This is a Task Assignment (DC009C) issued under Contract HW685 by the State of Florida Department of Environmental Protection (FDEP) to WSP USA Inc. for well installation activities at the Lake Lucina Shopping Center site located at 6054 Merrill Road in Jacksonville, Duval County, Florida. The project is identified as ERIC_4610 and was authorized on April 2, 2024, with a completion date of January 10, 2025. The contract involves coordination between FDEP (represented by Project Manager Patrick McGrane) and WSP USA Inc. (represented by Project Manager Matt Crews).
WSP is authorized to install 21 injection wells, 5 shallow groundwater monitoring wells, 5 intermediate groundwater monitoring wells, and 2 deep groundwater monitoring wells, all in accordance with the March 21, 2024 Scope of Work, Cost Estimate, and Bid Documentation. The total contract value is $172,449.93, with invoicing structured across five subtasks: Project Management ($6,754.33), Site Access and Utility Location ($3,056.91), Well Installation Activities ($144,860.23), Investigation-Derived Waste Transportation and Disposal ($13,019.27), and Reporting ($4,759.19). Field deliverables include submission of utility location reports, well construction logs, survey data, field documentation, waste characterization results, and a final Well Installation Completion Report. Work is scheduled to begin in April 2024, with phased deliverables due between May and September 2024, and project completion anticipated for October 25, 2024.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O.
Object Code
Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department
Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature)
Date:
Additional signatures attached on separate page.
HW685
DC009C January 10, 2025
This Task Assignment authorizes WSP to install 21 injection wells, five shallow wells, five intermediate wells, and two deep wells at the Lake Lucina Shopping Center site. All work is to be performed in accordance with the March 21, 2024, Scope of Work, Cost Estimate, and Bid Documentation.
Patrick McGrane 850-245-8899 WSP USA Inc.
Matt Crews 904-363-3430
ERIC_4610
6054 Merrill Road, Jacksonville, Duval County
Lake Lucina Shopping Center
$ 172,449.93
$ 172,449.93
Scope of Work
WSP USA Inc.
Matthew Crews
Environmental Engineer
4/2/2024
Crews, Matt (USMC700671) Digitally signed by Crews, Matt (USMC700671) Date: 2024.04.02 14:39:49 -04'00'
Teresa Booeshaghi
Teresa Booeshaghi Digitally signed by Teresa Booeshaghi Date: 2024.04.02 13:54:49 -04'00'
4/2/2024
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: Negotiation File Lake Lucina Shopping Center Jacksonville, Duval County
ERIC_4610
FROM: Patrick McGrane, Project Manager
SUBJECT: Negotiation Summary Task Assignment DC009C (HW685)
DATE: March 28, 2024
This Task Assignment authorizes WSP USA Inc. (WSP) to install injection, shallow, intermediate, and deep wells at the Lake Lucina Shopping Center site.
The total cost for this project is $172,449.93 with 439 total labor hours. All work is to be completed in accordance with the March 21, 2024, Scope of Work, Cost Estimate, and Bid Documentation.
WSP may invoice according to the included schedule.
Subtask 1:
Project Management is automatically calculated as a percentage of total labor in accordance with
Contract HW685.
Subtask 2:
Following confirmation of an up-to-date access agreement with the real property owner, WSP will contact
Sunshine State One Call to locate underground utilities. In the event that Sunshine State One Call cannot perform work on site, a private utility location company will be contacted to conduct the work.
Subtask 3:
WSP will install a variety of wells. The specifics of each well are included in the Scope of Work and in the included Figures (Figures 5, 6, 7, 8, and 11).
A summary of wells proposed are:
21 injection wells (IW) via DPT and hollow-stem auger rig.
o WSP has assumed all IWs will be installed to a depth of 20 feet below ground surface
(bgs).
Five shallow groundwater monitoring wells via DPT and hollow-stem auger rig.
o WSP has assumed all shallow groundwater monitoring wells will be installed to a total depth of 20 feet bgs.
Five intermediate groundwater monitoring wells via sonic well drilling.
o WSP has assumed all intermediate groundwater monitoring wells will be installed to a total depth of 38 feet bgs.
Two deep groundwater monitoring wells via sonic well drilling.
o WSP has assumed all deep groundwater monitoring wells will be installed to a total depth of 58 feet bgs.
Subtask 4:
IDW generated during well installation activities will be stored onsite in 55-gallon drums pending waste characterization and transport and disposal. WSP has estimated that 54 55-gallon drums will be required for the soil and liquids generated.
Subtask 5:
Following the completion of well installation activities, WSP will submit a Well Installation Completion
Report.
Baseline sampling and injections will be proposed in a separate Task Assignment.
F D
E P
C O
S T
E S
T
IM
A T
E C o n tr a ct o r:
W S
P U
S A
I n c.
D a te
/2
/2
T a sk
C
B
S u b T a sk
P ro je ct M a n a g e m e n t S u b
T a sk
S ite u b T a sk
S ite A cc e ss a n d
U til ity L o ca tio n
S u b T a sk
A ct iv ity
/P h a se
A ss e ss m e n t
S u b T a sk
W e ll
In st a lla tio n
A ct iv iti e s
S u b T a sk
P ro je ct
M a n a g e
P a tr ic k M cG ra n b
T a sk
ID
W
T ra n sp o rt a tio n
D is p o sa l
S u b T a sk
S u b T a sk
R e p o rt in g
S u b T a sk
T o ta ls
L a b o r R a te
C a te g o ry
.3
P ro je c t
M a n a g e r (R
D M
.5
.0
P ro g ra m L e a d e r
X -1
.3
P ra ct ic e
L e a d e r
X
-1
R
D M
.9
S e n io r
C o n su lta n t
X -1
M C
C
.0
S e n io r S ci /E n g
X
-1
.0
S e n io r
P ro je ct
S ci
/E n g
P -1
B L
.6
S e n io r
P ro je ct
S ci
/E n g
P -1
S S
.0
P ro je ct
S ci
/E n g
P -9
.0
P ro je ct
S ci
/E n g
P -9
.0
S ta ff S ci /E n g
P
-8
.9
S ta ff
S ci
/E n g
P -8
A
S
.5
S ta ff
S ci
/E n g
P -8
JW
.0
S ci /E n g
/A d m in
P
-7
L K
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
T o ta l
H o u rs
.5
.0
.0
.0
.0
D ir e ct
L a b o r
,5
.5
,2
.3
.9
,0
.2
.3
,5
.7
.0
.0
.0
.0
.0
O ve rh e a d
.5
,7
.8
,8
.9
.5
,9
.1
.3
,7
.8
.0
.0
.0
.0
.0
G e n
A d m in
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
F ri n g e
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
T o ta l
L a b o r
,3
.4
,1
.3
,1
.5
,0
.3
.7
,3
.5
.0
.0
.0
.0
.0
F o rm e r L a ke
L u ci n a D ry cl e a n e rs
R E V
C E F
G O L D E R
P a g
F
E P
C O
S T
E S
T
IM
A T
E C o n tr a ct o
W
P U
S A
I n c.
D a te
/2
/2
T a sk
C
B
S u b T a sk
P ro je ct M a n a g e m e n t S u b
T a sk
S ite b T a sk
S ite A cc e ss a n d
U til ity L o ca tio n
S u b T a sk
A ct iv ity
/P h a se ss e ss m e n t
S u b T a sk
W e ll
In st a lla tio n
A ct iv iti e s
S u b T a sk
P ro je ct
M a n a g a tr ic k M cG ra b
T a sk
ID
W
T ra n sp o rt a tio n
D is p o sa l
S u b T a sk
S u b T a sk
R e p o rt in g
S u b T a sk
T o ta ls
F o rm e r L a ke
L u ci n a D ry cl e a n e rs
T ra ve l
V e h ic le R e n ta l
,8
.0
.0
,6
.0
.0
.0
.0
.0
.0
.0
.0
M ile a g e C o st s
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
A ir
F a re
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
P e r d ie m
H o te l
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
T o ta l T ra ve l
,8
.0
.0
,6
.0
.0
.0
.0
.0
.0
.0
.0
S u b c o n tr a c to r (E q u ip m e n t P ro c u re m e t)
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
S u b co n tr a ct o r
S u b to ta l
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
P ro cu re m e n t
F e e
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
T o ta l
S u b c o n tr a c to r C o s t
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
S u b c o n tr a c to r (S e rv ic e s P ro c u re m e t) ri lli n g
C o n ve n tio n a l)
,3
.0
.0
,3
.0
.0
.0
.0
.0
.0
.0
.0
D ri lli n g
N o n -c o n ve n tio n a l)
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
M o b ile
L a b o ra to ry
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
S u rv e yi n g
,9
.0
.0
,9
.0
.0
.0
.0
.0
.0
.0
.0
ID
W
,5
.0
.0
.0
,5
.0
.0
.0
.0
.0
.0
.0
U til iti e s
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
U til ity L o ca tio n
,5
.0
,5
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
S u b co n tr a ct o r
S u b to ta l
,3
.0
,5
.0
,3
.0
,5
.0
.0
.0
.0
.0
.0
.0
H a n d lin g
F e e
,9
.1
.0
,7
.1
,0
.0
.0
.0
.0
.0
.0
.0
T o ta l
S u b c o n tr a c to r C o s t
,3
.1
,6
.0
,1
.1
,5
.0
.0
.0
.0
.0
.0
.0
L a b o ra to ry a ly tic a l C o st s
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
F a st T u rn a ro u n d C h a rg e s
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
S a m p le S h ip p in g
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
T o ta l
L a b o ra to ry
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
F ie ld E x p e n s s rs o n a l P ro te ct io n
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
E xp e n d a b le s
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
E q u ip m e n t
(D ri lli n g r e la te d
,9
.0
.0
,9
.0
.0
.0
.0
.0
.0
.0
.0
E q u ip m e n t
(A n a ly tic a l r e la te d
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
E q u ip m e n t
(I D
W r e la te d
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
E q u ip m e n t
(O th e r)
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
T o ta l
F ie ld E x p e n s e s
,9
.0
.0
,9
.0
.0
.0
.0
.0
.0
.0
.0
S u b to ta l
,1
.5
,1
.3
,9
.5
,7
.4
,9
.7
,3
.5
.0
.0
.0
.0
.0
C o m p le ti o n
F e e
,3
.3
.0
.3
,1
.7
.5
.6
.0
.0
.0
.0
.0
T o ta l
E s ti m a te d C o s t
,4
.9
,7
.3
,0
.9
,8
.2
,0
.2
,7
.1
.0
.0
.0
.0
.0
R E V
C E F
G O L D E R
P a g
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Former Lake Lucina Drycleaners SUBTASK 2: Site Access and Utility Location
DATE: 3/21/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Practice Lead (R. McCann) 6
TOTAL LABOR 6
VEHICLE TYPE RATE UNIT USEAGE
Truck $120.00 Per Day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
GeoTek Services Utility Location $1,500.00 1 $1,500.00
TOTAL $1,500.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$40.00 Per Day 1 $40.00
TOTAL EQUIPMENT $40.00
Verification of property ownership and viable Permission to Enter Property form prior to mobilization (1 hour). Round trip travel; mark proposed well locations for utility location subcontractor; submit utility location report via e-mail deliverable (5 hours).
Miscellaneous Expendables
FINAL --7/24/96
SUBTASK 3: Well Installation Activities
DATE: 3/21/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Practice Lead (R. McCann) 34
Senior Consultant (M. Crews) 4
Senior Project Sci/Eng (S. Sider) 154
Staff Sci/Eng (J. Whipple) 154
Staff Sci/Eng (J. Whipple) 16
TOTAL LABOR 362
VEHICLE TYPE RATE UNIT USEAGE
Truck - Well Installation $480.00 Per Week 3 $1,440.00 Truck - Survey $120.00 Per Day 2 $240.00
TOTAL VEHICLE $1,680.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST NOTES USAGE
Groundwater Protection DPT-HSA Drilling $49,520.00 (21 IWs + 5 SH MWs) 1 $49,520.00
Groundwater Protection Sonic Drilling $25,832.00 (5 INT MWs + 2 Deep MWs) 1 $25,832.00
SurvTech Surveying $9,995.00 1 $9,995.00
TOTAL $85,347.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$40.00 Per Day 17 $680.00
$1,300.00 Per Week 3 $3,900.00
$90.00 Package of 10 2 $180.00
$90.00 Package of 10 2 $180.00
TOTAL EQUIPMENT $4,940.00
Vinyl chloride detector tubes
PCE detector tubes (high range)
Prepare Health and Safety Plan (2 hours). Project kick-off meeting (4 hours). Site visits during well installation activities, including round-trip travel (4 hours per visit x 5 visits = 20 hours). Prepare and submit Field Deliverable summarizing well installation activities (8 hours).
Monitor Well Installation Kit
Project kick-off meeting (4 hours).
Well Installation Activities: Field event preparation (4 hours). Injection Well installations (21 total) and shallow monitoring well installations (5 total) - (10 days x 10 hrs/day = 100 hours).
Intermediate monitoring well installations (5 total) and deep monitoring well installations (2 total) - (5 days x 10 hrs/day = 50 hrs).
Survey: Oversee completion of professional survey crew during surveying activities (8 hrs/day x 2 days = 16 hrs).
Well Installation Activities: Field event preparation (4 hours). Injection Well installations (21 total) and shallow monitoring well installations (5 total) - (10 days x 10 hrs/day = 100 hours).
Intermediate monitoring well installations (5 total) and deep monitoring well installations (2 total) - (5 days x 10 hrs/day = 50 hrs).
Miscellaneous Expendables
SUBTASK 4: IDW Transportation & Disposal
DATE: 3/21/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Practice Lead (R. McCann) 4
TOTAL LABOR 4
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE RATE COSTING UNIT USEAGE
Erwin Remediation IDW T&D (DPT-HSA) $195.00 (35 Soil + 10 Water) 45 $8,775.00 Erwin Remediation IDW T&D (Sonic) $195.00 (6 Soil + 3 Water) 9 $1,755.00
TOTAL $10,530.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
IDW
TCLP Metals Soil Drums $135.00 1 $135.00 TCLP VOCs Soil Drums $210.00 1 $210.00 PID/Hall Series Liquids Drums $110.00 1 $110.00
Sample Shipping Large $150.00 1 $150.00
TOTAL LAB $605.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
Prepare waste profile for IDW and email deliverable with non-hazardous waste manifest.
(4 hours).
SUBTASK 5: Reporting
DATE: 3/21/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Practice Lead (R. McCann) 4
Senior Project Sci/Eng (S. Sider) 24
Senior Project Sci/Eng (B. Lucero) 4
Staff Sci/Eng (A. Strayer) 2
TOTAL LABOR 34
VEHICLE TYPE RATE UNIT USEAGE
TOTAL EQUIPMENT $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL VEHICLE $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL $0.00
Prepare final Well Installation Completion Report.
Update site data tables with new well construction information; prepare draft Well Installation Completion Report.
Prepare Report figures.
Document production, Create PDF for OCULUS.
WSP USA Inc.
9428 Baymeadows Road, Suite 400, Jacksonville, FL 32256 USA
T: +1 904 363-3430 +1 904 363 3445 wsp.com
March 21, 2024 Proposal No. 2024US200848
Mr. Patrick McGrane
Florida Department of Environmental Protection
2600 Blair Stone Road, MS 4520
Tallahassee, FL 32399-2400
RE: COST PROPOSAL FOR WELL INSTALLATION ACTIVITIES
FORMER LAKE LUCINA DRYCLEANERS
JACKSONVILLE, DUVAL COUNTY, FLORIDA
DEP FACILITY ID NUMBER: ERIC_4610
PROPOSED TASK ASSIGNMENT: DC009C
Dear Mr. McGrane:
WSP USA Inc. (WSP) is pleased to provide the Florida Department of Environmental Protection (DEP) with this cost proposal for completing additional groundwater assessment by installing additional wells in shallow, intermediate, and deep zones of the surficial aquifer, as well as installing additional shallow injection wells at the above-referenced site. This proposal includes a description of the proposed scope of services, level of effort spreadsheets, and a cost estimate form that summarizes the costs of the proposed services. The proposed scope of services is described below.
RECENT SITE HISTORY
During May and June 2023, WSP completed supplemental site assessment activities, including collecting soil vapor samples from existing vapor extraction wells, vadose zone soil samples from nine boring locations, and groundwater samples for vertical profiling. The assessment was also completed at five boring locations using a Membrane
Interface Probe with Hydraulic Profiling Tool System to evaluate chlorinated volatile organic compound (VOC) contaminant distribution, site lithology, and aquifer hydraulic conductivity to support refining groundwater remediation strategies. The primary areas of concern have been the southern portion inside of the building of the tenant space, where the dry cleaner formerly operated, the asphalt-paved alley behind that tenant space area, and adjacent to monitoring well MW021 northwest of the tenant space.
The results of the investigation, provided in the WSP Site Assessment Report dated October 2023, indicated the following:
Based on the reported tetrachloroethene (PCE) concentrations in the soil vapor samples collected from the 14 soil vapor extraction well locations having VOC concentrations higher than 1.0 milligram per cubic meter, there appeared to be residual drycleaning solvent source material present in the vicinity of the former drycleaning
Mr. Patrick McGrane Proposal No. 2024US200848
Florida Department of Environmental Protection March 21, 2024 machines and behind the building, since soil vapor extraction system operation was discontinued in April 2019 due to low mass removal. In addition, six out of 45 soil samples exceeded the Soil Cleanup Target Level (SCTL) for leachability, based on groundwater criteria, for PCE, with four out of the six samples analyzed by the Synthetic
Precipitate Leaching Procedure (SPLP) exceeding the groundwater cleanup target level (GCTL) for PCE. There is a possibility that the source of the increase in soil vapor VOCs resulted from off-gassing by the PCE-impacted saturated mass of contamination in the brown slightly silty, hardpan located beneath the southern portion of the building and paved area behind the building at approximately 12 to 20 feet below ground surface (bgs).
Based on the vertical groundwater profiling results, PCE concentrations exceeding 1,000 micrograms per liter (µg/L) were in the shallow zone between 10 to 20 feet bgs at DPT locations DPT002 through DPT009 (south side of the tenant space). The highest PCE concentrations were observed in the 11 to 15 feet bgs depth interval (200,000 µg/L) and the 16 to 20 feet bgs depth interval (170,000 µg/L) at location DPT003, which was located in the asphalt-paved alley south of the former drycleaning machine location. The vertical groundwater profile results at DPT005, located next to MW020, exceeded the Natural Attenuation Default Concentration (NADC) for PCE in each of the samples to a depth of 65 feet bgs. Groundwater results for the DPT boring collected northwest of the tenant space (DPT001) indicated PCE concentrations exceeding the NADC to a depth of 22 feet bgs and exceeding the GCTL only at each depth interval to the boring termination depth of 62 feet bgs.
The results of the membrane interface probe (MIP) investigation indicated a zone with possible dense non-aqueous phase liquid in the vicinity of MIP003 (next to DPT003) and MIP005 (next to DPT005) and possibly beneath the floor slab of the building. The MIP results suggested dense non-aqueous phase liquid could be present to depths of approximately 10 to 20 feet bgs at the site. Based on the MIP results and review of existing groundwater data, WSP recommended that remedial actions should include another injection event in the source area beneath the slab of the building and south of the building in the shallow zone aquifer.
WSP also recommended the installation of additional shallow, intermediate, and deep zone monitoring wells to complete the delineation of chlorinated VOCs associated with the site, as well as installing additional shallow injection wells. The DEP approved of the proposed monitoring well and injection well locations via e-mail on
December 21, 2023.
SUBTASK 1 PROJECT MANAGEMENT
To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with the DEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with DEP Waste Site Cleanup Section requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the DEP-approved task assignment.
SUBTASK 2 SITE ACCESS AND UTILITY LOCATION
Following authorization to proceed, WSP will verify that the current property owner has an executed Permission to Enter Property agreement with the DEP. WSP will coordinate with the real property owner and tenant for access to complete the scope of work. WSP will obtain the applicable local, county, and state-required permits before implementing the proposed scope of work. The location of underground utilities will be identified and marked. Sunshine State One Call, a utility location service provider, will be contacted at least three working days (72 hours) before any subsurface work begins. Given that work will be conducted on private property, Sunshine State One Call might not be able to provide details regarding specific utilities across the entire property. Therefore, WSP will use a private utility location company to locate and map shallow subsurface anomalies present within the investigation areas.
Upon completion of Subtask 2, WSP will submit an e-mail deliverable, which will include field documentation and a copy of the utility location report.
SUBTASK 3 WELL INSTALLATION ACTIVITIES
Injection Wells
WSP will supervise the installation of 21 injection wells by a Florida-licensed drilling subcontractor. Well construction will be consistent with FDEP and St. Johns River Water Management District well construction criteria. The drilling contractor will be responsible for decontaminating the drilling rods, hand augers, and other relevant equipment before arrival at the site and after each well is installed. Up to 14 of the injection wells will be installed both north and south of the current building in asphalt paved areas. The remaining seven injection wells will be installed inside the former dry cleaner building near the footprint of the former dry-cleaning machine. For cost-estimating purposes, WSP has assumed that baseline groundwater sampling and subsequent injection events will be tasked separately.
The proposed locations are shown on Figure 11.
The injection wells will be installed using a combination of direct-push technology (DPT) and a hollow-stem auger rig. Entry space for a track-mounted rig will be provided by the property owner. The exhaust from the drilling rig will be conveyed outside of the building. The well screens will consist of 12 feet of 2-inch diameter, Schedule 40, wire-wrapped well screen (0.010-inch slot size). The well risers will consist of a 2-inch diameter, Schedule 40 PVC.
The well risers will be connected to the screens using an appropriate length to reach the ground surface. The annular space between the borehole wall and the wire-wrapped well screen will be filled with a 20/30 grade silica sand filter pack to a level above the top of the well screen (minimum 2 feet above). A minimum 2-foot thick, fine
(30/65) grade silica sand seal will be placed above the sand filter pack, and the remainder of the annular space will be filled with a Portland Cement Type II grout seal. For cost estimating purposes, WSP has assumed the injection wells will be installed to a total depth of 20 feet bgs (i.e., screened from 8 to 20 feet bgs).
Injection wells installed in asphalt and concrete covered areas outside of the building will be completed at the surface with 8-inch diameter bolt-down steel covers inside flush-mounted 2-foot by 2-foot concrete pads, which will be sloped away from the wells to prevent surface water infiltration. Injection wells installed in concrete inside the former dry cleaner building will be completed at the surface with 8-inch diameter bolt-down steel covers completed flush with the concrete floor.
The well risers will be capped with water-tight expandable locking plugs. To remove fine-grained particles in the filter pack and those adhered to the borehole walls, and to establish a good hydraulic connection with the aquifer, the newly installed wells will be developed until the purged water remains visibly clear and free of suspended particulate matter.
Shallow Zone Groundwater Monitoring Wells
WSP will supervise the installation of five shallow groundwater monitoring wells by a Florida-licensed drilling subcontractor. Four of the shallow wells will be installed south of the building (downgradient) to further delineate impacts to shallow groundwater and fill data gaps. One of the proposed shallow well locations is inside of the current building near the location of the former drycleaning machine. The wells will be installed using a combination of DPT and hollow-stem auger rig. Entry space for a track-mounted rig will be provided by the property owner. The exhaust from the drilling rig will be conveyed outside of the building. The well screens will consist of 10 feet of 2-inch diameter, Schedule 40, well screen (0.010-inch machine slot size). The well risers will consist of 2-inch diameter, Schedule 40 PVC connected to the screens with flush-threaded joints, using an appropriate length to reach the ground surface. The annular spaces between the borehole walls and the well screens will be filled with a
20/30 grade silica sand filter pack to approximately one foot above the tops of the well screens. A minimum one-foot thick, fine (30/65) grade silica sand seal will be placed above the sand filter pack, and the remainder of the annular spaces will be filled with a Portland Cement Type II grout seal. For cost estimating purposes, WSP has assumed the shallow monitoring wells will be installed to a total depth of 20 feet bgs (i.e., screened from 10 to
20 feet bgs). The proposed locations are shown on Figures 5 and 6.
Monitoring wells installed in asphalt and concrete covered areas outside of the building will be completed at the surface with 8-inch diameter bolt-down steel covers inside flush-mounted 2-foot by 2-foot concrete pads which will be sloped away from the wells to prevent surface water infiltration. The one monitoring well installed in concrete inside the former dry suite will be completed at the surface with an 8-inch diameter bolt-down steel cover completed flush with the concrete floor.
The well risers will be capped with water-tight expandable locking plugs. To remove fine-grained particles in the filter pack and those adhered to the borehole walls, and to establish a good hydraulic connection with the aquifer, the newly installed wells will be developed until the purged water remains visibly clear and free of suspended particulate matter.
Intermediate Zone Groundwater Monitoring Wells
WSP will supervise the installation of five intermediate groundwater monitoring wells by a Florida-licensed drilling subcontractor. The intermediate zone wells will be installed using sonic well drilling technology to reduce drilling time on site and investigation-derived waste (IDW). The proposed well screens will consist of 5 feet of 2-inch diameter, Schedule 40, well screen (0.010-inch machine slot size). The well risers will consist of 2-inch diameter, Schedule 40 PVC connected to the screens with flush-threaded joints, using an appropriate length to reach the ground surface. The annular spaces between the borehole walls and the well screens will be filled with a
20/30 grade silica sand filter pack to approximately 2 feet above the top of the well screens. A minimum two-foot thick, fine (30/65) grade silica sand seal will be placed above the sand filter pack, and the remainder of the annular spaces will be filled with a Portland Cement Type II grout seal. For cost estimating purposes, WSP has assumed the intermediate zone monitoring wells will be installed to total depths of approximately 38 feet bgs (i.e., screened from 33 to 38 feet bgs). Well completion will be similar to that described above for the shallow zone monitoring wells. The proposed locations are shown on Figure 7.
Deep Zone Groundwater Monitoring Wells
WSP will supervise the installation of two deep groundwater monitoring wells by a Florida-licensed drilling subcontractor. The deep wells will be installed in a similar manner to the intermediate wells (see above). For cost estimating purposes, WSP has assumed the deep monitoring wells will be installed to a total depth of 58 feet bgs
(i.e., screened from 53 to 58 feet bgs). Well completion will be similar to that described above for the shallow zone monitoring wells. The proposed locations are shown on Figure 8.
Air Monitoring
During indoor well installation activities, the drilling subcontractor will set up industrial fans at each of the doors to increase ventilation within the work area. Ambient and breathing zone air conditions will be monitored for potentially hazardous chemicals generated by the indoor well installation activities. The building interior and exterior (outside of the building and at the property boundary) will be monitored for VOC concentrations. The building interior will also be monitored for carbon monoxide (CO) concentrations. Carbon monoxide could accumulate in the building interior due to the use of drilling equipment. A four-gas meter will be used to measure CO concentrations. A photo-ionization detector will measure VOC concentrations. Action levels will be 25 parts per million (ppm) for CO and 1 ppm for VOCs. At VOC concentrations above 1 ppm, colorimetric detector tubes will be used to measure concentrations of vinyl chloride. Personal protective equipment may be upgraded based on the vinyl chloride results.
In addition, WSP will continuously monitor for percent oxygen and combustible gases during well installation activities inside the building. The acceptable levels for these parameters will be when the oxygen percentages are between 19.5% and 23% and the combustible gas measurements are zero percent of the lower explosive limit.
Work will be stopped if conditions do not meet the air monitoring requirements until appropriate engineering controls have been instituted.
Surveying
Following the installation of the injection wells and monitoring wells, WSP will subcontract a Florida-licensed professional land surveyor to provide a survey of the monitoring well locations, including the top-of-well casing elevations (+/- 0.01 feet accuracy). The survey's final product will contain the following features:
The survey will be done in relation to the National Geodetic Vertical Datum (NGVD) of 1929 or the North
American Vertical Datum of 1988 (NAVD 88).
The horizontal datum will be in State Plane NAD83.
The operating units will be in feet.
The benchmark (monument) and vertical datum will be referenced.
Upon completion of Subtask 3, WSP will submit an e-mail deliverable, which will include copies of the field data sheets, monitoring well construction logs, well survey, and associated pictures.
SUBTASK 4 INVESTIGATION-DERIVED WASTE TRANSPORTATION AND DISPOSAL
WSP will containerize the soil and liquids generated during well installation activities in 55-gallon drums; label the waste as IDW; and secure the drums onsite to await waste characterization, profiling, and disposal acceptance.
WSP will collect a sample of the IDW soil and the IDW liquids for waste characterization purposes. WSP will submit one set of samples to a fixed-base laboratory. The IDW soil sample will be analyzed for the Resource Conservation and Recovery Act metals and a full list of VOCs using the Toxicity Characteristic Leaching Procedure. The IDW liquids sample will be analyzed for the full list of VOCs using EPA Method 8260.
For cost estimating purposes, WSP has assumed that 54 55-gallon drums of non-hazardous soil and liquids will be generated as IDW and will be transported and disposed of as non-hazardous waste at an approved facility. The
IDW generated during well installation activities will be disposed of in accordance with state and federal regulations.
Upon completion of Subtask 4, an e-mail deliverable will be submitted and include copies of waste transportation manifests and associated documentation.
SUBTASK 5 REPORTING
Following completion of the well installation activities, WSP will submit a Well Installation Completion Report. The report will include a description of the well installation procedures, field documentation, well construction logs, waste characterization, and disposal documentation, an updated site map showing the new injection well and monitoring well locations, laboratory analytical data, conclusions, and recommendations.
HEALTH AND SAFETY
WSP will update the existing site-specific Health and Safety Plan for the fieldwork. The work will be completed in accordance with WSP safety policies and procedures. At a minimum, WSP will wear safety glasses, high visibility safety vests, and steel-toed boots. A safety job briefing will be conducted before the start of work activities, and anytime the scope of work or site conditions change.
COST AND SCHEDULE
The estimated cost to complete the proposed scope of work is $172,449.93. WSP anticipates the field activities will take place in April/May 2024 or sooner depending on subcontractor availability. The level of effort/cost estimate form sheets are included in Attachment A. Subcontractor quotes including from the drilling, surveying, utility locating, and IDW waste handling subcontractors are included in Attachment B. The following table summarizes the proposed costs and deliverable schedule.
Task Proposed Cost Proposed Schedule/Deliverables
Subtask 1 Project Management $ 6,754.33 September 27, 2024
Subtask 2 Site Access and Utility Location
$ 3,056.91 April 19, 2024
Subtask 3 Well Installation Activities $ 144,860.23 June 21, 2024 (Field documentation and laboratory analytical report via E-mail)
Subtask 4 Investigation Derived Waste Transportation and Disposal
$ 13,019.27 July 12, 2024
(Non-hazardous waste manifest via E-mail)
Subtask 5 Reporting $ 4,759.19 August 16, 2024
(Well Installation Completion Report)
Total/Completion Date $172,449.93 October 25, 2024
WSP appreciates the opportunity to provide services under the Waste Site Cleanup Section. Should you require additional information or clarifications, please contact us at (904) 363-3430.
Respectfully, WSP USA Inc.
Richard D. "Rick" McCann, PG Matthew C. Crews, PE
Vice President, Geologist Assistant Vice President, Environmental Engineer
RDM/MCC/ams
Attachments: Figure 5 Groundwater Characterization in the Shallow Zone of the Surficial Aquifer NADC Treatment Area Figure 6 - Groundwater Characterization in the Shallow Zone of the Surficial Aquifer Figure 7 - Groundwater Characterization in the Intermediate Zone of the Surficial Aquifer Figure 8 - Groundwater Characterization in the Deep Zone of the Surficial Aquifer Figure 11 Proposed Injection Well Locations Attachment A Level of Effort Sheets and Cost Estimate Form Attachment B Subcontractor Quotes
G:\Projects\DEP-Drycleaning\Projects\Jax\Lake Lucina Shopping Center\HW685\DC009C - Well Installation Activities\Proposal\DC009C - Lake Lucina Well Installation Proposal.docx
SurvTech Solutions, Inc.
10220 U.S. Highway 92 East Phone: 813-621-4929 Tampa, Florida 33610 Fax: 813-621-7194 Web: www.survtechsolutions.com Email: Sales@survtechsolutions.com
Tuesday, March 5, 2024
Richard McCann
WSP USA INC.
9428 Baymeadows Road, Suite 400 Jacksonville, FL 32256
RE: Proposal for Services for Lake Lucina Cleaners PLS located at 6044 Merrill Rd, Jacksonville, FL, 32277-3427; Folio No.: N/A; Estimate No.: 240410; Project No.: N/A
Dear Richard;
SurvTech Solutions, Inc. is pleased to submit the following information for your consideration in selecting a firm to perform the necessary services, as noted above. We feel that you will find SurvTech Solutions, Inc. is well qualified to accomplish all services set forth in the request for proposal. Our outstanding staff of professional, technical, and support personnel has extensive and varied qualifications.
The lump-sum cost for the project will be $9,995.00, with an estimated time frame of 28 days from notice to proceed. Please see attached scope of work for a detailed breakdown of costs and services. If a quicker schedule is needed, please contact us, and we will try to accommodate your schedule.
If this proposal is acceptable, please sign the attached contract and send it to SurvTech Solutions via fax, email, or U.S. Mail. SurvTech cannot start said project without having a signed contract in place. If your firm wishes to use its own in-house contract or purchase order, then please forward them to SurvTech for review and signatures. SurvTech Solutions, Inc. appreciates this opportunity to submit this proposal for services. We look forward to serving WSP USA INC. on this project.
Respectfully submitted, SurvTech Solutions, Inc.
Florida Licensed Business No. 7340
Matthew S. Brooks PSM, LS, PLS V.P. of Contracts Management
Tampa, Florida 33610 Fax: 813-621-7194 Web: www.survtechsolutions.com Email: Sales@survtechsolutions.com
PROPOSAL 240410
Specific Purpose Survey per FDEP PLS Requirements
See Scope of Services Below
$9,995.00
TOTAL $9,995.00
Scope of Services
Standards of Practice:
1. All Surveying and Mapping will be performed per “The Florida Standards of Practice for Surveying and Mapping” and signed and sealed by a Florida Licensed Surveyor and Mapper.
Geodesy & Datums
1. Survey project data will be on the following coordinate system(s) and datum(s):
Horizontal datum (x, y; easting, northing)
SPC NAD1983, Florida East zone state plane coordinates
Vertical datum (z; elevation)
NAVD 1988 benchmark (North American Vertical Datum of 1988)
2. Units for the project shall be:
U.S. Survey Feet
FDEP Pre-Approval Specific Purpose Survey
1. The base map shall be prepared by a Professional Surveyor and Mapper (PSM). SurvTech shall deliver a signed and sealed map, electronic and paper copies. The electronic format shall be in its original updateable format (AutoCAD). The electronic copy shall be forwarded to the client (or contracted local program, as appropriate) so that it can be kept on file to be used by future Contractors to build upon as necessary (also see section 3.5.6 – Access to Public Records).
2. SurvTech shall establish a minimum of two (2) benchmarks on site.
3. This proposal does NOT include the potable well survey and the area use survey; these activities do not need to be performed by a PSM.
4. SurvTech shall coordinate with the client, if requested, so that the survey task can be coordinated with another on-site task, such as the “Area Survey.”
5. The scope of work for this survey is as follows [maps to be provided in both paper and electronic format (typically Auto CADD)]:
Tampa, Florida 33610 Fax: 813-621-7194 Web: www.survtechsolutions.com Email: Sales@survtechsolutions.com
a. Designation of North direction;
b. The scale of the drawing (the scale should be written and represented as a bar scale);
c. The date of the field survey;
d. The location of the property in relation to bordering roads and streets, neighboring properties and the locations of the property entrances from the roadway. Business names and street addresses of adjoining properties should be marked on the site plan;
e. Approximate property boundaries and right-of-ways;
f. Accurate dimensions and locations of the foundation outlines of any existing structures on the subject property, including buildings, pump islands, tank areas, UST vents, septic drain fields and treatment systems;
g. Accurate dimensions and locations of the foundation outlines of any existing structures that establish a reasonably continuous and uniform construction line, including any permanent walls or fences;
h. Accurate location and elevation of top-of-casing for any existing monitoring wells or compliance wells, including on-site wells and any off-site wells, as identified by the Contractor or FDEP, associated with the subject property (elevations will be referenced to a known published datum.)
i. Location and type of all surface cover materials, including asphalt, concrete, bare soil, vegetation, lawns and landscaping;
j. Location and type of any surface features not covered above, including overhead and above ground utilities, fire hydrants, communication poles or boxes, transformer enclosures, well pumps and pump enclosures and free-standing satellite dishes;
k. Location and dimensions of all major underground utilities or structures that are evidenced by manholes, fill port covers, monitoring point covers, significant visible pavement repairs or saw cuts (including remediation system piping trenches if visible), storm sewer grates and utility marking posts;
l. Accurate dimensions and locations of any surface features in the immediate (contiguous or adjacent) areas, including surface water bodies of any sort (canals, streams, creeks, rivers, pools, ponds, lakes, including storm water retention ponds), or surface relief (ditches, swales, berms, ravines, gullies, sinkholes);
m. The signature and seal of the surveyor who performed the survey;
n. Any other site-specific information required to make a complete site map; and
o. The site plan shall be submitted in both paper and electronic format (typically Auto
CADD).
Survey Deliverables
1. The following deliverables are included in this proposal:
Survey drawing at a standard scale on a standard 18" x 24"size title block, unless specifically requested otherwise by client.
Final drawings shall be submitted as full-size copies, certified, and sealed, dated, and signed by a Florida Professional Surveyor and Mapper.
Final survey shall be made available to client in electronic format, AutoCAD (.dwg format), and Adobe PDF format. File will be sent by email unless the client specifically requests a CD of the drawing file.
Additional Non-Typical Items, Exceptions, and Conditions
1. Please reference attached aerial imagery for approximate project location and site limits.
Tampa, Florida 33610 Fax: 813-621-7194 Web: www.survtechsolutions.com Email: Sales@survtechsolutions.com
Yellow Polygon = Approximate Parcel Boundary
Tampa, Florida 33610 Fax: 813-621-7194 Web: www.survtechsolutions.com Email: Sales@survtechsolutions.com
Exhibit "A" SurvTech Solutions, Inc. Short Form Agreement
General Terms of Agreement for Consulting (Surveying and Mapping) Services
1. Client hereby agrees to retain SurvTech Solutions, Inc. to perform professional land surveying services as described herein. This Agreement applies only to the specific project identified herein.
2. General Responsibility: SurvTech Solutions, Inc. agrees that we shall act as an independent contractor and shall perform the services provided for in this Agreement in accordance with the generally accepted standard of care of SurvTech Solutions, Inc.'s profession.
3. SurvTech Solutions, Inc. agrees to perform the services set forth in attached “Proposal of Services” ("services").
4. Payment: Client shall be invoiced upon completion of the project . . Client agrees to pay invoice(s) within thirty (30) days of its receipt. Client further agrees to pay interest on all amounts invoiced and not paid or objected to for valid cause in writing within said thirty (30) day period at the rate of eighteen (18) percent per annum (or the maximum interest rate permitted under applicable law), until paid. Client agrees to pay SurvTech Solutions, Inc.'s cost of collection of all amounts due and unpaid after ninety
(90) days, including court costs and reasonable attorney's fees. SurvTech Solutions, Inc. shall not be bound by any provision or agreement requiring or providing for arbitration of disputes or controversies arising out of this agreement, any provision wherein SurvTech Solutions, Inc. waives any rights to a mechanics' lien, or any provision conditioning SurvTech Solutions, Inc.’s right to receive payment for its work upon payment to Client by any third party. These General Conditions are notice where required, that SurvTech Solutions, Inc. shall file a lien whenever necessary to collect past due amounts. Failure to make payment within 30 days of invoice shall constitute a release of SurvTech Solutions, Inc. from any and all claims which Client may have whether in tort, contract or otherwise and whether known or unknown at the time.
5. Insurance: For any services provided under this Agreement, SurvTech Solutions, Inc. shall procure and maintain in effect insurance coverage in amounts not less than set forth below.
a. Workers' Compensation and Employers' Liability: Comply with the laws of the State of Florida.
b. General Liability: Comprehensive Liability Insurance for personal and bodily injury, including death and property damage in the amount of $1,000,000 combined single limit each occurrence and $2,000,000 in aggregate.
c. Professional Liability Insurance: SurvTech Solutions, Inc. shall provide Professional Liability Insurance in the amount of $2,000,000.
d. Umbrella Liability Insurance: SurvTech Solutions, Inc. shall provide additional Liability Insurance in the amount of $6,000,000 for Auto Liability and General Liability.
e. Certificates: SurvTech Solutions, Inc. shall provide certificates of insurance upon request evidencing coverage required above. Each certificate shall provide that coverage afforded shall not be canceled nor ordered reduced by the SurvTech Solutions, Inc. except with at least thirty (30) days prior written notice to the Client. Should this occur, SurvTech Solutions, Inc. shall procure and furnish for Client prior to such effective date new certificates conforming to the above coverage requirement.
SurvTech Solutions, Inc. shall not have the right to receive any payment under the Agreement until such certificates are received by Client.
6. Indemnification and Hold Harmless: Client agrees to defend, indemnify and save harmless SurvTech Solutions, Inc. from all claims, including negligence claims, suits, losses, personal injuries, death and property liability resulting from client’s performance of the proposed work, whether such claims or
Tampa, Florida 33610 Fax: 813-621-7194 Web: www.survtechsolutions.com Email: Sales@survtechsolutions.com damages are caused in whole or in part by client, and agrees to reimburse SurvTech Solutions, Inc. for expenses in connection with any such claims or suits, including reasonable attorney’s fees.
7. Termination: Client may terminate this Agreement with SurvTech Solutions, Inc. upon written notice if SurvTech Solutions, Inc. breaches his obligations under this Agreement or for any other cause. Client shall compensate SurvTech Solutions, Inc. for performance of services through the period of notice.
8. SurvTech Solutions, Inc. and client mutually waive claims for consequential and incidental damages arising out of or relating to this agreement.
9. Attorney Fees: Should suit be filed to enforce or for the breach of the term of this Agreement, the prevailing party shall be entitled to the award of reasonable attorney's fees.
10. Governing Law: This Agreement shall be governed by the Laws of the State of Florida.
11. Severability: If any provision of this Agreement is held by a court of competent jurisdiction to be invalid, void, or unenforceable, the remaining provisions shall remain in full force and effect and are binding on SurvTech Solutions, Inc. and Client.
Tampa, Florida 33610 Fax: 813-621-7194 Web: www.survtechsolutions.com Email: Sales@survtechsolutions.com
CLIENT AND SURVTECH SOLUTIONS, INC.
PROFESSIONAL SERVICES AGREEMENT - (SHORT FORM)
This agreement is made and entered into and made effective Tuesday, March 5, 2024 , by and between:
SurvTech Solutions, Inc. Client: WSP USA INC.
Name: Matthew Brooks Name: Richard McCann Address: 10220 U.S. Highway 92 East Address: 9428 Baymeadows Road Address cont: Tampa, Florida 33610 Address cont: Suite 400 Phone: 813-621-4929 Address cont: Jacksonville, FL 32256 Fax: 813-621-7194 Phone: None Project No.: N/A Email: richard.mccann@wsp.com
Estimate No.: 240410
The property upon which the services hereinafter described are to be performed is located at 6044 Merrill Rd, Jacksonville, FL, 32277-3427; Property Appraiser Parcel No.: N/A ("the property")
Services: Surveying and mapping services as described in “Scope of Services” as attached herein.
Fee & Time frame: Payment for the hereinabove described services will be $9,995.00. Estimated time frame is 28 days. All government fees or miscellaneous expenses will be incurred by the Client. SurvTech will notify the client of any such fees or expenses prior to the expenses being incurred.
12. By execution of this agreement Client accepts the terms hereof, acknowledges receipt of a copy hereof, including all exhibits, and authorizes Consultant to proceed with the work. In the event Client is not the owner of the property. Client represents that Client has obtained permission from said owner for Consultant to proceed.
IN WITNESS THEREOF, the parties hereby execute this agreement upon the terms and conditions stated above and on the date first above written.
CONSULTANT: SurvTech Solutions, Inc. CLIENT: WSP USA INC.
By: _______________________________ By: ________________________________
Name: ____________________________ Name: ______________________________
Title: ______________________________ Title: _______________________________
Date: ______________________________ Date: _______________________________
DATE: 2/6/2024
ESTIMATE #: 224012
ID QTY Unit Rate TOTAL
1 1 each 1,500.00$ 1,500.00$
1a 1 each 800.00$ 800.00$
2 7 night 450.00$ 3,150.00$
3 DPT Combo Rig and Crew 9 day 2,450.00$ 22,050.00$
4 Materials: 2" PVC Well Installation w/o Soil Sampling 520 foot 12.00$ 6,240.00$
5 Materials: 2" x 10' PVC .010 Wire Wrapped Screens 21 each 305.00$ 6,405.00$
6 26 each 150.00$ 3,900.00$
7 26 each 50.00$ 1,300.00$
8 1 each 500.00$ 500.00$
9 Drum (Soil) (Estimated) 35 each 65.00$ 2,275.00$
10 10 each 65.00$ 650.00$
11 5 each 150.00$ 750.00$
Subtotal 49,520.00$
Todd Hodgson
Todd Hodgson TOTAL 49,520.00$ Project Manager
9428 Baymeadows Road, Ste. 400 Jacksonville, Florida 32256
(904) 207-6031
Borehole clearance to 5' bgs beyond 20 minutes willrequire a change order for additional time and cost
Jacksonville, Florida
ROW Permits and MOT Responsibility of the Client
DPT Combo Auger Well Installation
(up to 14) 2" x 20' PVC INJ Well w/10' of .010 Wire Wrap Screen w/2' of .010 Slot Screen w/Cap. 8" BD Completion w/2' x 2' Concrete Pad Completion. No Soil Sampling (Asphalt)
(1) 2" x 20' PVC MW Well w/10' of .010 Screen, 5" BD Completion w/Donut Pad. No Soil Sampling (Indoors w/Concrete installed with Augers- DPT Combo Rig)
Drum All IDW
PROJECT
Lake Lucina 6044 Merrill Road
CUSTOMER
Jonathon Whipple, GIT
WSP
PROJECT DESCRIPTION:
Damages to utilities on private property clearance are the responsibility of the client
Utility Locates on Private…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .