CN-370000-HW685-DC028B.pdf

PDF 2 MB Posted

Attached to
Master Agreement FL|HW685|184b9800bda47b032a54413957b4b38d
Contract number
HW685
Issued by
Florida

About this file

Task Assignment Summary

This document is a Task Assignment (TA) entered into between the State of Florida Department of Environmental Protection (FDEP) and Golder Associates USA Inc. under Contract Number HW685. The TA, numbered DC028B, was executed on October 7, 2022, with a completion date of May 30, 2023, and authorizes Golder to conduct groundwater monitoring activities at the former Music Man site located at 799 Lane Avenue South, Jacksonville, Duval County, Florida (FDEP Facility ID: ERIC_4619).

The scope of work encompasses three subtasks: Project Management (Subtask 1), Annual Groundwater Monitoring (Subtask 2), and Reporting (Subtask 3). Golder will collect and analyze groundwater samples from 13 monitoring wells for chlorinated volatile organic compounds using EPA Method 8260B and methane/ethane/ethene analysis at selected wells. The monitoring includes field documentation, laboratory analysis, investigation-derived waste disposal, and preparation of an annual groundwater monitoring report. The total TA value is $12,401.07 on a fixed unit rate basis, allocated as follows: Subtask 1 at $1,007.73, Subtask 2 at $8,066.32, and Subtask 3 at $4,334.75. Deliverables are scheduled with Subtask 2 due February 20, 2023, and Subtasks 1 and 3 due March 31, 2023, with invoicing contingent upon FDEP approval of submitted deliverables. The project involves 67 total labor hours and includes subcontracted services for investigation-derived waste disposal through Clark Environmental.

View the file

Other files

File Type Posted
CN-370000-HW685-BF01C.pdf PDF
CN-370000-HW685-BF05ACO2.pdf PDF
CN-370000-HW685-BF05ACO3.pdf PDF
CN-370000-HW685-BF06A.pdf PDF
CN-370000-HW685-BF1ACO1.pdf PDF
CN-370000-HW685-BF6ACO1.pdf PDF
CN-370000-HW685-BIL01C.pdf PDF
CN-370000-HW685-BIL01CO1.pdf PDF
CN-370000-HW685-BIL03A.pdf PDF
CN-370000-HW685-BIL2ACO1.pdf PDF
CN-370000-HW685-BIL2CCO1.pdf.crdownload CRDOWNLOAD file
CN-370000-HW685-DC001A.pdf PDF
CN-370000-HW685-DC002G.pdf PDF
CN-370000-HW685-DC003A.pdf PDF
CN-370000-HW685-DC005C.pdf PDF
CN-370000-HW685-DC006B.pdf PDF
CN-370000-HW685-DC006C.pdf PDF
CN-370000-HW685-DC007C.pdf PDF
CN-370000-HW685-DC008A.pdf PDF
CN-370000-HW685-DC009B.pdf PDF
CN-370000-HW685-DC010A.pdf PDF
CN-370000-HW685-DC011A.pdf PDF
CN-370000-HW685-DC012C.pdf PDF
CN-370000-HW685-DC013A.pdf PDF
CN-370000-HW685-DC013C.pdf PDF
CN-370000-HW685-DC015B.pdf PDF
CN-370000-HW685-DC015C.pdf PDF
CN-370000-HW685-DC016A.pdf PDF
CN-370000-HW685-DC018A.pdf PDF
CN-370000-HW685-DC019B.pdf PDF
CN-370000-HW685-DC01ACO6.pdf PDF
CN-370000-HW685-DC01ACO8.pdf PDF
CN-370000-HW685-DC01ACO9.pdf PDF
CN-370000-HW685-DC020B.pdf PDF
CN-370000-HW685-DC022A.pdf PDF
CN-370000-HW685-DC022B.pdf PDF
CN-370000-HW685-DC022D.pdf PDF
CN-370000-HW685-DC023B.pdf PDF
CN-370000-HW685-DC023C.pdf PDF
CN-370000-HW685-DC027B.pdf PDF
CN-370000-HW685-DC027C.pdf PDF
CN-370000-HW685-DC029B.pdf PDF
CN-370000-HW685-DC029C.pdf PDF
CN-370000-HW685-DC02CCO1.pdf PDF
CN-370000-HW685-DC02FCO1.pdf PDF
CN-370000-HW685-DC031A.pdf PDF
CN-370000-HW685-DC031C.pdf PDF
CN-370000-HW685-DC032B.pdf PDF
CN-370000-HW685-DC035A.pdf PDF
CN-370000-HW685-DC037A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW685

DC028B Completion May 30, 2023

This Task Assignment authorizes Golder to conduct groundwater monitoring activities in accordance with the September 28, 2022, Scope of Work, Cost Estimate, and Bid Documentation.

Ginger Shirah 850-245-8899 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Golder Associates USA Inc.

Golder Associates USA Inc.

Matt Crews 904-363-3430

ERIC_4619

799 Lane Avenue South, Jacksonville, Duval County

The Music Man

✔ $ 12,401.07

$ 12,401.07

Scope of Work

Matthew Crews

Senior Lead Consultant, Environmental Engineer

10/7/2022

Matthew C. Crews Digitally signed by Matthew C. Crews Date: 2022.10.07 08:06:13 -04'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2022.10.06 09:35:14 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtask 2: Groundwater Monitoring Field Documentation and Laboratory Report;

IDW Disposal Documentation 02/20/2023

Subtasks 1 & 3: Annual Groundwater Monitoring Report; Project Management 03/31/2023

Subtask 2: Submittal and FDEP approval of the Groundwater Monitoring Field Documentation and Laboratory Report; IDW Disposal Documentation $ 8,066.32

Subtasks 1 & 3: Submittal and FDEP approval of the Annual Groundwater Monitoring Report; Project Management $ 4,334.75

$ 12,401.07

HW685

DC028B

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Secretary

To:

From:

Date:

HW685 Contract Negotiation File The Music Man Jacksonville, Duval County

ERIC_4619

Ginger Shirah, Project Manager October 5, 2022

Subject: Negotiation Summary

HW685 DC028B

This Task Assignment authorizes Golder to conduct groundwater monitoring activities in accordance with the September 28, 2022, Scope of Work, Cost Estimate, and Bid Documentation, and the follow up email on September 29, 2022 adjusting the project schedule.

Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.

Subtask 2: Annual Groundwater Monitoring Golder will collect groundwater samples from monitoring wells SW-4, SW-10, SW-13, SW-15, SW-17, IW-1, IW-4, IW-9, IW-10, IW-13, IW-15 and IW-17 and analyzed for chlorinated volatile organic compounds (VOCs) via EPA Method 8260. Groundwater samples from monitor wells SW-1, SW-4, SW-10, SW-15, IW-1, IW-9, IW-10 and IW-15 will be analyzed for methane, ethane, ethene (MEE). Prior to sampling, depth-to-water will be measured. The wells will then be purged, and field parameters will be recorded. The groundwater samples will be collected using low flow sampling methods. Investigation-derived waste (IDW) will be temporarily stored in a 55-gallon drum. Golder requested bids for IDW drum treatment and disposal from Clark, Erwin, Whatever Waste and M&D Industries.

Clark was selected as the lowest responsive and responsible bid for waste including PFAS & chlorinated solvents.

Subtask 3: Reporting Golder will submit the Annual Groundwater Monitoring Report deliverable to FDEP.

Golder and the FDEP confirmed on September 28, 2022, that an Access Agreement with the current real property owner of the Music Man (ERIC_4619) site has been executed.

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $12,401.07 with 67 labor hours.

FDEP COST ESTIMATEContractor: Golder Associates USA Inc.

Date: 9/28/2022

Task #: DC028B SubTask 1 Project Management SubTask 6

Site: Music Man SubTask 2 Annual GW Monitoring SubTask 7

Activity/Phase: Assessment SubTask 3 Reporting SubTask 8

Project Manager: Ginger Shirah SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$51.23 Project Manager (RFM) 7 6.6 $0.00 Program Leader - X-14 0 0 0 0 0 0 0 0 0 0

$63.65 Practice Leader - X-13 (JB) 3 0 3 0 0 0 0 0 0 0 $59.62 Senior Consultant - X-12 (MCC) 0 0 0 0 0 0 0 0 0 0 $51.23 Senior Sci/Eng - X-11 (RFM) 21 7 14 0 0 0 0 0 0 0 $45.42 Senior Project Sci/Eng - P-10 (BL) 3 0 3 0 0 0 0 0 0 0

$0.00 Project Sci/Eng - P-10 0 0 0.0 0 0 0 0 0 0 0 $38.61 Staff Sci/Eng - P-8 (LS) 16 16.0 0 0 0 0 0 0 0 0 $33.32 Staff Sci/Eng - P-8 (JS) 15 15.0 0 0 0 0 0 0 0 0 $32.75 Staff Sci/Eng - P-8 (AS) 2 0 2 0 0 0 0 0 0 0

$0.00 Sci/Eng/Admin - P-7 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 67 6.6 38.0 22.0 0 0 0 0 0 0 0

Direct Labor $2,922.29 $336.19 $1,476.17 $1,109.93 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.50% $5,040.95 $579.93 $2,546.39 $1,914.63 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $7,963.24 $916.12 $4,022.56 $3,024.56 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF GOLDER Page 1

FDEP COST ESTIMATEContractor: Golder Associates USA Inc.

Date: 9/28/2022

Task #: DC028B SubTask 1 Project Management SubTask 6

Site: Music Man SubTask 2 Annual GW Monitoring SubTask 7

Activity/Phase: Assessment SubTask 3 Reporting SubTask 8

Project Manager: Ginger Shirah SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Travel

Vehicle Rental $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $165.00 $165.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $165.00 $165.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $16.50 $16.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $181.50 $181.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $2,426.00 $2,426.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $220.00 $220.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $2,646.00 $2,646.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $40.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $554.00 $554.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $694.00 $694.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $11,604.74 $916.12 $7,664.06 $3,024.56 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $796.33 $91.61 $402.26 $302.46 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $12,401.07 $1,007.73 $8,066.32 $3,327.02 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF GOLDER Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Music Man SUBTASK 2: Annual GW Monitoring

DATE: 9/28/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Sci/Eng (R Mongillo) 7

Staff Sci/Eng L. Swindle) 16

Staff Sci/Eng (J. Spengler) 15

TOTAL LABOR 38

VEHICLE TYPE RATE UNIT USEAGE

Truck (GW sampling $120.00 Per Day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Clark Disposal of liquids $60.00 Per Drum 1 $60.00 Clark Transportation 101-250 miles $40.00 Per Drum 1 $40.00 Clark Stop fee less than 6 drums $50.00 Per Drum 1 $50.00 Clark 10% surcharge $15.00 Per Drum 1 $15.00

TOTAL $165.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Chlorinated VOCs - EPA Method 8260B

Total VOHs EPA Method 8260B $73.00 12 $876.00

MEE RSK174 $180.00 8 $1,440.00

Total VOCs EPA Method 8260B $110.00 1 $110.00

Sample Shipping Small $110.00 2 $220.00

TOTAL LAB $2,646.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Miscellaneous Expendables $40.00 Per Day 1 $40.00 Shallow Groundwater Sampling Kit $290.00 Per Day 1 $290.00 Tubing, Poly HDPE $0.30 Per Foot 750 $225.00 Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 13 $39.00 Drum, 55-gallon $100.00 Per Drum 1 $100.00

TOTAL EQUIPMENT $694.00

Round trip travel (1 hour). Field event preparation (1 hr). Instrument calibration, groundwater measure water levels, measure field parameters, collect samples from 13 wells: five shallow zone monitoring wells (SW-4, SW-10, SW-13, SW-15, and SW-17), and seven intermediate zone monitoring wells (IW-1, IW-4, IW-9, IW-10, IW 13, IW-15, and IW-17) analyze for chlorinated VOCs by EPA Method 8260B and SW-1, SW-4, SW-10, SW-15, IW-1, IW-9, IW-10 and IW-15 for methane, ethane, and ethene (RSK174), and manage IDW (14 hours). .

Communication with RPO, verification of property ownership, and offsite access properties prior to site access (2 hr), prepare and submit field notes, sample forms, laboratory report in an email deliverable to the DEP (3 hours), characterization and waste profile for transportation and disposal of IDW drum(s) (2 hr).

Round trip travel (1 hour). Instrument calibration, groundwater measure water levels, measure field parameters, collect samples from 13 wells: five shallow zone monitoring wells (SW-4, SW- 10, SW-13, SW-15, and SW-17), and seven intermediate zone monitoring wells (IW-1, IW-4, IW- 9, IW-10, IW 13, IW-15, and IW-17) analyze for chlorinated VOCs by EPA Method 8260B and SW-1, SW-4, SW-10, SW-15, IW-1, IW-9, IW-10 and IW-15 for methane, ethane, and ethene (RSK174), and manage IDW (14 hours). .

Contact property owner offsite property owners, and DEP scheduling field work, collect and depth to water measurements and groundwater samples from 12 existing monitoring wells for chlorinated VOC analysis and MEE from 7 wells, one additional well for MEE only, and IDW characterization and waste profile for transportation and disposal.

FINAL --7/24/96

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Music Man SUBTASK 3: Reporting

DATE: 9/28/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Practice Leader (J. Brown) 3

Senior Sci/Eng (R Mongillo) 14

Senior Project Sci/Eng (B. Lucero) 3

Staff Sci/Eng (A. Strayer) 2

TOTAL LABOR 22

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

Reporting: Updating tables document production, binding and shipping. Create pdf for OCULUS.

Develop conclusions and recommendations and prepare final Annual Monitoring Report.

Data entry, prepare tables and figures, and draft Annual Monitoring Report

CADD Update Figures (one groundwater flow and one CVOC detections)

FINAL --7/24/96

Golder Associates USA Inc.

9428 Baymeadows Road, Suite 400, Jacksonville, Florida, USA 32256

T: +1 904 363-3430 F: +1 904 363-3445 golder.com

September 28, 2022 Proposal No. 202208346

Ms. Ginger Shirah Florida Department of Environmental Protection Division of Waste Management Drycleaning Solvent Cleanup Program 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400

RE: COST PROPOSAL FOR THE FORMER MUSIC MAN

2023 ANNUAL GROUNDWATER MONITORING

799 LANE AVENUE SOUTH

JACKSONVILLE, DUVAL COUNTY, FLORIDA

DEP FACILITY ID NUMBER: ERIC_4619

PROPOSED TASK ASSIGNMENT: HW685_DC028B

Dear Ms. Shirah:

Golder Associates USA Inc. (Golder) is pleased to provide the Florida Department of Environmental Protection (DEP) with this cost proposal for the 2023 annual groundwater monitoring at the above-referenced site. This proposal includes a description of the proposed scope of services, level of effort sheets for each subtask, and a cost estimate form that summarizes the costs of the proposed services. The scope of work is based on the recommendations presented in the Golder 2022 Annual Groundwater Monitoring Report. The proposed scope of services is described below.

SUBTASK 1 – PROJECT MANAGEMENT

To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with DEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with DEP Drycleaning Solvent Cleanup Program requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the DEP-approved task assignment.

SUBTASK 2 – ANNUAL GROUNDWATER MONITORING AND IDW TREATMENT

Golder will collect groundwater samples from 13 monitoring wells. Groundwater samples will be collected from one shallow well SW-1 for (methane, ethane, and ethene (MEE) only) and five shallow zone monitoring wells (SW-4, SW-10, SW-13, SW-15, and SW-17), and seven intermediate zone monitoring wells (IW-1, IW-4, IW-9, IW-10, Ms. Ginger Shirah Proposal No. 202208346

Florida Department of Environmental Protection September 28, 2022

IW-13, IW-15, and IW-17) chlorinated volatile organic compounds (VOCs) by EPA Method 8260B. In addition, eight samples will be collected from SW-1, SW-4, SW-10, SW-15, IW-1, IW-9, IW-10, and IW-15 and analyzed for MEE by RSK174). Figures 5 and 6 from the previous annual monitoring report, which show chlorinated VOC results for the surficial aquifers, are attached. Prior to groundwater sampling, depth-to-water measurements will be collected using an electronic water level indicator at the 13 monitoring wells that will be sampled to determine groundwater depth. During the sampling event, the locks and well caps will be inspected for damage or degradation and repaired or replaced, as necessary.

Groundwater samples will be collected from the wells in accordance with DEP Standard Operating Procedures (SOPs) for Field Activities (DEP SOP-001/01). Prior to collecting the groundwater sample, each well will be purged and field parameters including temperature, pH, specific conductance, dissolved oxygen, turbidity, and oxidation reduction potential (ORP) will be monitored. Purge volumes and field parameters will be recorded on field data sheets, and the field monitoring equipment will be calibrated in accordance with the manufacturer’s recommended procedures.

Groundwater samples will be collected using low flow sampling methods. The groundwater samples will be placed in laboratory-supplied containers, labeled with a unique identification number attached to the outside of the sample container, preserved on ice in a laboratory-provided cooler at a maximum temperature of four degrees Celsius, and delivered to a Florida Department of Health and National Environmental Laboratory Accreditation Program certified fixed-base laboratory along with the completed chain-of-custody documentation to be analyzed for chlorinated VOCs using EPA Method 8260B and MEE at selected wells. Upon receipt of the laboratory analytical results, Golder will evaluate the constituent concentrations to determine if off-site notification is required.

Golder will temporarily store the investigation derived waste (IDW) purge water generated from the groundwater sampling event in a 55-gallon steel drum(s). A waste characterization sample will be collected from the IDW drum(s) for analysis of total VOCs using EPA Method 8260. If the waste characterization sample is acceptable to the disposal subcontractor, the IDW drum(s) will be picked up and transported to a facility for proper disposal. A non-hazardous waste manifest will be provided by the disposal subcontractor upon delivery to the disposal facility.

Upon completion of Subtask 2, an e-mail deliverable will be submitted and include copies of the field data sheets, equipment calibration forms, field notes, laboratory analytical report, and laboratory chain-of-custody documentation.

SUBTASK 3 – REPORTING

The annual groundwater monitoring report will include a description of the sampling procedures, evaluation of the analytical results, comparison of current to historical data, tabulated summary of the current and historical analytical data, a site map showing the groundwater analytical results, water level elevation information in tables and figures, laboratory analytical data, conclusions, and recommendations. Golder will forward the Automated Data Processing Tool (ADaPT) data deliverables for the groundwater sampling event provided by the laboratory.

HEALTH AND SAFETY

Golder will update the existing site-specific Health and Safety Plan for the field work. The work will be completed in accordance with Golder’s safety policies and procedures. At a minimum, Golder will wear safety glasses, high visibility safety vests, and steel-toed boots. A safety job briefing will be conducted prior to the start of work activities, and anytime the scope of work or site conditions change.

Ms. Ginger Shirah Proposal No. 202208346

Florida Department of Environmental Protection September 28, 2022

COST AND SCHEDULE

The estimated cost to complete the proposed scope of work is $12,285.57. Golder anticipates the monitoring event will take place late July or early August 2023. The LOE/CEF sheets and disposal subcontractor IDW quotes are included in Attachment A. The following table summarizes the proposed costs and deliverable schedule.

Task Proposed Cost Proposed Schedule/Deliverables

Subtask 1 – Project Management $ 1,007.73 November 25, 2023

Subtask 2 – Annual Groundwater Monitoring

$ 7,950.82 September 16, 2023 (Field documentation and laboratory analytical report via E-mail)

Subtask 3 – Reporting $ 3,327.02 October 28, 2023 (Annual Groundwater Monitoring Report)

Total/Completion Date $12,285.57 December 30, 2023

Please be aware that Golder has been acquired by and is now a Member of the WSP family of companies. Golder remains as a legal entity and is the proposed contracting entity for this proposal. We are in the process of integrating the resources of our companies. Correspondence for this proposal should continue to be addressed to the undersigned.

Golder appreciates the opportunity to provide services under the Drycleaning Solvent Cleanup Program. Should you require additional information or clarifications, please contact us at (904) 363-3430.

Sincerely, Golder Associates USA Inc.

Ralph F. Mongillo, Jr., PG Jesse C. Brown, PE Lead Consultant / Senior Geologist Director / Environmental Engineer

RFM/JCB/as

Attachments: Figure 5 – Chlorinated Hydrocarbon Concentrations in the Shallow Zone of the Surficial Aquifer (August 2022) Figure 6 – Chlorinated Hydrocarbon Concentrations in the Intermediate Zone of the Surficial Aquifer (August 2022)

Attachment A – Level of Effort Sheets and Cost Estimate Form and Subcontractor Quotes

G:\Projects\DEP-Drycleaning\Projects\Jax\Grace & Co MusicMan - HW685\DC028B - 2023 Ann GW Mon\DC028B GW Monitoring proposal - ERIC_4619.docx

L A

N E

V E

N U

E

HOME DEPOT ENTRANCE

CONCRETE

POWER POLE

POWER POLE

CONCRETE

FIRE HYDRANT

BACK OF WALK

GRASS ISLAND

TELEPHONE

WIRE

AREA OF

EXCAVATION

CONCRETE

POWER POLE

R A M O N A B O U L E V A R D

PICCADILLY

CAFETERIA

MUSIC

DEPOT

BONO'S

BAR B QUE

O F F I C E D E P O T

UES TMW-2

UES TMW-1

IW-7

IW-9

IW-8

IW-11

IW-12

IW-2

DW-1

IW-3

IW-6

IW-10

IW-4

IW-5

IW-13

IW-14 IW-15

IW-16

IW-20

IW-19

IW-18

IW-21

SW-18

SW-21

SW-19

SW-20

SW-14 SW-15

SW-16

SW-5

SW-13

SW-4

SW-10

SW-7

SW-9

SW-8

SW-2

SW-1

SW-3

SW-6

IW-17

SW-17

MW-25

MW-15

MW-23

MW-17R

MW-24

MW-7MW-21MW-18MW-19

MW-5R

MW-6R

MW-12R

MW-8R

MW-22

MW-26

MW-27

IW-1

FORMER

BUILDING

FOOTPRINT

INFERRED EXTENT OF

CHLORINATED

HYDROCARBONS

EXCEEDING THE FDEP

NADCs

INFERRED EXTENT OF CHLORINATED

HYDROCARBONS (EXCEEDING THE

FDEP GROUNDWATER CLEANUP

TARGET LEVELS) DICK ENVIRONMENTAL SERVICES WELL

SHALLOW MONITORING WELL LOCATION

TEMPORARY MONITORING WELL LOCATION

INTERMEDIATE MONITORING WELL LOCATION

DEEP MONITORING WELL LOCATION

CHITIN COLUMNS

in

31404452.4619 Control No.

4619-DC028A-005

FIGURE

2022-09-01

BCL

JWS

GRACE PROPERTY

JACKSONVILLE, DUVAL COUNTY, FLORIDA

FL. DEPT. OF ENVIRONMENTAL PROTECTION

CHLORINATED HYDROCARBON CONCENTRATIONS IN THE

SHALLOW ZONE OF THE SURFICIAL AQUIFER

(AUGUST 2022)

TITLE

PROJECT NO. REV.

PROJECTCLIENT

IF

T

H

IS

M

EA

SU

R

EM

EN

T D

O

ES

N O

T M

AT

C

H W

H

AT

IS

S

H O

W N

, T H

E

SH

EE

T

SI

ZE

H

AS

B

EE

N M

O D

IF

IE

D F

R O

M : A

N

SI

B

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

Path: \\golder.gds\complexdata\Office\Jacksonville\drafting\Projects\FDEP\FDEP-DC\31404452\31404452_4619_Music_Man\DC028A\Active Drawings\ | File Name: 4619-DC028A-005.dwg

LEGEND

DRAFT

1. ALL UNITS REPORTED IN MICROGRAMS PER LITER (µg/L).

2. < = BELOW THE LABORATORY REPORTED METHOD

DETECTION LIMIT.

3. I - REPORTED VALUE IS BETWEEN THE LABORATORY METHOD

DETECTION LIMIT AND LABORATORY PRACTICAL

QUANTITATION LIMIT.

4. BOLD/YELLOW HIGHLIGHTED VALUE INDICATES

CONCENTRATION IS ABOVE THE FDEP GROUNDWATER

CLEANUP TARGET LEVEL (GCTL).

5. BOLD/BLUE HIGHLIGHTED VALUE INDICATES CONCENTRATION

IS ABOVE THE FDEP NATURAL ATTENUATION DEFAULT

CONCENTRATION (NADC).

SCALE

0 40 80

FEET

NOTE(S)

1. BASE MAP OBTAINED FROM GANNETT FLEMING, TITLED "SITE

DRAWING GRACE PROPERTIES, INC JACKSONVILLE FLORIDA

FEBRUARY 2005", DATED 3/21/05.

2. BASE MAP UPDATED FROM CADD FILE PREPARED BY WALTON

F. POPPELL, INC., LAND SURVEYORS, JOB No. 07-061, FIELD

SURVEYED ON 03/15/07 IN RELATION TO THE NATIONAL

GEODETIC VERTICAL DATUM OF 1988 (NAVD 88).

REFERENCE(S)

WELL NUMBER

DATE SAMPLED

TETRACHLOROETHYLENE CONCENTRATION

TRICHLOROETHYLENE CONCENTRATION

CIS-1,2-DICHLOROETHYLENE CONCENTRATION

VINYL CHLORIDE CONCENTRATION

SW-15

DEC 2017 JUNE 2018 JUNE 2019 JUNE 2020 JULY 2021 AUG 2022

< 0.22 < 0.50 0.38 U 0.38 U 0.38 U 0.38 U < 0.36 < 0.50 0.36 U 0.36 U 0.36 U 0.36 U

31 358 591 466 197 13.0

160 297 274 164 161 61.0

SW-21

FEB 2016

<0.50

<0.50

<0.50

<0.50

SW-17

JUNE 2018 JUNE 2019 JUNE 2020 JULY 2021 AUG 2022

< 0.50 0.38 U 0.38 U 0.38 U 0.38 U

< 0.50 0.36 U 0.36 U 0.36 U 0.36 U

< 0.50 2.2 0.27 U 0.27 U 0.27 U

< 0.50 0.39 U 0.39 U 0.39 U 0.39 U

SW-13

JUNE 2018 JUNE 2019 JUNE 2020 JULY 2021 AUG 2022

< 0.50 0.38 U 0.38 U 0.38 U 0.38 U

4.6 3.7 3.6 3.8 3.3

57.1 56.8 53.4 67.8 66.6

3.7 4.1 4.6 11.5 9.1

SW-4

JUNE 2018 JUNE 2019 JUNE 2020 JULY 2021 AUG 2022

< 0.50 0.38 U 0.38 U 0.38 U 0.38 U

7.0 1.3 0.36 U 0.36 U 0.36 U

417 230 68.2 177 253

28.9 51.7 62.1 87.4 106

SW-10

DEC 2017 JUNE 2018 JUNE 2019 JUNE 2020 JULY 2021 AUG 2022

< 0.22 < 0.50 0.38 U 0.38 U 0.38 U 0.38 U

0.45 I < 0.50 0.54 I 0.36 U 0.63 I 0.36 U

390 435 1,390 704 382 673 90 77.7 452 256 165 307

SW-9

FEB 2016 JUNE 2018

< 0.50 < 0.50

< 0.50 < 0.50

< 0.50 < 0.50

< 0.50 < 0.50

SW-1

FEB 2016

< 0.50

< 0.50

< 0.50

< 0.50

SW-3

FEB 2016

< 0.50

< 0.50

14.2

< 0.50

SW-00

APR 2017

3 300

3 300

70 700

1 100

SW-14

FEB 2016

< 0.50

< 0.50

< 0.50

< 0.50

SW-16

FEB 2016 JUNE 2018

< 0.50 < 0.50

< 0.50 < 0.50

< 0.50 < 0.50

< 0.50 < 0.50

SW-6

FEB 2016

< 0.50

< 0.50

< 0.50

< 0.50

SW-19

FEB 2016 APR 2017 JUNE 2018

< 0.50 < 0.22 < 0.50

< 0.50 < 0.36 < 0.50

< 0.50 < 0.36 < 0.50

< 0.50 < 0.36 < 0.50

FDEP NATURAL ATTENUATION

DEFAULT CONCENTRATION (NADC)

FDEP GROUNDWATER CLEANUP

TARGET LEVEL (GCTL)

AutoCAD SHX Text N 00%%D00'00" E

AutoCAD SHX Text

ASSUMED BEARING

L

N E

V E

N U

E

HOME DEPOT ENTRANCE

CONCRETE

POWER POLE

POWER POLE

CONCRETE

FIRE HYDRANT

BACK OF WALK

GRASS ISLAND

TELEPHONE

WIRE

AREA OF

EXCAVATION

CONCRETE

POWER POLE

R A M O N A B O U L E V A R D

PICCADILLY

CAFETERIA

MUSIC

DEPOT

BONO'S

BAR B QUE

O F F I C E D E P O T

UES TMW-2UES TMW-1

IW-7

IW-9

IW-8

IW-11

IW-12

IW-2

IW-1

DW-1

IW-3

IW-6IW-10

IW-4

IW-5

IW-13

IW-14 IW-15

IW-16

IW-20

IW-19

IW-18

IW-21

SW-18

SW-21

SW-19

SW-20

SW-14

SW-15

SW-16

SW-5

SW-13

SW-4

SW-10

SW-7

SW-9

SW-8

SW-2

SW-1

SW-3

SW-6

IW-17

SW-17

MW-25

MW-15

MW-23

MW-17R

MW-24

MW-7MW-21MW-18MW-19

MW-5R

MW-6R

MW-12R

MW-8R

MW-22

MW-26

MW-27

FORMER

BUILDING

FOOTPRINT

INFERRED EXTENT OF

CHLORINATED HYDROCARBONS

(EXCEEDING THE FDEP

GROUNDWATER CLEANUP

TARGET LEVELS)

INFERRED EXTENT OF

CHLORINATED

HYDROCARBONS

EXCEEDING THE FDEP

NADCs

DICK ENVIRONMENTAL SERVICES WELL

SHALLOW MONITORING WELL LOCATION

TEMPORARY MONITORING WELL LOCATION

INTERMEDIATE MONITORING WELL LOCATION

DEEP MONITORING WELL LOCATION

CHITIN COLUMNS

in

31404452.4619 Control No.

4619-DC028A-006

FIGURE

2022-09-01

BCL

JWS

GRACE PROPERTY

JACKSONVILLE, DUVAL COUNTY, FLORIDA

FL. DEPT. OF ENVIRONMENTAL PROTECTION

CHLORINATED HYDROCARBON CONCENTRATIONS IN THE

INTERMEDIATE ZONE OF THE SURFICIAL AQUIFER

(AUGUST 2022)

TITLE

PROJECT NO. REV.

PROJECTCLIENT

IF

T

H

IS

M

EA

SU

R

EM

EN

T D

O

ES

N O

T M

AT

C

H W

H

AT

IS

S

H O

W N

, T H

E

SH

EE

T

SI

ZE

H

AS

B

EE

N M

O D

IF

IE

D F

R O

M : A

N

SI

B

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

Path: \\golder.gds\complexdata\Office\Jacksonville\drafting\Projects\FDEP\FDEP-DC\31404452\31404452_4619_Music_Man\DC028A\Active Drawings\ | File Name: 4619-DC028A-006.dwg

LEGEND

DRAFT

SCALE

0 40 80

FEET

1. BASE MAP OBTAINED FROM GANNETT FLEMING, TITLED "SITE

DRAWING GRACE PROPERTIES, INC JACKSONVILLE FLORIDA

FEBRUARY 2005", DATED 3/21/05.

2. BASE MAP UPDATED FROM CADD FILE PREPARED BY WALTON

F. POPPELL, INC., LAND SURVEYORS, JOB No. 07-061, FIELD

SURVEYED ON 03/15/07 IN RELATION TO THE NATIONAL

GEODETIC VERTICAL DATUM OF 1988 (NAVD 88).

REFERENCE(S)

1. ALL UNITS REPORTED IN MICROGRAMS PER LITER (µg/L).

2. < = BELOW THE LABORATORY REPORTED METHOD

DETECTION LIMIT.

3. I - REPORTED VALUE IS BETWEEN THE LABORATORY METHOD

DETECTION LIMIT AND LABORATORY PRACTICAL

QUANTITATION LIMIT.

4. BOLD/YELLOW HIGHLIGHTED VALUE INDICATES

CONCENTRATION IS ABOVE THE FDEP GROUNDWATER

CLEANUP TARGET LEVEL (GCTL).

5. BOLD/BLUE HIGHLIGHTED VALUE INDICATES CONCENTRATION

IS ABOVE THE FDEP NATURAL ATTENUATION DEFAULT

CONCENTRATION (NADC).

6. * = RESULT DETERMINED NOT TO EXCEED THE GCTL BASED

ON THE FDEP MEMORANDUM "ROUNDING ANALYTICAL DATA

FOR THE SITE REHABILITATION COMPLETION", DATED

NOVEMBER 17, 2011.

NOTE(S)

IW-21

FEB 2016 JUNE 2018

< 0.50 < 0.50

< 0.50 < 0.50

< 0.50 < 0.50

< 0.50 < 0.50

IW-19

FEB 2016 APR 2017 JUNE 2018

< 0.50 < 0.22 < 0.50

< 0.50 < 0.36 < 0.50

50.1 38 37.2

3.9 1.1* 0.72 IIW-17

JUNE 2018 JUNE 2019 JUNE 2020 JULY 2021 AUG 2022

< 0.50 0.38 U 0.38 U 0.38 U 0.38 U

0.68 I 0.50 I 0.36 U 0.36 U 0.36 U

21.4 11.6 5.0 1.5 0.54 I

0.82 I 0.48 I 0.39 U 0.39 U 0.39 U

IW-13

JUNE 2018 JUNE 2019 JUNE 2020 JULY 2021 AUG 2022

< 0.50 0.38 U 0.38 U 0.38 U 0.38 U

1.4 0.47 I 0.65 I 0.36 U 0.36 U

108 102 89.5 106 85.8

3.8 4.4 5.5 5.9 10.6

IW-4

JUNE 2018 JUNE 2019 JUNE 2020 JULY 2021 AUG 2022

< 0.50 0.38 U 0.38 U 0.38 U 0.38 U < 0.50 0.36 U 0.36 U 0.36 U 0.36 U

77.4 75.0 69.3 77.2 60.5

0.88 I 0.88 I 0.70 I 0.49 I 0.39 U

IW-10

JUNE 2018 JUNE 2019 JUNE 2020 JULY 2021 AUG 2022

< 0.50 0.38 U 0.38 U 0.38 U 0.38 U < 0.50 0.44 I 0.36 U 0.36 U 0.36 U

5 383 179 169 30.6

0.61 I 136 110 162 107

IW-9

JUNE 2018 JUNE 2019 JUNE 2020 JULY 2021 AUG 2022

< 0.50 0.38 U 0.38 U 0.38 U 0.38 U < 0.50 0.36 U 0.36 U 0.36 U 0.36 U

166 153 23 683 936 115 115 16.7 497 488

IW-1

JUNE 2018 JUNE 2019 JUNE 2020 JULY 2021 AUG 2022

< 0.50 0.38 U 0.38 U 0.38 U 0.38 U < 0.50 0.36 U 0.36 U 0.36 U 0.36 U 334 232 149 669 651 186 136 121 231 182

IW-3

FEB 2016

< 0.50

< 0.50

< 0.50

< 0.50

IW-15

JUNE 2018 JUNE 2019 JUNE 2020 JULY 2021 AUG 2022

< 0.50 0.38 U 0.38 U 0.38 U 0.38 U < 0.50 0.36 U 0.36 U 0.36 U 0.36 U

381 410 273 154 83.5 102 136 99.4 109 60.9

IW-14

FEB 2016

< 0.50

< 0.50

< 0.50

< 0.50

IW-16

FEB 2016 JUNE 2018

< 0.50 < 0.50

< 0.50 < 0.50

< 0.50 < 0.50

< 0.50 < 0.50

IW-6

FEB 2016

< 0.50

< 0.50

< 0.50

< 0.50

WELL NUMBER

DATE SAMPLED

TETRACHLOROETHYLENE CONCENTRATION

TRICHLOROETHYLENE CONCENTRATION

CIS-1,2-DICHLOROETHYLENE CONCENTRATION

VINYL CHLORIDE CONCENTRATION

IW-00

APR 2017

3 300

3 300

70 700

1 100

FDEP NATURAL ATTENUATION

DEFAULT CONCENTRATION (NADC)

FDEP GROUNDWATER CLEANUP

TARGET LEVEL (GCTL)

AutoCAD SHX Text N 00%%D00'00" E

AutoCAD SHX Text

ASSUMED BEARING

5/10/22, 12:47 PM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19536 1/2

Quote Number: 19536

QUOTE

QUOTED TO:

QUOTE DATE: 1/1/2022

COMPANY NAME: WSP / Golder QUOTED BY: Craig Burns

PHONE NUMBER:

Ext.

FAX NUMBER:

PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials

CUSTOMER PO:

CONTACT EMAIL:

SITE ADDRESS: TBD

CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING

COST ESTIMATE FOR

THE SITE/ PROJECT LISTED ABOVE.

DESCRIPTION PRICE QTY. UNIT TOTAL

NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00

NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00

TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$30.00 DRUM $0.00

TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$40.00 DRUM $0.00

TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site

$50.00 DRUM $0.00

Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax

$0.00 . $0.00

HAZ Drums to be quoted case-by-case $0.00 . $0.00

OPTIONAL LINE ITEMS

***10% FSC applied to the total cost of the invoice*** $0.00 . $0.00

TOTAL REQUIRED ITEMS $0.00

TOTAL OPTIONAL ITEMS $0.00

GRAND TOTAL $0.00

NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups.

**Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's**PFAS drum rates are the same as the Petro/Drycleaner NonHaz Drums rates T&D.**Haz rates will be quoted case-by-case** Craig Burns

863.327.6289 - cburns@clarkenv.com

Name (print) Title mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight

5/10/22, 12:47 PM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19536 2/2

Signature Date

CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854

WWW.ClarkEnvironmental.com

From: Fred Portofe To: Mongillo, Ralph Cc: Madison Rogers; Roger Pragle; Crews, Matt Subject: RE: Investigative Derived Waste Drum Costs for Transportation and Disposal at a Regulated Facility Date: Wednesday, March 9, 2022 9:33:38 AM Attachments: F0152F28A2B5418EBC7A4FD870EC8D28.png

AD282F6C3391468088CDA42829B8E703.png A719914B10184314957B0CA910CA8D14.png F1DF3C4322764E8A9076F1ADFF76864A.png 3409DF389C3B4156BA232DDC85C60E09.png

EXTERNAL EMAIL

EXTERNAL EMAIL - We could not verify the authenticity of this message. Please be cautious when clicking on links or opening attachments.

Ralph

We are not going to provide annual Pricing for the Statewide Contract . After reviewing the scope with my partners and the variability with respect to disposal costing and ever changing fuel costs, we feel we can not bid this work given the current uncertainty in the market. We would be please to bid this work on a casa by case basis.

Fred G. Portofe, PG President of Environmental Services (Professional Geologist in FL, GA, AL, MS, TX, SC, NC, TN, IN, LA, WI and AK) M & D Industrial Services, LLC 5896 Azalea Street Port Orange, Florida 32127 Email: Fportofe@mdindustrialservices.com Website: mdindustrialservices.com Cell: 813-951-1012 Emergencies: 888-307-2790

Sent from Mail for Windows

From: Mongillo, Ralph Sent: Tuesday, March 8, 2022 12:46 PM To: Fred Portofe Cc: Madison Rogers; Roger Pragle; Eddy Mendoza; Crews, Matt mailto:fportofe@mdindustrialservices.com mailto:ralph.mongillo@wsp.com mailto:mrogers@mdindustrialservices.com mailto:rpragle@mdindustrialservices.com mailto:matt.crews@wsp.com mailto:Fportofe@mdindustrialservices.com https://nam10.safelinks.protection.outlook.com/?url=http%3A%2F%2Fmdindustrialservices.com%2F&data=04%7C01%7Cmculbreth%40ectinc.com%7Cbfdc4a6d2ce945e1eaf008d9dcf8eabf%7C911eb1cc54d34d8ca5773bf3ccc8105c%7C0%7C0%7C637783784008834159%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C2000&sdata=ntkZP1OGe7McYRA722JXtcGwkbgN9EEhQtSgBSKqC3E%3D&reserved=0 https://go.microsoft.com/fwlink/?LinkId=550986 mailto:Ralph_Mongillo@golder.com mailto:fportofe@mdindustrialservices.com mailto:mrogers@mdindustrialservices.com mailto:rpragle@mdindustrialservices.com mailto:emendoza@mdindustrialservices.com mailto:Matt_Crews@golder.com

Shirah, Ginger K

From: Mongillo, Ralph <Ralph_Mongillo@golder.com> Sent: Thursday, September 29, 2022 11:09 AM To: Shirah, Ginger K Cc: Crews, Matt; Brown, Jesse Subject: Revised Schedule for Proposals submitted

EXTERNAL MESSAGE

This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.

Ginger, Attached are some revised dates for the proposals submitted.

Subtask 1 Subtask 2 Subtask 3 TA AR Pats 3/13/23 1/31/23 3/13/23 5/30/23

Coin Laundry 3/13/23 1/31/23 3/13/23 5/30/23

Swift Cesery 3/13/23 1/31/23 3/13/23 5/30/23

Sages 3/13/23 1/31/23 3/13/23 5/30/23

Music Man 3/31/23 2/20/23 3/31/23 5/30/23

Bert Morsch 3/31/23 2/20/23 3/31/23 5/30/23

Regards

Ralph

Ralph F. Mongillo Jr., PG Senior Geologist/Lead Consultant

T: +1 904 363 3430 D: +1 904 421 4245 C: +904 610 8761

9428 Baymeadows Road, Suite 400, Jacksonville, Florida, USA 32256 wsp.com | golder.com

WSP and Golder have joined together to form the premier environmental consultancy in the industry. Together we are 14,000 strong, Future Ready©, and delivering innovative solutions to our clients around the globe.

As of October 28, 2021, Golder Associates Inc. is now Golder Associates USA Inc.

DC010B Annual GW Monitoring proposal - ERIC_4553.pdf
Figures 4-8.pdf
Sheets and Views
1 SITE LOCATION MAP
2 POTENTIOMETRIC MAP OF THE INTERMEDIATE ZONE
3 POT MAP OF THE DEEP ZONE OF THE SURFICIAL AQUIFER
4 GW CHARACTERIZATION SHALLOW ZONE SURFICIAL AQUIFER
5 GW CHARACTERIZATION INTERMEDIATE ZONE SURFICIAL AQUIFER
6 GW CHARACTERIZATION DEEP ZONE SURFICIAL AQUIFER
7 GW CHARACTERIZATION ROCK ZONE SURFICIAL AQUIFER
8 GROUNDWATER CHARACTERIZATION TPOC WELLS
PLOT
DC023B Former Sages Cleaners GW Monitoring proposal - ERIC_4596.pdf
Table 1 - 2023 Performance Monitoring Plan.pdf
Table 5
Figures 6-8.pdf
Sheets and Views
1 SITE LOCATION MAP
2 SITE LAYOUT
3 POTENTIONMETRIC MAP OF THE SHALLOW SURFICIAL AQUIFER
4 POT MAP OF THE INTERMEDIATE SURFICIAL AQUIFER
5 POTENTIOMETRIC MAP OF THE DEEP SURFICIAL AQUIFER
6 GW CHARAC IN THE SHALLOW ZONE OF THE SURFICIAL AQUIFER
7 GW CHARAC IN THE INTERMEDIATE ZONE OF THE SURFICIAL AQUIFER
8 GW CHARACTERIZATION IN THE DEEP ZONE OF THE SURFICIAL AQUIFER

File details come from the government source that posted it. Updated .