CN-370000-HW685-DC03ACO1.pdf
PDF 3 MB Posted
- Contract number
- HW685
- Issued by
- Florida
About this file
Summary
This document package contains a Task Assignment (TA) and Task Assignment Change Order (TACO) between the State of Florida Department of Environmental Protection and Golder Associates USA Inc. for groundwater monitoring services at the Prestige Cleaners Inc. site located at 3044 West Tharpe Street in Tallahassee, Leon County, Florida. The contract is issued under the indefinite delivery vehicle Contract Number HW685, with the task assignment numbered DC003A. Project Manager Ben Grubbs represents the Department, while Matt Crews serves as the contractor's project manager.
The task assignment authorizes Golder to conduct groundwater monitoring activities including field documentation, laboratory analysis, reporting, and project management through August 31, 2022. The original task assignment value was $9,248.98, which was reduced by $94.16 through TACO #1 (effective May 17, 2022) to a final value of $9,154.82, reflecting a personnel change on Subtask 2 (Annual Groundwater Monitoring and IDW Treatment) that reduced labor costs by $83.34. The work encompasses 56 total labor hours distributed across three subtasks: Project Management ($819.21 revised), Annual Groundwater Monitoring ($5,261.64 revised), and Reporting ($3,073.96). Deliverables include groundwater monitoring field documentation and laboratory reports due May 16, 2022, and annual monitoring reports with GIS updates due June 30, 2022, with corresponding invoice milestones upon FDEP approval of each deliverable.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department’s Project Manager: Department’s Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Name:
4. ☐ There are no changes to the TA compensation.
☐ The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO ☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. ☐ There are no changes to the TA Expiration Date.
☐ The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. ☐ There are no changes to the Attachments.
☐ Attachment ___ is replaced with Attachment -____.
7. ☐ No Additional Changes.
☐ Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
DC003A 1 HW685
This Task Assignment Change Order authorizes a reduction in labor costs in accordance with the May 17, 2022, Scope of Work and Cost Estimate.
Ben Grubbs 850-245-8992 Contractor Contractor
Contractor Contractor
Contractor
Golder Associates USA Inc.
Matt Crews 904-363-3430
ERIC_4873
Prestige Cleaners Inc
✔ $ 9,154.82 $ 9,248.98
$ 9,154.82 $ 9,248.98 ✔ Completion
Completion 0
✔ 1 1 1
Golder Associates USA Inc.
Matthew Crews
Senior Lead Consultant, Environmental Engineer
Matthew C. Crews Digitally signed by Matthew C. Crews Date: 2022.05.18 08:33:28 -04'00'
William E. Burns, Jr.
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2022.05.17 16:32:54 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 01_18
Contract Number:
Task Assignment #:
Change Order #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
HW685
DC003A
$ 9,154.82
Subtask 2: Groundwater monitoring field documentation and laboratory report
Subtasks 1 & 3: Annual Groundwater Monitoring Report; ADaPT/GIS update; Project Management
Subtask 2: Submittal and FDEP approval of the groundwater monitoring field documentation and laboratory report
Subtasks 1 & 3: Submittal and FDEP approval of the Annual Groundwater Monitoring Report; ADaPT/GIS update; Project Management
05/16/2022
06/30/2022
$ 3,893.18
$ 5,261.64
Printed on recycled paper.
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
To: HW685 Contract Negotiation File Prestige Cleaners Inc
Tallahassee, Leon County
ERIC_4873
From: Ben Grubbs, Project Manager Date: May 17, 2022 Subject: Negotiation Summary
HW685 DC003A-1
This Task Assignment Change Order authorizes a reduction in labor costs in accordance with the May 17, 2022, Scope of Work and Cost Estimate.
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2: Annual Groundwater Monitoring and IDW Treatment Changes to subtask include a reduction in labor costs. The costs are associated with a change in personnel. The cost reduction for this subtask is $83.34.
The cost reduction related to this change order is $94.16.
The FDEP project manager agrees to the scope of work and final cost associated with this Task Assignment Change Order. The final cost for this Task Assignment Change Order is $9,154.82 with 56 labor hours.
Golder Associates may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Change Order Notification Form.
FDEP COST ESTI MATEContractor: Golder Associates USA Inc.
Date: 5/16/2022
Task #: DC003A SubTask 1 Project Management SubTask 6
Site: Prestige Cleaners SubTask 2 Annual GW Monitoring SubTask 7
Activity/Phase: Assessment SubTask 3 Reporting SubTask 8
Project Manager: Ben Grubbs SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$63.65 Practice Leader - X-13 BROWN, JESSE 1 2 0 0 0 0 0 0 0 $51.23 Senior Sci/Eng - X-11 MONGILLO, RALPH 10 5.3 5 0 0 0 0 0 0 0 0 $44.15 Senior Project Sci/Eng - P-10 THOMAS, JAMES 2 0 2 0 0 0 0 0 0 0 $45.42 Project Sci/Eng - P-9 LUCERO, BENJAMIN 5 0 5 0 0 0 0 0 0 0 $40.38 Project Sci/Eng - P-9 CHAPPELL, LOGAN 23 11 12 0 0 0 0 0 0 0 $34.06 Project Sci/Eng - P-9 OIEN, ERIK 0 0 0 0 0 0 0 0 0 0 $33.32 Staff Sci/Eng - P-8 SPENGLER, JUSTIN 0 0 0 0 0 0 0 0 0 0 $31.28 Staff Sci/Eng - P-8 MATHER, WILLIAM 10 10 0 0 0 0 0 0 0 0 $32.75 Staff Sci/Eng - P-8 STRAYER, ALICIA 3 0 3 0 0 0 0 0 0 0
Total Hours 56 5.3 27.0 24.0 0 0 0 0 0 0 0
Direct Labor $2,375.59 $273.30 $1,076.78 $1,025.51 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.50% $4,097.89 $471.44 $1,857.45 $1,769.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $6,473.48 $744.74 $2,934.23 $2,794.51 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel Vehicle Rental $240.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $240.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $10.00 $10.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $767.00 $767.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $877.00 $877.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $40.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $667.00 $667.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $807.00 $807.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $8,507.48 $744.74 $4,968.23 $2,794.51 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $647.34 $74.47 $293.42 $279.45 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $9,154.82 $819.21 $5,261.65 $3,073.96 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Original $9,248.98 $830.04 $5,344.98 $3,073.96 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Delta #1 ($94.16) ($10.82) ($83.34) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total $9,154.82 $819.22 $5,261.64 $3,073.96 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GOLDER Page 1
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Prestige Cleaners SUBTASK 2: Annual GW Monitoring
DATE: 5/16/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
BROWN, JESSE Practice Leader - X-13 1
MONGILLO, RALPH Senior Sci/Eng - X-11 5
CHAPPELL, LOGAN Project Sci/Eng - P-9 11
OIEN, ERIK Project Sci/Eng - P-9 -10
OIEN, ERIK Project Sci/Eng - P-9 10
MATHER, WILLIAM Staff Sci/Eng - P-8 10
TOTAL LABOR 27
VEHICLE TYPE RATE UNIT USEAGE
Truck (GW sampling) $120.00 Per Day 2 $240.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin IDW T&D - Liquids $100.00 Per Drum 1 $100.00
TOTAL $100.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Chlorinated VOCs - EPA Method 8260B Total VOHs EPA Method 8260B $73.00 9 $657.00 Total VOCs EPA Method 8260B $110.00 1 $110.00 Sample Shipping Small $110.00 1 $110.00
TOTAL LAB $877.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Miscellaneous Expendables $40.00 Per Day 1 $40.00 Deep Groundwater Sampling Kit $415.00 Per Day 1 $415.00 Tubing, Poly HDPE $0.30 Per Foot 750 $225.00 Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 9 $27.00 Drum, 55-gallon $100.00 Per Drum 1 $100.00
TOTAL EQUIPMENT $807.00
Review of field document submittal
Correspondence with RPO for site access (1 hour). Prepare the field document deliverable for submittal to the FDEP. IDW characterization and waste profile for disposal (2 hours).
Field event preparation (1.0 hr), Mobilization (1.0 hr), pre & post instrument calibration, collect a round of water levels, collect groundwater samples from nine wells (MW001, MW002, MW003, MW004, MW005, MW006RR, MW-7S, MW-7I, and MW-7D), measure field parameters, stage and label IDW drum, and submittal of samples to the lab (9.0 hrs) .
Mobilization (1.0 hr), pre & post instrument calibration, collect a round of water levels, collect groundwater samples from nine wells (MW001, MW002, MW003, MW004, MW005, MW006RR, MW-7S, MW-7I, and MW-7D), measure field parameters, stage and label IDW drum, and submittal of samples to the lab (9.0 hrs) .
Mobilization (1.0 hr), pre & post instrument calibration, collect a round of water levels, collect groundwater samples from nine wells (MW001, MW002, MW003, MW004, MW005, MW006RR, MW-7S, MW-7I, and MW-7D), measure field parameters, stage and label IDW drum, and submittal of samples to the lab (9.0 hrs) .
Mobilization (1.0 hr), pre & post instrument calibration, collect a round of water levels, collect groundwater samples from nine wells (MW001, MW002, MW003, MW004, MW005, MW006RR, MW-7S, MW-7I, and MW-7D), measure field parameters, stage and label IDW drum, and submittal of samples to the lab (9.0 hrs) .
FINAL --7/24/96
SUBTASK 3: Reporting
DATE: 5/16/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
BROWN, JESSE Practice Leader - X-13 2
THOMAS, JAMES Senior Project Sci/Eng - P 2
LUCERO, BENJAMIN Project Sci/Eng - P-9 5
CHAPPELL, LOGAN Project Sci/Eng - P-9 12
STRAYER, ALICIA Staff Sci/Eng - P-8 3
TOTAL LABOR 24
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
Annual monitoring report senior review: conclusions and recommendations.
Update FDEP GIS Tables, run data checker, create and edit error report, review and annotate error report (9 data points x 8 min/point = 72 minutes). Submit FDEPGIS tables; submit ADaPT deliverable (0.5)
CADD Update Figures (two groundwater flow and three CVOC detections) received from another consultant to the Golder report format.
Annual Report preparation - data entry and review, report tables, prepare figures and author annual monitoring report
Reporting: Updating tables from another consultant to the Golder report format, document production, binding and shipping. Create pdf for OCULUS.
Date: 5/16/2022
Task #: DC003A SubTask 1 Project Management SubTask 6
Site: Prestige Cleaners SubTask 2 Annual GW Monitoring SubTask 7
Activity/Phase: Assessment SubTask 3 Reporting SubTask 8
Project Manager: Ben Grubbs SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$63.65 Practice Leader - X-13 BROWN, JESSE 0 0 0 0 0 0 0 0 0 $51.23 Senior Sci/Eng - X-11 MONGILLO, RALPH 0 -0.1 0 0 0 0 0 0 0 0 0 $44.15 Senior Project Sci/Eng - P-10 THOMAS, JAMES 0 0 0 0 0 0 0 0 0 0 $45.42 Project Sci/Eng - P-9 LUCERO, BENJAMIN 0 0 0 0 0 0 0 0 0 0 $40.38 Project Sci/Eng - P-9 CHAPPELL, LOGAN 0 0 0 0 0 0 0 0 0 0 $34.06 Project Sci/Eng - P-9 OIEN, ERIK -10 -10 0 0 0 0 0 0 0 0 $31.28 Staff Sci/Eng - P-8 MATHER, WILLIAM 10 10 0 0 0 0 0 0 0 0 $32.75 Staff Sci/Eng - P-8 STRAYER, ALICIA 0 0 0 0 0 0 0 0 0 0
Total Hours 0 -0.1 0.0 0.0 0 0 0 0 0 0 0
Direct Labor ($31.41) ($3.61) ($27.80) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.50% ($54.19) ($6.23) ($47.96) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor ($85.60) ($9.84) ($75.76) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal ($85.60) ($9.84) ($75.76) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee ($8.56) ($0.98) ($7.58) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost ($94.16) ($10.82) ($83.34) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
SUBTASK 2: Annual GW Monitoring
DATE: 5/16/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
OIEN, ERIK Project Sci/Eng - P-9 -10
MATHER, WILLIAM Staff Sci/Eng - P-8 10
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
Mobilization (1.0 hr), pre & post instrument calibration, collect a round of water levels, collect groundwater samples from nine wells (MW001, MW002, MW003, MW004, MW005, MW006RR, MW-7S, MW-7I, and MW-7D), measure field parameters, stage and label IDW drum, and submittal of samples to the lab (9.0 hrs) .
Mobilization (1.0 hr), pre & post instrument calibration, collect a round of water levels, collect groundwater samples from nine wells (MW001, MW002, MW003, MW004, MW005, MW006RR, MW-7S, MW-7I, and MW-7D), measure field parameters, stage and label IDW drum, and submittal of samples to the lab (9 0 hrs)
Date: 3/16/2022
Task #: DC003A SubTask 1 Project Management SubTask 6
Site: Prestige Cleaners SubTask 2 Annual GW Monitoring SubTask 7
Activity/Phase: Assessment SubTask 3 Reporting SubTask 8
Project Manager: Ben Grubbs SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$51.23 Project Manager (RFM) 5 5.4 $0.00 Program Leader - X-14 0 0 0 0 0 0 0 0 0 0
$63.65 Practice Leader - X-13 (JCB) 3 1 2 0 0 0 0 0 0 0 $0.00 Senior Consultant - X-12 0 0 0 0 0 0 0 0 0 0
$51.23 Senior Sci/Eng - X-11 (RFM) 5 5 0 0 0 0 0 0 0 0 $45.42 Senior Project Sci/Eng - P-10 (BL) 5 0 5 0 0 0 0 0 0 0 $44.15 Project Sci/Eng - P-10 (JT) 2 0 2.0 0 0 0 0 0 0 0 $40.38 Staff Sci/Eng - P-9 (LC) 23 11 12 0 0 0 0 0 0 0 $34.06 Staff Sci/Eng - P-8 (EO) 10 10 0 0 0 0 0 0 0 0 $32.75 Staff Sci/Eng - P-8 (AS) 3 0 3 0 0 0 0 0 0 0
$0.00 Sci/Eng/Admin - P-7 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 56 5.4 27.0 24.0 0 0 0 0 0 0 0
Direct Labor $2,407.00 $276.91 $1,104.58 $1,025.51 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.50% $4,152.07 $477.67 $1,905.40 $1,769.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $6,559.07 $754.58 $3,009.98 $2,794.51 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Date: 3/16/2022
Task #: DC003A SubTask 1 Project Management SubTask 6
Site: Prestige Cleaners SubTask 2 Annual GW Monitoring SubTask 7
Activity/Phase: Assessment SubTask 3 Reporting SubTask 8
Project Manager: Ben Grubbs SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $240.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $240.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $10.00 $10.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $767.00 $767.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $877.00 $877.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $40.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $667.00 $667.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $807.00 $807.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $8,593.07 $754.58 $5,043.98 $2,794.51 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $655.91 $75.46 $301.00 $279.45 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $9,248.98 $830.04 $5,344.98 $3,073.96 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GOLDER Page 2
From: Crews, Matt To: Grubbs, Benjamin Cc: Mongillo, Ralph; Chappell, Logan Subject: DC003A (TACO #1) - Prestige Cleaners Inc. Annual GW Monitoring Date: Tuesday, May 17, 2022 08:50:36 Attachments: image001.png image002.png DC003A (TACO #1) - Prestige Cleaners LOECEF.xlsx DC003A (Delta #1) - Prestige Cleaners LOECEF.xlsx DC003A - Prestige Cleaners Signed TA.pdf DC003A - Prestige Cleaners LOECEF.xlsx
EXTERNAL MESSAGE
This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.
Ben, Golder has attached the files necessary to complete TACO #1 for TA DC003A. The TACO #1 reflects the actual field staff used during the Subtask 2 field activities at the Prestige Cleaners Inc. site in Tallahassee, FL (ERIC_4873). Please review and let us know if you have any questions or comments.
Thanks, Matt
Matthew Crews, P.E.
Senior Lead Consultant, Environmental Engineer
T: +1 904 363 3430 D: +1 904 207 6023 C: +1 904 327 8420
9428 Baymeadows Road, Suite 400, Jacksonville, Florida, USA 32256 wsp.com | golder.com
WSP and Golder have joined together to form the premier environmental consultancy in the industry. Together we are 14,000 strong, Future Ready©, and delivering innovative solutions to our clients around the globe.
As of October 28, 2021, Golder Associates Inc. is now Golder Associates USA Inc.
This email transmission is confidential and may contain proprietary information for the exclusive use of the intended recipient. Any use, distribution or copying of this transmission, other than by the intended recipient, is strictly prohibited. If you are not the intended recipient, please notify the sender and delete all copies. Electronic media is susceptible to unauthorized modification, deterioration, and incompatibility. Accordingly, the electronic media version of any work product may not be relied upon.
mailto:Matt_Crews@golder.com mailto:Benjamin.Grubbs@FloridaDEP.gov mailto:Ralph_Mongillo@golder.com mailto:Logan.Chappell@wsp.com http://secure-web.cisco.com/1kbjevgezHX0sDyhJZFIBncbfJ-6nytZHgnUgQ9ZuiJle7xtzd1ReUJE0K_IviWTt6G7y3oK8zWpHoxn-9PjnYYPoI3chXGShs2cCd3tbCDQTga_H1Y8cHXBYJpViKBOw_3arq1XRobhBLR2uYkO7MhVKZylVhXAFaUDGgj0slkENs87v2Ms3klc76I0aSP3P_psGv8izGRbkNmehCLf3wF89XpjHvpT_j40IB3ODeubm9uHwyjv1YSicsScX45vaB2LXSIavNZn1USm8XbPjOVxGGmj0gJjHF1eCSOloGD2xRJ3aO2WhpFJTmni2HDu8qzH5p0uzofdwVyXwSm5rHw/http%3A%2F%2Fwsp.com%2F http://secure-web.cisco.com/1L4w4pcrB2XF0zWSTdG8c2wCyeBfG1Afj5FnIPbs70vDlVCEamJVAOhv5TL2L0weCzRgYADpv-FoIjFmWGxU_WqVRhDN-xDUzp3YaSDuCDj9Ap8TE0qiJ3puIX9ONZ_mq1W73ZoHmFvCCX0CkERVTSn0U3J8cprNPu_eMj2ZPEGXoRo5OeUYv3StKtXX6rMGfX_XdXWZsPdeYD1sSqkwj32Lt1wMGz5gR3HjoVLjBchnOiXy-7JyTXY6vq_gLZ18hiAcQQv2zc3-oI3onL_wbcvUCMU6oMNLuUi2nz7s-k-Dfw9QJyiRTDFk-O1BtCjDXXFAqqk57lGGSdayFxOo5hw/http%3A%2F%2Fgolder.com%2F
Subtask 2
SITE : Prestige Cleaners
SUBTASK 2: Annual GW Monitoring
DATE: 5/16/22
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
GOIST, TIMOTHY Program Leader – X-14
POWELL, BRENDA Program Leader – X-14
BLAIR, STEPHEN Program Leader – X-14
MILLER, DONALD Program Leader – X-14
PAUL, JEFFERY Program Leader – X-14
PHELPS, MICHAEL Practice Leader - X-13
WAGNER, ANDREAS Practice Leader - X-13
RICKER, JOSEPH Practice Leader - X-13
WOJCIK, ROBERT Practice Leader - X-13
BROWN, JESSE Practice Leader - X-13 Review of field document submittal 1
KELSO, PERRY Senior Consultant - X-12
ACKERLUND, STEVEN Senior Consultant - X-12
GRIGG, DON Senior Consultant - X-12
CROOK, MARTIN Senior Consultant - X-12
HARTER, ERICK Senior Consultant - X-12
ZAGAGI, YANIV Senior Consultant - X-12
LONG, RYAN Senior Consultant - X-12
HOLCOMB, BLAKE Senior Consultant - X-12
BENNETT, ROSS Senior Consultant - X-12
CREWS, MATTHEW Senior Consultant - X-12
BONES, ADELMARIE Senior Sci/Eng - X-11
BAKER, JEFF Senior Sci/Eng - X-11
MOORE, KENNETH Senior Sci/Eng - X-11
FALLON, MICHAEL Senior Sci/Eng - X-11
CRESCI, CHRISTOPHER Senior Sci/Eng - X-11
MONGILLO, RALPH Senior Sci/Eng - X-11 Correspondence with RPO for site access (1 hour). Prepare the field document deliverable for submittal to the FDEP. IDW characterization and waste profile for disposal (2 hours). 5
REAT, VICKIE Senior Sci/Eng - X-11
HAMPTON, MATTHEW Senior Sci/Eng - X-11
HESS, KRISTI Senior Sci/Eng - X-11
FERRIS, EVERETT Senior Sci/Eng - X-11
KRAJEWSKI, KEVIN Project Sci/Eng - P-9
MCDANIELS, DAVID Project Sci/Eng - P-9
BROOKS, HERSIE Project Sci/Eng - P-9
BURTON, DONALD Staff Sci/Eng - P-8
HUBER, WILLIAM Senior Project Sci/Eng - P-10
SULLIVAN, COLLEEN Senior Project Sci/Eng - P-10
CHAK, SARAH Senior Project Sci/Eng - P-10
COOK, AMY Senior Project Sci/Eng - P-10
DILLON, TIMOTHY Senior Project Sci/Eng - P-10
ANDERS, JAMES Senior Project Sci/Eng - P-10
THOMAS, JAMES Senior Project Sci/Eng - P-10
TEMPLE, NIGEL Senior Project Sci/Eng - P-10
CROCKETT, KRIS Senior Project Sci/Eng - P-10
MORELLI, GENE Senior Project Sci/Eng - P-10
BENDER, ERIC Senior Project Sci/Eng - P-10
GUNDERSON, KATHY Senior Project Sci/Eng - P-10
WILLIAMS, TAYLOR Project Sci/Eng - P-9
LUCERO, BENJAMIN Project Sci/Eng - P-9
DIEMER, JEFFREY Project Sci/Eng - P-9
CHAPPELL, LOGAN Project Sci/Eng - P-9 Field event preparation (1.0 hr), Mobilization (1.0 hr), pre & post instrument calibration, collect a round of water levels, collect groundwater samples from nine wells (MW001, MW002, MW003, MW004, MW005, MW006RR, MW-7S, MW-7I, and MW-7D), measure field parameters, stage and label IDW drum, and submittal of samples to the lab (9.0 hrs) . 11
SMYTH, SHAWN Project Sci/Eng - P-9
MURAK, ANDREW Project Sci/Eng - P-9
GUEST, TAYLOR Project Sci/Eng - P-9
HUANG, YUHAO Project Sci/Eng - P-9
EWINKSKI, RONALD Project Sci/Eng - P-9
SLABAUGH, TAYLOR Project Sci/Eng - P-9
CORTEZ, NICOLE Project Sci/Eng - P-9
NEAL, SCOTT Project Sci/Eng - P-9
OIEN, ERIK Project Sci/Eng - P-9 Mobilization (1.0 hr), pre & post instrument calibration, collect a round of water levels, collect groundwater samples from nine wells (MW001, MW002, MW003, MW004, MW005, MW006RR, MW-7S, MW-7I, and MW-7D), measure field parameters, stage and label IDW drum, and submittal of samples to the lab (9.0 hrs) . -10
OIEN, ERIK Project Sci/Eng - P-9 Mobilization (1.0 hr), pre & post instrument calibration, collect a round of water levels, collect groundwater samples from nine wells (MW001, MW002, MW003, MW004, MW005, MW006RR, MW-7S, MW-7I, and MW-7D), measure field parameters, stage and label IDW drum, and submittal of samples to the lab (9.0 hrs) . 10
CARROLL, DECLAN Project Sci/Eng - P-9
SIDER, STEPHEN Project Sci/Eng - P-9
FRALEY, THEAR Project Sci/Eng - P-9
COOPER, CAITLYN Project Sci/Eng - P-9
SWINDLE, LUCAS Staff Sci/Eng - P-8
GSTALDER, IAN Staff Sci/Eng - P-8
MCQUAID, BRANDON Staff Sci/Eng - P-8
DEL VAL, LUIS Staff Sci/Eng - P-8
SPENGLER, JUSTIN Staff Sci/Eng - P-8
MATHER, WILLIAM Staff Sci/Eng - P-8 Mobilization (1.0 hr), pre & post instrument calibration, collect a round of water levels, collect groundwater samples from nine wells (MW001, MW002, MW003, MW004, MW005, MW006RR, MW-7S, MW-7I, and MW-7D), measure field parameters, stage and label IDW drum, and submittal of samples to the lab (9.0 hrs) . 10
MORGAN, TORI Staff Sci/Eng - P-8
MCADAM, ALEXANDRIA Staff Sci/Eng - P-8
IVERS, MATTHEW Staff Sci/Eng - P-8
KUHN, PAUL Staff Sci/Eng - P-8
MORALES, ANTHONY Staff Sci/Eng - P-8
BROWN, SANDRA Project Sci/Eng - P-9
SHPORTUN, ALICE Staff Sci/Eng - P-8
STRAYER, ALICIA Staff Sci/Eng - P-8
TOTAL LABOR 27
VEHICLE TYPE RATE UNIT USEAGE
Truck (GW sampling) $120.00 Per Day 2 $240.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin IDW T&D - Liquids $100.00 Per Drum 1 $100.00
TOTAL $100.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Chlorinated VOCs - EPA Method 8260B
Total VOHs EPA Method 8260B $73.00 9 $657.00
Total VOCs EPA Method 8260B $110.00 1 $110.00
Sample Shipping Small $110.00 1 $110.00
TOTAL LAB $877.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Miscellaneous Expendables $40.00 Per Day 1 $40.00
Deep Groundwater Sampling Kit $415.00 Per Day 1 $415.00
Tubing, Poly HDPE $0.30 Per Foot 750 $225.00
Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 9 $27.00
Drum, 55-gallon $100.00 Per Drum 1 $100.00
TOTAL EQUIPMENT $807.00
&"Times New Roman,Regular"&12LEVEL OF EFFORT/EXPENSE WORKSHEET
Page &P
Subtask 3
SITE : Prestige Cleaners
SUBTASK 3: Reporting
DATE: 5/16/22
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
GOIST, TIMOTHY Program Leader – X-14
POWELL, BRENDA Program Leader – X-14
BLAIR, STEPHEN Program Leader – X-14
MILLER, DONALD Program Leader – X-14
PAUL, JEFFERY Program Leader – X-14
PHELPS, MICHAEL Practice Leader - X-13
WAGNER, ANDREAS Practice Leader - X-13
RICKER, JOSEPH Practice Leader - X-13
WOJCIK, ROBERT Practice Leader - X-13
BROWN, JESSE Practice Leader - X-13 Annual monitoring report senior review: conclusions and recommendations. 2
KELSO, PERRY Senior Consultant - X-12
ACKERLUND, STEVEN Senior Consultant - X-12
GRIGG, DON Senior Consultant - X-12
CROOK, MARTIN Senior Consultant - X-12
HARTER, ERICK Senior Consultant - X-12
ZAGAGI, YANIV Senior Consultant - X-12
LONG, RYAN Senior Consultant - X-12
HOLCOMB, BLAKE Senior Consultant - X-12
BENNETT, ROSS Senior Consultant - X-12
CREWS, MATTHEW Senior Consultant - X-12
BONES, ADELMARIE Senior Sci/Eng - X-11
BAKER, JEFF Senior Sci/Eng - X-11
MOORE, KENNETH Senior Sci/Eng - X-11
FALLON, MICHAEL Senior Sci/Eng - X-11
CRESCI, CHRISTOPHER Senior Sci/Eng - X-11
MONGILLO, RALPH Senior Sci/Eng - X-11
REAT, VICKIE Senior Sci/Eng - X-11
HAMPTON, MATTHEW Senior Sci/Eng - X-11
HESS, KRISTI Senior Sci/Eng - X-11
FERRIS, EVERETT Senior Sci/Eng - X-11
KRAJEWSKI, KEVIN Project Sci/Eng - P-9
MCDANIELS, DAVID Project Sci/Eng - P-9
BROOKS, HERSIE Project Sci/Eng - P-9
BURTON, DONALD Staff Sci/Eng - P-8
HUBER, WILLIAM Senior Project Sci/Eng - P-10
SULLIVAN, COLLEEN Senior Project Sci/Eng - P-10
CHAK, SARAH Senior Project Sci/Eng - P-10
COOK, AMY Senior Project Sci/Eng - P-10
DILLON, TIMOTHY Senior Project Sci/Eng - P-10
ANDERS, JAMES Senior Project Sci/Eng - P-10
THOMAS, JAMES Senior Project Sci/Eng - P-10 Update FDEP GIS Tables, run data checker, create and edit error report, review and annotate error report (9 data points x 8 min/point = 72 minutes). Submit FDEPGIS tables; submit ADaPT deliverable (0.5) 2
TEMPLE, NIGEL Senior Project Sci/Eng - P-10
CROCKETT, KRIS Senior Project Sci/Eng - P-10
MORELLI, GENE Senior Project Sci/Eng - P-10
BENDER, ERIC Senior Project Sci/Eng - P-10
GUNDERSON, KATHY Senior Project Sci/Eng - P-10
WILLIAMS, TAYLOR Project Sci/Eng - P-9
LUCERO, BENJAMIN Project Sci/Eng - P-9 CADD Update Figures (two groundwater flow and three CVOC detections) received from another consultant to the Golder report format. 5
DIEMER, JEFFREY Project Sci/Eng - P-9
CHAPPELL, LOGAN Project Sci/Eng - P-9 Annual Report preparation - data entry and review, report tables, prepare figures and author annual monitoring report 12
SMYTH, SHAWN Project Sci/Eng - P-9
MURAK, ANDREW Project Sci/Eng - P-9
GUEST, TAYLOR Project Sci/Eng - P-9
HUANG, YUHAO Project Sci/Eng - P-9
EWINKSKI, RONALD Project Sci/Eng - P-9
SLABAUGH, TAYLOR Project Sci/Eng - P-9
CORTEZ, NICOLE Project Sci/Eng - P-9
NEAL, SCOTT Project Sci/Eng - P-9
OIEN, ERIK Project Sci/Eng - P-9
CARROLL, DECLAN Project Sci/Eng - P-9
SIDER, STEPHEN Project Sci/Eng - P-9
FRALEY, THEAR Project Sci/Eng - P-9
COOPER, CAITLYN Project Sci/Eng - P-9
SWINDLE, LUCAS Staff Sci/Eng - P-8
GSTALDER, IAN Staff Sci/Eng - P-8
MCQUAID, BRANDON Staff Sci/Eng - P-8
DEL VAL, LUIS Staff Sci/Eng - P-8
SPENGLER, JUSTIN Staff Sci/Eng - P-8
MATHER, WILLIAM Staff Sci/Eng - P-8
MORGAN, TORI Staff Sci/Eng - P-8
MCADAM, ALEXANDRIA Staff Sci/Eng - P-8
IVERS, MATTHEW Staff Sci/Eng - P-8
KUHN, PAUL Staff Sci/Eng - P-8
MORALES, ANTHONY Staff Sci/Eng - P-8
BROWN, SANDRA Project Sci/Eng - P-9
SHPORTUN, ALICE Staff Sci/Eng - P-8
STRAYER, ALICIA Staff Sci/Eng - P-8 Reporting: Updating tables from another consultant to the Golder report format, document production, binding and shipping. Create pdf for OCULUS. 3
0 0
TOTAL LABOR 24
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
&"Times New Roman,Regular"&12LEVEL OF EFFORT/EXPENSE WORKSHEET
Page &P
Subtask 4
SITE : Prestige Cleaners
SUBTASK 4: 0
DATE: 5/16/22
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
GOIST, TIMOTHY Program Leader – X-14
POWELL, BRENDA Program Leader – X-14
BLAIR, STEPHEN Program Leader – X-14
MILLER, DONALD Program Leader – X-14
PAUL, JEFFERY Program Leader – X-14
PHELPS, MICHAEL Practice Leader - X-13
WAGNER, ANDREAS Practice Leader - X-13
RICKER, JOSEPH Practice Leader - X-13
WOJCIK, ROBERT Practice Leader - X-13
BROWN, JESSE Practice Leader - X-13
KELSO, PERRY Senior Consultant - X-12
ACKERLUND, STEVEN Senior Consultant - X-12
GRIGG, DON Senior Consultant - X-12
CROOK, MARTIN Senior Consultant - X-12
HARTER, ERICK Senior Consultant - X-12
ZAGAGI, YANIV Senior Consultant - X-12
LONG, RYAN Senior Consultant - X-12
HOLCOMB, BLAKE Senior Consultant - X-12
BENNETT, ROSS Senior Consultant - X-12
CREWS, MATTHEW Senior Consultant - X-12
BONES, ADELMARIE Senior Sci/Eng - X-11
BAKER, JEFF Senior Sci/Eng - X-11
MOORE, KENNETH Senior Sci/Eng - X-11
FALLON, MICHAEL Senior Sci/Eng - X-11
CRESCI, CHRISTOPHER Senior Sci/Eng - X-11
MONGILLO, RALPH Senior Sci/Eng - X-11
REAT, VICKIE Senior Sci/Eng - X-11
HAMPTON, MATTHEW Senior Sci/Eng - X-11
HESS, KRISTI Senior Sci/Eng - X-11
FERRIS, EVERETT Senior Sci/Eng - X-11
KRAJEWSKI, KEVIN Project Sci/Eng - P-9
MCDANIELS, DAVID Project Sci/Eng - P-9
BROOKS, HERSIE Project Sci/Eng - P-9
BURTON, DONALD Staff Sci/Eng - P-8
HUBER, WILLIAM Senior Project Sci/Eng - P-10
SULLIVAN, COLLEEN Senior Project Sci/Eng - P-10
CHAK, SARAH Senior Project Sci/Eng - P-10
COOK, AMY Senior Project Sci/Eng - P-10
DILLON, TIMOTHY Senior Project Sci/Eng - P-10
ANDERS, JAMES Senior Project Sci/Eng - P-10
THOMAS, JAMES Senior Project Sci/Eng - P-10
TEMPLE, NIGEL Senior Project Sci/Eng - P-10
CROCKETT, KRIS Senior Project Sci/Eng - P-10
MORELLI, GENE Senior Project Sci/Eng - P-10
BENDER, ERIC Senior Project Sci/Eng - P-10
GUNDERSON, KATHY Senior Project Sci/Eng - P-10
WILLIAMS, TAYLOR Project Sci/Eng - P-9
LUCERO, BENJAMIN Project Sci/Eng - P-9
DIEMER, JEFFREY Project Sci/Eng - P-9
CHAPPELL, LOGAN Project Sci/Eng - P-9
SMYTH, SHAWN Project Sci/Eng - P-9
MURAK, ANDREW Project Sci/Eng - P-9
GUEST, TAYLOR Project Sci/Eng - P-9
HUANG, YUHAO Project Sci/Eng - P-9
EWINKSKI, RONALD Project Sci/Eng - P-9
SLABAUGH, TAYLOR Project Sci/Eng - P-9
CORTEZ, NICOLE Project Sci/Eng - P-9
NEAL, SCOTT Project Sci/Eng - P-9
OIEN, ERIK Project Sci/Eng - P-9
CARROLL, DECLAN Project Sci/Eng - P-9
SIDER, STEPHEN Project Sci/Eng - P-9
FRALEY, THEAR Project Sci/Eng - P-9
COOPER, CAITLYN Project Sci/Eng - P-9
SWINDLE, LUCAS Staff Sci/Eng - P-8
GSTALDER, IAN Staff Sci/Eng - P-8
MCQUAID, BRANDON Staff Sci/Eng - P-8
DEL VAL, LUIS Staff Sci/Eng - P-8
SPENGLER, JUSTIN Staff Sci/Eng - P-8
MATHER, WILLIAM Staff Sci/Eng - P-8
MORGAN, TORI Staff Sci/Eng - P-8
MCADAM, ALEXANDRIA Staff Sci/Eng - P-8
IVERS, MATTHEW Staff Sci/Eng - P-8
KUHN, PAUL Staff Sci/Eng - P-8
MORALES, ANTHONY Staff Sci/Eng - P-8
BROWN, SANDRA Project Sci/Eng - P-9
SHPORTUN, ALICE Staff Sci/Eng - P-8
STRAYER, ALICIA Staff Sci/Eng - P-8
0 0
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
&"Times New Roman,Regular"&12LEVEL OF EFFORT/EXPENSE WORKSHEET
Page &P
Subtask 5
SITE : Prestige Cleaners
SUBTASK 5: 0
DATE: 5/16/22
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
GOIST, TIMOTHY Program Leader – X-14
POWELL, BRENDA Program Leader – X-14
BLAIR, STEPHEN Program Leader – X-14
MILLER, DONALD Program Leader – X-14
PAUL, JEFFERY Program Leader – X-14
PHELPS, MICHAEL Practice Leader - X-13
WAGNER, ANDREAS Practice Leader - X-13
RICKER, JOSEPH Practice Leader - X-13
WOJCIK, ROBERT Practice Leader - X-13
BROWN, JESSE Practice Leader - X-13
KELSO, PERRY Senior Consultant - X-12
ACKERLUND, STEVEN Senior Consultant - X-12
GRIGG, DON Senior Consultant - X-12
CROOK, MARTIN Senior Consultant - X-12
HARTER, ERICK Senior Consultant - X-12
ZAGAGI, YANIV Senior Consultant - X-12
LONG, RYAN Senior Consultant - X-12
HOLCOMB, BLAKE Senior Consultant - X-12
BENNETT, ROSS Senior Consultant - X-12
CREWS, MATTHEW Senior Consultant - X-12
BONES, ADELMARIE Senior Sci/Eng - X-11
BAKER, JEFF Senior Sci/Eng - X-11
MOORE, KENNETH Senior Sci/Eng - X-11
FALLON, MICHAEL Senior Sci/Eng - X-11
CRESCI, CHRISTOPHER Senior Sci/Eng - X-11
MONGILLO, RALPH Senior Sci/Eng - X-11
REAT, VICKIE Senior Sci/Eng - X-11
HAMPTON, MATTHEW Senior Sci/Eng - X-11
HESS, KRISTI Senior Sci/Eng - X-11
FERRIS, EVERETT Senior Sci/Eng - X-11
KRAJEWSKI, KEVIN Project Sci/Eng - P-9
MCDANIELS, DAVID Project Sci/Eng - P-9
BROOKS, HERSIE Project Sci/Eng - P-9
BURTON, DONALD Staff Sci/Eng - P-8
HUBER, WILLIAM Senior Project Sci/Eng - P-10
SULLIVAN, COLLEEN Senior Project Sci/Eng - P-10
CHAK, SARAH Senior Project Sci/Eng - P-10
COOK, AMY Senior Project Sci/Eng - P-10
DILLON, TIMOTHY Senior Project Sci/Eng - P-10
ANDERS, JAMES Senior Project Sci/Eng - P-10
THOMAS, JAMES Senior Project Sci/Eng - P-10
TEMPLE, NIGEL Senior Project Sci/Eng - P-10
CROCKETT, KRIS Senior Project Sci/Eng - P-10
MORELLI, GENE Senior Project Sci/Eng - P-10
BENDER, ERIC Senior Project Sci/Eng - P-10
GUNDERSON, KATHY Senior Project Sci/Eng - P-10
WILLIAMS, TAYLOR Project Sci/Eng - P-9
LUCERO, BENJAMIN Project Sci/Eng - P-9
DIEMER, JEFFREY Project Sci/Eng - P-9
CHAPPELL, LOGAN Project Sci/Eng - P-9
SMYTH, SHAWN Project Sci/Eng - P-9
MURAK, ANDREW Project Sci/Eng - P-9
GUEST, TAYLOR Project Sci/Eng - P-9
HUANG, YUHAO Project Sci/Eng - P-9
EWINKSKI, RONALD Project Sci/Eng - P-9
SLABAUGH, TAYLOR Project Sci/Eng - P-9
CORTEZ, NICOLE Project Sci/Eng - P-9
NEAL, SCOTT Project Sci/Eng - P-9
OIEN, ERIK Project Sci/Eng - P-9
CARROLL, DECLAN Project Sci/Eng - P-9
SIDER, STEPHEN Project Sci/Eng - P-9
FRALEY, THEAR Project Sci/Eng - P-9
COOPER, CAITLYN Project Sci/Eng - P-9
SWINDLE, LUCAS Staff Sci/Eng - P-8
GSTALDER, IAN Staff Sci/Eng - P-8
MCQUAID, BRANDON Staff Sci/Eng - P-8
DEL VAL, LUIS Staff Sci/Eng - P-8
SPENGLER, JUSTIN Staff Sci/Eng - P-8
MATHER, WILLIAM Staff Sci/Eng - P-8
MORGAN, TORI Staff Sci/Eng - P-8
MCADAM, ALEXANDRIA Staff Sci/Eng - P-8
IVERS, MATTHEW Staff Sci/Eng - P-8
KUHN, PAUL Staff Sci/Eng - P-8
MORALES, ANTHONY Staff Sci/Eng - P-8
BROWN, SANDRA Project Sci/Eng - P-9
SHPORTUN, ALICE Staff Sci/Eng - P-8
STRAYER, ALICIA Staff Sci/Eng - P-8
0 0
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
&"Times New Roman,Regular"&12LEVEL OF EFFORT/EXPENSE WORKSHEET
Page &P
Subtask 6
SITE : Prestige Cleaners
SUBTASK 6: 0
DATE: 5/16/22
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
GOIST, TIMOTHY Program Leader – X-14
POWELL, BRENDA Program Leader – X-14
BLAIR, STEPHEN Program Leader – X-14
MILLER, DONALD Program Leader – X-14
PAUL, JEFFERY Program Leader – X-14
PHELPS, MICHAEL Practice Leader - X-13
WAGNER, ANDREAS Practice Leader - X-13
RICKER, JOSEPH Practice Leader - X-13
WOJCIK, ROBERT Practice Leader - X-13
BROWN, JESSE Practice Leader - X-13
KELSO, PERRY Senior Consultant - X-12
ACKERLUND, STEVEN Senior Consultant - X-12
GRIGG, DON Senior Consultant - X-12
CROOK, MARTIN Senior Consultant - X-12
HARTER, ERICK Senior Consultant - X-12
ZAGAGI, YANIV Senior Consultant - X-12
LONG, RYAN Senior Consultant - X-12
HOLCOMB, BLAKE Senior Consultant - X-12
BENNETT, ROSS Senior Consultant - X-12
CREWS, MATTHEW Senior Consultant - X-12
BONES, ADELMARIE Senior Sci/Eng - X-11
BAKER, JEFF Senior Sci/Eng - X-11
MOORE, KENNETH Senior Sci/Eng - X-11
FALLON, MICHAEL Senior Sci/Eng - X-11
CRESCI, CHRISTOPHER Senior Sci/Eng - X-11
MONGILLO, RALPH Senior Sci/Eng - X-11
REAT, VICKIE Senior Sci/Eng - X-11
HAMPTON, MATTHEW Senior Sci/Eng - X-11
HESS, KRISTI Senior Sci/Eng - X-11
FERRIS, EVERETT Senior Sci/Eng - X-11
KRAJEWSKI, KEVIN Project Sci/Eng - P-9
MCDANIELS, DAVID Project Sci/Eng - P-9
BROOKS, HERSIE Project Sci/Eng - P-9
BURTON, DONALD Staff Sci/Eng - P-8
HUBER, WILLIAM Senior Project Sci/Eng - P-10
SULLIVAN, COLLEEN Senior Project Sci/Eng - P-10
CHAK, SARAH Senior Project Sci/Eng - P-10
COOK, AMY Senior Project Sci/Eng - P-10
DILLON, TIMOTHY Senior Project Sci/Eng - P-10
ANDERS, JAMES Senior Project Sci/Eng - P-10
THOMAS, JAMES Senior Project Sci/Eng - P-10
TEMPLE, NIGEL Senior Project Sci/Eng - P-10
CROCKETT, KRIS Senior Project Sci/Eng - P-10
MORELLI, GENE Senior Project Sci/Eng - P-10
BENDER, ERIC Senior Project Sci/Eng - P-10
GUNDERSON, KATHY Senior Project Sci/Eng - P-10
WILLIAMS, TAYLOR Project Sci/Eng - P-9
LUCERO, BENJAMIN Project Sci/Eng - P-9
DIEMER, JEFFREY Project Sci/Eng - P-9
CHAPPELL, LOGAN Project Sci/Eng - P-9
SMYTH, SHAWN Project Sci/Eng - P-9
MURAK, ANDREW Project Sci/Eng - P-9
GUEST, TAYLOR Project Sci/Eng - P-9
HUANG, YUHAO Project Sci/Eng - P-9
EWINKSKI, RONALD Project Sci/Eng - P-9
SLABAUGH, TAYLOR Project Sci/Eng - P-9
CORTEZ, NICOLE Project Sci/Eng - P-9
NEAL, SCOTT Project Sci/Eng - P-9
OIEN, ERIK Project Sci/Eng - P-9
CARROLL, DECLAN Project Sci/Eng - P-9
SIDER, STEPHEN Project Sci/Eng - P-9
FRALEY, THEAR Project Sci/Eng - P-9
COOPER, CAITLYN Project Sci/Eng - P-9
SWINDLE, LUCAS Staff Sci/Eng - P-8
GSTALDER, IAN Staff Sci/Eng - P-8
MCQUAID, BRANDON Staff Sci/Eng - P-8
DEL VAL, LUIS Staff Sci/Eng - P-8
SPENGLER, JUSTIN Staff Sci/Eng - P-8
MATHER, WILLIAM Staff Sci/Eng - P-8
MORGAN, TORI Staff Sci/Eng - P-8
MCADAM, ALEXANDRIA Staff Sci/Eng - P-8
IVERS, MATTHEW Staff Sci/Eng - P-8
KUHN, PAUL Staff Sci/Eng - P-8
MORALES, ANTHONY Staff Sci/Eng - P-8
BROWN, SANDRA Project Sci/Eng - P-9
SHPORTUN, ALICE Staff Sci/Eng - P-8
STRAYER, ALICIA Staff Sci/Eng - P-8
0 0
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
&"Times New Roman,Regular"&12LEVEL OF EFFORT/EXPENSE WORKSHEET
Page &P
Subtask 7
SITE : Prestige Cleaners
SUBTASK 7 0
DATE: 5/16/22
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
GOIST, TIMOTHY Program Leader – X-14
POWELL, BRENDA Program Leader – X-14
BLAIR, STEPHEN Program Leader – X-14
MILLER, DONALD Program Leader – X-14
PAUL, JEFFERY Program Leader – X-14
PHELPS, MICHAEL Practice Leader - X-13
WAGNER, ANDREAS Practice Leader - X-13
RICKER, JOSEPH Practice Leader - X-13
WOJCIK, ROBERT Practice Leader - X-13
BROWN, JESSE Practice Leader - X-13
KELSO, PERRY Senior Consultant - X-12
ACKERLUND, STEVEN Senior Consultant - X-12
GRIGG, DON Senior Consultant - X-12
CROOK, MARTIN Senior Consultant - X-12
HARTER, ERICK Senior Consultant - X-12
ZAGAGI, YANIV Senior Consultant - X-12
LONG, RYAN Senior Consultant - X-12
HOLCOMB, BLAKE Senior Consultant - X-12
BENNETT, ROSS Senior Consultant - X-12
CREWS, MATTHEW Senior Consultant - X-12
BONES, ADELMARIE Senior Sci/Eng - X-11
BAKER, JEFF Senior Sci/Eng - X-11
MOORE, KENNETH Senior Sci/Eng - X-11
FALLON, MICHAEL Senior Sci/Eng - X-11
CRESCI, CHRISTOPHER Senior Sci/Eng - X-11
MONGILLO, RALPH Senior Sci/Eng - X-11
REAT, VICKIE Senior Sci/Eng - X-11
HAMPTON, MATTHEW Senior Sci/Eng - X-11
HESS, KRISTI Senior Sci/Eng - X-11
FERRIS, EVERETT Senior Sci/Eng - X-11
KRAJEWSKI, KEVIN Project Sci/Eng - P-9
MCDANIELS, DAVID Project Sci/Eng - P-9
BROOKS, HERSIE Project Sci/Eng - P-9
BURTON, DONALD Staff Sci/Eng - P-8
HUBER, WILLIAM Senior Project Sci/Eng - P-10
SULLIVAN, COLLEEN Senior Project Sci/Eng - P-10
CHAK, SARAH Senior Project Sci/Eng - P-10
COOK, AMY Senior Project Sci/Eng - P-10
DILLON, TIMOTHY Senior Project Sci/Eng - P-10
ANDERS, JAMES Senior Project Sci/Eng - P-10
THOMAS, JAMES Senior Project Sci/Eng - P-10
TEMPLE, NIGEL Senior Project Sci/Eng - P-10
CROCKETT, KRIS Senior Project Sci/Eng - P-10
MORELLI, GENE Senior Project Sci/Eng - P-10
BENDER, ERIC Senior Project Sci/Eng - P-10
GUNDERSON, KATHY Senior Project Sci/Eng - P-10
WILLIAMS, TAYLOR Project Sci/Eng - P-9
LUCERO, BENJAMIN Project Sci/Eng - P-9
DIEMER, JEFFREY Project Sci/Eng - P-9
CHAPPELL, LOGAN Project Sci/Eng - P-9
SMYTH, SHAWN Project Sci/Eng - P-9
MURAK, ANDREW Project Sci/Eng - P-9
GUEST, TAYLOR Project Sci/Eng - P-9
HUANG, YUHAO Project Sci/Eng - P-9
EWINKSKI, RONALD Project Sci/Eng - P-9
SLABAUGH, TAYLOR Project Sci/Eng - P-9
CORTEZ, NICOLE Project Sci/Eng - P-9
NEAL, SCOTT Project Sci/Eng - P-9
OIEN, ERIK Project Sci/Eng - P-9
CARROLL, DECLAN Project Sci/Eng - P-9
SIDER, STEPHEN Project Sci/Eng - P-9
FRALEY, THEAR Project Sci/Eng - P-9
COOPER, CAITLYN Project Sci/Eng - P-9
SWINDLE, LUCAS Staff Sci/Eng - P-8
GSTALDER, IAN Staff Sci/Eng - P-8
MCQUAID, BRANDON Staff Sci/Eng - P-8
DEL VAL, LUIS Staff Sci/Eng - P-8
SPENGLER, JUSTIN Staff Sci/Eng - P-8
MATHER, WILLIAM Staff Sci/Eng - P-8
MORGAN, TORI Staff Sci/Eng - P-8
MCADAM, ALEXANDRIA Staff Sci/Eng - P-8
IVERS, MATTHEW Staff Sci/Eng - P-8
KUHN, PAUL Staff Sci/Eng - P-8
MORALES, ANTHONY Staff Sci/Eng - P-8
BROWN, SANDRA Project Sci/Eng - P-9
SHPORTUN, ALICE Staff Sci/Eng - P-8
STRAYER, ALICIA Staff Sci/Eng - P-8
0 0
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
&"Times New Roman,Regular"&12LEVEL OF EFFORT/EXPENSE WORKSHEET
Page &P
Subtask 8
SITE : Prestige Cleaners
SUBTASK 8: 0
DATE: 5/16/22
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
GOIST, TIMOTHY Program Leader – X-14
POWELL, BRENDA Program Leader – X-14
BLAIR, STEPHEN Program Leader – X-14
MILLER, DONALD Program…