4_GLEN131406_AF_Form_66.pdf

Air Force Form PDF 18 KB Posted

Attached to
Solicitation FA2550-18-R-1009
Solicitation number
FA2550-18-R-1009
Issued by

About this file

AF Form 66

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
Attach 9_AF Form 66 Submittal Register.pdf Revision not stated PKAA Dorm Water Damage Repair (Construction)
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GLEN131406_AF Form 66

LI

N

E N

U M

B ER Note: 3 copies required per submittal. Government will retain all submittals.

C

ER

TI

FI

C

AT

E O

F C

O M

PL

IA

N C

E

SH

O

P D

R

AW

IN

G

S

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

TU

R

U R

'S R

EC

O

M M

EN

D

AT

IO

N

C

AT

AL

O

G D

AT

A

O &M

R

EC

O M

M

EN

D

AT

IO

N

S

C

AL

C U

LA

TI

O N

S

W

AR

R

AN

TY

D R

AW

IN

G S

R

EP

O R

T

TE

ST

R

ES

U

LT

S

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E

TO

C O

N

TR

AC

TI

N G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

SU

BM

IT

TA

L N

U M

BE

R

S

AP

PR

O

VE

D

D

IS

AP

PR

O

VE

D

C O

N

TR

AC

TO

R S

U

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

REMARKS

GENERAL

1 Specification Section 01 00 00 para. 1.5.10.1.b: AF Form 3064, Contract Progress Schedule X NTP+10 Days

2 Specification Section 01 00 00 para. 1.5.10.1.b: AF Form 3065, Contract Progress Report X Per Contract

Specification Section 01 35 29 para. 1.2.1.1.a and b: Accident Prevention Plan and Activity Hazard Analysis

X Prior to Project Start

4 Specification Section 01 57 20.00 10, Appendix A, Contractor Hazardous Material Approval Form X Prior to Project

Start

5 Specification Section 01 57 20.00 10, Appendix B:

Green Products Determination Form X Prior to Project

Start

Specification Section 01 57 20.00 10, Appendix C:Recovered Materials Estimate and Certification Form

X Prior to Project Start

MECHANICAL

7 Specification Section 23 07 00 para. 2.2: Pipe Insulation X NTP+15 Days

8 Specification Section 23 25 00 para. 2.6.5.2:

Chemical Feed Pump and Tank X NTP+15 Days

9 Specification Section 23 52 00 para. 2.2: Boilers X NTP+15 Days

10 Specification Section 23 64 26 para. 2.2: Piping X NTP+15 Days

11 Specification Section 23 64 26 para. 2.6: Valves X NTP+15 Days

Specification Section 23 64 26 para. 2.7.6:

Temnperature Gauges X NTP+15 Days

ELECTRICAL

Specification Section 26 05 19.00 10 para. 2.1:

Wiring and conduit X NTP+15 Days

CLOSEOUT

Specification Section 01 78 00 para 2: As-Built Drawings X Prior to

Closeout

Specification Section 01 78 00 para 2.4: O&M Manuals X

Prior to Closeout

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

PROJECT NUMBER PROJECT NAME SOLICITATION /CONTRACT NUMBER

GLEN 13-1406 Repair by Replacing Boilers, B210

Submittal 1