Task Assignment DC024D Summary
This Task Assignment (TA) is a state contract document entered into between the State of Florida Department of Environmental Protection (FDEP) and WSP USA Inc. for groundwater monitoring services at the Blue Ribbon Cleaners site located at 1102 East Lafayette Street, Tallahassee, Leon County, Florida (ERIC_4859). The contract is issued under the underlying Contract Number HW685, with the Task Assignment effective March 30, 2026, and completion scheduled for December 11, 2026. The Department Project Manager is Patrick McGrane (850-245-8899), and the Contractor's Project Manager is Matt Crews (904-363-3430).
WSP USA Inc. will conduct annual groundwater monitoring activities including site access verification, groundwater sampling from 12 monitoring wells (MW001-MW012), water level measurements, field parameter monitoring, sample collection and analysis for chlorinated volatile organic compounds using EPA Method 8260D, investigation-derived waste characterization and disposal, and preparation of a comprehensive Annual Groundwater Monitoring Report. The total Task Assignment value is $15,417.68 on a fixed unit rate basis, consisting of Subtask 1 (Project Management) at $1,455.55, Subtask 2 (Annual Groundwater Monitoring Activities) at $9,324.57 with deliverable due August 14, 2026, and Subtask 3 (Reporting) at $4,637.56 with deliverable due October 9, 2026. The scope includes 84 total labor hours across multiple staff categories, laboratory analytical costs of $986.00, field expenses totaling $1,402.00, travel costs of $240.00, and a completion fee of $1,150.20. Subcontractor costs for investigation-derived waste disposal are estimated at $137.50 for containerization services.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 2025
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW685
DC024D Completion December 11, 2026
This Task Assignment authorizes WSP to conduct groundwater sampling at Blue Ribbon Cleaners in accordance with the March 23, 2026 Scope of Work, Cost Estimate, and Bid Documentation.
Patrick McGrane 850-245-8899 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
WSP USA Inc.
WSP USA Inc.
Matt Crews 904-363-3430
ERIC_4859
1102 East Lafayette Street, Tallahassee, Leon County
Blue Ribbon Cleaners
✔ $ 15,417.68
$ 15,417.68
Scope of Work
Matthew Crews
Environmental Engineer
3/30/2026
Crews, Matt (USMC700671) Digitally signed by Crews, Matt (USMC700671) Date: 2026.03.30 15:59:54 -04'00'
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2026.03.27 11:37:41 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
BWC TAFORM 25
HW685
DC024D
Subtasks 1 & 3 - Project Management; Reporting
Subtask 2 - Annual Groundwater Monitoring 08/14/2026
10/09/2026
Subtask 2 - Submittal and FDEP approval of email summary containing field documentation, certified laboratory reports for VOCs, and signed waste manifest(s)
Subtasks 1 & 3 - Submittal and FDEP approval of the Annual Groundwater Monitoring Report
$ 9,324.57
$ 15,417.68
$ 6,093.11
McGrane_P Rectangle
Memorandum
TO: Negotiation File
Blue Ribbon Cleaners Tallahassee, Leon County
ERIC_4859
FROM: Patrick McGrane, Project Manager
SUBJECT: Negotiation Summary Task Assignment DC024D (HW685)
DATE: March 24, 2026
This Task Assignment authorizes WSP USA Inc. (WSP) to conduct groundwater monitoring at the Blue Ribbon Cleaners site. The scope of work is approved based on review of the 2025 Annual Groundwater Monitoring Report.
The total cost for this project is $15,417.68 with 84 total labor hours. All work is to be completed in accordance with the March 23, 2026, Scope of Work, Cost Estimate, and Bid Documentation.
WSP may invoice according to the included schedule.
FDEP COST ESTI MATE
Contractor: WSP USA, Inc.
Date: 3/23/2026
Task #: DC024D SubTask 1 Project Management SubTask 6 Site: SubTask 2 Annual Groundwater Monitoring Activities SubTask 7
Activity/Phase: Monitoring SubTask 3 Reporting SubTask 8 Project Manager: Patrick McGrane SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$80.31 Practice Leader - X-13 SCHAEFER, GEOFFREY 3 0.0 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $56.85 Senior Sci/Eng - X-11 CHAPPELL, LOGAN 31 8.5 6.0 16.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $56.33 Senior Sci/Eng - X-11 LUCERO, BEN 5 0.0 5.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $42.74 Senior Project Sci/Eng - P-10 DEL VAL, LUIS 22 22.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $45.34 Senior Project Sci/Eng - P-10 OIEN, ERIK 20 20.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $38.32 Staff Sci/Eng - P-8 STRAYER, ALICIA 3 0.0 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Hours 84 8.5 48.0 27.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Direct Labor $4,220.91 $485.59 $2,188.18 $1,547.14 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.50% $7,281.07 $837.64 $3,774.61 $2,668.82 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $11,501.98 $1,323.23 $5,962.79 $4,215.96 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel Vehicle $240.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Meals $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $240.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Erwin $125.00 $125.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Other $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Other $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subcontractor Subtotal $125.00 $125.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $12.50 $12.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $137.50 $137.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $986.00 $986.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $986.00 $986.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $140.00 $140.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $80.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $1,082.00 $1,082.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,402.00 $1,402.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $14,267.48 $1,323.23 $8,728.29 $4,215.96 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,150.20 $132.32 $596.28 $421.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $15,417.68 $1,455.55 $9,324.57 $4,637.56 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Blue Ribbon Cleaners
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Blue Ribbon Cleaners SUBTASK 2: Annual Groundwater Monitoring Activities
DATE: 3/23/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF TITLE WORK DESCRIPTION HOURS
CHAPPELL, LOGAN Senior Sci/Eng - X-11 6
DEL VAL, LUIS Senior Project Sci/Eng - P-10 22
OIEN, ERIK Senior Project Sci/Eng - P-10 20
TOTAL LABOR 48
VEHICLE TYPE RATE UNIT USEAGE
Utility Van $120.00 Per day 2 $240.00
TOTAL VEHICLE $240.00
MEALS STAFF RATE UNIT USEAGE
TOTAL MEALS $0.00
HOTELS STAFF RATE UNIT USEAGE
TOTAL HOTELS $0.00
SUBCONTRACTOR COSTS
Erwin IDW $125.00 Drum 1 $125.00
$0.00
TOTAL $125.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Halocarbons Method 8260 $73.00 12 0 $876.00 PID/Hall-Series (Total VOCs) Method 8021 (IDW) $110.00 1 0 $110.00
TOTAL LAB $986.00
EQUIPMENT RATE COSTING UNIT USEAGE TOTALS
$35.00 Per Man Day 4 $140.00 $40.00 Per Day 2 $80.00 $415.00 Per Day 2 $830.00 $0.30 Per Foot 720 $216.00 $3.00 Per Foot 12 $36.00
$100.00 Per Drum 1 $100.00
ITEM
PPE- Level D
Miscellaneous Expendables Deep Groundwater Sampling Kit
Tubing, Poly HDPE Tubing, Silicon 3/16 x 3/8
Drum, 55-gallon
TOTAL EQUIPMENT $1,402.00
Verification of property ownership prior to groundwater sampling (1 hour). Characterize IDW and prepare waste profile for transportation and disposal of IDW (2 hours). Prepare and submit Trip Report deliverable (3 hrs).
Field event preparation (1 hour). Mobilization 1hr/day x 2 days (2 hours). Gauge water levels and calibrate instrumentation, Collect groundwater samples from 12 wells MW001 through MW012 and IDW Management and Sample (17 hr). Deliver samples to local Laboratory (1 hour). Scan and upload notes and documentation (1 hr).
Pickup samples from Laboratory (1 hr); Mobilization 1hr/day x 2 days (2 hours). Gauge water levels and calibrate instrumentation, Collect groundwater samples from 12 wells MW001 through MW012 and IDW Management and Sample (17 hr).
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Blue Ribbon Cleaners SUBTASK 3: Reporting
DATE: 3/23/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
SCHAEFER, GEOFFREY Practice Leader - X-13 3 CHAPPELL, LOGAN Senior Sci/Eng - X-11 16 LUCERO, BEN Senior Sci/Eng - X-11 CADD - Develop figures for Groundwater Monitoring Report 5
STRAYER, ALICIA Staff Sci/Eng - P-8 3
TOTAL LABOR 27
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
MEALS STAFF RATE UNIT USEAGE
TOTAL MEALS $0.00
HOTELS STAFF RATE UNIT USEAGE
TOTAL HOTELS $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin IDW $125.00 Drum 0 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
Develop Conclusions and Recommendations for Annual Monitoring Report Update data tables and prepare draft Groundwater Monitoring Report.
Reporting: report formatting, document production. Create pdf for OCULUS.
WSP USA Inc.
9428 Baymeadows Road, Suite 400, Jacksonville, Florida 32256 USA
T: +1 904 363-3430 F: +1 904 363-3445 wsp.com
March 23, 2026 Proposal No. 2026US572437
Mr. Patrick McGrane
Florida Department of Environmental Protection
Division of Waste Management
Waste Site Cleanup Section
2600 Blair Stone Road, MS 4520
Tallahassee, FL 32399-2400
RE: COST PROPOSAL FOR ANNUAL GROUNDWATER MONITORING
BLUE RIBBON CLEANERS
1102 EAST LAFAYETTE STREET
TALLAHASSEE, LEON COUNTY, FLORIDA
FACILITY IDENTIFICATION NUMBER: ERIC_4859
PROPOSED TASK ASSIGNMENT: DC024D
Dear Mr. McGrane:
WSP USA Inc. (WSP) is pleased to provide the Florida Department of Environmental Protection (DEP) with this cost proposal for annual groundwater monitoring activities at the above-referenced site. This proposal includes a description of the proposed scope of services, level of effort sheets for each subtask, and a cost estimate form that summarizes the costs of the proposed services. The proposed scope of services is described below.
SUBTASK 1 – PROJECT MANAGEMENT
To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with the DEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with the DEP Waste Site Cleanup Section requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the DEP-approved task assignment.
SUBTASK 2 – ANNUAL GROUNDWATER MONITORING ACTIVITIES
Site Access
Following authorization to proceed, WSP will use the Leon County Property Appraiser’s website to verify that the current property owner and relevant offsite property owners have an executed Permission to Enter Property agreement with the DEP. WSP will then coordinate with the real property owner, tenant, and offsite property owners for access to complete the scope of work.
Mr. Patrick McGrane Proposal No. 2026US572437
Florida Department of Environmental Protection March 23, 2026
Groundwater Sampling
WSP will collect groundwater samples from the following 12 monitoring wells: MW001 through MW012. The well locations and previous analytical results are shown on the attached Figure 4.
Prior to groundwater sampling, the depth-to-groundwater will be measured at accessible monitoring wells using an electronic water level indicator to determine groundwater elevations and flow direction. During the sampling event, the locks and well caps will be inspected for damage or degradation and repaired or replaced as necessary.
Groundwater samples will be collected from the wells in accordance with DEP Standard Operating Procedures
(SOPs) for Field Activities (DEP-SOP-001/01) dated January 2017 (effective April 16, 2018). Prior to collecting the groundwater sample, each well will be purged and field parameters including temperature, pH, specific conductance, dissolved oxygen, turbidity, and oxidation-reduction potential will be monitored. Purge volumes and field parameters will be recorded on field data sheets, and the field monitoring equipment will be calibrated in accordance with the manufacturer’s recommended procedures. Groundwater samples will be collected using low-flow sampling methods.
The samples will be placed in laboratory-supplied containers, labeled with a unique identification number attached to the outside of the sample container, and preserved on ice in a laboratory-provided cooler. The groundwater samples will be shipped to a Florida Department of Health and National Environmental Laboratory Accreditation
Program-certified, fixed-base laboratory, along with the completed chain-of-custody, for analysis of chlorinated volatile organic compounds (VOCs) using EPA Method 8260D. Upon receipt of the laboratory analytical results, WSP will evaluate the constituent concentrations to determine if offsite notification is required.
Investigation-Derived Waste
WSP will containerize the investigation-derived waste (IDW) purge water and decontamination water in a 55-gallon drum. WSP will collect a waste characterization sample from the drum for analysis of total VOCs using EPA
Method 8260. The drum will be temporarily staged onsite, pending waste characterization. For cost-estimating purposes, WSP has assumed that the IDW can be transported and disposed of as non-hazardous waste at an approved facility. The IDW transportation and disposal subcontractor will provide WSP with a non-hazardous waste manifest upon delivery to the disposal facility. WSP estimates one drum of IDW purge water will be generated during the field activities.
Interim Deliverable
Upon completion of Subtask 2, an e-mail deliverable will be submitted and include copies of the field data sheets, equipment calibration forms, field notes, laboratory analytical report, laboratory chain-of-custody documentation, and non-hazardous waste manifest.
SUBTASK 3 – REPORTING
WSP will prepare an Annual Groundwater Monitoring Report that will include a description of the sampling procedures, evaluation of the analytical results; comparison of current to historical data; tabulated summary of the current and historical analytical data; site maps showing the groundwater analytical results and soil gas analytical results; water level elevation information in tables and figures; laboratory analytical data; and conclusions and recommendations.
Mr. Patrick McGrane Proposal No. 2026US572437
Florida Department of Environmental Protection March 23, 2026
HEALTH AND SAFETY
WSP will prepare a site-specific Health and Safety Plan for the field work. The work will be completed in accordance with WSP’s safety policies and procedures. At a minimum, WSP will wear safety glasses, high-visibility safety vests, and steel-toed boots. A safety job briefing will be conducted prior to the start of work activities and anytime the scope of work or site conditions change.
COST AND SCHEDULE
The estimated cost to complete the proposed scope of work is $15,417.68. WSP anticipates the monitoring event will take place in June 2026. The level of effort sheets and cost estimate form are included in Attachment A. The subcontractor quotes are included in Attachment B. The following table summarizes the proposed costs and deliverable schedule.
Task Proposed Cost Proposed Schedule/Deliverables
Subtask 1 – Project Management $ 1,455.55 October 31, 2026
Subtask 2 – Annual Groundwater Monitoring Activities
$ 9,324.57 August 7, 2026 (Field Documentation, Laboratory Report, and IDW Manifest via e-mail deliverable)
Subtask 3 – Reporting $ 4,637.56 September 25, 2026 (Annual Groundwater Monitoring Report)
Total/Completion Date $ 15,417.68 November 25, 2026
WSP appreciates the opportunity to provide services to the DEP. Should you require additional information or clarifications, please contact us at (904) 363-3430.
Sincerely, WSP USA Inc.
Logan Chappell, PE Matthew C. Crews, PE
Environmental Engineer Assistant Vice President, Environmental Engineering
LC/MCC/as
Attachments: Figure 4 – Groundwater Analytical Results (June 2025)
Attachment A – Level of Effort Sheets and Cost Estimate Form Attachment B – Subcontractor Quotes https://wsponlinenam.sharepoint.com/sites/US-TallahasseeSIR/Shared Documents/SIR/FDEP- WCP/DryClean/Blue Ribbon Cleaners (4859)/06 - 2026 GW Monitoring/Proposal/DC024D - Blue Ribbon Cleaners Ann GW Mon Proposal (ERIC_4859).docx
X
MW006
MW009
MW011
MW012
PROPOSED 8' x 8'
CONCRETE REPLACEMENT
MW005
MW008
MW007
MW003
MW001
MW002
MW004
MW010
in
31404452.0490 Control No.
4859-0490-004
FIGURE
2025-12-09
BCL
LC
LC
MCC
BLUE RIBBON CLEANERS (LAFAYETTE)
TALLAHASSEE, LEON COUNTY, FLORIDA
FL. DEPT. OF ENVIRONMENTAL PROTECTION
GROUNDWATER ANALYTICAL RESULTS
(JUNE 2025)
TITLE
PROJECT NO. REV.
PROJECT
CLIENT
CONSULTANT
PREPARED
DESIGNED
REVIEWED
APPROVED
YYYY-MM-DD
IF
T
H
IS
M
EA
SU
R
EM
EN
T D
O
ES
N O
T M
AT
C
H W
H
AT
IS
S
H O
W N
, T H
E
SH
EE
T
SI
ZE
H
AS
B
EE
N M
O D
IF
IE
D F
R O
M : A
N
SI
B
Pa th
\c or p.
pb w an .n et \U
S\ C en tra lD at a\ U
SJ
AX
0\ dr af tin g\
Pr oj ec ts
\F D
EP
\F
D
EP
-D C
\3
2\
_4
9_
Bl ue
R ib bo nC le an er s\
_J un
D at a\ Ac tiv e
D ra w in gs
Fi le N am e:
9-
-0
.d w g
APPROXIMATE PROPERTY BOUNDARY (PARCEL)
SCALE
0 40 80
FEET
1. AERIAL IMAGERY COURTESY OF USGS, MICROSOFT CORPORATION,
AND bing©
2. BASEMAP SOURCE: ECOLOGY AND ENVIRONMENT, INC., FILE No.
1003077.016801C.
3. PROPERTY BOUNDARY TAKEN FROM FLORIDA DEPARTMENT OF
REVENUE.
LEGEND
REFERENCE(S)
MONITORING WELL LOCATION
DRYCLEANING MACHINE
1. ALL RESULTS ARE REPORTED IN MICROGRAMS PER LITER (µg/L).
2. U - INDICATES THAT THE COMPOUND WAS ANALYZED FOR BUT NOT
DETECTED
3. I- REPORTED VALUE IS BETWEEN THE LABORATORY METHOD DETECTION
LIMIT AND LABORATORY PRACTICAL QUANTITATION LIMIT
4. PCE = TETRACHLOROETHENE
5. BOLD FONT INDICATES CONCENTRATIONS EXCEEDING THE GCTL
6. GCTL - GROUNDWATER CLEANUP TARGET LEVEL PER CHAPTER 62-777,
TABLE I OF THE FLORIDA ADMINISTRATIVE CODE (FAC).
7. BOLD FONT AND BLUE SHADED CELL INDICATES AN EXCEEDANCE OF THE
APPLICABLE NADC.
8. NADC - NATURAL ATTENUATION DEFAULT CONCENTRATION PER CHAPTER
62-777, TABLE V OF THE FLORIDA ADMINISTRATIVE CODE (FAC)
NOTE(S)
MW001 Sample ID 25' - 35' Screen Interval (ft-bgs) 06/24/25 Date Sampled
3 300 PCE
NADCs GCTLs
GCTL ISOCONCENTRATION PLUME
(DASHED WHERE INFERRED)
MW001
25' - 35'
05/03/21 12/19/22 05/20/24 06/24/25 10 10 3.7 4.2
MW007
40' - 50'
05/03/21 12/19/22 05/15/24 06/23/25 210 89 160 280
MW002
35' - 45'
05/03/21 12/19/22 05/15/24 06/23/25 14 17 160 94
MW008
35' - 45'
05/03/21 12/19/22 05/15/24 06/24/25
0.48 U 7.7 4.7 14
MW003
37' - 47'
05/03/21 12/19/22 05/15/24 06/24/25 20 230 290 170
MW010
35' - 45'
05/15/24 06/24/25 . .
42 21 . .
MW004
35' - 45'
05/03/21 12/19/22 05/20/24 06/24/25 46 78 39 200
MW009
34' - 44'
05/20/24 06/23/25 . .
Insufficient Insufficient . .
MW005
30' - 40'
05/03/21 12/19/22 05/20/24 06/23/25 80 77 80 140
MW011
25' - 35'
05/20/24 06/24/25 . .
0.48 U 2.4 . .
MW006
35' - 45'
05/03/21 12/19/22 05/20/24 06/23/25 12 9 0.48 U 16
MW012
25' - 35'
05/20/24 06/24/25 . .
40 33 . .
AutoCAD SHX Text
SERVICE ROAD
AutoCAD SHX Text
LAFAYETTE STREET
AutoCAD SHX Text
APALACHEE PARKWAY
AutoCAD SHX Text
FORMER ONE HOUR VALLET CLEANERS
AutoCAD SHX Text
CONCRETE WALK
AutoCAD SHX Text
CONCRETE WALK
AutoCAD SHX Text
CONCRETE WALK
AutoCAD SHX Text
PARKWAY SHOPPING CENTER
AutoCAD SHX Text
BLUE RIBBON CLEANER'S
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
MOTEL 6
AutoCAD SHX Text
OLIVE GARDEN
AutoCAD SHX Text E
AutoCAD SHX Text
SVE1
AutoCAD SHX Text
SVE4
AutoCAD SHX Text
SVE5
AutoCAD SHX Text
SVE2
AutoCAD SHX Text
SVE3
AutoCAD SHX Text
ASPHALT DRIVE AND PARKING
AutoCAD SHX Text
ASPHALT DRIVE AND PARKING
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
ASPHALT PAVEMENT ACCESS ROAD
AutoCAD SHX Text
LOADING RAMP
AutoCAD SHX Text
ASPHALT DRIVE
AutoCAD SHX Text
LOADING RAMP
AutoCAD SHX Text
AND PARKING
Erwin US Ecology* HEPACO T&D Non Haz Soil - CVOCs, Petroleum, Metals per drum 0 $125.00 $0.00 T&D Non Haz Mud/water - CVOCs, Petroleum, Metals per drum 1 $125.00 $125.00 False Mobilization (no drum found) 0 $85.00 $0.00 PFAS Profile Fee (1 per site) 0 $350.00 $0.00 T&D Non Haz Soil - PFAS/PFOS per drum 0 $195.00 $0.00 T&D Non Haz Mud/water -PFAS/PFOS per drum 0 $195.00 $0.00 Disposal Non Haz Soil - VOCs per drum 0 $150.00 $0.00 Disposal Non Haz Mud/water - VOCs per drum 1 $150.00 $150.00 Profile Fee (1 per site) 1 $95.00 $95.00 Disposal Non Haz Soil - PFAS/PFOS 0 $650.00 $0.00 Disposal Non Haz Mud/water -PFAS/PFOS 0 $650.00 $0.00 Approval Fee (per site) 0 $750.00 $0.00 Non Haz Solification Waste Profile fee 0 $50.00 $0.00 Non Haz Solids Disposal (per drum) 0 $185.00 $0.00 Non Haz Sludge Disposal 0 $185.00 $0.00 PFAS Waste 55 gal drum emelle AL 0 $810.00 $0.00 Truck with lift gate and driver 4 $145.00 $580.00 non haz liquids disposal (per drum) 1 $141.75 $141.75 55 gallon reconditioned drum 0 $134.63 $0.00 LTL fees (less than 15 drums 1 $150.00 $150.00 Energy security recovery fee 15% 1 $130.76 $130.76
Total Cost per Drum $125.00 $245.00 * $1,002.51
Notes* Transportation costs will be calculated based on pickups at various sites and waste stream volume
IDW SUBCONTRACTOR COST ESTIMATES FOR CHLORINATED VOCS, PETROLEUM COMPOUNDS, AND METALS
Summary of IDW Subcontractors Costs 2023_6_20 CVOC-Petro-Metals Page 1 of 1
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
To: Mr. Ralph Mongillo
WSP
9428 Baymeadows Road, Suite 400 Jacksonville, FL 32256
June 16, 2023
Re: Non-Hazardous Disposal of PFOS/PFAS Impacted Materials
Mr. Mongillo:
The price for the transportation and disposal (T&D) of non-hazardous soil, mud, and water is listed below:
For Non-Hazardous Chlorinated Solvent Impacted Materials:
Description Rate Unit
T&D - Non-Haz Chlorinated Solvents Impacted Soil $ 125.00 Per Drum
T&D - Non-Haz Chlorinated Solvents Impacted Mud/Water $ 125.00 Per Drum
T&D - Non-Haz Chlorinated Solvents Impacted Water $ 95.00 Per Bucket
For Non-Hazardous PFAS/PFOS Impacted Materials:
Description Rate Unit
Profile Fee (Charged once per site) $ 350.00 Per Site
T&D - Non-Haz PFOS/PFAS Impacted Water (5-gallon bucket) $ 95.00 Per Bucket
T&D - Non-Haz PFOS/PFAS Impacted Soil $ 195.00 Per Drum
T&D - Non-Haz PFOS/PFAS Impacted Mud/Water $ 195.00 Per Drum
Please ensure that all drum lids are properly secured and that drums are on a level surface like the surrounding area (i.e., not on a pallet, etc.). A single False Mobilization fee will apply if our driver is not able to locate a drum on site or if we are unable to access the property due to a locked gate, etc. This quote is valid for 90 days.
Respectfully, Robert Donado Erwin Remediation, Inc.
Email: robert@erwinremediation.com
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_v2.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v1.pdf |
| Cost Estimate |
| Subtask 2 |
| Subtask 3 |
| Subtask 4 |
| Subtask 5 |
| Subtask 6 |
| 2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev1_12-12-22.pdf |
| Table 1 for SAWP |
| Monitoring Well Locations |
| Utility Locate Bids_Compiled.pdf |
| Geosyntec Utility-272_Geotek_1500 |
| Geoview Utility Quote_2000_COT FTF SIS |
| Tallahassee Fire Training Division_V1_Bloodhound_3700 |
| Drilling Bids_Compiled.pdf |
| PDS_Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (sonic) |
| Direct Push |
| City of Tallahassee Fire Training Site_GW Protection PFAS Free Water Estimate Email |
| Cascade_Geosyntec Consultants, Inc. - City of Tallahassee Fire Training Facility - PN221026-118844 |
| GW Protection_Geosyntec (T) 1022060 S.pdf |
| Invoice |
| Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (MOT).xlsx.pdf |
| Sheet1 |
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v1.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v2.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v2.pdf |
| Cost Estimate |
| Subtask 2 |
| Subtask 3 |
| Subtask 4 |
| Subtask 5 |
| Subtask 6 |
| 2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev2.pdf |
| Table 1 for SAWP |
| Monitoring Well Locations |
File details come from the government source that posted it. Updated .