CN-370000-HW685-DC026A.pdf
PDF 15 MB Posted
- Contract number
- HW685
- Issued by
- Florida
About this file
Summary
This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) to Golder Associates USA Inc. for environmental remediation services at the Dry Cleaning Depot facility located at 1320 West Sunrise Boulevard in Fort Lauderdale, Broward County, Florida (ERIC_4158). The document establishes a fixed unit rate contract valued at $22,134.73 with a completion date of September 9, 2022. The Department Project Manager is Ben Grubbs, and the contractor's Project Manager is Matt Crews. The underlying contract number is HW685, with the specific task assignment number DC026A.
The scope of work comprises three subtasks: Project Management ($1,973.10), Annual Groundwater Monitoring and Site Visit ($13,722.88), and Annual Groundwater Monitoring and Proposed Path Forward Report ($6,438.75). The contractor will conduct groundwater monitoring activities at eighteen monitoring wells, collect samples for analysis of chlorinated volatile organic compounds and dissolved gases, manage investigation-derived waste, and submit deliverables including field documentation, laboratory reports, updated GIS tables, and a final comprehensive report. Deliverables are scheduled for May 27, 2022 (preliminary path forward), and June 24, 2022 (final report). The cost estimate reflects 128 total labor hours at various professional staff levels, along with expenses for travel, laboratory analysis, field equipment, and subcontractor services for investigation-derived waste disposal through Erwin Remediation at $100.00 per drum.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW685
DC026A Completion September 9, 2022
This Task Assignment authorizes Golder to conduct groundwater monitoring activities and develop a proposed path forward in accordance with the April 27, 2022, Scope of Work, Cost Estimate, and Bid Documentation.
Ben Grubbs 850-245-8992 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Golder Associates USA Inc.
Golder Associates USA Inc.
Matt Crews 904-363-3430
ERIC_4158
1320 West Sunrise Boulevard, Fort Lauderdale, Broward County
Dry Cleaning Depot
✔ $ 22,134.73
$ 22,134.73
Scope of Work
Matthew Crews
Senior Lead Consultant, Environmental Engineer
Matthew C. Crews Digitally signed by Matthew C. Crews Date: 2022.05.16 12:51:28 -04'00'
William E. Burns, Jr.
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2022.05.16 11:30:47 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 2: Preliminary Path Forward Deliverable (to include Site Visit/Groundwater Sampling Field Documentation, Laboratory Report, Tables, and Figures); IDW Disposal Documentation; ADaPT/GIS Update; Teleconference Discussion Notes
05/27/2022
Subtasks 1 & 3: Annual Groundwater Monitoring and Proposed Path Forward Report;
Project Management 06/24/2022
Subtask 2: Submittal and FDEP approval of Preliminary Path Forward Deliverable (to include Site Visit/Groundwater Sampling Field Documentation, Laboratory Report, Tables, and Figures); IDW Disposal Documentation; ADaPT/GIS Update;
Teleconference Discussion Notes
$ 13,722.88
Subtasks 1 & 3: Submittal and FDEP approval of Annual Groundwater Monitoring and Proposed Path Forward Report; Project Management $ 8,411.85
$ 22,134.73
HW685
DC026A
Printed on recycled paper.
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
To: HW685 Contract Negotiation File Dry Cleaning Depot Fort Lauderdale, Broward County
ERIC_4158
From: Ben Grubbs, Project Manager Date: May 13, 2022 Subject: Negotiation Summary
HW685 DC026A
This Task Assignment authorizes Golder to conduct groundwater monitoring activities and develop a proposed path forward in accordance with the April 27, 2022, Scope of Work, Cost Estimate, and Bid Documentation.
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2: Annual Groundwater Monitoring and Site Visit Golder will collect groundwater samples from eighteen monitoring wells (MW001R1, MW008, MW010R, MW011R, MW014, MW015R, MW020, MW022, MW023, MW035, MW037, MW038, and MW040 – MW045). Prior to sampling, depth-to-water will be measured. The wells will then be purged, and field parameters will be recorded. The groundwater samples will be collected using low flow sampling methods and analyzed for chlorinated volatile organic compounds (VOCs). Six samples will also be analyzed for dissolved gases. Investigation-derived waste (IDW) will be temporarily stored in a 55-gallon drum. Golder requested bids for IDW drum treatment and disposal from Clark, Erwin, Whatever Waste, and M & D Industrial Services. Erwin was selected as the lowest responsive and responsible bidder.
Golder will submit the Preliminary Path Forward deliverable to FDEP that includes field documentation of the site visit and groundwater sampling event along with the laboratory report, tables, figures. Golder will also submit the IDW disposal documentation and ADaPT/GIS deliverable to FDEP. Following the submittal of these deliverables, Golder and FDEP will hold a teleconference to discuss the preliminary path forward for the site. Golder will submit meeting notes from the teleconference to FDEP.
Subtask 3: Reporting Golder will submit the Annual Groundwater Monitoring and Proposed Path Forward Report to
FDEP.
MEMORANDUM
Dry Cleaning Depot May 13, 2022 Page Two
Golder and the FDEP confirmed on April 27, 2022, that an Access Agreement with the current real property owner of the Dry Cleaning Depot (ERIC_4158) site has been executed.
This site visit/groundwater monitoring event is to determine whether injections are necessary to remediate groundwater at the site.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $22,134.73 with 128 labor hours.
Golder may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.
FDEP COST ESTIMATEContractor: Golder Associates USA Inc.
Date: 4/27/2022
Task #: DC026A SubTask 1 Project Management SubTask 6
Site: SubTask 2 Annual GW Monitoring SubTask 7
Activity/Phase: Path Forward SubTask 3 Annual GW Monitoring and Proposed Path Forward Report SubTask 8
Project Manager: Ben Grubbs SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$55.25 Project Manager (MC) 11.9 $0.00 Program Leader - X-14 0 0 0 0 0 0 0 0 0 0
$63.65 Practice Leader - X-13 (JB) 3 0 3 0 0 0 0 0 0 0 $55.25 Senior Consultant - X-12 (MC) 48 16 32 0 0 0 0 0 0 0
$0.00 Senior Sci/Eng - X-11 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Project Sci/Eng - P-10 0 0 0 0 0 0 0 0 0 0
$45.42 Senior Project Sci/Eng - P-10 (BL) 7 5 2 0 0 0 0 0 0 0 $44.15 Senior Project Sci/Eng - P-10 (JT) 4 3.5 0 0 0 0 0 0 0 0 $33.32 Staff Sci/Eng - P-8 (JS) 30 29.5 0 0 0 0 0 0 0 0 $30.31 Staff Sci/Eng - P-8 (PK) 22 22.0 0 0 0 0 0 0 0 0 $32.75 Staff Sci/Eng - P-8 (AS) 3 0 3 0 0 0 0 0 0 0
$0.00 Sci/Eng/Admin - P-7 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 128 11.9 76.0 40.0 0 0 0 0 0 0 0
Direct Labor $5,721.68 $658.25 $2,915.39 $2,148.04 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.50% $9,869.90 $1,135.48 $5,029.05 $3,705.37 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $15,591.58 $1,793.73 $7,944.44 $5,853.41 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Dry Cleaning Depot
REV: 02/03 CEF GOLDER Page 1
FDEP COST ESTIMATEContractor: Golder Associates USA Inc.
Date: 4/27/2022
Task #: DC026A SubTask 1 Project Management SubTask 6
Site: SubTask 2 Annual GW Monitoring SubTask 7
Activity/Phase: Path Forward SubTask 3 Annual GW Monitoring and Proposed Path Forward Report SubTask 8
Project Manager: Ben Grubbs SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
Dry Cleaning Depot
Travel Vehicle Rental $600.00 $600.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $286.00 $286.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $886.00 $886.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $10.00 $10.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $2,504.00 $2,504.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $220.00 $220.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $2,724.00 $2,724.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $80.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling Related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,084.00 $1,084.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,264.00 $1,264.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $20,575.58 $1,793.73 $12,928.44 $5,853.41 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,559.15 $179.37 $794.44 $585.34 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $22,134.73 $1,973.10 $13,722.88 $6,438.75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GOLDER Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Dry Cleaning Depot SUBTASK 2: Annual GW Monitoring
DATE: 4/27/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Consultant (M. Crews) 12
Senior Consultant (M. Crews) 4
Senior Project Sci/Eng (B. Lucero) 5
Staff Sci/Eng (J. Spengler) 29.5
Staff Sci/Eng (P. Kuhn) 22
Senior Project Sci/Eng (J. Thomas) 3.5
TOTAL LABOR 76.0
VEHICLE TYPE RATE UNIT USEAGE
Truck (J. Spengler) - Sun/Mon/Tues $120.00 Per Day 3 $360.00
Truck (P. Kuhn) - Mon/Tues $120.00 Per Day 2 $240.00
TOTAL VEHICLE $600.00
PER DIEM STAFF RATE UNIT USEAGE
Per Diem J. Spengler - Sun/Mon/Tues $36.00 Per Day 3 $108.00 Hotel J. Spengler - Sun/Mon $89.00 Per Day 2 $178.00
TOTAL PER DIEM $286.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin IDW T&D - Liquids $100.00 Per Drum 1 $100.00
TOTAL $100.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Chlorinated VOCs - EPA Method 8260B Total VOHs EPA Method 8260B $73.00 18 $1,314.00 Methane/ethane/ethene RSK175 $180.00 6 $1,080.00 Total VOCs (IDW) PID/Hall Series $110.00 1 $110.00 Sample Shipping Small $110.00 2 $220.00
TOTAL LAB $2,724.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Miscellaneous Expendables $40.00 Per Day 2 $80.00 Shallow Groundwater Sampling Kit $290.00 Per Day 2 $580.00
Tubing, Poly HDPE $0.30 Per Foot 1,500 $450.00 Tubing, Silicon 3/16 x 3/8 $3.00 Per foot 18 $54.00
Drum, 55-gallon $100.00 Per Drum 1 $100.00
TOTAL EQUIPMENT $1,264.00
Note: Contact property owner and DEP to schedule field work; locate wells at new site;
collect depth to water measurements from accessible monitoring wells and groundwater samples from 18 monitoring wells for chlorinated VOC analysis (6 to also be analyzed for dissolved gases), and management of IDW for transportation and disposal. Mobilization and demobilization costs for this event will be split with the DC Depot site in Pompano Beach (ERIC_4163). This site will be sampled first (Monday/Tuesday).
Staff Sci/Eng J. Spengler: Mobilize to Fort Lauderdale on Sunday; annual monitoring at DC Depot (ERIC_4158) Monday and Tuesday; travel to Pompano Beach Tuesday night;
annual monitoring at DC Depot (ERIC_4163) Wednesday and Thursday; demobilize to Jacksonville on Friday Staff Sci/Eng P. Kuhn: Annual monitoring at DC Depot (ERIC_4158) Monday and Tuesday (local travel); travel to Pompano Beach Tuesday night; annual monitoring at DC Depot (ERIC_4163) Wednesday and Thursday; demobilize to Miami on Thursday.
Update FDEP GIS Tables, run data checker, create and edit error report, and annotate error report. Submit FDEPGIS tables; submit ADaPT deliverable.
Communication with RPO (verification of property ownership) and offsite property owners for site access (2 hours). Prepare and submit field notes, sample forms, laboratory report and updated tables and figures in an email deliverable to the DEP (8 hours). Characterization and waste profile for transportation and disposal of IDW drum(s) (2 hours).
Annual Monitoring Event. Mobilize and collect samples from 18 monitoring wells: MW001R1 and MW035 in the shallow zone of the surficial aquifer; MW008, MW037, and MW040 in the intermediate zone of the surficial aquifer; and MW010R, MW011R, MW014, MW015R, MW020, MW022, MW023, MW038, MW041, MW042, MW043, MW044, and MW045 in the deep zone of the surficial aquifer. Water levels, instrument calibration, and sampling (10 hours per day x 2 days = 20 hours). Development of Health and Safety Plan (3 hours). Field event preparation (1 hour). Travel from Jacksonville to Fort Lauderdale (5.5 hours).
CADD: Develop and update figures for e-mail deliverable (one site map, three groundwater flow and three CVOC figures) into Golder format (current figures are from previous Contractor).
Annual Monitoring Event. Mobilize and collect samples from 18 monitoring wells: MW001R1 and MW035 in the shallow zone of the surficial aquifer; MW008, MW037, and MW040 in the intermediate zone of the surficial aquifer; and MW010R, MW011R, MW014, MW015R, MW020, MW022, MW023, MW038, MW041, MW042, MW043, MW044, and MW045 in the deep zone of the surficial aquifer. Water levels, instrument calibration, and sampling (10 hours per day x 2 days = 20 hours). Round trip travel (1 hour per day x 2 days = 2 hours).
Develop preliminary path forward following review of groundwater monitoring results and site history. Participate in conference call with DEP after deliverable submittal to discuss preliminary path forward.
FINAL --7/24/96
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Dry Cleaning Depot SUBTASK 3: Annual GW Monitoring and Proposed Path Forward Report
DATE: 4/27/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Practice Leader (J. Brown) 3
Senior Consultant (M. Crews) 32
Staff Sci/Eng (A. Strayer) 3
Senior Project Sci/Eng (B. Lucero) 2
TOTAL LABOR 40
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
Reporting: Formatting tables, document production; convert tables from previous Contractor to the Golder report format, binding and shipping. Create pdf for OCULUS.
Develop conclusions and recommendations and prepare final Path Forward Report.
Conduct file review on OCULUS; and prepare draft 2022 Annual Groundwater Monitoring and Proposed Path Forward Report.
Finalize CADD Figures for Annual Groundwater Monitoring and Proposed Path Forward Report.
FINAL --7/24/96
Golder Associates USA Inc.
9428 Baymeadows Road, Suite 400, Jacksonville, Florida, USA 32256
T: +1 904 363-3430 F: +1 904 363-3445
Golder and the G logo are trademarks of Golder Associates Corporation golder.com
April 27, 2022 Proposal No. 202208346
Mr. Ben Grubbs Florida Department of Environmental Protection Division of Waste Management Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400
RE: COST PROPOSAL FOR DRY CLEANING DEPOT
ANNUAL GROUNDWATER MONITORING AND PROPOSED PATH FORWARD REPORT
1320 WEST SUNRISE BOULEVARD
FORT LAUDERDALE, BROWARD COUNTY, FLORIDA
FACILITY IDENTIFICATION NUMBER: ERIC_4158
PROPOSED TASK ASSIGNMENT: HW685_HW026A
Dear Mr. Grubbs:
Golder Associates USA Inc. (Golder) is pleased to provide the Florida Department of Environmental Protection (DEP) with this cost proposal for an Annual Groundwater Monitoring and Proposed Path Forward Report for the above-referenced site. This proposal includes a description of the proposed scope of services, level of effort (LOE) sheets for each subtask, and a Cost Estimate Form (CEF) that summarizes the costs of the proposed services.
The proposed scope of services is described below.
SUBTASK 1 – PROJECT MANAGEMENT
To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with DEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with DEP Drycleaning Solvent Cleanup Program requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the DEP-approved task assignment.
Mr. Ben Grubbs Proposal No. 202208346
Florida Department of Environmental Protection April 27, 2022
SUBTASK 2 – ANNUAL GROUNDWATER MONITORING
Golder will collect groundwater samples from the following 18 wells: MW001R1 and MW035 in the shallow zone of the surficial aquifer; MW008, MW037, and MW040 in the intermediate zone of the surficial aquifer; and MW010R, MW011R, MW014, MW015R, MW020, MW022, MW023, MW038, MW041, MW042, MW043, MW044, and MW045 in the deep zone of the surficial aquifer. The attached figures (Figures 1, 2A, 2B, 2C, and 3) from the July 2021 Supplemental Site Assessment Report, revised in October 2021, show the monitoring well locations, potentiometric maps, and chlorinated volatile organic compound (VOC) results for the shallow, intermediate, and deep zones of the surficial aquifer.
Prior to groundwater sampling, the depth to groundwater will be measured at accessible monitoring well using an electronic water level indicator to determine groundwater elevations and flow direction. During the sampling event, the locks and well caps will be inspected for damage or degradation and repaired or replaced as necessary.
Groundwater samples will be collected from the wells in accordance with DEP Standard Operating Procedures (SOPs) for Field Activities (DEP-SOP-001/01) dated January 2017 (effective April 16, 2018). Prior to collecting the groundwater sample, each well will be purged and field parameters including temperature, pH, specific conductance, dissolved oxygen, turbidity, and oxidation-reduction potential will be monitored. Purge volumes and field parameters will be recorded on field data sheets, and the field monitoring equipment will be calibrated in accordance with the manufacturer’s recommended procedures.
Groundwater samples will be collected using low flow sampling methods. The groundwater samples will be placed in laboratory-supplied containers, labeled with a unique identification number attached to the outside of the sample container, preserved on ice in a laboratory-provided cooler, and delivered to a Florida Department of Health and National Environmental Laboratory Accreditation Program-certified fixed-base laboratory along with the completed chain-of-custody documentation. The samples will be analyzed for chlorinated VOCs using EPA Method 8260B. In addition, samples from monitoring wells MW001R1, MW011R, MW035, MW038, MW041, and MW042 will be analyzed for dissolved gases using Method RSK175.
Golder will temporarily store the investigation derived waste (IDW) purge water generated from the groundwater sampling event in a 55-gallon steel drum(s). A waste characterization sample will be collected from the IDW drum(s) for analysis of total VOCs using EPA Method 8260. If the waste characterization sample is acceptable to the disposal subcontractor, the IDW drum(s) will be picked up and transported to a facility for proper disposal. A non-hazardous waste manifest will be provided by the disposal subcontractor upon delivery to the disposal facility.
During the annual groundwater monitoring event, Golder will assess the general site layout and dimensions, adjacent property use, and the existing site features to aid in the evaluation of feasible site remediation alternatives.
Upon completion of Subtask 2, an e-mail deliverable will be submitted and include copies of the field data sheets, equipment calibration forms, field notes, laboratory analytical report, and laboratory chain-of-custody documentation. In addition, tables and figures with the current and previous groundwater results will be completed for discussion in a teleconference with Golder and DEP representatives to discuss a preliminary path forward scope of work.
SUBTASK 3 – ANNUAL GROUNDWATER MONITORING AND PROPOSED PATH
FORWARD REPORT
The Annual Groundwater Monitoring and Proposed Path Forward Report will include the site location and description; operational history; a summary of previous assessment and remedial activities; and site geology and hydrogeology. The report will also include a description of the groundwater sampling procedures, evaluation of analytical results, comparison of current to historical data, tabulated summary of the current and historical analytical data, a site map showing the groundwater analytical results, water level elevation information in tables and figures, laboratory analytical data, conclusions, and recommendations for a proposed path forward for future site assessment (if necessary) and remediation activities. Golder will update the DEP GIS tables with the new water level data, field parameter measurements, and VOC data; run the DEP data checker on the completed tables; and submit the updated tables and error report. Additionally, Golder will forward Automated Data Processing Tool (ADaPT) data deliverables provided by the laboratory for each groundwater sampling event.
Information included in this report will be obtained from readily accessible files located on the DEP Consolidated OCULUS System database and from observations made during the annual groundwater monitoring event.
HEALTH AND SAFETY
Golder will prepare a site-specific Health and Safety Plan for the field work. The work will be completed in accordance with Golder’s safety policies and procedures. At a minimum, Golder will wear safety glasses, high visibility safety vests, and steel-toed boots. A safety job briefing will be conducted prior to the start of work activities, and anytime the scope of work or site conditions change.
COST AND SCHEDULE
The estimated cost to complete the annual groundwater monitoring is $22,134.73. Golder will tentatively schedule the annual sampling event for May 2022. The LOE/CEF cost sheets are included in Attachment A. The subcontractor bids are included in Attachment B. The following table summarizes the proposed costs and deliverable schedule.
Task Proposed Cost Proposed Schedule/Deliverables
Subtask 1 – Project Management $ 1,973.10 August 5, 2022
Subtask 2 – Annual Groundwater Monitoring
$13,722.88 May 27, 2022 (Field Documentation, Laboratory Report, GIS Tables, ADaPT Deliverables)
Subtask 3 – Annual Groundwater Monitoring and Proposed Path Forward Report
$ 6,438.75 June 24, 2022 (Annual Monitoring and Proposed Path Forward Report)
Total/Completion Date $22,134.73 September 9, 2022
Please be aware that Golder has been acquired by and is now a Member of the WSP family of companies. Golder remains as a legal entity and is the proposed contracting entity for this proposal. We are in the process of integrating the resources of our companies. Correspondence for this proposal should continue to be addressed to the undersigned.
Golder appreciates the opportunity to provide services to the DEP. Should you require additional information or clarifications, please contact us at (904) 363-3430.
Sincerely, Golder Associates USA Inc.
Matthew C. Crews, PE Donald J. Miller, PEng Senior Lead Consultant, Environmental Engineer Senior Director
MCC/DJM/as
Attachments: Figure 1 – Site Plan
Figure 2A – Shallow Monitoring Well Groundwater Elevations – May 3, 2021 Figure 2B – Intermediate Monitoring Well Groundwater Elevations – May 3, 2021 Figure 2C – Deep Monitoring Well Groundwater Elevations – May 3, 2021 Figure 3 – Groundwater Analytical Data – May 2021
Attachment A – Level of Effort Sheets / Cost Estimate Form Attachment B – Subcontractor Bids
G:\Projects\DEP-Drycleaning\Projects\Fort Lauderdale\Drycleaning Depot - Ft Lauderdale - HW685\Proposal\DC026A - DC Depot Ann Mon & Path Forward\HW685_DC026A - DC Depot Annual GW Mon & PF Proposal.docx
@A
@A@A
@A
@A
&'D
E
E
E
E
E
E /E
E
E
E
E
E
E
E
E
E
@AD
@A
@AD
@AD
@AD
@AD
@A@A
@A @A@A@A
ADADAD
@A@A@A @A @A
!O
!O
!O
!O
!O
!O
!O
!O
!O
!O
!O
!O
!O
!O
!O
@A
@A
@A
@A
@A@A
@A
@A
&'D
E
E
E /Ea
E
E Ea
E /E
Ea
E Ea
E Ea
E Ea
E Ea E
Ea
E Ea
E Ea
E
E Ea
@AD
@A
@AD
@AD
@AD
@AD
@A@A
@A @A@A@A
@A@A@A @A @A
!R
!R
!R
!R
!R
!R
!R
!R
!R
!R
!R
!R
!R
!R
!R
@A
@A
@A
AUTO ZONE
MW042
BCMW001
BCMW002
MW041
MW040
MW009R
MW010R
MW011R
MW012R
MW009
MW016
MW017
MW018
IRR002
IRR001
MW001R1
MW007 MW008
MW035
MW036
MW037
MW038
MW039
MW001
MW001R
MW004
MW002
MW003
MW005
IW-1
IWA30
IWA55
IWA80
IWB30
IWB55
IWB80
IWC30
IWC55
IWC80
IWD55
IWD80
IWE55
IWE80
IWF55
IWF80
IWG55
IWG80
IWH55
IWH80
IWI55
IWI80
IWJ55
IWJ80
IWK30
IWK55
IWK80
SVE-1
SVE-10
SVE-11
SVE-12
SVE-13
SVE-14
SVE-15
SVE-2
SVE-3
SVE-4
SVE-5
SVE-6
SVE-7
SVE-8
SVE-9
MW043
MW044
MW045
SITE PLAN
DRY CLEANING DEPOT
1320 WEST SUNRISE BOULEVARD, Ft Lauderdale, Florida
FDEP Facility ID No.: 069502027
FIGURE 1
SCALE:
Notes:
- All groundwater elevation measurements in feet NAVD-88
- Aerial Source: Google Earth Pro, January 2016
Legend
@A MONITORING WELL
@A CLUSTER MONITORING WELL
Ea Deep Inj Well
E
INJECTION WELL
!R SOIL VAPOR EXTRACTION WELL
@AD MONITORING WELL - ABANDONED
@AD MONITORING WELL - DESTROYED
&'D IRRIGATION WELL - DESTROYED
&' IRRIGATION WELL
PARCEL BOUNDARY
15 0 15 Feet
Former Dry Cleaning Depot Building
Shallow Wells
Intermediate Wells
Deep Wells mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Text Box Note: Deeps wells MW014, MW015R, MW020, MW022, and MW023 are offsite and outside of image.
mcrews Text Box Proposed Wells to be Sampled mcrews Callout PCE & TCE above GCTL 4/2007 mcrews Text Box Shallow (5-15): MW001R1, MW035
Intermediate (45-50) or (50-55): MW008, MW037, MW040
Deep (65-70); (60-80); or (75-80): MW010R, MW011R, MW014, MW015R, MW020, MW022, MW023, MW038, MW041, MW042, MW043, MW044, MW045
(screened interval) mcrews Highlight mcrews Callout Injection well upgradient?
mcrews Highlight mcrews Callout Horizontal delineation?
@A
@A
NW 9TH PL
MW001R1
(-0.19)
MW007
(-0.14)
MW031
(-0.34)
MW035
(-0.21)
-0.15
-0.19
-0.21
-0.17
0 50 100 150
Feet
SHALLOW MONITORING WELL (0 to 20 feet bls)
GROUNDWATER ELEVATIONS -
MAY 3, 2021
DRY CLEANING DEPOT
1320 WEST SUNRISE BOULEVARD, Ft Lauderdale, Florida FDEP Facility ID No.: 069502027
FIGURE 2A
SCALE:
Notes:
NG = Not Gauged
- All groundwater elevation measurements in feet NAVD-88
- Aerial Source: FDOT, January 2015
- MW001R1 was installed in March 2015
Legend
@A Shallow Monitoring Well
Groundwater Contour (ft.)
Approximate Direction of Groundwater Flow
@A @A
@A
@A
@A
@A
@A
@A
@A
@A @A
MW008
(-0.16)
MW033
(NC)
MW037
(-0.25)*
MW025
(-0.20)* MW027
(-0.26)
MW009R
(-0.11)
MW013
(-0.30)
MW021
(-0.29)
MW028
(-0.33)
MW032
(-0.29)
-0 .1
-0 .2
-0 .2
-0 .3
INTERMEDIATE MONITORING WELL (35 to 50 feet bls)
GROUNDWATER ELEVATIONS -
MAY 3, 2021
DRY CLEANING DEPOT
1320 WEST SUNRISE BOULEVARD, Ft Lauderdale, Florida FDEP Facility ID No.: 069502027
FIGURE 2B
Notes:
- * = Not used in contouring
- All groundwater elevation measurements in feet NAVD-88
- Aerial Source: FDOT, January 2017
D:\FDEP\HW551\DC\DC Depot Ft L\Geospatial\mxd\2021_March\F2B_(35 to 50 feet bls)GWE_May21.mxd
0 50 100 150
Feet
SCALE:Legend
@A Intermediate Monitoring Well (Screen Interval 35'-40' BLS)
@A Intermediate Monitoring Well (Screen Interval 40'-50' BLS)
Approximate Direction of Groundwater Flow
Former Dry Clean Depot Location
Parcel Boundary Groundwater Contour (Ft.)
(Dashed Where Inferred)
@A@A
@A@A
@A@A
@A@A
@A
@A
@A
@A
@A
MW010R
(-0.14)*
MW014
(-0.11)*
MW019
(-0.26)
MW022
(-0.26)*
MW042
(-0.29)
MW041
(-0.36)*
MW011R
(-0.21)
MW015R
(-0.22)
MW020
(-0.27)
MW023
(-0.31)
MW029
(-0.40)
MW038
(-0.19)
MW045
(-0.27)
MW043
(-0.29)
MW044
(-0.31)*
-0.25
-0.30
-0.35
-0.20
-0.25
DEEP MONITORING WELL (65 to 80 feet bls)
GROUNDWATER ELEVATIONS -
MAY 3, 2021
1320 WEST SUNRISE BOULEVARD, Ft. Lauderdale, Florida
FDEP Facility ID No.: 069502027
FIGURE 2C
SCALE:
Notes:
- * = Not used in contouring
- All groundwater elevation measurements in feet NAVD-88
- Aerial Source, FDOT, 2017
0 50 100 Feet
D:\FDEP\HW551\DC\DC Depot Ft L\Geospatial\mxd\2021_March\F2C_(65 to 80 feet bls)_GWE_May21.mxd
Legend
@A Deep Monitoring Well (65'-70' BLS)
@A Deep Monitoring Well (75'-80' BLS) Approximate Direction of Groundwater Flow
Former Dry Clean Depot Location
Parcel
Groundwater Contour (ft.)
(Dashed Where Inferred)
Ea Injection Well (60'-80' BLS)
@A@A
@A @A
@A
&'D
E
E
E Ea
E
E Ea
E
E Ea
E Ea
E Ea
E Ea
E Ea E
Ea
E Ea
E Ea
E
E Ea
@AD
@A
@AD
@AD
@AD
@AD
@AD
@A@A
@AD@A@A@A@A
@A@A@A
ADADAD
@A@A
@A@A@A
@AD
@A
@A@A@A@A@A
@A @A
@A
@A
@A
International Granite
Auto Zone
Fmr. DC Depot
SUNRISE BLVD.
IWF55/80
MW021
MW042
MW040/MW041
BCMW001
BCMW002
BCMW003
MW009R
MW009
MW013
MW014
MW016
MW017
MW018
MW019
MW021
MW022
MW023
IRR002
IRR001
IW-1
IWA30
IWA55/80
IWB30
IWB55/80
IWC30
IWC55/80
IWD55/80
IWE55/80
IWG55/80
IWH55/80
IWI55/80
IWJ55/80
IWK30
IWK55/80MW001R1
MW007
MW015R
MW033
MW038
MW039
MW025
MW027
MW001
MW004
MW006
MW002
MW003
MW005
MW026
MW038
IWB30
MW043
MW044
MW045
SCALE:
Ê
Note:
Yellow Shading indicates current data
* = Duplicate Sample
0 40 80 Feet
GROUNDWATER ANALYTICAL DATA
MAY 2021
DRY CLEANING DEPOT
1320 WEST SUNRISE BOULEVARD, Ft Lauderdale, Florida
FDEP Facility ID No.: 069502027
Parcel
LEGEND:
@AD MW - Abandoned or Destroyed
@A Cluster Monitoring Well (CMW) @A Monitoring Well (MW)
@AD CMW - Abandoned or Destroyed
EXTENT OF
NADC PLUME
EXTENT OF
GCTL PLUME
Injection Well Ea
Point ID
Screened Interval (feet bls) Sample Date
PCE
(ug/L)
TCE
(ug/L) cis-1-2- Dichloroethene
(ug/L) trans-1-2- Dichloroethene
(ug/L)
Vinyl Chloride
(ug/L) 7-Jun-16 0.76 U 0.89 U 0.53 U 0.73 U 6.4
18-May-17 0.76 U 0.89 U 0.53 U 0.73 U 3.2 24-Jul-18 0.76 U 0.89 U 1.0 0.73 U 4.0 4-May-21 0.2 U 0.2 U 0.2 U 0.2 U 0.81 I
MW014 65-70
Point ID
Screened Interval (feet bls) Sample Date
PCE
(ug/L)
TCE
(ug/L) cis-1-2- Dichloroethene
(ug/L) trans-1-2- Dichloroethene
(ug/L)
Vinyl Chloride
(ug/L)
FLPRO
(µg/L) 18-Jan-18 0.76 U 5.8 120 1.1 97 - 16-Apr-18 0.76 U 0.89 U 99 0.73 U 110 - 24-Jul-18 0.76 U 0.89 U 120 0.73 U 110 - 3-May-21 7.5 11 310 D 2.8 160 D 250 U
MW001R1 5-15
Point ID
Screened
Interval
(feet bls) Sample Date
PCE
(ug/L)
TCE
(ug/L) cis-1-2
Dichloroethene
(ug/L) trans-1-2-
Dichloroethene
(ug/L)
Vinyl
Chloride
(ug/L)
FL PRO
(ug/L) 6-Jun-16 0.76 U 0.89 U 1.6 0.73 U 0.71 U -
17-May-17 0.76 U 0.89 U 0.91 I 0.73 U 0.71 U - 24-Jul-18 0.76 U 0.89 U 0.84 I 0.73 U 0.71 U - 3-May-21 0.2 U 0.2 U 0.2 U 0.2 U 0.2 U - 18-Jan-18 0.76 U 0.89 U 1.1 0.73 U 2.7 100 U 16-Apr-18 0.76 U 0.89 U 5.5 0.73 U 3.3 300 I 23-Jul-18 0.76 U 0.89 U 1.1 0.73 U 1.8 100 U 3-May-21 0.2 U 0.2 U 0.2 U 0.2 U 0.2 U 250 U
MW007 2-12
MW008 45-50 Point ID
Screened Interval (feet bls) Sample Date
PCE
(ug/L)
TCE
(ug/L) cis-1-2- Dichloroethene
(ug/L) trans-1-2- Dichloroethene
(ug/L)
Vinyl Chloride
(ug/L)
FL PRO
(ug/L) 18-Jan-18 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U 100 U 16-Apr-18 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U 100 U 23-Jul-18 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U 100 U 3-May-21 0.2 U 0.2 U 0.2 U 0.2 U 0.2 U 250 U 18-Jan-18 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U 100 U 16-Apr-18 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U 100 U 23-Jul-18 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U 100 U 3-May-21 0.2 U 0.43 I 3.4 0.2 U 15 250 U 16-Apr-18 0.76 U 0.89 U 1.7 0.73 U 2.3 - 24-Jul-18 0.76 U 0.89 U 1.3 0.73 U 21 100 U 24-Jul-18 0.76 U 0.89 U 0.66 I 0.73 U 17 - 3-May-21 0.2 U 0.2 U 8.3 0.2 U 100 250 U 7-Jun-16 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U -
17-May-17 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U - 23-Jul-18 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U - 3-May-21 0.2 U 0.2 U 0.2 U 0.2 U 0.2 U -
MW012R 111-116
MW009R 35-40
MW010R 65-70
MW011R 75-80
Point ID
Screened Interval (feet bls) Sample Date
PCE
(ug/L)
TCE
(ug/L) cis-1-2- Dichloroethene
(ug/L) trans-1-2- Dichloroethene
(ug/L)
Vinyl Chloride
(ug/L)
FL PRO
(ug/L) 7-Jun-16 0.76 U 0.89 U 0.53 U 0.73 U 7.6 -
18-May-17 0.76 U 0.89 U 0.53 U 0.73 U 4.0 - 24-Jul-18 0.76 U 0.89 U 0.53 U 0.73 U 3.1 - 4-May-21 0.2 U 0.2 U 0.26 I 0.2 U 0.33 I -
MW015R 75-80
Point ID
Screened Interval (feet bls) Sample Date
PCE
(ug/L)
TCE
(ug/L) cis-1-2- Dichloroethene
(ug/L) trans-1-2- Dichloroethene
(ug/L)
Vinyl Chloride
(ug/L)
FL PRO
(ug/L) 7-Jun-16 0.76 U 0.89 U 0.53 U 0.73 U 5.7 -
18-May-17 0.76 U 0.89 U 0.53 U 0.73 U 1.3 - 24-Jul-18 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U - 4-May-21 0.2 U 0.2 U 0.2 U 0.2 U 1.4 - 7-Jun-16 0.76 U 0.89 U 0.53 U 0.73 U 24 -
18-May-17 0.76 U 0.89 U 0.53 U 0.73 U 5.6 - 24-Jul-18 0.76 U 0.89 U 0.53 U 0.73 U 4.2 - 4-May-21 0.2 U 0.2 U 0.2 U 0.2 U 0.89 I - 7-Jun-16 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U -
18-May-17 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U 100 U 24-Jul-18 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U - 4-May-21 - - - - - 250 U
MW019 65-70
MW020 75-80
MW021 35-40
Point ID
Screened Interval (feet bls) Sample Date
PCE
(ug/L)
TCE
(ug/L) cis-1-2- Dichloroethene
(ug/L) trans-1-2- Dichloroethene
(ug/L)
Vinyl Chloride
(ug/L)
FL PRO
(ug/L) 7-Jun-16 0.76 U 0.89 U 1.6 0.73 U 5.6 -
18-May-17 0.76 U 0.89 U 0.53 U 0.73 U 0.99 - 24-Jul-18 0.76 U 0.89 U 0.53 U 0.73 U 1.1 - 4-May-21 0.2 U 0.2 U 0.2 U 0.2 U 0.2 U -
MW027 45-50
Point ID
Screened Interval (feet bls) Sample Date
PCE
(ug/L)
TCE
(ug/L) cis-1-2- Dichloroethene
(ug/L) trans-1-2- Dichloroethene
(ug/L)
Vinyl Chloride (ug/L)
FL
PRO
(ug/L)
18-Jan-18 0.91 I 0.99 I 1.2 0.73 U 0.71 U 100 U 16-Apr-18 0.85 I 0.89 U 1.8 0.73 U 0.71 U 100 U 23-Jul-18 0.76 U 0.89 U 5.8 0.73 U 0.71 U 100 U 3-May-21 0.59 I 0.2 U 0.51 I 0.2 U 0.2 U 250 U 16-Apr-18 0.76 U 0.89 U 21 0.93 I 96 100 U 24-Jul-18 76 U 89 U 3900 73 U 5500 100 U 4-Mar-19 150 U 180 U 3900 150 U 11000 - 3-May-21 70 D 7100 D 8100 D 120 D 4000 D 250 U
MW035 5-15
MW038 75-80
Point ID
Screened Interval (feet bls) Sample Date
PCE
(ug/L)
TCE
(ug/L) cis-1-2- Dichloroethene
(ug/L) trans-1-2- Dichloroethene
(ug/L)
Vinyl Chloride
(ug/L)
FL PRO
(ug/L) 18-Jan-18 0.76 U 0.89 U 1.5 0.73 U 1.3 100 U 16-Apr-18 0.76 U 0.89 U 2.0 0.73 U 0.91 I 130 I 23-Jul-18 0.76 U 0.89 U 1.8 0.73 U 1.3 100 U 3-May-21 0.2 U 0.2 U 0.63 I 0.2 U 0.31 I 250 U 18-Jan-18 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U 100 U 16-Apr-18 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U 100 U 23-Jul-18 0.76 U 0.89 U 0.92 I 0.73 U 1.5 100 U 3-May-21 0.2 U 0.2 U 0.2 U 0.2 U 1.5 250 U
MW036 25-30
MW037 45-50
Point ID
Screened Interval (feet bls) Sample Date
PCE
(ug/L)
TCE
(ug/L) cis-1-2- Dichloroethene
(ug/L) trans-1-2- Dichloroethene
(ug/L)
Vinyl Chloride
(ug/L)
FL PRO
(ug/L) 7-Jun-16 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U -
18-May-17 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U 100 U 24-Jul-18 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U - 4-May-21 - - - - - 250 U
MW021 35-40
Point ID
Screened Interval (feet bls) Sample Date
PCE
(ug/L)
TCE
(ug/L) cis-1-2- Dichloroethene
(ug/L) trans-1-2- Dichloroethene
(ug/L)
Vinyl Chloride
(ug/L)
FL PRO
(ug/L) 18-Jan-18 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U - 16-Apr-18 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U - 23-Jul-18 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U - 4-May-21 0.2 U 0.2 U 0.2 U 0.2 U 0.2 U -
MW039 110-115
Point ID
Screened Interval (feet bls) Sample Date
PCE
(ug/L)
TCE
(ug/L) cis-1-2- Dichloroethene
(ug/L) trans-1-2- Dichloroethene
(ug/L)
Vinyl Chloride (ug/L)
FL
PRO
(ug/L)
MW040 50-55 21-Mar-16 0.76 U 0.89 U 0.97 I 0.73 U 21 - 23-Jul-18 3.8 U 4.4 U 13000 9.0 15000 - 4-Mar-19 190 U 220 U 6600 180 U 18000 - 4-May-21 2 U,D 34 D 140 D 2 U,D 3500 D - 4-May-21* 0.2 U 0.2 U 100 0.75 I 3300 D -
MW041 75-80
Point ID
Screened Interval (feet bls) Sample Date
PCE
(ug/L)
TCE
(ug/L) cis-1-2- Dichloroethene
(ug/L) trans-1-2- Dichloroethene
(ug/L)
Vinyl Chloride (ug/L)
FLPRO
(ug/L) 35-55 3-May-21 0.2 U 0.2 U 0.2 U 0.2 U 0.2 U - 60-80 3-May-21 0.2 U 0.2 U 0.2 U 0.2 U 0.2 U -
IW-I
Point ID
Screened Interval (feet bls) Sample Date
PCE
(ug/L)
TCE
(ug/L) cis-1-2- Dichloroethene
(ug/L) trans-1-2- Dichloroethene
(ug/L)
Vinyl Chloride
(ug/L)
FL
PRO
(ug/L)
23-Jul-18 7.6 U 8.9 U 1100 71 870 - 4-Mar-19 7.6 U 8.9 U 740 62 500 - 4-Mar-19 7.6 U 8.9 U 780 58 510 - 3-May-21 0.2 U 0.2 U 0.2 U 0.2 U 1.2 - 3-May-21* 0.2 U 0.2 U 0.2 U 0.2 U 1.2
MW042 75-80
Point ID
Screened Interval (feet bls) Sample Date
PCE
(ug/L)
TCE
(ug/L) cis-1-2- Dichloroethene
(ug/L) trans-1-2- Dichloroethene
(ug/L)
Vinyl Chloride
(ug/L)
FL PRO
(ug/L) MW045 75-80 3-May-21 0.2 U 0.2 U 0.2 U 0.2 U 5.2 -
Point ID
Screened Interval (feet bls) Sample Date
PCE
(ug/L)
TCE
(ug/L) cis-1-2- Dichloroethene
(ug/L) trans-1-2- Dichloroethene
(ug/L)
Vinyl Chloride
(ug/L)
FL PRO
(ug/L) MW043 75-80 3-May-21 0.2 U 0.2 U 0.2 U 0.2 U 0.2 U -
Point ID
Screened Interval (feet bls) Sample Date
PCE
(ug/L)
TCE
(ug/L) cis-1-2- Dichloroethene
(ug/L) trans-1-2- Dichloroethene
(ug/L)
Vinyl Chloride
(ug/L)
FL PRO
(ug/L) MW044 75-80 3-May-21 30 D 28 D 1200 D 7.1 I,D 8300 D -
Point ID
Screened Interval (feet bls) Sample Date
PCE
(ug/L)
TCE
(ug/L) cis-1-2- Dichloroethene
(ug/L) trans-1-2- Dichloroethene
(ug/L)
Vinyl Chloride (ug/L)
FL
PRO
(ug/L)
7-Jun-16 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U - 18-May-17 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U - 24-Jul-18 0.76 U 0.89 U 0.53 U 0.73 U 0.71 U - 3-May-21 - - - - - 250 U
MW025 45-50
FIGURE
mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight mcrews Text Box Shallow (5-15): MW001R1, MW035
Intermediate (35-55) or (45-50): MW008, MW037
Deep (65-70); (60-80); or (75-80): MW010R, MW011R, MW014, MW015R, MW019, MW020, MW038, MW041, MW042, MW043, MW044, MW045
(screened interval)
From: Fred Portofe To: Mongillo, Ralph Cc: Madison Rogers; Roger Pragle; Crews, Matt Subject: RE: Investigative Derived Waste Drum Costs for Transportation and Disposal at a Regulated Facility Date: Wednesday, March 9, 2022 9:33:38 AM Attachments: F0152F28A2B5418EBC7A4FD870EC8D28.png
AD282F6C3391468088CDA42829B8E703.png A719914B10184314957B0CA910CA8D14.png F1DF3C4322764E8A9076F1ADFF76864A.png 3409DF389C3B4156BA232DDC85C60E09.png
EXTERNAL EMAIL
EXTERNAL EMAIL - We could not verify the authenticity of this message. Please be cautious when clicking on links or opening attachments.
Ralph
We are not going to provide annual Pricing for the Statewide Contract . After reviewing the scope with my partners and the variability with respect to disposal costing and ever changing fuel costs, we feel we can not bid this work given the current uncertainty in the market. We would be please to bid this work on a casa by case basis.
Fred G. Portofe, PG President of Environmental Services (Professional Geologist in FL, GA, AL, MS, TX, SC, NC, TN, IN, LA, WI and AK) M & D Industrial Services, LLC 5896 Azalea Street Port Orange, Florida 32127 Email: Fportofe@mdindustrialservices.com Website: mdindustrialservices.com Cell: 813-951-1012 Emergencies: 888-307-2790
Sent from Mail for Windows
From: Mongillo, Ralph Sent: Tuesday, March 8, 2022 12:46 PM To: Fred Portofe Cc: Madison Rogers; Roger Pragle; Eddy Mendoza; Crews, Matt mailto:fportofe@mdindustrialservices.com mailto:ralph.mongillo@wsp.com mailto:mrogers@mdindustrialservices.com mailto:rpragle@mdindustrialservices.com mailto:matt.crews@wsp.com mailto:Fportofe@mdindustrialservices.com https://nam10.safelinks.protection.outlook.com/?url=http%3A%2F%2Fmdindustrialservices.com%2F&data=04%7C01%7Cmculbreth%40ectinc.com%7Cbfdc4a6d2ce945e1eaf008d9dcf8eabf%7C911eb1cc54d34d8ca5773bf3ccc8105c%7C0%7C0%7C637783784008834159%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C2000&sdata=ntkZP1OGe7McYRA722JXtcGwkbgN9EEhQtSgBSKqC3E%3D&reserved=0 https://go.microsoft.com/fwlink/?LinkId=550986 mailto:Ralph_Mongillo@golder.com mailto:fportofe@mdindustrialservices.com mailto:mrogers@mdindustrialservices.com mailto:rpragle@mdindustrialservices.com mailto:emendoza@mdindustrialservices.com mailto:Matt_Crews@golder.com