This document package consists of Task Assignment Change Orders (TACOs) issued by the State of Florida Department of Environmental Protection (FDEP) to WSP USA Inc. under Contract HW685, a Critical Response, Multiple Sites indefinite delivery vehicle. The TACOs amend the original Task Assignment DC001A and authorize cost increases to reconcile work change directives related to environmental remediation activities at multiple sites, including the Blue Ribbon Cleaners facility (ERIC_4859) in Florida.

The change orders authorize increases in task compensation for well pad and concrete replacement work, site assessment activities, and related environmental services. TACO #5 increases the task value by $10,785.79 to a total of $19,658.94, covering project management, well pad replacement, labor costs for senior and staff-level scientists/engineers, vehicle rental, subcontractor services (ACME Barricades for $1,100.00 and RNA Consulting Group for $3,500.00), and field expenses. TACO #4 increases compensation by $2,964.97 to $8,873.15, authorizing site visit and documentation activities. Labor rates are applied at 172.5% overhead with completion fees, and deliverables consist of documentation of completed site activities with invoice schedules spanning from January 2022 through December 2026. The work is performed on a fixed unit rate basis with no changes to completion dates or contract terms beyond the specified cost adjustments.

View the file

Other files

File Type Posted
CN-370000-HW685-BF01DCO1.pdf PDF
CN-370000-HW685-BF02B.pdf PDF
CN-370000-HW685-BF04A.pdf PDF
CN-370000-HW685-BIL01A.pdf PDF
CN-370000-HW685-BIL1ACO1.pdf PDF
CN-370000-HW685-BIL1ACO2.pdf PDF
CN-370000-HW685-BIL1ACO3.pdf PDF
CN-370000-HW685-BIL1BCO1.pdf PDF
CN-370000-HW685-DC001F.pdf PDF
CN-370000-HW685-DC001b.pdf PDF
CN-370000-HW685-DC002A.pdf PDF
CN-370000-HW685-DC002D.pdf PDF
CN-370000-HW685-DC002H.pdf PDF
CN-370000-HW685-DC003B.pdf PDF
CN-370000-HW685-DC004B.pdf PDF
CN-370000-HW685-DC008C.pdf PDF
CN-370000-HW685-DC009C.pdf PDF
CN-370000-HW685-DC010D.pdf PDF
CN-370000-HW685-DC014A.pdf PDF
CN-370000-HW685-DC015A.pdf PDF
CN-370000-HW685-DC016B.pdf PDF
CN-370000-HW685-DC016C.pdf PDF
CN-370000-HW685-DC018C.pdf PDF
CN-370000-HW685-DC01ACO3.pdf PDF
CN-370000-HW685-DC021D.pdf PDF
CN-370000-HW685-DC024A.pdf PDF
CN-370000-HW685-DC024B.pdf PDF
CN-370000-HW685-DC024D.pdf PDF
CN-370000-HW685-DC026A.pdf PDF
CN-370000-HW685-DC026D.pdf PDF
CN-370000-HW685-DC028B.pdf PDF
CN-370000-HW685-DC028E.pdf PDF
CN-370000-HW685-DC02DCO1.pdf PDF
CN-370000-HW685-DC02ECO1.pdf PDF
CN-370000-HW685-DC02GCO1.pdf PDF
CN-370000-HW685-DC030A.pdf PDF
CN-370000-HW685-DC031B.pdf PDF
CN-370000-HW685-DC033B.pdf PDF
CN-370000-HW685-DC034C.pdf PDF
CN-370000-HW685-DC034D.pdf PDF
CN-370000-HW685-DC036A.pdf PDF
CN-370000-HW685-DC038A.pdf PDF
CN-370000-HW685-DC038D.pdf PDF
CN-370000-HW685-DC03ACO1.pdf PDF
CN-370000-HW685-DC03BCO1.pdf PDF
CN-370000-HW685-DC041A.pdf PDF
CN-370000-HW685-DC042C.pdf PDF
CN-370000-HW685-DC051B.pdf PDF
CN-370000-HW685-DC052D.pdf PDF
CN-370000-HW685-DC055B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. ☐ There are no changes to the TA compensation.

☐ The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO ☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. ☐ There are no changes to the TA Expiration Date.

☐ The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. ☐ There are no changes to the Attachments.

☐ Attachment ___ is replaced with Attachment -____.

7. ☐ No Additional Changes.

☐ Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

DC001A 5 HW685

This Task Assignment Change Order authorizes an increase in costs to reconcile Work Change Directive (WCD) #4 and WCD #6 which tasks WSP to perform a well Pad replacement at Blue Ribbon Cleaners

Opeyemi Kehinde 850-245-8887 Contractor Contractor

Contractor Contractor

Contractor

WSP USA Inc.

Matt Crews 904-363-3430

Multiple

Multiple

✔ $ 19,658.94 $ 8,873.15

$ 19,658.94 $ 8,873.15 ✔ Completion

Completion 0

✔ 1 1 5

Matthew Crews

Environmental Engineer

10/2/2023

Crews, Matt (USMC700671) Digitally signed by Crews, Matt (USMC700671) Date: 2023.10.02 10:03:07 -04'00' Kelly Crain Digitally signed by Kelly Crain

Date: 2023.09.28 15:33:47 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 01_18

Contract Number:

Task Assignment #:

Change Order #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW685

DC001A

$ 19,658.94

Documentation of Completed Site Activities

Documentation of Completed Site Activities

Documentation of Completed Site Activities

Documentation of Completed Site Activities

Documentation of Completed Site Activities

Documentation of Completed Site Activities

Documentation of Completed Site Activities

Documentation of Completed Site Activities

Documentation of Completed Site Activities

Documentation of Completed Site Activities

Documentation of Completed Site Activities

12/27/2026

01/26/2022

11/30/2022

06/15/2023

10/13/2023

$ 1,351.30

$ 2,500.00

$ 1,094.44

$ 962.44

$ 2,964.97

$ 10,785.79

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Secretary

To:

From:

Date:

HW685 Contract Negotiation File Critical Response, Multiple Sites

Opeyemi Kehinde, Project Manager September 26, 2023

Subject: Negotiation Summary

HW685 DC001A-5

This Task Assignment Change Order authorizes an increase in costs to reconcile Work Change Directive (WCD) #4 and WCD #6 which tasks WSP to perform a Well Pad replacement at the Blue Ribbon Site, due to complaint from the RPO.

Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.

Subtask 2: Well Pad replacement This subtask includes labor hours necessary to reconcile WCD #4 and WCD #6. The hours and costs are associated with the replacing the Well Pad at the Blue Ribbon.

The cost increase related to this change order is $10,785.79 (with a Delta error of $0.04).

The FDEP project manager agrees to the scope of work and final cost associated with this Task Assignment Change Order. The final cost for this Task Assignment Change Order #5 is $19,658.94

Printed on recycled paper.

FDEP COST ESTIMATE

Contractor: WSP USA, Inc.

Date: 9/19/2023

Task #: DC001A SubTask 1 Project Management SubTask 6

Site: SubTask 2 Barricades, Well Pad / Concrete Repair WCD #4 & 6 SubTask 7

Activity/Phase: Well Pad Repair SubTask 3 SubTask 8

Project Manager: Opeyemi Kehinde SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$44.83 Senior Project Sci/Eng - P-10 CHAPPELL, LOGAN 25 4 21.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $42.00 Project Sci/Eng - P-9 LUCERO, BENJAMIN 2 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $30.00 Staff Sci/Eng - P-7 DAWALT, TYLER 17 17.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Total Hours 44 4.0 40.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Direct Labor $1,735.04 $199.61 $1,535.43 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.50% $2,992.95 $344.33 $2,648.62 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $4,727.99 $543.94 $4,184.05 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel Vehicle Rental $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

ACME $1,100.00 $1,100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

RNA $3,500.00 $3,500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Other $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Other $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Other $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subcontractor Subtotal $4,600.00 $4,600.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $460.00 $460.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $5,060.00 $5,060.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $35.00 $35.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $80.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $50.00 $50.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $165.00 $165.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $10,312.99 $543.94 $9,769.05 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $472.80 $54.39 $418.41 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $10,785.79 $598.33 $10,187.46 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Multiple Sites

REV: 02/03 CEF GOLDER Page 1

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Multiple Sites SUBTASK 2: Barricades, Well Pad / Concrete Repair WCD #4 & 6

DATE: 9/19/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF TITLE WORK DESCRIPTION HOURS

CHAPPELL, LOGAN Senior Project Sci/Eng - P-10 21

LUCERO, BENJAMIN Project Sci/Eng - P-9 2

DAWALT, TYLER Staff Sci/Eng - P-7 17

TOTAL LABOR 40

VEHICLE TYPE RATE UNIT USEAGE

WCD #4 Utility Van $120.00 Per day 1 $120.00 WCD #6 Utility Van $120.00 Per Day 2 $240.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

ACME WCD #4 Barrier rental (2 month) and delivery/pickup $1,100.00 Quote 1 $1,100.00 RNA WCD #6:Concrete Replacment $3,500.00 1 $3,500.00

TOTAL $4,600.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

WCD #6: PPE- Level D $35.00 Per Man Day 1 $35.00 WCD #4 & 6: Miscellaneous Expendables $40.00 Per Day 2 $80.00

Total Survey Station $50.00 Per Day 1 $50.00

TOTAL EQUIPMENT $165.00

WCD #6: Installation: Mobilization (1 hr), Construction Oversight (10 hrs), Deliverable (3 hrs).

Barricades: Mobilization (1 hr), Drain Barricades for pickup (1 hr), TOC Survey (1hr)

WCD #4: Prepare preliminary design drawings for concrete and well repair design

WCD#4: Field event preparation (1 hour). Project kick-off meeting with property owner representatives (2 hours). Safety barrier Installation oversight (3 hours). Prepare photographic log and preliminary concrete and well repair repair design via e-mail deliverable with field documentation (6 hours).

WCD#6: Installation: Construction Oversight (5 hrs), Deliverable (2 hrs).

Barricades: Mobilization (1 hr), Drain Barricades for pickup (1 hr)

Panhandle Division 1675 Commerce Blvd

Midway, Florida 32343 Tel:(850) 765-8546 Fax:(850) 765-8549

Tampa Division 2611 South 82nd Street, Tampa ,FL 33619 Tel: (813) 623-ACME Fax: (813) 623-2045

Orlando Division 508 Clifton St

Orlando, FL 32808 Tel: (407) 253-4337 Fax: (407) 253-1342

AmountPriceQtyHrs/DaysToFromItem Equipment and Labor

08/31/23

7650 Corporate Center Drive Suite 300

WSP USA Inc

Miami, FL 33126

REF:

ACME Job

Job No

12013

Logan.Chappell@wsp.com- 719 -306-4640

1102 Layfette St

Date

P.O. #

Terms Net 30

INVOICE

628555

Send Payments To:

Acme Barricades LC

Attn: Accounts Receivable 9800 Normandy Blvd., Jacksonville, FL 32221-2036

Tel: (904) 781-1950 Fax: (904) 781-1921 Federal Tax ID #59-3541899

Invoice No

Customer Phone

Customer Fax

305-514-3154

West Palm Beach 3705 Interstate Pkwy

West Palm Beach, FL 33404 Tel: (561)-657-8222 Fax: (561)-657-8226

Miami Division 4601 Oakes Road Davie, FL 33314

Tel: (954)-321-8205 Fax: (954)-791-0921

Email *Sandra.Class@wsp.com cc: Yamila Hernandez

Rentals:

$0.00$0.00408/31/2308/08/23Water Filled Barrier Wall 24MMMM

$0.00

$0.00Tax

SubtotalRentals:

Services:

Equipment Rental (LS)EQPRENTAL 1 1 $1,100.00 $1,100.0008/08/23

$82.50

$1,100.00

Tax

SubtotalServices:

Progress Bill Total Amount $1,100.00

$1,182.50Invoice Total

$82.50Total Taxes

Contract No. HW685

Additional work is not authorized without prior FDEP approval as indicated by an approved Work Change Directive Form or Task Assignment Change Order Form. It is the Contractor's responsibility to ensure that additional costs associated with this WCD are resolved by a Task Assignment Change Order (TACO) prior to the completion date of the original Task Assignment or subsequent TACOs completed prior to the execution date of this WCD. Failure to do so will result in a loss of reimbursement for work associated with this WCD.

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Work Change DirectiveForm

ATTACHMENT 6

Site Name: Site ID #:

Contract #:

Task Assignment #:

Contractor:

Work Change Directive #:

• Reason for Work Change Directive :

• Description of Work Change Directive :

• Attachments(if applicable, listdocuments supportingchange):

• Costs (if negotiated unitcosts, provide information below):

Maximum Estimated Increase in Task Amount:

AuthorizedContractorSignature:

AuthorizedFDEPSignature:

FDEP SupervisorApproval:

(if applicable)

Multiple Multiple

HW685 WSP USA Inc.

DC001A 4

WSP is requesting approval of this work change directive to cover costs associated with asphalt and monitoring well repair at the Blue Ribbon Cleaners site (ERIC_4859). The property manager expressed concern regarding asphalt and well pad surrounding MW004.

The area in the vicinity of the well is a public safety hazard for both cars and pedestrians.

WSP will arrange for water filled barricades to be delivered and installed onsite to address the safety hazard. ACME Barricades will deliver rental units to site, and pickup at 2 months or earlier. WSP will prepare photographic log and preliminary concrete and well repair repair design via e-mail deliverable with field documentation.

Acme cost email

*ACME - delivery and pickup of four barricades. Includes a 2 month rental.

*Sub handling fee *Labor and expendable costs using HW685 rates: 12 hours for Senior Project Sci/Eng (L. Chappell) and 2 hours for Project Sci/Eng (B. Lucero).

$ 3,500.00

Crews, Matt

(USMC700671)

Digitally signed by Crews, Matt

(USMC700671)

Date: 2023.08.03 13:52:48 -04'00'

Opeyemi Kehinde Digitally signed by Opeyemi Kehinde Date: 2023.08.03 16:31:09 -04'00'

Aaron Cohen Digitally signed by Aaron Cohen Date: 2023.08.04 08:35:11 -04'00'

Contract No. HW685

Additional work is not authorized without prior FDEP approval as indicated by an approved Work Change Directive Form or Task Assignment Change Order Form. It is the Contractor's responsibility to ensure that additional costs associated with this WCD are resolved by a Task Assignment Change Order (TACO) prior to the completion date of the original Task Assignment or subsequent TACOs completed prior to the execution date of this WCD. Failure to do so will result in a loss of reimbursement for work associated with this WCD.

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Work Change DirectiveForm

ATTACHMENT 6

Site Name: Site ID #:

Contract #:

Task Assignment #:

Contractor:

Work Change Directive #:

• Reason for Work Change Directive :

• Description of Work Change Directive :

• Attachments(if applicable, listdocuments supportingchange):

• Costs (if negotiated unitcosts, provide information below):

Maximum Estimated Increase in Task Amount:

AuthorizedContractorSignature:

AuthorizedFDEPSignature:

FDEP SupervisorApproval:

(if applicable)

Multiple Multiple

HW685 WSP USA Inc.

DC001A 6

WSP is requesting approval of this work change directive to cover costs associated with asphalt and monitoring well repair at the Blue Ribbon Cleaners site (ERIC_4859). The property manager expressed concern regarding asphalt and well pad surrounding MW004. The area in the vicinity of the well is a public safety hazard for both cars and pedestrians.

WSP will provide oversight for removal of broken asphalt (~64 sqft) and installation of new concrete and well pad for MW004. Following installation, WSP will prepare barricades for pickup and survey the well top of casing (TOC) elevation based upon existing monitoring wells. WSP will prepare photographic log and field documentation e-mail deliverable.

Concrete Repair Quotes

*RNA - Construction Subcontractor ($3,850) -includes Sub handling fee *Labor and expendable costs using HW685 rates: 9 hours for Senior Project Sci/ Eng (L. Chappell) and 17 hours for Project Sci/Eng (T. Dawalt).

$ 7,500.00

Crews, Matt

(USMC700671)

Digitally signed by Crews, Matt

(USMC700671)

Date: 2023.08.14 13:10:24 -04'00'

Opeyemi Kehinde Digitally signed by Opeyemi Kehinde Date: 2023.08.15 09:59:11 -04'00'

Aaron Cohen Digitally signed by Aaron Cohen Date: 2023.08.15 11:32:55 -04'00'

From: Chappell, Logan To: Kehinde, Opeyemi Cc: Crews, Matt Subject: DC001A DELTA WCD #4 and #6 - Blue Ribbon Well Pad Date: Tuesday, September 19, 2023 3:09:14 PM Attachments: image001.png

WCD#4 Backup.xlsm WCD#6 Backup.xlsm LOECEF - DC001A - DELTA Blue Ribbon Well Pad Repair Adjusted.xlsm WSP USA Inc. Invoice # 628555 (002).pdf Invoice RNA.pdf

EXTERNAL MESSAGE

This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.

Hi Opeyemi, Attached is the DELTA sheet to add the Blue Ribbon Well Pad replacement WCD’s #4 and #6 from the Critical Response TA DC001A.

The email deliverable will be generated once the barricades have been picked up (scheduled for Sep.

21, 2023).

DELTA TACO: $10,785.79

WCD#4:

WSP used $3,476.67 of $3,500.00 approved; backup calcs attached.

WCD#6:

WSP used $7,309.08 of $7,500.00 approved; backup calcs attached.

Note: There is a 0.04 cent rounding error when you add the WCD #4 and WCD #6 values and compare to the DELTA TACO LOECEF.

Let me know if you need anything else.

Thanks, Logan

Logan Chappell, P.E.

Project Manager / Environmental Engineer

Email: Logan.Chappell@wsp.com Phone: +1 719-306-4640

WSP USA

325 John Knox Rd. Bldg F, Suite 140 mailto:Logan.Chappell@wsp.com mailto:Opeyemi.Kehinde@FloridaDEP.gov mailto:matt.crews@wsp.com mailto:Logan.Chappell@wsp.com

Cost Estimate

Contractor: WSP USA, Inc. 1

Date: 9/19/23 1

Task #: DC001A SubTask 1 Project Management SubTask 6 1

Site: Multiple Sites SubTask 2 Barricades - WCD #4 SubTask 7 1

Activity/Phase: Well Pad Repair SubTask 3 Well Pad / Concrete Repair - WCD#6 SubTask 8 1

Project Manager: Opeyemi Kehinde SubTask 4 SubTask 9 1

SubTask 5 SubTask 10 1

Totals 1 2 3 4 5 6 7 8 9 10 1

Labor Rate Category 1

$105.00 Program Leader – X-14 GOIST, TIMOTHY 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$86.60 Program Leader – X-14 MILLER, DONALD 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$86.67 Program Leader – X-14 PAUL, JEFFERY 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$105.00 Program Leader – X-14 POWELL, BRENDA 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$91.25 Program Leader – X-14 WAGNER, ANDREAS 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$68.75 Practice Leader - X-13 BROWN, JESSE 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$82.73 Practice Leader - X-13 RICKER, JOSEPH 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$71.63 Practice Leader - X-13 ZAGAGI, YANIV 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$62.85 Senior Consultant - X-12 BENNETT, ROSS 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$67.79 Senior Consultant - X-12 BONES, ADELMARIE 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$64.39 Senior Consultant - X-12 CREWS, MATTHEW 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$61.80 Senior Consultant - X-12 CROOK, MARTIN 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$65.66 Senior Consultant - X-12 GRIGG, DON 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$55.88 Senior Consultant - X-12 HAMPTON, MATTHEW 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$61.67 Senior Consultant - X-12 HOLCOMB, BLAKE 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$68.97 Senior Consultant - X-12 KELSO, PERRY 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$60.55 Senior Consultant - X-12 LONG, RYAN 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$58.88 Senior Sci/Eng - X-11 BAKER, JEFF 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$49.71 Senior Sci/Eng - X-11 HESS, KRISTI 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$53.28 Senior Sci/Eng - X-11 MONGILLO, RALPH 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$56.97 Senior Sci/Eng - X-11 O'NEAL, GREGORY 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$48.00 Senior Project Sci/Eng - P-10 CHAK, SARAH 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$44.83 Senior Project Sci/Eng - P-10 CHAPPELL, LOGAN 14 2 12.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1

$39.26 Senior Project Sci/Eng - P-10 MORELLI, GENE 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$48.00 Senior Project Sci/Eng - P-10 POIENCOT, BRANDON 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$45.70 Senior Project Sci/Eng - P-10 THOMAS, JAMES 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$36.89 Project Sci/Eng - P-9 CARROLL, DECLAN 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$42.00 Project Sci/Eng - P-9 LUCERO, BENJAMIN 2 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1

$40.73 Project Sci/Eng - P-9 MCDANIELS, DAVID 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$38.10 Project Sci/Eng - P-9 NEAL, SCOTT 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$38.51 Project Sci/Eng - P-9 OIEN, ERIK 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$36.18 Project Sci/Eng - P-9 SIDER, STEPHEN 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$40.94 Project Sci/Eng - P-9 SMYTH, SHAWN 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$34.01 Staff Sci/Eng - P-8 AGRAWAL, VICKY 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$36.06 Staff Sci/Eng - P-8 BROOKS, HERSIE 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$32.66 Staff Sci/Eng - P-8 BURTON, DONALD 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$34.77 Staff Sci/Eng - P-8 DEL VAL, LUIS 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$36.10 Staff Sci/Eng - P-8 GSTALDER, IAN 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$35.51 Staff Sci/Eng - P-8 MATHER, WILLIAM 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$35.07 Staff Sci/Eng - P-8 MCADAM, ALEXANDRIA 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$33.86 Staff Sci/Eng - P-8 MCQUAID, BRANDON 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$29.87 Staff Sci/Eng - P-8 MORALES, ANTHONY 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$35.00 Staff Sci/Eng - P-8 MUFTIC, ISAAC 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$36.96 Staff Sci/Eng - P-8 SHPORTUN, ALICE 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$36.66 Staff Sci/Eng - P-8 SPENGLER, JUSTIN 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$33.90 Staff Sci/Eng - P-8 STRAYER, ALICIA 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$39.00 Staff Sci/Eng - P-8 SWINDLE, LUCAS 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$32.70 Staff Sci/Eng - P-7 DAWALT, TYLER 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$27.47 Staff Sci/Eng - P-7 BAXTER, MITCH 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$30.00 Staff Sci/Eng - P-7 CONNELLY, MICHAEL 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$30.00 Staff Sci/Eng - P-7 KAMIKAZI, LISA 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$30.00 Staff Sci/Eng - P-7 TASSIMBEDO, THEODARD 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$29.81 Staff Sci/Eng - P-7 WHIPPLE, JONATHAN 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$28.44 Staff Sci/Eng - P-7 WILLIAMS, MICHAEL 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$91.51 Practice Leader - X-13 GARDINER, CHARLES 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$88.83 Practice Leader - X-13 FRAXEDAS, RICK 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$70.13 Senior Consultant - X-12 LASTINGER, JOHN 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$65.42 Senior Consultant - X-12 SCHAEFER, GEOFF 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$61.08 Senior Consultant - X-12 GLOVER, NORMAN 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$58.36 Senior Consultant - X-12 QUINTIN, AMY 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$57.69 Senior Consultant - X-12 SAGAN, JENNIFER 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$45.00 Senior Sci/Eng - X-11 MCCARTHY, JIM 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$54.48 Senior Sci/Eng - X-11 BRUST, RENEE 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$60.10 Senior Sci/Eng - X-11 ATWATER, DUSTIN 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$54.23 Senior Sci/Eng - X-11 VOWLES, CORY 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$51.82 Senior Sci/Eng - X-11 WHITE, RON 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$48.99 Senior Sci/Eng - X-11 ARENBERG, ERIC 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$56.52 Senior Project Sci/Eng - P-10 DAY, TIRRELL 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$50.49 Senior Project Sci/Eng - P-10 AITHARAJU, ASHOK 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$44.41 Senior Project Sci/Eng - P-10 BAIRD, SUZANNE 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$42.42 Senior Project Sci/Eng - P-10 HANKS, STEPHEN 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$34.31 Project Sci/Eng - P-9 MCMURRAY, BECKY 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$37.53 Project Sci/Eng - P-9 TOMLINSON, NIC 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$42.88 Project Sci/Eng - P-9 GUATY, CARMEN 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$31.17 Project Sci/Eng - P-9 PANICO, NICHOLE 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$37.51 Project Sci/Eng - P-9 HORNE, ALEXANDRA 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$32.98 Staff Sci/Eng - P-8 BURTON, GEORGE 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$28.18 Staff Sci/Eng - P-8 BROWN, ERIC 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$27.37 Staff Sci/Eng - P-8 LAWSON, ZACHARY 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$24.77 Staff Sci/Eng - P-7 JORDAN, DALTON 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$23.74 Staff Sci/Eng - P-7 PECK, RENEE 0

Total Hours 16 2.0 14.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1

Direct Labor $702.81 $80.85 $621.96 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

Overhead 172.50% $1,212.35 $139.47 $1,072.88 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

Total Labor $1,915.16 $220.32 $1,694.84 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

Travel 1

Vehicle Rental $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

Total Travel $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

Subcontractor (Equipment Procurement) 1

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

Subcontractor (Services Procurement) 1

ACME $1,100.00 $1,100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

RNA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

Other $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

Other $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

Other $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

Subcontractor Subtotal $1,100.00 $1,100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

Handling Fee $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

Total Subcontractor Cost $1,210.00 $1,210.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

Laboratory 1

Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

Field Expenses 1

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

Expendables $40.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

Total Field Expenses $40.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

Subtotal $3,285.16 $220.32 $3,064.84 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

Completion Fee $191.51 $22.03 $169.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

Total Estimated Cost $3,476.67 $242.35 $3,234.32 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1

A 1

&"CG Times,Bold"&16FDEP COST ESTIMATE

&"Courier New,Bold"&10REV: 02/03 &"Courier New,Bold"&10CEF GOLDER &"Courier New,Bold"&10Page &P

HIDE

UNHIDE

Subtask 2

SITE : Multiple Sites 1

SUBTASK 2: Barricades - WCD #4 1

DATE: 9/19/23 1

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON 1

STAFF TITLE WORK DESCRIPTION HOURS 1

GOIST, TIMOTHY Program Leader – X-14 0

MILLER, DONALD Program Leader – X-14 0

PAUL, JEFFERY Program Leader – X-14 0

POWELL, BRENDA Program Leader – X-14 0

WAGNER, ANDREAS Program Leader – X-14 0

BROWN, JESSE Practice Leader - X-13 0

RICKER, JOSEPH Practice Leader - X-13 0

ZAGAGI, YANIV Practice Leader - X-13 0

BENNETT, ROSS Senior Consultant - X-12 0

BONES, ADELMARIE Senior Consultant - X-12 0

CREWS, MATTHEW Senior Consultant - X-12 0

CROOK, MARTIN Senior Consultant - X-12 0

GRIGG, DON Senior Consultant - X-12 0

HAMPTON, MATTHEW Senior Consultant - X-12 0

HOLCOMB, BLAKE Senior Consultant - X-12 0

KELSO, PERRY Senior Consultant - X-12 0

LONG, RYAN Senior Consultant - X-12 0

BAKER, JEFF Senior Sci/Eng - X-11 0

HESS, KRISTI Senior Sci/Eng - X-11 0

MONGILLO, RALPH Senior Sci/Eng - X-11 0

O'NEAL, GREGORY Senior Sci/Eng - X-11 0

CHAK, SARAH Senior Project Sci/Eng - P-10 0

CHAPPELL, LOGAN Senior Project Sci/Eng - P-10 Field event preparation (1 hour). Project kick-off meeting with property owner representatives (2 hours). Safety barrier Installation oversight (3 hours). Prepare photographic log and preliminary concrete and well repair repair design via e-mail deliverable with field documentation (6 hours). 12 1

MORELLI, GENE Senior Project Sci/Eng - P-10 0

POIENCOT, BRANDON Senior Project Sci/Eng - P-10 0

THOMAS, JAMES Senior Project Sci/Eng - P-10 0

CARROLL, DECLAN Project Sci/Eng - P-9 0

LUCERO, BENJAMIN Project Sci/Eng - P-9 Prepare preliminary design drawings for concrete and well repair design 2 1

MCDANIELS, DAVID Project Sci/Eng - P-9 0

NEAL, SCOTT Project Sci/Eng - P-9 0

OIEN, ERIK Project Sci/Eng - P-9 0

SIDER, STEPHEN Project Sci/Eng - P-9 0

SMYTH, SHAWN Project Sci/Eng - P-9 0

AGRAWAL, VICKY Staff Sci/Eng - P-8 0

BROOKS, HERSIE Staff Sci/Eng - P-8 0

BURTON, DONALD Staff Sci/Eng - P-8 0

DEL VAL, LUIS Staff Sci/Eng - P-8 0

GSTALDER, IAN Staff Sci/Eng - P-8 0

MATHER, WILLIAM Staff Sci/Eng - P-8 0

MCADAM, ALEXANDRIA Staff Sci/Eng - P-8 0

MCQUAID, BRANDON Staff Sci/Eng - P-8 0

MORALES, ANTHONY Staff Sci/Eng - P-8 0

MUFTIC, ISAAC Staff Sci/Eng - P-8 0

SHPORTUN, ALICE Staff Sci/Eng - P-8 0

SPENGLER, JUSTIN Staff Sci/Eng - P-8 0

STRAYER, ALICIA Staff Sci/Eng - P-8 0

SWINDLE, LUCAS Staff Sci/Eng - P-8 0

BAXTER, MITCH Staff Sci/Eng - P-7 0

CONNELLY, MICHAEL Staff Sci/Eng - P-7 0

KAMIKAZI, LISA Staff Sci/Eng - P-7 0

TASSIMBEDO, THEODARD Staff Sci/Eng - P-7 0

WHIPPLE, JONATHAN Staff Sci/Eng - P-7 0

WILLIAMS, MICHAEL Staff Sci/Eng - P-7 0

GARDINER, CHARLES Practice Leader - X-13 0

FRAXEDAS, RICK Practice Leader - X-13 0

LASTINGER, JOHN Senior Consultant - X-12 0

SCHAEFER, GEOFF Senior Consultant - X-12 0

GLOVER, NORMAN Senior Consultant - X-12 0

QUINTIN, AMY Senior Consultant - X-12 0

SAGAN, JENNIFER Senior Consultant - X-12 0

ATWATER, DUSTIN Senior Sci/Eng - X-11 0

VOWLES, CORY Senior Sci/Eng - X-11 0

WHITE, RON Senior Sci/Eng - X-11 0

ARENBERG, ERIC Senior Sci/Eng - X-11 0

DAY, TIRRELL Senior Project Sci/Eng - P-10 0

AITHARAJU, ASHOK Senior Project Sci/Eng - P-10 0

BRUST, RENEE Senior Sci/Eng - X-11 0

MCCARTHY, JIM Senior Sci/Eng - X-11 0

BAIRD, SUZANNE Senior Project Sci/Eng - P-10 0

HANKS, STEPHEN Senior Project Sci/Eng - P-10 0

TOMLINSON, NIC Project Sci/Eng - P-9 0

GUATY, CARMEN Project Sci/Eng - P-9 0

PANICO, NICHOLE Project Sci/Eng - P-9 0

HORNE, ALEXANDRA Project Sci/Eng - P-9 0

BURTON, GEORGE Staff Sci/Eng - P-8 0

MCMURRAY, BECKY Project Sci/Eng - P-9 0

LAWSON, ZACHARY Staff Sci/Eng - P-8 0

JORDAN, DALTON Staff Sci/Eng - P-7 0

BROWN, ERIC Staff Sci/Eng - P-8 0

PECK, RENEE Staff Sci/Eng - P-7 0

TOTAL LABOR 14 1

VEHICLE TYPE RATE UNIT USEAGE 1

Utility Van $120.00 Per day 1 $120.00 1

Automobile $320.00 Per Week 0 $0.00 0

TOTAL VEHICLE $120.00 1

PER DIEM STAFF RATE UNIT USEAGE 1

Per Diem Staff Sci/Eng) $36.00 Per Day 0 $0.00 0

Per Diem Project Sci/Eng $36.00 Per Day 0 $0.00 0

Hotel Staff Sci/Eng $96.00 Per Day 0 $0.00 0

Hotel Project Sci/Eng $96.00 Per Day 0 $0.00 0

TOTAL PER DIEM $0.00 1

SUBCONTRACTOR COSTS 1

NAME PURPOSE USEAGE 0

ACME Barrier rental (2 month) and delivery/pickup $1,100.00 Quote 1 $1,100.00 1

RNA $0.00 Quote 0 $0.00 0

$0.00 Quote 0 $0.00 0

$0.00 Quote 0 $0.00 0

TOTAL $1,100.00 1

LABORATORY COSTS 1

PARAMETER RATE # SAMPLES #QAQC 1

Chlorinated VOCs - EPA Method 8260B 0

Total VOCs EPA Method 8260B $73.00 0 0 $0.00 0

1,4-Dioxane EPA Method 522 $160.00 0 0 $0.00 0

VOC Soil Vapor-Full Scan TO-15 $200.00 $0.00 0

Total VOCs EPA Method 8260B $47.45 Expedite 3-Day TAT $0.00 0

1,4-Dioxane EPA Method 522 $104.00 0 Expedite 3-Day TAT $0.00 0

VOC Soil Vapor-Full Scan TO-15 $130.00 Expedite 3-Day TAT $0.00 0

Sample Shipping Small $110.00 0 $0.00 0

TOTAL LAB $0.00 1

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS 1

PPE- Level D $35.00 Per Man Day 0 $0.00 0

Miscellaneous Expendables $40.00 Per Day 1 $40.00 1

Shallow Groundwater Sampling Kit $3,480.00 Per Month 0 $0.00 0

Tubing, Poly HDPE $0.30 Per Foot 0 $0.00 0

Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 0 $0.00 0

Drum, 55-gallon $100.00 Per Drum 0 $0.00 0

Photoionization Meter $88.00 Per Day 0 $0.00 0

Persitaltic Pump $30.00 Per Day 0 $0.00 0

Metal Detector $40.00 Per Day 0 $0.00 0

Hammer Drill $60.00 Per Day 0 $0.00 0

Hand Auger $12.00 Per Day 0 $0.00 0

4" Extraction Well Cap and Fitting $103.37 Per Item 0 $0.00 0

TOTAL EQUIPMENT $40.00 1

&"Times New Roman,Regular"&12LEVEL OF EFFORT/EXPENSE WORKSHEET

Subtask 3

SITE : Multiple Sites 1

SUBTASK 3: Well Pad / Concrete Repair - WCD#6 1

DATE: 9/19/23 1

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON 1

STAFF-TITLE WORK DESCRIPTION HOURS 1

GOIST, TIMOTHY Program Leader – X-14 0

MILLER, DONALD Program Leader – X-14 0

PAUL, JEFFERY Program Leader – X-14 0

POWELL, BRENDA Program Leader – X-14 0

WAGNER, ANDREAS Program Leader – X-14 0

BROWN, JESSE Practice Leader - X-13 0

RICKER, JOSEPH Practice Leader - X-13 0

ZAGAGI, YANIV Practice Leader - X-13 0

BENNETT, ROSS Senior Consultant - X-12 0

BONES, ADELMARIE Senior Consultant - X-12 0

CREWS, MATTHEW Senior Consultant - X-12 0

CROOK, MARTIN Senior Consultant - X-12 0

GRIGG, DON Senior Consultant - X-12 0

HAMPTON, MATTHEW Senior Consultant - X-12 0

HOLCOMB, BLAKE Senior Consultant - X-12 0

KELSO, PERRY Senior Consultant - X-12 0

LONG, RYAN Senior Consultant - X-12 0

BAKER, JEFF Senior Sci/Eng - X-11 0

HESS, KRISTI Senior Sci/Eng - X-11 0

MONGILLO, RALPH Senior Sci/Eng - X-11 0

O'NEAL, GREGORY Senior Sci/Eng - X-11 0

CHAK, SARAH Senior Project Sci/Eng - P-10 0

CHAPPELL, LOGANSenior Project Sci/Eng - P-10Installation: Construction Oversight (4 hrs), Deliverable (2 hrs).
Barricades/Survey: Mobilization (1 hr), Drain Barricades for pickup (1 hr), TOC Survey (1hr)00

MORELLI, GENE Senior Project Sci/Eng - P-10 0

POIENCOT, BRANDON Senior Project Sci/Eng - P-10 0

THOMAS, JAMES Senior Project Sci/Eng - P-10 0

CARROLL, DECLAN Project Sci/Eng - P-9 0

LUCERO, BENJAMIN Project Sci/Eng - P-9 0

MCDANIELS, DAVID Project Sci/Eng - P-9 0

NEAL, SCOTT Project Sci/Eng - P-9 0

OIEN, ERIK Project Sci/Eng - P-9 0

SIDER, STEPHEN Project Sci/Eng - P-9 0

SMYTH, SHAWN Project Sci/Eng - P-9 0

AGRAWAL, VICKY Staff Sci/Eng - P-8 0

BROOKS, HERSIE Staff Sci/Eng - P-8 0

BURTON, DONALD Staff Sci/Eng - P-8 0

DEL VAL, LUIS Staff Sci/Eng - P-8 0

GSTALDER, IAN Staff Sci/Eng - P-8 0

MATHER, WILLIAM Staff Sci/Eng - P-8 0

MCADAM, ALEXANDRIA Staff Sci/Eng - P-8 0

MCQUAID, BRANDON Staff Sci/Eng - P-8 0

MORALES, ANTHONY Staff Sci/Eng - P-8 0

MUFTIC, ISAAC Staff Sci/Eng - P-8 0

SHPORTUN, ALICE Staff Sci/Eng - P-8 0

SPENGLER, JUSTIN Staff Sci/Eng - P-8 0

STRAYER, ALICIA Staff Sci/Eng - P-8 0

SWINDLE, LUCAS Staff Sci/Eng - P-8 0

DAWALT, TYLERStaff Sci/Eng - P-7Installation: Mobilization (1 hr), Construction Oversight (10 hrs), Deliverable (3 hrs).
Barricades/Survey: Mobilization (1 hr), Drain Barricades for pickup (1 hr), TOC Survey (1hr)00

BAXTER, MITCH Staff Sci/Eng - P-7 0

CONNELLY, MICHAEL Staff Sci/Eng - P-7 0

KAMIKAZI, LISA Staff Sci/Eng - P-7 0

TASSIMBEDO, THEODARD Staff Sci/Eng - P-7 0

WHIPPLE, JONATHAN Staff Sci/Eng - P-7 0

WILLIAMS, MICHAEL Staff Sci/Eng - P-7 0

GARDINER, CHARLES Practice Leader - X-13 0

FRAXEDAS, RICK Practice Leader - X-13 0

LASTINGER, JOHN Senior Consultant - X-12 0

SCHAEFER, GEOFF Senior Consultant - X-12 0

GLOVER, NORMAN Senior Consultant - X-12 0

QUINTIN, AMY Senior Consultant - X-12 0

SAGAN, JENNIFER Senior Consultant - X-12 0

MCCARTHY, JIM Senior Sci/Eng - X-11 0

BRUST, RENEE Senior Sci/Eng - X-11 0

ATWATER, DUSTIN Senior Sci/Eng - X-11 0

VOWLES, CORY Senior Sci/Eng - X-11 0

WHITE, RON Senior Sci/Eng - X-11 0

ARENBERG, ERIC Senior Sci/Eng - X-11 0

DAY, TIRRELL Senior Project Sci/Eng - P-10 0

AITHARAJU, ASHOK Senior Project Sci/Eng - P-10 0

BAIRD, SUZANNE Senior Project Sci/Eng - P-10 0

HANKS, STEPHEN Senior Project Sci/Eng - P-10 0

MCMURRAY, BECKY Project Sci/Eng - P-9 0

TOMLINSON, NIC Project Sci/Eng - P-9 0

GUATY, CARMEN Project Sci/Eng - P-9 0

PANICO, NICHOLE Project Sci/Eng - P-9 0

HORNE, ALEXANDRA Project Sci/Eng - P-9 0

BURTON, GEORGE Staff Sci/Eng - P-8 0

BROWN, ERIC Staff Sci/Eng - P-8 0

LAWSON, ZACHARY Staff Sci/Eng - P-8 0

JORDAN, DALTON Staff Sci/Eng - P-7 0

TOTAL LABOR 0 1

VEHICLE TYPE RATE UNIT USEAGE 1

Utility Van $120.00 Per Day 0 $0.00 0

Automobile $320.00 Per Week 0 $0.00 1

TOTAL VEHICLE $0.00 1

PER DIEM STAFF RATE UNIT USEAGE 1

Per Diem Project Sci/Eng $36.00 Per Day 0 $0.00 0

Hotel Project Sci/Eng $96.00 Per Day 0 $0.00 0

TOTAL PER DIEM $0.00 1

SUBCONTRACTOR COSTS 1

NAME PURPOSE COST 1

RNA Concrete Replacment $0.00 $0.00 0

TOTAL $0.00 1

LABORATORY COSTS 1

PARAMETER RATE # SAMPLES #QAQC 1

Total VOCs EPA Method 8260B $73.00 0 0 $0.00 0

1,4-Dioxane EPA Method 522 $160.00 0 0 $0.00 0

1,4-Dioxane EPA Method 522 $104.00 0 Expedite 3-Day TAT $0.00 0

Sample Shipping Small $110.00 0 $0.00 0

TOTAL LAB $0.00 1

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS 1

PPE- Level D $35.00 Per Man Day 0 $0.00 0

Miscellaneous Expendables $40.00 Per Day 0 $0.00 0

Deep Groundwater Sampling Kit $415.00 Per Day 0 $0.00 0

Tubing, Poly/HDPE $0.30 per foot 0 $0.00 0

Total Survey Station $50.00 Per Day 0 $0.00 0

TOTAL EQUIPMENT $0.00 1

&"Times New Roman,Regular"&12LEVEL OF EFFORT/EXPENSE WORKSHEET

Subtask 4

SITE : Multiple Sites

SUBTASK 4: 0

DATE: 9/19/23

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

GOIST, TIMOTHY Program Leader – X-14

MILLER, DONALD Program Leader – X-14

PAUL, JEFFERY Program Leader – X-14

POWELL, BRENDA Program Leader – X-14

WAGNER, ANDREAS Program Leader – X-14

BROWN, JESSE Practice Leader - X-13

RICKER, JOSEPH Practice Leader - X-13

ZAGAGI, YANIV Practice Leader - X-13

BENNETT, ROSS Senior Consultant - X-12

BONES, ADELMARIE Senior Consultant - X-12

CREWS, MATTHEW Senior Consultant - X-12

CROOK, MARTIN Senior Consultant - X-12

GRIGG, DON Senior Consultant - X-12

HAMPTON, MATTHEW Senior Consultant - X-12

HOLCOMB, BLAKE Senior Consultant - X-12

KELSO, PERRY Senior Consultant - X-12

LONG, RYAN Senior Consultant - X-12

BAKER, JEFF Senior Sci/Eng - X-11

HESS, KRISTI Senior Sci/Eng - X-11

MONGILLO, RALPH Senior Sci/Eng - X-11

O'NEAL, GREGORY Senior Sci/Eng - X-11

CHAK, SARAH Senior Project Sci/Eng - P-10

CHAPPELL, LOGAN Senior Project Sci/Eng - P-10

MORELLI, GENE Senior Project Sci/Eng - P-10

POIENCOT, BRANDON Senior Project Sci/Eng - P-10

THOMAS, JAMES Senior Project Sci/Eng - P-10

CARROLL, DECLAN Project Sci/Eng - P-9

LUCERO, BENJAMIN Project Sci/Eng - P-9

MCDANIELS, DAVID Project Sci/Eng - P-9

NEAL, SCOTT Project Sci/Eng - P-9

OIEN, ERIK Project Sci/Eng - P-9

SIDER, STEPHEN Project Sci/Eng - P-9

SMYTH, SHAWN Project Sci/Eng - P-9

AGRAWAL, VICKY Staff Sci/Eng - P-8

BROOKS, HERSIE Staff Sci/Eng - P-8

BURTON, DONALD Staff Sci/Eng - P-8

DEL VAL, LUIS Staff Sci/Eng - P-8

GSTALDER, IAN Staff Sci/Eng - P-8

MATHER, WILLIAM Staff Sci/Eng - P-8

MCADAM, ALEXANDRIA Staff Sci/Eng - P-8

MCQUAID, BRANDON Staff Sci/Eng - P-8

MORALES, ANTHONY Staff Sci/Eng - P-8

MUFTIC, ISAAC Staff Sci/Eng - P-8

SHPORTUN, ALICE Staff Sci/Eng - P-8

SPENGLER, JUSTIN Staff Sci/Eng - P-8

STRAYER, ALICIA Staff Sci/Eng - P-8

SWINDLE, LUCAS Staff Sci/Eng - P-8

BAXTER, MITCH Staff Sci/Eng - P-7

CONNELLY, MICHAEL Staff Sci/Eng - P-7

KAMIKAZI, LISA Staff Sci/Eng - P-7

TASSIMBEDO, THEODARD Staff Sci/Eng - P-7

WHIPPLE, JONATHAN Staff Sci/Eng - P-7

WILLIAMS, MICHAEL Staff Sci/Eng - P-7

GARDINER, CHARLES Practice Leader - X-13

FRAXEDAS, RICK Practice Leader - X-13

LASTINGER, JOHN Senior Consultant - X-12

SCHAEFER, GEOFF Senior Consultant - X-12

GLOVER, NORMAN Senior Consultant - X-12

QUINTIN, AMY Senior Consultant - X-12

SAGAN, JENNIFER Senior Consultant - X-12

ATWATER, DUSTIN Senior Sci/Eng - X-11

VOWLES, CORY Senior Sci/Eng - X-11

WHITE, RON Senior Sci/Eng - X-11

ARENBERG, ERIC Senior Sci/Eng - X-11

DAY, TIRRELL Senior Project Sci/Eng - P-10

AITHARAJU, ASHOK Senior Project Sci/Eng - P-10

BRUST, RENEE Senior Sci/Eng - X-11

MCCARTHY, JIM Senior Sci/Eng - X-11

BAIRD, SUZANNE Senior Project Sci/Eng - P-10

HANKS, STEPHEN Senior Project Sci/Eng - P-10

TOMLINSON, NIC Project Sci/Eng - P-9

GUATY, CARMEN Project Sci/Eng - P-9

PANICO, NICHOLE Project Sci/Eng - P-9

HORNE, ALEXANDRA Project Sci/Eng - P-9

BURTON, GEORGE Staff Sci/Eng - P-8

MCMURRAY, BECKY Project Sci/Eng - P-9

LAWSON, ZACHARY Staff Sci/Eng - P-8

JORDAN, DALTON Staff Sci/Eng - P-7

BROWN, ERIC Staff Sci/Eng - P-8

PECK, RENEE Staff Sci/Eng - P-7

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

&"Times New Roman,Regular"&12LEVEL OF EFFORT/EXPENSE WORKSHEET

FINAL --7/24/96

Page &P

Subtask 5

SITE : Multiple Sites

SUBTASK 5: 0

DATE: 9/19/23

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

GOIST, TIMOTHY Program Leader – X-14

MILLER, DONALD Program Leader – X-14

PAUL, JEFFERY Program Leader – X-14

POWELL, BRENDA Program Leader – X-14

WAGNER, ANDREAS Program Leader – X-14

BROWN, JESSE Practice Leader - X-13

RICKER, JOSEPH Practice Leader - X-13

ZAGAGI, YANIV Practice Leader - X-13

BENNETT, ROSS Senior Consultant - X-12

BONES, ADELMARIE Senior Consultant - X-12

CREWS, MATTHEW Senior Consultant - X-12

CROOK, MARTIN Senior Consultant - X-12

GRIGG, DON Senior Consultant - X-12

HAMPTON, MATTHEW Senior Consultant - X-12

HOLCOMB, BLAKE Senior Consultant - X-12

KELSO, PERRY Senior Consultant - X-12

LONG, RYAN Senior Consultant - X-12

BAKER, JEFF Senior Sci/Eng - X-11

HESS, KRISTI Senior Sci/Eng - X-11

MONGILLO, RALPH Senior Sci/Eng - X-11

O'NEAL, GREGORY Senior Sci/Eng - X-11

CHAK, SARAH Senior Project Sci/Eng - P-10

CHAPPELL, LOGAN Senior Project Sci/Eng - P-10

MORELLI, GENE Senior Project Sci/Eng - P-10

POIENCOT, BRANDON Senior Project Sci/Eng - P-10

THOMAS, JAMES Senior Project Sci/Eng - P-10

CARROLL, DECLAN Project Sci/Eng - P-9

LUCERO, BENJAMIN Project Sci/Eng - P-9

MCDANIELS, DAVID Project Sci/Eng - P-9

NEAL, SCOTT Project Sci/Eng - P-9

OIEN, ERIK Project Sci/Eng - P-9

SIDER, STEPHEN Project Sci/Eng - P-9

SMYTH, SHAWN Project Sci/Eng - P-9

AGRAWAL, VICKY Staff Sci/Eng - P-8

BROOKS, HERSIE Staff Sci/Eng - P-8

BURTON, DONALD Staff Sci/Eng - P-8

DEL VAL, LUIS Staff Sci/Eng - P-8

GSTALDER, IAN Staff Sci/Eng - P-8

MATHER, WILLIAM Staff Sci/Eng - P-8

MCADAM, ALEXANDRIA Staff Sci/Eng - P-8

MCQUAID, BRANDON Staff Sci/Eng - P-8

MORALES, ANTHONY Staff Sci/Eng - P-8

MUFTIC, ISAAC Staff Sci/Eng - P-8

SHPORTUN, ALICE Staff Sci/Eng - P-8

SPENGLER, JUSTIN Staff Sci/Eng - P-8

STRAYER, ALICIA Staff Sci/Eng - P-8

SWINDLE, LUCAS Staff Sci/Eng - P-8

BAXTER, MITCH Staff Sci/Eng - P-7

CONNELLY, MICHAEL Staff Sci/Eng - P-7

KAMIKAZI, LISA Staff Sci/Eng - P-7

TASSIMBEDO, THEODARD Staff Sci/Eng - P-7

WHIPPLE, JONATHAN Staff Sci/Eng - P-7

WILLIAMS, MICHAEL Staff Sci/Eng - P-7

GARDINER, CHARLES Practice Leader - X-13

FRAXEDAS, RICK Practice Leader - X-13

LASTINGER, JOHN Senior Consultant - X-12

SCHAEFER, GEOFF Senior Consultant - X-12

GLOVER, NORMAN Senior Consultant - X-12

QUINTIN, AMY Senior Consultant - X-12

SAGAN, JENNIFER Senior Consultant - X-12

ATWATER, DUSTIN Senior Sci/Eng - X-11

VOWLES, CORY Senior Sci/Eng - X-11

WHITE, RON Senior Sci/Eng - X-11

ARENBERG, ERIC Senior Sci/Eng - X-11

DAY, TIRRELL Senior Project Sci/Eng - P-10

AITHARAJU, ASHOK Senior Project Sci/Eng - P-10

BRUST, RENEE Senior Sci/Eng - X-11

MCCARTHY, JIM Senior Sci/Eng - X-11

BAIRD, SUZANNE Senior Project Sci/Eng - P-10

HANKS, STEPHEN Senior Project Sci/Eng - P-10

TOMLINSON, NIC Project Sci/Eng - P-9

GUATY, CARMEN Project Sci/Eng - P-9

PANICO, NICHOLE Project Sci/Eng - P-9

HORNE, ALEXANDRA Project Sci/Eng - P-9

BURTON, GEORGE Staff Sci/Eng - P-8

MCMURRAY, BECKY Project Sci/Eng - P-9

LAWSON, ZACHARY Staff Sci/Eng - P-8

JORDAN, DALTON Staff Sci/Eng - P-7

BROWN, ERIC Staff Sci/Eng - P-8

PECK, RENEE Staff Sci/Eng - P-7

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

&"Times New Roman,Regular"&12LEVEL OF EFFORT/EXPENSE WORKSHEET

Page &P

Subtask 6

SITE : Multiple Sites

SUBTASK 6: 0

DATE: 9/19/23

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

GOIST, TIMOTHY Program Leader – X-14

MILLER, DONALD Program Leader – X-14

PAUL, JEFFERY Program Leader – X-14

POWELL, BRENDA Program Leader – X-14

WAGNER, ANDREAS Program Leader – X-14

BROWN, JESSE Practice Leader - X-13

RICKER, JOSEPH Practice Leader - X-13

ZAGAGI, YANIV Practice Leader - X-13

BENNETT, ROSS Senior Consultant - X-12

BONES, ADELMARIE Senior Consultant - X-12

CREWS, MATTHEW Senior Consultant - X-12

CROOK, MARTIN Senior Consultant - X-12

GRIGG, DON Senior Consultant - X-12

HAMPTON, MATTHEW Senior Consultant - X-12

HOLCOMB, BLAKE Senior Consultant - X-12

KELSO, PERRY Senior Consultant - X-12

LONG, RYAN Senior Consultant - X-12

BAKER, JEFF Senior Sci/Eng - X-11

HESS, KRISTI Senior Sci/Eng - X-11

MONGILLO, RALPH Senior Sci/Eng - X-11

O'NEAL, GREGORY Senior Sci/Eng - X-11

CHAK, SARAH Senior Project Sci/Eng - P-10

CHAPPELL, LOGAN Senior Project Sci/Eng - P-10

MORELLI, GENE Senior Project Sci/Eng - P-10

POIENCOT, BRANDON Senior Project Sci/Eng - P-10

THOMAS, JAMES Senior Project Sci/Eng - P-10

CARROLL, DECLAN Project Sci/Eng - P-9

LUCERO, BENJAMIN Project Sci/Eng - P-9

MCDANIELS, DAVID Project Sci/Eng - P-9

NEAL, SCOTT Project Sci/Eng - P-9

OIEN, ERIK Project Sci/Eng - P-9

SIDER, STEPHEN Project Sci/Eng - P-9

SMYTH, SHAWN Project Sci/Eng - P-9

AGRAWAL, VICKY Staff Sci/Eng - P-8

BROOKS, HERSIE Staff Sci/Eng - P-8

BURTON, DONALD Staff Sci/Eng - P-8

DEL VAL, LUIS Staff Sci/Eng - P-8

GSTALDER, IAN Staff Sci/Eng - P-8

MATHER, WILLIAM Staff Sci/Eng - P-8

MCADAM, ALEXANDRIA Staff Sci/Eng - P-8

MCQUAID, BRANDON Staff Sci/Eng - P-8

MORALES, ANTHONY Staff Sci/Eng - P-8

MUFTIC, ISAAC Staff Sci/Eng - P-8

SHPORTUN, ALICE Staff Sci/Eng - P-8

SPENGLER, JUSTIN Staff Sci/Eng - P-8

STRAYER, ALICIA Staff Sci/Eng - P-8

SWINDLE, LUCAS Staff Sci/Eng - P-8

BAXTER, MITCH Staff Sci/Eng - P-7

CONNELLY, MICHAEL Staff Sci/Eng - P-7

KAMIKAZI, LISA Staff Sci/Eng - P-7

TASSIMBEDO, THEODARD Staff Sci/Eng - P-7

WHIPPLE, JONATHAN Staff Sci/Eng - P-7

WILLIAMS, MICHAEL Staff Sci/Eng - P-7

ERROR:#REF! ERROR:#REF!

GARDINER, CHARLES Practice Leader - X-13

FRAXEDAS, RICK Practice Leader - X-13

LASTINGER, JOHN Senior Consultant - X-12

SCHAEFER, GEOFF Senior Consultant - X-12

GLOVER, NORMAN Senior Consultant - X-12

QUINTIN, AMY Senior Consultant - X-12

SAGAN, JENNIFER Senior Consultant - X-12

ATWATER, DUSTIN Senior Sci/Eng - X-11

VOWLES, CORY Senior Sci/Eng - X-11

WHITE, RON Senior Sci/Eng - X-11

ARENBERG, ERIC Senior Sci/Eng - X-11

DAY, TIRRELL Senior Project Sci/Eng - P-10

AITHARAJU, ASHOK Senior Project Sci/Eng - P-10

BRUST, RENEE Senior Sci/Eng - X-11

MCCARTHY, JIM Senior Sci/Eng - X-11

BAIRD, SUZANNE Senior Project Sci/Eng - P-10

HANKS, STEPHEN Senior Project Sci/Eng - P-10

TOMLINSON, NIC Project Sci/Eng - P-9

GUATY, CARMEN Project Sci/Eng - P-9

PANICO, NICHOLE Project Sci/Eng - P-9

HORNE, ALEXANDRA Project Sci/Eng - P-9

BURTON, GEORGE Staff Sci/Eng - P-8

MCMURRAY, BECKY Project Sci/Eng - P-9

LAWSON, ZACHARY Staff Sci/Eng - P-8

JORDAN, DALTON Staff Sci/Eng - P-7

BROWN, ERIC Staff Sci/Eng - P-8

PECK, RENEE Staff Sci/Eng - P-7

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

&"Times New Roman,Regular"&12LEVEL OF EFFORT/EXPENSE WORKSHEET

Page &P

Subtask 7

SITE : Multiple Sites

SUBTASK 7 0

DATE: 9/19/23

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

GOIST, TIMOTHY Program Leader – X-14

MILLER, DONALD Program Leader – X-14

PAUL, JEFFERY Program Leader – X-14

POWELL, BRENDA Program Leader – X-14

WAGNER, ANDREAS Program Leader – X-14

BROWN, JESSE Practice Leader - X-13

RICKER, JOSEPH Practice Leader - X-13

ZAGAGI, YANIV Practice Leader - X-13

BENNETT, ROSS Senior Consultant - X-12

BONES, ADELMARIE Senior Consultant - X-12

CREWS, MATTHEW Senior Consultant - X-12

CROOK, MARTIN Senior Consultant - X-12

GRIGG, DON Senior Consultant - X-12

HAMPTON, MATTHEW Senior Consultant - X-12

HOLCOMB, BLAKE Senior Consultant - X-12

KELSO, PERRY Senior Consultant - X-12

LONG, RYAN Senior Consultant - X-12

BAKER, JEFF Senior Sci/Eng - X-11

HESS, KRISTI Senior Sci/Eng - X-11

MONGILLO, RALPH Senior Sci/Eng - X-11

O'NEAL, GREGORY Senior Sci/Eng - X-11

CHAK, SARAH Senior Project Sci/Eng - P-10

CHAPPELL, LOGAN Senior Project Sci/Eng - P-10

MORELLI, GENE Senior Project Sci/Eng - P-10

POIENCOT, BRANDON…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .