eyewash/Showers | Issue Pad | Guardian | Not Listed | 2.0 In. | X | X | X | 11-3 | Weekly - Equipment installed within 10 seconds from the hazard and on the same plane as the hazard Pathway is clear of obstructions Plumbed equipment activated to ensure compliant operation and to clear any sediment Self-contained equipment checked to determine if the flushing fluid needs to be changed or supplemented Equipment free of broken or missing parts Equipment protected against freezing User protected from scalding water | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Automatic Air Vents | Issue Line 3 Separator Air Eliminator | Armstrong | 11AV | N/A | 0 | 0 | X | 3-10.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Automatic Air Vents | Product Saver | The Protectoseal | 6672 | N/A | 0 | 0 | X | 3-10.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Automatic Air Vents | Issue Pump 2 Separator Air Eliminator Tank | Armstrong | 11AV | N/A | 0 | 0 | X | 3-10.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Automatic Air Vents | Issue Pump 1 Separator 1 | Armstrong | 11AV | N/A | 0 | 0 | X | 3-10.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Automatic Air Vents | Receipt Filter Separator Air Eliminator | Armstrong | 11AV | N/A | 0 | 0 | X | 3-10.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Filter Separators | Receipt Separator | Facet | VCS-1243-436 | 1,200 GPM GPM/SCFM 100 Gallons | X | X | 0 | 3-6.2 | Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. Replace filter cartridges when the acceptable maximum differential pressure is reached, the maximum in-service duration has passed, or the fuel becomes visibly dirty or discolored. | Daily - Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. | Partial System OOS | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Filter Separators | Issue Pump 2 Filter Separator | Facet | VCD-643-236 | 600 GPM GPM/SCFM 100 Gallons | X | X | 0 | 3-6.2 | Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. Replace filter cartridges when the acceptable maximum differential pressure is reached, the maximum in-service duration has passed, or the fuel becomes visibly dirty or discolored. | Daily - Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. | Partial System OOS | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Filter Separators | Issue Pump 1 Separator 1 | Facet | VCS-643-236 | 600 GPM GPM/SCFM Gallons | X | X | 0 | 3-6.2 | Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. Replace filter cartridges when the acceptable maximum differential pressure is reached, the maximum in-service duration has passed, or the fuel becomes visibly dirty or discolored. | Daily - Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. | Partial System OOS | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Filter Separators | Issue line 3 separator | Facet | VOS-643-256 | 600 GPM GPM/SCFM Gallons | X | X | 0 | 3-6.2 | Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. Replace filter cartridges when the acceptable maximum differential pressure is reached, the maximum in-service duration has passed, or the fuel becomes visibly dirty or discolored. | Daily - Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. | Partial System OOS | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Basket Strainers | Issue Pump 2 Basket Strainer | Titan | Titan 8-WCB 150 | 8.0 in. | X | X | 0 | 3-6.4 | Periodically checking for leaks. Timely cleaning or replacement of screen | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | ||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | No Mission Impact | ||||||||||||||||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Basket Strainers | Issue Pump 1 Basket Strainer | Titan | 8-150 | 8.0 in. | X | X | 0 | 3-6.4 | Periodically checking for leaks. Timely cleaning or replacement of screen | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | ||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | No Mission Impact | With DP Gauge | |||||||||||||||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Basket Strainers | Issue Pump 3 basket strainer | Titan | 8 150 WCB | 8.0 in. | X | X | 0 | 3-6.4 | Periodically checking for leaks. Timely cleaning or replacement of screen | Daily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. | ||||||
| Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | No Mission Impact | ||||||||||||||||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Vertical Inline Pumps | Issue line 3 pump | SPX Clyde Union Pumps | C130 | 600 GPM GPM/SCFM | X | X | X | 3-8.1.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Vertical Inline Pumps | Issue Pump 1 | SPX Clyde Union Pumps | 800 C0245354X | 600 GPM GPM/SCFM | X | X | X | 3-8.1.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Vertical Inline Pumps | Issue Pump 2 Pump | SPX Clyde Union Pumps | 800C02453AX-WGB | 600 GPM GPM/SCFM | X | X | X | 3-8.1.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Vertical Inline Pumps | Product Saver | Goulds | 1SV5NA3A30-M01 | 10 GPM GPM/SCFM | X | X | X | 3-8.1.2 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Refuel Control Valves | Check Stand | Cla-Val | 1000 MM | 4.0 in. | X | X | 0 | 4-3.2.5 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Non-Surge Check Valves | Issue line 3 non surge check valve | Cla-Val | 150/PN16 | 4.0 in. | X | X | 0 | 4-4.2.1 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Non-Surge Check Valves | Issue Pump 1 Non-Surge Check Valve A10 | Cla-Val | 4-150 | 4.0 in. | X | X | 0 | 4-4.2.1 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Non-Surge Check Valves | Issue Pump 2 Non Surge Check Valve A10 | Cla-Val | 150/PN16 | 4.0 in. | X | X | 0 | 4-4.2.1 | No Additional Manufacturer Requirements | No Operator/equipment Requirements | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Filter Separator Control Valves | Issue line 3 separator control valve | Cla-Val | 150/PN16 | 6.0 in. | X | X | 0 | 4-4.2.2 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Filter Separator Control Valves | Issue Pump 1 Separator 1 Filter Separator Control Valve | Cla-Val | CF8M | 6.0 in. | X | X | 0 | 4-4.2.2 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Filter Separator Control Valves | Receipt filter separator control valve | Cla-Val | 150/pn16 | 8.0 in. | X | X | 0 | 4-4.2.2 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Filter Separator Control Valves | Issue Pump 2 Separator Control Valve A9 | Cla-Val | 150/PN16 | 6.0 in. | X | X | 0 | 4-4.2.2 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Defuel/Flush Valves | Type III defuel flush valve | Cla-Val | Mil flow 150 | 8.0 in. | X | X | 0 | 4-4.2.3 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Back Pressure Control Valves | BPCV | Cla-Val | 50 MM | 2.0 in. | X | X | 0 | 4-4.2.6 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Pressure Control Valves | Issue line 3 CRD | Cla-Val | 9803803H | 0.375 (3/8) in. | X | X | 0 | 4-4.2.7 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Pressure Control Valves | Issue line 3 pv | Cla-Val | 47088A | 0.375 (3/8) in. | X | X | 0 | 4-4.2.7 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Pressure Control Valves | Hydrant Test Stand/Flush Station Pressure Control Valve on DB&B Valve O-36-NC | Cla-Val | 20-200 | 0.5 in. | X | X | 0 | 4-4.2.7 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Pressure Control Valves | Hydrant Test Stand/Flush Station | Cla-Val | Not Legible | 0.5 in. | X | X | 0 | 4-4.2.7 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Pressure Control Valves | South Fillstand | Cla-Val | 2106612K | 0.5 in. | X | X | 0 | 4-4.2.7 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Pressure Control Valves | Issue line 3 CRL | Cla-Val | 76154F | 0.375 (3/8) in. | X | X | 0 | 4-4.2.7 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Pressure Control Valves | Hydrant Return Loop Pressure Control Valve | Cla-Val | 6-150 | 6.0 in. | X | X | 0 | 4-4.2.7 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Pressure Control Valves | Hydrant Loop Issue DBBV | Cla-Val | 8106602K | 0.5 in. | X | X | 0 | 4-4.2.7 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Pressure Control Valves | Hydrant Loop Return | Cla-Val | 006602K | 0.5 in. | X | X | 0 | 4-4.2.7 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Pressure Control Valves | North Fillstand | Cla-Val | 106602K | 0.5 in. | X | X | 0 | 4-4.2.7 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Pressure Control Valves | Test Stand Return DBBV | Cla-Val | Not Legible | 0.5 in. | X | X | 0 | 4-4.2.7 | No Manufacturers Data Available. Adjustment not advised unless formal training is received. | No Operator Requirement | Partial System OOS | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Hydrant Adapters | Check Stand | Cla-Val | 364AF | 4.0 In. | X | X | 0 | 4-7.3 | Inspect hydrant adapter for proper operation, damage, and wear. Test operation of dry break system. | No Operator Requirement | Partial System OOS | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Surge Suppressors | Check stand surge arrestor #2 | Young Engineering | 40BSA-27 | N/A | X | X | 0 | 4-7.5 | No Additional Manufacturer Requirements | Operator required for system operation | Partial System OOS | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Surge Suppressors | Surge Suppressor 1 | Young Engineering | 40BSA-27 | N/A | X | X | 0 | 4-7.5 | No Additional Manufacturer Requirements | Operator required for system operation | Partial System OOS | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Aboveground Piping | Issue line 3 Pump Piping | N/A | N/A | 4.0 in. | X | X | X | 6-1.3 | No Manufacturer Requirements Available | Weekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection. | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Aboveground Piping | Issue line 3 separator piping | N/A | N/A | 6.0 in. | X | X | X | 6-1.3 | No Manufacturer Requirements Available | Weekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection. | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Aboveground Piping | Outside of dike bldg 981 piping | N/A | N/A | 8.0 in. | X | X | X | 6-1.3 | No Manufacturer Requirements Available | Weekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection. | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Aboveground Piping | Issue line 2 piping | N/A | N/A | 4.0 in. | X | X | X | 6-1.3 | No Manufacturer Requirements Available | Weekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection. | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Aboveground Piping | Issue line 1 piping | N/A | N/A | 4.0 in. | X | X | X | 6-1.3 | No Manufacturer Requirements Available | Weekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection. | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Aboveground Piping | Hydrant issue piping | N/A | N/A | 12.0 in. | X | X | X | 6-1.3 | No Manufacturer Requirements Available | Weekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection. | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Aboveground Piping | Hydrant issue piping | N/A | N/A | 10.0 in. | X | X | X | 6-1.3 | No Manufacturer Requirements Available | Weekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection. | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Aboveground Piping | Hydrant receipt piping | N/A | N/A | 8.0 in. | X | X | X | 6-1.3 | No Manufacturer Requirements Available | Weekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection. | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Aboveground Piping | Hydrant receipt piping | N/A | N/A | 10.0 in. | X | X | X | 6-1.3 | No Manufacturer Requirements Available | Weekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection. | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Aboveground Piping | Hydrant receipt piping | N/A | N/A | 4.0 in. | X | X | X | 6-1.3 | No Manufacturer Requirements Available | Weekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection. | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Aboveground Piping | Hydrant receipt piping | N/A | N/A | 6.0 in. | X | X | X | 6-1.3 | No Manufacturer Requirements Available | Weekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection. | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Aboveground Piping | Hydrant receipt piping | N/A | N/A | 8.0 in. | X | X | X | 6-1.3 | No Manufacturer Requirements Available | Weekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection. | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Aboveground Piping | Bldg 981 issue piping | N/A | N/A | 8.0 in. | X | X | X | 6-1.3 | No Manufacturer Requirements Available | Weekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection. | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Aboveground Piping | Bldg 981 piping | N/A | N/A | 2.0 in. | X | X | X | 6-1.3 | No Manufacturer Requirements Available | Weekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection. | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Aboveground Piping | Bldg 981 piping | N/A | N/A | 1.0 in. | X | X | X | 6-1.3 | No Manufacturer Requirements Available | Weekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection. | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Sight Flow Indicators | Issue line 3 separator sight glass | Kenco | N/A | N/A | 0 | 0 | 0 | 6-12.3 | Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Partial System OOS | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Sight Flow Indicators | Issue Pump 1 Separator 1 Sight Glass | Kenco | N/A | N/A | 0 | 0 | 0 | 6-12.3 | Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Partial System OOS | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Sight Flow Indicators | Issue Pump 2 F/S Sight Gauge | Kenco | N/A | N/A | 0 | 0 | 0 | 6-12.3 | Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Partial System OOS | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Sight Flow Indicators | Receipt filter separator sight glass | Kenco | N/A | N/A | 0 | 0 | 0 | 6-12.3 | Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Partial System OOS | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Sight Flow Indicators | PRT sight glass | Kenco | N/A | N/A | 0 | 0 | 0 | 6-12.3 | Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks. | Partial System OOS | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Gate Valves | Bowser Dike Drain (PIV) | Mueller | A20806 | 6.0 in. | X | X | 0 | 6-6.2.3 | Operate from fully open to fully closed . Conduct Tightness test as required for application. | No Operator Requirement | Partial System OOS | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue Pump 2 DP Gauge Inlet | Gammon Tech Products | GTP-1149 | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue Pump 2 DP Gauge Outlet | Gammon Tech Products | GTP-1149 | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Test Stand Return PCV Isolation | Flo-Tite | CF8M | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | South Side Fillstand Low Point Drain | Apollo | Not Labeled | 1.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | South Side PRV Line Drain M 207 NC | Flow-Tek | RF15 | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue line 3 Downstream Control Valve | Flo-Tite | RF15 | 6.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue line 3 Post Control Valve | Flo-Tite | RF15 | 6.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Receipt F/S Isolation 89 NO | Flo-Tite | RF15 | 6.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Defuel Flush Line Ball Valve 2 | Flow-Tek | CF8M | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | DPT Line | Flo-Tite | T12SS | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | DPT Line Drain | Flo-Tite | T12SS | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | DPT Line | Flo-Tite | T12SS | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | DPT drain Line | Apollo | CF8M | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | DPT Drain 1 | Apollo | CF8M | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | DPT Drain 2 | Apollo | CF8M | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | DPT Drain 3 | Apollo | CF8M | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | DPT Drain 4 | Apollo | CF8M | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | DPT Isolation | Apollo | CF8M | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | DPT Drain | Apollo | CF8M | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | DPT Isolation | Apollo | CF8M | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | DPT Drain | Apollo | CF8M | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | DPT Drain 5 | Apollo | CF8M | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | DPT Drain 6 | Apollo | CF8M | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | DPT Drain 7 | Apollo | CF8M | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | DPT Drain 8 | Apollo | CF8M | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Defuel Flush Line Ball Valve, Downstream defuel valve | Flow-Tek | CF8M | 8.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | BPCV Line Isolation O-45-NO | Flow-Tek | CF8M | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | BPCV Gauge Isolation | Flow-Tek | CF8M | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | BPCV High Point Drain | Flow-Tek | CF8M | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | BPCVO-44-NO | Flow-Tek | CF8M | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Defuel Flush Line Ball Valve 1 | Flow-Tek | CF8M | 8.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Check Stand Gauge Isolation | Flo-Tite | CF8M | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Check Stand SPR Isolation 2 O-32-NC | TCI | CF8M | 4.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Check Stand Isolation 0-33-NC | TCI | CF8M | 4.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | BPCV Blind Flange M-233-NC | Flow-Tek | CF8M | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue line 3 check valve | Flo-Tite | Rf15 | 6.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue line 3 check valve | Flo-Tite | RF15 | 6.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue line 3 at Separator | Flo-Tite | RF15 | 6.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue Pump 3 Sample Cock | Not Labeled | Not Labeled | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue Pump 3 F/S Drain 1 | Flo-Tite | RF15 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue Pump 3 F/S PRV Test Tee | Gammon Tech Products | Not Labeled | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue Pump 3 Sample Cock | Schultz | Not Labeled | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Receipt F/S DP Gauge Inlet | Not Labeled | Not Labeled | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Receipt F/S DP Gauge Outlet | Not Labeled | Not Labeled | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Receipt F/S Control Valve PCV Isolation | Cla-Val | Not Labeled | 0.75 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Hydrant Return Line Pressure Relief Isolation Valve M-240-NO | Flo-Tite | RF15 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue Line Drain Valve M-131 NC | Flo-Tite | Sf150 | 2.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue Pump 3 F/S Air Eliminator Isolation Drain | Flo-Tite | T12SS | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue Pump 2 F/S Inlet Ball Valve Sample Port | Gammon Tech Products | 1000W08 | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue Pump 1 Separator 1 Sample Valve | Gammon Tech Products | GTP-992-4MS | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue Pump 2 Separator Pressure Relief Sampling Ball Valve | Gammon Tech Products | 1000-WOG | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Receipt F/S Sample Cock | Gammon Tech Products | Gtp-9924MD | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue Pump 2 Separator Outlet Sampling Valve Port | Gammon Tech Products | 1000 WOG | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Receipt F/S Air Eliminator Drain | Flo-Tite | RF15 | 0.75 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Receipt F/S Air Eliminator Isolation | Flo-Tite | RF15 | 0.75 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Receipt F/S Drain Line Isolation | Flo-Tite | RF15 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Receipt F/S Drain Line Isolation | Flo-Tite | RF15 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Receipt filter separator drain valve | Flo-Tite | RF15 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue Line PRV Isolation M-160-NO | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Surge Suppressor 1 Sampling Port | Flo-Tite | RF15 | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Hydrant Issue Line Pressure Relief Isolation Valve M-172-NO | Flo-Tite | CF8M | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Main Issue Line from Tanks Drain Valve M-112-NC | Painted Over | Painted Over | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue Pump 3 Basket Strainer Drain | Flo-Tite | Cf8m | 1.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue Pump 3 DP Gauge Inlet | Not Labeled | Not Labeled | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue Pump 3 DP Gauge Outlet | Not Labeled | Not Labeled | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue Pump 1 Inlet Valve for DP Gauge on Basket Strainer | Not Labeled | Not Labeled | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue Pump 1 Outlet Valve for DP Gauge on Basket Strainer | Not Labeled | Not Labeled | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue Pump 2 Isolation Valve M-117-NC | Flo-Tite | F150 | 1.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue Pump 2 Pressure Gauge Isolation Valve M-118-N0 | Flo-Tite | F150 | 0.5 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue Pump 2 Pressure Relief Valve before PRV M-125-NO | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue Pump 2 Isolation valve after PRV | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue Pump 2 Pressure Gauge Isolation Valve M-127-N0 | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue Pump 2 Pressure Gauge Isolation Valve M-127-N0 | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue Pump 3 F/S Air Eliminator Isolation | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue Pump 1 Filter Separator 1 Sample Port | Schults | Not Labeled | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue Pump 2 Separator Sump Ball Valve M-146-NC | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue Pump 2 Separator DP Gauge Inlet Ball Valve | Not Labeled | Not Labeled | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue Pump 2 Separator DP Gauge Outlet Ball Valve | Not Labeled | Not Labeled | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue Pump 2 Separator Drain Line Isolation Valve M-145-NC | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue Pump 2 Separator Drain Valve | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue Pump 2 Separator Pressure Relief IsolationValve before PRV | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue Pump 2 Separator Pressure Relief Draw Off Valve | Flo-Tite | T12SS | 0.75 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue Pump 2 Separator PRV Outlet Valve | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue Pump 2 Separator Air Eliminator Outlet Valve | Flo-Tite | F150 | 0.75 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue Pump 2 PRV Outlet Isolation Valve M-152-N0 | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue Pump 1 Separator 1 Outlet Sample Port | Not Labeled | Not Labeled | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Issue Line High Point Valve | Conbraco | 2000WOG | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Isolation Valve O-40-NO | Flow-Tek | FTG22 | 4.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Hydrant Test Stand/Flush Station Pressure Relief Isolation Valve M-187-NO | Not Labeled | Not Labeled | 0.75 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Hydrant Test Stand/Flush Station Pressure Relief Isolation Valve M-188-NO | Not Labeled | Not Labeled | 0.75 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Receipt F/S PRV Isolation | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Receipt F/S Line PRV Isolation | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Receipt F/S Line Sample Cock | Schultz | ANSI 150 | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Receipt F/S Line Sample Cock | Schultz | Sc-2051-1 | 0.25 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Receipt F/S Line PRV Isolation | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Receipt F/S Line Isolation | Flow-Tek | 130007-11202533 | 8.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Receipt F/S PRV Isolation | Flo-Tite | F150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Receipt F/S Bypass Line PRV Isolation | Flow-Tek | RF15 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Receipt F/S Bypass Line PRV Isolation | Flow-Tek | RF15 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Main Issue Line PRV Isolation | Flo-Tite | 0035YS | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact | |||||
| 981 | Issue Pad / Canopy | Issue Pad / Canopy | Ball Valves | Main Issue Line Pressure Relief Line Isolation | Flo-Tite | F-150 | 1.0 in. | X | 0 | 0 | 6-6.2.4 | Operate from fully open to fully closed with 90 degree rotation of the ball. | No Operator Requirement | No Mission Impact |