Task Assignment DC033B Summary
This Task Assignment (TA) is a state contract between the State of Florida Department of Environmental Protection (FDEP) and WSP USA Inc. for biennial groundwater monitoring services at Al Grubers Drycleaners, a former dry cleaning facility located at 5161 Beach Boulevard, Jacksonville, Duval County, Florida (DEP Facility ID: ERIC_4562). The contract falls under the master contract number HW685 and is effective through April 25, 2025. The Department Project Manager is Patrick McGrane (850-245-8899), and the Contractor's Project Manager is Matt Crews (904-363-3430).
WSP USA Inc. will conduct a comprehensive biennial groundwater monitoring event including chlorinated volatile organic compound (VOC) analysis at 18 monitoring wells (9 shallow zone and 9 intermediate zone) and expanded per- and polyfluoroalkyl substances (PFAS) monitoring due to elevated PFAS concentrations detected during a 2022 screening event. The work encompasses four subtasks: Project Management ($2,230.95), Biennial Groundwater Monitoring Activities ($8,085.05), PFAS-Related Costs and Investigative Derived Waste (IDW) Transportation and Disposal ($6,492.47), and Reporting ($5,880.64), for a total contract value of $22,689.11 with 128 total labor hours. Deliverables include field sampling documentation with certified laboratory reports due January 10, 2025 for VOCs, February 7, 2025 for PFAS and waste manifests, and a final Biennial Groundwater Monitoring Report due March 28, 2025. All work is to be completed in accordance with the October 25, 2024 Scope of Work, Cost Estimate, and Bid Documentation.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number) Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW685
DC033B Completion April 25, 2025
This Task Assignment authorizes WSP to conduct Biennial Groundwater Sampling at Al Grubers in accordance with the October 25, 2024 Scope of Work, Cost Estimate, and Bid Documentation.
Patrick McGrane 850-245-8899 Contractor WSP USA Inc. Contractor
Contractor Matt Crews Contractor 904-363-3430
ERIC_4562
5161 Beach Boulevard, Jacksonville, Duval County
Al Grubers Drycleaners
Contractor Contractor
✔ $ 22,689.11
$ 22,689.11
Scope of Work
WSP USA Inc.
Contractor Matthew Crews
Environmental Engineer
11/26/2024
Crews, Matt (USMC700671) Digitally signed by Crews, Matt (USMC700671) Date: 2024.11.26 14:44:12 -05'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2024.11.26 11:08:43 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
BWC TAFORM 01/18
HW685
DC033B
Subtask 3 - PFAS Related Costs & IDW Management
Subtasks 1 & 4 - Project Management; Reporting
Subtask 2 - Biennial Groundwater Sampling for VOCs 01/10/2025
02/07/2025
03/28/2025
Subtask 2 - Submittal and FDEP approval of email summary with field documentation and certified laboratory reports for VOCs
Subtask 3 - Submittal and FDEP approval of email summary with field documentation, certified laboratory reports for PFAS, and signed waste manifests
Subtasks 1 & 4 - Submittal and FDEP approval of the Biennial Groundwater Monitoring Report
$ 8,085.05
$ 6,492.47
$ 8,111.59
$ 22,689.11
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette NNuñez
Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: Negotiation File Al Grubers Drycleaners
Jacksonville, Duval County
ERIC_4562
FROM: Patrick McGrane, Project Manager
SUBJECT: Negotiation Summary Task Assignment DC033B (HW685)
DATE: November 19, 2024
This Task Assignment authorizes WSP USA Inc. (WSP) to conduct a biennial groundwater monitoring event at the Al Grubers Drycleaners site. Due to concentrations observed during the 2022 PFAS screening event, this site qualifies for expanded monitoring. As a result, 18 total wells will be sampled and analyzed for PFAS compounds.
The total cost for this project is $22,689.11 with 128 total labor hours. All work is to be completed in accordance with the October 25, 2024, Scope of Work, Cost Estimate, and Bid Documentation.
WSP may invoice according to the included schedule.
FDEP COST ESTIMATEContractor: WSP USA Inc.
Date: 11/19/2024_V2
Task #: DC033B SubTask 1 Project Management SubTask 6 Site: SubTask 2 Biennial GW Monitoring Activities SubTask 7
Activity/Phase: SubTask 3 PFAS Related Costs and IDW T&D SubTask 8
Project Manager: Patrick McGrane SubTask 4 Reporting SubTask 9 SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$69.78 Project Manager (rdm) 11 10.7 $0.00 Program Leader - X-14 0 0 0 0 0 0 0 0 0 0
$69.78 Practice Leader - X-13 (rdm) 42 11 11 20 0 0 0 0 0 0 $68.39 Senior Consultant - X-12 (MC) 3 0 0 3 0 0 0 0 0 0 $53.09 Senior Sci/Eng - X-11 (BL) 7 0 3 4 0 0 0 0 0 0 $0.00 Senior Project Sci/Eng - P-10 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Project Sci/Eng - P-10 0 0 0 0 0 0 0 0 0 0
$37.18 Project Sci/Eng - P-9 (JW) 36 18 14 4 0 0 0 0 0 0 $0.00 Project Sci/Eng - P-9 0 0 0 0 0 0 0 0 0 0
$32.56 Staff Sci/Eng - P-8 (LK) 27 17 10 0 0 0 0 0 0 0 $34.92 Staff Sci/Eng - P-8 (AS) 2 0 0 2 0 0 0 0 0 0 $0.00 Staff Sci/Eng - P-8 0 0 0 0 0 0 0 0 0 0 $0.00 Sci/Eng/Admin - P-7 0 0 0 0 0 0 0 0 0 0 $0.00 Sci/Eng/Admin - P-7 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 128 10.7 46.0 38.0 33.0 0 0 0 0 0 0
Direct Labor $6,469.43 $744.27 $1,990.34 $1,772.97 $1,961.85 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.50% $11,159.77 $1,283.87 $3,433.34 $3,058.37 $3,384.19 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $17,629.20 $2,028.14 $5,423.68 $4,831.34 $5,346.04 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Al Gruber's Dry Cleaners - Former Monitoring
REV: 02/03 CEF GOLDER Page 1
FDEP COST ESTIMATEContractor: WSP USA Inc.
Date: 11/19/2024_V2
Task #: DC033B SubTask 1 Project Management SubTask 6 Site: SubTask 2 Biennial GW Monitoring Activities SubTask 7
Activity/Phase: SubTask 3 PFAS Related Costs and IDW T&D SubTask 8
Project Manager: Patrick McGrane SubTask 4 Reporting SubTask 9 SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
Al Gruber's Dry Cleaners - Former Monitoring
Travel Vehicle Rental $360.00 $240.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $360.00 $240.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $390.00 $0.00 $390.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $390.00 $0.00 $390.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $39.00 $0.00 $39.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $429.00 $0.00 $429.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $913.00 $913.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $150.00 $150.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,063.00 $1,063.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $120.00 $80.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,125.00 $736.00 $389.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $200.00 $0.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,445.00 $816.00 $629.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $20,926.20 $2,028.14 $7,542.68 $6,009.34 $5,346.04 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,762.91 $202.81 $542.37 $483.13 $534.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $22,689.11 $2,230.95 $8,085.05 $6,492.47 $5,880.64 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GOLDER Page 2
SITE :
SUBTASK 2: Biennial GW Monitoring Activities
DATE: 11/19/2024_V2
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLES WORK DESCRIPTIONS HOURS
Practice Leader (R. McCann) 11.0
Staff Sci/Eng (J. Whipple) 18.0
Sci/Eng/Admin (L. Kamikazi) 17.0
TOTAL LABOR 46.0
VEHICLES TYPES RATES UNITS USEAGES
Truck (CVOC GW Sampling) $120.00 Per Day 2 $240.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATES UNITS USEAGES
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAMES PURPOSES RATES UNITS USEAGES
TOTAL $0.00
LABORATORY COSTS
PARAMETERS RATES # SAMPLES #QAQC
Chlorinated VOCs EPA 8260D Groundwater $73.00 11 0 $803.00 Total VOCs EPA 8260D - IDW $110.00 1 0 $110.00
Sample Shipping Large $150.00 1 0 $150.00
TOTAL LAB $1,063.00
EQUIPMENT ITEMS RATES UNITS USEAGES TOTALS
$40.00 Per Day 2 $80.00 $290.00 Per Day 2 $580.00
$0.30 Per Foot 400 $120.00 $3.00 Per Foot 12 $36.00
TOTAL EQUIPMENT $816.00
Al Gruber's Dry Cleaners - Former
Tubing, Silicon 3/16 x 3/8
Verify property ownership prior to mobilization (1 hour); obtain offsite access agreements as needed for offsite properties (4 hours); update Health and Safety Plan (2 hours); and prepare and submit Interim Deliverable (4 hours).
Round trip travel (1 hour). Field event preparation (1 hour). Water levels (29 wells), instrument calibration, sampling for 11 wells for chlorinated VOC analysis (see Table in proposal), and IDW sampling and staging (8 hours per day x 2 days = 16 hours).
Round trip travel (1 hour). Water levels (29 wells), instrument calibration, sampling for 11 wells for chlorinated VOC analysis (see Table in proposal), and IDW sampling and staging (8 hours per day x 2 days = 16 hours).
Miscellaneous Expendables
Tubing, Poly HDPE Shallow Groundwater Sampling Kit
LEVEL OF EFFORT/EXPENSE WORKSHEET
SUBTASK 3: PFAS Related Costs and IDW T&D
DATE: 11/19/2024_V2
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLES WORK DESCRIPTIONS HOURS
Practice Leader (R. McCann) 11.0
Staff Sci/Eng (J. Whipple) 14.0
Sci/Eng/Admin (L. Kamikazi) 10.0
Senior Sci/Eng (B. Lucero) 3.0
TOTAL LABOR 38.0
VEHICLES TYPES RATES UNITS USEAGES
Truck (PFAS GW Sampling) $120.00 Per Day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATES UNITS USEAGES
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAMES PURPOSES RATES UNITS USEAGES
Erwin T&D - Non-Haz PFOS/PFAS Water $195.00 Per Drum 2 $390.00
TOTAL $390.00
LABORATORY COSTS
PARAMETERS MEDIA RATES # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEMS RATES UNITS USEAGES TOTALS
$40.00 Per Day 1 $40.00 $290.00 Per Day 1 $290.00
$0.30 Per Foot 250 $75.00 $3.00 Per Foot 8 $24.00
$100.00 Per Drum 2 $200.00
TOTAL EQUIPMENT $629.00
Al Gruber's Dry Cleaners - Former
Tubing, Poly HDPE Tubing, Silicon 3/16 x 3/8
Drum, 55-gallon
Prepare CADD Figures with PFAS data for Biennial Report.
Complete forms to arrange for PFAS sample bottle order delivery and shipment from DEP Central Laboratory (2 hours); characterize IDW and prepare waste profile for transportation and disposal of IDW (2 hours); prepare and submit email summary with field documentation and certified laboratory report with PFAS results (3 hours); and prepare PFAS section for the draft Biennial Report (4 hours).
Collect samples from 7 wells for PFAS analysis only; collect samples from 11 remaining wells listed in Subtask 2 for PFAS analysis; collect equipment blank for PFAS analysis (8 hours). Package and deliver PFAS samples to shipping point for DEP Central Laboratory (2 hours). Prepare data tables with PFAS analytical results (4 hours).
Collect samples from 7 wells for PFAS analysis only; collect samples from 11 remaining wells listed in Subtask 2 for PFAS analysis; collect equipment blank for PFAS analysis (8 hours). Package and deliver PFAS samples to shipping point for DEP Central Laboratory (2 hours).
Miscellaneous Expendables Shallow Groundwater Sampling Kit
FINAL --7/24/96
LEVEL OF EFFORT/EXPENSE WORKSHEET
SUBTASK 4: Reporting
DATE: 11/19/2024_V2
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLES WORK DESCRIPTIONS HOURS
Senior Consultant (M. Crews) 3.0
Practice Leader (R. McCann) 20.0
Staff Sci/Eng (J. Whipple) 4.0
Senior Sci/Eng (B. Lucero) 4.0
Staff Sci/Eng (A. Strayer) 2.0
TOTAL LABOR 33.0
VEHICLES TYPES RATES UNITS USEAGES
TOTAL EQUIPMENT $0.00
PER DIEM STAFF RATES UNITS USEAGES
TOTAL VEHICLE $0.00
SUBCONTRACTOR COSTS
NAMES PURPOSES RATES UNITS USEAGES
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETERS RATES # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEMS RATES UNITS USEAGES TOTALS
TOTAL $0.00
Al Gruber's Dry Cleaners - Former
Prepare draft Biennial Groundwater Monitoring Report
Prepare 2024 Biennial Groundwater Monitoring Report figures
Document production, Create pdf for OCULUS
Develop conclusions and recommendations & finalize Biennial Groundwater Monit Report
Update data tables for Biennial Groundwater Monitoring Report
FINAL --7/24/96
WSP USA Inc.
9428 Baymeadows Road, Suite 400, Jacksonville, Florida 32256 USA
T: +1 904 363-3430 F: +1 904 363-3445 wsp.com
October 25, 2024 Proposal No. 2024US328740
Mr. Patrick McGrane Florida Department of Environmental Protection Division of Waste Management Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400
RE: COST PROPOSAL FOR BIENNIAL GROUNDWATER MONITORING
AL GRUBER’S DRY CLEANERS - FORMER
5161 BEACH BOULEVARD
JACKSONVILLE, DUVAL COUNTY, FLORIDA
DEP FACILITY ID NUMBER: ERIC_4562
PROPOSED TASK ASSIGNMENT: HW685_DC033B
Dear Mr. McGrane:
WSP USA Inc. (WSP) is pleased to provide the Florida Department of Environmental Protection (DEP) with this cost proposal for biennial groundwater monitoring and expanded per- and polyfluoroalkyl Substances (PFAS) monitoring at the above-referenced site. This proposal includes a description of the proposed scope of services, level of effort sheets for each subtask, and a cost estimate form that summarizes the costs of the proposed services.
The proposed scope of services is described below.
SUBTASK 1 – PROJECT MANAGEMENT
To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with DEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with DEP Waste Site Cleanup Section requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the DEP-approved task assignment.
SUBTASK 2 – BIENNIAL GROUNDWATER MONITORING
Groundwater Monitoring Following authorization to proceed, WSP will use the Duval County Property Appraiser’s website to verify that the current property owner and the offsite property owners have an executed Permission to Enter Property agreement with the DEP. WSP will then coordinate with the real property owner, tenant, and offsite property owners for access
Mr. Patrick McGrane Proposal No. 2024US328740
Florida Department of Environmental Protection October 25, 2024 to complete the scope of work. WSP or the DEP will attempt to obtain updated Permission to Enter Property forms from relevant property owners prior to and/or during mobilization to the site, as needed.
WSP will collect groundwater samples from nine shallow zone monitoring wells and nine intermediate zone monitoring wells (18 wells total). The attached Figure 1 shows the January 2022 PFAS screening results. The attached Figures 3 through Figure 6 from the November 2022 Biennial Groundwater Monitoring Report show the monitoring well locations, groundwater flow directions, and chlorinated volatile organic compound (VOC) results for the shallow and intermediate zones of the surficial aquifer.
Prior to groundwater sampling, the depth-to-groundwater will be measured at the wells sampled using an electronic water level indicator to determine groundwater elevations and flow direction. During the sampling event, the locks and well caps will be inspected for damage or degradation and repaired or replaced, as necessary. Groundwater sampling activities will be completed in accordance with DEP Standard Operating Procedures (SOPs) for Field Activities (DEP SOP-001/01), dated January 2017 (effective April 16, 2018) and DEP SOPs for Sampling with and Analysis of PFAS, dated August 2020. Prior to collecting the groundwater sample, each well will be purged and field parameters including temperature, pH, specific conductance, dissolved oxygen, turbidity, and oxidation-reduction potential will be monitored. Purge volumes and field parameters will be recorded on field data sheets, and the field monitoring equipment will be calibrated in accordance with the manufacturer’s recommended procedures.
The groundwater samples to be analyzed for chlorinated VOCs will be delivered to a Florida Department of Health and National Environmental Laboratory Accreditation Program certified, fixed-base laboratory along with the completed chain-of-custody documentation. The selected groundwater samples to be analyzed for PFAS will be shipped to the DEP Central Laboratory in Tallahassee, Florida. Upon receipt of the laboratory analytical results, WSP will evaluate the constituent concentrations to determine if off-site notification is required.
Based on the September 2024 DEP guidance for PFAS sampling at DEP Drycleaning Solvent Cleanup Program sites and subsequent correspondence with the DEP, WSP recommends expanded PFAS monitoring during this groundwater monitoring event, due to sum of perfluoro-n-octanoic acid (PFOA) and perfluorooctanesulfonic acid (PFOS) concentrations above 300 nanograms per liter during the January 2022 PFAS screening event, as well as the presence of potable wells within ¼-mile of the site (per 2023 Potable Well Survey).
The samples will be analyzed as follows:
Sample ID Chlorinated VOCs (EPA Method 8260D)
PFAS
(DEP SOP: LC001-3 or
Similar) Shallow Zone Surficial Aquifer Well
OW-08R X X
MW001 X X – Sampled in January 2022
MW002 --- X
MW003 --- X
MW005 --- X
MW008 --- X
MW010 X X – Sampled in January 2022
MW012 X X
MW014 X X – Sampled in January 2022
Sample ID Chlorinated VOCs (EPA Method 8260D)
PFAS
(DEP SOP: LC001-3 or
Similar) Intermediate Zone Surficial Aquifer Wells
MW004 --- X
MW006 --- X
MW007 X X – Sampled in January 2022
MW011 X X
MW013 X X
MW015 X X
MW018 X X – Sampled in January 2022
MW021 X X
MW030 --- X
Equipment Blank --- X Investigative Derived
Waste (IDW) Total VOCs X
Interim Deliverable Upon completion of Subtask 2, an e-mail deliverable will be submitted for the chlorinated VOC samples and include copies of the field data sheets, equipment calibration forms, field notes, laboratory analytical report, and laboratory chain-of-custody documentation.
SUBTASK 3 – PFAS-RELATED COSTS AND IDW TRANSPORTATION AND DISPOSAL
WSP will include costs associated with the expanded PFAS monitoring activities in this subtask. These activities include completing bottle order requests with the DEP Central Laboratory; characterizing investigation-derive waste (IDW); waste profile preparation for transportation and disposal of IDW; packaging and shipping PFAS samples to the DEP Central Laboratory; labor involved in sampling wells associated with PFAS analysis only; preparing and submitting the email summary deliverable with field documentation and certified PFAS laboratory report; and preparing the PFAS section for the draft Biennial Report.
Quality Assurance/Quality Control WSP will collect one equipment blank sample during the groundwater sampling event. The equipment blank will be collected by pumping (peristaltic pump) PFAS-free water through silicon and/or HDPE tubing and into laboratory-supplied containers. The equipment blank will be analyzed for PFAS using DEP SOP: LC001-3 (or similar), as shown in the above table.
IDW Transportation and Disposal WSP will containerize the IDW purge water and decontamination water in a 55-gallon drum(s). WSP will collect a waste characterization sample from the drum for analysis of total VOCs using EPA Method 8260 and PFAS using DEP SOP: LC001-3 (or similar), as shown in the above table. The drum(s) will be temporarily staged onsite, pending waste characterization. For cost estimating purposes, WSP has assumed that the IDW can be transported and disposed of as non-hazardous waste at an approved facility. The IDW transportation and disposal subcontractor will provide WSP with a non-hazardous waste manifest upon delivery to the disposal facility. WSP estimates two drums of IDW purge water will be generated during the field activities.
Interim Deliverable Upon completion of Subtask 3, an e-mail deliverable will be submitted for the PFAS samples and include copies of the field data sheets, equipment calibration forms, field notes, laboratory analytical report, laboratory chain-of-custody documentation, and updated data tables and figures.
SUBTASK 4 – REPORTING
WSP will prepare a Biennial Groundwater Monitoring Report that will include a description of the sampling procedures, evaluation of the analytical results; comparison of current to historical data; tabulated summary of the current and historical analytical data; a site map showing the groundwater analytical results; water level elevation information in tables and figures; laboratory analytical data; and conclusions and recommendations.
HEALTH AND SAFETY
WSP will update the existing site-specific Health and Safety Plan for the fieldwork. The work will be completed in accordance with WSP’s safety policies and procedures. At a minimum, WSP will wear safety glasses, high visibility safety vests, and steel-toed boots. A safety job briefing will be conducted prior to the start of work activities, and anytime the scope of work or site conditions change.
COST AND SCHEDULE
The estimated cost to complete the proposed scope of work is $24,135.50. WSP anticipates the groundwater monitoring event will take place in November or December of 2024. The level of effort sheets and cost estimate form are included in Attachment A. The IDW disposal subcontractor quotes are included in Attachment B. The following table summarizes the proposed costs and deliverable schedule.
Task Proposed Cost Proposed Schedule/Deliverables
Subtask 1 – Project Management $ 2,397.34 February 25, 2025
Subtask 2 – Biennial Groundwater Monitoring Activities
$ 8,503.38 November 30, 2024 (E-mail summary with field documentation and certified laboratory analytical report for chlorinated VOCs)
Subtask 3 – PFAS Related Costs and IDW Transportation and Disposal
$ 6,812.97 December 23, 2024 (E-mail summary with field documentation and certified laboratory analytical report for PFAS and non-hazardous waste manifest for IDW)
Subtask 4 – Reporting $ 6,421.81 January 31, 2025 (Biennial Groundwater Monitoring Report)
Total/Completion Date $ 24,135.50 March 23, 2025
WSP appreciates the opportunity to provide services to the DEP. Should you require additional information or clarifications, please contact us at (904) 363-3430.
Sincerely, WSP USA Inc.
Richard D. "Rick" McCann, PG Matthew C. Crews, PE Vice President, Geologist Assistant Vice President, Environmental Engineer
RDM/MCC/as
Attachments: Figures
Attachment A – Level of Effort Sheets and Cost Estimate Form Attachment B – Subcontractor Quotes
G:\Projects\DEP-Drycleaning\Projects\Jax\Al Grubers Drycleaners\HW685\DC033B - 2024 Biennial GW Mon\Proposal\DC033B - Al Grubers 2024 Biennial Mon Proposal (ERIC_4562).docx
MW014
MW010
MW008
MW012
MW005 MW001
MW003
MW002
OW-8
OW-10
OW-7R
OW-14R
OW-11
OW-3
OBSERVATION WELL LOCATION
SHALLOW MONITORING WELL LOCATION
BUILDING
ESTIMATED EXTENT OF VOLATILE ORGANIC
COMPOUNDS EXCEEDING GCTLs
1.) ALL RESULTS ARE REPORTED IN MICROGRAMS PER LITER
(ug/L).
2.) GCTL - GROUNDWATER CLEANUP TARGET LEVEL PER CHAPTER
62-777, TABLE 1, OF THE FLORIDA ADMINISTRATIVE CODE.
3.) SHADED CELL AND BOLD FONT INDICATE AN EXCEEDANCE OF
THE APPLICABLE GCTL.
4.) U - INDICATES THAT THE COMPOUND WAS ANALYZED FOR BUT
NOT DETECTED. THE VALUE SHOWN IS THE METHOD
DETECTION LIMIT.
5.) I - THE REPORTED VALUE IS BETWEEN THE LABORATORY
METHOD DETECTION LIMIT AND THE LABORATORY PRACTICAL
QUANTITATION LIMIT.
6.) MW012 WAS SAMPLED INSTEAD OF OW-08 BECAUSE OW-08 WAS
COVERED BY ASPHALT.
7.) *DID NOT OBTAIN PROPERT OWNERS ACCESS FOR MW008 AND
MW010.
MW002
2/20/08
0.24 U
0.13 U
0.18 U
0.058 U
MW001
3/24/15
GCTLs
MW003
9/11/00
1.0 U
1.0 U
1.0 U
1.0 U
OW-10
7/27/16 6/14/17 7/11/18 10/22
1.9 2.8 1.6 1.3
0.36 U 0.36 U 0.36 U 0.25U
0.36 U 0.36 U 0.36 U 0.50U
0.36 U 0.36 U 0.36 U 0.26U
MW005
2/20/08 6/18/20 10/22
9.7 2.4 1.7
1.1 1.4 0.25U
8.2 1.3 0.63I
0.39 I 0.36 U 0.54I
MW012
2/20/08 6/18/20 10/22
0.48 I 1.7 1.9
0.38 I 0.36 U 0.25U
32 0.36 U 0.50U
0.98 I 0.36 U 0.25U
OW-8 OW-8R
10/12/00 10/22
54 0.25U
1.0 U 0.25U
2 0.5U
1.0 U 0.25U
MW014
6/14/17 7/12/18 6/18/20 10/22
0.22 U 0.22 U 0.22 U 0.25U
5.9 5.9 6.8 5.5 64 58 72 55
5.7 5.3 5.3 2.9
MW010*
7/27/16 6/15/17 7/11/18 6/18/20
0.53 I 0.22 U 0.22 U 0.22 U
14 0.66 I 2.4 2.5
76 12 120 110
4.3 0.45 I 3.3 0.80 I
MW008*
2/19/08 6/18/20
0.24 U 0.22 U
1.3 0.36 U
5.9 0.68 I
0.058 U 0.36 U
MW001
7/27/16 6/14/17 6/18/20 10/22
4 4.5 6.8 3.2
0.36 U 0.36 U 0.36 U 0.25U
1.5 0.72 I 0.36 U 0.50U
0.36 U 0.36 U 0.36 U 0.25U
MW001
OW-10
1.) SITE MAP BY HARDING ESE, DATED JUNE 2002.
in
31404452.4562 Phase
4562-DC033A-005
FIGURE
2022-10-26
BCL
RFM
RFM
JCB
AL GRUBERS
2022 BIENNIAL GROUNDWATER MONITORING
JACKSONVILLE, DUVAL COUNTY, FLORIDA
FL DEPT OF ENVIRONMENTAL PROTECTION
GROUNDWATER ANALYTICAL RESULTS
SHALLOW ZONE OF THE SURFICIAL AQUIFER
TITLE
PROJECT NO. REV.
PROJECT
CLIENT
CONSULTANT
PREPARED
DESIGNED
REVIEWED
APPROVED
YYYY-MM-DD
IF
T
H
IS
M
EA
SU
R
EM
EN
T D
O
ES
N O
T M
AT
C
H W
H
AT
IS
S
H O
W N
, T H
E
SH
EE
T
SI
ZE
H
AS
B
EE
N M
O D
IF
IE
D F
R O
M : A
N
SI
B
DRAFT
0 50 100
LEGEND
NOTE(S)
REFERENCE(S)
OW-7R
7/27/16 6/15/17 7/11/18 10/22
0.22 U 0.41 I 0.22 U 0.53I
0.36 U 0.36 U 0.36 U 0.25U
0.36 U 0.36 U 0.36 U 0.50U
0.36 U 0.36 U 0.36 U 0.25U
MONITORING WELL I.D.
SAMPLE DATE
TETRACHLOROETHENE (PCE)
TRICHLOROETHENE (TCE)
cis-1,2-DICHLOROETHENE
VINYL CHLORIDE
WELL COVERED BY ASPHALT OR CONCRETE
OW-14R
10/22 0.25U 0.25U 0.50
0.25U
OW-3
10/22 1.6 1.9
0.50U 0.25U
OW-11
10/22 0.25U 0.25U 0.50U 0.25U
MW015
MW021
MW018
MW013
MW011
MW007
MW006
MW004
MW009
MW026
MW024
MW027
MW025
MW029
OW-13
OW-09
MW030
OBSERVATION WELL LOCATION
INTERMEDIATE MONITORING WELL LOCATION
BUILDING
1.) SITE MAP BY HARDING ESE, DATED JUNE 2002.
ESTIMATED EXTENT OF VOLATILE ORGANIC
COMPOUNDS EXCEEDING GCTLs
1.) ALL RESULTS ARE REPORTED IN MICROGRAMS PER LITER (ug/L).
2.) GCTL - GROUNDWATER CLEANUP TARGET LEVEL PER CHAPTER 62-777, TABLE 1,
OF THE FLORIDA ADMINISTRATIVE CODE.
3.) SHADED CELL AND BOLD FONT INDICATE AN EXCEEDANCE OF THE APPLICABLE
GCTL.
4.) U - INDICATES THAT THE COMPOUND WAS ANALYZED FOR BUT NOT DETECTED.
THE VALUE SHOWN IS THE METHOD DETECTION LIMIT.
5.) I - THE REPORTED VALUE IS BETWEEN THE LABORATORY METHOD DETECTION
LIMIT AND THE LABORATORY PRACTICAL QUANTITATION LIMIT.
6.) * - RESULTS DETERMINED NOT TO EXCEED THE GCTL BASED ON MEMORANDUM
"ROUNDING THE ANALYTICAL DATA FOR SITE REHABILITATION COMPLETION",
DATED NOVEMBER 17, 2011.
7.) MW006 WAS SAMPLED INSTEAD OF MW029 BECAUSE MW029 WAS COVERED BY
ASPHALT.
8.) * - DID NOT OBTAIN PROPERTY OWNER ACCESS FOR MW002, MW011, MW018 AND
MW021.
MW004
3/24/15
GCTLs
MW004
9/11/00
1.0 U
1.0 U
1.0 U
1.0 U
OW-09
10/12/00 6/15/17 7/11/18
7.8 0.58 I 0.57 I
1.0 U 0.36 U 0.36 U
1.0 U 0.36 U 0.36 U
1.0 U 0.36 U 0.36 U
OW-13
10/12/00 7/27/16 6/15/17 7/11/18
185 1.1 1.1 1.9
18.7 0.36 I 0.53 I 0.41 I
225 0.36 U 0.36 U 0.36 U
1.0 U 0.36 U 0.36 U 0.36 U
MW004
OW-09
MW027
2/20/08
0.24 U
0.17 I
1.1
0.058 U
MW024
9/26/01
1.0 U
1.8
1.0 U
1.0 U
MW025
2/18/08
0.48 I
1.0 8.9
0.058 U
MW026
10/1/04
0.17 U
0.47 I
1.2
0.25 U
MW029
2/19/08
0.51 I
0.13 U
0.18 U
0.058 U
MW007*
7/27/16 6/15/17 7/12/18 6/18/20
0.22 U 0.22 U 0.22 U 0.22 U
9.3 3.4* 3.3* 0.89 I
330 460 200 460
0.36 U 0.76 I 0.36 U 0.36 U
MW009
2/18/08
0.41 I
0.27 I
0.53 I
0.058 U
MW018*
7/27/16 6/14/17 7/12/18 6/18/20
11 9.8 17 9.1 I 15 14 24 14 310 310 270 270
3.0 3.2 2.2 0.36 U
MW021*
7/27/16 6/15/17 7/11/18 6/18/20
0.22 U 0.22 U 0.22 U 0.22 U
0.36 U 0.36 U 0.36 U 0.36 U
0.36 U 0.36 U 6.8 39
0.36 U 0.36 U 0.36 U 0.87 I
MW011*
7/27/16 6/15/17 7/11/18 6/18/20
0.22 U 0.22 U 0.22 U 0.22 U
5.3 3.4* 5.0 0.36 U
0.51 I 110 170 95
3.8 2.4 3.0 1.1
MW013
6/14/17 7/12/18 6/18/20 10/22
2.4 2.7 1.4 0.73I
7.4 4.3 4.3 4.3 240 140 130 100 12 9 9.3 9.0
MW015
6/14/17 7/12/18 6/18/20 10/22
0.22 U 0.22 U 0.22 U 0.25U
2.9 3.9 5.3 4.0 54 44 56 53
9.0 6.9 6.2 3.3 in
31404452.4562 Phase
4562-DC033A-006
FIGURE
2022-10-26
BCL
RFM
RFM
JCB
AL GRUBERS
2022 BIENNIAL GROUNDWATER MONITORING
JACKSONVILLE, DUVAL COUNTY, FLORIDA
FL DEPT OF ENVIRONMENTAL PROTECTION
GROUNDWATER ANALYTICAL RESULTS
INTERMEDIATE ZONE OF THE SURFICIAL AQUIFER
TITLE
PROJECT NO. REV.
PROJECT
CLIENT
CONSULTANT
PREPARED
DESIGNED
REVIEWED
APPROVED
YYYY-MM-DD
IF
T
H
IS
M
EA
SU
R
EM
EN
T D
O
ES
N O
T M
AT
C
H W
H
AT
IS
S
H O
W N
, T H
E
SH
EE
T
SI
ZE
H
AS
B
EE
N M
O D
IF
IE
D F
R O
M : A
N
SI
B
DRAFT0 60 120
LEGEND
NOTE(S)
REFERENCE(S)
MW030
7/26/16 6/14/17 7/12/18
0.22 U 0.22 U 0.22 U
0.36 U 0.36 U 0.36 U
0.48 I 0.54 I 0.36 U
0.36 U 0.36 U 0.36 U
MONITORING WELL I.D.
SAMPLE DATE
TETRACHLOROETHENE (PCE)
TRICHLOROETHENE (TCE)
cis-1,2-DICHLOROETHENE
VINYL CHLORIDE
WELL COVERED BY ASPHALT OR CONCRETE
MW006
2/20/08 6/18/20 10/22
0.33 I 0.22 U 0.25U
0.73 I 0.36 U 0.25U
0.57 I 0.36 U 0.50U
0.058 U 0.36 U 0.25U
MW015
MW021
MW018
MW014
MW013
MW010
MW011
MW007
MW008
MW012
MW005
MW006
MW001
MW003
MW004 MW002
MW009
MW026
MW024
MW027
MW025
MW029
OW-08
OW-13
OW-09
MW030
OW-7R
OBSERVATION WELL LOCATION
INTERMEDIATE MONITORING WELL LOCATION
BUILDING
1.) SITE MAP BY HARDING ESE, DATED JUNE 2002.
MW004
OW-09
in
FDEP-HW008A
Phase
FDEP-DC009-H009
FIGURE
2022-02-07
BCL
RFM
AL GRUBERS
JACKSONVILLE, DUVAL COUNTY, FLORIDA
FL DEPT OF ENVIRONMENTAL PROTECTION
PFAS ANALYTICAL RESULTS IN THE SHALLOW AND
INTERMEDIATE ZONES OF THE SURFICIAL AQUIFER
TITLE
PROJECT NO. REV.
PROJECT
CLIENT
CONSULTANT
PREPARED
DESIGNED
REVIEWED
APPROVED
YYYY-MM-DD
IF
T
H
IS
M
EA
SU
R
EM
EN
T D
O
ES
N O
T M
AT
C
H W
H
AT
IS
S
H O
W N
, T H
E
SH
EE
T
SI
ZE
H
AS
B
EE
N M
O D
IF
IE
D F
R O
M : A
N
SI
B
Pa th
\g ol de r.g ds
\c om pl ex da ta
\O ffi ce \J ac ks on vi lle \d ra fti ng \F ile \F
D
EP
\F D
EP
-D
C \D
C N o
A l G ru be rs
\H
Ju n2
An nu al M on R pt \A ct iv e D ra w in gs
Fi le
N am e:
F
D
EP
-D C
9-
H
9.
dw g
DRAFT
0 60 120
LEGEND
NOTE(S)
REFERENCE(S)
WELL COVERED BY ASPHALT OR CONCRETE
PROVISIONAL GROUND WATER
CLEANUP TARGET LEVEL (GCTL)
PFOA IN
ng/L
PFOS IN
ng/L
SUM OF PFOA +
PFOS IN ng/L
GCTL 70 70 70
1. PROVISIONAL GCTL - FDEP PROVISIONAL GROUNDWATER CLEANUP
TARGET LEVEL.
2. ALL RESULTS ARE REPORTED IN NANOGRAMS PER LITER (ng/L).
3. BOLD FONTS INDICATES CONSTITUENT CONCENTRATION WAS
REPORTED ABOVE THE LABORATORY METHOD DETECTION LIMIT.
4. HIGHLIGHTED FONT INDICATES CONSTITUENT CONCENTRATION WAS
REPORTED ABOVE THE PROVISIONAL GROUNDWATER CLEANUP LEVEL.
5. I- REPORTED VALUE IS BETWEEN THE LABORATORY METHOD
DETECTION LIMIT AND LABORATORY PRACTICAL QUANTITATION LIMIT.
6. U - THE COMPOUND WAS ANALYZED FOR, BUT NOT DETECTED. THE
REPORTED VALUE IS THE METHOD DETECTION LIMIT FOR THE SAMPLE
ANALYZED.
7. PFOA - PERFLUORO-N-OCTANOIC ACID.
8. PFOS - PERFLUOROOCTANESULFONIC ACID.
MW007
Date PFOA PFOS PFOA+PFOS
1/20/2022 31 280 311
MW010
Date PFOA PFOS PFOA+PFOS
1/20/2022 28 390 418
MW014
Date PFOA PFOS PFOA+PFOS
1/20/2022 42 430 472
MW018
Date PFOA PFOS PFOA+PFOS
1/20/2022 22 92 114
MW001
Date PFOA PFOS PFOA+PFOS
1/20/2022 49 190 239
SHALLOW MONITORING WELL LOCATION
MW001
5/10/22, 12:47 PM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19536 1/2
Quote Number: 19536
QUOTE
QUOTED TO: QUOTE DATE: 1/1/2022
COMPANY NAME: WSP / Golder QUOTED BY: Craig Burns
PHONE NUMBER: Ext.
FAX NUMBER:
PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials
CUSTOMER PO:
CONTACT EMAIL:
SITE ADDRESS: TBD
CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING
COST ESTIMATE FOR THE SITE/ PROJECT LISTED ABOVE.
DESCRIPTION PRICE QTY. UNIT TOTAL
NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00
NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00
TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$30.00 DRUM $0.00
TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$40.00 DRUM $0.00
TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site
$50.00 DRUM $0.00
Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax
$0.00 . $0.00
HAZ Drums to be quoted case-by-case $0.00 . $0.00
OPTIONAL LINE ITEMS
***10% FSC applied to the total cost of the invoice*** $0.00 . $0.00
TOTAL REQUIRED ITEMS $0.00
TOTAL OPTIONAL ITEMS $0.00
GRAND TOTAL $0.00
NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups. **Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's**PFAS drum rates are the same as the Petro/Drycleaner NonHaz Drums rates T&D.**Haz rates will be quoted case-by-case** Craig Burns 863.327.6289 - cburns@clarkenv.com
Name (print) Title
***10% FSC applied to the total cost of the invoice***
*PFAS drumq y q rates are the same as the Petro/Drycleaner NonHaz Drums rates T&D.*
NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM
TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 $50.00 DRUM drums/site - surcharge of $200/site
5/10/22, 12:47 PM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19536 2/2
Signature Date
CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854
WWW.ClarkEnvironmental.com
From: Fred Portofe To: Mongillo, Ralph Cc: Madison Rogers; Roger Pragle; Crews, Matt Subject: RE: Investigative Derived Waste Drum Costs for Transportation and Disposal at a Regulated Facility Date: Wednesday, March 9, 2022 9:33:38 AM Attachments: F0152F28A2B5418EBC7A4FD870EC8D28.png
AD282F6C3391468088CDA42829B8E703.png A719914B10184314957B0CA910CA8D14.png F1DF3C4322764E8A9076F1ADFF76864A.png 3409DF389C3B4156BA232DDC85C60E09.png
EXTERNAL EMAIL
EXTERNAL EMAIL - We could not verify the authenticity of this message. Please be cautious when clicking on links or opening attachments.
Ralph
We are not going to provide annual Pricing for the Statewide Contract . After reviewing the scope with my partners and the variability with respect to disposal costing and ever changing fuel costs, we feel we can not bid this work given the current uncertainty in the market. We would be please to bid this work on a casa by case basis.
Fred G. Portofe, PG President of Environmental Services (Professional Geologist in FL, GA, AL, MS, TX, SC, NC, TN, IN, LA, WI and AK) M & D Industrial Services, LLC 5896 Azalea Street Port Orange, Florida 32127 Email: Fportofe@mdindustrialservices.com Website: mdindustrialservices.com Cell: 813-951-1012 Emergencies: 888-307-2790
Sent from Mail for Windows
From: Mongillo, Ralph Sent: Tuesday, March 8, 2022 12:46 PM To: Fred Portofe Cc: Madison Rogers; Roger Pragle; Eddy Mendoza; Crews, Matt
File details come from the government source that posted it. Updated .