DEPARTMENT OF THE AIR FORCE

355TH CIVIL ENGINEER SQUADRON (ACC)

DAVIS-MONTHAN AIR FORCE BASE, ARIZONA

Global Power For America

MEMORANDUM FOR 355 CONS/PKAA

FROM: 355th Civil Engineer Squadron

SUBJECT: Requirement Deleteions for Project FBNV130007 Repair NDI Lab, Facility 5406

1. Revise SOW paragraph 1.1.1, as well as Drawing Sheets M-101, M-601, M-901 to delete the chiller replacement as well as the new equipment pad. The existing chiller will remain in place with the new piping and electrical attaching as shown within the project drawings.

2. Thank you in advance for your prompt attention to this matter. If any additional information is required, I can be reached at 228-8999 or by email at renee.riegert@us.af.mil

RENEE RIEGERT, CIV, USAF

Lead Civil Engineer

2018-11-13T15:24:56-0700
RIEGERT.RENEE.E.1367477357