Attachment_4_-_AF_Form_66.pdf

Air Force Form PDF 476 KB Posted

Attached to
Airfield Paving IDIQ
Solicitation number
FA527017R0007_
Issued by

About this file

AF Form 66, Schedule of Material Submittals

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
Attach 9_AF Form 66 Submittal Register.pdf Revision not stated PKAA Dorm Water Damage Repair (Construction)
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

File Type Posted
RFI's__5.pdf PDF
Revised_RFI's__4.pdf PDF
RFI's__4.pdf PDF
Amendment_03.pdf PDF
Revised_Pricing_Schedule_18Aug17.xls XLS spreadsheet
RFI's__3.pdf PDF
Airfield_Paving_IDIQ,_Pre-Proposal_Conference_Minutes.pdf PDF
RFI's__2.pdf PDF
PPQ_cover_letter_2.pdf PDF
Amendment_02.pdf PDF
RFI's__1.pdf PDF
Amendment_01.pdf PDF
Pricing_Schedule_(Exhibits_A~E).xls XLS spreadsheet
Exhibit_D_-_Option_Year_Three.pdf PDF
Attachment_6_-_PPQ.pdf PDF
Exhibit_E_-_Option_Year_Four.pdf PDF
Attachment_1.pdf PDF
Exhibit_B_-_Option_Year_One.pdf PDF
Attachment_5_-_Project_Information_Sheet.pdf PDF
Exhibit_A_-_Base_Year.pdf PDF
Exhibit_C_-_Option_Year_Two.pdf PDF
Attachment_3-OCR.pdf PDF
FA5270-17-R-0007.pdf PDF
Attachment_2.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF FORM 66, 24 Mar 17

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER

LXEZ172664

PROJECT TITLE

AIRFIELD PAVEMENT-IDIQ

SOLICITATION/CONTRACT NO.

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

LOCAL MATERIAL

NO. OF COPIES REQUIRED

REQUIRED

SUB-

MISSION

DATE

After

NTP

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

RETURN

SUS-

PENSE

FOLLOW-UP

CONTRACTOR

NOTIFIED

CONTRAC-

TOR RE-

SUBMIT-

TAL

FINAL

APPROVAL

REMARKS

D E

S

IG

N D

A T

A

M a n u fa c tu re r' s C a ta lo g ta

O p e ra ti o n a n d

M a it e n a n c e

P R

O D

U C

T D

A

S

A T

E M

E N

L is t O

F E

Q U

IP

M

E N

S T

R E

P O

R

APPROVED

DIS-

General Requirements

Excavation Permits

01010, 1.9.1.C

14 calendar days prior to start of on-site work

Traffic Control Plan

01010, 1.9.1.D after final inspection

Progress Schedules

01010, 1.9.2.A

14 calendar days prior to start of on-site work

As-Built Drawings

01010, 1.9.3.A

7 days

DD Form 1354

01010, 1.9.3.B

1-Year Warranty Letter

01010, 1.9.3.C

Environmental

List of Hazardous

Materials

01560-1.03. A. 1

As Required

Spill Prevention Plan

01560-1.03. A. 2

Erosion Control Plan

01560-1.03. A. 3

Hazardous waste disposal Permit

01560-1.03. A. 4-5

Sampling and Analysis

Report

01560-1.03, B, 1

Dispposal Certificate

01560-1.03, B, 3-4

S

IG

N D

A n u fa c tu re r' s C a ta e ra ti o n a n d

M a it e n a n

O D

U C

T D

A

A T

E M

E N t O

F E

Q U

IP

M

E

S T

R E

P O

R

Existing Conditions

Documentation

02 41 00 1.3. A

Demolition Plan

02 41 00 - 1.3. C

Joint Filler

03 15 14. 10. 1.2 A- D

Joint Sealant

Concrete Joints

Joint Layout

Cast-In- Place

Concrete

03 30 00 - 1.3. E

Exterior Signage

10 14 01. 1.2 A & B

Basic Electrical

Materials and Method

26 00 00 1.5 A- C

26 00 00 1.4 D-E

Earth Work - Shoring

31 00 00 1.3. A.1

7 days prior to starting work

Earth Work

Dewatering Work Plan

31 00 00 1.3. A.2

15 days prior to starting work

Earth Work

31 00 00 1.3. B-D

Rubber Removal

32 01 11.52 1.1.A

AIRFIELD PAVEMENT- IDIQ

Fog Coats

32 01 13. 1.2.A-C

E S

IG

N

D A n u fa c tu re r' s C a ta e ra ti o n a n d

M a it e n a n

O D

U C

T D

A

A T

E M

E N t O

F E

Q U

IP

M

E

S T

R E

P O

R

Sealing of Cracks in

Bituminous Pavements

32 01 17.16. 1.4.A-C

30 days prior to their use

Resealing of Joints in PCC

32 01 19.61.1.2.A-E

Field Molded Sealants

For Sealing Joints in PCC

32 01 19.1.2.A-B

Grooving

32 01 26.71 1.1.A

Required

Partial Depth Patching of PCC Pavements

32 01 28, 1.2.A-B

Subbase course

32 11 16, 1.2.A-B

Base course

32 11 23, 1.3.A-B

Tack Coat

32 12 10, 1.2.A-B

Prime Coat

32 12 10, 1.2.A-B

HMA Pavement

Airfield

32 12 15, 1.2.A-F

HMA Pavement

Roads

32 12 15, 1.2.A-B to their use As

Airfield Concrete

Pavement

32 13 11 1.3-SD-03-SD-07

S

IG

N D

A n u fa c tu re r' s C a ta e ra ti o n a n d

M a it e n a n

O D

U C

T D

A

A T

E M

E N t O

F E

Q U

IP

M

E

S T

R E

P O

R

Pavement Markings

Paint

32 17 24.00 10, 1.2.A- C/2.3

2.3-Glass Beads-type I/III

4 4

30 days before use use

Pavement Markings

Thermoplastic

32 17 24.00 10, 1.2.A-C

Seeding

32 92 19, 1.2.A-D

Sodding

32 92 23, 1.3.A

32 92 23, 1.3.B-C 4

Electrical Distribution

Underground

33 71 02, 1.3.A-B

Grounding Points

34 73 13, 1.2.A-C

45 Quality Control Plan

32 13 11-1.4-1-1.4.8