Exhibit_A_-_Base_Year.pdf
PDF 24 KB Posted
- Attached to
- Airfield Paving IDIQ Federal contract opportunity
- Solicitation number
- FA527017R0007_
About this file
Exhibit A - Base Year Pricing Schedule
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI's__5.pdf | ||
| Revised_RFI's__4.pdf | ||
| RFI's__4.pdf | ||
| Amendment_03.pdf | ||
| Revised_Pricing_Schedule_18Aug17.xls | XLS spreadsheet | |
| RFI's__3.pdf | ||
| Airfield_Paving_IDIQ,_Pre-Proposal_Conference_Minutes.pdf | ||
| RFI's__2.pdf | ||
| PPQ_cover_letter_2.pdf | ||
| Amendment_02.pdf | ||
| RFI's__1.pdf | ||
| Amendment_01.pdf | ||
| Pricing_Schedule_(Exhibits_A~E).xls | XLS spreadsheet | |
| Exhibit_E_-_Option_Year_Four.pdf | ||
| Attachment_5_-_Project_Information_Sheet.pdf | ||
| Attachment_4_-_AF_Form_66.pdf | ||
| Attachment_1.pdf | ||
| Exhibit_B_-_Option_Year_One.pdf | ||
| Attachment_2.pdf | ||
| FA5270-17-R-0007.pdf | ||
| Exhibit_D_-_Option_Year_Three.pdf | ||
| Attachment_6_-_PPQ.pdf | ||
| Exhibit_C_-_Option_Year_Two.pdf | ||
| Attachment_3-OCR.pdf |
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B-1 Project Description: Project LXEZ 172664, AIRFIELD PAVEMENT, IDIQ for Airfield Pavement
KADENA AIR BASE. The contractor will provide all supervision, materials, equipment, tools, labor, etc., required to perform the work items included in this Schedule to repair existing pavement or to install new concrete /asphalt, replace existing sealant and repaint marking Various Locations, Okinawa, Japan.
The work includes, but is not limited to: Pavement shoulder, spall, crack and patching repair, install re-bar, construction , contraction and expansion joint with dowel/tie bar. Provide hydroseeding, base course& sub base work and other miscellaneous work.
B-2 Place of Performance:
All work under this project will be performed in the following areas, Runway, Taxiway, Aircraft parking apron, shoulder and over run areas. Kadena Air Base , Okinawa, Japan.
B-3 Period of Performance:
Each Delivery Order will be assigned its own period of performance
B-4 Pricing Schedule: Price will be submitted in yen. Unit pricing for each CLIN item shall include all labor, materials, equipment, tools, transportation, field investigations, quality control, testing, mobilization, demobilization, overhead, profit, bonding, etc. for a complete work item in accordance with the specification.
Price
Unit of Estimated per Estimated
ELIN Description Measure Quantity Unit Amount
(YEN) (YEN)
A001 PCC (Portland Cement Concrete) Slab:
AA01 Construct New PCC Pavement with Plain Concrete CY 1,000
Work includes excavation, removal of top soil, disposal , sub grade compaction, and all associated quality control and compaction testing. Perform IAW Section 32 13 11 and TYP details page 1,5 and 6. Flexural Strength 45/50- Kg/cm²
AB01 Construct New PCC Pavement with reinforced Concrete CY 500
(BASIC YEAR 1 )
IDIQ
AIRFIELD PAVEMENT
KADENA AIR BASE, OKINAWA, JAPAN
PART I - THE SCHEDULE
( CONTRACTOR )
SUPPLIES OR SERVICES AND PRICES
FOR OFFICIAL USE ONLY Page 1
Work includes excavation, removal of top soil, disposal , sub grade compaction, and all associated quality control and compaction testing. Perform IAW Section 32 13 11 and TYP details page 1. Flexural Strength 45/50- Kg/cm².
AC01 Replace Existing PCC Slab with Plain concrete CY 2,000
Work includes excavation, removal /disposal of existing concrete , sawcut, sub grade compaction, and all associated quality control and compaction testing. Perform IAW Section 32 13 11 and TYP detail #1. Flexural Strength 45/50- Kg/cm², TYP details page1,2,3,5 and 6.
AD01 Replace Existing PCC Slab with Reinforced concrete CY 1,500
Work includes excavation, removal /disposal of existing concrete , sawcut, sub grade compaction, and all associated quality control and compaction testing. TYP Details #1. Flexural Strength 45/50-
Kg/cm², TYP detail page 1,2,3 and 5.
AE01 Partial Depth Spall Repair CY 15
Work includes sawcut, removal /disposal of existing concrete , apply epoxy resin adhesive, and all associated quality control.
TYP Detail 11. Flexural Strength 45/50- Kg/cm².
AF01 Full Depth Spall Repairion CY 10
Work includes full depth sawcut, removal /disposal of existing concrete , apply epoxy resin adhesive, dowel, tie bar, compaction testing and all associated quality control. Perform TYP Detail page12. Flexural Strength 45/50- Kg/cm².
AG01 Repair concrete crack LF 3,000
Work includes sawcut/route, cleaning of surface, reseal and removal /disposal of existing concrete , and all associated quality control. TYP Detail page 11 and 10.
A002 PCC SLAB JOINT:
AA02 Provide Expansion Joint LF 1,000
Providing the new dowel bar which includes: placing, paint and grease. All slab edging rounded 1/8inch radius.
AB02 Construction joint . Provided Doweled LF 3,000
Providing the new dowel bar which includes: placing, paint and grease. All slab edging rounded 1/8inch radius.
AC02 Provide Contraction Joint LF 5,000
Providing the new dowel bar which includes: placing, paint and grease. All slab edging rounded 1/8inch radius.
AD02 Replace Joint Seals LF 10,000
Providing the new joint sealant which includes: placing, clean surface , TYP detail page 2,3 and 4.
FOR OFFICIAL USE ONLY Page 2
A003 Pavement marking,Rubber removal, Grooving and Grounding:
AA03 New Pavement Markings with Paint . SY 1,500
Contractor should be follow the ETL 04-2-2,UFGS and ETL97-18 for paint & Beads
AB03 Reflective Beads Type-I SY 1,500
AC03 Reflective Beads Type-III SY 1,500
AD03 Remaval of Existing Pavement markings SY 1,500
Work includes surface clean up.
AE03 Grinding SY 200
AF03 Rubber Removal SY 1,500
AG03 Provide new Grounding Points $ Tie Down EA 100
Work includes removal and replace existing grounding with concrete pad.
A004 AC(Asphalt concrete) pavement:
AA04 Provide New AC pavement
2"Thk or more-4"Thk or less SY 20,000
Work includes prime /tack coat , compaction , and AC testing.
Surface /wearing ,Binder course and including modify type II AC
AB04 Provide New AC pavement
4"Thk or more-6"Thk or less SY 25,000
Work includes prime /tack coat , compaction , and AC testing.
Surface /wearing ,Binder course and including modify type II AC
FOR OFFICIAL USE ONLY Page 3
AC04 Remove AC pavement
Work includes removal and disposal ,sawcut and excavation CY 1,000
AD04 Mill and Overlay 2"-4" thk AC pavement SY 6,000
Work includse prime/tack coat and diposal.
AE04 AC removal by Cold Planning, up to 2" thick SY 10,000 including disposal
AF04 AC removal by Cold Planning, more than 2" thick SY 15,000 including disposal
AG04 Provide crack seal for AC pavement LF 300
A005 Base, Excavation and Fill material:
AA05 Provide new Base Course CY 1,500
Work includes compaction.
AB05 Provide new Sub-Base Course LF 1,500
Work includes compaction.
AC05 Excavation CY 2,000
Work includes disposal.
AD05 Provide fill Material CY 500
Work includes copmaction.
AE05 Remove Existing Base & Sub-Base Course CY 2,500
Work includes diposal and compaction.
A006 SODDING:
AA06 Provide 2-1/2" thick Topsoil SY 500
AB06 Provide new sod SY 500
AC06 Provide Hydroseeding SY 500
Work includes watering and maintenance
A007 SODIUM SILICATE COATING
AA07 Sodium Silicate Coating(Perform ETL 14-2) SY 2000
TOTAL BASIC YEAR
FOR OFFICIAL USE ONLY Page 4
File details come from the government source that posted it. Updated .