Exhibit B - Option Year One Pricing Schedule
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI's__5.pdf | ||
| Revised_RFI's__4.pdf | ||
| RFI's__4.pdf | ||
| Amendment_03.pdf | ||
| Revised_Pricing_Schedule_18Aug17.xls | XLS spreadsheet | |
| RFI's__3.pdf | ||
| Airfield_Paving_IDIQ,_Pre-Proposal_Conference_Minutes.pdf | ||
| RFI's__2.pdf | ||
| PPQ_cover_letter_2.pdf | ||
| Amendment_02.pdf | ||
| RFI's__1.pdf | ||
| Amendment_01.pdf | ||
| Pricing_Schedule_(Exhibits_A~E).xls | XLS spreadsheet | |
| Attachment_4_-_AF_Form_66.pdf | ||
| Attachment_1.pdf | ||
| Exhibit_E_-_Option_Year_Four.pdf | ||
| Attachment_5_-_Project_Information_Sheet.pdf | ||
| Exhibit_A_-_Base_Year.pdf | ||
| Attachment_2.pdf | ||
| FA5270-17-R-0007.pdf | ||
| Exhibit_D_-_Option_Year_Three.pdf | ||
| Attachment_6_-_PPQ.pdf | ||
| Exhibit_C_-_Option_Year_Two.pdf | ||
| Attachment_3-OCR.pdf |
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B-1 Project Description: Project LXEZ 172664, AIRFIELD PAVEMENT, IDIQ for Airfield Pavement
KADENA AIR BASE. The contractor will provide all supervision, materials, equipment, tools, labor, etc., required to perform the work items included in this Schedule to repair existing pavement or to install new concrete /asphalt, replace existing sealant and repaint marking Various Locations, Okinawa, Japan.
The work includes, but is not limited to: Pavement shoulder, spall, crack and patching repair, install re-bar, construction , contraction and expansion joint with dowel/tie bar. Provide hydroseeding, base course& sub base work and other miscellaneous work.
B-2 Place of Performance:
All work under this project will be performed in the following areas, Runway, Taxiway, Aircraft parking apron, shoulder and over run areas. Kadena Air Base , Okinawa, Japan.
B-3 Period of Performance:
Each Delivery Order will be assigned its own period of performance
B-4 Pricing Schedule: Price will be submitted in yen. Unit pricing for each CLIN item shall include all labor, materials, equipment, tools, transportation, field investigations, quality control, testing, mobilization, demobilization, overhead, profit, bonding, etc. for a complete work item in accordance with the specification.
Price
Unit of Estimated per Estimated
ELIN Description Measure Quantity Unit Amount
(YEN) (YEN)
B001 PCC (Portland Cement Concrete) Slab:
BA01 Construct New PCC Pavement with Plain Concrete CY 1,000 Work includes excavation, removal of top soil, disposal , sub grade compaction, and all associated quality control and compaction testing. Perform IAW Section 32 13 11 and TYP detail page 1 5 and 6. Flexural Strength 45/50- Kg/cm²
(OPTION YEAR 1 )
IDIQ
AIRFIELD PAVEMENT
KADENA AIR BASE, OKINAWA, JAPAN
PART I - THE SCHEDULE
SECTION B ( CONTRACTOR )
SUPPLIES OR SERVICES AND PRICES
FOR OFFICIAL USE ONLY Page 1
BB01 Construct New PCC Pavement with reinforced Concrete CY 500 Work includes excavation, removal of top soil, disposal , sub grade compaction, and all associated quality control and compaction testing. Perform IAW Section 32 13 11 and TYP detail 1. Flexural Strength 45/50- Kg/cm².
BC01 Replace Existing PCC Slab with Plain concrete CY 2,000 Work includes excavation, removal /disposal of existing concrete , sawcut, sub grade compaction, and all associated quality control and compaction testing. Perform IAW Section 32 13 11 and TYP detail 1. Flexural Strength 45/50- Kg/cm², TYP detail page1,2,3,5 and 6.
BD01 Replace Existing PCC Slab with Reinforced concrete CY 1,500 Work includes excavation, removal /disposal of existing concrete , sawcut, sub grade compaction, and all associated quality control and compaction testing. TYP Detail #1. Flexural Strength 45/50-
Kg/cm², TYP detail 1,2,3 and 5.
BE02 Partial Depth Spall Repair CY 15
Work includes sawcut, removal /disposal of existing concrete , apply epoxy resin adhesive, and all associated quality control.
and TYP detail 11. Flexural Strength 45/50- Kg/cm².
BF01 Full Depth Spall Repairion CY 10 Work includes full depth sawcut, removal /disposal of existing concrete , apply epoxy resin adhesive, dowel, tie bar, compaction testing and all associated quality control. TYP Detail 12. Flexural
Strength 45/50- Kg/cm².
BG01 Repair concrete crack LF 3,000
Work includes sawcut/route, cleaning of surface, reseal and removal /disposal of existing concrete , and all associated quality control. TYP Detail 11 and 10.
B002 PCC SLAB JOINT:
BA02 Provide Expansion Joint LF 1,000
Providing the new dowel bar which includes: placing, paint and grease. All slab edging rounded 1/8inch radius.
BB02 Construction joint . Provided Doweled LF 3,000
Providing the new dowel bar which includes: placing, paint and grease. All slab edging rounded 1/8inch radius.
BC02 Provide Contraction Joint LF 5,000
FOR OFFICIAL USE ONLY Page 2
Providing the new dowel bar which includes: placing, paint and grease. All slab edging rounded 1/8inch radius.
BD02 Replace Joint Seals LF 10,000
Providing the new joint sealant which includes: placing, clean surface , TYP detail # 2,3 and 4.
B003 Pavement marking,Rubber removal, Grooving and Grounding:
BA03 New Pavement Markings with Paint and Reflective Beads. SY 1,500
Contractor should be follow the ETL 04-2-2,UFGS and ETL 97-18 for Ppaint & Beads
UFGS and ETL97-18
BB03 Reflective Beads Type-I SY 1,500
BC03 Reflective Beads Type-III SY 1,500
BD03 Removal of Existing Pavement markings SY 1,500
Work includes surface clean up.
BE03 Grinding SY 200
BF03 Rubber Removal SY 1,500
BG03 Provide new Grounding Points $ Tie Down EA 100
Work includes removal and replace existing grounding with concrete pad.
B004 AC(Asphalt concrete) pavement:
BA04 Provide New AC pavement
2" Thk or more -4" Thk or less SY 20,000
Work includes prime /tack coat , compaction , and AC testing.
Surface /wearing ,Binder course and modify type II AC-2"- 6" Thk
AC
BB04 Provide New AC pavement
4" Thk or more -6" Thk or less SY 25,000
Work includes prime /tack coat , compaction , and AC testing.
Surface /wearing ,Binder course and modify type II AC
BC04 Remove AC pavement
Work includes removal and disposal ,sawcut and excavation CY 1,000
FOR OFFICIAL USE ONLY Page 3
BD04 Mill and Overlay 2"-4" thk AC pavement SY 6,000
Work includse prime/tack coat and diposal.
BE04 AC removal by Cold Planning, up to 2" thick SY 10,000 including disposal
BF04 AC removal by Cold Planning, more than 2" thick SY 15,000 including disposal
BG04 Provide crack seal for AC pavement LF 300
B005 Base, Excavation and Fill material:
BA05 Provide new Base Course CY 1,500
Work includes compaction.
BB05 Provide new Sub-Base Course LF 1,500
Work includes compaction.
BC05 Excavation CY 2,000
Work includes disposal.
BD05 Provide fill Material CY 500
Work includes copmaction.
BE05 Remove Existing Base & Sub-Base Course CY 2,500
Work includes diposal and compaction.
B006 SODDING:
BA06 Provide 2-1/2" thick Topsoil SY 500
BB06 Provide new sod SY 500
BC06 Provide Hydroseeding SY 500
Work includes watering and maintenance
B007 SODIUM SILICATE COATING
BA07 Sodium Silicate Coating(Perform ETL 14-2) SY 2000
TOTAL OPTION YEAR 1
FOR OFFICIAL USE ONLY Page 4