About this file

This file is a Facility Maintenance Plan (FMP) template for fuel system maintenance at JBSA-Kelly Field Annex in San Antonio, TX. The template outlines maintenance requirements for permanently installed fuel facilities operated under Quality Assurance Evaluators' control, including above/underground storage tanks, filter separators, valves, meters, pumps, monitoring equipment, alarms, and firefighting equipment.

The template contains detailed maintenance schedules and requirements for various components including ball valves, check valves, pressure relief valves, filter separators, and pumps. It specifies inspection frequencies (quarterly, semi-annual, annual) and maintenance procedures for each component type. The plan requires contractors to maintain compliance with federal, state, local and host nation regulations while performing maintenance and repairs on petroleum systems. The facility operates 24 hours and includes bulk storage, aircraft fueling, ground products fueling, and support facilities. This appears to be a standardized template rather than a completed maintenance plan, as it contains instructional notes and placeholder fields for site-specific information.

View the file

Other files

File Type Posted
Sources Sought FUELS - Programmatic Rev1 7 May 25.docx DOCX document
3.4 Appendix B - Attachment 4 - SO Tracker-20210628.xlsx XLSX spreadsheet
6.0 - Appendix E ISR 15-Bulk_Fuel_Facilities FY25.xlsx XLSX spreadsheet
2.0 Appendix A RM_SO Process_20241220_PgM Reviewed Incorporated.docx DOCX document
3.1 Appendix B - Attachment 1 - Three Week Look Ahead_20230420.xlsx XLSX spreadsheet
3.2 Appendix B - Attachment 2 - Monthly Report Format 20240910.docx DOCX document
2.2 Appendix A - Attachment 2 Contractor Travel Expense Report_20240910.xlsx XLSX spreadsheet
9.0 Appendix H - Minor Repairs Incidental to Maintenance Activities POJ 20231009.xlsx XLSX spreadsheet
7.0 CUID - v2.1.pdf PDF
8.0 Appendix G_UFC 3-460-03 Maintenance Table- v4.3.pdf PDF
6.0 Appendix E ISR 14_operational_fuel_facilities FY25.xlsx XLSX spreadsheet
3.0 Appendix B Reporting Requirements_20240910.docx DOCX document
4.0 Appendix C Task Order Specifications_202401216.docx DOCX document
5.0 Appendix D Antiterrorism and OPSEC 20230206.docx DOCX document
PWS LEX FMP Template - v2.2.xlsx XLSX spreadsheet
PWS VNC FMP Template - v2.2.xlsx XLSX spreadsheet
PWS CVZ FMP Template - v2.2.xlsx XLSX spreadsheet
PWS SHP FMP Template - v2.2.xlsx XLSX spreadsheet
PWS PBA FMP Template - v2.2.xlsx XLSX spreadsheet
PWS GRB FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BRO FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BAR FMP Template - v2.2.xlsx XLSX spreadsheet
PWS EFS FMP Template - v2.2.xlsx XLSX spreadsheet
PWS LAU FMP Template - v2.2.xlsx XLSX spreadsheet
PWS CHF FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BEU FMP Template - v2.2.xlsx XLSX spreadsheet
PWS GDF FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BLI FMP Template - v2.2.xlsx XLSX spreadsheet
PWS TKR FMP Template - v2.2.xlsx XLSX spreadsheet
PWS RBN FMP Template - v2.2.xlsx XLSX spreadsheet
PWS MAA FMP Template - v2.2.xlsx XLSX spreadsheet
PWS FSH FMP Template - v2.2.xlsx XLSX spreadsheet
PWS FSO FMP Template - v2.2.xlsx XLSX spreadsheet
PWS LRG FMP Template - v2.2.xlsx XLSX spreadsheet
PWS RRT FMP Template - v2.2.xlsx XLSX spreadsheet
PWS ALT FMP Template - v2.2.xlsx XLSX spreadsheet
PWS TUL FMP Template - v2.2.xlsx XLSX spreadsheet
PWS BL2 FMP Template - v2.2.xlsx XLSX spreadsheet
PWS ELL FMP Template - v2.2.xlsx XLSX spreadsheet
PWS WRF FMP Template - v2.2.xlsx XLSX spreadsheet
PWS LLD FMP Template - v2.2.xlsx XLSX spreadsheet
PWS DYE FMP Template - v2.2.xlsx XLSX spreadsheet
12.0 PWS Appendix K Real Property Data_20230420.xlsx XLSX spreadsheet
PWS RAN FMP Template - v2.2.xlsx XLSX spreadsheet
PWS FSM FMP Template - v2.2.xlsx XLSX spreadsheet
PWS _Fuels RMMR 20241220.docx DOCX document
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Administrative

LocationSite NameJBSA-Kelly Field Annex
RPSUID2334
DLA Site CodeKEQ
Hours of Operation24 Hours of Operation
Address102 Hall Boulevard, San Antonio, TX 78236
ContractContractor
Contract #
Local POCsQAE Name
QAE Phone
QAE Email
Alt QAE Name
Alt QAE Phone
Alt QAE Email
DLA/SCP POCsDLA PM Name
DLA PM Phone
DLA PM Email
SCP PM Name
SCP PM Phone
SCP PM Email
Contractor POCsContractor PM Name
Contractor PM Phone
Contractor PM Email
Contractor QC Name
Contractor QC Phone
Contractor QC Email
Contractor SM Name
Contractor SM Phone
Contractor SM Email
USACE POCsUSACE PM/COR Name
USACE PM/COR Phone
USACE PM/COR Email
USACE PE Name
USACE PE Phone
USACE PE Email
USACE KO Name
USACE KO Phone
USACE KO Email

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

This table shows the minimum information required. Additional details should be included based on site specific requirements. Additional POCs may be required.

General Facility Description Facility Description

Purpose:

This Facility Maintenance Plan provides guidance for Contractor personnel in the operation, inspection, and maintenance of permanently installed fuel facilities operated under the control of the Quality Assurance Evaluators. Federal, state, and local environmental laws and regulations shall be complied with if this plan is in conflict with them.

Scope:

The instructions prescribed by this plan outline general fuels maintenance information associated with fuel storage and dispensing systems and provides the minimum periodic contractor maintenance and inspection criteria requirements for the systems. This plan is to be used in conjunction with other existing directives governing fuel system operations and maintenance requirements. Conotractor will properly maintain and repair federally funded petroleum systems and facilities in order to provide compliance with applicable code, criteria, and federal, state, local and/or host nation regulations.

Fuels Facilities:

Organizational tanks, and associated dispensing equipment are maintained and operated by the owning organization. Fuel system maintenance contractors shall perform all maintenance and associated procurement actions on installed fuel systems.

Each installation under the Southwest Division contract are military land-based facilities who receive, store, distribute, and/or dispense liquid fuels.

Standard fuel system equipment includes:

a) Above Ground Sorage Stanks (AST), Underground Storage Tanks (UST)

b) Filter/separator and other filtration device maintenance access, particularly element removal.

c) Manual valves

d) Meter Registers, and Flow Meters.

e) Control Valves.

f) Pumps

g) Tank Monitoring Equipment and Instruments

h) Alarms

i) Fire Fighting Equipment

Site Specific General Information:

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

Include a general facility overview and description of each fuel system for the sites in accordance with UFC 3-460-01. Examples include: Bulk Storage Facilities, Aircraft Fueling Facilities, Marine and Dispensing Facilities, Ground Products Fueling Facilities, Alternate POL Facilities, and Support Facilities. Also include facility #s, facility names, fuel type, photos, and any other pertinent information.

Include Site Specific Conditions and Restrictions in this tab.

Communication Plan

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

Communication plan shall address in/out briefs, lines of communication, coordination for access, etc.

Safety

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

Site Specific Addendum and Activity Hazard Analysis, which are Attachments to the APP, specific to activities or tasks related to recurring maintenance for this site.

RM Schedule

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

Link RM schedule here

Task Matrix

Applicable Facility AssetsUFC System Level Maintenance FrequencySpecial Considerations
Real Property Unique Identifier
(RPUID)Real Property Facility #Real Property Facility NameOperational AreaComponent TypeBase Asset IDComponent Unique Identifier (CUID)MakeModelCapacity/SizeQSAUFC Section ReferenceAdditional Manufacturer RM RequirementsOperator/ equipment RequirementsSystem availabilityOther ContractComments
980Operations Building / General FacilityOperations BuildingSignage and MarkingsBldg 980 OPs bldg entire bulk area fencingN/AN/AN/A00X2-7No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
980Operations Building / General FacilityOperations BuildingSignage and MarkingsBldg 980 fencing signageN/AN/AN/A00X2-7No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyCanopiesIssue Pad CanopyN/AN/AN/AXX011-2.2No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyEmergency Eyewash/ShowersIssue PadGuardianNot Listed2.0 In.XXX11-3Weekly - Equipment installed within 10 seconds from the hazard and on the same plane as the hazard Pathway is clear of obstructions Plumbed equipment activated to ensure compliant operation and to clear any sediment Self-contained equipment checked to determine if the flushing fluid needs to be changed or supplemented Equipment free of broken or missing parts Equipment protected against freezing User protected from scalding waterNo Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyAutomatic Air VentsIssue Line 3 Separator Air EliminatorArmstrong11AVN/A00X3-10.2No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyAutomatic Air VentsProduct SaverThe Protectoseal6672N/A00X3-10.2No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyAutomatic Air VentsIssue Pump 2 Separator Air Eliminator TankArmstrong11AVN/A00X3-10.2No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyAutomatic Air VentsIssue Pump 1 Separator 1Armstrong11AVN/A00X3-10.2No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyAutomatic Air VentsReceipt Filter Separator Air EliminatorArmstrong11AVN/A00X3-10.2No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyFilter SeparatorsReceipt SeparatorFacetVCS-1243-4361,200 GPM GPM/SCFM 100 GallonsXX03-6.2Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. Replace filter cartridges when the acceptable maximum differential pressure is reached, the maximum in-service duration has passed, or the fuel becomes visibly dirty or discolored.Daily - Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges.Partial System OOS
981Issue Pad / CanopyIssue Pad / CanopyFilter SeparatorsIssue Pump 2 Filter SeparatorFacetVCD-643-236600 GPM GPM/SCFM 100 GallonsXX03-6.2Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. Replace filter cartridges when the acceptable maximum differential pressure is reached, the maximum in-service duration has passed, or the fuel becomes visibly dirty or discolored.Daily - Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges.Partial System OOS
981Issue Pad / CanopyIssue Pad / CanopyFilter SeparatorsIssue Pump 1 Separator 1FacetVCS-643-236600 GPM GPM/SCFM GallonsXX03-6.2Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. Replace filter cartridges when the acceptable maximum differential pressure is reached, the maximum in-service duration has passed, or the fuel becomes visibly dirty or discolored.Daily - Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges.Partial System OOS
981Issue Pad / CanopyIssue Pad / CanopyFilter SeparatorsIssue line 3 separatorFacetVOS-643-256600 GPM GPM/SCFM GallonsXX03-6.2Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges. Replace filter cartridges when the acceptable maximum differential pressure is reached, the maximum in-service duration has passed, or the fuel becomes visibly dirty or discolored.Daily - Open drain under flow conditions until clear fuel is observed from the drain valve. Monitor differential pressure of coalescer cartridges.Partial System OOS
981Issue Pad / CanopyIssue Pad / CanopyBasket StrainersIssue Pump 2 Basket StrainerTitanTitan 8-WCB 1508.0 in.XX03-6.4Periodically checking for leaks. Timely cleaning or replacement of screenDaily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBasket StrainersIssue Pump 1 Basket StrainerTitan8-1508.0 in.XX03-6.4Periodically checking for leaks. Timely cleaning or replacement of screenDaily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyNo Mission ImpactWith DP Gauge
981Issue Pad / CanopyIssue Pad / CanopyBasket StrainersIssue Pump 3 basket strainerTitan8 150 WCB8.0 in.XX03-6.4Periodically checking for leaks. Timely cleaning or replacement of screenDaily - Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations.
Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterlyNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyVertical Inline PumpsIssue line 3 pumpSPX Clyde Union PumpsC130600 GPM GPM/SCFMXXX3-8.1.2No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyVertical Inline PumpsIssue Pump 1SPX Clyde Union Pumps800 C0245354X600 GPM GPM/SCFMXXX3-8.1.2No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyVertical Inline PumpsIssue Pump 2 PumpSPX Clyde Union Pumps800C02453AX-WGB600 GPM GPM/SCFMXXX3-8.1.2No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyVertical Inline PumpsProduct SaverGoulds1SV5NA3A30-M0110 GPM GPM/SCFMXXX3-8.1.2No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyRefuel Control ValvesCheck StandCla-Val1000 MM4.0 in.XX04-3.2.5No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
981Issue Pad / CanopyIssue Pad / CanopyNon-Surge Check ValvesIssue line 3 non surge check valveCla-Val150/PN164.0 in.XX04-4.2.1No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyNon-Surge Check ValvesIssue Pump 1 Non-Surge Check Valve A10Cla-Val4-1504.0 in.XX04-4.2.1No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyNon-Surge Check ValvesIssue Pump 2 Non Surge Check Valve A10Cla-Val150/PN164.0 in.XX04-4.2.1No Additional Manufacturer RequirementsNo Operator/equipment RequirementsNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyFilter Separator Control ValvesIssue line 3 separator control valveCla-Val150/PN166.0 in.XX04-4.2.2No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
981Issue Pad / CanopyIssue Pad / CanopyFilter Separator Control ValvesIssue Pump 1 Separator 1 Filter Separator Control ValveCla-ValCF8M6.0 in.XX04-4.2.2No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
981Issue Pad / CanopyIssue Pad / CanopyFilter Separator Control ValvesReceipt filter separator control valveCla-Val150/pn168.0 in.XX04-4.2.2No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
981Issue Pad / CanopyIssue Pad / CanopyFilter Separator Control ValvesIssue Pump 2 Separator Control Valve A9Cla-Val150/PN166.0 in.XX04-4.2.2No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
981Issue Pad / CanopyIssue Pad / CanopyDefuel/Flush ValvesType III defuel flush valveCla-ValMil flow 1508.0 in.XX04-4.2.3No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBack Pressure Control ValvesBPCVCla-Val50 MM2.0 in.XX04-4.2.6No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyPressure Control ValvesIssue line 3 CRDCla-Val9803803H0.375 (3/8) in.XX04-4.2.7No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
981Issue Pad / CanopyIssue Pad / CanopyPressure Control ValvesIssue line 3 pvCla-Val47088A0.375 (3/8) in.XX04-4.2.7No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
981Issue Pad / CanopyIssue Pad / CanopyPressure Control ValvesHydrant Test Stand/Flush Station Pressure Control Valve on DB&B Valve O-36-NCCla-Val20-2000.5 in.XX04-4.2.7No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
981Issue Pad / CanopyIssue Pad / CanopyPressure Control ValvesHydrant Test Stand/Flush StationCla-ValNot Legible0.5 in.XX04-4.2.7No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
981Issue Pad / CanopyIssue Pad / CanopyPressure Control ValvesSouth FillstandCla-Val2106612K0.5 in.XX04-4.2.7No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
981Issue Pad / CanopyIssue Pad / CanopyPressure Control ValvesIssue line 3 CRLCla-Val76154F0.375 (3/8) in.XX04-4.2.7No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
981Issue Pad / CanopyIssue Pad / CanopyPressure Control ValvesHydrant Return Loop Pressure Control ValveCla-Val6-1506.0 in.XX04-4.2.7No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
981Issue Pad / CanopyIssue Pad / CanopyPressure Control ValvesHydrant Loop Issue DBBVCla-Val8106602K0.5 in.XX04-4.2.7No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
981Issue Pad / CanopyIssue Pad / CanopyPressure Control ValvesHydrant Loop ReturnCla-Val006602K0.5 in.XX04-4.2.7No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
981Issue Pad / CanopyIssue Pad / CanopyPressure Control ValvesNorth FillstandCla-Val106602K0.5 in.XX04-4.2.7No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
981Issue Pad / CanopyIssue Pad / CanopyPressure Control ValvesTest Stand Return DBBVCla-ValNot Legible0.5 in.XX04-4.2.7No Manufacturers Data Available. Adjustment not advised unless formal training is received.No Operator RequirementPartial System OOS
981Issue Pad / CanopyIssue Pad / CanopyHydrant AdaptersCheck StandCla-Val364AF4.0 In.XX04-7.3Inspect hydrant adapter for proper operation, damage, and wear. Test operation of dry break system.No Operator RequirementPartial System OOS
981Issue Pad / CanopyIssue Pad / CanopySurge SuppressorsCheck stand surge arrestor #2Young Engineering40BSA-27N/AXX04-7.5No Additional Manufacturer RequirementsOperator required for system operationPartial System OOS
981Issue Pad / CanopyIssue Pad / CanopySurge SuppressorsSurge Suppressor 1Young Engineering40BSA-27N/AXX04-7.5No Additional Manufacturer RequirementsOperator required for system operationPartial System OOS
981Issue Pad / CanopyIssue Pad / CanopyAboveground PipingIssue line 3 Pump PipingN/AN/A4.0 in.XXX6-1.3No Manufacturer Requirements AvailableWeekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection.No Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyAboveground PipingIssue line 3 separator pipingN/AN/A6.0 in.XXX6-1.3No Manufacturer Requirements AvailableWeekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection.No Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyAboveground PipingOutside of dike bldg 981 pipingN/AN/A8.0 in.XXX6-1.3No Manufacturer Requirements AvailableWeekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection.No Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyAboveground PipingIssue line 2 pipingN/AN/A4.0 in.XXX6-1.3No Manufacturer Requirements AvailableWeekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection.No Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyAboveground PipingIssue line 1 pipingN/AN/A4.0 in.XXX6-1.3No Manufacturer Requirements AvailableWeekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection.No Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyAboveground PipingHydrant issue pipingN/AN/A12.0 in.XXX6-1.3No Manufacturer Requirements AvailableWeekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection.No Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyAboveground PipingHydrant issue pipingN/AN/A10.0 in.XXX6-1.3No Manufacturer Requirements AvailableWeekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection.No Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyAboveground PipingHydrant receipt pipingN/AN/A8.0 in.XXX6-1.3No Manufacturer Requirements AvailableWeekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection.No Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyAboveground PipingHydrant receipt pipingN/AN/A10.0 in.XXX6-1.3No Manufacturer Requirements AvailableWeekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection.No Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyAboveground PipingHydrant receipt pipingN/AN/A4.0 in.XXX6-1.3No Manufacturer Requirements AvailableWeekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection.No Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyAboveground PipingHydrant receipt pipingN/AN/A6.0 in.XXX6-1.3No Manufacturer Requirements AvailableWeekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection.No Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyAboveground PipingHydrant receipt pipingN/AN/A8.0 in.XXX6-1.3No Manufacturer Requirements AvailableWeekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection.No Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyAboveground PipingBldg 981 issue pipingN/AN/A8.0 in.XXX6-1.3No Manufacturer Requirements AvailableWeekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection.No Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyAboveground PipingBldg 981 pipingN/AN/A2.0 in.XXX6-1.3No Manufacturer Requirements AvailableWeekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection.No Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyAboveground PipingBldg 981 pipingN/AN/A1.0 in.XXX6-1.3No Manufacturer Requirements AvailableWeekly - Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection.No Mission Impact
981Issue Pad / CanopyIssue Pad / CanopySight Flow IndicatorsIssue line 3 separator sight glassKencoN/AN/A0006-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Partial System OOS
981Issue Pad / CanopyIssue Pad / CanopySight Flow IndicatorsIssue Pump 1 Separator 1 Sight GlassKencoN/AN/A0006-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Partial System OOS
981Issue Pad / CanopyIssue Pad / CanopySight Flow IndicatorsIssue Pump 2 F/S Sight GaugeKencoN/AN/A0006-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Partial System OOS
981Issue Pad / CanopyIssue Pad / CanopySight Flow IndicatorsReceipt filter separator sight glassKencoN/AN/A0006-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Partial System OOS
981Issue Pad / CanopyIssue Pad / CanopySight Flow IndicatorsPRT sight glassKencoN/AN/A0006-12.3Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Daily or at each use - Verify there are no leaks around pipe connection fittings and glass seals. Also check glass for indications of cracks.Partial System OOS
981Issue Pad / CanopyIssue Pad / CanopyGate ValvesBowser Dike Drain (PIV)MuellerA208066.0 in.XX06-6.2.3Operate from fully open to fully closed . Conduct Tightness test as required for application.No Operator RequirementPartial System OOS
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue Pump 2 DP Gauge InletGammon Tech ProductsGTP-11490.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue Pump 2 DP Gauge OutletGammon Tech ProductsGTP-11490.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesTest Stand Return PCV IsolationFlo-TiteCF8M0.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesSouth Side Fillstand Low Point DrainApolloNot Labeled1.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesSouth Side PRV Line Drain M 207 NCFlow-TekRF152.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue line 3 Downstream Control ValveFlo-TiteRF156.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue line 3 Post Control ValveFlo-TiteRF156.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesReceipt F/S Isolation 89 NOFlo-TiteRF156.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesDefuel Flush Line Ball Valve 2Flow-TekCF8M0.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesDPT LineFlo-TiteT12SS0.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesDPT Line DrainFlo-TiteT12SS0.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesDPT LineFlo-TiteT12SS0.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesDPT drain LineApolloCF8M0.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesDPT Drain 1ApolloCF8M0.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesDPT Drain 2ApolloCF8M0.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesDPT Drain 3ApolloCF8M0.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesDPT Drain 4ApolloCF8M0.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesDPT IsolationApolloCF8M0.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesDPT DrainApolloCF8M0.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesDPT IsolationApolloCF8M0.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesDPT DrainApolloCF8M0.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesDPT Drain 5ApolloCF8M0.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesDPT Drain 6ApolloCF8M0.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesDPT Drain 7ApolloCF8M0.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesDPT Drain 8ApolloCF8M0.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesDefuel Flush Line Ball Valve, Downstream defuel valveFlow-TekCF8M8.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesBPCV Line Isolation O-45-NOFlow-TekCF8M2.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesBPCV Gauge IsolationFlow-TekCF8M0.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesBPCV High Point DrainFlow-TekCF8M1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesBPCVO-44-NOFlow-TekCF8M2.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesDefuel Flush Line Ball Valve 1Flow-TekCF8M8.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesCheck Stand Gauge IsolationFlo-TiteCF8M0.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesCheck Stand SPR Isolation 2 O-32-NCTCICF8M4.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesCheck Stand Isolation 0-33-NCTCICF8M4.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesBPCV Blind Flange M-233-NCFlow-TekCF8M1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue line 3 check valveFlo-TiteRf156.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue line 3 check valveFlo-TiteRF156.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue line 3 at SeparatorFlo-TiteRF156.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue Pump 3 Sample CockNot LabeledNot Labeled0.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue Pump 3 F/S Drain 1Flo-TiteRF151.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue Pump 3 F/S PRV Test TeeGammon Tech ProductsNot Labeled0.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue Pump 3 Sample CockSchultzNot Labeled0.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesReceipt F/S DP Gauge InletNot LabeledNot Labeled0.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesReceipt F/S DP Gauge OutletNot LabeledNot Labeled0.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesReceipt F/S Control Valve PCV IsolationCla-ValNot Labeled0.75 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesHydrant Return Line Pressure Relief Isolation Valve M-240-NOFlo-TiteRF151.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue Line Drain Valve M-131 NCFlo-TiteSf1502.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue Pump 3 F/S Air Eliminator Isolation DrainFlo-TiteT12SS1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue Pump 2 F/S Inlet Ball Valve Sample PortGammon Tech Products1000W080.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue Pump 1 Separator 1 Sample ValveGammon Tech ProductsGTP-992-4MS0.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue Pump 2 Separator Pressure Relief Sampling Ball ValveGammon Tech Products1000-WOG0.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesReceipt F/S Sample CockGammon Tech ProductsGtp-9924MD0.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue Pump 2 Separator Outlet Sampling Valve PortGammon Tech Products1000 WOG0.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesReceipt F/S Air Eliminator DrainFlo-TiteRF150.75 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesReceipt F/S Air Eliminator IsolationFlo-TiteRF150.75 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesReceipt F/S Drain Line IsolationFlo-TiteRF151.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesReceipt F/S Drain Line IsolationFlo-TiteRF151.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesReceipt filter separator drain valveFlo-TiteRF151.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue Line PRV Isolation M-160-NOFlo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesSurge Suppressor 1 Sampling PortFlo-TiteRF150.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesHydrant Issue Line Pressure Relief Isolation Valve M-172-NOFlo-TiteCF8M1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesMain Issue Line from Tanks Drain Valve M-112-NCPainted OverPainted Over1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue Pump 3 Basket Strainer DrainFlo-TiteCf8m1.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue Pump 3 DP Gauge InletNot LabeledNot Labeled0.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue Pump 3 DP Gauge OutletNot LabeledNot Labeled0.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue Pump 1 Inlet Valve for DP Gauge on Basket StrainerNot LabeledNot Labeled0.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue Pump 1 Outlet Valve for DP Gauge on Basket StrainerNot LabeledNot Labeled0.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue Pump 2 Isolation Valve M-117-NCFlo-TiteF1501.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue Pump 2 Pressure Gauge Isolation Valve M-118-N0Flo-TiteF1500.5 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue Pump 2 Pressure Relief Valve before PRV M-125-NOFlo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue Pump 2 Isolation valve after PRVFlo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue Pump 2 Pressure Gauge Isolation Valve M-127-N0Flo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue Pump 2 Pressure Gauge Isolation Valve M-127-N0Flo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue Pump 3 F/S Air Eliminator IsolationFlo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue Pump 1 Filter Separator 1 Sample PortSchultsNot Labeled0.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue Pump 2 Separator Sump Ball Valve M-146-NCFlo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue Pump 2 Separator DP Gauge Inlet Ball ValveNot LabeledNot Labeled0.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue Pump 2 Separator DP Gauge Outlet Ball ValveNot LabeledNot Labeled0.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue Pump 2 Separator Drain Line Isolation Valve M-145-NCFlo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue Pump 2 Separator Drain ValveFlo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue Pump 2 Separator Pressure Relief IsolationValve before PRVFlo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue Pump 2 Separator Pressure Relief Draw Off ValveFlo-TiteT12SS0.75 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue Pump 2 Separator PRV Outlet ValveFlo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue Pump 2 Separator Air Eliminator Outlet ValveFlo-TiteF1500.75 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue Pump 2 PRV Outlet Isolation Valve M-152-N0Flo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue Pump 1 Separator 1 Outlet Sample PortNot LabeledNot Labeled0.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIssue Line High Point ValveConbraco2000WOG1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesIsolation Valve O-40-NOFlow-TekFTG224.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesHydrant Test Stand/Flush Station Pressure Relief Isolation Valve M-187-NONot LabeledNot Labeled0.75 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesHydrant Test Stand/Flush Station Pressure Relief Isolation Valve M-188-NONot LabeledNot Labeled0.75 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesReceipt F/S PRV IsolationFlo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesReceipt F/S Line PRV IsolationFlo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesReceipt F/S Line Sample CockSchultzANSI 1500.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesReceipt F/S Line Sample CockSchultzSc-2051-10.25 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesReceipt F/S Line PRV IsolationFlo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesReceipt F/S Line IsolationFlow-Tek130007-112025338.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesReceipt F/S PRV IsolationFlo-TiteF1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesReceipt F/S Bypass Line PRV IsolationFlow-TekRF151.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesReceipt F/S Bypass Line PRV IsolationFlow-TekRF151.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesMain Issue Line PRV IsolationFlo-Tite0035YS1.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact
981Issue Pad / CanopyIssue Pad / CanopyBall ValvesMain Issue Line Pressure Relief Line IsolationFlo-TiteF-1501.0 in.X006-6.2.4Operate from fully open to fully closed with 90 degree rotation of the ball.No Operator RequirementNo Mission Impact

This is the start of the file's text. The full file is on GovTribe.