This Task Assignment (TA) is a contract document issued by the State of Florida Department of Environmental Protection to Golder Associates USA Inc. The agreement, designated as Contract Number HW685 with Task Assignment Number DC038A, was executed on July 8, 2022, between the Department (represented by Secretary William E. Burns, Jr.) and the contractor (represented by Matthew C. Crews, Senior Lead Consultant, Environmental Engineer). The Department's Project Manager is Ginger Shirah, and the contractor's Project Manager is Matt Crews.
The Task Assignment authorizes Golder Associates USA Inc. to generate a Site Assessment Work Plan (SAWP) for the L & M Cleaners of Palm Beach County site located at 210 US Highway 1, North Palm Beach, Florida. The contract is structured as a fixed unit rate agreement with a total value of $5,000.00, payable upon submittal and FDEP approval of the Site Assessment Work Plan and Project Management deliverables. The deliverable is due on October 17, 2022, and includes completion of a Drycleaning Site Visit Checklist, site summary/narrative with an initial conceptual site model, figures (topographic, site features, and proposed sampling locations), a sampling plan/checklist, a proposed schedule from SAWP approval to Site Assessment Report submittal, and cost estimate/level of effort worksheets. The work plan must include PFAS screening and shall exclude documents available in ERIC or HASPs, EDR or ESA-like reports, offsite property owner/use or well survey information, and potable well surveys. The TA completion date is December 30, 2022.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW685
DC038A Completion December 30, 2022
This Task Assignment authorizes Golder Associates USA Inc. to generate a Site Assessment Work Plan for the L & M Cleaners of Palm Beach County site located in North Palm Beach, FL in accordance with the attached Site Assessment Work Plan Task List.
Ginger Shirah (850) 245-8899 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Golder Associates USA Inc.
Golder Associates USA Inc.
Matt Crews (904) 363-3430
ERIC_5124
210 US Hwy 1, North Palm Beach, Palm Beach County, Florida
L & M Cleaners of Palm Beach County
✔ $ 5,000.00
$ 5,000.00
Scope of Work
Matthew Crews
Senior Lead Consultant, Environmental Engineer
7/8/2022
Matthew C. Crews Digitally signed by Matthew C. Crews Date: 2022.07.08 12:52:54 -04'00'
William E. Burns, Jr.
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2022.07.07 12:33:10 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Site Assessment Work Plan; Project Management 10/17/2022
Subtasks 1 & 2: Upon submittal and FDEP approval of the Site Assessment Work Plan; Project Management $ 5,000.00
$ 5,000.00
HW685
DC038A
Site Assessment Work Plan (SAWP) Task List
Site Review:
1. Information Portal/ERIC/OCULUS Review
a. Review applicable documents
b. Application
c. Site Screening Report
d. Other assessment data
e. Permitting/Compliance/Enforcement history
2. Additional information as available and as needed
a. Google maps, aerial photographs, topographical maps, building/planning department records, land use maps, insurance maps
b. Other regulatory agency records
c. Contact DC operator for operations history. May be able to find operator even if DC is no longer operating
Site Visit:
1. Complete Drycleaning Site Visit Checklist
2. Verify Site Screening Report information, especially sample location(s)
3. Identify likely source/release areas (machine location, service door, floor drains, lint trap, sewer line, septic tank, dumpster, ASTs/USTs). Look for evidence on floors/walls for former machine location.
4. Identify above/below ground utilities and potential impediments to assessment activities
5. Verify accuracy of site map, revise as necessary
6. Interview operator/owner for site history
7. Discuss work plan elements with property owner and get direction regarding approach to tenants, and schedule.
SAWP:
1. Completed Drycleaning Site Visit Checklist
2. Site summary/narrative – Initial conceptual site model (brief text)
- Current status and history of DC operations
- Primary solvents used both prior to and after eligibility determination
- Owner/operator/tenant information
- Status of site structures (original, renovated, razed/redeveloped, vacant)
- Historical site assessment/remediation information
- Anticipated lithology, depth to water, and groundwater flow direction
- Known or anticipated source areas -Site Assessment Approach
3. Figures
- Topo
- Site features, aerial view, facility layout, waste storage areas, utilities, etc.
- Proposed sampling locations (soil, MAGS, DPT profiling, MWs, sediment, surface water, sewer/septic/lint trap)
4. Sampling Plan/Checklist (templated, see Word SAWP Summary Checklist) - Including proposed number of samples for soil, MAGs, groundwater, etc.
5. Proposed schedule from approval of SAWP to submittal of SAR
6. Cost Estimate (CE)/Level of Effort (LOE) Worksheets, including subcontractor quotes, as appropriate. The CE/LOE should be submitted upon approval of the SAWP and under separate cover.
Notes: 1) No documents that are available in ERIC or HASPs should be included with the SAWP, 2) No EDR or other ESA-like reports are required, 3) No offsite property owner/use or well survey information is required, 4) No potable well survey, 5) SOW should include PFAS screening (see guidance)
| IDW Quote 5.19.22.pdf |
| PermaFix Qte 9.5.21.pdf |
| Est. Total |
| LTL Transportation, per drum (55-gallon) |
| Transportation Stop Fee |
| Unit Price |
| Quantity/Size |
| CEF - Harveys GW Sampling - 05192022.pdf |
| Cost Estimate |
| ST2 |
| ST3 |
| Formula Sheet |
File details come from the government source that posted it. Updated .