This document is a Task Assignment (TA) under Contract Number HW685 issued by the State of Florida Department of Environmental Protection (FDEP). The task assignment authorizes WSP USA Inc., an environmental consulting firm, to conduct groundwater sampling activities at the Concord Custom Cleaners #201 site located at 1413 South Monroe Street in Tallahassee, Leon County, Florida. The project is identified as ERIC_4867 and involves coordination between the FDEP (represented by Project Manager Patrick McGrane) and WSP USA Inc. (represented by Project Manager Matt Crews).

The task assignment encompasses three subtasks valued at a total of $9,031.09: Subtask 1 (Project Management) at $873.38, Subtask 2 (Groundwater Sampling Activities) at $4,731.92, and Subtask 3 (Reporting) at $3,425.79. Under Subtask 2, WSP will collect split groundwater samples from four monitoring wells (CCCMW001, CCCMW003, CCCMW007, and CCCDW001) in accordance with the December 2024 Sampling and Restoration Agreement, including field parameter monitoring, low-flow sampling methods, and laboratory analysis using EPA Method 8260B for chlorinated volatile organic compounds. The scope also includes investigation-derived waste management, temporary storage in 55-gallon drums, and waste characterization sampling. Deliverables are due on a fixed schedule: field documentation and laboratory reports by April 24, 2026, and the Groundwater Monitoring Report by May 22, 2026, with a project completion date of July 24, 2026. The work is funded through the State of Florida with payment structured as a fixed unit rate based on task completion and FDEP approval of deliverables.

View the file

Other files

File Type Posted
CN-370000-HW685-BF01DCO1.pdf PDF
CN-370000-HW685-BF02B.pdf PDF
CN-370000-HW685-BF04A.pdf PDF
CN-370000-HW685-BIL01A.pdf PDF
CN-370000-HW685-BIL1ACO1.pdf PDF
CN-370000-HW685-BIL1ACO2.pdf PDF
CN-370000-HW685-BIL1ACO3.pdf PDF
CN-370000-HW685-BIL1BCO1.pdf PDF
CN-370000-HW685-DC001F.pdf PDF
CN-370000-HW685-DC001b.pdf PDF
CN-370000-HW685-DC002A.pdf PDF
CN-370000-HW685-DC002D.pdf PDF
CN-370000-HW685-DC003B.pdf PDF
CN-370000-HW685-DC004B.pdf PDF
CN-370000-HW685-DC008C.pdf PDF
CN-370000-HW685-DC009C.pdf PDF
CN-370000-HW685-DC010D.pdf PDF
CN-370000-HW685-DC014A.pdf PDF
CN-370000-HW685-DC015A.pdf PDF
CN-370000-HW685-DC016B.pdf PDF
CN-370000-HW685-DC016C.pdf PDF
CN-370000-HW685-DC018C.pdf PDF
CN-370000-HW685-DC01ACO3.pdf PDF
CN-370000-HW685-DC01ACO5.pdf PDF
CN-370000-HW685-DC021D.pdf PDF
CN-370000-HW685-DC024A.pdf PDF
CN-370000-HW685-DC024B.pdf PDF
CN-370000-HW685-DC024D.pdf PDF
CN-370000-HW685-DC026A.pdf PDF
CN-370000-HW685-DC026D.pdf PDF
CN-370000-HW685-DC028B.pdf PDF
CN-370000-HW685-DC028E.pdf PDF
CN-370000-HW685-DC02DCO1.pdf PDF
CN-370000-HW685-DC02ECO1.pdf PDF
CN-370000-HW685-DC02GCO1.pdf PDF
CN-370000-HW685-DC030A.pdf PDF
CN-370000-HW685-DC031B.pdf PDF
CN-370000-HW685-DC033B.pdf PDF
CN-370000-HW685-DC034C.pdf PDF
CN-370000-HW685-DC034D.pdf PDF
CN-370000-HW685-DC036A.pdf PDF
CN-370000-HW685-DC038A.pdf PDF
CN-370000-HW685-DC038D.pdf PDF
CN-370000-HW685-DC03ACO1.pdf PDF
CN-370000-HW685-DC03BCO1.pdf PDF
CN-370000-HW685-DC041A.pdf PDF
CN-370000-HW685-DC042C.pdf PDF
CN-370000-HW685-DC051B.pdf PDF
CN-370000-HW685-DC052D.pdf PDF
CN-370000-HW685-DC055B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev.

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

HW685

DC002H Completion July 24, 2026

This Task Assignment authorizes WSP to conduct groundwater sampling at Concord Custom Cleaners #201 in accordance with the February 20, 2026 Scope of Work, Cost Estimate, and Bid Documentation.

Patrick McGrane 850-245-8899 Contractor WSP USA Inc. Contractor

Contractor Matt Crews Contractor 904-363-3430

ERIC_4867

1413 South Monroe Street, Tallahassee, Leon County

Concord Custom Cleaners #201

Contractor Contractor

✔ $ 9,031.09

$ 9,031.09

Scope of Work

WSP USA Inc.

Contractor Matthew Crews

Environmental Engineer

3/9/2026

Crews, Matt (USMC700671) Digitally signed by Crews, Matt (USMC700671) Date: 2026.03.09 16:18:54 -04'00'

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2026.03.06 10:22:14 -05'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

BWC TAFORM

HW685

DC002H

Subtasks 1 & 3 - Project Management; Reporting

Subtask 2 - Annual Groundwater Monitoring 04/24/2026

05/22/2026

Subtask 2 - Submittal and FDEP approval of email summary containing field documentation, certified laboratory reports for VOCs, and signed waste manifest(s)

Subtasks 1 & 3 - Submittal and FDEP approval of the Annual Groundwater Monitoring Report

$ 4,731.92

$ 9,031.09

$ 4,299.17

Memorandum

TO: Negotiation File

Concord Custom Cleaners #201 Tallahassee, Leon County

ERIC_4867

FROM: Patrick McGrane, Project Manager

SUBJECT: Negotiation Summary Task Assignment DC002H (HW685)

DATE: February 27, 2026

This Task Assignment authorizes WSP USA Inc. (WSP) to conduct groundwater sampling at the

Concord Custom Cleaners #201 site.

As outlined in the 2024 Sampling and Restoration agreement, groundwater samples are to be collected on an annual basis from CCCMW001, CCCMW003, CCCMW007, and CCCDW001. WSP will collect split samples from each well while the property owner’s contractor collects the primary samples.

The total cost for this project is $9,031.09 with 42 total labor hours. All work is to be completed in accordance with the February 20, 2026, Scope of Work, Cost Estimate, and Bid

Documentation.

WSP may invoice according to the included schedule.

FD

EP

C

OS

T

ES

TI

MA

TE

C on tra ct or

W S

P U

S A

, I nc

D at e:

2/

/2

Ta sk

D C

2H

Su bT as k

Pr oj ec t M an ag em en t Su bT as k

Si te

Su bT as k

G ro un dw at er

S am pl in g A ct iv iti es

Su bT as k

Ac tiv ity

/P ha se

M on ito rin g as k

R ep or tin g

Su bT as k

Pr oj ec t M an ag er

Pa tri ck

M cG ra ne as k

Su bT as k

Su bT as k

Su bT as k

T To ta ls

La bo r R at e

C at eg or y $7

8.

PP

ra ct ic e Le ad er

X

-1

C R

E W

S , M

A

TT

H E

W

6.

2.

0.

0.

0.

0.

0.

0.

0.

$5 6.

Se ni or

C on su lta nt

X-

C H

A P

P E

LL

, L

O G

A N

5.

.0

.0 0.

0.

0.

0.

0.

0.

0.

$5

6.

Se ni or C on su lta nt

X-

LU

C E

R O

, B E

N

0.

2.

0.

0.

0.

0.

0.

0.

0.

$3 8.

S ta ff

S ci

/E ng

P

-8 S

TR

A

Y E

R , A

LI

C

IA

0.

2.

0.

0.

0.

0.

0.

0.

0.

To ta l H ou rs

5.

.0

.0

0.

0.

0.

0.

0.

0.

0.

D ire ct L ab or

$2

,5

.6

$2

.3

$1 ,0

.3

$1

,1

.8

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

O ve rh ea d

2.

$4

,3

.8

$5

.6

$1 ,8

.7

$1

,9

.4

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

G en

A dm in 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fr in ge

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l L ab or

$6 ,9

.4

$7

.9

$2

,9

.1

$3 ,1

.3

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Tr av el Ve hi cl e $1

.0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M ile ag e C os ts

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Ai r F ar e

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ea ls $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

H ot el

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l T ra ve l

$1

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bc on tr ac to r (E qu ip m en t P ro cu re m en t)

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tra ct or S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pr oc ur em en t F ee $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tr ac to r

(S er vi ce s Pr oc ur em en t)

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Er w in

$1

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

U til iti es $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

O th er $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

O th er

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

O th er $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tra ct or S ub to ta l

$1

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

H an dl in g Fe e $1

2.

$1 2.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $1

.5

$1

.5

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

La bo ra to ry

An al yt ic al

C os ts $4

.0

$4

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fa st T ur na ro un d C ha rg es $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Sa m pl e Sh ip pi ng $1

.0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L ab or at or y $5

.0

$5

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fi el d

Ex pe ns es

Pe rs on al P ro te ct io n $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Ex pe nd ab le s $4

0.

$4 0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

D ril lin g re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t ( An al yt ic al re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t (

ID

W re la te

d) $1

.0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

O th er

$4

.0

$4

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l F ie ld E xp en se s

$6

.0

$6

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bt ot al

$8 ,3

.9

$7

.9

$4

,4

.6

$3 ,1

.3

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

C om pl et io n

Fe e

$6

.1

$7 9.

$2

.3

$3

.4

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l E st im at ed C os t

$9 ,0

.0

$8

.3

$4

,7

.9

$3 ,4

.7

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

C on co rd

C us to m

C le an er s N o.

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Concord Custom Cleaners No. 201 SUBTASK 2: Groundwater Sampling Activities

DATE: 2/20/2026

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF TITLE WORK DESCRIPTION HOURS

CREWS, MATTHEW Practice Leader - X-13 6

CHAPPELL, LOGAN Senior Consultant - X-11 11

TOTAL LABOR 17

VEHICLE TYPE RATE UNIT USEAGE

Utility Van $120.00 Per day 1 $120.00

TOTAL VEHICLE $120.00

MEALS STAFF RATE UNIT USEAGE

TOTAL MEALS $0.00

HOTELS STAFF RATE UNIT USEAGE

TOTAL HOTELS $0.00

SUBCONTRACTOR COSTS

Erwin IDW $125.00 Drum 1 $125.00

$0.00

TOTAL $125.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Halocarbons Method 8260 $73.00 4 0 $292.00 PID/Hall-Series (Total VOCs) Method 8021 (IDW) $110.00 1 0 $110.00 Sample Shipping Large $150.00 1 $150.00

TOTAL LAB $552.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Miscellaneous Expendables $40.00 Per Day 1 $40.00 Deep Groundwater Sampling Kit $415.00 Per Day 1 $415.00

Tubing, Poly HDPE $0.30 Per Foot 250 $75.00 Drum, 55-gallon $100.00 Per Drum 1 $100.00

TOTAL EQUIPMENT $630.00

Field event preparation (1 hour). Water levels and instrument calibration. Collect groundwater samples from four wells (CCCDW001, CCCMW001, CCCMW003, and CCCMW007) for chlorinated VOC analysis. IDW sampling and staging (10 hours).

Verification of property ownership prior to site access (1 hour). Characterize IDW and prepare waste profile for transportation and disposal of IDW (2 hours). Prepare and submit field notes, sample forms, laboratory report in an email deliverable (3 hours).

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Concord Custom Cleaners No. 201 SUBTASK 3: Reporting

DATE: 2/20/2026

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

CREWS, MATTHEW Practice Leader - X-13 2

CHAPPELL, LOGAN Senior Consultant - X-11 14

LUCERO, BEN Senior Consultant - X-11 CADD - Develop figures for Groundwater Monitoring Report 2

STRAYER, ALICIA Staff Sci/Eng - P-8 2

TOTAL LABOR 20

VEHICLE TYPE RATE UNIT USEAGE

Utility Van $120.00 Per Day 0 $0.00

TOTAL VEHICLE $0.00

MEALS STAFF RATE UNIT USEAGE

TOTAL MEALS $0.00

HOTELS STAFF RATE UNIT USEAGE

TOTAL HOTELS $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin IDW $125.00 Drum 0 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Halocarbons Method 8260 $73.00 0 0 $0.00 PID/Hall-Series (Total VOCs) Method 8021 (IDW) $110.00 0 0 $0.00 Sample Shipping Large $150.00 0 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Miscellaneous Expendables $40.00 Per Day 0 $0.00 Deep Groundwater Sampling Kit $415.00 Per Day 0 $0.00

Tubing, Poly/HDPE $0.30 per foot 0 $0.00 55-Gal Drum $100.00 Each 0 $0.00

TOTAL EQUIPMENT $0.00

Reporting: report formatting, document production. Create pdf for OCULUS.

Update data tables and prepare draft Groundwater Monitoring Report.

Prepare conclusions and recommendations for Groundwater Monitoring Report

WSP USA Inc.

9428 Baymeadows Road, Suite 400, Jacksonville, Florida 32256 USA

T: +1 904 363-3430 F: +1 904 363-3445 wsp.com

February 20, 2026 Proposal No. 2024US567338

Mr. Patrick McGrane Florida Department of Environmental Protection Division of Waste Management Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400

RE: COST PROPOSAL FOR GROUNDWATER SAMPLING

CONCORD CUSTOM CLEANERS #201

1413 S MONROE STREET

TALLAHASSEE, LEON COUNTY, FLORIDA

DEP FACILITY ID NUMBER: ERIC_4867

PROPOSED TASK ASSIGNMENT: DC002H

Dear Mr. McGrane:

WSP USA Inc. (WSP) is pleased to provide the Florida Department of Environmental Protection (DEP) with this cost proposal to complete groundwater sampling activities at the above-referenced site. This proposal includes a description of the proposed scope of services, level of effort sheets for each subtask, and a cost estimate form that summarizes the costs of the proposed services. The proposed scope of services is described below.

SUBTASK 1 – PROJECT MANAGEMENT

To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with the DEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with DEP Waste Site Cleanup Section requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the DEP-approved task assignment.

SUBTASK 2 – GROUNDWATER SAMPLING ACTIVITIES

Groundwater Monitoring Following authorization to proceed, WSP will use the Leon County Property Appraiser’s website to verify that the current property owner has an executed Permission to Enter Property agreement with the DEP. WSP and the DEP will then coordinate with the real property owner for access to complete the scope of work.

Mr. Patrick McGrane Proposal No. 2024US567338

Florida Department of Environmental Protection February 20, 2026

In accordance with the December 2024 Sampling and Restoration Agreement between the DEP and the property owner, WSP will mobilize to the site to collect a split groundwater sample (a second sample collected from the same well) from monitoring wells CCCMW001, CCCMW003, CCCMW007, and CCCDW001 while the property owner’s contractor collects the primary groundwater sample. The attached Figure 2 shows the monitoring well locations.

Prior to groundwater sampling, depth-to-water measurements will be collected using an electronic water level indicator at each of the four monitoring wells to determine groundwater depth. During the sampling event, the locks and well caps will be inspected for damage or degradation and repaired or replaced, as necessary.

Groundwater samples will be collected from the wells in accordance with DEP Standard Operating Procedures (SOPs) for Field Activities (DEP SOP-001/01). Prior to collecting the groundwater sample, each well will be purged and field parameters including temperature, pH, specific conductance, dissolved oxygen, turbidity, and oxidation-reduction potential (ORP) will be monitored. Purge volumes and field parameters will be recorded on field data sheets, and the field monitoring equipment will be calibrated in accordance with the manufacturer’s recommended procedures.

Groundwater samples will be collected using low-flow sampling methods. The groundwater samples will be placed in laboratory-supplied containers, labeled with a unique identification number attached to the outside of the sample container, preserved on ice in a laboratory-provided cooler at a maximum temperature of four degrees Celsius, and delivered to a Florida Department of Health and National Environmental Laboratory Accreditation Program certified fixed-base laboratory, along with the completed chain-of-custody documentation. The laboratory will analyze the samples for chlorinated volatile organic compounds (VOCs) using EPA Method 8260B.

Investigation Derived Waste WSP will temporarily store the investigation-derived waste (IDW) purge water generated from the groundwater sampling event in a 55-gallon steel drum. A waste characterization sample will be collected from the IDW drum for analysis of total VOCs using EPA Method 8260. If the waste characterization sample is acceptable to the disposal subcontractor, the IDW drum will be picked up and transported to a facility for proper disposal. A non-hazardous waste manifest will be provided by the disposal subcontractor upon delivery to the disposal facility.

Interim Deliverable Upon completion of Subtask 2, an e-mail deliverable will be submitted and include copies of the field data sheets, equipment calibration forms, field notes, laboratory analytical report, laboratory chain-of-custody documentation, and non-hazardous waste manifest for the IDW transportation and disposal.

SUBTASK 3 – REPORTING

The Groundwater Monitoring Report will include a description of the sampling procedures, evaluation of the analytical results, comparison of current to historical data, tabulated summary of the current and historical analytical data, a site map showing the groundwater analytical results, water level elevation information in tables and figures, laboratory analytical data, conclusions, and recommendations.

HEALTH AND SAFETY

WSP will update the existing site-specific Health and Safety Plan for the fieldwork as needed. The work will be completed in accordance with WSP’s safety policies and procedures. At a minimum, WSP will wear safety glasses, high-visibility safety vests, and steel-toed boots. A safety job briefing will be conducted prior to the start of work activities, and anytime the scope of work or site conditions change.

Mr. Patrick McGrane Proposal No. 2024US567338

Florida Department of Environmental Protection February 20, 2026

COST AND SCHEDULE

The estimated cost to complete the proposed scope of work is $9,031.09. WSP anticipates the monitoring event will take place in March 2026. The level of effort sheets and cost estimate form are included in Attachment A. The IDW disposal subcontractor quotes are included in Attachment B. The following table summarizes the proposed costs and deliverable schedule.

Task Proposed Cost Proposed Schedule/Deliverables

Subtask 1 – Project Management $873.38 May 21, 2026

Subtask 2 – Groundwater Sampling Activities

$4, 731.92 April 21, 2026 (Field documentation, laboratory analytical report, and non-hazardous waste manifest via E-mail)

Subtask 3 – Reporting $3,425.79 May 21, 2026 (Groundwater Monitoring Report)

Total/Completion Date $9,031.09 July 1, 2026

WSP appreciates the opportunity to provide services to the DEP. Should you require additional information or clarifications, please contact us at (904) 363-3430.

Sincerely, WSP USA Inc.

Logan Chappell, PE Matthew C. Crews, PE Project Manager, Environmental Engineer Vice President, Environmental Engineer

LC/MCC/as

Attachments: Figure 2 – Site Layout

Attachment A – Level of Effort Sheets and Cost Estimate Form Attachment B – Subcontractor Quotes https://wsponlinenam.sharepoint.com/sites/US-TallahasseeSIR/Shared Documents/SIR/FDEP- WCP/DryClean/Concord Custom Cleaners #201 (4867)/HW685/DC002H - GWS/Proposal/DC002H - Concord Custom Cleaners #201 GW Mon Proposal.docx

X X

X X X X X

X X

O /H

O /H

O /H

O /H

O /H

O /H

O /H

O/H O/H O/H O/H

O /H

O /H

O /H

O /H

O /H

O /H

O /H

O /H

O /H

O /H

O /H

O /H

O /H

O /H

O /H

O /H

O /H

O /H

O /H

O /H

O /H

O /H

O

O

C C

C M

W

C C

C M

W

C C

C M

W

C

C C

M W

C C

C M

W

EX

M W

EX

M

W

C C

C M

W

C C

C M

W

EX

D

W

C C

C D

W

VE

W

-4 S

VE

W

-4 D

C C

C M

W

VE

W

-3 D

VE

W

-3 S

VE

W

-6 D

VE

W

-6 S

H

EW

-2 H

EW

-1

VE

W

-5 D

VE

W

-5 S

O/HO/HO/HO/HO/HO/HO/HO/HO/HO/HO/HO/HO/HO/H

VE

W

-7 S

VE

W

-7 D

E H

AR

R

IS

O

N S

TR

EE

T

SOUTH MONROE ST.

SV

E

SY

ST

EM

E

XC

AV

AT

IO

N

A R

EA

(5 ft-

BG

S)

E

XC

AV

AT

IO

N

A R

EA

(5 ft-

BG

S)

FO

R

M

ER

C O

N C

O R

D C

U

ST

O M

C

LE

AN

ER

S N o.

C

AN

O

PY

C

AN

O

PY

EX

EC

U

TI

VE

O

FF

IC

E

SU

PP

LY

SO

U

TH

M

O N

R O

E

EN

TE

R

PR

IS

E, L

LC

H

M W

IL

LI

AM

S

PR

O

PE

R

TI

ES

L

TD

EX

EC

U

TI

VE

O

FF

IC

E

SU

PP

LY

, I N

C

U N

N

AM

ED

W

EL

L

01 in

PH

AS

E

-D

C

2C -A

FI

G

U R

E 2

-1 2-

BC

L

M C

C

M C

C

JC

B

SI

TE

R

ES

TO

R

AT

IO

N P

LA

N

C O

N C

O R

D N o

TA

LL

AH

AS

SE

E, L

EO

N

C O

U N

TY

, F

LO

R

ID

A

FL

. D

EP

T.

O F

EN

VI

R O

N M

EN

TA

L

PR

O

TE

C

TI

O N

SI

TE

L A

YO

U

T

TI

TL

E

PR

O

JE

C

T N

O

R

EV

PR

O

JE

C

T

C

LI

EN

T

C O

N

SU

LT

AN

T

PR

EP

AR

ED

D

ES

IG

N

ED

R

EV

IE

W

ED

AP

PR

O

VE

D

YY

YY

-M M

-D D

IF THIS MEASUREMENT DOES NOT MATCH WHAT IS SHOWN, THE SHEET SIZE HAS BEEN MODIFIED FROM: ANSI B

Path: \\golder.gds\complexdata\Office\Jacksonville\drafting\Projects\FDEP\FDEP-DC\31404452\31404452_4867_Concord201\02_PRODUCTION\DWG\ | File Name: 4867-DC002C-A002.dwg

1.

AE

R

IA

L

IM

AG

E

TA

KE

N F

R O

M F

D O

T-

AP

LU

S, D

AT

ED

J

AN

U

AR

Y

, 2

8.

2.

PR

O

PE

R

TY

B O

U N

D

AR

Y

TA

KE

N

F R

O M

F

LO

R

ID

A D

EP

AR

TM

EN

T O

F R

EV

EN

U E.

3.

BA

SE

M

AP

S

O U

R C

E:

B

R O

W

AR

D D

AV

IS

A

SS

O

C

IA

TE

S, IN

C

SU

R

VE

Y D

AT

E:

.0

8.

E

AR

TH

S

YS

TE

M S, T

IT

LE

D

"S

IT

E

LA

YO

U

T"

LE

G

EN

D

R

EF

ER

EN

C E(

S)

U

PP

ER

F

LO

R

ID

AN

A Q

U

IF

ER

W

EL

L

LO

C

AT

IO

N

D

EE

PE

R

F

LO

R

ID

AN

A

Q U

IF

ER

W

EL

L

LO

C

AT

IO

N

U

TI

LI

TY

P O

LE

VA

PO

R E

XT

R

AC

TI

O N

W

EL

L

LO

C

AT

IO

N

H O

R

IZ

O N

TA

L

VA

PO

R E

XT

R

AC

TI

O N

W

EL

L

LO

C

AT

IO

N

SV

E

SY

ST

EM

C

O N

VE

YA

N C

E

PI

PI

N

G T

R

EN

C H

PE

R

C H

ED

/S

U R

FI

C

IA

L

AQ

U

IF

ER

W

EL

L

LO

C

AT

IO

N

O /H

O /H

EX

IS

TI

N

G O

VE

R

H

EA

D U

TI

LI

TY

N O

TE

(S

1.

ft-

BG

S

FE

ET

B

EL

O W

G R

O U

N D

S U

R

FA

C E

2.

SV

E

SO

IL

V

AP

O R

E

XT

R

AC

TI

O

N 3.

H

EW

H

O R

IZ

O

N

TA

L

EX

TR

AC

TI

O

N W

EL

L

4.

VE

W

V

ER

TI

C

AL

E

XT

R

AC

TI

O N

W

EL

L

408 Ditmar Street Pensacola, FL 32503

To: Mr. Ralph Mongillo

WSP

9428 Baymeadows Road, Suite 400 Jacksonville, FL 32256

June 16, 2023

Re: Non-Hazardous Disposal of PFOS/PFAS Impacted Materials

Mr. Mongillo:

The price for the transportation and disposal (T&D) of non-hazardous soil, mud, and water is listed below:

For Non-Hazardous Chlorinated Solvent Impacted Materials:

Description Rate Unit T&D - Non-Haz Chlorinated Solvents Impacted Soil $ 125.00 Per Drum T&D - Non-Haz Chlorinated Solvents Impacted Mud/Water $ 125.00 Per Drum T&D - Non-Haz Chlorinated Solvents Impacted Water $ 95.00 Per Bucket

For Non-Hazardous PFAS/PFOS Impacted Materials:

Description Rate Unit Profile Fee (Charged once per site) $ 350.00 Per Site T&D - Non-Haz PFOS/PFAS Impacted Water (5-gallon bucket) $ 95.00 Per Bucket T&D - Non-Haz PFOS/PFAS Impacted Soil $ 195.00 Per Drum T&D - Non-Haz PFOS/PFAS Impacted Mud/Water $ 195.00 Per Drum

Please ensure that all drum lids are properly secured and that drums are on a level surface like the surrounding area (i.e., not on a pallet, etc.). A single False Mobilization fee will apply if our driver is not able to locate a drum on site or if we are unable to access the property due to a locked gate, etc. This quote is valid for 90 days.

Respectfully, Robert Donado Erwin Remediation, Inc.

Email: robert@erwinremediation.com p y

T&D - Non-Haz Chlorinated Solvents Impacted Mud/Water $ 125.00 Per Drum