Revised_Pricing_Schedule_18Aug17.xls

XLS spreadsheet 106 KB Posted

Attached to
Airfield Paving IDIQ Federal contract opportunity
Solicitation number
FA527017R0007_
Issued by
Department of the Air Force Pacific Air Forces

About this file

Revised Excel Pricing Schedule, Exhibits A~E

View the file

Other files for this federal contract opportunity

Other files attached to Airfield Paving IDIQ, newest first.
File Type Posted
RFI's__5.pdf PDF
Revised_RFI's__4.pdf PDF
RFI's__4.pdf PDF
Amendment_03.pdf PDF
RFI's__3.pdf PDF
Airfield_Paving_IDIQ,_Pre-Proposal_Conference_Minutes.pdf PDF
RFI's__2.pdf PDF
PPQ_cover_letter_2.pdf PDF
Amendment_02.pdf PDF
RFI's__1.pdf PDF
Amendment_01.pdf PDF
Pricing_Schedule_(Exhibits_A~E).xls XLS spreadsheet
Attachment_4_-_AF_Form_66.pdf PDF
Attachment_1.pdf PDF
Exhibit_B_-_Option_Year_One.pdf PDF
Exhibit_E_-_Option_Year_Four.pdf PDF
Attachment_5_-_Project_Information_Sheet.pdf PDF
Exhibit_A_-_Base_Year.pdf PDF
Attachment_2.pdf PDF
FA5270-17-R-0007.pdf PDF
Exhibit_D_-_Option_Year_Three.pdf PDF
Attachment_6_-_PPQ.pdf PDF
Exhibit_C_-_Option_Year_Two.pdf PDF
Attachment_3-OCR.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BY

EXHIBIT A
IDIQ AIRFIELD PAVEMENT
KADENA AIR BASE, OKINAWA, JAPAN
REQUEST FOR PROPOSAL FA5270-17-R-0007
PART I - THE SCHEDULE
Offeror (Company Name) __________________________ Corporate Seal (Han)_________________
(BASIC YEAR )
Unit ofEstimatedPrice perEstimated
SUBLINEDescriptionMeasureQuantityUnitAmount
(YEN)(YEN)
A001PCC (Portland Cement Concrete) Slab:
AA01Construct New PCC Pavement with Plain ConcreteCY1,000
Work includes excavation, removal of top soil, disposal , sub grade compaction, and all associated quality control and compaction testing. Perform IAW Section 32 13 11 and detail page 1,5 and 6. Flexural Strength 45/50- Kg/cm²
AB01Construct New PCC Pavement with reinforced ConcreteCY500
Work includes excavation, removal of top soil, disposal , sub grade compaction, and all associated quality control and compaction testing. Perform IAW Section 32 13 11 and detail page 1. Flexural Strength 45/50- Kg/cm².
AC01Replace Existing PCC Slab with Plain concreteCY2,000
Work includes excavation, removal /disposal of existing concrete , sawcut, sub grade compaction, and all associated quality control and compaction testing. Perform IAW Section 32 13 11 and detail Plate #1. Flexural Strength 45/50- Kg/cm², detail page1,2,3,5 and 6.
AD01Replace Existing PCC Slab with Reinforced concreteCY1,500
Work includes excavation, removal /disposal of existing concrete , sawcut, sub grade compaction, and all associated quality control and compaction testing. Detail Plate #1. Flexural Strength 45/50- Kg/cm², detail page 1,2,3 and 5.
AE01Partial Depth Spall RepairCY15
Work includes sawcut, removal /disposal of existing concrete , apply epoxy resin adhesive, and all associated quality control. Detail 11. Flexural Strength 45/50- Kg/cm².
AF01Full Depth Spall RepairionCY10
Work includes full depth sawcut, removal /disposal of existing concrete , apply epoxy resin adhesive, dowel, tie bar, compaction testing and all associated quality control. Perform Detail page12. Flexural Strength 45/50- Kg/cm².
AG01Repair concrete crackLF3,000
Work includes sawcut/route, cleaning of surface, reseal and removal /disposal of existing concrete , and all associated quality control. Detail page 11 and 10.
A002PCC SLAB JOINT:
AA02Provide Expansion JointLF1,000
Providing the new dowel bar which includes: placing, paint and grease. All slab edging rounded 1/8inch radius.
AB02Construction joint . Provided DoweledLF3,000
Providing the new dowel bar which includes: placing, paint and grease. All slab edging rounded 1/8inch radius.
AC02Provide Contraction JointLF5,000
Providing the new dowel bar which includes: placing, paint and grease. All slab edging rounded 1/8inch radius.
AD02Replace Joint SealsLF10,000
Providing the new joint sealant which includes: placing, clean surface , detail page 2,3 and 4.
A003Pavement marking,Rubber removal, Grooving and Grounding:
AA03New Pavement Markings with Paint .SY1,500
Contractor should be follow the ETL 04-2-2,UFGS and ETL97-18 for paint & Beads
AB03Reflective Beads Type-ISY1,500
AC03Reflective Beads Type-IIISY1,500
AD03Removal of Existing Pavement markingsSY1,500
Work includes surface clean up.
AE03GroovingSY200
AF03Rubber RemovalSY1,500
AG03Provide new Grounding Points $ Tie DownEA100
Work includes removal and replace existing grounding
with concrete pad.
A004AC(Asphalt concrete) pavement:
AA04Provide New AC pavement
2"Thk or more-4"Thk or lessSY20,000
Work includes prime /tack coat , compaction , and AC testing.
Surface /wearing ,Binder course and including modify type II AC
AB04Provide New AC pavement
4"Thk or more-6"Thk or lessSY25,000
Work includes prime /tack coat , compaction , and AC testing.
Surface /wearing ,Binder course and including modify type II AC
AC04Remove AC pavement
Work includes removal and disposal ,sawcut and excavationCY1,000
AD04Mill and Overlay 2"-4" thk AC pavementSY6,000
Work includse prime/tack coat and diposal.
AE04AC removal by Cold Planning, up to 2" thickSY10,000
including disposal
AF04AC removal by Cold Planning, more than 2" thickSY15,000
including disposal
AG04Provide crack seal for AC pavementLF300
A005Base, Excavation and Fill material:
AA05Provide new Base CourseCY1,500
Work includes compaction.
AB05Provide new Sub-Base CourseCY1,500
Work includes compaction.
AC05ExcavationCY2,000
Work includes disposal.
AD05Provide fill MaterialCY500
Work includes copmaction.
AE05Remove Existing Base & Sub-Base CourseCY2,500
Work includes diposal and compaction.
A006SODDING:
AA06Provide 2-1/2" thick TopsoilSY500
AB06Provide new sodSY500
AC06Provide HydroseedingSY500
Work includes watering and maintenance
A007SODIUM SILICATE COATING
AA07Sodium Silicate Coating(Perform ETL 14-2)SY2,000
TOTAL BASIC YEAR 1¥
$ 1.00 = ¥ 122.4519 (FY17)$

&CFOR OFFICIAL USE ONLY&RPage &P

OP-1

EXHIBIT B
IDIQ AIRFIELD PAVEMENT
KADENA AIR BASE, OKINAWA, JAPAN
REQUEST FOR PROPOSAL FA5270-17-R-0007
PART I - THE SCHEDULE
Offeror (Company Name) ___________________________ Corporate Seal (Han)__________________
(OPTION YEAR 1 )
Unit ofEstimatedPrice perEstimated
SUBLINEDescriptionMeasureQuantityUnitAmount
(YEN)(YEN)
B001PCC (Portland Cement Concrete) Slab:
BA01Construct New PCC Pavement with Plain ConcreteCY1,000
Work includes excavation, removal of top soil, disposal , sub grade compaction, and all associated quality control and compaction testing. Perform IAW Section 32 13 11 and detail page 1 5 and 6. Flexural Strength 45/50- Kg/cm²
BB01Construct New PCC Pavement with reinforced ConcreteCY500
Work includes excavation, removal of top soil, disposal , sub grade compaction, and all associated quality control and compaction testing. Perform IAW Section 32 13 11 and detail 1. Flexural Strength 45/50- Kg/cm².
BC01Replace Existing PCC Slab with Plain concreteCY2,000
Work includes excavation, removal /disposal of existing concrete , sawcut, sub grade compaction, and all associated quality control and compaction testing. Perform IAW Section 32 13 11 and detail 1. Flexural Strength 45/50- Kg/cm², detail page1,2,3,5 and 6.
BD01Replace Existing PCC Slab with Reinforced concreteCY1,500
Work includes excavation, removal /disposal of existing concrete , sawcut, sub grade compaction, and all associated quality control and compaction testing. Detail #1. Flexural Strength 45/50- Kg/cm², detail 1,2,3 and 5.
BE01Partial Depth Spall RepairCY15
Work includes sawcut, removal /disposal of existing concrete , apply epoxy resin adhesive, and all associated quality control. and detail 11. Flexural Strength 45/50- Kg/cm².
BF01Full Depth Spall RepairionCY10
Work includes full depth sawcut, removal /disposal of existing concrete , apply epoxy resin adhesive, dowel, tie bar, compaction testing and all associated quality control. Detail 12. Flexural Strength 45/50- Kg/cm².
BG01Repair concrete crackLF3,000
Work includes sawcut/route, cleaning of surface, reseal and removal /disposal of existing concrete , and all associated quality control. Detail 11 and 10.
B002PCC SLAB JOINT:
BA02Provide Expansion JointLF1,000
Providing the new dowel bar which includes: placing, paint and grease. All slab edging rounded 1/8inch radius.
BB02Construction joint . Provided DoweledLF3,000
Providing the new dowel bar which includes: placing, paint and grease. All slab edging rounded 1/8inch radius.
BC02Provide Contraction JointLF5,000
Providing the new dowel bar which includes: placing, paint and grease. All slab edging rounded 1/8inch radius.
BD02Replace Joint SealsLF10,000
Providing the new joint sealant which includes: placing, clean surface , detail # 2,3 and 4.
B003Pavement marking,Rubber removal, Grooving and Grounding:
BA03New Pavement Markings with Paint and Reflective Beads.SY1,500
Contractor should be follow the ETL 04-2-2,UFGS and ETL 97-18 for Ppaint & Beads
UFGS and ETL97-18
BB03Reflective Beads Type-ISY1,500
BC03Reflective Beads Type-IIISY1,500
BD03Remaval of Existing Pavement markingsSY1,500
Work includes surface clean up.
BE03GroovingSY200
BF03Rubber RemovalSY1,500
BG03Provide new Grounding Points $ Tie DownEA100
Work includes removal and replace existing grounding
with concrete pad.
B004AC(Asphalt concrete) pavement:
BA04Provide New AC pavement
2" Thk or more -4" Thk or lessSY20,000
Work includes prime /tack coat , compaction , and AC testing.
Surface /wearing ,Binder course and modify type II AC-2"- 6" Thk AC
BB04Provide New AC pavement
4" Thk or more -6" Thk or lessSY25,000
Work includes prime /tack coat , compaction , and AC testing.
Surface /wearing ,Binder course and modify type II AC
BC04Remove AC pavement
Work includes removal and disposal ,sawcut and excavationCY1,000
BD04Mill and Overlay 2"-4" thk AC pavementSY6,000
Work includse prime/tack coat and diposal.
BE04AC removal by Cold Planning, up to 2" thickSY10,000
including disposal
BF04AC removal by Cold Planning, more than 2" thickSY15,000
including disposal
BG04Provide crack seal for AC pavementLF300
B005Base, Excavation and Fill material:
BA05Provide new Base CourseCY1,500
Work includes compaction.
BB05Provide new Sub-Base CourseCY1,500
Work includes compaction.
BC05ExcavationCY2,000
Work includes disposal.
BD05Provide fill MaterialCY500
Work includes copmaction.
BE05Remove Existing Base & Sub-Base CourseCY2,500
Work includes diposal and compaction.
B006SODDING:
BA06Provide 2-1/2" thick TopsoilSY500
BB06Provide new sodSY500
BC06Provide HydroseedingSY500
Work includes watering and maintenance
B007SODIUM SILICATE COATING
BA07Sodium Silicate Coating(Perform ETL 14-2)SY2000
TOTAL OPTION YEAR 1¥
Upward price-1.5%

&CFOR OFFICIAL USE ONLY&RPage &P

OP-2

EXHIBIT C
IDIQ AIRFIELD PAVEMENT
KADENA AIR BASE, OKINAWA, JAPAN
REQUEST FOR PROPOSAL FA5270-17-R-0007
PART I - THE SCHEDULE
Offeror (Company Name) ________________________________ Corporate Seal (Han) _______________
(OPTION YEAR 2 )
Unit ofEstimatedPrice perEstimated
SUBLINEDescriptionMeasureQuantityUnitAmount
(YEN)(YEN)
C001PCC (Portland Cement Concrete) Slab:
CA01Construct New PCC Pavement with Plain ConcreteCY1,000
Work includes excavation, removal of top soil, disposal , sub grade compaction, and all associated quality control and compaction testing. Perform IAW Section 32 13 11 and detail #1#5 and #6. Flexural Strength 45/50- Kg/cm²
CB01Construct New PCC Pavement with reinforced ConcreteCY500
Work includes excavation, removal of top soil, disposal , sub grade compaction, and all associated quality control and compaction testing. Perform IAW Section 32 13 11 and detail #1. Flexural Strength 45/50- Kg/cm².
CC01Replace Existing PCC Slab with Plain concreteCY2,000
Work includes excavation, removal /disposal of existing concrete , sawcut, sub grade compaction, and all associated quality control and compaction testing. Perform IAW Section 32 13 11 and detail Plate #1. Flexural Strength 45/50- Kg/cm², detail 1,2,3,5 and 6.
CD01Replace Existing PCC Slab with Reinforced concreteCY1,500
Work includes excavation, removal /disposal of existing concrete , sawcut, sub grade compaction, and all associated quality control and compaction testing. Flexural Strength 45/50- Kg/cm², detail 1,2,3 and 5.
CE01Partial Depth Spall RepairCY15
Work includes sawcut, removal /disposal of existing concrete , apply epoxy resin adhesive, and all associated quality control. Detail 11. Flexural Strength 45/50- Kg/cm².
CF01Full Depth Spall RepairionCY10
Work includes full depth sawcut, removal /disposal of existing concrete , apply epoxy resin adhesive, dowel, tie bar, compaction testing and all associated quality control. Detail 12. Flexural Strength 45/50- Kg/cm².
CG01Repair concrete crackLF3,000
Work includes sawcut/route, cleaning of surface, reseal and removal /disposal of existing concrete , and all associated quality control. Detail 11 and #10.
C002PCC SLAB JOINT:
CA02Provide Expansion JointLF1,000
Providing the new dowel bar which includes: placing, paint and grease. All slab edging rounded 1/8inch radius.
CB02Construction joint . Provided DoweledLF3,000
Providing the new dowel bar which includes: placing, paint and grease. All slab edging rounded 1/8inch radius.
CC02Provide Contraction JointLF5,000
Providing the new dowel bar which includes: placing, paint and grease. All slab edging rounded 1/8inch radius.
CD02Replace Joint SealsLF10,000
Providing the new joint sealant which includes: placing, clean surface , plate # 2,3 and 4.
C003Pavement marking,Rubber removal, Grooving and Grounding:
CA03New Pavement Markings with Paint .SY1,500
Contractor should be follow the ETL 04-2-2 ,UFGS and ETL97-18 for paint & Beads
CB03Reflective Beads Type-ISY1,500
CC03Reflective Beads Type-IIISY1,500
CD03Remaval of Existing Pavement markingsSY1,500
Work includes surface clean up.
CE03GroovingSY200
CF03Rubber RemovalSY1,500
CG03Provide new Grounding Points $ Tie DownEA100
Work includes removal and replace existing grounding
with concrete pad.
C004AC(Asphalt concrete) pavement:
CA04Provide New AC pavement
2" Thk or more - 4"Thk or less
Work includes prime /tack coat , compaction , and AC testing.SY20,000
Surface /wearing ,Binder course and modify type II AC
CB04Provide New AC pavement
4" Thk or more - 6"Thk or lessSY25,000
Work includes prime /tack coat , compaction , and AC testing.
Surface /wearing ,Binder course and modify type II AC
CC04Remove AC pavement
Work includes removal and disposal ,sawcut and excavationCY1,000
CD04Mill and Overlay 2"-4" thk AC pavementSY6,000
Work includse prime/tack coat and diposal.
CE04AC removal by Cold Planning, up to 2" thickSY10,000
including disposal
CF04AC removal by Cold Planning, more than 2" thickSY15,000
including disposal
CG04Provide crack seal for AC pavementLF300
C005Base, Excavation and Fill material:
CA05Provide new Base CourseCY1,500
Work includes compaction.
CB05Provide new Sub-Base CourseCY1,500
Work includes compaction.
CC05ExcavationCY2,000
Work includes disposal.
CD05Provide fill MaterialCY500
Work includes copmaction.
CE05Remove Existing Base & Sub-Base CourseCY2,500
Work includes diposal and compaction.
C006SODDING:
CA06Provide 2-1/2" thick TopsoilSY500
CB06Provide new sodSY500
CC06Provide HydroseedingSY500
Work includes watering and maintenance
C007SODIUM SOLICATE COATING
2007Sodium Silicate Coating(Perform ETL 14-2)SY2000
TOTAL OPTION YEAR 2¥
Upward price-1.5%

&CFOR OFFICIAL USE ONLY&RPage &P

OP-3

EXHIBIT D
IDIQ AIRFIELD PAVEMENT
KADENA AIR BASE, OKINAWA, JAPAN
REQUEST FOR PROPOSAL FA5270-17-R-0007
PART I - THE SCHEDULE
Offeror (Company Name) _____________________________ Corporate Seal (Han) __________________
(OPTION YEAR 3 )
Unit ofEstimatedPer perEstimated
SUBLINEDescriptionMeasureQuantityUnitAmount
(YEN)(YEN)
D001PCC (Portland Cement Concrete) Slab:
DA01Construct New PCC Pavement with Plain ConcreteCY1,000
Work includes excavation, removal of top soil, disposal , sub grade compaction, and all associated quality control and compaction testing. Perform IAW Section 32 13 11 and detail #1#5 and #6. Flexural Strength 45/50- Kg/cm²
DB01Construct New PCC Pavement with reinforced ConcreteCY500
Work includes excavation, removal of top soil, disposal , sub grade compaction, and all associated quality control and compaction testing. Perform IAW Section 32 13 11 and detail #1. Flexural Strength 45/50- Kg/cm².
DC01Replace Existing PCC Slab with Plain concreteCY2,000
Work includes excavation, removal /disposal of existing concrete , sawcut, sub grade compaction, and all associated quality control and compaction testing. Perform IAW Section 32 13 11 and detail #1. Flexural Strength 45/50- Kg/cm², detail #1,2,3,5 and 6.
DD01Replace Existing PCC Slab with Reinforced concreteCY1,500
Work includes excavation, removal /disposal of existing concrete , sawcut, sub grade compaction, and all associated quality control and compaction testing. Detail #1. Flexural Strength 45/50- Kg/cm², detail #1,2,3 and 5.
DE01Partial Depth Spall RepairCY15
Work includes sawcut, removal /disposal of existing concrete , apply epoxy resin adhesive, and all associated quality control. Detail #11. Flexural Strength 45/50- Kg/cm².
DF01Full Depth Spall RepairionCY10
Work includes full depth sawcut, removal /disposal of existing concrete , apply epoxy resin adhesive, dowel, tie bar, compaction testing and all associated quality control. Detail #12. Flexural Strength 45/50- Kg/cm².
DG01Repair concrete crackLF3,000
Work includes sawcut/route, cleaning of surface, reseal and removal /disposal of existing concrete , and all associated quality control. Detail #11 and #10.
D002PCC SLAB JOINT:
DA02Provide Expansion JointLF1,000
Providing the new dowel bar which includes: placing, paint and grease. All slab edging rounded 1/8inch radius.
DB02Construction joint . Provided DoweledLF3,000
Providing the new dowel bar which includes: placing, paint and grease. All slab edging rounded 1/8inch radius.
DC02Provide Contraction JointLF5,000
Providing the new dowel bar which includes: placing, paint and grease. All slab edging rounded 1/8inch radius.
DD02Replace Joint SealsLF10,000
Providing the new joint sealant which includes: placing, clean surface , Detail # 2,3 and 4.
D003Pavement marking,Rubber removal, Grooving and Grounding:
DA03New Pavement Markings with Paint.SY1,500
Contractor should be follow the ETL 04-2-2,UFGS and ETL97-18 for paint & Beads
DB03Reflective Beads Type-ISY1,500
DC03Reflective Beads Type-IIISY1,500
DD03Remaval of Existing Pavement markingsSY1,500
Work includes surface clean up.
DE03GroovingSY200
DF03Rubber RemovalSY1,500
DG03Provide new Grounding Points $ Tie DownEA100
Work includes removal and replace existing grounding
with concrete pad.
D004AC(Asphalt concrete) pavement:
DA04Provide New AC pavement
2" Thk or more - 4" Thk or less
Work includes prime /tack coat , compaction , and AC testing.SY20,000
Surface / wearing, Binder course and including modify typeII AC.
DB04Provide New AC pavement
4" Thk or more - 6" Thk or lessSY25,000
Work includes prime /tack coat , compaction , and AC testing.
Surface / wearing, Binder course and including modify typeII AC.
DC04Remove AC pavement
Surface /wearing ,Binder course and modify type II ACCY1,000
DD04Mill and Overlay 2"-4" thk AC pavementSY6,000
Work includse prime/tack coat and diposal.
DE04AC removal by Cold Planning, up to 2" thickSY10,000
including disposal.
DF04AC removal by Cold Planning, more than 2" thickSY15,000
including disposal.
DG04Provide crack seal for AC pavementLF300
D005Base, Excavation and Fill material:
DA05Provide new Base CourseCY1,500
Work includes compaction.
DB05Provide new Sub-Base CourseCY1,500
Work includes compaction.
DC05ExcavationCY2,000
Work includes disposal.
DD05Provide fill MaterialCY500
Work includes copmaction.
DE05Remove Existing Base & Sub-Base CourseCY2,500
Work includes diposal and compaction.
D006SODDING:
DA06Provide 2-1/2" thick TopsoilSY500
DB06Provide new sodSY500
DC06Provide HydroseedingSY500
Work includes watering and maintenance
D007SODIUM SILICATE COATING
DA07Sodium Silicate Coating(Perform ETL 14-2)SY2000
TOTAL OPTION YEAR 3¥
Upward price-1.5%

&CFOR OFFICIAL USE ONLY&RPage &P

OP-4

EXHIBIT E
IDIQ AIRFIELD PAVEMENT
KADENA AIR BASE, OKINAWA, JAPAN
REQUEST FOR PROPOSAL FA5270-17-R-0007
PART I - THE SCHEDULE
Offeror (Company Name) _____________________________ Corporate Seal (Han) __________________
(OPTION YEAR 4 )
Unit ofEstimatedPrice perEstimated
SUBLINEDescriptionMeasureQuantityUnitAmount
(YEN)(YEN)
E001PCC (Portland Cement Concrete) Slab:
EA01Construct New PCC Pavement with Plain ConcreteCY1,000
Work includes excavation, removal of top soil, disposal , sub grade compaction, and all associated quality control and compaction testing. Perform IAW Section 32 13 11 and detail 1,5, and6. Flexural Strength 45/50- Kg/cm²
EB01Construct New PCC Pavement with reinforced ConcreteCY500
Work includes excavation, removal of top soil, disposal , sub grade compaction, and all associated quality control and compaction testing. Perform IAW Section 32 13 11 and detail 1,5 and 6. Flexural Strength 45/50- Kg/cm².
EC01Replace Existing PCC Slab with Plain concreteCY2,000
Work includes excavation, removal /disposal of existing concrete , sawcut, sub grade compaction, and all associated quality control and compaction testing. Perform IAW Section 32 13 11 and detail Plate #1. Flexural Strength 45/50- Kg/cm², detail 1,2,3,5 and 6.
ED01Replace Existing PCC Slab with Reinforced concreteCY1,500
Work includes excavation, removal /disposal of existing concrete , sawcut, sub grade compaction, and all associated quality control and compaction testing. Detail 1. Flexural Strength 45/50- Kg/cm², detail #1,2,3 and 5.
EE01Partial Depth Spall RepairCY15
Work includes sawcut, removal /disposal of existing concrete , apply epoxy resin adhesive, and all associated quality control. Detail #11. Flexural Strength 45/50- Kg/cm².
EF01Full Depth Spall RepairionCY10
Work includes full depth sawcut, removal /disposal of existing concrete , apply epoxy resin adhesive, dowel, tie bar, compaction testing and all associated quality control. Detail #12. Flexural Strength 45/50- Kg/cm².
EG01Repair concrete crackLF3,000
Work includes sawcut/route, cleaning of surface, reseal and removal /disposal of existing concrete , and all associated quality control. Detail #11 and #10.
E002PCC SLAB JOINT:
EA02Provide Expansion JointLF1,000
Providing the new dowel bar which includes: placing, paint and grease. All slab edging rounded 1/8inch radius.
EB02Construction joint . Provided DoweledLF3,000
Providing the new dowel bar which includes: placing, paint and grease. All slab edging rounded 1/8inch radius.
EC02Provide Contraction JointLF5,000
Providing the new dowel bar which includes: placing, paint and grease. All slab edging rounded 1/8inch radius.
ED02Replace Joint SealsLF10,000
Providing the new joint sealant which includes: placing, clean surface , plate # 2,3 and 4.
Pavement marking,Rubber removal, Grooving and Grounding:
EA03New Pavement Markings with Paint .SY1,500
Contractor should be follow the ETL 04-2-2 ,UFGS and ETL 97-18 for paint & Beads
EB03Reflectice Beads Type-ISY1,500
EC03Reflectice Beads Type-IIISY1,500
ED03Remaval of Existing Pavement markingsSY1,500
Work includes surface clean up.
EE03GroovingSY200
EF03Rubber RemovalSY1,500
EG03Provide new Grounding Points $ Tie DownEA100
Work includes removal and replace existing grounding
with concrete pad.
E004AC(Asphalt concrete) pavement:
EA04Provide New AC pavement
2" Thk or more - 4" Thk or less
Work includes prime /tack coat , compaction , and AC testing.SY20,000
Surface /wearing ,Binder course and including modify type II AC
EB04Provide New AC pavement
4" Thk or more - 6"Thk or less
Work includes prime /tack coat , compaction , and AC testing.SY25,000
Surface /wearing ,Binder course and including modify type II AC
EC04Remove AC pavement
Work includes removal and disposal ,sawcut and excavationCY1,000
2"-6" Thk AC
ED04Mill and Overlay 2"-4" thk AC pavementSY6,000
Work includse prime/tack coat and diposal.
EE04AC removal by Cold Planning, up to 2" thickSY10,000
including disposal
EF04AC removal by Cold Planning, more than 2" thickSY15,000
including disposal
EG04Provide crack seal for AC pavementLF300
E005Base, Excavation and Fill material:
EA05Provide new Base CourseCY1,500
Work includes compaction.
EB05Provide new Sub-Base CourseCY1,500
Work includes compaction.
EC05ExcavationCY2,000
Work includes disposal.
ED05Provide fill MaterialCY500
Work includes copmaction.
EE05Remove Existing Base & Sub-Base CourseCY2,500
Work includes diposal and compaction.
E006SODDING:
EA06Provide 2-1/2" thick TopsoilSY500
EB06Provide new sodSY500
EC06Provide HydroseedingSY500
Work includes watering and maintenance
E007SODIUM SILICATE COATING
EA07Sodium Silicate Coating(Perform ETL 14-2)SY2,000
TOTAL OPTION YEAR 4¥
Upward price-1.5%