3_-_AF_Form_66.pdf
PDF 129 KB Posted
- Attached to
- Repair (Sustain) NDI Lab Federal contract opportunity
- Solicitation number
- FA487718B0005
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_2.pdf | ||
| Memo__Project_Requirement_Revision.pdf | ||
| Procurement_RFIs.pdf | ||
| FA4877-18-B-0005_NDI_Lab_Solicitation_2.pdf | ||
| NDI_lab_Site_Visit_Sign-in_Sheet.pdf | ||
| FA4877-19-B-0001-0001_NDI_Lab_Amendment_1.pdf | ||
| 2_-_Project_Drawings.pdf | ||
| FA4877-18-B-0005_NDI_Lab_Solicitation.pdf | ||
| 2_-_Project_Drawings.pdf | ||
| 2_-_Project_Drawings_-_Pt3.pdf | ||
| FA4877-19-B-0001_-_NDI_Lab_solicitation.pdf | ||
| 7_-_Contract_Security_Requirements.pdf | ||
| 6_-_Wage_Determination_(AZ33)_21_Sept_18.pdf | ||
| 2_-_Project_Drawings_-_Pt1.pdf | ||
| 8_-_Contractor_Environmental_Guide.pdf | ||
| 2_-_Project_Drawings_-_Pt2.pdf | ||
| 4_-_AF_Form_3052_(Blank).xlsx | XLSX spreadsheet | |
| 5_-_DMAFB_Design_Compatibility_Guidelines_2017.pdf | ||
| 1_-_Specifications_(Statement_of_Work).pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NUMBER : PROJECT TITLE: SOLICITATION/CONTRACT NO.:
Awarded:
Pre-Con:
NTP:
Const. Start:
Const. End:
Finalled:
APPROVED DISAPPROVED
1 3
2 3
3 2 (1st of the month for projects >60days) (End of project for projects <60 days)
4 2 7 Days after Reciept of Permit
5 2 2 Days Prior to Construction
6 1
7 Days after Reciept of Permit
7 1
7 Days after Reciept of Permit
8 2 7 Days after Reciept of Asbestos Demolition Permit
9 3
10 3
11 2 7 Days After Reciept of Manifest
12 2 3 days after Disposal
13 2 Coordinated Prior to Removal from Installation
Asbestos Manifests Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Asbestos Removal
Non-Regulated Waste Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Regulated Hazardous Waste
Regulated Waste Disposal Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Regulated Hazardous Waste
Asbestos Removal/Demolition Activity Permit Sec 01010, Para 2.5d Env Cont Guide Sec 3.3 Asbestos
LBP Removal/Demolition Activity Permit Sec 01010, Para 2.5d Env Cont Guide Sec 3.3 Lead-Based Paint
Asbestos Removal/Demolition Abatement Plan Sec 01010, Para 2.5e Env Cont Guide Sec 3.3 Asbestos
Construction & Demolition Debris Diversion Plan Sec 01010, Para 2.5e Env Cont Guide Sec 3.3 C&D Plan SWPP Plan Sec 01010, Para 2.5f Env Cont Guide Sec 3.3 SWPP
Hazardous Material Usage Sec 01010, Para 2.5c Env Cont Guide Sec 3.3 Hazardous Material
HAZMAT Usage Reports Sec 01010, Para 2.5c Env Cont Guide Sec 3.4 HAZMAT Usage
Air Quality Activity Permit Sec 01010, Para 2.5d Env Cont Guide Sec 3.3 Air Quality AZPDES General Permit Sec 01010, Para 2.5d Env Cont Guide Sec 3.3 SWPP
AF Form 103 Job Order Sec 01010, Para 1.3c
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
AS
-B
UI
LT
S
OT
HE
R
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
DATE CONTRACTOR NOTIFIED
NO. OF COPIES REQUIRED
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
LI
NE
N
UM
BE
R
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
Rpr NDI Lab, Fac 5406FBNV130007
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
REMARKS
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
FI
NA
L
AP
PR
OV
AL
AF FORM 66 (Computer Generated) PAGE 1 of 14
Pre-Con:
NTP:
Const. Start:
Const. End:
Finalled:
APPROVED DISAPPROVED
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
AS
-B
UI
LT
S
OT
HE
R
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
DATE CONTRACTOR NOTIFIED
NO. OF COPIES REQUIRED
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
LI
NE
N
UM
BE
R
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
Rpr NDI Lab, Fac 5406FBNV130007
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
REMARKS
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
FI
NA
L
AP
PR
OV
AL
14 2 3 Days after Disposal
15 2 (1st of the month for projects >60days) (End of project for projects <60 days)
16 2 (1st of the month for projects >60days) (End of project for projects <60 days)
17 3
18 1
19 1
20 1
21 1
22 1
23 1
24 3
25 2
26 2
At PreCon Meeting
27 2 At PreCon Meeting
28 2 7 Days after Construction Complete (Only for Contracts >$100,000)
29 2 7 Days after Construction Complete
30 02 41 00-Preconstruction Submittals Demolition/Deconstruction Plan 1.2.1 2
31 02 85 00.00 20-Preconstruction Submittals Microbial Remediation Plan 1.4.1.2 2
EMS Most Significant Environmental Aspects Awareness Form Env Cont Guide Sec 3.2 & Appendix E
EMS Awareness Training Env Cont Guide Sec 3.3 & Appendix F
Recovered Materials Certification Env Cont Guide Sec 3.5 Recovered Materials Notifce of Termination Env Cont Guide 3.5 SWPP Plan
DD Form 1354 Sec 01010, Para 3.2.2.c.1 DD Form 1354 Checklist Sec 01010, Para 3.2.2.c.2 Warranty/Guarantee Items Sec 01010, Para 3.2.2.c.3 O&M Manual Sec 01010, Para 3.2.2.d AF Form 3064
Non-Hazardous Waste Manifests Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Waste & Recyclables
Radioactive Use Sec 01010, Para 2.5i Env Cont Guide Sec 3.3 Radioactive Material Progress Photographs Sec 01010, Para 2.8
Record As-Builts Sec 01010, Para 3.2.2.a Record Disks Sec 01010, Para 3.2.2.b
Regulated Waste Manifests Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Regulated Hazardous Waste
Recycling Manifests Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Waste & Recyclables
AF FORM 66 (Computer Generated) PAGE 2 of 14
Pre-Con:
NTP:
Const. Start:
Const. End:
Finalled:
APPROVED DISAPPROVED
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
AS
-B
UI
LT
S
OT
HE
R
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
DATE CONTRACTOR NOTIFIED
NO. OF COPIES REQUIRED
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
LI
NE
N
UM
BE
R
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
Rpr NDI Lab, Fac 5406FBNV130007
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
REMARKS
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
FI
NA
L
AP
PR
OV
AL
32 02 85 00.00 20-Product Data Fungicidal Agents, (EPA) 1.2.12 2
33 02 85 00.00 20-Closeout Submittals Submittals at Completion of Remediation Work 1.4.4 2
34 03 30 53-Shop Drawings Installation Drawings 1.5 2
35 03 30 53-Product Data Mix Design Data 2.3 2
36 03 30 53-Test Reports Concrete Mixture Proportions 2.1.3 2
37 03 30 53-Test Reports Compressive Strength Testing 3.9.3 2
38 03 30 53-Test Reports Slump 3.9.3 2
39 05 50 14-Certificates Application Qualification for Steel Studs 2.1.2.3.1 2
40 07 92 00.00 06 Product Data Sealants 2.1 2
41 08 11 13-Product Data Doors 2.1 2
42 08 11 13-Product Data Frames 2.4 2
43 08 71 00-Shop Drawings Verification of Existing Conditions 1.3 2
44 08 71 00-Shop Drawings Keying System 2.3.5 2
45 08 71 00-Product Data Hardware Items 2.3 2
46 08 71 00-Operation and Maintenance Data Hardware Schedule 1.5 2
47 09 29 00-Certificates Asbestos Free Materials 2.2 2
48 09 30 10-Shop Drawings Detail Drawings 3.2 2
49 09 30 10-Product Data Tile 2.1 2
50 09 30 10-Product Data Tile 2.1 2
51 09 30 10-Product Data Setting-Bed 2.2 2
52 09 30 10-Product Data Mortar, Grout, and Adhesive 2.4 2
53 09 65 00-Product Data Resilient Flooring and Accessories 2.8 2
54 09 67 23.14-Product Data Sealer and Resin 2.5 2
55 09 67 23.14-Product Data Floor Surfacing 3.3.2 2
56 09 67 23.14-Product Data Conductive Sparkproof Flooring 2.4 2
AF FORM 66 (Computer Generated) PAGE 3 of 14
Pre-Con:
NTP:
Const. Start:
Const. End:
Finalled:
APPROVED DISAPPROVED
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
AS
-B
UI
LT
S
OT
HE
R
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
DATE CONTRACTOR NOTIFIED
NO. OF COPIES REQUIRED
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
LI
NE
N
UM
BE
R
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
Rpr NDI Lab, Fac 5406FBNV130007
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
REMARKS
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
FI
NA
L
AP
PR
OV
AL
57 09 67 23.14-Product Data Mixing 3.2 2
58 09 67 23.14-Test Reports Testing 3.4 2
59 09 67 23.14-Certificates Qualifications of Installer 1.3.1 2
60 09 67 23.14-Manufacturer’s Instructions Application 3.3 2
61 09 67 23.14-Operation and Maintenance Data Flooring Systems 2.3 2
62 09 90 00-Product Data Coating 2.1 2
63 09 90 00-Operation and Maintenance Data Coatings: 2.1 2
64 09 90 00-Mfg's Material Safety Data Sheets Safety Data Sheets 2.1
65 10 14 00.20-Product Data Installation and Warranty 1.7
66 12 32 00-Shop Drawings Fabrication 2.2 2
67 12 32 00-Shop Drawings Installation Drawings 3.1.2 2
68 12 32 00-Product Data Cabinets 2.3.1 2
69 12 32 00-Product Data Corrosion-Resistant Steel 2.4 2
70 12 32 00-Product Data Plywood 2.4 2
71 12 32 00-Product Data Hardwood 2.4 2
72 12 32 00-Product Data Hardwood Plywood 2.4 2
73 12 32 00-Product Data Adhesives 2.4 2
74 12 32 00-Product Data Varnish 2.4 2
75 12 32 00-Product Data Fasteners 2.4 2
76 12 32 00-Product Data Accessories and Hardware 2.5 2
77 12 32 00-Product Data Plastic Laminate 2.5 2
78 12 32 00-Samples Accessories and Hardware 2.5 2
79 12 32 00-Samples Manufacturer's Standard Color Charts 2.3.3 2
80 12 36 00-Shop Drawings Fabrication 2.3 2
81 12 36 00-Product Data Synthetic Resin 2.3.1 2
AF FORM 66 (Computer Generated) PAGE 4 of 14
Pre-Con:
NTP:
Const. Start:
Const. End:
Finalled:
APPROVED DISAPPROVED
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
AS
-B
UI
LT
S
OT
HE
R
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
DATE CONTRACTOR NOTIFIED
NO. OF COPIES REQUIRED
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
LI
NE
N
UM
BE
R
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
Rpr NDI Lab, Fac 5406FBNV130007
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
REMARKS
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
FI
NA
L
AP
PR
OV
AL
82 12 36 00-Samples Manufacturer's Standard Color Charts 2.2 2
83 13 49 10-Shop Drawings X-Ray Shielding 2.1 2
84 13 49 10 - Product Data Lead Lined Steel doors and frame 2.1
85 13 49 10 - Certificates X-Ray Shielding 2.1
86 21 13 13.00 10-Product Data Materials and Equipment 2.3 2
87 21 13 13.00 10-Product Data Preliminary Tests 3.7 2
88 21 13 13.00 10-Product Data Final Acceptance Test 3.8 2
89 21 13 13.00 10-Product Data Onsite Training 3.9 2
90 21 13 13.00 10-Product Data Fire Protection Specialist 1.5.1 2
91 21 13 13.00 10-Product Data Sprinkler System Installer 1.5.2 2
92 21 13 13.00 10-Design Data Sway Bracing 1.5.3 2
93 21 13 13.00 10-Design Data Hydraulic Calculations 1.3.1.3 2
94 21 13 13.00 10-Operation and Maintenance Data
Operating and Maintenance Manuals 3.9 2
95 22 00 00-Product Data Fixtures 2.5 2
96 22 00 00-Product Data Flush Valve Water Closets 2.5.1 2
97 22 00 00-Product Data Countertop Lavatories 2.5.2 2
98 22 00 00-Product Data Kitchen Sinks 2.5.3 2
99 22 00 00-Product Data Service Sinks 2.5.3 2
100 22 00 00-Product Data Drinking-Water Coolers 2.5.5 2
101 22 00 00-Product Data Water Heaters 2.9 2
102 22 00 00-Product Data Pumps 2.10 2
103 22 00 00-Product Data Backflow Prevention Assemblies 3.9.1.1 2
104 22 00 00-Product Data Vibration-Absorbing Features 3.4 2
105 22 00 00-Test Reports Test of Backflow Prevention Assemblies 3.9.1.1 2
106 22 00 00-Operation and Maintenance Data Plumbing System 3.9.1 2
AF FORM 66 (Computer Generated) PAGE 5 of 14
Pre-Con:
NTP:
Const. Start:
Const. End:
Finalled:
APPROVED DISAPPROVED
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
AS
-B
UI
LT
S
OT
HE
R
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
DATE CONTRACTOR NOTIFIED
NO. OF COPIES REQUIRED
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
LI
NE
N
UM
BE
R
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
Rpr NDI Lab, Fac 5406FBNV130007
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
REMARKS
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
FI
NA
L
AP
PR
OV
AL
107 23 00 00-Product Data Air Handling Units 2.12 2
108 23 00 00-Product Data Variable Volume, Single Duct Terminal Units 2.13.2.1 2
109 23 00 00-Product Data Reheat Units 2.13.2.2 2
110 23 00 00-Test Reports Performance Tests 3.12 2
111 23 00 00-Test Reports Damper Acceptance Test 2.10 2
112 23 00 00-Operation and Maintenance Data
Operation and Maintenance Manuals 3.14.1 2
113 23 00 00-Operation and Maintenance Data Centrifugal Fans 2.11.1.1 2
114 23 00 00-Operation and Maintenance Data Axial Flow Fans 2.11.1 2
115 23 00 00-Operation and Maintenance Data Panel Type Power Wall Ventilators 2.11.1.2 2
116 23 00 00-Operation and Maintenance Data
Centrifugal Type Power Wall Ventilators 2.11.1.3 2
117 23 00 00-Operation and Maintenance Data Air Handling Units 2.12 2
118 23 00 00-Operation and Maintenance Data
Variable Volume, Single Duct Terminal Units 2.13.2.1 2
119 23 00 00-Operation and Maintenance Data Reheat Units 2.13.2.2 2
120 23 05 93-Shop Drawings TAB Schematic Drawings and Report Forms 1.3.3 2
121 23 05 93-Product Data Equipment and Performance Data 1.4 2
122 23 05 93-Certificates Independent TAB Agency and Personnel Qualifications 1.5.1 2
123 23 07 00-Product Data Pipe Insulation Systems 3.2 2
124 23 07 00-Product Data Duct Insulation Systems 3.3 2
125 23 07 00-Product Data Equipment Insulation Systems 3.4 2
126 23 09 00-Shop Drawings DDC Contractor Design Drawings 3.3 2
127 23 09 00-Shop Drawings Draft As-Built Drawings 3.3 2
128 23 09 00-Shop Drawings Final As-Built Drawings 3.3 2
129 23 09 00-Product Data Programming Software 1.8.1 2
130 23 09 00-Product Data Controller Application Programs 1.8.2 2
131 23 09 00-Product Data Manufacturer's Product Data 2.2 2
AF FORM 66 (Computer Generated) PAGE 6 of 14
Pre-Con:
NTP:
Const. Start:
Const. End:
Finalled:
APPROVED DISAPPROVED
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
AS
-B
UI
LT
S
OT
HE
R
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
DATE CONTRACTOR NOTIFIED
NO. OF COPIES REQUIRED
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
LI
NE
N
UM
BE
R
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
Rpr NDI Lab, Fac 5406FBNV130007
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
REMARKS
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
FI
NA
L
AP
PR
OV
AL
132 23 09 00-Product Data XIF files 2.2.1 2
133 23 09 00-Product Data Final LNS Database 3.6.4 2
134 23 09 00-Product Data LNS Plug-ins 1.8.3 2
135 23 09 00-Test Reports Start-Up Testing Report 3.5.2 2
136 23 09 00-Test Reports PVT Procedures 3.6.1 2
137 23 09 00-Test Reports PVT Report 3.6.3 2
138 23 09 00-Test Reports Pre-Construction Quality Control (QC) Checklist 1.9.1 2
139 23 09 00-Test Reports Post-Construction Quality Control (QC) Checklist 1.9.2 2
140 23 09 00-Operation and Maintenance Data
Operation and Maintenance (O&M) Instructions 3.7 2
141 23 09 00-Operation and Maintenance Data Training Documentation 3.9.1 2
142 23 09 00-Closeout Submittals Enclosure Keys 2.5 2
143 23 09 00-Closeout Submittals Password Summary Report 3.2.6.1 2
144 23 09 00-Closeout Submittals Closeout Quality Control (QC) Checklist 1.9.3 2
145 23 23 00-Shop Drawings Refrigerant Piping System 2.3 2
146 23 23 00-Test Reports Refrigerant Piping Tests 3.5 2
147 23 23 00-Operation and Maintenance Data Maintenance 3.4 2
148 23 23 00-Operation and Maintenance Data
Operation and Maintenance Manuals 3.4 2
149 23 23 00-Operation and Maintenance Data Demonstrations 3.4 2
150 23 36 00.00 40-Shop Drawings Shutoff Single-Duct Air Terminal Units 2.1.2 2
151 23 36 00.00 40-Product Data Shutoff Single-Duct Air Terminal Units 2.1.2 2
152 23 64 10-Product Data Water Chiller 2.5 2
153 23 64 10-Certificates Refrigeration System 3.2.8 2
154 23 64 10-Manufacturer’s Instructions Water Chiller - Installation Instructions 3.2 2
155 23 64 10-Operation and Maintenance Data
Operation and Maintenance Manuals 3.8 2
156 23 64 26-Product Data Grooved Mechanical Connections For Steel 2.2.2.4 2
AF FORM 66 (Computer Generated) PAGE 7 of 14
Pre-Con:
NTP:
Const. Start:
Const. End:
Finalled:
APPROVED DISAPPROVED
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
AS
-B
UI
LT
S
OT
HE
R
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
DATE CONTRACTOR NOTIFIED
NO. OF COPIES REQUIRED
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
LI
NE
N
UM
BE
R
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
Rpr NDI Lab, Fac 5406FBNV130007
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
REMARKS
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
FI
NA
L
AP
PR
OV
AL
157 23 64 26-Product Data Grooved Mechanical Connections For Copper 2.4.3 2
158 23 64 26-Product Data Calibrated Balancing Valves 2.5.8 2
159 23 64 26-Product Data Automatic Flow Control Valves 2.5.9 2
160 23 64 26-Product Data Water Temperature Mixing Valve 2.5.11 2
161 23 64 26-Product Data Water Temperature Regulating Valves 2.5.12 2
162 23 64 26-Product Data Expansion Joints 2.5 2
163 23 64 26-Product Data Pumps 2.7 2
164 23 64 26-Product Data Water Treatment Systems 2.10 2
165 23 64 26-Test Reports Pressure Tests Reports 3.5.2 2
166 23 64 26-Test Reports Condenser Water Quality Test Reports 3.5 2
167 23 64 26-Test Reports One-Year Inspection Report For Cooling Water 3.5 2
168 23 64 26-Manufacturer’s Instructions Lesson plan for the Instruction Course 3.6 2
169 23 64 26-Operation and Maintenance Data Water Treatment Systems 2.10 2
170 23 64 26-Operation and Maintenance Data Calibrated Balancing Valves 2.5.8 2
171 23 64 26-Operation and Maintenance Data Automatic Flow Control Valves 2.5.9 2
172 23 64 26-Operation and Maintenance Data Pump Discharge Valve 2.5.10 2
173 23 64 26-Operation and Maintenance Data Water Temperature Mixing Valve 2.5.11 2
174 23 64 26-Operation and Maintenance Data
Water Temperature Regulating Valves 2.5.12 2
175 23 64 26-Operation and Maintenance Data Water Pressure Reducing Valve 2.5.13 2
176 23 64 26-Operation and Maintenance Data Pressure Relief Valve 2.5.14 2
177 23 64 26-Operation and Maintenance Data
Combination Pressure and Temperature Relief Valves 2.5.15 2
178 23 64 26-Operation and Maintenance Data Expansion Joints 2.5 2
179 23 64 26-Operation and Maintenance Data Pumps 2.7 2
180 23 64 26-Operation and Maintenance Data
Combination Strainer and Pump Suction Diffuser 2.6.3 2
181 23 64 26-Operation and Maintenance Data Expansion Tanks 2.8 2
AF FORM 66 (Computer Generated) PAGE 8 of 14
Pre-Con:
NTP:
Const. Start:
Const. End:
Finalled:
APPROVED DISAPPROVED
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
AS
-B
UI
LT
S
OT
HE
R
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
DATE CONTRACTOR NOTIFIED
NO. OF COPIES REQUIRED
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
LI
NE
N
UM
BE
R
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
Rpr NDI Lab, Fac 5406FBNV130007
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
REMARKS
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
FI
NA
L
AP
PR
OV
AL
182 23 64 26-Operation and Maintenance Data Air Separator Tanks 2.9 2
183 23 73 13.00 40-Shop Drawings Installation Drawings 3.1 2
184 23 73 13.00 40-Shop Drawings Fabrication and Connection Drawings 2.1 2
185 23 73 13.00 40-Product Data Equipment and Performance Data 2.1 2
186 23 73 13.00 40-Product Data Sample Warranty 1.3.2 2
187 23 73 13.00 40-Product Data Final Test Reports 3.2.3 2
188 23 73 13.00 40-Certificates Listing of Product Installations 1.3 2
189 23 73 13.00 40-Certificates Certificates of Conformance 1.3.1 2
190 23 73 13.00 40-Certificates Unit Cabinet 2.2.2 2
191 23 73 13.00 40-Certificates Fan 2.2.3 2
192 23 73 13.00 40-Certificates Insulation 2.2.5 2
193 23 73 13.00 40-Certificates Blow-Through AHU 2.2.7 2
194 23 73 13.00 40-Operation and Maintenance Data
Operation and Maintenance Manuals 3.3.1 2
195 23 73 13.00 40-Closeout Submittals Warranty 1.5 2
196 26 20 00-Shop Drawings Panelboards 2.13 2
197 26 20 00-Shop Drawings Transformers 2.16 2
198 26 20 00-Shop Drawings Wireways 2.27 2
199 26 20 00-Shop Drawings Marking strips 3.1.7.1 2
200 26 20 00-Product Data Receptacles 2.12 2
201 26 20 00-Product Data Circuit breakers 2.13.3 2
202 26 20 00-Product Data Switches 2.10 2
203 26 20 00-Product Data Transformers 2.16 2
204 26 20 00-Product Data Enclosed circuit breakers 2.14 2
205 26 20 00-Product Data Motor controllers 2.18 2
206 26 20 00-Product Data Manual motor starters 2.19 2
AF FORM 66 (Computer Generated) PAGE 9 of 14
Pre-Con:
NTP:
Const. Start:
Const. End:
Finalled:
APPROVED DISAPPROVED
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
AS
-B
UI
LT
S
OT
HE
R
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
DATE CONTRACTOR NOTIFIED
NO. OF COPIES REQUIRED
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
LI
NE
N
UM
BE
R
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
Rpr NDI Lab, Fac 5406FBNV130007
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
REMARKS
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
FI
NA
L
AP
PR
OV
AL
207 26 20 00-Product Data Grounding Busbar 2.22.2 2
208 26 20 00-Product Data Surge protective devices 2.28 2
209 26 20 00-Test Reports 600-volt wiring test 3.5.2 2
210 26 20 00-Test Reports Grounding system test 3.5.5 2
211 26 20 00-Test Reports Transformer tests 3.5.3 2
212 26 20 00-Test Reports Ground-fault receptacle test 3.5.4 2
213 26 20 00-Certificates Fuses 2.11 2
214 26 20 00-Operation and Maintenance Data Electrical Systems 1.5.1 2
215 26 24 16.00 40-Shop Drawings Detail Drawings 2.1.1 2
216 26 24 16.00 40-Product Data Panelboards 2.1.1 2
217 26 24 16.00 40-Product Data Directory Card and Holder 2.1.3 2
218 26 24 16.00 40-Test Reports Continuity Tests 3.2 2
219 26 24 16.00 40-Test Reports Insulation Tests 3.2 2
220 26 24 16.00 40-Certificates Certification 1.3.1 2
221 26 27 13.10 30-Product Data Power Meters 2.1 2
222 26 27 13.10 30-Product Data Current Transformers 2.1.3 2
223 26 27 13.10 30-Product Data Communications Module 2.2.2 2
224 26 27 13.10 30-Product Data Protocol Modules 1.6.1 2
225 26 27 13.10 30-Product Data Data Recorder 1.6.2 2
226 26 27 13.10 30-Product Data Modem 1.6.2 2
227 26 27 13.10 30-Test Reports Acceptance Checks and Tests 3.3.1 2
228 26 27 13.10 30-Operation and Maintenance Data Power Meters 2.1 2
229 26 27 13.10 30-Operation and Maintenance Data Communications Module 2.2.2 2
230 26 27 13.10 30-Operation and Maintenance Data Protocol Modules 1.6.1 2
231 26 27 13.10 30-Operation and Maintenance Data Data Recorder 1.6.2 2
AF FORM 66 (Computer Generated) PAGE 10 of 14
Pre-Con:
NTP:
Const. Start:
Const. End:
Finalled:
APPROVED DISAPPROVED
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
AS
-B
UI
LT
S
OT
HE
R
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
DATE CONTRACTOR NOTIFIED
NO. OF COPIES REQUIRED
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
LI
NE
N
UM
BE
R
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
Rpr NDI Lab, Fac 5406FBNV130007
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
REMARKS
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
FI
NA
L
AP
PR
OV
AL
232 26 27 13.10 30-Operation and Maintenance Data Modem 1.6.2 2
233 26 27 13.10 30-Closeout Submittals System Function Verification 3.3.2 2
234 26 28 21.00 40-Manufacturer’s Instructions Automatic Transfer Switch 2.2.2 2
235 26 29 23-Shop Drawings Schematic diagrams 1.5.1 2
236 26 29 23-Shop Drawings Interconnecting diagrams 1.5.2 2
237 26 29 23-Shop Drawings Installation drawings 1.5.3 2
238 26 29 23-Product Data Variable frequency drives 2.1 2
239 26 29 23-Manufacturer’s Field Reports VFD Factory Test Plan 2.5.1 2
240 26 41 00-Test Reports Lightning Protection and Grounding System Test Plan 1.4.3 2
241 26 41 00-Test Reports Lightning Protection and Grounding System Test 3.3.1 2
242 26 41 00-Certificates Lightning Protection System Installers Documentation 1.2.3 2
243 26 41 00-Certificates Component UL Listed and Labeled 1.4.2 2
244 26 41 00-Certificates Lightning protection system inspection certificate 1.4.4 2
245 26 41 00-Certificates Roof manufacturer's warranty 3.1.1 2
246 26 51 00-Product Data Luminaires 2.2 2
247 26 51 00-Product Data Light Sources 2.4 2
248 26 51 00-Product Data Drivers, Ballasts and Generators 2.3 2
249 26 51 00-Product Data LED Luminaire Warranty 1.6.1 2
250 26 51 00-Product Data Luminaire Design Data 1.5.4 2
251 26 51 00-Product Data Vacancy Sensors 2.5.3.2 2
252 26 51 00-Product Data Dimming Controllers (Dimmers) 2.5.2 2
253 26 51 00-Product Data Power Hook Luminaire Hangers 2.8 2
254 26 51 00-Product Data Exit Signs 2.6.1 2
255 26 51 00-Product Data LED Emergency Drivers 2.6.2 2
256 26 51 00-Product Data Occupancy Sensors 2.5.3.1 2
AF FORM 66 (Computer Generated) PAGE 11 of 14
Pre-Con:
NTP:
Const. Start:
Const. End:
Finalled:
APPROVED DISAPPROVED
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
AS
-B
UI
LT
S
OT
HE
R
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
DATE CONTRACTOR NOTIFIED
NO. OF COPIES REQUIRED
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
LI
NE
N
UM
BE
R
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
Rpr NDI Lab, Fac 5406FBNV130007
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
REMARKS
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
FI
NA
L
AP
PR
OV
AL
257 26 51 00-Product Data Ambient Light Level Sensor 3.1.8 2
258 26 51 00-Test Reports LED Luminaire - IES LM-79 Test Report 1.5.5 2
259 26 51 00-Test Reports LED Light Source - IES LM-80 Test Report 1.5.6 2
260 26 51 00-Test Reports LED Light Source - IES TM-21 Test Report 1.5.7 2
261 26 51 00-Test Reports Occupancy/Vacancy Sensor Verification Tests 1.5.8 2
262 26 51 00-Test Reports Energy Efficiency 1.5.11.3 2
263 27 10 00-Shop Drawings Telecommunications drawings 1.5.1.1 2
264 27 10 00-Shop Drawings Telecommunications Space Drawings 1.5.1.2 2
265 27 10 00-Product Data Telecommunications cabling 2.3 2
266 27 10 00-Product Data Telecommunications outlet/connector assemblies 2.5 2
267 27 10 00-Test Reports Telecommunications cabling testing 3.5.1 2
268 27 10 00-Manufacturer’s Field Reports Factory reel tests 2.9.1 2
269 27 10 00-Operation and Maintenance Data
Telecommunications cabling and pathway system 1.9.1 2
270 27 10 00-Closeout Submittals Record Documentation 1.9.2 2
271 28 31 76-Product Data Technical Data And Computer Software 1.6 2
272 28 31 76-Product Data Fire Alarm Control Unit and Mass Notification Control Unit (FMCP) 2.14 2
273 28 31 76-Product Data Terminal Cabinets 3.2.2 2
274 28 31 76-Product Data Manual Stations 2.16 2
275 28 31 76-Product Data Transmitters 2.19 2
276 28 31 76-Product Data Batteries 2.13.1 2
277 28 31 76-Product Data Battery Chargers 2.13.2 2
278 28 31 76-Product Data Smoke Sensors 2.10 2
279 28 31 76-Product Data Notification Appliances 2.3.1
280 28 31 76-Product Data Carbon Monoxide Sensors 2.11
281 28 31 76-Product Data Duct Smoke Detector 2.10.2
AF FORM 66 (Computer Generated) PAGE 12 of 14
Pre-Con:
NTP:
Const. Start:
Const. End:
Finalled:
APPROVED DISAPPROVED
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
AS
-B
UI
LT
S
OT
HE
R
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
DATE CONTRACTOR NOTIFIED
NO. OF COPIES REQUIRED
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
LI
NE
N
UM
BE
R
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
Rpr NDI Lab, Fac 5406FBNV130007
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
REMARKS
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
FI
NA
L
AP
PR
OV
AL
282 28 31 76-Product Data Addressable Interface Devices 2.7 2
283 28 31 76-Product Data Amplifiers 2.15 2
284 28 31 76-Product Data Tone Generators 2.15 2
285 28 31 76-Product Data Digitalized Voice Generators 2.15 2
286 28 31 76-Product Data Radio Transmitter and Interface Panels 2.19.1 2
287 28 31 76-Product Data Local Operating Console (LOC) 1.4.3 2
288 28 31 76-Design Data Battery Power 2.13.1.2 2
289 28 31 76-Design Data Battery Chargers 2.13.2 2
290 28 31 76-Test Reports Testing Procedures 3.7.1 2
291 28 31 76-Test Reports Smoke Sensor Testing 2.10.3 2
292 28 31 76-Manufacturer’s Field Reports System Operation 2.3 2
293 28 31 76-Operation and Maintenance Data
Operation and Maintenance (O&M) Instructions 3.10 2
294 28 31 76-Operation and Maintenance Data
Instruction of Government Employees 3.8 2
295 31 00 00-Preconstruction Submittals Shoring 3.3 2
296 31 00 00-Product Data Utilization of Excavated Materials 3.7 2
297 31 11 00-Product Data Nonsaleable Materials 3.4.1 2
298 31 32 11-Shop Drawings Layout 3.2.2 2
299 31 32 11-Shop Drawings Obstructions Below Ground 3.2.4 2
300 31 32 11-Operation and Maintenance Data Maintenance Instructions 3.5.2 2
301 32 12 10-Product Data Prime Coat 2.2
302 32 12 10-Product Data Tack Coat 2.3
303 32 11 24-Product Data Aggregates 2.1.1 2
304 32 12 17-Design Data Job Mix Formula 2.3.1 2
305 32 12 17-Design Data Asphalt Cement Binder 2.2 2
306 32 12 17-Design Data Mix Design 2.3 2
AF FORM 66 (Computer Generated) PAGE 13 of 14
Pre-Con:
NTP:
Const. Start:
Const. End:
Finalled:
APPROVED DISAPPROVED
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
AS
-B
UI
LT
S
OT
HE
R
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
DATE CONTRACTOR NOTIFIED
NO. OF COPIES REQUIRED
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
LI
NE
N
UM
BE
R
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
Rpr NDI Lab, Fac 5406FBNV130007
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
REMARKS
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
FI
NA
L
AP
PR
OV
AL
307 32 16 13-Product Data Concrete 2.1 2
308 32 17 23-Product Data Material Safety Data Sheets
(MSDS) 1.3.1 2
309 32 17 23-Product Data Reflective media for roads 2.2.21.2 2
310 32 17 23-Product Data Waterborne Paint 2.2.1 2
311 32 17 23-Test Reports Reflective Media for Roads 2.2.21.2 2
312 32 17 23-Test Reports Waterborne Paint 2.2.1 2
313 32 17 23-Certificates Reflective media for roads 2.2.1 2
314 32 17 23-Certificates Waterborne Paint 2.2.1 2
315 32 17 23-Manufacturer’s Instructions Waterborne Paint 2.2.1 2
316 33 11 00-Product Data Pipe, Fittings, Joints and Couplings 2.2 2
317 33 11 00-Product Data Valves 2.3 2
318 33 11 00-Product Data Valve Boxes 2.3.8 2
319 33 11 00-Product Data Hydrants 2.4.1 2
320 33 11 00-Product Data Meters 2.5 2
321 33 11 00-Product Data Pipe Anchorage 2.2.2 2
322 33 11 00-Product Data Tapping Sleeves 2.6.1 2
323 33 11 00-Product Data Corporation Stops 2.6.5.1 2
324 33 11 00-Product Data Fire Department Connections 2.6.6 2
325 33 11 00-Product Data Backflow Preventers 1.3.2.1 2
326 33 11 00-Test Reports Bacteriological Samples 3.2.8 2
AF FORM 66 (Computer Generated) PAGE 14 of 14