This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) to Golder Associates USA Inc. for environmental remediation services at the Dry Cleaning Depot facility located at 1320 West Sunrise Boulevard in Fort Lauderdale, Broward County, Florida (ERIC_4158). The document establishes a fixed unit rate contract valued at $22,134.73 with a completion date of September 9, 2022. The Department Project Manager is Ben Grubbs, and the contractor's Project Manager is Matt Crews. The underlying contract number is HW685, with the specific task assignment number DC026A.

The scope of work comprises three subtasks: Project Management ($1,973.10), Annual Groundwater Monitoring and Site Visit ($13,722.88), and Annual Groundwater Monitoring and Proposed Path Forward Report ($6,438.75). The contractor will conduct groundwater monitoring activities at eighteen monitoring wells, collect samples for analysis of chlorinated volatile organic compounds and dissolved gases, manage investigation-derived waste, and submit deliverables including field documentation, laboratory reports, updated GIS tables, and a final comprehensive report. Deliverables are scheduled for May 27, 2022 (preliminary path forward), and June 24, 2022 (final report). The cost estimate reflects 128 total labor hours at various professional staff levels, along with expenses for travel, laboratory analysis, field equipment, and subcontractor services for investigation-derived waste disposal through Erwin Remediation at $100.00 per drum.

View the file

Other files

File Type Posted
CN-370000-HW685-BF01A.pdf PDF
CN-370000-HW685-BF01CCO1.pdf PDF
CN-370000-HW685-BF02A.pdf PDF
CN-370000-HW685-BF05A.pdf PDF
CN-370000-HW685-BF05ACO1.pdf PDF
CN-370000-HW685-BF1BCO1.pdf PDF
CN-370000-HW685-BIL02C.pdf PDF
CN-370000-HW685-BIL1ACO4.pdf PDF
CN-370000-HW685-BIL2CCO1.pdf PDF
CN-370000-HW685-BIL3ACO1.pdf PDF
CN-370000-HW685-CSS01.pdf PDF
CN-370000-HW685-CSS2ACO2.pdf PDF
CN-370000-HW685-DC001C.pdf PDF
CN-370000-HW685-DC001E.pdf PDF
CN-370000-HW685-DC002B.pdf PDF
CN-370000-HW685-DC002C.pdf PDF
CN-370000-HW685-DC002E.pdf PDF
CN-370000-HW685-DC003C.pdf PDF
CN-370000-HW685-DC004A.pdf PDF
CN-370000-HW685-DC007A.pdf PDF
CN-370000-HW685-DC007B.pdf PDF
CN-370000-HW685-DC008B.pdf PDF
CN-370000-HW685-DC008D.pdf PDF
CN-370000-HW685-DC009A.pdf PDF
CN-370000-HW685-DC009D.pdf PDF
CN-370000-HW685-DC009E.pdf PDF
CN-370000-HW685-DC010C.pdf PDF
CN-370000-HW685-DC012A.pdf PDF
CN-370000-HW685-DC012D.pdf PDF
CN-370000-HW685-DC014B.pdf PDF
CN-370000-HW685-DC016D.pdf PDF
CN-370000-HW685-DC017A.pdf PDF
CN-370000-HW685-DC017B.pdf PDF
CN-370000-HW685-DC018B.pdf PDF
CN-370000-HW685-DC019A.pdf PDF
CN-370000-HW685-DC019C.pdf PDF
CN-370000-HW685-DC01ACO1.pdf PDF
CN-370000-HW685-DC01ECO1.pdf PDF
CN-370000-HW685-DC021A.pdf PDF
CN-370000-HW685-DC021B.pdf PDF
CN-370000-HW685-DC021C.pdf PDF
CN-370000-HW685-DC021E.pdf PDF
CN-370000-HW685-DC022C.pdf PDF
CN-370000-HW685-DC023A.pdf PDF
CN-370000-HW685-DC023D.pdf PDF
CN-370000-HW685-DC024C.pdf PDF
CN-370000-HW685-DC025A.pdf PDF
CN-370000-HW685-DC027D.pdf PDF
CN-370000-HW685-DC028A.pdf PDF
CN-370000-HW685-DC028D.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW685

DC026A Completion September 9, 2022

This Task Assignment authorizes Golder to conduct groundwater monitoring activities and develop a proposed path forward in accordance with the April 27, 2022, Scope of Work, Cost Estimate, and Bid Documentation.

Ben Grubbs 850-245-8992 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Golder Associates USA Inc.

Golder Associates USA Inc.

Matt Crews 904-363-3430

ERIC_4158

1320 West Sunrise Boulevard, Fort Lauderdale, Broward County

Dry Cleaning Depot

✔ $ 22,134.73

$ 22,134.73

Scope of Work

Matthew Crews

Senior Lead Consultant, Environmental Engineer

Matthew C. Crews Digitally signed by Matthew C. Crews Date: 2022.05.16 12:51:28 -04'00'

William E. Burns, Jr.

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2022.05.16 11:30:47 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtask 2: Preliminary Path Forward Deliverable (to include Site Visit/Groundwater Sampling Field Documentation, Laboratory Report, Tables, and Figures); IDW Disposal Documentation; ADaPT/GIS Update; Teleconference Discussion Notes

05/27/2022

Subtasks 1 & 3: Annual Groundwater Monitoring and Proposed Path Forward Report;

Project Management 06/24/2022

Subtask 2: Submittal and FDEP approval of Preliminary Path Forward Deliverable (to include Site Visit/Groundwater Sampling Field Documentation, Laboratory Report, Tables, and Figures); IDW Disposal Documentation; ADaPT/GIS Update;

Teleconference Discussion Notes

$ 13,722.88

Subtasks 1 & 3: Submittal and FDEP approval of Annual Groundwater Monitoring and Proposed Path Forward Report; Project Management $ 8,411.85

$ 22,134.73

HW685

DC026A

Printed on recycled paper.

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Secretary

To: HW685 Contract Negotiation File Dry Cleaning Depot Fort Lauderdale, Broward County

ERIC_4158

From: Ben Grubbs, Project Manager Date: May 13, 2022 Subject: Negotiation Summary

HW685 DC026A

This Task Assignment authorizes Golder to conduct groundwater monitoring activities and develop a proposed path forward in accordance with the April 27, 2022, Scope of Work, Cost Estimate, and Bid Documentation.

Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.

Subtask 2: Annual Groundwater Monitoring and Site Visit Golder will collect groundwater samples from eighteen monitoring wells (MW001R1, MW008, MW010R, MW011R, MW014, MW015R, MW020, MW022, MW023, MW035, MW037, MW038, and MW040 – MW045). Prior to sampling, depth-to-water will be measured. The wells will then be purged, and field parameters will be recorded. The groundwater samples will be collected using low flow sampling methods and analyzed for chlorinated volatile organic compounds (VOCs). Six samples will also be analyzed for dissolved gases. Investigation-derived waste (IDW) will be temporarily stored in a 55-gallon drum. Golder requested bids for IDW drum treatment and disposal from Clark, Erwin, Whatever Waste, and M & D Industrial Services. Erwin was selected as the lowest responsive and responsible bidder.

Golder will submit the Preliminary Path Forward deliverable to FDEP that includes field documentation of the site visit and groundwater sampling event along with the laboratory report, tables, figures. Golder will also submit the IDW disposal documentation and ADaPT/GIS deliverable to FDEP. Following the submittal of these deliverables, Golder and FDEP will hold a teleconference to discuss the preliminary path forward for the site. Golder will submit meeting notes from the teleconference to FDEP.

Subtask 3: Reporting Golder will submit the Annual Groundwater Monitoring and Proposed Path Forward Report to

FDEP.

MEMORANDUM

Dry Cleaning Depot May 13, 2022 Page Two

Golder and the FDEP confirmed on April 27, 2022, that an Access Agreement with the current real property owner of the Dry Cleaning Depot (ERIC_4158) site has been executed.

This site visit/groundwater monitoring event is to determine whether injections are necessary to remediate groundwater at the site.

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $22,134.73 with 128 labor hours.

Golder may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.

FDEP COST ESTIMATEContractor: Golder Associates USA Inc.

Date: 4/27/2022

Task #: DC026A SubTask 1 Project Management SubTask 6

Site: SubTask 2 Annual GW Monitoring SubTask 7

Activity/Phase: Path Forward SubTask 3 Annual GW Monitoring and Proposed Path Forward Report SubTask 8

Project Manager: Ben Grubbs SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$55.25 Project Manager (MC) 11.9 $0.00 Program Leader - X-14 0 0 0 0 0 0 0 0 0 0

$63.65 Practice Leader - X-13 (JB) 3 0 3 0 0 0 0 0 0 0 $55.25 Senior Consultant - X-12 (MC) 48 16 32 0 0 0 0 0 0 0

$0.00 Senior Sci/Eng - X-11 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Project Sci/Eng - P-10 0 0 0 0 0 0 0 0 0 0

$45.42 Senior Project Sci/Eng - P-10 (BL) 7 5 2 0 0 0 0 0 0 0 $44.15 Senior Project Sci/Eng - P-10 (JT) 4 3.5 0 0 0 0 0 0 0 0 $33.32 Staff Sci/Eng - P-8 (JS) 30 29.5 0 0 0 0 0 0 0 0 $30.31 Staff Sci/Eng - P-8 (PK) 22 22.0 0 0 0 0 0 0 0 0 $32.75 Staff Sci/Eng - P-8 (AS) 3 0 3 0 0 0 0 0 0 0

$0.00 Sci/Eng/Admin - P-7 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 128 11.9 76.0 40.0 0 0 0 0 0 0 0

Direct Labor $5,721.68 $658.25 $2,915.39 $2,148.04 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.50% $9,869.90 $1,135.48 $5,029.05 $3,705.37 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $15,591.58 $1,793.73 $7,944.44 $5,853.41 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Dry Cleaning Depot

REV: 02/03 CEF GOLDER Page 1

FDEP COST ESTIMATEContractor: Golder Associates USA Inc.

Date: 4/27/2022

Task #: DC026A SubTask 1 Project Management SubTask 6

Site: SubTask 2 Annual GW Monitoring SubTask 7

Activity/Phase: Path Forward SubTask 3 Annual GW Monitoring and Proposed Path Forward Report SubTask 8

Project Manager: Ben Grubbs SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Dry Cleaning Depot

Travel Vehicle Rental $600.00 $600.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $286.00 $286.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $886.00 $886.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $10.00 $10.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $2,504.00 $2,504.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $220.00 $220.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $2,724.00 $2,724.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $80.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling Related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,084.00 $1,084.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,264.00 $1,264.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $20,575.58 $1,793.73 $12,928.44 $5,853.41 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,559.15 $179.37 $794.44 $585.34 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $22,134.73 $1,973.10 $13,722.88 $6,438.75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF GOLDER Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Dry Cleaning Depot SUBTASK 2: Annual GW Monitoring

DATE: 4/27/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Consultant (M. Crews) 12

Senior Consultant (M. Crews) 4

Senior Project Sci/Eng (B. Lucero) 5

Staff Sci/Eng (J. Spengler) 29.5

Staff Sci/Eng (P. Kuhn) 22

Senior Project Sci/Eng (J. Thomas) 3.5

TOTAL LABOR 76.0

VEHICLE TYPE RATE UNIT USEAGE

Truck (J. Spengler) - Sun/Mon/Tues $120.00 Per Day 3 $360.00

Truck (P. Kuhn) - Mon/Tues $120.00 Per Day 2 $240.00

TOTAL VEHICLE $600.00

PER DIEM STAFF RATE UNIT USEAGE

Per Diem J. Spengler - Sun/Mon/Tues $36.00 Per Day 3 $108.00 Hotel J. Spengler - Sun/Mon $89.00 Per Day 2 $178.00

TOTAL PER DIEM $286.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin IDW T&D - Liquids $100.00 Per Drum 1 $100.00

TOTAL $100.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Chlorinated VOCs - EPA Method 8260B Total VOHs EPA Method 8260B $73.00 18 $1,314.00 Methane/ethane/ethene RSK175 $180.00 6 $1,080.00 Total VOCs (IDW) PID/Hall Series $110.00 1 $110.00 Sample Shipping Small $110.00 2 $220.00

TOTAL LAB $2,724.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Miscellaneous Expendables $40.00 Per Day 2 $80.00 Shallow Groundwater Sampling Kit $290.00 Per Day 2 $580.00

Tubing, Poly HDPE $0.30 Per Foot 1,500 $450.00 Tubing, Silicon 3/16 x 3/8 $3.00 Per foot 18 $54.00

Drum, 55-gallon $100.00 Per Drum 1 $100.00

TOTAL EQUIPMENT $1,264.00

Note: Contact property owner and DEP to schedule field work; locate wells at new site;

collect depth to water measurements from accessible monitoring wells and groundwater samples from 18 monitoring wells for chlorinated VOC analysis (6 to also be analyzed for dissolved gases), and management of IDW for transportation and disposal. Mobilization and demobilization costs for this event will be split with the DC Depot site in Pompano Beach (ERIC_4163). This site will be sampled first (Monday/Tuesday).

Staff Sci/Eng J. Spengler: Mobilize to Fort Lauderdale on Sunday; annual monitoring at DC Depot (ERIC_4158) Monday and Tuesday; travel to Pompano Beach Tuesday night;

annual monitoring at DC Depot (ERIC_4163) Wednesday and Thursday; demobilize to Jacksonville on Friday Staff Sci/Eng P. Kuhn: Annual monitoring at DC Depot (ERIC_4158) Monday and Tuesday (local travel); travel to Pompano Beach Tuesday night; annual monitoring at DC Depot (ERIC_4163) Wednesday and Thursday; demobilize to Miami on Thursday.

Update FDEP GIS Tables, run data checker, create and edit error report, and annotate error report. Submit FDEPGIS tables; submit ADaPT deliverable.

Communication with RPO (verification of property ownership) and offsite property owners for site access (2 hours). Prepare and submit field notes, sample forms, laboratory report and updated tables and figures in an email deliverable to the DEP (8 hours). Characterization and waste profile for transportation and disposal of IDW drum(s) (2 hours).

Annual Monitoring Event. Mobilize and collect samples from 18 monitoring wells: MW001R1 and MW035 in the shallow zone of the surficial aquifer; MW008, MW037, and MW040 in the intermediate zone of the surficial aquifer; and MW010R, MW011R, MW014, MW015R, MW020, MW022, MW023, MW038, MW041, MW042, MW043, MW044, and MW045 in the deep zone of the surficial aquifer. Water levels, instrument calibration, and sampling (10 hours per day x 2 days = 20 hours). Development of Health and Safety Plan (3 hours). Field event preparation (1 hour). Travel from Jacksonville to Fort Lauderdale (5.5 hours).

CADD: Develop and update figures for e-mail deliverable (one site map, three groundwater flow and three CVOC figures) into Golder format (current figures are from previous Contractor).

Annual Monitoring Event. Mobilize and collect samples from 18 monitoring wells: MW001R1 and MW035 in the shallow zone of the surficial aquifer; MW008, MW037, and MW040 in the intermediate zone of the surficial aquifer; and MW010R, MW011R, MW014, MW015R, MW020, MW022, MW023, MW038, MW041, MW042, MW043, MW044, and MW045 in the deep zone of the surficial aquifer. Water levels, instrument calibration, and sampling (10 hours per day x 2 days = 20 hours). Round trip travel (1 hour per day x 2 days = 2 hours).

Develop preliminary path forward following review of groundwater monitoring results and site history. Participate in conference call with DEP after deliverable submittal to discuss preliminary path forward.

FINAL --7/24/96

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Dry Cleaning Depot SUBTASK 3: Annual GW Monitoring and Proposed Path Forward Report

DATE: 4/27/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Practice Leader (J. Brown) 3

Senior Consultant (M. Crews) 32

Staff Sci/Eng (A. Strayer) 3

Senior Project Sci/Eng (B. Lucero) 2

TOTAL LABOR 40

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

Reporting: Formatting tables, document production; convert tables from previous Contractor to the Golder report format, binding and shipping. Create pdf for OCULUS.

Develop conclusions and recommendations and prepare final Path Forward Report.

Conduct file review on OCULUS; and prepare draft 2022 Annual Groundwater Monitoring and Proposed Path Forward Report.

Finalize CADD Figures for Annual Groundwater Monitoring and Proposed Path Forward Report.

FINAL --7/24/96

Golder Associates USA Inc.

9428 Baymeadows Road, Suite 400, Jacksonville, Florida, USA 32256

T: +1 904 363-3430 F: +1 904 363-3445

Golder and the G logo are trademarks of Golder Associates Corporation golder.com

April 27, 2022 Proposal No. 202208346

Mr. Ben Grubbs Florida Department of Environmental Protection Division of Waste Management Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400

RE: COST PROPOSAL FOR DRY CLEANING DEPOT

ANNUAL GROUNDWATER MONITORING AND PROPOSED PATH FORWARD REPORT

1320 WEST SUNRISE BOULEVARD

FORT LAUDERDALE, BROWARD COUNTY, FLORIDA

FACILITY IDENTIFICATION NUMBER: ERIC_4158

PROPOSED TASK ASSIGNMENT: HW685_HW026A

Dear Mr. Grubbs:

Golder Associates USA Inc. (Golder) is pleased to provide the Florida Department of Environmental Protection (DEP) with this cost proposal for an Annual Groundwater Monitoring and Proposed Path Forward Report for the above-referenced site. This proposal includes a description of the proposed scope of services, level of effort (LOE) sheets for each subtask, and a Cost Estimate Form (CEF) that summarizes the costs of the proposed services.

The proposed scope of services is described below.

SUBTASK 1 – PROJECT MANAGEMENT

To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with DEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with DEP Drycleaning Solvent Cleanup Program requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the DEP-approved task assignment.

Mr. Ben Grubbs Proposal No. 202208346

Florida Department of Environmental Protection April 27, 2022

SUBTASK 2 – ANNUAL GROUNDWATER MONITORING

Golder will collect groundwater samples from the following 18 wells: MW001R1 and MW035 in the shallow zone of the surficial aquifer; MW008, MW037, and MW040 in the intermediate zone of the surficial aquifer; and MW010R, MW011R, MW014, MW015R, MW020, MW022, MW023, MW038, MW041, MW042, MW043, MW044, and MW045 in the deep zone of the surficial aquifer. The attached figures (Figures 1, 2A, 2B, 2C, and 3) from the July 2021 Supplemental Site Assessment Report, revised in October 2021, show the monitoring well locations, potentiometric maps, and chlorinated volatile organic compound (VOC) results for the shallow, intermediate, and deep zones of the surficial aquifer.

Prior to groundwater sampling, the depth to groundwater will be measured at accessible monitoring well using an electronic water level indicator to determine groundwater elevations and flow direction. During the sampling event, the locks and well caps will be inspected for damage or degradation and repaired or replaced as necessary.

Groundwater samples will be collected from the wells in accordance with DEP Standard Operating Procedures (SOPs) for Field Activities (DEP-SOP-001/01) dated January 2017 (effective April 16, 2018). Prior to collecting the groundwater sample, each well will be purged and field parameters including temperature, pH, specific conductance, dissolved oxygen, turbidity, and oxidation-reduction potential will be monitored. Purge volumes and field parameters will be recorded on field data sheets, and the field monitoring equipment will be calibrated in accordance with the manufacturer’s recommended procedures.

Groundwater samples will be collected using low flow sampling methods. The groundwater samples will be placed in laboratory-supplied containers, labeled with a unique identification number attached to the outside of the sample container, preserved on ice in a laboratory-provided cooler, and delivered to a Florida Department of Health and National Environmental Laboratory Accreditation Program-certified fixed-base laboratory along with the completed chain-of-custody documentation. The samples will be analyzed for chlorinated VOCs using EPA Method 8260B. In addition, samples from monitoring wells MW001R1, MW011R, MW035, MW038, MW041, and MW042 will be analyzed for dissolved gases using Method RSK175.

Golder will temporarily store the investigation derived waste (IDW) purge water generated from the groundwater sampling event in a 55-gallon steel drum(s). A waste characterization sample will be collected from the IDW drum(s) for analysis of total VOCs using EPA Method 8260. If the waste characterization sample is acceptable to the disposal subcontractor, the IDW drum(s) will be picked up and transported to a facility for proper disposal. A non-hazardous waste manifest will be provided by the disposal subcontractor upon delivery to the disposal facility.

During the annual groundwater monitoring event, Golder will assess the general site layout and dimensions, adjacent property use, and the existing site features to aid in the evaluation of feasible site remediation alternatives.

Upon completion of Subtask 2, an e-mail deliverable will be submitted and include copies of the field data sheets, equipment calibration forms, field notes, laboratory analytical report, and laboratory chain-of-custody documentation. In addition, tables and figures with the current and previous groundwater results will be completed for discussion in a teleconference with Golder and DEP representatives to discuss a preliminary path forward scope of work.

SUBTASK 3 – ANNUAL GROUNDWATER MONITORING AND PROPOSED PATH

FORWARD REPORT

The Annual Groundwater Monitoring and Proposed Path Forward Report will include the site location and description; operational history; a summary of previous assessment and remedial activities; and site geology and hydrogeology. The report will also include a description of the groundwater sampling procedures, evaluation of analytical results, comparison of current to historical data, tabulated summary of the current and historical analytical data, a site map showing the groundwater analytical results, water level elevation information in tables and figures, laboratory analytical data, conclusions, and recommendations for a proposed path forward for future site assessment (if necessary) and remediation activities. Golder will update the DEP GIS tables with the new water level data, field parameter measurements, and VOC data; run the DEP data checker on the completed tables; and submit the updated tables and error report. Additionally, Golder will forward Automated Data Processing Tool (ADaPT) data deliverables provided by the laboratory for each groundwater sampling event.

Information included in this report will be obtained from readily accessible files located on the DEP Consolidated OCULUS System database and from observations made during the annual groundwater monitoring event.

HEALTH AND SAFETY

Golder will prepare a site-specific Health and Safety Plan for the field work. The work will be completed in accordance with Golder’s safety policies and procedures. At a minimum, Golder will wear safety glasses, high visibility safety vests, and steel-toed boots. A safety job briefing will be conducted prior to the start of work activities, and anytime the scope of work or site conditions change.

COST AND SCHEDULE

The estimated cost to complete the annual groundwater monitoring is $22,134.73. Golder will tentatively schedule the annual sampling event for May 2022. The LOE/CEF cost sheets are included in Attachment A. The subcontractor bids are included in Attachment B. The following table summarizes the proposed costs and deliverable schedule.

Task Proposed Cost Proposed Schedule/Deliverables

Subtask 1 – Project Management $ 1,973.10 August 5, 2022

Subtask 2 – Annual Groundwater Monitoring

$13,722.88 May 27, 2022 (Field Documentation, Laboratory Report, GIS Tables, ADaPT Deliverables)

Subtask 3 – Annual Groundwater Monitoring and Proposed Path Forward Report

$ 6,438.75 June 24, 2022 (Annual Monitoring and Proposed Path Forward Report)

Total/Completion Date $22,134.73 September 9, 2022

Please be aware that Golder has been acquired by and is now a Member of the WSP family of companies. Golder remains as a legal entity and is the proposed contracting entity for this proposal. We are in the process of integrating the resources of our companies. Correspondence for this proposal should continue to be addressed to the undersigned.

Golder appreciates the opportunity to provide services to the DEP. Should you require additional information or clarifications, please contact us at (904) 363-3430.

Sincerely, Golder Associates USA Inc.

Matthew C. Crews, PE Donald J. Miller, PEng Senior Lead Consultant, Environmental Engineer Senior Director

MCC/DJM/as

Attachments: Figure 1 – Site Plan

Figure 2A – Shallow Monitoring Well Groundwater Elevations – May 3, 2021 Figure 2B – Intermediate Monitoring Well Groundwater Elevations – May 3, 2021 Figure 2C – Deep Monitoring Well Groundwater Elevations – May 3, 2021 Figure 3 – Groundwater Analytical Data – May 2021

Attachment A – Level of Effort Sheets / Cost Estimate Form Attachment B – Subcontractor Bids

G:\Projects\DEP-Drycleaning\Projects\Fort Lauderdale\Drycleaning Depot - Ft Lauderdale - HW685\Proposal\DC026A - DC Depot Ann Mon & Path Forward\HW685_DC026A - DC Depot Annual GW Mon & PF Proposal.docx

@A

@A@A

@A

@A

&'D

E

E

E

E

E

E /E

E

E

E

E

E

E

E

E

E

@AD

@A

@AD

@AD

@AD

@AD

@A@A

@A @A@A@A

ADADAD

@A@A@A @A @A

!O

!O

!O

!O

!O

!O

!O

!O

!O

!O

!O

!O

!O

!O

!O

@A

@A

@A

@A

@A@A

@A

@A

&'D

E

E

E /Ea

E

E Ea

E /E

Ea

E Ea

E Ea

E Ea

E Ea E

Ea

E Ea

E Ea

E

E Ea

@AD

@A

@AD

@AD

@AD

@AD

@A@A

@A @A@A@A

@A@A@A @A @A

!R

!R

!R

!R

!R

!R

!R

!R

!R

!R

!R

!R

!R

!R

!R

@A

@A

@A

AUTO ZONE

MW042

BCMW001

BCMW002

MW041

MW040

MW009R

MW010R

MW011R

MW012R

MW009

MW016

MW017

MW018

IRR002

IRR001

MW001R1

MW007 MW008

MW035

MW036

MW037

MW038

MW039

MW001

MW001R

MW004

MW002

MW003

MW005

IW-1

IWA30

IWA55

IWA80

IWB30

IWB55

IWB80

IWC30

IWC55

IWC80

IWD55

IWD80

IWE55

IWE80

IWF55

IWF80

IWG55

IWG80

IWH55

IWH80

IWI55

IWI80

IWJ55

IWJ80

IWK30

IWK55

IWK80

SVE-1

SVE-10

SVE-11

SVE-12

SVE-13

SVE-14

SVE-15

SVE-2

SVE-3

SVE-4

SVE-5

SVE-6

SVE-7

SVE-8

SVE-9

MW043

MW044

MW045

SITE PLAN

DRY CLEANING DEPOT

1320 WEST SUNRISE BOULEVARD, Ft Lauderdale, Florida

FDEP Facility ID No.: 069502027

FIGURE 1

SCALE:

Notes:

- All groundwater elevation measurements in feet NAVD-88

- Aerial Source: Google Earth Pro, January 2016

Legend

@A MONITORING WELL

@A CLUSTER MONITORING WELL

Ea Deep Inj Well

E

INJECTION WELL

!R SOIL VAPOR EXTRACTION WELL

@AD MONITORING WELL - ABANDONED

@AD MONITORING WELL - DESTROYED

&'D IRRIGATION WELL - DESTROYED

&' IRRIGATION WELL

PARCEL BOUNDARY

15 0 15 Feet

Former Dry Cleaning Depot Building

Shallow Wells

Intermediate Wells

Deep Wells mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Text Box Note: Deeps wells MW014, MW015R, MW020, MW022, and MW023 are offsite and outside of image.

mcrews Text Box Proposed Wells to be Sampled mcrews Callout PCE & TCE above GCTL 4/2007 mcrews Text Box Shallow (5-15): MW001R1, MW035

Intermediate (45-50) or (50-55): MW008, MW037, MW040

Deep (65-70); (60-80); or (75-80): MW010R, MW011R, MW014, MW015R, MW020, MW022, MW023, MW038, MW041, MW042, MW043, MW044, MW045

(screened interval) mcrews Highlight mcrews Callout Injection well upgradient?

mcrews Highlight mcrews Callout Horizontal delineation?

@A

@A

NW 9TH PL

MW001R1

(-0.19)

MW007

(-0.14)

MW031

(-0.34)

MW035

(-0.21)

-0.15

-0.19

-0.21

-0.17

0 50 100 150

Feet

SHALLOW MONITORING WELL (0 to 20 feet bls)

GROUNDWATER ELEVATIONS -

MAY 3, 2021

DRY CLEANING DEPOT

1320 WEST SUNRISE BOULEVARD, Ft Lauderdale, Florida FDEP Facility ID No.: 069502027

FIGURE 2A

SCALE:

Notes:

NG = Not Gauged

- All groundwater elevation measurements in feet NAVD-88

- Aerial Source: FDOT, January 2015

- MW001R1 was installed in March 2015

Legend

@A Shallow Monitoring Well

Groundwater Contour (ft.)

Approximate Direction of Groundwater Flow

@A @A

@A

@A

@A

@A

@A

@A

@A

@A @A

MW008

(-0.16)

MW033

(NC)

MW037

(-0.25)*

MW025

(-0.20)* MW027

(-0.26)

MW009R

(-0.11)

MW013

(-0.30)

MW021

(-0.29)

MW028

(-0.33)

MW032

(-0.29)

-0 .1

-0 .2

-0 .2

-0 .3

INTERMEDIATE MONITORING WELL (35 to 50 feet bls)

GROUNDWATER ELEVATIONS -

MAY 3, 2021

DRY CLEANING DEPOT

1320 WEST SUNRISE BOULEVARD, Ft Lauderdale, Florida FDEP Facility ID No.: 069502027

FIGURE 2B

Notes:

- * = Not used in contouring

- All groundwater elevation measurements in feet NAVD-88

- Aerial Source: FDOT, January 2017

D:\FDEP\HW551\DC\DC Depot Ft L\Geospatial\mxd\2021_March\F2B_(35 to 50 feet bls)GWE_May21.mxd

0 50 100 150

Feet

SCALE:Legend

@A Intermediate Monitoring Well (Screen Interval 35'-40' BLS)

@A Intermediate Monitoring Well (Screen Interval 40'-50' BLS)

Approximate Direction of Groundwater Flow

Former Dry Clean Depot Location

Parcel Boundary Groundwater Contour (Ft.)

(Dashed Where Inferred)

@A@A

@A@A

@A@A

@A@A

@A

@A

@A

@A

@A

MW010R

(-0.14)*

MW014

(-0.11)*

MW019

(-0.26)

MW022

(-0.26)*

MW042

(-0.29)

MW041

(-0.36)*

MW011R

(-0.21)

MW015R

(-0.22)

MW020

(-0.27)

MW023

(-0.31)

MW029

(-0.40)

MW038

(-0.19)

MW045

(-0.27)

MW043

(-0.29)

MW044

(-0.31)*

-0.25

-0.30

-0.35

-0.20

-0.25

DEEP MONITORING WELL (65 to 80 feet bls)

GROUNDWATER ELEVATIONS -

MAY 3, 2021

1320 WEST SUNRISE BOULEVARD, Ft. Lauderdale, Florida

FDEP Facility ID No.: 069502027

FIGURE 2C

SCALE:

Notes:

- * = Not used in contouring

- All groundwater elevation measurements in feet NAVD-88

- Aerial Source, FDOT, 2017

0 50 100 Feet

D:\FDEP\HW551\DC\DC Depot Ft L\Geospatial\mxd\2021_March\F2C_(65 to 80 feet bls)_GWE_May21.mxd

Legend

@A Deep Monitoring Well (65'-70' BLS)

@A Deep Monitoring Well (75'-80' BLS) Approximate Direction of Groundwater Flow

Former Dry Clean Depot Location

Parcel

Groundwater Contour (ft.)

(Dashed Where Inferred)

Ea Injection Well (60'-80' BLS)

@A@A

@A @A

@A

&'D

E

E

E Ea

E

E Ea

E

E Ea

E Ea

E Ea

E Ea

E Ea E

Ea

E Ea

E Ea

E

E Ea

@AD

@A

@AD

@AD

@AD

@AD

@AD

@A@A

@AD@A@A@A@A

@A@A@A

ADADAD

@A@A

@A@A@A

@AD

@A

@A@A@A@A@A

@A @A

@A

@A

@A

International Granite

Auto Zone

Fmr. DC Depot

SUNRISE BLVD.

IWF55/80

MW021

MW042

MW040/MW041

BCMW001

BCMW002

BCMW003

MW009R

MW009

MW013

MW014

MW016

MW017

MW018

MW019

MW021

MW022

MW023

IRR002

IRR001

IW-1

IWA30

IWA55/80

IWB30

IWB55/80

IWC30

IWC55/80

IWD55/80

IWE55/80

IWG55/80

IWH55/80

IWI55/80

IWJ55/80

IWK30

IWK55/80MW001R1

MW007

MW015R

MW033

MW038

MW039

MW025

MW027

MW001

MW004

MW006

MW002

MW003

MW005

MW026

MW038

IWB30

MW043

MW044

MW045

SCALE:

Ê

Note:

Yellow Shading indicates current data

* = Duplicate Sample

0 40 80 Feet

GROUNDWATER ANALYTICAL DATA

MAY 2021

DRY CLEANING DEPOT

1320 WEST SUNRISE BOULEVARD, Ft Lauderdale, Florida

FDEP Facility ID No.: 069502027

Parcel

LEGEND:

@AD MW - Abandoned or Destroyed

@A Cluster Monitoring Well (CMW) @A Monitoring Well (MW)

@AD CMW - Abandoned or Destroyed

EXTENT OF

NADC PLUME

EXTENT OF

GCTL PLUME

Injection Well Ea

Point ID

Screened Interval (feet bls) Sample Date

PCE

(ug/L)

TCE

(ug/L) cis-1-2- Dichloroethene

(ug/L) trans-1-2- Dichloroethene

(ug/L)

Vinyl Chloride

(ug/L) 7-Jun-16 0.76 U 0.89 U 0.53 U 0.73 U 6.4

18-May-17 0.76 U 0.89 U 0.53 U 0.73 U 3.2 24-Jul-18 0.76 U 0.89 U 1.0 0.73 U 4.0 4-May-21 0.2 U 0.2 U 0.2 U 0.2 U 0.81 I

MW014 65-70

Point ID

Screened Interval (feet bls) Sample Date

PCE

(ug/L)

TCE

(ug/L) cis-1-2- Dichloroethene

(ug/L) trans-1-2- Dichloroethene

(ug/L)

Vinyl Chloride

(ug/L)

FLPRO

(µg/L) 18-Jan-18 0.76 U 5.8 120 1.1 97 - 16-Apr-18 0.76 U 0.89 U 99 0.73 U 110 - 24-Jul-18 0.76 U 0.89 U 120 0.73 U 110 - 3-May-21 7.5 11 310 D 2.8 160 D 250 U

MW001R1 5-15

Point ID

Screened

Interval

(feet bls) Sample Date

PCE

(ug/L)

TCE

(ug/L) cis-1-2

Dichloroethene

(ug/L) trans-1-2-

Dichloroethene

(ug/L)

Vinyl

Chloride

(ug/L)

FL PRO

(ug/L) 6-Jun-16 0.76 U 0.89 U 1.6 0.73 U 0.71 U -

17-May-17 0.76 U 0.89 U 0.91 I 0.73 U 0.71 U - 24-Jul-18 0.76 U 0.89 U 0.84 I 0.73 U 0.71 U - 3-May-21 0.2 U 0.2 U 0.2 U 0.2 U 0.2 U - 18-Jan-18 0.76 U 0.89 U 1.1 0.73 U 2.7 100 U 16-Apr-18 0.76 U 0.89 U 5.5 0.73 U 3.3 300 I 23-Jul-18 0.76 U 0.89 U 1.1 0.73 U 1.8 100 U 3-May-21 0.2 U 0.2 U 0.2 U 0.2 U 0.2 U 250 U

MW007 2-12

MW008 45-50 Point ID

Screened Interval (feet bls) Sample Date

PCE

(ug/L)

TCE

(ug/L) cis-1-2- Dichloroethene

(ug/L) trans-1-2- Dichloroethene

(ug/L)

Vinyl Chloride

(ug/L)

FL PRO

(ug/L) 18-Jan-18 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U 100 U 16-Apr-18 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U 100 U 23-Jul-18 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U 100 U 3-May-21 0.2 U 0.2 U 0.2 U 0.2 U 0.2 U 250 U 18-Jan-18 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U 100 U 16-Apr-18 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U 100 U 23-Jul-18 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U 100 U 3-May-21 0.2 U 0.43 I 3.4 0.2 U 15 250 U 16-Apr-18 0.76 U 0.89 U 1.7 0.73 U 2.3 - 24-Jul-18 0.76 U 0.89 U 1.3 0.73 U 21 100 U 24-Jul-18 0.76 U 0.89 U 0.66 I 0.73 U 17 - 3-May-21 0.2 U 0.2 U 8.3 0.2 U 100 250 U 7-Jun-16 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U -

17-May-17 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U - 23-Jul-18 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U - 3-May-21 0.2 U 0.2 U 0.2 U 0.2 U 0.2 U -

MW012R 111-116

MW009R 35-40

MW010R 65-70

MW011R 75-80

Point ID

Screened Interval (feet bls) Sample Date

PCE

(ug/L)

TCE

(ug/L) cis-1-2- Dichloroethene

(ug/L) trans-1-2- Dichloroethene

(ug/L)

Vinyl Chloride

(ug/L)

FL PRO

(ug/L) 7-Jun-16 0.76 U 0.89 U 0.53 U 0.73 U 7.6 -

18-May-17 0.76 U 0.89 U 0.53 U 0.73 U 4.0 - 24-Jul-18 0.76 U 0.89 U 0.53 U 0.73 U 3.1 - 4-May-21 0.2 U 0.2 U 0.26 I 0.2 U 0.33 I -

MW015R 75-80

Point ID

Screened Interval (feet bls) Sample Date

PCE

(ug/L)

TCE

(ug/L) cis-1-2- Dichloroethene

(ug/L) trans-1-2- Dichloroethene

(ug/L)

Vinyl Chloride

(ug/L)

FL PRO

(ug/L) 7-Jun-16 0.76 U 0.89 U 0.53 U 0.73 U 5.7 -

18-May-17 0.76 U 0.89 U 0.53 U 0.73 U 1.3 - 24-Jul-18 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U - 4-May-21 0.2 U 0.2 U 0.2 U 0.2 U 1.4 - 7-Jun-16 0.76 U 0.89 U 0.53 U 0.73 U 24 -

18-May-17 0.76 U 0.89 U 0.53 U 0.73 U 5.6 - 24-Jul-18 0.76 U 0.89 U 0.53 U 0.73 U 4.2 - 4-May-21 0.2 U 0.2 U 0.2 U 0.2 U 0.89 I - 7-Jun-16 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U -

18-May-17 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U 100 U 24-Jul-18 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U - 4-May-21 - - - - - 250 U

MW019 65-70

MW020 75-80

MW021 35-40

Point ID

Screened Interval (feet bls) Sample Date

PCE

(ug/L)

TCE

(ug/L) cis-1-2- Dichloroethene

(ug/L) trans-1-2- Dichloroethene

(ug/L)

Vinyl Chloride

(ug/L)

FL PRO

(ug/L) 7-Jun-16 0.76 U 0.89 U 1.6 0.73 U 5.6 -

18-May-17 0.76 U 0.89 U 0.53 U 0.73 U 0.99 - 24-Jul-18 0.76 U 0.89 U 0.53 U 0.73 U 1.1 - 4-May-21 0.2 U 0.2 U 0.2 U 0.2 U 0.2 U -

MW027 45-50

Point ID

Screened Interval (feet bls) Sample Date

PCE

(ug/L)

TCE

(ug/L) cis-1-2- Dichloroethene

(ug/L) trans-1-2- Dichloroethene

(ug/L)

Vinyl Chloride (ug/L)

FL

PRO

(ug/L)

18-Jan-18 0.91 I 0.99 I 1.2 0.73 U 0.71 U 100 U 16-Apr-18 0.85 I 0.89 U 1.8 0.73 U 0.71 U 100 U 23-Jul-18 0.76 U 0.89 U 5.8 0.73 U 0.71 U 100 U 3-May-21 0.59 I 0.2 U 0.51 I 0.2 U 0.2 U 250 U 16-Apr-18 0.76 U 0.89 U 21 0.93 I 96 100 U 24-Jul-18 76 U 89 U 3900 73 U 5500 100 U 4-Mar-19 150 U 180 U 3900 150 U 11000 - 3-May-21 70 D 7100 D 8100 D 120 D 4000 D 250 U

MW035 5-15

MW038 75-80

Point ID

Screened Interval (feet bls) Sample Date

PCE

(ug/L)

TCE

(ug/L) cis-1-2- Dichloroethene

(ug/L) trans-1-2- Dichloroethene

(ug/L)

Vinyl Chloride

(ug/L)

FL PRO

(ug/L) 18-Jan-18 0.76 U 0.89 U 1.5 0.73 U 1.3 100 U 16-Apr-18 0.76 U 0.89 U 2.0 0.73 U 0.91 I 130 I 23-Jul-18 0.76 U 0.89 U 1.8 0.73 U 1.3 100 U 3-May-21 0.2 U 0.2 U 0.63 I 0.2 U 0.31 I 250 U 18-Jan-18 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U 100 U 16-Apr-18 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U 100 U 23-Jul-18 0.76 U 0.89 U 0.92 I 0.73 U 1.5 100 U 3-May-21 0.2 U 0.2 U 0.2 U 0.2 U 1.5 250 U

MW036 25-30

MW037 45-50

Point ID

Screened Interval (feet bls) Sample Date

PCE

(ug/L)

TCE

(ug/L) cis-1-2- Dichloroethene

(ug/L) trans-1-2- Dichloroethene

(ug/L)

Vinyl Chloride

(ug/L)

FL PRO

(ug/L) 7-Jun-16 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U -

18-May-17 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U 100 U 24-Jul-18 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U - 4-May-21 - - - - - 250 U

MW021 35-40

Point ID

Screened Interval (feet bls) Sample Date

PCE

(ug/L)

TCE

(ug/L) cis-1-2- Dichloroethene

(ug/L) trans-1-2- Dichloroethene

(ug/L)

Vinyl Chloride

(ug/L)

FL PRO

(ug/L) 18-Jan-18 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U - 16-Apr-18 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U - 23-Jul-18 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U - 4-May-21 0.2 U 0.2 U 0.2 U 0.2 U 0.2 U -

MW039 110-115

Point ID

Screened Interval (feet bls) Sample Date

PCE

(ug/L)

TCE

(ug/L) cis-1-2- Dichloroethene

(ug/L) trans-1-2- Dichloroethene

(ug/L)

Vinyl Chloride (ug/L)

FL

PRO

(ug/L)

MW040 50-55 21-Mar-16 0.76 U 0.89 U 0.97 I 0.73 U 21 - 23-Jul-18 3.8 U 4.4 U 13000 9.0 15000 - 4-Mar-19 190 U 220 U 6600 180 U 18000 - 4-May-21 2 U,D 34 D 140 D 2 U,D 3500 D - 4-May-21* 0.2 U 0.2 U 100 0.75 I 3300 D -

MW041 75-80

Point ID

Screened Interval (feet bls) Sample Date

PCE

(ug/L)

TCE

(ug/L) cis-1-2- Dichloroethene

(ug/L) trans-1-2- Dichloroethene

(ug/L)

Vinyl Chloride (ug/L)

FLPRO

(ug/L) 35-55 3-May-21 0.2 U 0.2 U 0.2 U 0.2 U 0.2 U - 60-80 3-May-21 0.2 U 0.2 U 0.2 U 0.2 U 0.2 U -

IW-I

Point ID

Screened Interval (feet bls) Sample Date

PCE

(ug/L)

TCE

(ug/L) cis-1-2- Dichloroethene

(ug/L) trans-1-2- Dichloroethene

(ug/L)

Vinyl Chloride

(ug/L)

FL

PRO

(ug/L)

23-Jul-18 7.6 U 8.9 U 1100 71 870 - 4-Mar-19 7.6 U 8.9 U 740 62 500 - 4-Mar-19 7.6 U 8.9 U 780 58 510 - 3-May-21 0.2 U 0.2 U 0.2 U 0.2 U 1.2 - 3-May-21* 0.2 U 0.2 U 0.2 U 0.2 U 1.2

MW042 75-80

Point ID

Screened Interval (feet bls) Sample Date

PCE

(ug/L)

TCE

(ug/L) cis-1-2- Dichloroethene

(ug/L) trans-1-2- Dichloroethene

(ug/L)

Vinyl Chloride

(ug/L)

FL PRO

(ug/L) MW045 75-80 3-May-21 0.2 U 0.2 U 0.2 U 0.2 U 5.2 -

Point ID

Screened Interval (feet bls) Sample Date

PCE

(ug/L)

TCE

(ug/L) cis-1-2- Dichloroethene

(ug/L) trans-1-2- Dichloroethene

(ug/L)

Vinyl Chloride

(ug/L)

FL PRO

(ug/L) MW043 75-80 3-May-21 0.2 U 0.2 U 0.2 U 0.2 U 0.2 U -

Point ID

Screened Interval (feet bls) Sample Date

PCE

(ug/L)

TCE

(ug/L) cis-1-2- Dichloroethene

(ug/L) trans-1-2- Dichloroethene

(ug/L)

Vinyl Chloride

(ug/L)

FL PRO

(ug/L) MW044 75-80 3-May-21 30 D 28 D 1200 D 7.1 I,D 8300 D -

Point ID

Screened Interval (feet bls) Sample Date

PCE

(ug/L)

TCE

(ug/L) cis-1-2- Dichloroethene

(ug/L) trans-1-2- Dichloroethene

(ug/L)

Vinyl Chloride (ug/L)

FL

PRO

(ug/L)

7-Jun-16 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U - 18-May-17 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U - 24-Jul-18 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U - 3-May-21 - - - - - 250 U

MW025 45-50

FIGURE

mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Text Box Shallow (5-15): MW001R1, MW035

Intermediate (35-55) or (45-50): MW008, MW037

Deep (65-70); (60-80); or (75-80): MW010R, MW011R, MW014, MW015R, MW019, MW020, MW038, MW041, MW042, MW043, MW044, MW045

(screened interval)

From: Fred Portofe To: Mongillo, Ralph Cc: Madison Rogers; Roger Pragle; Crews, Matt Subject: RE: Investigative Derived Waste Drum Costs for Transportation and Disposal at a Regulated Facility Date: Wednesday, March 9, 2022 9:33:38 AM Attachments: F0152F28A2B5418EBC7A4FD870EC8D28.png

AD282F6C3391468088CDA42829B8E703.png A719914B10184314957B0CA910CA8D14.png F1DF3C4322764E8A9076F1ADFF76864A.png 3409DF389C3B4156BA232DDC85C60E09.png

EXTERNAL EMAIL

EXTERNAL EMAIL - We could not verify the authenticity of this message. Please be cautious when clicking on links or opening attachments.

Ralph

We are not going to provide annual Pricing for the Statewide Contract . After reviewing the scope with my partners and the variability with respect to disposal costing and ever changing fuel costs, we feel we can not bid this work given the current uncertainty in the market. We would be please to bid this work on a casa by case basis.

Fred G. Portofe, PG President of Environmental Services (Professional Geologist in FL, GA, AL, MS, TX, SC, NC, TN, IN, LA, WI and AK) M & D Industrial Services, LLC 5896 Azalea Street Port Orange, Florida 32127 Email: Fportofe@mdindustrialservices.com Website: mdindustrialservices.com Cell: 813-951-1012 Emergencies: 888-307-2790

Sent from Mail for Windows

From: Mongillo, Ralph Sent: Tuesday, March 8, 2022 12:46 PM To: Fred Portofe Cc: Madison Rogers; Roger Pragle; Eddy Mendoza; Crews, Matt mailto:fportofe@mdindustrialservices.com mailto:ralph.mongillo@wsp.com mailto:mrogers@mdindustrialservices.com mailto:rpragle@mdindustrialservices.com mailto:matt.crews@wsp.com mailto:Fportofe@mdindustrialservices.com https://nam10.safelinks.protection.outlook.com/?url=http%3A%2F%2Fmdindustrialservices.com%2F&data=04%7C01%7Cmculbreth%40ectinc.com%7Cbfdc4a6d2ce945e1eaf008d9dcf8eabf%7C911eb1cc54d34d8ca5773bf3ccc8105c%7C0%7C0%7C637783784008834159%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C2000&sdata=ntkZP1OGe7McYRA722JXtcGwkbgN9EEhQtSgBSKqC3E%3D&reserved=0 https://go.microsoft.com/fwlink/?LinkId=550986 mailto:Ralph_Mongillo@golder.com mailto:fportofe@mdindustrialservices.com mailto:mrogers@mdindustrialservices.com mailto:rpragle@mdindustrialservices.com mailto:emendoza@mdindustrialservices.com mailto:Matt_Crews@golder.com