CN-370000-HW685-DC031B.pdf
PDF 3 MB Posted
- Contract number
- HW685
- Issued by
- Florida
About this file
Task Assignment DC031B Summary
This is a Task Assignment (TA) document issued under Florida Department of Environmental Protection (FDEP) Contract Number HW685 for annual groundwater monitoring services. The contract authorizes WSP USA Inc., an environmental consulting firm headquartered in Jacksonville, Florida, to conduct the work at the City Hall of Jacksonville Beach site located at 11 North 3rd Street, Jacksonville Beach, Duval County, Florida (Facility ID: ERIC_4616). The Task Assignment was executed on March 19, 2024, with a completion date of September 27, 2024. FDEP's Department Project Manager is Patrick McGrane (850-245-8899), and WSP's Project Manager is Matt Crews (904-363-3430).
The scope of work consists of three subtasks: (1) Project Management calculated as a percentage of total labor in accordance with Contract HW685; (2) Annual Groundwater Monitoring involving collection and analysis of groundwater samples from seven monitoring wells (MW001, IW001, IW002, IW003, IW004, IW005, and MW011) using EPA Method 8260B for chlorinated volatile organic compounds, with a completion date of June 14, 2024; and (3) Reporting involving preparation of a 2024 Annual Groundwater Monitoring Report with conclusions and recommendations, due August 9, 2024. The total Task Assignment value is $11,273.52, consisting of $4,728.36 for groundwater monitoring and $6,545.16 for project management and reporting. This work involves 57 total labor hours and includes laboratory analysis, equipment, vehicle usage, and investigation-derived waste disposal. Payment terms include invoicing milestones tied to completion of deliverables as outlined in the attached invoice schedule.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O.
Object Code
Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department
Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature)
Date:
Additional signatures attached on separate page.
HW685
DC031B September 27, 2024
This Task Assignment authorizes WSP to conduct Annual Groundwater Monitoring at
City Hall of Jacksonville Beach in accordance with the March 11, 2024 Scope of Work, Cost Estimate, and Bid Documentation.
Patrick McGrane 850-245-8899 WSP USA Inc.
Matt Crews 904-363-3430
ERIC_4616
11 North 3rd Street, Jacksonville Beach, Duval County
City Hall of Jacksonville Beach
$ 11,273.52
$ 11,273.52
Scope of Work
WSP USA Inc.
Matthew Crews
Environmental Engineer
3/19/2024
Crews, Matt (USMC700671) Digitally signed by Crews, Matt (USMC700671) Date: 2024.03.19 11:27:20 -04'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2024.03.14 16:41:52 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Shawn Hamilton
Secretary
Memorandum
TO: Negotiation File Jacksonville Beach, Duval County City Hall of Jacksonville Beach
ERIC_4616
FROM: Patrick McGrane, Project Manager
SUBJECT: Negotiation Summary Task Assignment DC031B (HW685)
DATE: March 13, 2024
This Task Assignment authorizes WSP USA Inc. (WSP) to conduct Annual Groundwater Monitoring at the
City Hall of Jacksonville Beach site.
The total cost for this project is $11,273.52 with 57 total labor hours. All work is to be completed in accordance with the March 11, 2024, scope of work, cost estimate, and bid documentation.
WSP may invoice according to the included schedule.
Subtask 1:
Project Management is automatically calculated as a percentage of total labor in accordance with
Contract HW685.
Subtask 2:
Following confirmation of an up-to-date access agreement with the real property owner, WSP will collect groundwater samples from seven monitoring wells. The goal of this event is to verify that the impacted area is <0.25 acres to pursue RMO II, if possible. Monitoring wells MW001, IW001, IW002, IW003, IW004, IW005, and MW011 will be sampled and analyzed using EPA Method 8260B for chlorinated VOCs.
Subtask 3:
Following the groundwater sampling event, WSP will submit an Annual Groundwater Report summarizing findings with updated analytical results and tables as well as conclusions and recommendations based on the most recent data.
SITE : Former City Hall Jax Beach SUBTASK 2: Annual Groundwater Monitoring
DATE: 3/12/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Practice Leader (R. McCann) 5.0
Staff Sci/Eng (L. Swindle) 10.0
Staff Sci/Eng (J. Whipple) 9.0
TOTAL LABOR 24.0
VEHICLE TYPE RATE UNIT USEAGE
Truck $120.00 Per Day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin T&D - Non-Haz Water $195.00 per drum 1 $195.00
TOTAL $195.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Chlorinated VOCs - EPA Method 8260B
Total VOHs EPA Method 8260B $73.00 7 $511.00
Total VOCs EPA Method 8021 - IDW $110.00 1 $110.00
Sample Shipping Small $150.00 1 $150.00
TOTAL LAB $771.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Miscellaneous Expendables $40.00 Per Day 1 $40.00
Shallow Groundwater Sampling Kit $290.00 Per Day 1 $290.00
Tubing, Poly HDPE $0.30 Per Foot 200 $60.00
Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 7 $21.00
Drum, 55-gallon $100.00 Per Day 1 $100.00
TOTAL EQUIPMENT $511.00
Verification of property ownership for source and offsite properties prior to groundwater sampling (2 hours). Prepare and submit email summary with field documentation and certified laboratory report with chlorinated VOC results (3 hours).
Round trip travel (1 hour). Field event preparation (1 hour). Instrument calibration, groundwater measure water levels, measure field parameters, collect samples from seven monitoring wells analyzed for chlorinated VOCs. Sample and stage IDW (8 hours).
Round trip travel (1 hour). Instrument calibration, groundwater measure water levels, measure field parameters, collect samples from seven monitoring wells analyzed for chlorinated VOCs.
Sample and stage IDW (8 hours).
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Former City Hall Jax Beach SUBTASK 3: Reporting
DATE: 3/12/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Practice Leader (J. Brown) 3.0
Practice Leader (R. McCann) 20.0
Senior Project Sci/Eng (B. Lucero) 3.0
Staff Sci/Eng (A. Strayer) 2.0
TOTAL LABOR 28.0
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
Develop conclusions and recommendations and prepare final Annual Monitoring Report.
Data entry, prepare tables and figures, and draft Annual Monitoring Report
Prepare potentiometric maps and VOC figures for Annual Monitoring Report.
Reporting: Updating tables, document production. Create pdf for OCULUS.
FINAL --7/24/96
WSP USA Inc.
9428 Baymeadows Road, Suite 400, Jacksonville, Florida 32256 USA
T: +1 904 363-3430 F: +1 904 363-3445 wsp.com
March 11, 2024 Proposal No. 2024US208793
Mr. Patrick McGrane
Florida Department of Environmental Protection
Division of Waste Management
Waste Site Cleanup Section
2600 Blair Stone Road, MS 4520
Tallahassee, FL 32399-2400
RE: COST PROPOSAL FOR ANNUAL GROUNDWATER MONITORING
CITY HALL OF JACKSONVILLE BEACH
11 NORTH 3RD STREET
JACKSONVILLE BEACH, DUVAL COUNTY, FLORIDA
DEP FACILITY ID NUMBER: ERIC_4616
PROPOSED TASK ASSIGNMENT: DC031B
Dear Mr. McGrane:
WSP USA Inc. (WSP) is pleased to provide the Florida Department of Environmental Protection (DEP) with this cost proposal for the 2024 annual groundwater monitoring at the above-referenced site. This proposal includes a description of the proposed scope of services, level of effort sheets for each subtask, and a cost estimate form that summarizes the costs of the proposed services.
SUBTASK 1 PROJECT MANAGEMENT
To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with DEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with DEP Waste Site Cleanup Section requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the DEP-approved task assignment.
SUBTASK 2 ANNUAL GROUNDWATER MONITORING
Groundwater Monitoring
Following authorization to proceed, WSP will verify that the current property owner and the offsite property owners have an executed Permission to Enter Property agreement with the DEP. WSP will then coordinate with the real property owner, tenant, and offsite property owners for access to complete the scope of work.
Mr. Patrick McGrane Proposal No. 2024US208793
Florida Department of Environmental Protection March 11, 2024
WSP will collect groundwater samples from seven monitoring wells. Figures 3 and 4 (attached) from the 2023 sampling event show the monitoring well locations, groundwater flow direction, and chlorinated VOC results for the shallow zone of the surficial aquifer. The goal is to verify that the impacted area is less the 0.25 acres with the ultimate goal of closing the site under Risk Management Option II, if possible.
Prior to groundwater sampling, the depth-to-groundwater will be measured at the wells sampled using an electronic water level indicator to determine groundwater elevations and flow direction. During the sampling event, the locks and well caps will be inspected for damage or degradation and repaired or replaced, as necessary.
Groundwater samples will be collected from the wells in accordance with DEP Standard Operating Procedures
(SOPs) for Field Activities (DEP SOP-001/01). Prior to collecting the groundwater sample, each well will be purged and field parameters including temperature, pH, specific conductance, dissolved oxygen, turbidity, and oxidation reduction potential (ORP) will be monitored. Purge volumes and field parameters will be recorded on field data procedures.
Groundwater samples will be collected using low-flow sampling methods. The groundwater samples will be placed in laboratory-supplied containers, labeled with a unique identification number attached to the outside of the sample container, preserved on ice in a laboratory-provided cooler at a maximum temperature of four degrees Celsius, and delivered to a Florida Department of Health and National Environmental Laboratory Accreditation Program certified fixed-base laboratory along with the completed chain-of-custody documentation. Upon receipt of the laboratory analytical results, WSP will evaluate the constituent concentrations to determine if off-site notification is required.
The samples will be analyzed as follows:
Sample ID Chlorinated VOCs
(EPA Method 8260B)
MW001 X
IW001 X
IW002 X
IW003 X
IW004 X
IW005 X
MW011 X
Investigative Derived Waste (IDW) Total VOCs
Investigation Derived Waste
WSP will temporarily store the purge water generated from the groundwater sampling event in a 55-gallon steel drum as investigation-derived waste (IDW). A waste characterization sample will be collected from the IDW drum for analysis of total VOCs using EPA Method 8260. If the waste characterization sample is acceptable to the disposal subcontractor, the IDW drum will be picked up and transported to a facility for proper disposal. A non-hazardous waste manifest will be provided by the disposal subcontractor upon delivery to the disposal facility.
WSP estimates one drum of IDW purge water will be generated during the field activities.
Interim Deliverable
Upon completion of Subtask 2, an e-mail deliverable will be submitted for the chlorinated VOC samples and include copies of the field data sheets, equipment calibration forms, field notes, laboratory analytical report, and laboratory chain-of-custody documentation.
SUBTASK 3 REPORTING
WSP will prepare an Annual Groundwater Monitoring Report that will include a description of the sampling procedures, evaluation of the analytical results; comparison of current to historical data; tabulated summary of the current and historical analytical data; a site map showing the groundwater analytical results; water level elevation information in tables and figures; laboratory analytical data; and conclusions and recommendations.
HEALTH AND SAFETY
WSP will update the existing site-specific Health and Safety Plan for the fieldwork. The work will be completed in accordance with WSP WSP will wear safety glasses, high visibility safety vests, and steel-toed boots. A safety job briefing will be conducted prior to the start of work activities, and anytime the scope of work or site conditions change.
COST AND SCHEDULE
The estimated cost to complete the proposed scope of work is $11,273.52. WSP anticipates the groundwater monitoring event will take place in March or April 2024. The level of effort sheets and cost estimate form are included in Attachment A. The IDW disposal subcontractor quotes are included in Attachment B. The following table summarizes the proposed costs and deliverable schedule.
Task Proposed Cost Proposed Schedule/Deliverables
Subtask 1 Project Management $ 1,110.99 July 27, 2024
Subtask 2 Groundwater Monitoring $ 4,728.36 May 31, 2024 (E-mail summary with field documentation and certified laboratory analytical report for chlorinated VOCs)
Subtask 3 Reporting $ 5,434.17 June 28, 2024 (Annual Groundwater Monitoring Report)
Total/Completion Date $ 11,273.52 August 23, 2024
WSP appreciates the opportunity to provide services to the DEP. Should you require additional information or clarifications, please contact us at (904) 363-3430.
Sincerely, WSP USA Inc.
Richard D. "Rick" McCann, PG Matthew C. Crews, PE
Vice President, Geologist Assistant Vice President, Environmental Engineer
RDM/MCC/as
Attachments: Figure 3 Potentiometric Map - Shallow Zone of the Surficial Aquifer (March 29, 2023) Figure 4 Chlorinated VOCs Analytical Summary Shallow Zone of the Surficial Aquifer
Attachment A Level of Effort Sheets and Cost Estimate Form Attachment B Subcontractor Quotes
G:\Projects\DEP-Drycleaning\Projects\Jax\City Hall of Jax Beach\HW685\3 DC031B - 2024 Ann GW Mon\Proposal\DC031B - City Hall Annual GW Mon Proposal.docx
U S
E c o lo g y*
H E
P A
C O
T
D N o n
H a z S o il
V
O C s p e r d ru m
.0
.0
T
D N o n
H a z M u d
/w a te r
V
O C s p e r d ru m
.0
.0
F a ls e
M o b ili za tio n n o d ru m f o u n d
.0
.0
P F
A S
P ro fil e
F e e p e r si te
.0
.0
T
D N o n
H a z S o il
P
F A
S /P
F O
S p e r d ru m
.0
.0
T
D N o n
H a z M u d
/w a te r
-P F
A S
/P F
O S p e r d ru m
.0
.0
D is p o sa l N o n
H a z S o il
V
O C s p e r d ru m
.0
.0
D is p o sa l N o n
H a z M u d
/w a te r
V
O C s p e r d ru m
.0
.0
P F
A S
P ro fil e
F e e p e r si te
.0
.0
D is p o sa l N o n
H a z S o il
P
F A
S /P
F O
S
.0
.0
D is p o sa l
N o n H a z
M u d /w a te r -P
F A
S /P
F O
S
.0
.0
A p p ro va l F e e p e r si te
.0
.0
N o n H a z
S o lif ic a tio n W a st e P ro fil e f e e
.0
.0
N o n H a z
S o lid s
D is p o sa l
(p e r d ru m
.0
.0
N o n H a z
S lu d g e D is p o sa l
.0
.0
P F
A S
W a st e g a l d ru m e m e lle A
L
.0
.0
T ru ck w ith li ft g a te a n d d ri ve r
.0
.0 n o n h a z liq u id s d is p o sa l ( p e r d ru m
.7
.0 g a llo n r e co n d iti o n e d d ru m
.6
.0
L T
L f e e s (l e ss t h a n d ru m s
.0
.0
E n e rg y se cu ri ty r e co ve ry f e e
.0
.0
T o ta l C o st
.0
,4
.0
,7
.0
N o te s*
T ra n sp o rt a tio n c o st s w ill b e c a lc u la te d b a se d o n p ic ku p s a t va ri o u s si te s a n d w a st e s tr e a m v o lu m e
E rw in
File details come from the government source that posted it. Updated .