Exhibit C - Option Year Two Pricing Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Airfield Paving IDIQ, newest first.
File Type Posted
RFI's__5.pdf PDF
Revised_RFI's__4.pdf PDF
RFI's__4.pdf PDF
Amendment_03.pdf PDF
Revised_Pricing_Schedule_18Aug17.xls XLS spreadsheet
RFI's__3.pdf PDF
Airfield_Paving_IDIQ,_Pre-Proposal_Conference_Minutes.pdf PDF
RFI's__2.pdf PDF
PPQ_cover_letter_2.pdf PDF
Amendment_02.pdf PDF
RFI's__1.pdf PDF
Pricing_Schedule_(Exhibits_A~E).xls XLS spreadsheet
Amendment_01.pdf PDF
Attachment_4_-_AF_Form_66.pdf PDF
Attachment_1.pdf PDF
Exhibit_B_-_Option_Year_One.pdf PDF
Attachment_2.pdf PDF
FA5270-17-R-0007.pdf PDF
Exhibit_E_-_Option_Year_Four.pdf PDF
Attachment_5_-_Project_Information_Sheet.pdf PDF
Exhibit_A_-_Base_Year.pdf PDF
Exhibit_D_-_Option_Year_Three.pdf PDF
Attachment_6_-_PPQ.pdf PDF
Attachment_3-OCR.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B-1 Project Description: Project LXEZ 172664, AIRFIELD PAVEMENT, IDIQ for Airfield Pavement

KADENA AIR BASE. The contractor will provide all supervision, materials, equipment, tools, labor, etc., required to perform the work items included in this Schedule to repair existing pavement or to install new concrete /asphalt, replace existing sealant and repaint marking Various Locations, Okinawa, Japan.

The work includes, but is not limited to: Pavement shoulder, spall, crack and patching repair, install re-bar, construction , contraction and expansion joint with dowel/tie bar. Provide hydroseeding, base course& sub base work and other miscellaneous work.

B-2 Place of Performance:

All work under this project will be performed in the following areas, Runway, Taxiway, Aircraft parking apron, shoulder and over run areas. Kadena Air Base , Okinawa, Japan.

B-3 Period of Performance:

Each Delivery Order will be assigned its own period of performance

B-4 Pricing Schedule: Price will be submitted in yen. Unit pricing for each CLIN item shall include all labor, materials, equipment, tools, transportation, field investigations, quality control, testing, mobilization, demobilization, overhead, profit, bonding, etc. for a complete work item in accordance with the specification.

Price

Unit of Estimated per Estimated

CLIN Description Measure Quantity Unit Amount

(YEN) (YEN)

C001 PCC (Portland Cement Concrete) Slab:

CA02 Construct New PCC Pavement with Plain Concrete CY 1,000 Work includes excavation, removal of top soil, disposal , sub grade compaction, and all associated quality control and compaction testing. Perform IAW Section 32 13 11 and TYP detail #1#5 and

#6. Flexural Strength 45/50- Kg/cm²

(OPTION YEAR 2 )

IDIQ

AIRFIELD PAVEMENT

KADENA AIR BASE, OKINAWA, JAPAN

PART I - THE SCHEDULE

SECTION B ( CONTRACTOR )

SUPPLIES OR SERVICES AND PRICES

FOR OFFICIAL USE ONLY Page 1

CB01 Construct New PCC Pavement with reinforced Concrete CY 500 Work includes excavation, removal of top soil, disposal , sub grade compaction, and all associated quality control and compaction testing. Perform IAW Section 32 13 11 and TYP detail #1. Flexural Strength 45/50- Kg/cm².

CC01 Replace Existing PCC Slab with Plain concrete CY 2,000 Work includes excavation, removal /disposal of existing concrete , sawcut, sub grade compaction, and all associated quality control and compaction testing. Perform IAW Section 32 13 11 and TYP detail #1. Flexural Strength 45/50- Kg/cm², TYP detail 1,2,3,5 and

6.

CD01 Replace Existing PCC Slab with Reinforced concrete CY 1,500 Work includes excavation, removal /disposal of existing concrete , sawcut, sub grade compaction, and all associated quality control and compaction testing. Flexural Strength 45/50- Kg/cm², TYP detail 1,2,3 and 5.

CE01 Partial Depth Spall Repair CY 15

Work includes sawcut, removal /disposal of existing concrete , apply epoxy resin adhesive, and all associated quality control.

TYP Detail 11. Flexural Strength 45/50- Kg/cm².

CF01 Full Depth Spall Repairion CY 10 Work includes full depth sawcut, removal /disposal of existing concrete , apply epoxy resin adhesive, dowel, tie bar, compaction testing and all associated quality control. TYP Detail 12. Flexural

Strength 45/50- Kg/cm².

CG01 Repair concrete crack LF 3,000

Work includes sawcut/route, cleaning of surface, reseal and removal /disposal of existing concrete , and all associated quality control. TYP Detail 11 and #10.

C002 PCC SLAB JOINT:

CA02 Provide Expansion Joint LF 1,000

Providing the new dowel bar which includes: placing, paint and grease. All slab edging rounded 1/8inch radius.

CB02 Construction joint . Provided Doweled LF 3,000

Providing the new dowel bar which includes: placing, paint and grease. All slab edging rounded 1/8inch radius.

CC02 Provide Contraction Joint LF 5,000

FOR OFFICIAL USE ONLY Page 2

Providing the new dowel bar which includes: placing, paint and grease. All slab edging rounded 1/8inch radius.

CD02 Replace Joint Seals LF 10,000

Providing the new joint sealant which includes: placing, clean surface , plate # 2,3 and 4.

C003 Pavement marking,Rubber removal, Grooving and Grounding:

CA03 New Pavement Markings with Paint . SY 1,500

Contractor should be follow the ETL 04-2-2 ,UFGS and ETL97-18 for paint & Beads

CB03 Reflective Beads Type-I SY 1,500

CC03 Reflective Beads Type-III SY 1,500

CD03 Remaval of Existing Pavement markings SY 1,500

Work includes surface clean up.

CE03 Grinding SY 200

CF03 Rubber Removal SY 1,500

CG03 Provide new Grounding Points $ Tie Down EA 100

Work includes removal and replace existing grounding with concrete pad.

C004 AC(Asphalt concrete) pavement:

CA04 Provide New AC pavement

2" Thk or more - 4"Thk or less

Work includes prime /tack coat , compaction , and AC testing. SY 20,000

Surface /wearing ,Binder course and modify type II AC

CB04 Provide New AC pavement

4" Thk or more - 6"Thk or less SY 25,000

Work includes prime /tack coat , compaction , and AC testing.

Surface /wearing ,Binder course and modify type II AC

CC04 Remove AC pavement

Work includes removal and disposal ,sawcut and excavation CY 1,000

CD04 Mill and Overlay 2"-4" thk AC pavement SY 6,000

Work includse prime/tack coat and diposal.

FOR OFFICIAL USE ONLY Page 3

CE04 AC removal by Cold Planning, up to 2" thick SY 10,000 including disposal

CF04 AC removal by Cold Planning, more than 2" thick SY 15,000 including disposal

CG04 Provide crack seal for AC pavement LF 300

C005 Base, Excavation and Fill material:

CA05 Provide new Base Course CY 1,500

Work includes compaction.

CB05 Provide new Sub-Base Course LF 1,500

Work includes compaction.

CC05 Excavation CY 2,000

Work includes disposal.

CD05 Provide fill Material CY 500

Work includes copmaction.

CE05 Remove Existing Base & Sub-Base Course CY 2,500

Work includes diposal and compaction.

C006 SODDING:

CA06 Provide 2-1/2" thick Topsoil SY 500

CB06 Provide new sod SY 500

CC06 Provide Hydroseeding SY 500

Work includes watering and maintenance

C007 SODIUM SILICATE COATING

CA07 Sodium Silicate Coating(Perform ETL 14-2) SY 2000

TOTAL OPTION YEAR 2