This document is a Task Assignment (TA) issued by the State of Florida Department of Environmental Protection (DEP) to WSP USA Inc. for environmental remediation services at L&M Cleaners of Palm Beach County, located at 210 US Highway 1, North Palm Beach, Florida. The Task Assignment is numbered DC038D, operates under Contract Number HW685, and is effective through November 20, 2026. The project is identified as ERIC_5124 and is managed by Patrick McGrane for the DEP and Matt Crews for WSP USA Inc.
WSP USA Inc. will install three shallow monitoring wells and conduct groundwater monitoring activities including chlorinated volatile organic compound (VOC) analysis and per- and polyfluoroalkyl substances (PFAS) monitoring. The scope is divided into four subtasks: Project Management ($2,625.87), Monitoring Well Installation and Annual Groundwater Monitoring Activities ($20,641.28), PFAS-Related Costs and Investigation-Derived Waste Transportation and Disposal ($4,753.97), and Reporting ($6,014.67). The total Task Assignment value is $34,035.79 with 152 total labor hours. Payment is structured as a fixed unit rate with deliverables due on specified dates: May 8, 2026 for well installation; May 29, 2026 for monitoring data submission; May 29, 2026 for PFAS-related costs; and August 21, 2026 for the Annual Groundwater Monitoring Report. Subcontractors include Earth Tech Drilling for well installation ($4,535.00), Blood Hound/BHUG for utility location ($588.00), GPRS Inc. for ground-penetrating radar scanning ($700.00), GeoTek Services for utility locating ($750.00), and Preferred Drilling Solutions or Groundwater Protection for alternative drilling services ($4,605.00-$4,735.00).
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev.
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW685
DC038D Completion November 20, 2026
This Task Assignment authorizes WSP to install three shallow monitoring and conduct groundwater sampling at L&M Cleaners in accordance with the January 26, 2026 Scope of Work, Cost Estimate, and Bid Documentation.
Patrick McGrane 850-245-8899 Contractor WSP USA Inc. Contractor
Contractor Matt Crews Contractor 904-363-3430
ERIC_5124
210 US Highway 1, North Palm Beach, Palm Beach County
L&M Cleaners of Palm Beach County Inc
Contractor Contractor
✔ $ 34,035.79
$ 34,035.79
Scope of Work
WSP USA Inc.
Contractor Matthew Crews
Environmental Engineer
2/9/2026
Crews, Matt (USMC700671) Digitally signed by Crews, Matt (USMC700671) Date: 2026.02.09 08:30:34 -05'00'
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2026.02.06 12:12:38 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
BWC TAFORM
HW685
DC038D
Subtask 3 - PFAS Related Costs & IDW Management
Subtasks 1 & 4 - Project Management; Reporting
Subtask 2 - Monitoring Well Installations & Annual Groundwater Monitoring 05/08/2026
05/29/2026
08/21/2026
Subtask 2 - Submittal and FDEP approval of email summary containing field documentation, well construction logs, utility locate report, and certified laboratory reports for VOCs
Subtask 3 - Submittal and FDEP approval of email summary containing field documentation, certified laboratory reports for PFAS, and signed waste manifests
Subtasks 1 & 4 - Submittal and FDEP approval of the Annual Groundwater Monitoring Report
$ 20,641.28
$ 34,035.79
$ 4,753.97
$ 8,640.54
Memorandum TO: Negotiation File
L&M Cleaners of Palm Beach County Inc North Palm Beach, Palm Beach County
ERIC_5124
FROM: Patrick McGrane, Project Manager
SUBJECT: Negotiation Summary Task Assignment DC038D (HW685)
DATE: , 2025
This Task Assignment authorizes WSP USA Inc. (WSP) to install three shallow monitoring wells and conduct groundwater monitoring at the L&M Cleaners of Palm Beach County site.
The scope of work was agreed upon following review of the 2024 Annual Groundwater
Monitoring Report. Wells authorized in this Task Assignment will help fill data gaps identified during last year’s sampling event.
The total cost for this project is $3 , . with 15 total labor hours. All work is to be completed in accordance with the 2 , 202 , Scope of Work, Cost Estimate, and Bid
Documentation.
WSP may invoice according to the included schedule.
F D E P
C O S T
E S T I M A T E
C on tra ct or
W
SP
U
SA
In c.
at e:
1/
/2
Ta sk
D C
8D
Su bT as k
Pr oj ec t M an ag em en t
Su bT as k
Si te
Su bT as k
M W
In st al la tio n an d
An nu al G
W M on ito rin g
Ac tiv iti es
Su bT as k
Ac tiv ity /P ha se
M on ito rin g
Su bT as k
PF
AS
R el at ed C os ts a nd
ID
W
T &D
Su bT as k
Pr oj ec t M an ag er
Pa tri ck M cG ra ne Su bT as k
R ep or tin g Su bT as k
Su bT as k
Su bT as k
To ta ls
La bo r R at e
C at eg or y $6
1.
Pr oj ec t M an ag er (S
S)
.3 $0
.0
Pr og ra m
L ea de r -
X -1
$7
8.
Pr ac tic e
Le ad er
X-
(M C
$0
.0
Se ni or C on su lta nt
X-
$6
1.
Se ni or S ci /E ng
X-
(S S)
$5 6.
Se ni or
S ci
/E ng
X-
(B
L)
$0
.0
Se ni or P ro je ct S ci /E ng
P-
$4 0.
Pr oj ec t S ci
/E ng
P-
(J
W
$4 0.
Pr oj ec t S ci
/E ng
P-
(M
T)
$3
8.
St af f S ci
/E ng
P-
(A
S)
$0
.0
Sc i/E ng /A dm in
P-
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l H ou rs
.3
D ire ct L ab or
$7
,6
.6
$8
.0
$3 ,7
.4
$1
,0
.6
$2 ,0
.5
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
O ve rh ea d
2.
$1
3, 5.
$1 ,5
.1
$6
,4
.3
$1 ,7
.4
$3
,4
.3
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
G en
A dm in
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fr in ge 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l L ab or
$2
0, 9.
$2 ,3
.1
$1
0, 1.
$2 ,7
.1
$5
,4
.8
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
L& M
C le an er s of
P al m B ea ch
C ou nt y
R E V
C E F
W S P
P a g e
F
E P
C O S T
E S T I M A T E
C on tra ct or
W
SP
U
SA
In c.
at e:
1/
/2
Ta sk
D C
8D
Su bT as k
Pr oj ec t M an ag em en t Su bT as k
Si te
Su bT as k
M W
In st al la tio n an d
An nu al G
W M on ito rin g
Ac tiv iti es
Su bT as k
Ac tiv ity /P ha se
M on ito rin g as k
PF
AS
R el at ed
C os ts a nd
ID
W T
&D Su bT as k
Pr oj ec t M an ag er
Pa tri ck M cG ra ne as k
R ep or tin g
Su bT as k
Su bT as k
Su bT as k
To ta ls
L& M
C le an er s of
P al m B ea ch
C ou nt y
Tr av el Ve hi cl e $4
.0
$3
.0
$1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ile ag e
C os ts $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Ai r F ar e $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M ea ls
$2
.0
$2
.0
$7 2.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
H ot el $1
,3
.0
$9
.0
$4
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l T ra ve l $2
,1
.0
$1 ,4
.0
$6
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Su bc on tr ac to r (E qu ip m en t P ro cu re m en t)
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Su bc on tra ct or S ub to ta l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Pr oc ur em en t F ee $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l S ub co nt ra ct or
C os t $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Su bc on tr ac to r
(S er vi ce s Pr oc ur em en t) ril lin g
(C on ve nt io na
l) $4
,5
.0
$4 ,5
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
D ril lin g (N on -c on ve nt io na l)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ob ile L ab or at or y $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Su rv ey in g
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
ID
W
$5
.0
$0 .0
$5
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
U til iti es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
U til ity L oc at io n
$5
.0
$5
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Su bc on tra ct or
S ub to ta l $5
,7
.0
$5 ,1
.0
$5
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
H an dl in g Fe e $5
.8
$5
.3
$5
8.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l S ub co nt ra ct or
C os t $6
,2
.8
$5 ,6
.3
$6
.5
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
La bo ra to ry
An al yt ic al C os ts
$1 ,0
.0
$1
,0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fa st
T ur na ro un d
C ha rg es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Sa m pl e
Sh ip pi ng
$1
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l L ab or at or y
$1 ,2
.0
$1
,2
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fi el d Ex pe ns es
Pe rs on al
P ro te ct io n
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Ex pe nd ab le s
$1
.0
$8 0.
$4
0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Eq ui pm en t (
D ril lin g
R el at ed
$3
.0
$3
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Eq ui pm en t (
An al yt ic al re la te
d) $8
.0
$5
.0
$3
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Eq ui pm en t (
ID
W re la te
d) $1
.0
$0
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Eq ui pm en t (
O th er
$2
.0
$2
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l F ie ld E xp en se s
$1 ,6
.0
$1
,1
.0
$4
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Su bt ot al
$3 1, 0.
$2
,3
.1
$1 9, 6.
$4
,4
.6
$5 ,4
.8
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
C om pl et io n Fe e $2
,0
.0
$2
.7
$1 ,0
.1
$2
.3
$5
.7
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l E st im at ed C os t
$3 4, 5.
$2
,6
.8
$2 0, 1.
$4
,7
.9
$6 ,0
.6
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
R E V
C E F
W S P
P a g e
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : L&M Cleaners of Palm Beach County SUBTASK 2: MW Installation and Annual GW Monitoring Activities
DATE: 1/26/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
TOTAL LABOR 85
VEHICLE TYPE RATE UNIT USEAGE
Truck $120.00 Per Day 3 $360.00
TOTAL VEHICLE $360.00
MEALS STAFF RATE UNIT USEAGE
J. Whipple $36.00 Per Day 3 $108.00 M. Triano $36.00 Per Day 3 $108.00
TOTAL MEALS $216.00
HOTEL STAFF RATE UNIT USEAGE
J. Whipple Mob day before $225.00 Per Day 2 $450.00 M. Triano Mob day before $225.00 Per Day 2 $450.00
TOTAL HOTEL $900.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Bloodhound Utility Locate $588.00 LS 1 $588.00 Earth Tech Drilling $4,535.00 LS 1 $4,535.00
TOTAL $5,123.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Chlorinated VOCs - EPA Method 8260B
Total VOHs EPA Method 8260B $73.00 13 $949.00 Total VOCs EPA Method 8021 - IDW $110.00 1 $110.00
Sample Shipping Large $150.00 1 $150.00
TOTAL LAB $1,209.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Miscellaneous Expendables $40.00 Per Day 2 $80.00 Monitor Well Installation Kit $325.00 Per Day 1 $325.00 Total GPS Station $175.00 Per Day 1 $175.00 Total Survey Station $50.00 Per Day 1 $50.00 Shallow Groundwater Sampling Kit $290.00 Per Day 1 $290.00 Tubing, Poly HDPE $0.30 Per Foot 650 $195.00 Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 13 $39.00
TOTAL EQUIPMENT $1,154.00
Project Sci/Eng (M. Triano)
Round Trip from Jacksonville to North Palm Beach (10 hours). Oversee utility locate and installation of 3 new monitoring wells (8 hours). Top of casing survey for 3 new monitoring wells (2 hours). Water levels, instrument calibration, sampling for 13 wells for chlorinated VOC analysis (see Table in proposal), and IDW sampling and staging (15 hours).
Verification of property ownership with property access forms and notify owners prior to groundwater monitoring (1 hour). Locate and provide documentation for three offsite property owners for site access (9 hours). Prepare and submit email summary with field data sheets, well construction logs, field notes, and utility locate report, laboratory chain-of-custody, and certified laboratory report (4 hours).
Round Trip from Jacksonville to North Palm Beach (10 hours). Field event preparation (1 hour).
Oversee utility locate and installation of 3 new monitoring wells (8 hours). Top of casing survey for 3 new monitoring wells (2 hours). Water levels, instrument calibration, sampling for 13 wells for chlorinated VOC analysis (see Table in proposal), and IDW sampling and staging (15 hours).
Senior Sci/Eng (S. Sider)
Project Sci/Eng (J. Whipple)
FINAL --7/24/96
SUBTASK 3: PFAS Related Costs and IDW T&D
DATE: 1/26/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
TOTAL LABOR 20
VEHICLE TYPE RATE UNIT USEAGE
Truck $120.00 Per Day 1 $120.00
TOTAL VEHICLE $120.00
MEALS STAFF RATE UNIT USEAGE
J. Whipple $36.00 Per Day 1 $36.00 M. Triano $36.00 Per Day 1 $36.00
TOTAL MEALS $72.00
HOTEL STAFF RATE UNIT USEAGE
J. Whipple $225.00 Per Day 1 $225.00 M. Triano $225.00 Per Day 1 $225.00
TOTAL HOTEL $450.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin T&D - Non-Haz PFOS/PFAS Water $195.00 per drum 3 $585.00
TOTAL $585.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
PFAS Monitoring Wells $0.00 7 $0.00 PFAS Equipment Blank $0.00 1 $0.00
PFAS IDW $0.00 1 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Miscellaneous Expendables $40.00 Per Day 1 $40.00 Shallow Groundwater Sampling Kit $290.00 Per Day 1 $290.00 Tubing, Poly HDPE $0.30 Per Foot 50 $15.00 Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 2 $6.00 Drum (55-gallon) $100.00 Each 1 $100.00
TOTAL EQUIPMENT $451.00
Senior Sci/Eng (B. Lucero) Prepare CADD Figures with PFAS data for Annual Groundwater Monitoring Report.
Complete forms to arrange for PFAS sample bottle order delivery and shipment from DEP Central Laboratory (2 hours). Characterize IDW and prepare waste profile for transportation and disposal of IDW (2 hours). Prepare and submit email summary with field documentation and certified laboratory report with PFAS results (2 hours). Prepare PFAS section for the draft Annual Monitoring Report (2 hours).
Collect samples from 7 wells listed in Subtask 2 for PFAS analysis and collect equipment blank for PFAS analysis (2 hours). Package and deliver PFAS samples to shipping point for DEP Central Laboratory (2 hours).
Collect samples from 7 wells listed in Subtask 2 for PFAS analysis and collect equipment blank for PFAS analysis (2 hours). Package and deliver PFAS samples to shipping point for DEP Central Laboratory (2 hours). Prepare data tables with PFAS analytical results (2 hours).
Senior Sci/Eng (S. Sider)
Project Sci/Eng (J. Whipple)
Project Sci/Eng (M. Triano)
SUBTASK 4: Reporting
DATE: 1/26/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Practice Leader (M. Crews) 3
Senior Sci/Eng (S. Sider) 24
Senior Sci/Eng (B. Lucero) 4
Staff Sci/Eng (A. Strayer) 2
TOTAL LABOR 33
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
MEALS STAFF RATE UNIT USEAGE
TOTAL MEALS $0.00
HOTEL STAFF RATE UNIT USEAGE
TOTAL HOTEL $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
Document production.
Develop conclusions and recommendations and review for final Annual Groundwater Monitoring Report.
Update data tables and prepare draft Annual Groundwater Monitoring Report.
Prepare CADD Figures for Annual Groundwater Monitoring Report
WSP USA Inc.
9428 Baymeadows Road, Suite 400, Jacksonville, Florida 32256 USA
T: +1 904 363-3430 F: +1 904 363-3445 wsp.com
January 26, 2026 Proposal No. 2025US497172.R1
Mr. Patrick McGrane Florida Department of Environmental Protection Division of Waste Management Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400
RE: COST PROPOSAL FOR MONITORING WELL INSTALLATION AND
ANNUAL GROUNDWATER MONITORING
L&M CLEANERS OF PALM BEACH COUNTY
210 US HIGHWAY 1 NORTH
NORTH PALM BEACH, PALM BEACH COUNTY, FLORIDA
FACILITY IDENTIFICATION NUMBER: ERIC_5124
PROPOSED TASK ASSIGNMENT: DC038D
Dear Mr. McGrane:
WSP USA Inc. (WSP) is pleased to provide the Florida Department of Environmental Protection (DEP) with this cost proposal for groundwater monitoring well installation and chlorinated volatile organic compound (VOC) and continued per- and polyfluoroalkyl substances (PFAS) groundwater monitoring activities at the above-referenced site. This proposal includes a description of the proposed scope of services, level of effort sheets for each subtask, and a cost estimate form that summarizes the costs of the proposed services. The proposed scope of services is described below.
SUBTASK 1 – PROJECT MANAGEMENT
To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with the DEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with the DEP Waste Site Cleanup Section requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the DEP-approved task assignment.
Mr. Patrick McGrane Proposal No. 2025US497172.R1
Florida Department of Environmental Protection January 26, 2026
SUBTASK 2 – MONITORING WELL INSTALLATION AND ANNUAL GROUNDWATER
MONITORING ACTIVITIES
Site Access and Utility Locate Following authorization to proceed, WSP will coordinate with the real property owner or owner representatives for access to complete the scope of work. This plan assumes adequate site access will be granted to perform the scope of work. WSP will obtain the applicable local, county, and state-required permits before implementing the proposed scope of work. The location of underground utilities will be identified and marked. Sunshine State One Call, a utility location service provider, will be contacted at least three working days (72 hours) before any subsurface work begins. Given that the work will be conducted on private property, Sunshine State One Call might not be able to provide details regarding specific utilities across the entire property. Therefore, WSP will contract a private utility location service provider, to locate and map shallow subsurface anomalies present in the vicinity of the proposed monitoring well locations.
Off-Site Access Off-site access to 202 US Highway 1, North Palm Beach, FL (Tax Parcel ID 68-43-42-16-01-000-2131), 215 Castlewood Drive, North Palm Beach, Florida (Tax Parcel ID 68-43-42-16-01-000-2030), and 227 Castlewood Drive, North Palm Beach, Florida (multiple Tax Parcel IDs), has not been obtained and is required for installation and sampling of proposed new monitoring wells. WSP will attempt to gain site access to these properties via telephone and email correspondence. A site visit associated with collection of off-site access agreements is not included in this proposal.
Monitoring Well Installation WSP will supervise the installation of three shallow zone groundwater monitoring wells (MW010, MW011, and MW012) by a Florida-licensed drilling subcontractor. Well screens will consist of 1-inch diameter, Schedule 40 PVC (0.010-inch pre-pack). The well risers will consist of 1-inch diameter, Schedule 40 PVC connected to the screens with flush-threaded joints, using an appropriate length to reach the ground surface. WSP anticipates that the monitoring wells will be screened 5 to 15 feet below ground surface. The annular space between the borehole walls and the well screens will be filled with a 20/30 grade silica sand filter pack to approximately one foot above the top of the well screens. A minimum one-foot thick, fine (30/65) grade silica sand seal will be placed above the sand filter pack, and the remainder of the annular space will be filled with a Portland Cement Type II grout seal. The proposed locations are presented on the attached Figure 7.
Monitoring wells will be completed at the surface with 8-inch diameter bolt-down steel covers inside flush-mounted 2-foot by 2-foot concrete pads, which will be sloped away from the wells to prevent surface water infiltration. The well risers will be capped with water-tight expandable locking plugs. To remove fine-grained particles in the filter pack and those adhered to the borehole walls, and to establish a good hydraulic connection with the aquifer, the newly installed wells will be developed until the purged water remains visibly clear and free of suspended particulate matter, or up to 30 minutes.
Monitoring Well Top-of-Casing Survey Before collecting groundwater samples from the newly installed monitoring wells, WSP will use a total survey station to measure the top-of-casing elevations at each location using existing elevations at nearby monitoring wells as a benchmark.
Groundwater Sampling WSP proposes collecting groundwater samples from 13 monitoring wells. The attached Figures 3 through 5 show the monitoring well locations, groundwater flow direction, and chlorinated VOC results for each zone of the surficial aquifer during the previous monitoring event. The attached Figure 6 shows the February 2025 PFAS screening results.
Prior to groundwater sampling, the depth-to-groundwater will be measured at accessible monitoring wells using an electronic water level indicator to determine groundwater elevations and flow direction. During the sampling event, the locks and well caps will be inspected for damage or degradation and repaired or replaced as necessary.
Groundwater samples will be collected from the wells in accordance with DEP Standard Operating Procedures (SOPs) for Field Activities (DEP-SOP-001/01) dated January 2017 (effective April 16, 2018) and DEP SOPs for Sampling and Analysis of PFAS, dated August 2020. Prior to collecting the groundwater sample, each well will be purged, and field parameters, including temperature, pH, specific conductance, dissolved oxygen, turbidity, and oxidation-reduction potential will be monitored. Purge volumes and field parameters will be recorded on field data sheets, and the field monitoring equipment will be calibrated in accordance with the manufacturer’s recommended procedures. Groundwater samples will be collected using low-flow sampling methods.
The samples will be placed in laboratory-supplied containers, labeled with a unique identification number attached to the outside of the sample container, and preserved on ice in a laboratory-provided cooler. Samples to be analyzed for chlorinated VOCs using EPA Method 8260B will be shipped to a Florida Department of Health and National Environmental Laboratory Accreditation Program-certified fixed-base laboratory, along with the completed chain-of-custody. Samples to be analyzed for PFAS using DEP SOP: LC001-3 or similar, will be shipped to the DEP Central Laboratory in Tallahassee, Florida, along with the completed chain-of-custody.
Based on the September 2024 DEP guidance for PFAS sampling at DEP Drycleaning Solvent Cleanup Program sites and subsequent correspondence with the DEP, WSP recommends continued PFAS monitoring at the site using the same wells as sample during the initial November 2023 PFAS screening event (MW001, MW007, MW008, and MW007I). WSP also recommends sampling the newly installed monitoring wells (MW010, MW011, and MW012) to delineate the PFAS impacts to the southeast.
The samples will be analyzed as follows:
Sample ID Chlorinated VOCs (EPA Method 8260B)
PFAS
(DEP SOP: LC001-3,
or similar)
MW001 X X
MW002 X
MW003 X
MW004 X
MW005 X
MW006 X
MW007 X X
MW008 X X
MW009 X
Sample ID Chlorinated VOCs (EPA Method 8260B)
PFAS
(DEP SOP: LC001-3,
or similar) MW010 (new well) X X MW011 (new well) X X MW012 (new well) X X
MW007I X X
Equipment Blank --- X
Investigative Derived Waste (IDW) Total VOCs X
Interim Deliverable Upon completion of Subtask 2, an e-mail deliverable will be submitted and include copies of the field data sheets, monitoring well construction logs, survey data logs, groundwater sampling logs, field notes, and laboratory chain-of-custody documentation.
SUBTASK 3 – PFAS-RELATED COSTS AND IDW TRANSPORTATION AND DISPOSAL
WSP will include costs associated with the expanded PFAS monitoring activities in this subtask. These activities include completing bottle order requests with the DEP Central Laboratory; waste characterization and waste profiling; packaging and shipping PFAS samples to the DEP Central Laboratory; labor involved in sampling wells associated with PFAS analysis only; and investigation-derived waste (IDW) transportation and disposal.
Quality Assurance/Quality Control WSP will collect one equipment blank sample during the groundwater sampling event. The equipment blank will be collected by pumping (peristaltic pump) PFAS-free water through silicon and/or HDPE tubing and into laboratory-supplied containers. The equipment blank will be analyzed for PFAS using DEP SOP: LC001-3 or similar, as shown in the above table.
Investigation-Derived Waste WSP will containerize the IDW purge water and decontamination water in a 55-gallon drum. WSP will collect a waste characterization sample from the drum for analysis of total VOCs using EPA Method 8260B and PFAS using DEP SOP: LC001-3 or similar, as shown in the above table. The drum will be temporarily staged onsite, pending waste characterization. For cost-estimating purposes, WSP has assumed that the IDW can be transported and disposed of as non-hazardous waste at an approved facility. The IDW transportation and disposal subcontractor will provide WSP with a non-hazardous waste manifest upon delivery to the disposal facility. WSP estimates three drums of IDW well development and purge water will be generated during the field activities.
Interim Deliverable Upon completion of Subtask 3, an e-mail deliverable will be submitted for the PFAS samples and will include copies of the field data sheets, equipment calibration forms, field notes, and laboratory chain-of-custody documentation.
SUBTASK 4 – REPORTING
WSP will prepare an Annual Groundwater Monitoring Report that will include well construction data for the installed groundwater monitoring wells, a description of the sampling procedures, evaluation of the analytical results;
comparison of current to historical data; tabulated summary of the current and historical analytical data; site maps showing the groundwater analytical results; water level elevation information in tables and figures; laboratory analytical data; and conclusions and recommendations.
HEALTH AND SAFETY
WSP will update the existing site-specific Health and Safety Plan for the field work. The work will be completed in accordance with WSP’s safety policies and procedures. At a minimum, WSP will wear safety glasses, high-visibility safety vests, and steel-toed boots. A safety job briefing will be conducted prior to the start of work activities and anytime the scope of work or site conditions change.
COST AND SCHEDULE
The estimated cost to complete the proposed scope of work is $34,035.79. WSP anticipates well installation and groundwater monitoring activities will take place in March or April 2026. The level of effort sheets and cost estimate form are included in Attachment A. Subcontractor quotes are included in Attachment B. The following table summarizes the proposed costs and deliverable schedule.
Task Proposed Cost Proposed Schedule/Deliverables
Subtask 1 – Project Management $ 2,625.87 September 25, 2026
Subtask 2 – Monitoring Well Installation and Annual Groundwater Monitoring Activities
$ 20,641.28 May 29, 2026 (Email summary with field data sheets, well construction logs, field notes, and utility locate report (if available).
Subtask 3 – PFAS-Related Costs and IDW Transportation and Disposal $ 4,753.97
June 19, 2026 (E-mail summary with field documentation and certified laboratory analytical report for PFAS and IDW disposal manifest)
Subtask 4 – Reporting $ 6,014.67 August 28, 2026 (Annual Groundwater Monitoring Report)
Total/Completion Date $ 34,035.79 October 30, 2026
WSP appreciates the opportunity to provide services to the DEP. Should you require additional information or clarification, please contact us at (904) 363-3430.
Sincerely, WSP USA Inc.
Stephen J.R. Sider, GISP, PG Matthew C. Crews, PE Senior Consultant, Geology Assistant Vice President, Environmental Engineering
SJRS/MCC/as
Attachments: Figure 3 – Site Layout Map Figure 4 – Potentiometric Map of the Shallow Zone of the Surficial Aquifer (February 17, 2025) Figure 5 – VOC Analytical Results in Groundwater (February 2025) Figure 6 – PFAS Analytical Results in Groundwater (February 2025) Figure 7 – Proposed Monitoring Well Location Map
Attachment A – Level of Effort Sheets and Cost Estimate Form Attachment B – Subcontractor Quotes
G:\Projects\DEP-WSCS\Projects\West Palm\L&M Cleaners\5 - DC038D - Ann GW Monitoring\Proposal\2 - Revision 1\DC038D - L&M Cleaners MW Install and Ann GW Mon Proposal.rev1 (ERIC_5124).docx
OE
OE
OE
OE
OE
OE
OE
OE
OE
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
H O
LD
IN
G T
AN
K
AS
PH
AL
T
ST
O
R M
W
AT
ER
D
R
AI
N
ST
O
R M
W
AT
ER
D
R
AI
N
AS
PH
AL
T
SA
N
IT
AR
Y
SE
W
ER
M
AN
H O
LE
PO
W
ER
PO
LE
AS
PH
AL
T
AL
LE
YW
AY
VA
C
AN
T
SH
O
PS
AS
PH
AL
T
PA
R
KI
N
G
ST
EE
P
SL
O
PE
ST
EE
P
SL
O
PE
U .S
. H W
Y
±1
S P
P
ST
O
R M
W
AT
ER
D
R
AI
N
G
D U
M
PS
TE
R
M W
M W
M W
M W
M W
M W
M W
M W
7I
M W
M W
O
VE
H
EA
D P
O W
ER
EE
01 in
.5
C on tro l N o.
-0
9-
FI
G U
R E 5
-0 4-
BC
L
SJ
R
S
SJ
R
S
M C
C
L
M C
LE
AN
ER
S
O F
PA
LM
B
EA
C H
C O
U N
TY
AN
N U
AL
G
R O
U N
D W
AT
ER
M O
N
IT
O R
IN
G
U S
H
IG
H W
AY
, N O
R
TH
P
AL
M B
EA
C
H , F
L
FL
. D
EP
T.
O F
EN
VI
R O
N M
EN
TA
L
PR
O
TE
C
TI
O N
B
LA
IR
S
TO
N
E R
O
AD
, M S4
TA
LL
AH
AS
SE
E, F L
9-
V O
C A
N A
L Y
IC
A
L A
N A
L Y
T
IC
A L
R E
S U
L T
S
IN
G R
O U
N D
W A
T E
R (F
EB
R
U
AR
Y
TI
TL
E
PR
O
JE
C
T N
O
R
EV
PR
O
JE
C
T
C
LI
EN
T
C O
N
SU
LT
AN
T
PR
EP
AR
ED
D
ES
IG
N
ED
R
EV
IE
W
ED
AP
PR
O
VE
D
YY
YY
-M M
-D D
IF THIS MEASUREMENT DOES NOT MATCH WHAT IS SHOWN, THE SHEET SIZE HAS BEEN MODIFIED FROM: ANSI B
Path: \\corp.pbwan.net\US\CentralData\USJAX100\drafting\Projects\FDEP\FDEP-DC\31404452\31404452_5124_L&MCleaners\0799_Feb2025\Active Drawings\ | File Name: 5124-0799-006.dwg
L E
G E
N D
IN
TE
R M
ED
IA
TE
Z
O N
E M
O N
IT
O
R
IN
G W
EL
L
LO
C
AT
IO
N
SH
AL
LO
W
Z O
N E
M O
N
IT
O R
IN
G
W
EL
L
LO
C
AT
IO
N
1.
PR
O
PE
R
TY
B O
U N
D
AR
Y
TA
KE
N
F R
O M
F
LO
R
ID
A D
EP
AR
TM
EN
T O
F R
EV
EN
U E.
R E
F E
R E
N C
E (S
AP
PR
O
XI
M
AT
E
PR
O
PE
R
TY
B O
U N
D
AR
Y
N O
T E
(S
M W
(7 -1
7) 9/
/2
2/
/2
0.
U
0.
U 0.
U
0.
U 1.
I
1.
I 4.
9.
M W
(7 -1
7) 9/
/2
2/
/2
6.
2.
3.
I*
1.
U
M W
(7 -1
7) 9/
/2
2/
/2
4.
0.
U
M W
(7 -1
7) 9/
/2
2/
/2
1.
0.
I
0.
U 0.
U
0.
U 0.
U
0.
U 0.
U
M W
7I
(4 0-
9/
/2
2/
/2
0.
U 0.
U
0.
U 0.
U
0.
U 0.
U
0.
U 0.
U
M W
(8 -1
3) 9/
/2
2/
/2
8.
0.
I 0.
U
6.
0.
I
0.
I
M W
(8 -1
3) 9/
/2
2/
/2
9.
4.
0.
I
0.
U
7.
2.
0.
I
M W
(7 -1
7) 9/
/2
2/
/2
2.
0.
U
5.
0.
U 9.
1.
I
2.
2.
M W
(7 -1
7) 9/
/2
2/
/2
1.
0.
I 0.
U
7.
0.
I 0.
U
0.
I
M W
(7 -1
7) 9/
/2
2/
/2
0.
U
0.
U 0.
U
0.
U 0.
U
0.
I 0.
U
0.
U
ES
TI
M
AT
ED
E
XT
EN
T O
F C
H
LO
R
IN
AT
ED
V O
C G
C
TL
EX
C
EE
D
AN
C
E (D
AS
H
ED
W
H
ER
E
IN
FE
R
R
ED
M W
(7 -1
7) Sa m pl ed
ID
(S cr ee n
In te rv al in ft
-b gs
/0 1/
D at e
Sa m pl ed
PC
E
TC
E
C is
-1 ,2
-D C
E
VC
1.
VO
C s
- V O
LA
TI
LE
O
R G
AN
IC
C O
M
PO
U N
D S
2.
TC
E
TR
IC
H
LO
R O
ET
H
EN
E
3.
PC
E
TE
TR
AC
H
LO
R
O
ET
H
EN
E 4.
C is
-1 ,2
-D C
E
1, 2-
D
IC
H
LO
R O
ET
H
EN
E
5.
VC
V
IN
YL
C H
LO
R
ID
E
6.
AN
AL
YT
IC
AL
R
ES
U
LT
S
AR
E M
EA
SU
R
ED
IN
M
IC
R
O G
R
AM
S
PE
R L
IT
ER
(μ g/
L)
7.
SC
R
EE
N
IN
TE
R
VA
L
D
EP
TH
S
M
EA
SU
R
ED
IN
F
EE
T
BE
LO
W
G R
O U
N D
S U
R
FA
C E
(ft -b gs
8.
U
IN
D
IC
AT
ES
T H
AT
T
H E
C O
M
PO
U N
D W
AS
A
N
AL
YZ
ED
F O
R B
U T
N O
T D
ET
EC
TE
D
9.
I - R
EP
O
R
TE
D V
AL
U
E
IS
B
ET
W
EE
N T
H E
LA
BO
R
AT
O R
Y M
ET
H
O D
D
ET
EC
TI
O N
L
IM
IT
A
N D
LA
BO
R
AT
O R
Y
PR
AC
TI
C
AL
Q U
AN
TI
TA
TI
O N
L
IM
IT
BO
LD
F O
N T
IN
D
IC
AT
ES
C
O N
C
EN
TR
AT
IO
N
S W
AS
D
ET
EC
TE
D
A
BO
VE
T
H E
M
ET
H O
D D
ET
EC
TI
O
N L
IM
IT
(M D
L)
BO
LD
F O
N T
AN
D
Y
EL
LO
W
S H
AD
ED
C
EL
L
IN
D
IC
AT
ES
A N
E
XC
EE
D
AN
C
E O
F
TH
E
AP
PL
IC
AB
LE
G C
TL
G C
TL
G R
O U
N D
W
AT
ER
C
LE
AN
U P
TA
R
G
ET
L
EV
EL
P
ER
C
H
AP
TE
R
2-
7, T
AB
LE
I
O F
TH
E
FL
O
R
ID
A
AD
M
IN
IS
TR
AT
IV
E C
O D
E (F
AC
R
ES
U
LT
S
D
ET
ER
M
IN
ED
N O
T
TO
E
XC
EE
D
T H
E G
C
TL
B
AS
ED
O
N T
H E
FD
EP
M
EM
O R
AN
D
U M
"R O
U N
D
IN
G A
N
AL
YT
IC
AL
D
AT
A
FO
R
S
IT
E R
EH
AB
IL
IT
AT
IO
N C
O M
PL
ET
IO
N
D
AT
ED
N O
VE
M
BE
R
7, 1.
OE
OE
OE
OE
OE
OE
OE
OE
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
H O
LD
IN
G T
AN
K
AS
PH
AL
T
ST
O
R M
W
AT
ER
D
R
AI
N
AS
PH
AL
T
SA
N
IT
AR
Y
SE
W
ER
M
AN
H O
LE
PO
W
ER
PO
LE
AS
PH
AL
T
AL
LE
YW
AY
VA
C
AN
T
SH
O
PS
AS
PH
AL
T
PA
R
KI
N
G
ST
EE
P
SL
O
PE
ST
EE
P
SL
O
PE
U .S
. H W
Y
±1
S P
P
ST
O
R M
W
AT
ER
D
R
AI
N
G
D U
M
PS
TE
R
M W
7I
O
VE
H
EA
D P
O W
ER
C C
C
G R
O U
P
IN
C
M W
M W
M W
M W
M W
M W
M W
M W
M W
ST
O
R M
W
AT
ER
D
R
AI
N
E
W E
LT
E
W
ER
LT
IN
G N
G
01 in
.5
C on tro l N o.
-0
9-
FI
G U
R E 6
-0 4-
BC
L
SJ
R
S
SJ
R
S
M C
C
L
M C
LE
AN
ER
S
O F
PA
LM
B
EA
C H
C O
U N
TY
AN
N U
AL
G
R O
U N
D W
AT
ER
M O
N
IT
O R
IN
G
U S
H
IG
H W
AY
, N O
R
TH
P
AL
M B
EA
C
H , F
L
FL
. D
EP
T.
O F
EN
VI
R O
N M
EN
TA
L
PR
O
TE
C
TI
O N
B
LA
IR
S
TO
N
E R
O
AD
, M S4
TA
LL
AH
AS
SE
E, F L
9-
P F
A S
A N
A L
Y T
IC
A
L R
E S
U L
T S
IN
G
R O
U N
D W
A T
E R
(F
EB
R U
AR
Y
TI
TL
E
PR
O
JE
C
T N
O
R
EV
PR
O
JE
C
T
C
LI
EN
T
C O
N
SU
LT
AN
T
PR
EP
AR
ED
D
ES
IG
N
ED
R
EV
IE
W
ED
AP
PR
O
VE
D
YY
YY
-M M
-D D
IF THIS MEASUREMENT DOES NOT MATCH WHAT IS SHOWN, THE SHEET SIZE HAS BEEN MODIFIED FROM: ANSI B
Path: \\corp.pbwan.net\US\CentralData\USJAX100\drafting\Projects\FDEP\FDEP-DC\31404452\31404452_5124_L&MCleaners\0799_Feb2025\Active Drawings\ | File Name: 5124-0799-007.dwg
L E
G E
N D
IN
TE
R M
ED
IA
TE
Z
O N
E M
O N
IT
O
R
IN
G W
EL
L
LO
C
AT
IO
N
SH
AL
LO
W
Z O
N E
M O
N
IT
O R
IN
G
W
EL
L
LO
C
AT
IO
N
1.
PR
O
PE
R
TY
B O
U N
D
AR
Y
TA
KE
N
F R
O M
F
LO
R
ID
A D
EP
AR
TM
EN
T O
F R
EV
EN
U E.
2.
AE
R
IA
L
IM
AG
ER
Y C
O U
R
TE
SY
O
F U
SG
S, M
IC
R O
SO
FT
C O
R
PO
R
AT
IO
N
, A N
D b in g©
R E
F E
R E
N C
E (S
AP
PR
O
XI
M
AT
E
PR
O
PE
R
TY
B O
U N
D
AR
Y
N O
T E
(S
1.
PR
O
VI
SI
O
N
AL
G C
TL
FD
EP
P R
O
VI
SI
O
N
AL
G R
O U
N D
W
AT
ER
C
LE
AN
U P
TA
R
G
ET
L
EV
EL
2.
AL
L R
ES
U
LT
S
AR
E
R
EP
O R
TE
D
IN
N
AN
O
G R
AM
S
PE
R
L
IT
ER
(n g/ L)
3.
BO
LD
F
O N
TS
IN
D
IC
AT
ES
C O
N
ST
IT
U
EN
T
C O
N C
EN
TR
AT
IO
N W
AS
R
EP
O
R
TE
D A
BO
VE
T H
E
LA
BO
R
AT
O
R Y
M
ET
H O
D D
ET
EC
TI
O
N L
IM
IT
4.
H
IG
H
LI
G H
TE
D
F O
N T
IN
D
IC
AT
ES
C
O N
ST
IT
U
EN
T C
O N
C
EN
TR
AT
IO
N
W
AS
R
EP
O R
TE
D
A
BO
VE
T
H E
PR
O
VI
SI
O N
AL
G
R O
U N
D W
AT
ER
C
LE
AN
U
P
LE
VE
L.
5.
I-
R
EP
O R
TE
D
V
AL
U E
IS
B
ET
W
EE
N
T H
E
LA
BO
R
AT
O
R Y
M
ET
H O
D D
ET
EC
TI
O
N L
IM
IT
A N
D L
AB
O
R
AT
O R
Y
PR
AC
TI
C
AL
Q U
AN
TI
TA
TI
O N
L
IM
IT
6.
U
TH
E C
O M
PO
U
N D
W
AS
A N
AL
YZ
ED
F
O R
, B U
T N
O T
D
ET
EC
TE
D . T
H E
R
EP
O R
TE
D
V
AL
U E
IS
T
H E
M
ET
H O
D D
ET
EC
TI
O
N L
IM
IT
F O
R T
H E
SA
M
PL
E
AN
AL
YZ
ED
7.
PF
O
A
- P
ER
FL
U O
R O
-N -O
C
TA
N O
IC
A
C
ID
8.
PF
O S
- P
ER
FL
U
O R
O O
C
TA
N
ES
U
LF
O N
IC
A
C
ID
W
EL
L
ID
(S C
R
EE
N
IN
TE
R
VA
L
IN
F
T-
BG
S)
PR
O
VI
SI
O N
AL
G
R O
U N
D W
AT
ER
C
LE
AN
U
P
TA
R G
ET
LE
VE
L
(G C
TL
PF
O
A
IN
ng /L
PF
O
S
IN
ng /L
SU
M
O F
PF
O
A
PF
O
S
IN
n g/
L
G C
TL
M W
7I
(4 0-
D
AT
E
PF
O A
PF
O
S
PF
O A+
PF
O
S
/0 9/
U 4.
I
4.
/1
8/
3.
I 6.
I
.2
M W
(7 -1
7) D
AT
E
PF
O
A
PF
O S
PF
O
A+
PF
O S
/0
9/
/1 8/
M W
(7 -1
7) D
AT
E
PF
O
A
PF
O S
PF
O
A+
PF
O S
/0
9/
/1 8/
6.
I
6.
M
W
(8
-1 3)
D
AT
E
PF
O A
PF
O
S
PF
O A+
PF
O
S
/0 8/
/1
8/
M W
(7 -1
7) D
AT
E
PF
O
A
PF
O S
PF
O
A+
PF
O S
/1
8/
6.
I
.7
M W
(7 -1
7) D
AT
E
PF
O
A
PF
O S
PF
O
A+
PF
O S
/1
7/
M W
(7 -1
7) D
AT
E
PF
O
A
PF
O S
PF
O
A+
PF
O S
/1
8/
M W
(7 -1
7) D
AT
E
PF
O
A
PF
O S
PF
O
A+
PF
O S
/1
8/
9.
.6
M W
(8 -1
3) D
AT
E
PF
O
A
PF
O S
PF
O
A+
PF
O S
/1
8/
6.
I
.8
M W
(7 -1
7) D
AT
E
PF
O
A
PF
O S
PF
O
A+
PF
O S
/1
8/
9.
.5
PR
O
VI
SI
O N
AL
G
C
TL
E
XC
EE
D
AN
C
E C
O N
TO
U
R (D
AS
H
ED
W
H
ER
E
IN
FE
R
R
ED
3x S ha llo w M on ito rin g
W el ls 3x
S ha llo w
M on ito rin g W el ls
In st al la tio n of
S ha llo w
M on ito rin g W el ls
ESTIMATE
Blood Hound Corporate Headquarters 6500 Technology Center Dr., Suite 200 Indianapolis, IN 46278
Email: BHI@bhug.com bhug.com Website: Phone #: 888-858-9830 888-858-9829 Fax #:
Corporate Headquarters 6500 Technology Center Dr., Suite 200 Indianapolis, IN 46278
Email: BHI@bhug.com bhug.com Website: Phone #: 888-858-9830 888-858-9829 Fax #:
Payment is due at the time of service, unless you already have an account with us. If you do have an account with us, payment terms are Net 30 days, unless otherwise stated in a pre-approved contract. To learn more, please call the office at 888-858-9830.
PRICE MAY VARY BASED ON ACTUAL TIME ON SITE. The above pricing is based only on the information supplied by the customer.
If a site walk through has not been conducted, this may affect the price.
If this is a prevailing wage job, please contact our office for a revised quote as this pricing does not reflect prevailing wage rates. If at some later date a project is determined to be a prevailing wage job, then any extra expense incurred by Blood Hound will be billed to the client.
Blood Hound will use electromagnetic (EM) and ground-penetrating-radar (GPR) equipment to locate private underground utilities at site indicated by client. All findings will be marked according to APWA standard. Customer is responsible for calling 811 for locates of any public utilities. If the scope of work should change or is different than that listed on estimate, please call our office for a revised estimate.
Unless expressly noted, Vacuum Excavation estimates do not include any of the following services: Permitting, Traffic Control, Restoration, Special Restoration, Special Backfill or Waste Disposal. If you need any of those services please call our office for a revised estimate.
Blood Hound is not responsible for the condition of the pipes or structures before or after jetting/clearing service is performed. Unsatisfactory conditions could be present within the structure and any services may bring those deficiencies to light.
In the event of inclement weather, if the client still requests for crew to arrive on site, then the client will be responsible for minimum charges even if no work is performed.
Corporate Headquarters 6500 Technology Center Dr., Suite 200 Indianapolis, IN 46278
Email: BHI@bhug.com bhug.com Website: Phone #: 888-858-9830 888-858-9829 Fax #:
By signing this Estimate the client acknowledges that they accept the scope of work listed on the estimate, as well as the service rates provided and are providing Blood Hound with a Notice To Proceed (NTP) for the listed Project. If the scope of work should change while the work is in progress, any changes will be documented on the technician’s field notes and signed off on by the client. Signing this estimate also acknowledges that the client agrees to the terms and conditions as they relate to payment for services rendered.
Signature: ______________________________________________________________________________________
Printed Name: ___________________________________________________________________________________
Date Signed: ____________________________________________________________________________________
The project estimate outlined in this specific proposal is valid for 90 days from the date of the proposal. Blood Hound reserves the right to review and adjust this estimate if client does not approve of the proposal within 90 days.
Please send all POs / Contracts to .BHUGContracts@bhug.com
We look forward to working with you.
WSP USA INC
October 7, 2025 Submitted By:
Jessica Baker 305-801-4138 floridainfo@gprsinc.com
Client: WSP USA INC Attn: Stephen Sider Project: 210 US Highway 1, North Palm Beach, FL 33408
GPRS appreciates the opportunity to provide this proposal. I encourage you to visit our website (www.gprsinc.com) and contact any of the numerous references listed. Our insurance certificate and W-9 can also be downloaded here. Please feel free to contact me if you have any questions, or if you need additional information. Visit www.simspec.org for an overview of our industry-leading best practices that will be applied to this project.
SCOPE OF WORK
We understand the scope to be to search for underground utilities within a radius of approximately 5’ x 5’ area around 3 soil borings as marked by green and black circles on the picture provided. We will attempt to trace any utilities for which there are structures visible from the work area. Utilities will be marked on the surface using paint, flags, or other appropriate means. The client will be responsible to provide drawings or notify GPRS of any utilities known to be entering the work area for which there are no apparent surface features or structures that are visible from the work area. The areas should be laid out, marked, and cleared of obstructions prior to our arrival in order to avoid additional charges.
EQUIPMENT
Underground Scanning GPR Antenna. The antenna frequencies range from 250 MHz-450 MHz is mounted in a stroller frame which rolls over the surface. The surface needs to be reasonably smooth and unobstructed in order to obtain readable scans. Obstructions such as curbs, landscaping, and vegetation will limit the feasibility of GPR. The data is displayed on a screen and marked in the field in real time. The total depth achieved can be as much as 8’ or more with this antenna but can vary widely depending on the types of materials being scanned through. Some soil types such as clay may limit maximum depths to 3’ or less. As depth increases, targets must be larger in order to be detected and non-metallic targets can be especially difficult to locate. Depths provided should always be treated as estimates as their accuracy can be affected by multiple factors. For more information, please visit: Link
Electromagnetic Pipe Locator. The EM locator can passively detect the signals from live AC power or radio signals travelling along some conductive utilities. It can also be used in conjunction with a transmitter to connect directly to accessible, metallic pipes, risers, or tracer wires. A current is sent through the pipe or tracer wire at a specific frequency and the resulting signal can then be detected by the receiver. A utility’s ability to be located depends on a variety of factors including access to the utility, conductivity, grounding, interference from other utilities, and many others. Depths provided should always be treated as estimates as their accuracy can be affected by multiple factors. For more information, please visit: Link
Traceable Rodder. The rodder has a copper wire encased in fiberglass. The line is pushed through accessible pipes before placing a current on the wire and the signal is then traced from the surface. The maximum traceable depth is 10’ depending on the soil conditions and the maximum distance is 200’. The line can be pushed through a pipe with direct access such as a sewer line at a cleanout or a storm drain catch basin. It may not be able to be pushed through deeper pipes within manholes. Electrical conduits will not be accessed by GPRS. The signal cannot be located through metallic pipes. For more information, please visit: Link
GPS. This handheld GPS unit offers accuracy down to 4 inches, however, the accuracy achieved will depend on the satellite environment at the time of collection and should not be considered to be survey-grade. Features can be collected as points, lines, or areas and then exported as a KML/KMZ or overlaid on a CAD drawing. For more information, please visit: Link
OPTIONAL EQUIPMENT
Soil Borings+
SITEMAP® PERSONAL VIEWER
SiteMap® is a GIS platform designed to visualize all outdoor utility locates on a site. The data from this utility investigation will be added to the system automatically. SiteMap stores geolocated facility documents created by GPRS and enables users to visualize, print, share, and export data to use in other software tools.
MAP OF SCAN AREA
PROJECT COSTS
SERVICE DESCRIPTION PRICE
SCANNING/FIELD MARKINGS Described on Page 1 $700 MOBILIZATION Local market or outside of local market Included JOB SUMMARY PDF document with brief description of equipment used, findings, limitations, site photos sent at conclusion of every job. Included
SITEMAP® PERSONAL VIEWER For more information, please visit: Link Included
This price assumes that we will be given access to perform the work during normal, weekday business hours (7am-5pm). Hours outside of these times are typically billed at time and a half.
As-builts and any other applicable drawings should be made available to GPRS prior to the project if possible.
A thorough utility search can only be completed if GPRS is given access to all utility structures, interior and exterior. This service is never a replacement for the use of the state One Call system (811).
This proposal is subject to the General Terms and Conditions for Services of Ground Penetrating Radar Systems, LLC posted at Link (the “Terms and Conditions”) and the Authorized User License Agreement for SiteMap® Accounts at Link and is hereby incorporated by reference into and made a part of this proposal. Customer acknowledges it has read and agrees to be bound by such Terms and Conditions. In the event of any conflict between the terms of this proposal and the Terms and Conditions, the Terms and Conditions will prevail.
PROPOSAL-SPECIFIC TERMS & CONDITIONS
1. Customer agrees to meet and perform all requirements described in this document and has fully read and understands all items listed within this document.
2. It is the customer’s responsibility to prepare the site for scanning, including clearly identifying areas to be scanned, securing access to all areas required for scanning, and keeping these areas clear and free of obstructions. Delays caused by customer’s failure to do so may result in an increased price.
3. GPRS does not conduct an investigation, analysis, or interpretation of soil composition, soil/concrete conditions, or geophysical, geological, engineering, or land surveying information. Customer acknowledges it understands that we are merely reporting retrieved data and that we do NOT provide geophysical, geological, engineering, or land surveying services. Customer should contact a professional in those fields if such services are needed.
4. If any work to be performed is within a road or street, unless specifically included by GPRS within this proposal, it is the customer’s responsibility to provide adequate traffic control to allow GPRS’ personnel to safely and efficiently work in the road/street.
5. Time-on-site in excess of 8 hours will be billed at overtime rates.
6. This price assumes that we will be given access to perform the work during normal, weekday business hours. Work performed outside of 6am-5pm Monday-
Friday will be billed at overtime rates.
7. These rates assume that there are no certified payroll or prevailing wage requirements for this work. If GPRS receives notice that any of these conditions exist, there will be additional costs.
8. If this proposal is not accepted within 90 days of the date shown on Page 1 then the pricing may be subject to review.
9. If for some reason the technician arrives on site and the work is cancelled there will be a charge of $500.00 per requested technician.
10. If your project is in WV, SD, NM, or HI: State sales tax is not included in the total on this proposal, but will be included on the invoice.
11. Payment terms are Net 30 or as specified if a current Master Service Agreement is in place.
ACCEPTED AND AGREED:
Billing Company Name:
Billing Address:
Company Phone/Email: PO#: Job#:
Print Name: Signature Date:
GGeoTek Services, LLC
08 October 2025
To: Stephen Sider
Golder Associates USA, Inc.
9428 Baymeadows Road, Suite 400 Jacksonville, Florida 32256
From: GeoTek Services, LLC 4060 Sparrow Hawk Road
Melbourne, Florida 32934
RE: Utility Locating Services – L&M Cleaners - North Palm Beach, Florida
Mr. Sider, GeoTek Services is pleased to respond to your request for Utility Locating services at L&M Cleaners located in North Palm Beach, Florida. We will scan a 5’ x 5’ area around three proposed bore locations with the goal of locating underground utilities. We can only scan the easily accessible open areas for utilities. Note that we cannot scan beneath fixed objects such as landscaping, fencing, buildings. We will scan as close as reasonably possible to fixed objects such as walls, landscaping, fences, etc. Our deliverable will be marking paint and/or flags indicating the location of potential underground utilities. It is the client’s responsibility to protect and preserve all marks.
We will use both Electromagnetic Induction instruments as well as Ground Penetrating Radar (GPR) to detect objects below the surface. Due to the nature of sub-surface detection and the physical laws governing radio wave propagation, some buried objects may not be detectable due to depth, obscuration, or a weak radar signature. GeoTek Services will use industry standard best practices to locate sub-surface objects, however some objects may not be detectable. Geotek Services does not guarantee that all underground objects can be found. GeoTek Services assumes no liability for any damages.
We request access to any as-built site plans of the scan areas prior to rendering services. Our fixed price quote for this effort is $750.00. No out-of-pocket expenses are expected for this project. This quote is valid for sixty days.
Best Regards, Martin (Bud) Connor GeoTek Services, LLC
4060 Sparrow Hawk Road ● Melbourne, FL 32934-8525 ● info@GeoTekServices.com ● 321.473.7498
EARTH TECH DRILLING
2703 NW 19TH STREET, POMPANO BEACH, FL 33069
954.974.2424 FAX:954.974.2423
Date: 10/7/2025
FAC ID#:
PROPOSED SCOPE OF WORK:
Drum Development water - 30 Minutes of Dev. Per well - Estimated at (2) Drums
Unit Unit Rate Number of Units Extended Price
Equipment Type: DPT Track Rig whole day $1,750.00 1 $1,750.00 half day $0.00 each $0.00 each $0.00 each $100.00 6 $600.00 each $40.00 3 $120.00 per well $225.00 3 $675.00 daily roundtrip $550.00 1 $550.00 per crew / per night $0.00 each $80.00 2 $160.00 each $60.00 3 $180.00 each $65.00 0 $0.00 each $95.00 0 $0.00
Temporary Decon Pit & Steamcleaner day $500.00 0 $500.00
TOTAL QUOTE PRICE $4,535.00
Notes:
Project No.: ___________________________
Date: 10/7/2025
Pre-Packed PVC Well Screen (includes all materials) 5' Length Pack OD ___1"____
MISCELLANEOUS
Mobilization Per Diem
DOT Approved 55-gal Drum
Well Riser (includes all materials) ID ___1"___ 5' Length
Well Completion (includes 30 Min Dev. 6"/8" B-D MH & locking well cap)
Permits - Install Well
Water Sample
Signature and Title of Person Submitting Quote: Charles Bucher
Concrete Core
Days to Complete Scope of Work: 1 Day
Subcontract Company Name: EARTH TECH DRILLING. Inc.
Subcontract Mailing Address: 2703 NW 19th Street, Pompano Beach, FL 33069
ETD Policy: If pea gravel is encountered, borehole advancement is terminated. If client would like to continue borehole advancement, it is at the risk of the consultant, FDEP or property owner.
Contractor Name: WSP - Stephen Sider - 904 207-6019
Site Name: L & M Cleaners - 210 US Hwy 1 - North Palm Beach, FL
(HAND CLEAR ALL LOCATIONS TO 5' or REFUSAL)
(3) MW 1" x 15' w/ 10' .010" Pre-Pack Screen & 8" BD Completion
On 3 different parcels requiring 3 permits
Direct Push Daily Rate 1 - on-site day
Direct Push Half-Day Rate 1 - on-site half day
MAG Wells - 2" x ~7' w/ 5' .010" Screen
Auger Attachment, 4" Surface Casing
DIRECT PUSH TECHNOLOGY
Monitoring Wells Sparge Wells Horizontal and Vertical Extraction Wells Geotechnical Drilling Direct Push
Sonic Auger DPT Injection Well Abandonment
REVISED DATE: 10/6/2025
ESTIMATE #: 1025011
L&M Cleaners
ID QTY Unit Rate TOTAL
1 1 each 1,000.00$ 1,000.00$
2 night 390.00$ -$
3 DPT Rig and Crew 1 day 1,850.00$ 1,850.00$
4 Materials: Soil Sample Liners (If Needed) each 4.00$ -$
5 Materials: 1" Sch 40 PVC Well Installation 45 foot 4.00$ 180.00$
6 Materials: (2) 1" x 5' PVC .010 Prepack Screen, 3" Exp Point 3 each 175.00$ 525.00$
7 2' x 2' Concrete Pad w/8" BD Completion 3 each 200.00$ 600.00$
8 Well Development (up to 1/2 hour w/pump) 3 each 50.00$ 150.00$
9 Refurbished Drums (Soil) Client Requested each 75.00$ -$
10 Refurbished Drums (Water) Client Requested 2 each 75.00$ 150.00$
11 Permits (Palm Beach County - 3 Parcels) 3 each 50.00$ 150.00$
Subtotal 4,605.00$
Todd Hodgson Todd Hodgson TOTAL 4,605.00$ Partner
Northt Palm Beach, Florida 9428 Baymeadows Road, Ste. 400
PROJECTCUSTOMER
Stephen Sider, P.G., GISP
Jacksonville, Florida 32256
210 US Hwy 1 WSP
"Actual quantities used and days onsite will be invoiced"
Completion: 1 Day + Travel
THANK YOU FOR YOUR BUSINESS!
DESCRIPTION
Mobilization
If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 at Todd@drillprollc.com.
Locations must be accessible with track mounted DPT rig and support equipment Note: It is Groundwater Protection policy that if 'Pea Gravel' is encountered, ANY type of boring/drilling will be terminated…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .