About this file
This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) to WSP USA Inc. for groundwater sampling and monitoring services at the Hanners Cleaners site located at 209 West Atlantic Boulevard, Pompano Beach, Broward County, Florida. The TA is designated as DC034D under Contract HW685, with a completion date of November 20, 2026. The project is overseen by FDEP Project Manager Patrick McGrane and WSP Project Manager Matt Crews, with the work to be performed in accordance with a February 20, 2026 Scope of Work, Cost Estimate, and Bid Documentation.
The contract authorizes WSP to conduct two quarterly groundwater monitoring events at the site, analyzing samples from 18 monitoring wells across shallow, intermediate, and deep zones for chlorinated volatile organic compounds using EPA Method 8260D. The total TA value is $41,537.43, consisting of $39,737.43 in fixed unit rate costs and $1,800.00 in cost reimbursement for hotel expenses. Compensation is structured across four subtasks: Subtask 1 ($3,650.75) for project management; Subtask 2 ($15,548.04) for Groundwater Monitoring Event 1 due May 8, 2026; Subtask 3 ($15,548.04) for Groundwater Monitoring Event 2 due August 14, 2026; and Subtask 4 ($6,790.60) for the final Quarterly Groundwater Monitoring and Site Rehabilitation Completion Report due September 25, 2026. The work comprises 225 total labor hours and includes investigation-derived waste characterization and disposal costs, with IDW disposal subcontracted to vendors including Erwin Remediation, US Ecology, and HEPACO at estimated rates ranging from $390 to $2,145 depending on waste stream volume and contamination type.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 2025
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW685
DC034D Completion November 20, 2026
This Task Assignment authorizes WSP to conduct groundwater sampling at Hanners Cleaners in accordance with the February 20, 2026 Scope of Work, Cost Estimate, and Bid Documentation.
Patrick McGrane 850-245-8899 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
WSP USA Inc.
WSP USA Inc.
Matt Crews 904-363-3430
ERIC_4221
209 West Atlantic Boulevard, Pompano Beach, Broward County
Hanners Cleaners
✔ $ 39,737.43 ✔ $ 1,800.00
$ 41,537.43
Scope of Work
Matthew Crews
Environmental Engineer
3/17/2026
Crews, Matt (USMC700671) Digitally signed by Crews, Matt (USMC700671) Date: 2026.03.17 11:18:22 -04'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2026.03.13 13:01:50 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
BWC TAFORM 25
HW685
DC034D
Subtask 3 - Groundwater Monitoring Event 2
Subtasks 1 & 4 - Project Management; Reporting
Subtask 2 - Groundwater Monitoring Event 1 05/08/2026
08/14/2026
09/25/2026
Subtask 2 - Submittal and FDEP approval of email summary containing field documentation, certified laboratory reports for VOCs, and signed waste manifests (Event 1) Hotel (Cost Reimbursement) - not to exceed $900.00
Subtask 3 - Submittal and FDEP approval of email summary containing field documentation, certified laboratory reports for VOCs, and signed waste manifests (Event 2) Hotel (Cost Reimbursement) - not to exceed $900.00
Subtasks 1 & 4 - Submittal and FDEP approval of the Quarterly Groundwater Monitoring and Site Rehabilitation Completion Report
$ 15,548.04
$ 41,537.43
$ 15,548.04
$ 10,441.35
McGrane_P Rectangle
Memorandum TO: Negotiation File
Hanners Cleaners Pompano Beach, Broward County
ERIC_4221
FROM: Patrick McGrane, Project Manager
SUBJECT: Negotiation Summary Task Assignment DC034D (HW685)
DATE: February 23, 2026
This Task Assignment authorizes WSP USA Inc. (WSP) to conduct the final two quarterly groundwater sampling events at the Hanners Cleaners site.
The four quarterly events were divided into two task assignments to provide flexibility in scheduling and potential scope changes as additional data became available. Given the expectation that access to the former property will be significantly limited following the completion of planned construction, the final deliverable will be a Conditional Site Rehabilitation Completion Report.
The total cost for this project is $41,537.43 with 225 total labor hours. All work is to be completed in accordance with the February 20, 2026, Scope of Work, Cost Estimate, and Bid Documentation.
WSP may invoice according to the included schedule.
FDEP COST ESTIMATEContractor: WSP USA Inc.
Date: 2/20/2026
Task #: DC034D SubTask 1 Project Management SubTask 6
Site: Hanners Cleaners SubTask 2 Groundwater Monitoring Event 1 SubTask 7
Activity/Phase: Monitoring SubTask 3 Groundwater Monitoring Event 2 SubTask 8
Project Manager: Patrick McGrane SubTask 4 Reporting SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$61.17 Project Manager (SS) 20 19.9 $0.00 Program Leader - X-14 0 0 0 0 0 0 0 0 0 0
$78.84 Practice Leader - X-13 (MC) 4 0 0 4 0 0 0 0 0 0 $0.00 Senior Sci/Eng - X-12 0 0 0 0 0 0 0 0 0 0
$61.17 Senior Sci/Eng - X-11 (SS) 42 6 6 30 0 0 0 0 0 0 $56.33 Senior Sci/Eng - X-11 (BL) 0 2 2 0 0 0 0 0 0 0
$0.00 Senior Project Sci/Eng - P-10 0 0 0 0 0 0 0 0 0 0 $40.70 Project Sci/Eng - P-9 (JW) 80 40 40 0 0 0 0 0 0 0
$0.00 Project Sci/Eng - P-9 0 0 0 0 0 0 0 0 0 0 $40.11 Project Sci/Eng - P-9 (MT) 72 36 36 0 0 0 0 0 0 0 $38.32 Staff Sci/Eng - P-8 (AS) 3 0 0 3 0 0 0 0 0 0
$0.00 Sci/Eng/Admin - P-7 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 225 19.9 84 84 37 0 0 0 0 0 0
Direct Labor $10,586.63 $1,217.93 $3,551.64 $3,551.64 $2,265.42 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.50% $18,261.94 $2,100.93 $6,126.58 $6,126.58 $3,907.85 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $28,848.57 $3,318.86 $9,678.22 $9,678.22 $6,173.27 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF ARCADIS Page 1
FDEP COST ESTIMATEContractor: WSP USA Inc.
Date: 2/20/2026
Task #: DC034D SubTask 1 Project Management SubTask 6
Site: Hanners Cleaners SubTask 2 Groundwater Monitoring Event 1 SubTask 7
Activity/Phase: Monitoring SubTask 3 Groundwater Monitoring Event 2 SubTask 8
Project Manager: Patrick McGrane SubTask 4 Reporting SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $720.00 $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Meals $216.00 $216.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Hotel $1,800.00 $900.00 $900.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $2,952.00 $1,476.00 $1,476.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $780.00 $390.00 $390.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $780.00 $390.00 $390.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $78.00 $39.00 $39.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $858.00 $429.00 $429.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $2,848.00 $1,424.00 $1,424.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $300.00 $150.00 $150.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $3,148.00 $1,574.00 $1,574.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $240.00 $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $2,406.00 $1,203.00 $1,203.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $200.00 $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $2,846.00 $1,423.00 $1,423.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $38,652.57 $3,318.86 $14,580.22 $14,580.22 $6,173.27 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $2,884.86 $331.89 $967.82 $967.82 $617.33 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $41,537.43 $3,650.75 $15,548.04 $15,548.04 $6,790.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF ARCADIS Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Hanners Cleaners SUBTASK 2: Groundwater Monitoring Event 1
DATE: 2/20/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Sci/Eng (S. Sider) 6
Project Sci/Eng (J. Whipple) 40
Project Sci/Eng (M. Triano) 36
Senior Sci/Eng (B. Lucero) 2
TOTAL LABOR 84
VEHICLE TYPE RATE UNIT USAGE
Truck $120.00 Per Day 3 $360.00
TOTAL VEHICLE $360.00
MEALS STAFF RATE UNIT USAGE
Project Sci/Eng (J. Whipple) $36.00 Per Day 3 $108.00 Project Sci/Eng (M. Triano) $36.00 Per Day 3 $108.00
TOTAL MEALS $216.00
HOTEL STAFF RATE UNIT USAGE
Project Sci/Eng (J. Whipple) $225.00 Per Day 2 $450.00 Project Sci/Eng (M. Triano) $225.00 Per Day 2 $450.00
TOTAL HOTEL $900.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin T&D - Non-Haz PFOS/PFAS Water $195.00 per drum 2 $390.00
TOTAL $390.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Chlorinated VOCs - EPA Method 8260D
Total VOHs EPA Method 8260D $73.00 18 $1,314.00 Total VOCs EPA Method 8021 - IDW $110.00 1 $110.00
Sample Shipping Large $150.00 1 $150.00
TOTAL LAB $1,574.00
EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS
Miscellaneous Expendables $40.00 Per Day 3 $120.00 Shallow Groundwater Sampling Kit $290.00 Per Day 3 $870.00 Tubing, Poly HDPE $0.30 Per Foot 920 $276.00 Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 19 $57.00 Drum, 55-gallon $100.00 Per Each 1 $100.00
TOTAL EQUIPMENT $1,423.00
Verification of property ownership with property access forms prior to groundwater monitoring activities (1 hour). Characterize IDW and prepare waste profile for transportation and disposal of IDW (2 hours). Prepare and submit email summary with field documentation, laboratory chain-of-custody, certified laboratory report, and updated tables and figures (3 hours).
Round Trip from Jacksonville to Pompano Beach (12 hours). Field event preparation (1 hour).
Instrument calibration, measure water levels, measure field parameters, collect samples from 18 wells for chlorinated VOC analysis (see Table in proposal), including IDW sampling and staging (12 hours per day x 2 days = 24 hours). Update water level and VOC analytical tables (3 hours).
Round Trip from Jacksonville to Pompano Beach (12 hours). Instrument calibration, measure water levels, measure field parameters, collect samples from 18 wells for chlorinated VOC analysis (see Table in proposal), including IDW sampling and staging (12 hours per day x 2 days = 24 hours).
Update CADD figures with water level and VOC analytical data
FINAL --7/24/96
LEVEL OF EFFORT/EXPENSE WORKSHEET
SUBTASK 3: Groundwater Monitoring Event 2
DATE: 2/20/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Sci/Eng (S. Sider) 6
Project Sci/Eng (J. Whipple) 40
Project Sci/Eng (M. Triano) 36
Senior Sci/Eng (B. Lucero) 2
TOTAL LABOR 84
VEHICLE TYPE RATE UNIT USAGE
Truck $120.00 Per Day 3 $360.00
TOTAL VEHICLE $360.00
MEALS STAFF RATE UNIT USAGE
Project Sci/Eng (J. Whipple) $36.00 Per Day 3 $108.00 Project Sci/Eng (M. Triano) $36.00 Per Day 3 $108.00
TOTAL MEALS $216.00
HOTEL STAFF RATE UNIT USAGE
Project Sci/Eng (J. Whipple) $225.00 Per Day 2 $450.00 Project Sci/Eng (M. Triano) $225.00 Per Day 2 $450.00
TOTAL HOTEL $900.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin T&D - Non-Haz PFOS/PFAS Water $195.00 per drum 2 $390.00
TOTAL $390.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Chlorinated VOCs - EPA Method 8260B
Total VOHs EPA Method 8260B $73.00 18 $1,314.00 Total VOCs EPA Method 8021 - IDW $110.00 1 $110.00
Sample Shipping Large $150.00 1 $150.00
TOTAL LAB $1,574.00
EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS
Miscellaneous Expendables $40.00 Per Day 3 $120.00 Shallow Groundwater Sampling Kit $290.00 Per Day 3 $870.00 Tubing, Poly HDPE $0.30 Per Foot 920 $276.00 Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 19 $57.00 Drum, 55-gallon $100.00 Per Each 1 $100.00
TOTAL EQUIPMENT $1,423.00
Verification of property ownership with property access forms prior to groundwater monitoring activities (1 hour). Characterize IDW and prepare waste profile for transportation and disposal of IDW (2 hours). Prepare and submit email summary with field documentation, laboratory chain-of-custody, certified laboratory report, and updated tables and figures (3 hours).
Round Trip from Jacksonville to Pompano Beach (12 hours). Field event preparation (1 hour).
Instrument calibration, measure water levels, measure field parameters, collect samples from 18 wells for chlorinated VOC analysis (see Table in proposal), including IDW sampling and staging (12 hours per day x 2 days = 24 hours). Update water level and VOC analytical tables (3 hours).
Round Trip from Jacksonville to Pompano Beach (12 hours). Instrument calibration, measure water levels, measure field parameters, collect samples from 18 wells for chlorinated VOC analysis (see Table in proposal), including IDW sampling and staging (12 hours per day x 2 days = 24 hours).
Update CADD figures with water level and VOC analytical data
FINAL --7/24/96
SUBTASK 4: Reporting
DATE: 2/20/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Sci/Eng (M. Crews) 4
Senior Sci/Eng (S. Sider) 30
Staff Sci/Eng (A. Strayer) 3
TOTAL LABOR 37
VEHICLE TYPE RATE UNIT USAGE
TOTAL VEHICLE $0.00
MEALS STAFF RATE UNIT USAGE
TOTAL MEALS $0.00
HOTEL STAFF RATE UNIT USAGE
TOTAL HOTEL $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS
TOTAL EQUIPMEN $0.00
Develop conclusions and recommendations are prepare final Quarterly Groundwater Monitoring and Site Rehabilitation Completion Report.
Draft Quarterly Groundwater Monitoring and Site Rehabilitation Completion Report, including an evaluation that the site meets closure criteria per Chapter 62-780.680 (2), FAC using Risk Management Option Level II.
Reporting: Updating tables document production, create pdf for OCULUS.
WSP USA Inc.
9428 Baymeadows Road, Suite 400, Jacksonville, Florida 32256 USA
T: +1 904 363-3430 F: +1 904 363-3445 wsp.com
February 20, 2026 Proposal No. 2026US535767.R1
Mr. Patrick McGrane
Florida Department of Environmental Protection
Division of Waste Management
Waste Site Cleanup Section
2600 Blair Stone Road, MS 4520
Tallahassee, FL 32399-2400
RE: COST PROPOSAL FOR QUARTERLY GROUNDWATER MONITORING
FORMER HANNERS CLEANERS
35 NORTH DIXIE HIGHWAY (FORMERLY 209 WEST ATLANTIC BOULEVARD)
POMPANO BEACH, BROWARD COUNTY, FLORIDA
DEP FACILITY ID NUMBER: ERIC_4221
PROPOSED TASK ASSIGNMENT: DC034D
Dear Mr. McGrane:
WSP USA Inc. (WSP) is pleased to provide the Florida Department of Environmental Protection (DEP) with this cost proposal for chlorinated volatile organic compound (VOC) groundwater monitoring activities at the above-referenced site. This proposal includes a description of the proposed scope of services, level of effort sheets for each subtask, and a cost estimate form that summarizes the costs of the proposed services. The proposed scope of services, based on the DEP’s email dated February 2, 2026, is described below.
SUBTASK 1 – PROJECT MANAGEMENT
To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with DEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with DEP Waste Site Cleanup Section requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the
DEP-approved task assignment.
SUBTASK 2 – GROUNDWATER MONITORING EVENT 1
Groundwater Monitoring
Following authorization to proceed, WSP will use the Broward County Property Appraiser’s website to verify that the current property owner and relevant offsite property owners have an executed Permission to Enter Property agreement with the DEP. WSP will then coordinate with the real property owner, tenant, and offsite property
Mr. Patrick McGrane Proposal No. 2026US535767.R1
Florida Department of Environmental Protection February 20, 2026 owners for access to complete the scope of work. WSP or the DEP will attempt to obtain updated Permission to
Enter Property forms from relevant property owners prior to and/or during mobilization to the site, as needed. This plan assumes adequate site access will be granted to perform the scope of work.
WSP will collect groundwater samples from 18 monitoring wells. The attached Figures 2 through 8 from the
December 2025 groundwater monitoring event show the monitoring well locations, groundwater flow direction, and chlorinated VOC results.
Prior to groundwater sampling, the depth-to-groundwater will be measured at accessible monitoring well locations, using an electronic water level indicator to determine groundwater elevations and flow direction. During the sampling event, the locks and well caps will be inspected for damage or degradation and repaired or replaced, as necessary.
Groundwater sampling activities will be completed in accordance with DEP Standard Operating Procedures
(SOPs) for Field Activities (DEP SOP-001/01), dated January 2017 (effective April 16, 2018). Prior to collecting the groundwater sample, each well will be purged and field parameters, including temperature, pH, specific conductance, dissolved oxygen, turbidity, and oxidation-reduction potential, will be monitored. Purge volumes and field parameters will be recorded on field data sheets, and the field monitoring equipment will be calibrated in accordance with the manufacturer’s recommended procedures.
The groundwater samples to be analyzed for chlorinated VOCs will be delivered to a Florida Department of Health and National Environmental Laboratory Accreditation Program-certified, fixed-base laboratory, along with the completed chain-of-custody documentation. Upon receipt of the laboratory analytical results, WSP will evaluate the constituent concentrations to determine if offsite notification is required.
The samples will be analyzed as follows:
Sample ID Chlorinated VOCs
(EPA Method 8260D)
Shallow Zone Monitoring Well (8)
MW001R2 X
MW003R X
MW005 X
MW007 X
MW026R X
MW035R X
MW042 X
MW043 X
Intermediate Zone Monitoring Well (7)
MW009R2 X
MW010R X
MW014R X
Sample ID Chlorinated VOCs
(EPA Method 8260D)
MW015R X
MW028 X
MW032R X
UNKMW001 X
Deep Zone Monitoring Well (3)
MW023 X
MW030 X
MW044 X
Waste Characterization (1)
Investigation Derived Waste (IDW) Total VOCs
Investigation Derived Waste
WSP will containerize the investigation-derived waste (IDW) purge water and decontamination water in a
55-gallon drum. WSP will collect a waste characterization sample from the drum for analysis of total VOCs, as shown in the above table. The drum will be temporarily staged onsite, pending waste characterization. For cost-estimating purposes, WSP has assumed that the IDW can be transported and disposed of as non-hazardous waste at an approved facility. The IDW transportation and disposal subcontractor will provide WSP with a non-hazardous waste manifest upon delivery to the disposal facility. WSP estimates that two drums of IDW purge water will be generated during the field activities.
Interim Deliverable
Upon completion of Subtask 2, WSP will submit an e-mail deliverable, which will include copies of the field data sheets, equipment calibration forms, field notes, laboratory analytical report, laboratory chain-of-custody documentation, and updated tables and figures.
SUBTASK 3 – GROUNDWATER MONITORING EVENT 2
At a minimum of three months following completion of the Subtask 2 field activities, WSP will return to the site to collect groundwater samples from the same 18 monitoring wells as presented in Subtask 2. The samples will be analyzed for chlorinated VOCs using EPA Method 8260D.
Investigation Derived Waste
WSP will containerize the IDW purge water and decontamination water in a 55-gallon drum. WSP will collect a waste characterization sample from the drum for analysis of total VOCs, as shown in the above table. The drum will be temporarily staged onsite, pending waste characterization. For cost-estimating purposes, WSP has assumed that the IDW can be transported and disposed of as non-hazardous waste at an approved facility. The
IDW transportation and disposal subcontractor will provide WSP with a non-hazardous waste manifest upon delivery to the disposal facility. WSP estimates that two drums of IDW purge water will be generated during the field activities.
Interim Deliverable
Upon completion of Subtask 3, WSP will submit an e-mail deliverable, which will include copies of the field data sheets, equipment calibration forms, field notes, laboratory analytical report, and laboratory chain-of-custody documentation, and updated tables and figures.
SUBTASK 4 – REPORTING
WSP will prepare an Quarterly Groundwater Monitoring and Site Rehabilitation Completion Report for the
September 2025, December 2025, March 2026 and June 2026 monitoring events, that will include a description of the sampling procedures, evaluation of the analytical results; comparison of current to historical data; tabulated summary of the current and historical analytical data; a site map showing the groundwater analytical results; water level elevation information in tables and figures; laboratory analytical data; and conclusions and recommendations, including an evaluation that the site meets closure criteria per Chapter 62-780.680 (2), FAC using Risk Management Option Level II.
HEALTH AND SAFETY
WSP will update the existing site-specific Health and Safety Plan for the fieldwork. The work will be completed in accordance with WSP’s safety policies and procedures. At a minimum, WSP will wear safety glasses, high-visibility safety vests, and steel-toed boots. A safety job briefing will be conducted prior to the start of work activities and anytime the scope of work or site conditions change.
COST AND SCHEDULE
The estimated cost to complete the proposed scope of work is $41,537.43. WSP anticipates Groundwater
Monitoring Event 1 will take place in March 2026 and Groundwater Monitoring Event 2 will take place in June
2026. The level of effort sheets and cost estimate form are included in Attachment A. The IDW disposal subcontractor quotes are included in Attachment B. The following table summarizes the proposed costs and deliverable schedule.
Task Proposed Cost Proposed Schedule/Deliverables
Subtask 1 – Project Management $ 3,650.75 October 30, 2026
Subtask 2 – Groundwater Monitoring Event 1
$ 15,548.04
April 24, 2026 (E-mail summary with field data sheets, equipment calibration forms, field notes, laboratory analytical report, laboratory chain-of-custody documentation, and updated tables and figures)
Subtask 3 – Groundwater Monitoring Event 2
$ 15,548.04
July 31, 2026 (E-mail summary with field data sheets, equipment calibration forms, field notes, laboratory analytical report, laboratory chain-of-custody documentation, and updated tables and figures)
Subtask 4 – Reporting $ 6,790.60 September 25, 2026 (Quarterly Groundwater Monitoring and Site Rehabilitation Completion Report)
Total/Completion Date $41,537.43 November 20, 2026
WSP appreciates the opportunity to provide services to the DEP. Should you require additional information or clarification, please contact us at (904) 363-3430.
Sincerely, WSP USA Inc.
Stephen J.R. Sider, GISP, PG Matthew C. Crews, PE
Senior Consultant, Geology Assistant Vice President, Environmental Engineer
SJRS/MCC/as
Attachments: Figure 2 Site Layout – Onsite Figure 3 Site Layout - Offsite Figure 4 Potentiometric Map of the Shallow Zone of the Surficial Aquifer (December 15, 2025) Figure 5 Potentiometric Map of the Intermediate Zone of the Surficial Aquifer (December 15, 2025) Figure 6 VOC Analytical Summary of the Shallow Zone of the Surficial Aquifer (December 2025) Figure 7 VOC Analytical Summary of the Intermediate Zone of the Surficial Aquifer (December 2025) Figure 8 VOC Analytical Summary of the Deep Zone of the Surficial (December 2025)
Attachment A – Level of Effort Sheets and Cost Estimate Form Attachment B – Subcontractor Quotes
G:\Projects\DEP-WSCS\Projects\Fort Lauderdale\Hanners Cleaners\5 - DC034D - 2026 Quarterly GW Mon\Proposal\Revision 1\DC034D - Hanners Cleaners GW Mon Proposal (ERIC_4221).R1.docx
NW 1st STREET
MW020
N D
IX
IE
H W
Y
W ATLANTIC BLVD.
MW002
MW003
MW006
MW010
MW011
MW012
MW013
MW015
MW022
MW025
MW032
MW034
MW036
MW039
MW040
UNKMW001
MW008
MW014
MW001MW001R
MW001R2
MW005MW007
MW009
MW009R
MW026
MW027
MW028
MW035
MW037
MW038
MW041
MW042
MW004R
MW003R
MW043
MW026R
MW035R
MW009R2
MW014R
MW010R
MW032R
MW015R
MW044
MW033
MW004
IW001IW002IW003IW004IW005 IW006
IW007
IW015 IW019IW020IW021IW024
IW025
IW026IW028
IW029IW031 IW032
IW033
MW020
MW021MW023
MW024
MW030
N
D
IX
IE
H
W Y
W ATLANTIC BLVD.
N
D
IX
IE
H
W Y
SW 2nd ST.
S C
YP
R
ES
S
R D
MW003
MW010
MW011
MW012 MW013
MW015
MW016
MW017
MW018
MW019
MW022MW025
MW029
MW031
MW032
MW034
MW039
MW040 UNKMW001
MW014MW001MW001R MW009MW009RMW026 MW027
MW028MW035MW037 MW038
MW004R
MW009R2 MW014R
MW010R
MW032R
MW015R
MW044
MW033
MW004
SCALE
0 250 500
FEET
in
31404452.4565 Control No.
4221-4565-D006
FIGURE
2026-01-20
BCL
BDC
SJRS
MCC
HANNERS CLEANERS
35 NORTH DIXIE HWY., POMPANO BEACH
BROWARD COUNTY, FL
FL. DEPT. OF ENVIRONMENTAL PROTECTION
VOC ANALYTICAL SUMMARY OF THE SHALLOW ZONE OF THE
SURFICIAL AQUIFER
(DECEMBER 2025)
TITLE
PROJECT NO. REV.
PROJECT
CLIENT
CONSULTANT
PREPARED
DESIGNED
REVIEWED
APPROVED
YYYY-MM-DD
IF
T
H
IS
M
EA
SU
R
EM
EN
T D
O
ES
N O
T M
AT
C
H W
H
AT
IS
S
H O
W N
, T H
E
SH
EE
T
SI
ZE
H
AS
B
EE
N M
O D
IF
IE
D F
R O
M : A
N
SI
B
Pa th
\c or p.
pb w an .n et \U
S\ C en tra lD at a\ U
SJ
AX
0\ dr af tin g\
Pr oj ec ts
\F D
EP
\F
D
EP
-D C
\3
2\
_4
1_
H an ne rs
C le an er s\
D ec
D at aR pt \A ct iv e D ra w in gs
Fi le
N am e:
1-
-D
6.
dw g
DRAFT
SCALE
0 15 30
FEET
LEGEND
1. AERIAL IMAGE TAKEN FROM FDEP BUREAU OF SURVEY AND MAPPING
(LAND BOUNDARY INFORMATION SYSTEM), PUBLISHED MARCH 2021.
2. WELL LOCATIONS SOURCE: AECOM, DATED MARCH, 2021.
3. PARCEL BOUNDARY TAKEN FROM FLORIDA DEPARTMENT OF REVENUE.
REFERENCE(S)
SHALLOW MONITORING WELL
INTERMEDIATE MONITORING WELL
ABANDONED, DESTROYED, OR MISSING WELLS
APPROXIMATE PARCEL BOUNDARY
DEEP MONITORING WELL
APPROXIMATE PROPERTY BOUNDARY
WELL ID (SCREEN INTERVAL DEPTH IN FT-BGS)
DATE SAMPLED
MW001R (5-15)
4/6/05
3 300
3 300
70 700
100 1000
1 100
FDEP NATURAL ATTENUATION
DEFAULT CONCENTRATION (NADC)
FDEP GROUNDWATER CLEANUP
TARGET LEVEL (GCTL)
NOTE(S)
TETRACHLOROETHYLENE CONCENTRATION (PCE)
TRICHLOROETHYLENE CONCENTRATION(TCE)
CIS-1,2-DICHLOROETHYLENE CONCENTRATION (CIS-1,2 DCE)
TRANS-1,2-DICHLOROETHENE (TRANS-1,2 DCE)
VINYL CHLORIDE CONCENTRATION (VC)
OFFSITE WELLS
1. ALL RESULTS ARE REPORTED IN MICROGRAMS PER LITER (µg/L).
2. GCTL - GROUNDWATER CLEANUP TARGET LEVEL PER CHAPTER 62-777,
TABLE 1, OF THE FLORIDA ADMINISTRATIVE CODE.
3. NADC - NATURAL ATTENUATION DEFAULT CONCENTRATION PER
CHAPTER 62-777,TABLE 1, OF THE FLORIDA ADMINISTRATIVE CODE.
4. BOLD FONT AND YELLOW SHADED CELL INDICATES AN EXCEEDANCE OF
THE APPLICABLE GCTL.
5. BOLD FONT AND BLUE SHADED CELL INDICATES AN EXCEEDANCE OF
THE APPLICABLE NADC.
6. U - CONSTITUENT WAS ANALYZED FOR BUT NOT DETECTED. THE
VALUE SHOWN IS THE METHOD DETECTION LIMIT FOR THE
CONSTITUENT ANALYZED
5. I - THE REPORTED VALUE IS BETWEEN THE LABORATORY METHOD
DETECTION LIMIT AND THE LABORATORY PRACTICAL QUANTITATION
LIMIT.
6. ISOCONCENTRATION CONTOURS DASHED WHERE INFERRED.
7. * RESULTS DETERMINED NOT TO EXCEED THE GCTL BASED ON THE
FDEP MEMORANDUM "ROUNDING ANALYTICAL DATA FOR SITE
REHABILITATION COMPLETION", DATED NOVEMBER 17, 2011.
GCTL EXCEEDANCE CONTOUR
MW025 (14-20)
11/11/02 12/09/03 11/03/05
2.49 1 U 1 U
1.14 1 U 1 U 307 5 1 U
8.09 1 U 1 U
2.03 2 1 U
MW043 (10-20)
09/10/25 12/16/25
0.25 U 0.25 U
0.25 U 0.25 U
0.50 U 0.50 U
0.50 U 0.50 U
0.25 U 0.25 U
MW026/MW026R (14-20)
11/11/02 12/09/03 09/09/25 12/17/25
10.4 1 U 0.25 U 0.25 U
22.2 1 U 0.25 U 0.25 U 7,930 18,400 7.2 72 120 495 0.50 U 0.50 U 669 7,560 29 54
MW003/MW003R (5-15)
07/23/97 09/10/25 12/16/25
6 0.25 U 0.25 U 1 U 0.25 U 0.25 U
7.8 0.50 U 0.50 U 1 U 0.50 U 0.50 U 1 U 0.25 U 0.25 U
MW001R/MW001R2 (5-15)
01/31/23 06/26/24 09/10/25 12/16/25
0.25 U 1.0 0.66 I 0.25 U
0.25 U 0.25 U 0.25 U 0.25 U
1.4 I 4.2 0.56 I 57
0.50 U 0.50 U 0.50 U 0.50 U
59 43 4.9 49
MW027 (14-20)
07/11/02 11/11/02 11/03/05
1 U 1 U 1 U 1 U 1 U 1 U
10.1 5.55 14.8 1 U 1 U 1 U 1 U 1 U 1 U
MW004/MW004R (4-14)
07/23/97 09/09/25
30.3 0.25 U
1.1 0.25 U 1 U 0.50 U 1 U 0.50 U 1 U 0.25 U
MW002 (4-14)
08/29/18 06/25/24 09/10/25 12/16/25
0.50 U 0.25 U 0.25 U 0.25 U
0.61 U 0.25 U 0.25 U 0.25 U
0.83I 0.50 U 0.50 U 0.50 U
0.39 U 0.50 U 0.50 U 0.50 U
0.26 U 0.25 U 0.25 U 0.25 U
MW035/MW035R (15-20)
05/10/07 08/16/07 09/11/25 12/17/25
2 U 1 U 0.25 U 0.25 U 2 U 1 U 0.25 U 0.25 U
5.44 3.4 0.50 U 0.50 U 1 U 1 U 0.50 U 0.50 U
7.22 9.7 0.25 U 0.25 U
MW008 (7-17)
07/23/97 09/09/25 12/17/25
1 U 0.25 U 0.25 U 1 U 0.25 U 0.25 U 1 U 0.50 U 0.50 U 1 U 0.50 U 0.50 U 1 U 0.25 U 0.25 U
MW041 (5-15)
01/31/23 06/26/24 9/10/25 12/16/25
0.25 U 0.25 U 0.25 U 0.25 U
0.25 U 0.25 U 0.25 U 0.25 U
0.50 U 0.50 U 0.50 U 0.50 U
0.50 U 0.50 U 0.50 U 0.50 U
0.45 I 0.25 U 0.25 U 0.25 I
MW036 (15-20)
01/25/10 04/07/11 09/11/25 12/17/25
0.20 U 0.20 U 0.25 U 0.25 U
0.26 U 0.26 U 0.25 U 0.25 U
0.22 U 0.22 U 0.50 U 0.50 U
0.25 U 0.25 U 0.50 U 0.50 U
0.29 U 0.29 U 1.1* 0.25 U
MW042 (5-15)
01/31/23 06/26/24 09/11/25 12/17/25
0.47 I 0.25 U 0.89 I 0.53 I
0.25 U 0.25 U 0.25 U 0.25 U
0.50 U 4.5 0.50 U 0.50 U
0.50 U 0.50 U 0.50 U 0.50 U
0.44 I 18 0.25 U 0.52 I
MW037 (15-20)
03/30/07 05/09/07 08/16/07
1 U 2 U 1 U 1 U 2 U 1 U 2 U 2 U 1 U 1 U 1 U 1 U
0.670 I 1 U 0.7
MW005 (5-15)
05/10/07 08/16/07 09/11/25 12/17/25
2 U 1.2 0.25 U 0.25 U 2 U 1 U 0.25 U 0.25 U
4.07 1.7 0.50 U 0.50 U 1 U 1 U 0.50 U 0.50 U
5.42 1.9 0.68 I 0.25 U
MW038 (15-20)
03/31/07 05/09/07 08/16/07
1 U 2 U 1 U 1 U 2 U 1 U 2 U 2 U 1 U 1 U 1 U 1 U 1 U 1 U 1 U
MW006 (5-15)
01/25/10 04/07/11 09/09/25 12/16/25
0.92 I 0.20 U 0.25 U 0.25 U
0.23 U 0.26 U 0.25 U 0.25 U
1.0 0.99 I 0.62 I 0.50 U
0.25 U 0.25 U 0.50 U 0.50 U
0.29 U 0.29 U 0.25 U 0.25 U
MW007 (5-15)
04/07/11 06/26/24 09/10/25 12/17/25
0.20 U 0.25 U 0.25 U 0.25 U
0.26 U 0.25 U 0.25 U 0.25 U
0.22 U 1.5 I 0.50 U 0.50 U
0.25 U 0.50 U 0.50 U 0.50 U
0.29 U 2.1 0.25 U 0.25 U
N D
IX
IE
H W
Y
W ATLANTIC BLVD.
MW002
MW003
MW006
MW010
MW011
MW012
MW013
MW015
MW022
MW025
MW032
MW034
MW036
MW039
MW040
UNKMW001
MW008
MW014
MW001MW001R
MW001R2
MW005MW007
MW009
MW009R
MW026
MW027
MW028
MW035
MW037
MW038
MW041
MW042
MW004R
MW003R
MW043
MW026R
MW035R
MW009R2
MW014R
MW010R
MW032R
MW015R
MW044
MW033
MW004
IW001IW002IW003IW004IW005 IW006
IW007
IW015 IW019IW020IW021IW024
IW025
IW026IW028
IW029IW031 IW032
IW033
MW020
MW021MW023
MW024
MW030
N
D
IX
IE
H
W Y
W ATLANTIC BLVD.
N
D
IX
IE
H
W Y
SW 2nd ST.
S C
YP
R
ES
S
R D
MW003
MW010
MW011
MW012 MW013
MW015
MW016
MW017
MW018
MW019
MW022MW025
MW029
MW031
MW032
MW034
MW039
MW040 UNKMW001
MW014MW001MW001R MW009MW009RMW026 MW027
MW028MW035MW037 MW038
MW004R
MW009R2 MW014R
MW010R
MW032R
MW015R
MW044
MW033
MW004
SCALE
0 250 500
FEET
in
31404452.4565 Control No.
4221-4565-D006
FIGURE
2026-01-20
BCL
BDC
SJRS
MCC
HANNERS CLEANERS
35 NORTH DIXIE HWY., POMPANO BEACH
VOC ANALYTICAL SUMMARY OF THE INTERMEDIATE ZONE OF
THE SURFICIAL AQUIFER
(DECEMBER 2025)
TITLE
PROJECT NO. REV.
PROJECT
CLIENT
CONSULTANT
PREPARED
DESIGNED
REVIEWED
APPROVED
YYYY-MM-DD
IF
T
H
IS
M
EA
SU
R
EM
EN
T D
O
ES
N O
T M
AT
C
H W
H
AT
IS
S
H O
W N
, T H
E
SH
EE
T
SI
ZE
H
AS
B
EE
N M
O D
IF
IE
D F
R O
M : A
N
SI
B
Pa th
\c or p.
pb w an .n et \U
S\ C en tra lD at a\ U
SJ
AX
0\ dr af tin g\
Pr oj ec ts
\F D
EP
\F
D
EP
-D C
\3
2\
_4
1_
H an ne rs
C le an er s\
D ec
D at aR pt \A ct iv e D ra w in gs
Fi le
N am e:
1-
-D
6.
dw g
DRAFT
SCALE
0 15 30
FEET
LEGEND
1. AERIAL IMAGE TAKEN FROM FDEP BUREAU OF SURVEY AND MAPPING
(LAND BOUNDARY INFORMATION SYSTEM), PUBLISHED MARCH 2021.
2. WELL LOCATIONS SOURCE: AECOM, DATED MARCH, 2021.
3. PARCEL BOUNDARY TAKEN FROM FLORIDA DEPARTMENT OF REVENUE.
REFERENCE(S)
SHALLOW MONITORING WELL
INTERMEDIATE MONITORING WELL
ABANDONED, DESTROYED, OR MISSING WELLS
APPROXIMATE PARCEL BOUNDARY
DEEP MONITORING WELL
APPROXIMATE PROPERTY BOUNDARY
WELL ID (SCREEN INTERVAL DEPTH IN FT-BGS)
DATE SAMPLED
MW001R (5-15)
4/6/05
3 300
3 300
70 700
100 1000
1 100
FDEP NATURAL ATTENUATION
DEFAULT CONCENTRATION (NADC)
FDEP GROUNDWATER CLEANUP
TARGET LEVEL (GCTL)
GCTL EXCEEDANCE CONTOUR
NOTE(S)
TETRACHLOROETHYLENE CONCENTRATION (PCE)
TRICHLOROETHYLENE CONCENTRATION(TCE)
CIS-1,2-DICHLOROETHYLENE CONCENTRATION (CIS-1,2 DCE)
TRANS-1,2-DICHLOROETHENE (TRANS-1,2 DCE)
VINYL CHLORIDE CONCENTRATION (VC)
OFFSITE WELLS
MW009R/MW009R2 (30-35)
07/11/02 11/11/02 09/09/25 12/17/25
10 U 1 U 0.25 U 0.25 U 10 U 1.47 0.25 U 0.25 U 10 U 221 0.50 U 0.50 U 10 U 5.31 0.50 U 0.50 U 10 U 1 U 0.25 U 0.25 U
MW028 (24-30)
01/31/23 06/26/24 09/10/25 12/17/25
0.25 U 0.25 U 0.25 U 0.25 U
0.25 U 0.25 U 0.25 U 0.25 U
0.50 U 64 0.50 U 0.50 U
0.50 U 0.50 U 0.50 U 0.50 U
1.6 26 0.25 U 0.25 U
MW010/MW010R (34-40)
08/22/97 09/10/25 12/16/25
1 U 0.25 U 0.25 U 1 U 0.25 U 0.25 U 1 U 0.50 U 0.50 U 1 U 0.50 U 0.50 U 1 U 0.25 U 0.25 U
MW032/MW032R (21-27)
05/10/07 08/16/07 09/11/25 12/17/25
2 U 1 U 0.25 U 0.25 U 2 U 1 U 0.25 U 0.25 U 2 U 0.96 0.50 U 0.50 U 1 U 1 U 0.50 U 0.50 U
2.89 2.2 0.25 U 0.25 U
MW011 (34-40)
08/22/97 12/05/97 09/10/25 12/16/25
1 U 1 U 0.25 U 0.25 U
10.5 1 U 0.25 U 0.25 U 1 U 1 U 0.50 U 0.50 U 1 U 1 U 0.50 U 0.50 U 1 U 1 U 0.25 U 0.25 U
MW039 (55-60)
05/06/06 09/13/06
1 U 1 U 1 U 1 U 1 U 1 U 1 U 1 U
1.47* 1 U
MW033 (32-38)
07/11/02 11/11/02 12/09/03
1 U 1 U 1 U 1 U 1 U 1 U
92.2 53.1 1 U 1 U 1 U 1 U 168 1 U 6
MW012 (34-40)
08/22/97 12/05/97 09/10/25 12/15/25
1 U 1 U 0.25 U 0.25 U
17.8 1 U 0.25 U 0.25 U 1 U 1 U 0.50 U 0.50 U 1 U 1 U 0.50 U 0.50 U 1 U 1 U 0.25 U 0.25 U
MW014/MW014R (34-40)
08/22/97 09/11/25 12/16/25
1 U 0.25 U 0.25 U
2.5 0.25 U 0.25 U 170 0.50 U 0.50 U
1.6 0.50 U 0.50 U
44.9 0.25 U 0.25 U
MW034 (22-28)
03/07/09 01/25/10 04/07/11
1 U 0.20 U 0.20 U 1 U 0.26 U 0.26 U
1.05 0.22 U 0.22 U 1 U 0.25 U 0.25 U
2.12 0.29 U 0.29 U
MW013 (34-40)
08/22/97 12/05/97 09/09/25 12/16/25
1 U 1 U 0.25 U 0.25 U 1 U 1 U 0.25 U 0.25 U 1 U 1.8 0.50 U 0.50 U 1 U 1 U 0.50 U 0.50 U 1 U 1 U 0.25 U 0.25 U
MW015/MW015R (34-40)
08/22/97 09/11/25 12/17/25
1 U 0.25 U 0.25 U 1 U 0.25 U 0.25 U 1 U 0.50 U 0.50 U 1 U 0.50 U 0.50 U 1 U 0.30 I 0.25 U
MW040 (33-38)
03/07/09 01/25/10 04/07/11
1 U 0.20 U 0.20 U 1 U 0.26 U 0.26 U 1 U 0.29 I 0.22 U 1 U 0.25 U 0.25 U
1.04* 1.4* 0.29 U
MW018 (38-44)
08/22/97 08/09/01 01/26/10
1 U 1 U 0.20 U 1 U 1 U 0.26 U
1.7 2.73 0.22 U 1 U 1 U 0.25 U
2.7 2.12 0.29 U
MW016 (33-39)
08/22/97 01/26/10
1 U 0.20 U
2.7 0.26 U 1 U 0.22 U 1 U 0.25 U 1 U 0.29 U
UNKMW001 (UNK-30)
09/11/25 12/17/25
0.25 U 0.25 U
0.25 U 0.25 U
0.50 U 0.50 U
0.50 U 0.50 U
0.32 I 0.25 U
MW017 (31-37)
08/22/97
1 U 1 U 1 U 1 U 1 U
1. ALL RESULTS ARE REPORTED IN MICROGRAMS PER LITER (µg/L).
2. GCTL - GROUNDWATER CLEANUP TARGET LEVEL PER CHAPTER 62-777,
TABLE 1, OF THE FLORIDA ADMINISTRATIVE CODE.
3. NADC - NATURAL ATTENUATION DEFAULT CONCENTRATION PER
CHAPTER 62-777,TABLE 1, OF THE FLORIDA ADMINISTRATIVE CODE.
4. BOLD FONT AND YELLOW SHADED CELL INDICATES AN EXCEEDANCE OF
THE APPLICABLE GCTL.
5. BOLD FONT AND BLUE SHADED CELL INDICATES AN EXCEEDANCE OF
THE APPLICABLE NADC.
6. U - CONSTITUENT WAS ANALYZED FOR BUT NOT DETECTED. THE
VALUE SHOWN IS THE METHOD DETECTION LIMIT FOR THE
CONSTITUENT ANALYZED
5. I - THE REPORTED VALUE IS BETWEEN THE LABORATORY METHOD
DETECTION LIMIT AND THE LABORATORY PRACTICAL QUANTITATION
LIMIT.
6. ISOCONCENTRATION CONTOURS DASHED WHERE INFERRED.
7. * RESULTS DETERMINED NOT TO EXCEED THE GCTL BASED ON THE
FDEP MEMORANDUM "ROUNDING ANALYTICAL DATA FOR SITE
REHABILITATION COMPLETION", DATED NOVEMBER 17, 2011.
MW019 (32-38)
08/22/97
1 U 1 U 1 U 1 U 1 U
N D
IX
IE
H W
Y
W ATLANTIC BLVD.
MW002
MW003
MW006
MW010
MW011
MW012
MW013
MW015
MW022
MW025
MW032
MW034
MW036
MW039
MW040
UNKMW001
MW008
MW014
MW001MW001R
MW001R2
MW005MW007
MW009
MW009R
MW026
MW027
MW028
MW035
MW037
MW038
MW041
MW042
MW004R
MW003R
MW043
MW026R
MW035R
MW009R2
MW014R
MW010R
MW032R
MW015R
MW044
MW033
MW004
IW001IW002IW003IW004IW005 IW006
IW007
IW015 IW019IW020IW021IW024
IW025
IW026IW028
IW029IW031 IW032
IW033
MW020
MW021MW023
MW024
MW030
N
D
IX
IE
H
W Y
W ATLANTIC BLVD.
N
D
IX
IE
H
W Y
SW 2nd ST.
S C
YP
R
ES
S
R D
MW003
MW010
MW011
MW012 MW013
MW015
MW016
MW017
MW018
MW019
MW022MW025
MW029
MW031
MW032
MW034
MW039
MW040 UNKMW001
MW014MW001MW001R MW009MW009RMW026 MW027
MW028MW035MW037 MW038
MW004R
MW009R2 MW014R
MW010R
MW032R
MW015R
MW044
MW033
MW004
SCALE
0 250 500
FEET
in
31404452.4565 Control No.
4221-4565-D006
FIGURE
2026-01-20
BCL
BDC
SJRS
MCC
HANNERS CLEANERS
35 NORTH DIXIE HWY., POMPANO BEACH
VOC ANALYTICAL SUMMARY OF THE DEEP ZONE OF THE
SURFICIAL AQUIFER
(DECEMBER 2025)
TITLE
PROJECT NO. REV.
PROJECT
CLIENT
CONSULTANT
PREPARED
DESIGNED
REVIEWED
APPROVED
YYYY-MM-DD
IF
T
H
IS
M
EA
SU
R
EM
EN
T D
O
ES
N O
T M
AT
C
H W
H
AT
IS
S
H O
W N
, T H
E
SH
EE
T
SI
ZE
H
AS
B
EE
N M
O D
IF
IE
D F
R O
M : A
N
SI
B
Pa th
\c or p.
pb w an .n et \U
S\ C en tra lD at a\ U
SJ
AX
0\ dr af tin g\
Pr oj ec ts
\F D
EP
\F
D
EP
-D C
\3
2\
_4
1_
H an ne rs
C le an er s\
D ec
D at aR pt \A ct iv e D ra w in gs
Fi le
N am e:
1-
-D
6.
dw g
DRAFT
SCALE
0 15 30
FEET
LEGEND
1. AERIAL IMAGE TAKEN FROM FDEP BUREAU OF SURVEY AND MAPPING
(LAND BOUNDARY INFORMATION SYSTEM), PUBLISHED MARCH 2021.
2. WELL LOCATIONS SOURCE: AECOM, DATED MARCH, 2021.
3. PARCEL BOUNDARY TAKEN FROM FLORIDA DEPARTMENT OF REVENUE.
REFERENCE(S)
SHALLOW MONITORING WELL
INTERMEDIATE MONITORING WELL
ABANDONED, DESTROYED, OR MISSING WELLS
APPROXIMATE PARCEL BOUNDARY
DEEP MONITORING WELL
APPROXIMATE PROPERTY BOUNDARY
WELL ID (SCREEN INTERVAL DEPTH IN FT-BGS)
DATE SAMPLED
MW001R (5-15)
4/6/05
3 300
3 300
70 700
100 1000
1 100
FDEP NATURAL ATTENUATION
DEFAULT CONCENTRATION (NADC)
FDEP GROUNDWATER CLEANUP
TARGET LEVEL (GCTL)
NOTE(S)
TETRACHLOROETHYLENE CONCENTRATION (PCE)
TRICHLOROETHYLENE CONCENTRATION(TCE)
CIS-1,2-DICHLOROETHYLENE CONCENTRATION (CIS-1,2 DCE)
TRANS-1,2-DICHLOROETHENE (TRANS-1,2 DCE)
VINYL CHLORIDE CONCENTRATION (VC)
OFFSITE WELLS
MW023 (73-78)
12/05/97 10/13/97 01/26/10 08/19/25
1 U 1 U 0.39 I 0.25 U 1 U 1 U 0.26 U 0.25 U 1 U 1 U 0.22 U 0.50 U 1 U 1 U 0.25 U 0.50 U 1 U 1 U 0.29 U 0.25 U
MW020 (70-75)
10/13/97
1 U 1 U 1 U 1 U 1 U
MW024 (70-75)
12/05/97 08/09/01 01/26/10 08/20/25
1 U 1 U 0.39 I 0.25 U 1 U 1 U 0.26 U 0.25 U 1 U 3.83 0.63 I 0.50 U
39.5 1 U 0.25 U 0.50 U
13.4 2.65 0.29 U 0.25 U
MW021 (60-65)
10/13/97
1 U 1 U 1 U 1 U 3.2
MW030 (95-100)
08/09/01 01/26/10 08/19/25
1 U 0.20 U 0.25 U 1 U 0.26 U 0.25 U 1 U 0.22 U 0.50 U 1 U 0.25 U 0.50 U 1 U 0.29 U 0.25 U
MW022 (80-85)
12/05/97
1 U 1 U 1 U 1 U 1 U
MW031 (75-80)
08/09/01
1 U 1 U 1 U 1 U 1 U
MW044 (70-80)
09/09/25 12/17/25
0.25 U 0.25 U
0.25 U 0.25 U
0.50 U 0.50 U
0.50 U 0.50 U
0.25 U 0.25 U
MW029 (75-80)
08/09/01
1 U 1 U 1 U 1 U 1 U
1. ALL RESULTS ARE REPORTED IN MICROGRAMS PER LITER (µg/L).
2. GCTL - GROUNDWATER CLEANUP TARGET LEVEL PER CHAPTER 62-777,
TABLE 1, OF THE FLORIDA ADMINISTRATIVE CODE.
3. NADC - NATURAL ATTENUATION DEFAULT CONCENTRATION PER
CHAPTER 62-777,TABLE 1, OF THE FLORIDA ADMINISTRATIVE CODE.
4. BOLD FONT AND YELLOW SHADED CELL INDICATES AN EXCEEDANCE OF
THE APPLICABLE GCTL.
5. BOLD FONT AND BLUE SHADED CELL INDICATES AN EXCEEDANCE OF
THE APPLICABLE NADC.
6. U - CONSTITUENT WAS ANALYZED FOR BUT NOT DETECTED. THE
VALUE SHOWN IS THE METHOD DETECTION LIMIT FOR THE
CONSTITUENT ANALYZED
5. I - THE REPORTED VALUE IS BETWEEN THE LABORATORY METHOD
DETECTION LIMIT AND THE LABORATORY PRACTICAL QUANTITATION
LIMIT.
6. ISOCONCENTRATION CONTOURS DASHED WHERE INFERRED.
7. * RESULTS DETERMINED NOT TO EXCEED THE GCTL BASED ON THE
FDEP MEMORANDUM "ROUNDING ANALYTICAL DATA FOR SITE
REHABILITATION COMPLETION", DATED NOVEMBER 17, 2011.
US Ecology* HEPACO
IDW SUBCONTRACTOR COST ESTIMATES FOR PFAS MATERIAL
Erwin T&D Non Haz Soil - VOCs per drum 0 $125.00 $0.00 T&D Non Haz Mud/water - VOCs per drum 0 $125.00 $0.00 False Mobilization (no drum found) 0 $85.00 $0.00 PFAS Profile Fee (1 per site) 0 $350.00 $0.00 T&D Non Haz Soil - PFAS/PFOS per drum 0 $195.00 $0.00 T&D Non Haz Mud/water -PFAS/PFOS per drum 2 $195.00 $390 Disposal Non Haz Soil - VOCs per drum 0 $150.00 $0.00 Disposal Non Haz Mud/water - VOCs per drum 0 $150.00 $0.00 PFAS Profile Fee (1 per site) 1 $95.00 $95.00 Disposal Non Haz Soil - PFAS/PFOS 0 $650.00 $0.00 Disposal Non Haz Mud/water -PFAS/PFOS 2 $650.00 $1,300.00 Approval Fee (per site) 1 $750.00 $750.00 Non Haz Solification Waste Profile fee 0 $50.00 $0.00 Non Haz Solids Disposal (per drum) 0 $185.00 $0.00 Non Haz Sludge Disposal 0 $185.00 $0.00
PFAS Waste 55 gal drum emelle AL 12 $810.00 $1,620.00 Truck with lift gate and driver 0 $145.00 $0.00 non haz liquids disposal (per drum) 0 $141.75 $0.00 55 gallon reconditioned drum 0 $134.63 $0.00 LTL fees (less than 15 drums 1 $150.00 $150.00 Energy security recovery fee 15% 1 $231.00 $231.00
Total Cost $390.00 $2,145.00* $2,001.00
Notes* Transportation costs will be calculated based on pickups at various sites and waste stream volume
Summary of IDW Subcontractors Costs 2023_6_16 PFAS no profile Page 1 of 1
USMC700671
Highlight
USMC700671
Highlight
USMC700671
Highlight
Sider, Stephen (USSS700716) Highlight Text
Sider, Stephen (USSS700716) Highlight Text
Sider, Stephen (USSS700716) Highlight Text
Sider, Stephen (USSS700716) Highlight Text
Sider, Stephen (USSS700716) Highlight Text
Sider, Stephen (USSS700716) Highlight Text
Sider, Stephen (USSS700716) Highlight Text
Sider, Stephen (USSS700716) Highlight Text
Sider, Stephen (USSS700716) Highlight Text
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
To: Mr. Ralph Mongillo
WSP
9428 Baymeadows Road, Suite 400 Jacksonville, FL 32256
June 16, 2023
Re: Non-Hazardous Disposal of PFOS/PFAS Impacted Materials
Mr. Mongillo:
The price for the transportation and disposal (T&D) of non-hazardous soil, mud, and water is listed below:
For Non-Hazardous Chlorinated Solvent Impacted Materials:
Description Rate Unit
T&D - Non-Haz Chlorinated Solvents Impacted Soil $ 125.00 Per Drum
T&D - Non-Haz Chlorinated Solvents Impacted Mud/Water $ 125.00 Per Drum
T&D - Non-Haz Chlorinated Solvents Impacted Water $ 95.00 Per Bucket
For Non-Hazardous PFAS/PFOS Impacted Materials:
Description Rate Unit
Profile Fee (Charged once per site) $ 350.00 Per Site
T&D - Non-Haz PFOS/PFAS Impacted Water (5-gallon bucket) $ 95.00 Per Bucket
T&D - Non-Haz PFOS/PFAS Impacted Soil $ 195.00 Per Drum
T&D - Non-Haz PFOS/PFAS Impacted Mud/Water $ 195.00 Per Drum
Please ensure that all drum lids are properly secured and that drums are on a level surface like the surrounding area (i.e., not on a pallet, etc.). A single False Mobilization fee will apply if our driver is not able to locate a drum on site or if we are unable to access the property due to a locked gate, etc. This quote is valid for 90 days.
Respectfully, Robert Donado Erwin Remediation, Inc.
Email: robert@erwinremediation.com
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_v2.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v1.pdf |
| Cost Estimate |
| Subtask 2 |
| Subtask 3 |
| Subtask 4 |
| Subtask 5 |
| Subtask 6 |
| 2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev1_12-12-22.pdf |
| Table 1 for SAWP |
| Monitoring Well Locations |
| Utility Locate Bids_Compiled.pdf |
| Geosyntec Utility-272_Geotek_1500 |
| Geoview Utility Quote_2000_COT FTF SIS |
| Tallahassee Fire Training Division_V1_Bloodhound_3700 |
| Drilling Bids_Compiled.pdf |
| PDS_Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (sonic) |
| Direct Push |
| City of Tallahassee Fire Training Site_GW Protection PFAS Free Water Estimate Email |
| Cascade_Geosyntec Consultants, Inc. - City of Tallahassee Fire Training Facility - PN221026-118844 |
| GW Protection_Geosyntec (T) 1022060 S.pdf |
| Invoice |
| Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (MOT).xlsx.pdf |
| Sheet1 |
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v1.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v2.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v2.pdf |
| Cost Estimate |
| Subtask 2 |
| Subtask 3 |
| Subtask 4 |
| Subtask 5 |
| Subtask 6 |
| 2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev2.pdf |
| Table 1 for SAWP |
| Monitoring Well Locations |
File details come from the government source that posted it. Updated .