This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) under Contract Number HW685 to WSP USA Inc. for environmental remediation services at the Kimco of North Miami facility located at 19911 Northwest 2nd Avenue, Miami-Dade County, Florida (ERIC_4487). The Task Assignment was executed on June 11, 2025, with a completion date of March 20, 2026. The Department Project Manager is Patrick McGrane (850-245-8899), and the Contractor's Project Manager is Matt Crews (904-363-3430).

The scope of work authorizes WSP to conduct groundwater monitoring and Modified Active Gas Sampling (MAGS) activities at the site in accordance with the June 10, 2025 Scope of Work, Cost Estimate, and Bid Documentation. The total Task Assignment value is $25,707.34 on a fixed unit rate basis, with 140 total labor hours. The project is organized into four subtasks: Subtask 1 (Project Management) at $2,448.36; Subtask 2 (Annual Groundwater Monitoring and MAGS Activities) at $10,716.20; Subtask 3 (PFAS-Related Costs and IDW Transportation and Disposal) at $4,988.00; and Subtask 4 (Reporting) at $7,554.78. Deliverables are scheduled across three invoice dates: October 17, 2025 (Subtask 2); November 21, 2025 (Subtask 3); and January 9, 2026 (Subtasks 1 & 4). The original proposed cost of $29,036.17 was negotiated downward to the final contract value of $25,707.34.

View the file

Other files

File Type Posted
CN-370000-HW685-BF01C.pdf PDF
CN-370000-HW685-BF05ACO2.pdf PDF
CN-370000-HW685-BF05ACO3.pdf PDF
CN-370000-HW685-BF06A.pdf PDF
CN-370000-HW685-BF1ACO1.pdf PDF
CN-370000-HW685-BF6ACO1.pdf PDF
CN-370000-HW685-BIL01C.pdf PDF
CN-370000-HW685-BIL01CO1.pdf PDF
CN-370000-HW685-BIL03A.pdf PDF
CN-370000-HW685-BIL2ACO1.pdf PDF
CN-370000-HW685-BIL2CCO1.pdf.crdownload CRDOWNLOAD file
CN-370000-HW685-DC001A.pdf PDF
CN-370000-HW685-DC002G.pdf PDF
CN-370000-HW685-DC003A.pdf PDF
CN-370000-HW685-DC005C.pdf PDF
CN-370000-HW685-DC006B.pdf PDF
CN-370000-HW685-DC006C.pdf PDF
CN-370000-HW685-DC007C.pdf PDF
CN-370000-HW685-DC008A.pdf PDF
CN-370000-HW685-DC009B.pdf PDF
CN-370000-HW685-DC010A.pdf PDF
CN-370000-HW685-DC011A.pdf PDF
CN-370000-HW685-DC012C.pdf PDF
CN-370000-HW685-DC013A.pdf PDF
CN-370000-HW685-DC013C.pdf PDF
CN-370000-HW685-DC015B.pdf PDF
CN-370000-HW685-DC015C.pdf PDF
CN-370000-HW685-DC016A.pdf PDF
CN-370000-HW685-DC018A.pdf PDF
CN-370000-HW685-DC019B.pdf PDF
CN-370000-HW685-DC01ACO6.pdf PDF
CN-370000-HW685-DC01ACO8.pdf PDF
CN-370000-HW685-DC01ACO9.pdf PDF
CN-370000-HW685-DC020B.pdf PDF
CN-370000-HW685-DC022A.pdf PDF
CN-370000-HW685-DC022B.pdf PDF
CN-370000-HW685-DC022D.pdf PDF
CN-370000-HW685-DC023B.pdf PDF
CN-370000-HW685-DC023C.pdf PDF
CN-370000-HW685-DC027B.pdf PDF
CN-370000-HW685-DC027C.pdf PDF
CN-370000-HW685-DC029B.pdf PDF
CN-370000-HW685-DC029C.pdf PDF
CN-370000-HW685-DC02CCO1.pdf PDF
CN-370000-HW685-DC02FCO1.pdf PDF
CN-370000-HW685-DC031A.pdf PDF
CN-370000-HW685-DC031C.pdf PDF
CN-370000-HW685-DC032B.pdf PDF
CN-370000-HW685-DC035A.pdf PDF
CN-370000-HW685-DC037A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

HW685

DC018C Completion March 20, 2026

This Task Assignment authorizes WSP to conduct groundwater and MAGS sampling at Kimco of North Miami in accordance with the June 10, 2025 Scope of Work, Cost Estimate, and Bid Documentation.

Patrick McGrane 850-245-8899 Contractor WSP USA Inc. Contractor

Contractor Matt Crews Contractor 904-363-3430

ERIC_4487

19911 Northwest 2nd Avenue, Miami, Miami-Dade County

Kimco of North Miami Inc

Contractor Contractor

✔ $ 25,707.34

$ 25,707.34

Scope of Work

WSP USA Inc.

Contractor Matthew Crews

Environmental Engineer

6/11/2025

Crews, Matt (USMC700671) Digitally signed by Crews, Matt (USMC700671) Date: 2025.06.11 10:56:01 -04'00'

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2025.06.11 08:25:14 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

BWC TAFORM 01/18

HW685

DC018C

Subtask 3 - PFAS Related Costs & IDW Management

Subtasks 1 & 4 - Project Management; Reporting

Subtask 2 - Annual Groundwater Monitoring and MAGS Event 10/17/2025

11/21/2025

01/09/2026

Subtask 2 - Submittal and FDEP approval of email summary with field logs, MAGS logs, and certified laboratory report for groundwater and soil vapor

Subtask 3 - Submittal and FDEP approval of email summary with field documentation, certified laboratory report for PFAS, and signed waste manifests

Subtasks 1 & 4 - Submittal and FDEP approval of the Annual Groundwater Monitoring and MAGS Investigation Report

$ 10,716.20

$ 4,988.00

$ 10,003.14

$ 25,707.34

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Alexis A. Lambert Secretary

Memorandum TO: Negotiation File

Kimco of North Miami Inc.

Miami, Miami-Dade County

ERIC_4487

FROM: Patrick McGrane, Project Manager

SUBJECT: Negotiation Summary Task Assignment DC018C (HW685)

DATE: June , 2025

This Task Assignment authorizes WSP USA Inc. (WSP) to conduct groundwater monitoring and

MAGS testing at the Kimco of North Miami site.

With only two wells remaining at concentrations above cleanup target levels, it was agreed that MAGS testing should be conducted to confirm that vadose zone remediation is complete.

The total cost for this project is $2 , . with total labor hours. Following negotiations with the DEP, the final total cost has been reduced from the initially proposed total of $29,036.17. All work is to be completed in accordance with the June , 2025, Scope of Work, Cost Estimate, and Bid

Documentation.

WSP may invoice according to the included schedule.

FD

EP

C O

ST

E

ST

IM

A

TE

C on tra ct or

W S

P U

S A

In c.

D at e:

6/

/2

Ta sk

D C

8C

S ub Ta sk

P ro je ct

M an ag em en t

S ub

Ta sk

S ite

K im co o f N or th

M ia m i

Ta sk

A nn ua l G

W M on ito rin g an d

M A

G S

A ct iv iti es S ub Ta sk

A ct iv ity

/P ha se

A ss es sm en t/M on ito rin g

Ta sk

P

FA

S R el at ed C os ts a nd

ID

W

T

D S ub Ta sk

P ro je ct

M an ag er

P at ric k M cG ra ne

Ta sk

R ep or tin g

S ub

Ta sk

S ub

Ta sk

S ub Ta sk

T T ot al s

La bo r R at e

C at eg or y $5

8.

PP

ro je ct

M an ag er

(S S

.0

$0 .0

P ro gr am L ea de r - X

-1

$8 1.

P ra ct ic e

Le ad er

- X

-1

(J B

$0

.0

S en io r C on su lta nt

X

-1

$5 8.

S en io r S ci

/E ng

X

-1

(S S

$5

4.

S en io r S ci /E ng

X -1

(B

L)

$4

5.

S en io r P ro je ct S ci /E ng

P -1

(D

M

$0 .0

P ro je ct S ci /E ng

P -9

$3 4.

S ta ff

S ci

/E ng

P

-8 (L

K

$3 6.

S ta ff

S ci

/E ng

P

-8 (A

S

$0 .0

S ta ff

S ci

/E ng

P

-8

$0

.0

S ci

/E ng

/A dm in

P -7

$7

2.

P ra ct ic e Le ad er

- X -1

(M

C

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al

H ou rs

.0

.0

.0

.0

D ire ct L ab or

$7

,0

.8

$8

.8

$2 ,4

.7

$1

,3

.9

$2 ,5

.3

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

O ve rh ea d

2.

$1

2, 7.

$1 ,4

.9

$4

,1

.3

$2 ,3

.3

$4

,3

.6

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

G en

A dm in

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fr in ge 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al

L ab or

$1 9, 7.

$2

,2

.7

$6 ,5

.0

$3

,6

.2

$6 ,8

.9

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

RE

V:

2/

CE

F

GO

LD

ER

Pa ge

FD

EP

C O

ST

E

ST

IM

A

TE

C on tra ct or

W S

P U

S A

In c.

at e:

6/

/2

Ta sk

D C

8C

Ta sk

P ro je ct

M an ag em en t

S ub

Ta sk

S ite

K im co o f N or th

M ia i

Ta sk

A nn ua l G

W M on ito rin g an d

M A

G S

A ct iv iti es S ub Ta sk

A ct iv ity

/P ha se

A ss es sm en t/M on ito rin g

Ta sk

P

FA

S R el at ed C os ts a nd

ID

W

T

D S ub Ta sk

P ro je ct

M an ag er

P at ric k M cG ra ne

Ta sk

R ep or tin g

S ub

Ta sk

S ub

Ta sk

S ub Ta sk

T T ot al s

T ra ve l

V eh ic le

R en ta l

$3

.0

$2

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M ile ag e C os ts

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

A ir

Fa re

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P er d ie m

H ot el $8

.0

$7

.0

$7

2.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l T ra ve l $1

,1

.0

$9

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

(E qu ip m en t P ro cu re m en t)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P ro cu re m en t F ee

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

T ot al S ub co nt ra ct or

C os t $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

(S er vi ce s P ro cu re m en t) ril lin g (C on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

D ril lin g

(N on

-c on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M ob ile

L ab or at or y

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ur ve yi ng $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

ID

W $1

.0

$0

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

U til iti es $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

U til ity

L oc at io n $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

S ub to ta l $1

.0

$0

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

H an dl in g

Fe e

$1 9.

$0

.0

$1 9.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

T ot al S ub co nt ra ct or

C os t $2

.5

$0

.0

$2

.5

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

La bo ra to ry

A na ly tic al

C os ts $1

,2

.0

$1 ,2

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fa st T ur na ro un d C ha rg es $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S am pl e S hi pp in g

$2

.0

$2

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

T ot al L ab or at or y $1

,5

.0

$1 ,5

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fi el d

E xp en se s

P er so na l P ro te ct io n

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E xp en da bl es

$1

.0

$8 0.

$4

0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( D ril lin g re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( A na ly tic al re la te d)

$7

.0

$3

.0

$3

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t (

ID

W re la te

d) $1

.0

$0

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( O th er

$5

.0

$5

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al

F ie ld E xp en se s

$1 ,5

.0

$9

.0

$5

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub to ta l $2

3, 2.

$2 ,2

.7

$1

0, 0.

$4 ,6

.7

$6

,8

.9

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

C om pl et io n

Fe e

$1 ,9

.7

$2

.5

$6

.1

$3

.2

$6

.8

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al E st im at ed

C os t $2

5, 7.

$2 ,4

.3

$1

0, 6.

$4 ,9

.0

$7

,5

.7

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

RE

V:

2/

CE

F

GO

LD

ER

Pa ge

SITE : Kimco of North Miami SUBTASK 2: Annual GW Monitoring and MAGS Activities

DATE: 6/10/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Sci/Eng (S. Sider) 6

Senior Project Sci/Eng (D. McDaniels) 27

Staff Sci/Eng (L. Kamikazi) 24

TOTAL LABOR 57

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 Per Day 2 $240.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

Per Diem D. McDaniels $36.00 Per Day 2 $72.00 Per Diem L. Kamikazi $36.00 Per Day 2 $72.00

Hotel D. McDaniels $150.00 Per Day 2 $300.00 Hotel L. Kamikazi $150.00 Per Day 2 $300.00

TOTAL PER DIEM $744.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Chlorinated VOCs - EPA Method 8260B

Total VOHs (GW) EPA Method 8260B $73.00 2 $146.00 Total VOCs (GW) EPA Method 8021 - IDW $110.00 1 $110.00

VOCs (Soil Vapor) TO-15 $200.00 5 $1,000.00

Sample Shipping (Groundwater) Small $110.00 1 $110.00

Sample Shipping (Soil Vapor) Large $150.00 1 $150.00

TOTAL LAB $1,516.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Miscellaneous Expendables $40.00 Per Day 2 $80.00 Construction/O&M Supplies $75.00 Per Day 1 $75.00 MAGS Investigation Kit $500.00 Per Day 1 $500.00 Shallow Groundwater Sampling Kit $290.00 Per Day 1 $290.00 Tubing, Poly HDPE $0.30 Per Foot 150 $45.00 Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 3 $9.00

TOTAL EQUIPMENT $999.00

Verification of property ownership with property access forms and notify owners prior to groundwater monitoring (2 hours). Prepare and submit email summary with field documentation and laboratory chain-of-custody (4 hours).

Round Trip from Jacksonville to Maimi (12 hours). Field event preparation (3 hours). Water levels, instrument calibration, sampling for 2 wells for chlorinated VOC analysis (see Table in proposal), and IDW sampling and staging (4 hours). MAGS Equipment set up and breakdown (2 hours). Complete MAGS investigation at 5 wells with step-test at one location (6 hours).

Round Trip from Jacksonville to Maimi (12 hours). Water levels, instrument calibration, sampling for 2 wells for chlorinated VOC analysis (see Table in proposal), and IDW sampling and staging (4 hours). MAGS Equipment set up and breakdown (2 hours). Complete MAGS investigation at 5 wells with step-test at one location (6 hours).

LEVEL OF EFFORT/EXPENSE WORKSHEET

SUBTASK 3: PFAS Related Costs and IDW T&D

DATE: 6/10/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Sci/Eng (S. Sider) 8

Senior Project Sci/Eng (D. McDaniels) 11

Staff Sci/Eng (L. Kamikazi) 8

Senior Sci/Eng (B. Lucero) 2

TOTAL LABOR 29

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 Per Day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

Per Diem D. McDaniels $36.00 Per Day 1 $36.00 Per Diem L. Kamikazi $36.00 Per Day 1 $36.00

TOTAL PER DIEM $72.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin T&D - Non-Haz PFOS/PFAS Water $195.00 per drum 1 $195.00

TOTAL $195.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Miscellaneous Expendables $40.00 Per Day 1 $40.00 Shallow Groundwater Sampling Kit $290.00 Per Day 1 $290.00 Tubing, Poly HDPE $0.30 Per Foot 250 $75.00 Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 5 $15.00 Drum (55-gallon) $100.00 Each 1 $100.00

TOTAL EQUIPMENT $520.00

Complete forms to arrange for PFAS sample bottle order delivery and shipment from DEP Central Laboratory (2 hour). Characterize IDW and prepare waste profile for transportation and disposal of IDW (2 hours). Prepare and submit email summary with field documentation and certified laboratory report with PFAS results (2 hours). Prepare PFAS section for the draft annual report (2 hours).

Collect samples from 4 wells from PFAS analysis only; collect samples from 2 wells listed in Subtask 2 for PFAS analysis; collect equipment blank for PFAS analysis (6 hours). Package and deliver PFAS samples to shipping point for DEP Central Laboratory (2 hours). Prepare data tables with PFAS analytical results (3 hours).

Prepare CADD Figures with PFAS data for Annual Groundwater Monitoring and MAGS Investigation Report

Collect samples from 4 wells from PFAS analysis only; collect samples from 2 wells listed in Subtask 2 for PFAS analysis; collect equipment blank for PFAS analysis (6 hours). Package and deliver PFAS samples to shipping point for DEP Central Laboratory (2 hours).

FINAL --7/24/96

LEVEL OF EFFORT/EXPENSE WORKSHEET

SUBTASK 4: Reporting

DATE: 6/10/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Practice Leader (J. Brown) 2

Senior Sci/Eng (S. Sider) 16

Practice Leader (M. Crews) 14

Senior Sci/Eng (B. Lucero) 6

Staff Sci/Eng (A. Strayer) 2

TOTAL LABOR 40

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

Develop conclusions and recommendations for final Annual Groundwater Monitoring and MAGS Investigation Report

Prepare draft Annual Groundwater Monitoring and MAGS Investigation Report

Prepare CADD Figures

Document production.

MAGS data evaluation and engineering calculations

FINAL --7/24/96

WSP USA Inc.

9428 Baymeadows Road, Suite 400, Jacksonville, Florida 32256 USA

T: +1 904 363-3430 F: +1 904 363-3445 wsp.com

June 10, 2026 Proposal No. 2024US328355.R3

Mr. Patrick McGrane Florida Department of Environmental Protection Division of Waste Management Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400

RE: COST PROPOSAL FOR ANNUAL GROUNDWATER MONITORING AND

MODIFIED ACTIVE GAS SAMPLING

KIMCO OF NORTH MIAMI

19911 NW 2ND AVENUE

MIAMI, DADE COUNTY, FLORIDA

FACILITY IDENTIFICATION NUMBER: ERIC_4487

PROPOSED TASK ASSIGNMENT: DC018C

Dear Mr. McGrane, WSP USA Inc. (WSP) is pleased to provide the Florida Department of Environmental Protection (DEP) with this cost proposal for annual groundwater monitoring activities, continued per- and polyfluoroalkyl substances (PFAS) groundwater monitoring activities, and modified active gas sampling (MAGS) at the above-referenced site. This proposal includes a description of the proposed scope of services, level of effort sheets for each subtask, and a cost estimate form that summarizes the costs of the proposed services. The proposed scope of services is described below.

SUBTASK 1 – PROJECT MANAGEMENT

To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with the DEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with the DEP Waste Site Cleanup Section requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the DEP-approved task assignment.

Mr. Patrick McGrane Proposal No. 2024US328355.R3

Florida Department of Environmental Protection June 10, 2026

SUBTASK 2 – ANNUAL GROUNDWATER MONITORING & MAGS ACTIVITIES

Groundwater Sampling WSP proposes collecting groundwater samples from six monitoring wells. The attached Figures 2 through 7 show the monitoring well locations, groundwater flow direction, and chlorinated volatile organic compound (VOC) results for each zone of the surficial aquifer during the previous monitoring event. The attached Figure 8 shows the January 2024 PFAS screening results.

Prior to groundwater sampling, the depth-to-groundwater will be measured at accessible monitoring wells using an electronic water level indicator to determine groundwater elevations and flow direction. During the sampling event, the locks and well caps will be inspected for damage or degradation and repaired or replaced as necessary.

Groundwater samples will be collected from the wells in accordance with DEP Standard Operating Procedures (SOPs) for Field Activities (DEP-SOP-001/01) dated January 2017 (effective April 16, 2018) and DEP SOPs for Sampling and Analysis of PFAS, dated August 2020. Prior to collecting the groundwater sample, each well will be purged and field parameters including temperature, pH, specific conductance, dissolved oxygen, turbidity, and oxidation-reduction potential will be monitored. Purge volumes and field parameters will be recorded on field data sheets, and the field monitoring equipment will be calibrated in accordance with the manufacturer’s recommended procedures. Groundwater samples will be collected using low-flow sampling methods.

The samples will be placed in laboratory-supplied containers, labeled with a unique identification number attached to the outside of the sample container, and preserved on ice in a laboratory-provided cooler. Samples to be analyzed for chlorinated VOCs using EPA Method 8260B will be shipped to a Florida Department of Health and National Environmental Laboratory Accreditation Program-certified fixed-base laboratory along with the completed chain-of-custody. Samples to be analyzed for PFAS using DEP SOP: LC001-3 or similar, will be collected and shipped to the DEP Central Laboratory in Tallahassee, Florida, along with the completed chain-of-custody.

Based on the September 2024 DEP guidance for PFAS sampling at DEP Drycleaning Solvent Cleanup Program sites and subsequent correspondence with the DEP, WSP recommends continued PFAS monitoring during this annual groundwater monitoring event, using the same monitoring wells sampled during the initial PFAS screening activities in January 2024.

The samples will be analyzed as follows:

Sample ID Chlorinated VOCs (EPA Method 8260B)

PFAS

(DEP SOP: LC001-3

or Similar)

MW001 --- X

MW002 --- X

MW005 X X

MW007 --- X

MW009 --- X

MW010 X ---

Equipment Blank --- X Investigation Derived

Waste (IDW) Total VOCs X

MAGS Investigation WSP will complete the MAGS investigation to evaluate the presence and locations of potential source areas and to identify locations and analyses for additional discrete soil sampling, if needed. The results may also be used for a full-scale soil vapor extraction (SVE) system design, if warranted.

The MAGS investigation will involve fitting a regenerative blower (Fuji Electric Model VFC508P-2T, 2.5 hp, single phase) to a MAGS well to extract soil vapor from vadose zone soil. WSP will analyze the extracted soil vapor using an OVA-PID and/or Draeger colorimetric detector tubes. The blower will be capable of a flow rate of 154 standard cubic feet per minute at a vacuum of 80 inches of water (inches H20) under ideal conditions. A portable generator will supply power to the blower. The connection between the MAGS wellhead and blower will be made using 2-inch or 4-inch diameter vacuum-rated flexible PVC tubing and Schedule 40 PVC pipe. Vacuum gauges, a flowmeter, filter, and sample ports will be installed in line.

WSP will test each of the existing MAGS wells (VEW-1 through VEW-5) for an estimated 30 minutes to one hour.

At a minimum of one location, WSP will perform step-increase vacuum tests, which will consist of a low, medium, and high vacuum setting. Based on the design criteria submitted in AECOM’s March 2011 Remedial Action Plan, the selected wellhead vacuum for SVE was 20 inches of water. When factoring in the capability of WSP’s MAGS blower, WSP proposes the step-increase vacuum test to consist of vacuum settings of 20, 40, and 60 inches of water. The reported depth-to-groundwater during the 2024 groundwater monitoring event generally ranged from 11 to 13 feet below the top of well casing at the site; therefore, WSP does not anticipate water entrainment at the proposed vacuum settings.

WSP will measure subsurface vacuum pressure at varying distances from the primary extraction points using nearby MAGS wells and monitoring wells, provided the monitoring well screen is sufficiently exposed, to evaluate subsurface flow characteristics. This data will be used to estimate the effective field ROI, soil permeability, hydraulic conductivity, pore volume, and purge time. The project engineer will perform calculations during the field event to confirm the time required to evaluate one pore volume of soil vapor based on the measured ROI and actual vapor flow rate. Based on these calculations, the time that vapor is extracted at each MAGS well will be adjusted accordingly. An OVA-PID will be used to monitor soil vapor extracted from the MAGS sampling point.

Near the end of the MAGS extraction at each location, one soil vapor sample will be collected to provide a general assessment of the types and concentrations of remaining chlorinated solvents in soil. The samples will be collected in Summa Canisters (Tedlar bags if Summa Canisters are not available) and submitted to a fixed-base laboratory for VOC analysis using EPA Method TO-15.

Interim Deliverable Upon completion of Subtask 2, an e-mail deliverable will be submitted and include copies of the field data sheets, groundwater sampling logs, field notes, and laboratory chain-of-custody documentation.

SUBTASK 3 – PFAS-RELATED COSTS AND IDW TRANSPORTATION AND DISPOSAL

WSP will include costs associated with the continued PFAS monitoring activities in this subtask. These activities include completing bottle order requests with the DEP Central Laboratory; waste characterization and waste profiling; packaging and shipping PFAS samples to the DEP Central Laboratory; labor involved in sampling wells associated with PFAS analysis only; and investigation-derived waste (IDW) transportation and disposal.

Quality Assurance/Quality Control WSP will collect one equipment blank sample during the groundwater sampling event. The equipment blank will be collected by pumping (peristaltic pump) PFAS-free water through silicon and/or HDPE tubing and into laboratory-supplied containers. The equipment blank will be analyzed for PFAS using DEP SOP: LC001-3 (or similar), as shown in the above table.

Investigation Derived Waste WSP will containerize the IDW purge water and decontamination water in a 55-gallon drum. WSP will collect a waste characterization sample from the drum for analysis of total VOCs using EPA Method 8260 and PFAS using DEP SOP: LC001-3 (or similar), as shown in the above table. The drum will be temporarily staged onsite, pending waste characterization. For cost-estimating purposes, WSP has assumed that the IDW can be transported and disposed of as non-hazardous waste at an approved facility. The IDW transportation and disposal subcontractor will provide WSP with a non-hazardous waste manifest upon delivery to the disposal facility. WSP estimates one drum of IDW purge water will be generated during the field activities.

Interim Deliverable Upon completion of Subtask 3, an e-mail deliverable will be submitted for the PFAS samples and include copies of the field data sheets, equipment calibration forms, field notes, and laboratory chain-of-custody documentation.

SUBTASK 4 – REPORTING

WSP will prepare an Annual Groundwater Monitoring and MAGS Investigation Report that will include a description of the sampling procedures, evaluation of the analytical results; comparison of current to historical data; tabulated summary of the current and historical analytical data; site maps showing the groundwater analytical results; MAGS results; water level elevation information in tables and figures; laboratory analytical data; and conclusions and recommendations.

HEALTH AND SAFETY

WSP will update the existing site-specific Health and Safety Plan for the field work. The work will be completed in accordance with WSP’s safety policies and procedures. At a minimum, WSP will wear safety glasses, high visibility safety vests, and steel-toed boots. A safety job briefing will be conducted prior to the start of work activities, and anytime the scope of work or site conditions change.

COST AND SCHEDULE

The estimated cost to complete the proposed scope of work is $25,707.34. WSP anticipates the groundwater monitoring and MAGS event will take place in July or August 2025. The level of effort sheets and cost estimate form are included in Attachment A. The IDW disposal subcontractor quotes are included in Attachment B. The following table summarizes the proposed costs and deliverable schedule.

Task Proposed Cost Proposed Schedule/Deliverables

Subtask 1 – Project Management $ 2,448,36 December 19, 2025

Subtask 2 – Annual Groundwater Monitoring and MAGS Activities

$ 10,716.20 September 26, 2025 (E-mail summary with field documentation and laboratory chain-of-custody)

Subtask 3 – PFAS Related Costs and IDW Transportation and Disposal

$ 4,988.00 October 24, 2025 (E-mail summary with field documentation and certified laboratory analytical report for PFAS and non-hazardous waste manifest for IDW)

Subtask 4 – Reporting $ 7,554.78 November 19, 2025 (Annual Groundwater Monitoring Report and MAGS Investigation Report)

Total/Completion Date $25,707.34 January 30, 2026

AWSP appreciates the opportunity to provide services to the DEP. Should you require additional information or clarifications, please contact us at (904) 363-3430.

Sincerely, WSP USA Inc.

Stephen J.R. Sider, GISP, PG Matthew C. Crews, PE Lead Consultant, Geology Assistant Vice President, Environmental Engineering

SJRS/MCC/as

Attachments: Figure 2 – Site Layout Figure 3 – Potentiometric Map of the Shallow Zone of the Surficial Aquifer (January 17, 2024) Figure 4 – Potentiometric Map of the Intermediate Zone of the Surficial Aquifer (January 17, 2024) Figure 5 – VOC Analytical Summary of the Shallow Zone of the Surficial Aquifer (October 10, 2024) Figure 6 – VOC Analytical Summary of the Intermediate Zone of the Surficial Aquifer (January 17 and 18, 2024) Figure 7 – VOC Analytical Summary of the Deep Zone of the Surficial Aquifer (October 10, 2024) Figure 8 – PFAS Analytical Results in Groundwater

Attachment A – Level of Effort Sheets and Cost Estimate Form Attachment B – Subcontractor Quotes

G:\Projects\DEP-WSCS\Projects\Miami\Kimco of North Miami\3 - DC018C - 2024 Ann GW Mon & MAGS\Proposal\Revision 3\DC018C - Kimco of North Miami - Annual GM Mon & MAGS - ERIC_4487.rev3.docx

FO

R

M

ER

C

AL

IF

O

R N

IA

C

LU

B

C

LE

AN

ER

S N W th S

TR

EE

T

M W

M W

M W

M W

M W

M W

0.

M W

0.

M W

0.

M W

M W

0.68

0.66 0.64

0.6 4 0.66

0.68

01 in

.4

C on tro l N o.

-D C

8B

-0

FI

G

U R

E 3

-0 1-

BC

L

SJ

R

S

SJ

R

S

M C

C

KI

M

C O

O F

N O

R

TH

M

IA

M I

N

W

N D

A

VE

N U

E M

IA

M

I, M

IA

M

I-D

AD

E C

O U

N

TY

, F L

FL

. D

EP

T.

O F

EN

VI

R O

N M

EN

TA

L

PR

O

TE

C

TI

O N

PO

TE

N

TI

O M

ET

R

IC

M

A P

O F

TH

E

SH

A

LL

O

W Z

O N

E O

F

TH

E

SU

R

FI

C

IA

L A

Q U

IF

ER

(J

AN

U

AR

Y

, 2

4)

TI

TL

E

PR

O

JE

C

T N

O

R

EV

PR

O

JE

C

T

C

LI

EN

T

C O

N

SU

LT

AN

T

PR

EP

AR

ED

D

ES

IG

N

ED

R

EV

IE

W

ED

AP

PR

O

VE

D

YY

YY

-M M

-D D

IF THIS MEASUREMENT DOES NOT MATCH WHAT IS SHOWN, THE SHEET SIZE HAS BEEN MODIFIED FROM: ANSI B

Path: \\golder.gds\complexdata\Office\Jacksonville\drafting\Projects\FDEP\FDEP-DC\31404452\31404452_4487_KimcoN_Miami\DC018B\Active Drawings\ | File Name: 4487-DC018B-003.dwg

SH

AL

LO

W

M O

N

IT

O R

IN

G

W

EL

L

LE

G

EN

D

D

EE

P M

O N

IT

O

R

IN

G W

EL

L

D

ES

TR

O

YE

D

M O

N

IT

O R

IN

G

W

EL

L

IN

TE

R M

ED

IA

TE

M

O N

IT

O

R

IN

G W

EL

L

PR

O

PE

R

TY

B

O U

N D

AR

Y

0.

G R

O U

N D

W

AT

ER

E

LE

VA

TI

O

N

G R

O U

N D

W

AT

ER

C

O N

TO

U

R

IN

TE

R

VA

L

(D

AS

H

ED

W H

ER

E

IN

FE

R R

ED

ES

TI

M

AT

ED

G

R O

U N

D W

AT

ER

F

LO

W D

IR

EC

TI

O

N

0.

1.

AE

R

IA

L

IM

AG

E

TA

KE

N F

R O

M F

L.

D

EP

T.

O F

TR

AN

SP

O

R

TA

TI

O

N

AP

LU

S, IM

AG

E

D

AT

E:

J

AN

U

AR

Y

, 2

1.

2.

PR

O

PE

R

TY

B O

U N

D

AR

Y

TA

KE

N

F R

O M

F

LO

R

ID

A D

EP

AR

TM

EN

T O

F R

EV

EN

U E.

3.

W

EL

L

LO

C

AT

IO

N S

AR

E

AP

PR

O

XI

M

AT

E.

4.

M

W

TO

M W

LO

C

AT

IO

N S

O U

R C

E:

A

EC

O

M , D

AT

ED

F

EB

R U

AR

Y

5.

M

W

LO

C

AT

IO

N

S O

U R

C E:

W

SP

, D

AT

ED

F

EB

R

U

AR

Y

N O

TE

(S

R

EF

ER

EN

C E(

S)

1.

- M

O N

IT

O

R

IN

G W

EL

L

C O

VE

R

ED

B

Y

AS

PH

AL

T O

R D

ES

TR

O

YE

D

M W

M W

M W

M W

M W

M W

FO

R

M

ER

C

AL

IF

O

R N

IA

C

LU

B

C

LE

AN

ER

S

N W th S

TR

EE

T

M W

M W

M W

M W

01 in

.4

C on tro l N o.

-D C

8B

-0

FI

G

U R

E 5

-0 1-

BC

L

SJ

R

S

SJ

R

S

M C

C

KI

M

C O

O F

N O

R

TH

M

IA

M I

N

W

N D

A

VE

N U

E M

IA

M

I, M

IA

M

I-D

AD

E C

O U

N

TY

, F L

FL

. D

EP

T.

O F

EN

VI

R O

N M

EN

TA

L

PR

O

TE

C

TI

O N

VO

C

A N

A

LY

TI

C

A L

SU

M

M A

R Y

O F

TH

E

SH

A

LL

O

W Z

O N

E O

F

TH

E

SU

R

FI

C

IA

L A

Q U

IF

ER

(O C

TO

BE

R

0, 2)

TI

TL

E

PR

O

JE

C

T N

O

R

EV

PR

O

JE

C

T

C

LI

EN

T

C O

N

SU

LT

AN

T

PR

EP

AR

ED

D

ES

IG

N

ED

R

EV

IE

W

ED

AP

PR

O

VE

D

YY

YY

-M M

-D D

IF THIS MEASUREMENT DOES NOT MATCH WHAT IS SHOWN, THE SHEET SIZE HAS BEEN MODIFIED FROM: ANSI B

Path: \\golder.gds\complexdata\Office\Jacksonville\drafting\Projects\FDEP\FDEP-DC\31404452\31404452_4487_KimcoN_Miami\DC018B\Active Drawings\ | File Name: 4487-DC018B-005.dwg

R

EF

ER

EN

C E(

S)

SH

AL

LO

W

M O

N

IT

O R

IN

G

W

EL

L

LE

G

EN

D

D

EE

P M

O N

IT

O

R

IN

G W

EL

L

D

ES

TR

O

YE

D

M O

N

IT

O R

IN

G

W

EL

L

IN

TE

R M

ED

IA

TE

M

O N

IT

O

R

IN

G W

EL

L

PR

O

PE

R

TY

B

O U

N D

AR

Y

M W

/1

0/

3 3 70 1

G C

TL

sM

O N

IT

O

R

IN

G W

EL

L

I.D

SA

M

PL

E

D

AT

E

TE

TR

AC

H

LO

R

O

ET

H

EN

E (P

C E)

TR

IC

H

LO

R O

ET

H

EN

E

(T C

E) ci s-

1, 2-

D

IC

H

LO

R O

ET

H

EN

E

VI

N

YL

C

H

LO

R

ID

E

1.

AL

L

R

ES

U

LT

S

AR

E R

EP

O

R

TE

D

IN

M

IC

R O

G R

AM

S

PE

R

L

IT

ER

ug /L

2.

G C

TL

G R

O U

N D

W

AT

ER

C

LE

AN

U P

TA

R

G

ET

L

EV

EL

P

ER

C

H

AP

TE

R

2-

7, TA

BL

E 1, O F

TH

E

FL

O

R

ID

A

AD

M

IN

IS

TR

AT

IV

E C

O D

E.

3.

SH

AD

ED

C

EL

L

AN

D

B O

LD

F

O N

T

IN

D

IC

AT

E

AN

E

XC

EE

D

AN

C E

O F

TH

E

AP

PL

IC

AB

LE

G

C

TL

4.

U

IN

D

IC

AT

ES

T

H

AT

T H

E C

O M

PO

U

N D

W

AS

A N

AL

YZ

ED

F

O R

B U

T N

O T

D

ET

EC

TE

D . T

H E

VA

LU

E

SH

O W

N

IS

T H

E M

ET

H

O D

D

ET

EC

TI

O N

L

IM

IT

5.

I - T

H E

R

EP

O R

TE

D

V

AL

U E

IS

B

ET

W

EE

N

T H

E

LA

BO

R

AT

O

R Y

M

ET

H O

D D

ET

EC

TI

O

N L

IM

IT

A N

D T

H E

LA

BO

R

AT

O R

Y

PR

AC

TI

C

AL

Q U

AN

TI

TA

TI

O N

LI

M

IT

6.

- M

O N

IT

O

R

IN

G W

EL

L

C O

VE

R

ED

B

Y

AS

PH

AL

T O

R D

ES

TR

O

YE

D

N O

TE

(S

M W

6/

/1

6/

/2

2/

/2

/1

0/

0.

I 0.

I

0.

U 0.

U

0.

U 0.

U

0.

U 0.

U

0.

U 0.

U

0.

U 0.

U

0.

U 0.

U

0.

U 0.

U

M W

6/

/1

6/

/2

2/

/2

/1

0/

0.

U 0.

U

0.

U 0.

U

0.

U 0.

U

0.

U 0.

U

0.

U 0.

U

0.

U 0.

U

0.

U 0.

U

0.

U 0.

U

M W

6/

/1

6/

/2

2/

/2

/1

0/

0.

U 0.

U

0.

U 0.

U

0.

U 0.

U

0.

U 0.

U

0.

U 0.

U

0.

U 0.

U

0.

U 0.

U

0.

U 0.

U

M W

6/

/2

2/

/2

2/

/2

/1

0/

0.

U 0.

U

0.

U 0.

I

0.

U 0.

U

0.

U 0.

U

0.

U 0.

U

0.

U 0.

U

0.

U 0.

U

0.

U 0.

U

1.

AE

R

IA

L

IM

AG

E

TA

KE

N F

R O

M F

L.

D

EP

T.

O F

TR

AN

SP

O

R

TA

TI

O

N

AP

LU

S, IM

AG

E

D

AT

E:

J

AN

U

AR

Y

, 2

1.

2.

PR

O

PE

R

TY

B O

U N

D

AR

Y

TA

KE

N

F R

O M

F

LO

R

ID

A D

EP

AR

TM

EN

T O

F R

EV

EN

U E.

3.

W

EL

L

LO

C

AT

IO

N S

AR

E

AP

PR

O

XI

M

AT

E.

4.

M

W

TO

M W

LO

C

AT

IO

N S

O U

R C

E:

A

EC

O

M , D

AT

ED

F

EB

R U

AR

Y

5.

M

W

LO

C

AT

IO

N

S O

U R

C E:

W

SP

, D

AT

ED

F

EB

R

U

AR

Y

M W

M W

M W

M W

M W

FO

R

M

ER

C

AL

IF

O

R N

IA

C

LU

B

C

LE

AN

ER

S

N W th S

TR

EE

T

M W

M W

M W

M W

01 in

.4

C on tro l N o.

-D C

8B

-0

FI

G

U R

E 6

-0 1-

BC

L

SJ

R

S

SJ

R

S

M C

C

KI

M

C O

O F

N O

R

TH

M

IA

M I

N

W

N D

A

VE

N U

E M

IA

M

I, M

IA

M

I-D

AD

E C

O U

N

TY

, F L

FL

. D

EP

T.

O F

EN

VI

R O

N M

EN

TA

L

PR

O

TE

C

TI

O N

VO

C

A N

A

LY

TI

C

A L

SU

M

M A

R Y

O F

TH

E

IN

TE

R M

ED

IA

TE

Z

O N

E O

F

TH

E

SU

R

FI

C

IA

L A

Q U

IF

ER

(J

AN

U

AR

Y

8, 4)

TI

TL

E

PR

O

JE

C

T N

O

R

EV

PR

O

JE

C

T

C

LI

EN

T

C O

N

SU

LT

AN

T

PR

EP

AR

ED

D

ES

IG

N

ED

R

EV

IE

W

ED

AP

PR

O

VE

D

YY

YY

-M M

-D D

IF THIS MEASUREMENT DOES NOT MATCH WHAT IS SHOWN, THE SHEET SIZE HAS BEEN MODIFIED FROM: ANSI B

Path: \\golder.gds\complexdata\Office\Jacksonville\drafting\Projects\FDEP\FDEP-DC\31404452\31404452_4487_KimcoN_Miami\DC018B\Active Drawings\ | File Name: 4487-DC018B-005.dwg

SH

AL

LO

W

M O

N

IT

O R

IN

G

W

EL

L

LE

G

EN

D

D

EE

P M

O N

IT

O

R

IN

G W

EL

L

D

ES

TR

O

YE

D

M O

N

IT

O R

IN

G

W

EL

L

IN

TE

R M

ED

IA

TE

M

O N

IT

O

R

IN

G W

EL

L

PR

O

PE

R

TY

B

O U

N D

AR

Y

M W

/1

0/

3 3 70 1

G C

TL

sM

O N

IT

O

R

IN

G W

EL

L

I.D

SA

M

PL

E

D

AT

E

TE

TR

AC

H

LO

R

O

ET

H

EN

E (P

C E)

TR

IC

H

LO

R O

ET

H

EN

E

(T C

E) ci s-

1, 2-

D

IC

H

LO

R O

ET

H

EN

E

VI

N

YL

C

H

LO

R

ID

E

M W

6/

/2

2/

/2

/1

0/

1/

/2

0.

U 0.

U

0.

U 0.

U

0.

U 0.

U

0.

U 0.

U

1.

4.

6.

8.

2.

M W

6/

/2

2/

/2

/1

0/

1/

/2

0.

U 0.

U

0.

U 0.

U

0.

U 0.

U

0.

U 0.

U

0.

U 0.

U

2.

0.

U 0.

I

0.

I 1.

I

0.

I

M W

6/

/1

6/

/2

2/

/2

/1

0/

0.

U 0.

U

0.

U 0.

U

0.

U 0.

U

0.

U 0.

U

0.

U 0.

U

0.

U 0.

U

0.

U 0.

U

0.

U 0.

U

G C

TL

E

XC

EE

D

AN

C E

C O

N

TO

U R

1.

AL

L

R

ES

U

LT

S

AR

E R

EP

O

R

TE

D

IN

M

IC

R O

G R

AM

S

PE

R

L

IT

ER

ug /L

2.

G C

TL

G R

O U

N D

W

AT

ER

C

LE

AN

U P

TA

R

G

ET

L

EV

EL

P

ER

C

H

AP

TE

R

2-

7, TA

BL

E 1, O F

TH

E

FL

O

R

ID

A

AD

M

IN

IS

TR

AT

IV

E C

O D

E.

3.

SH

AD

ED

C

EL

L

AN

D

B O

LD

F

O N

T

IN

D

IC

AT

E

AN

E

XC

EE

D

AN

C E

O F

TH

E

AP

PL

IC

AB

LE

G

C

TL

4.

U

IN

D

IC

AT

ES

T

H

AT

T H

E C

O M

PO

U

N D

W

AS

A N

AL

YZ

ED

F

O R

B U

T N

O T

D

ET

EC

TE

D . T

H E

VA

LU

E

SH

O W

N

IS

T H

E M

ET

H

O D

D

ET

EC

TI

O N

L

IM

IT

5.

I - T

H E

R

EP

O R

TE

D

V

AL

U E

IS

B

ET

W

EE

N

T H

E

LA

BO

R

AT

O

R Y

M

ET

H O

D D

ET

EC

TI

O

N L

IM

IT

A N

D T

H E

LA

BO

R

AT

O R

Y

PR

AC

TI

C

AL

Q U

AN

TI

TA

TI

O N

LI

M

IT

N

IT

O

R

IN

G W

EL

L

C O

VE

R

ED

B

Y

AS

PH

AL

T O

R D

ES

TR

O

YE

D

N O

TE

(S

M W

6/

/2

2/

/2

0.

U 0.

U

0.

U 0.

U

0.

U 0.

U

0.

U 0.

U

R

EF

ER

EN

C E(

S) 1.

AE

R

IA

L

IM

AG

E

TA

KE

N

F R

O M

F L.

D

EP

T.

O

F

TR

AN

SP

O R

TA

TI

O N

AP

LU

S, IM

AG

E D

AT

E:

J

AN

U

AR

Y

, 2

1.

2.

PR

O

PE

R

TY

B

O U

N D

AR

Y

TA

KE

N F

R O

M F

LO

R

ID

A

D

EP

AR

TM

EN

T

O F

R

EV

EN

U

E.

3.

W

EL

L

LO

C

AT

IO

N

S

AR

E

AP

PR

O

XI

M

AT

E.

4.

M

W

TO

M W

LO

C

AT

IO

N S

O U

R C

E:

A

EC

O

M , D

AT

ED

F

EB

R U

AR

Y

5.

M

W

LO

C

AT

IO

N

S O

U R

C E:

W

SP

, D

AT

ED

F

EB

R

U

AR

Y

M W

1/

/2

0.

I 0.

U

0.

U 0.

U

M W

M W

M W

M W

M W

FO

R

M

ER

C

AL

IF

O

R N

IA

C

LU

B

C

LE

AN

ER

S

N W th S

TR

EE

T

M W

M W

M W

M W

01 in

.4

C on tro l N o.

-D C

8B

-0

FI

G

U R

E 7

-0 1-

BC

L

SJ

R

S

SJ

R

S

M C

C

KI

M

C O

O F

N O

R

TH

M

IA

M I

N

W

N D

A

VE

N U

E M

IA

M

I, M

IA

M

I-D

AD

E C

O U

N

TY

, F L

FL

. D

EP

T.

O F

EN

VI

R O

N M

EN

TA

L

PR

O

TE

C

TI

O N

VO

C

A N

A

LY

TI

C

A L

SU

M

M A

R Y

O F

TH

E

D

EE

P

ZO

N E

O F

TH

E

SU

R

FI

C

IA

L

A Q

U

IF

ER

(O

C

TO

BE

R

0, 2)

TI

TL

E

PR

O

JE

C

T N

O

R

EV

PR

O

JE

C

T

C

LI

EN

T

C O

N

SU

LT

AN

T

PR

EP

AR

ED

D

ES

IG

N

ED

R

EV

IE

W

ED

AP

PR

O

VE

D

YY

YY

-M M

-D D

IF THIS MEASUREMENT DOES NOT MATCH WHAT IS SHOWN, THE SHEET SIZE HAS BEEN MODIFIED FROM: ANSI B

Path: \\golder.gds\complexdata\Office\Jacksonville\drafting\Projects\FDEP\FDEP-DC\31404452\31404452_4487_KimcoN_Miami\DC018B\Active Drawings\ | File Name: 4487-DC018B-005.dwg

SH

AL

LO

W

M O

N

IT

O R

IN

G

W

EL

L

LE

G

EN

D

D

EE

P M

O N

IT

O

R

IN

G W

EL

L

D

ES

TR

O

YE

D

M O

N

IT

O R

IN

G

W

EL

L

IN

TE

R M

ED

IA

TE

M

O N

IT

O

R

IN

G W

EL

L

PR

O

PE

R

TY

B

O U

N D

AR

Y

M W

/1

0/

3 3 70 1

G C

TL

sM

O N

IT

O

R

IN

G W

EL

L

I.D

SA

M

PL

E

D

AT

E

TE

TR

AC

H

LO

R

O

ET

H

EN

E (P

C E)

TR

IC

H

LO

R O

ET

H

EN

E

(T C

E) ci s-

1, 2-

D

IC

H

LO

R O

ET

H

EN

E

VI

N

YL

C

H

LO

R

ID

E

M W

6/

/2

6/

/2

2/

/2

/1

0/

0.

U 0.

U

0.

U 0.

U

0.

U 0.

U

0.

U 0.

U

0.

U 0.

U

0.

I 0.

I

0.

U 0.

U

0.

U 0.

U

1.

AL

L

R

ES

U

LT

S

AR

E R

EP

O

R

TE

D

IN

M

IC

R O

G R

AM

S

PE

R

L

IT

ER

ug /L

2.

G C

TL

G R

O U

N D

W

AT

ER

C

LE

AN

U P

TA

R

G

ET

L

EV

EL

P

ER

C

H

AP

TE

R

2-

7, TA

BL

E 1, O F

TH

E

FL

O

R

ID

A

AD

M

IN

IS

TR

AT

IV

E C

O D

E.

3.

SH

AD

ED

C

EL

L

AN

D

B O

LD

F

O N

T

IN

D

IC

AT

E

AN

E

XC

EE

D

AN

C E

O F

TH

E

AP

PL

IC

AB

LE

G

C

TL

4.

U

IN

D

IC

AT

ES

T

H

AT

T H

E C

O M

PO

U

N D

W

AS

A N

AL

YZ

ED

F

O R

B U

T N

O T

D

ET

EC

TE

D . T

H E

VA

LU

E

SH

O W

N

IS

T H

E M

ET

H

O D

D

ET

EC

TI

O N

L

IM

IT

5.

I - T

H E

R

EP

O R

TE

D

V

AL

U E

IS

B

ET

W

EE

N

T H

E

LA

BO

R

AT

O

R Y

M

ET

H O

D D

ET

EC

TI

O

N L

IM

IT

A N

D T

H E

LA

BO

R

AT

O R

Y

PR

AC

TI

C

AL

Q U

AN

TI

TA

TI

O N

LI

M

IT

N

IT

O

R

IN

G W

EL

L

C O

VE

R

ED

B

Y

AS

PH

AL

T O

R D

ES

TR

O

YE

D

N O

TE

(S

R

EF

ER

EN

C E(

S) 1.

AE

R

IA

L

IM

AG

E

TA

KE

N

F R

O M

F L.

D

EP

T.

O

F

TR

AN

SP

O R

TA

TI

O N

AP

LU

S, IM

AG

E D

AT

E:

J

AN

U

AR

Y

, 2

1.

2.

PR

O

PE

R

TY

B

O U

N D

AR

Y

TA

KE

N F

R O

M F

LO

R

ID

A

D

EP

AR

TM

EN

T

O F

R

EV

EN

U

E.

3.

W

EL

L

LO

C

AT

IO

N

S

AR

E

AP

PR

O

XI

M

AT

E.

4.

M

W

TO

M W

LO

C

AT

IO

N S

O U

R C

E:

A

EC

O

M , D

AT

ED

F

EB

R U

AR

Y

5.

M

W

LO

C

AT

IO

N

S O

U R

C E:

W

SP

, D

AT

ED

F

EB

R

U

AR

Y

M W

M W

M W

M W

M W

FO

R

M

ER

C

AL

IF

O

R N

IA

C

LU

B

C

LE

AN

ER

S

N W th S

TR

EE

T

M W

M W

M W

M W

01 in

.4

C on tro l N o.

-D C

8B

-0

FI

G

U R

E 8

-0 1-

BC

L

SJ

R

S

SJ

R

S

M C

C

KI

M

C O

O F

N O

R

TH

M

IA

M I

N

W

N D

A

VE

N U

E M

IA

M

I, M

IA

M

I-D

AD

E C

O U

N

TY

, F L

FL

. D

EP

T.

O F

EN

VI

R O

N M

EN

TA

L

PR

O

TE

C

TI

O N

PF

A

S A

N A

LY

TI

C A

L R

ES

U

LT

S

IN

G

R O

U N

D W

A

TE

R

TI

TL

E

PR

O

JE

C

T N

O

R

EV

PR

O

JE

C

T

C

LI

EN

T

C O

N

SU

LT

AN

T

PR

EP

AR

ED

D

ES

IG

N

ED

R

EV

IE

W

ED

AP

PR

O

VE

D

YY

YY

-M M

-D D

IF THIS MEASUREMENT DOES NOT MATCH WHAT IS SHOWN, THE SHEET SIZE HAS BEEN MODIFIED FROM: ANSI B

Path: \\golder.gds\complexdata\Office\Jacksonville\drafting\Projects\FDEP\FDEP-DC\31404452\31404452_4487_KimcoN_Miami\DC018B\Active Drawings\ | File Name: 4487-DC018B-008.dwg

SH

AL

LO

W

M O

N

IT

O R

IN

G

W

EL

L

LE

G

EN

D

D

EE

P M

O N

IT

O

R

IN

G W

EL

L

D

ES

TR

O

YE

D

M O

N

IT

O R

IN

G

W

EL

L

IN

TE

R M

ED

IA

TE

M

O N

IT

O

R

IN

G W

EL

L

PR

O

PE

R

TY

B

O U

N D

AR

Y

N O

TE

(S

R

EF

ER

EN

C E(

S) 1.

AE

R

IA

L

IM

AG

E

TA

KE

N

F R

O M

F L.

D

EP

T.

O

F

TR

AN

SP

O R

TA

TI

O N

AP

LU

S, IM

AG

E D

AT

E:

J

AN

U

AR

Y

, 2

1.

2.

PR

O

PE

R

TY

B

O U

N D

AR

Y

TA

KE

N F

R O

M F

LO

R

ID

A

D

EP

AR

TM

EN

T

O F

R

EV

EN

U

E.

3.

W

EL

L

LO

C

AT

IO

N

S

AR

E

AP

PR

O

XI

M

AT

E.

4.

M

W

TO

M W

LO

C

AT

IO

N S

O U

R C

E:

A

EC

O

M , D

AT

ED

F

EB

R U

AR

Y

5.

M

W

LO

C

AT

IO

N

S O

U R

C E:

W

SP

, D

AT

ED

F

EB

R

U

AR

Y

(5

SC

R

EE

N

IN

TE

R

VA

L (F

EE

T

BE

LO

W G

R O

U N

D S

U R

FA

C

E)

M W

(5

- 6 0)

D

AT

E

PF

O A

PF

O

S

PF

O A+

PF

O

S 1/

/2

8.

.6

PR

O

VI

SI

O N

AL

G

R O

U N

D W

AT

ER

C

LE

AN

U

P

TA

R G

ET

LE

VE

L

(G C

TL

PF

O

A

IN

ng /L

PF

O

S

IN

ng /L

SU

M

O F

PF

O

A

PF

O

S

IN

n g/

L

G C

TL

1.

PR

O

VI

SI

O

N

AL

G C

TL

FD

EP

P R

O

VI

SI

O

N

AL

G R

O U

N D

W

AT

ER

C

LE

AN

U P

TA

R

G

ET

L

EV

EL

2.

AL

L R

ES

U

LT

S

AR

E

R

EP

O R

TE

D

IN

N

AN

O

G R

AM

S

PE

R

L

IT

ER

(n g/ L)

3.

BO

LD

F O

N

TS

IN

D

IC

AT

ES

C

O N

ST

IT

U

EN

T C

O N

C

EN

TR

AT

IO

N

W

AS

R

EP

O R

TE

D

A

BO

VE

T

H E

LA

BO

R

AT

O R

Y M

ET

H

O D

D

ET

EC

TI

O N

L

IM

IT

4.

H

IG

H

LI

G

H

TE

D F

O N

T

IN

D

IC

AT

ES

C O

N

ST

IT

U

EN

T

C O

N C

EN

TR

AT

IO

N W

AS

R

EP

O

R

TE

D A

BO

VE

T H

E

PR

O

VI

SI

O

N

AL

G R

O U

N D

W

AT

ER

C

LE

AN

U P

LE

VE

L.

5.

I-

R

EP

O R

TE

D

V

AL

U E

IS

B

ET

W

EE

N

T H

E

LA

BO

R

AT

O

R Y

M

ET

H O

D D

ET

EC

TI

O

N L

IM

IT

A N

D L

AB

O

R

AT

O R

Y

PR

AC

TI

C

AL

Q U

AN

TI

TA

TI

O N

L

IM

IT

6.

U

TH

E C

O M

PO

U

N D

W

AS

A N

AL

YZ

ED

F

O R

, B U

T N

O T

D

ET

EC

TE

D . T

H E

R

EP

O R

TE

D

V

AL

U E

IS

T

H E

M

ET

H O

D D

ET

EC

TI

O

N L

IM

IT

F O

R T

H E

SA

M

PL

E

AN

AL

YZ

ED

7.

PF

O A

- P

ER

FL

U

O R

O -N

-O C

TA

N

O

IC

A C

ID

8.

PF

O S

- P

ER

FL

U

O R

O O

C

TA

N

ES

U

LF

O N

IC

A

C

ID

M W

(5

D

AT

E

PF

O A

PF

O

S

PF

O A+

PF

O

S 1/

/2

1.

U

M W

(5

D

AT

E

PF

O A

PF

O

S

PF

O A+

PF

O

S 1/

/2

1.

U 1.

U

3.

U

M W

(3

- 4 0)

D

AT

E

PF

O A

PF

O

S

PF

O A+

PF

O

S 1/

/2

M W

(3

- 4 0)

D

AT

E

PF

O A

PF

O

S

PF

O A+

PF

O

S 1/

/2

U

Ec ol og y*

H

EP

AC

O

T& D

N on

H az

S oi l - V

O C s pe r d ru m

$1

.0

$0 .0

T&

D N on H az M ud /w at er

VO

C s pe r d ru m

$1

.0

$0

.0

Fa ls e M ob iliz at io n (n o dr um fo un d)

$8

5.

$0 .0

PF

AS

P ro fil e Fe e (1 p er s ite

$3

.0

$0 .0

T&

D N on H az S oi l -

P

FA

S/

PF

O S pe r d ru m

$1

.0

$0

.0

T& D

N on

H az

M ud

/w at er -P

FA

S/

PF

O

S pe r d ru m

$1

.0

$1

.0

D is po sa l N on

H az

S oi l - V

O C s pe r d ru m

$1

.0

$0 .0

D is po sa l N on H az M ud /w at er

VO

C s pe r d ru m

$1

.0

$0

.0

PF

AS

P ro fil e

Fe e

(1 p er s ite

$9

5.

$9 5.

D is po sa l N on H az S oi l -

P

FA

S/

PF

O S

$6

.0

$0

.0

D is po sa l N on H az M ud /w at er

-P

FA

S/

PF

O S

$6

.0

$6

.0

Ap pr ov al F ee (p er s ite

$7

.0

$7

.0

N on H az S ol ifi ca tio n W as te

P ro fil e fe e

$5

0.

$0 .0

N on H az S ol id s D is po sa l

(p er d ru m

$1

.0

$0

.0

N on

H az

S lu dg e

D is po sa l

$1

.0

$0 .0

PF

AS

W as te ga l d ru m e m el le

A L

$8

.0

$8

.0

Tr uc k w ith li ft ga te a nd d riv er

$1

.0

$5

.0 no n ha z liq ui ds d is po sa l ( pe r d ru m

$1

.7

$0 .0 g al lo n re co nd iti on ed d ru

$1

.6

$0

.0

LT

L fe es

(l es s th an dr um s

$1

.0

$1

.0

En er gy s ec ur ity re co ve ry fe e

$2

.0

$2

.0

To ta l C os t $1

.0

$1

,4

.0

$1

,7

.0

N ot es

* T ra ns po rta tio n co st s w ill be c al cu la te d ba se d on p ic ku ps a t v ar io us s ite s an d w as te s tre am v ol um e

ID

W

S U

B C

O N

TR

AC

TO

R

C O

ST

E

ST

IM

AT

ES

F O

R P

FA

S

M

AT

ER

IA

L

Er w in

Su m m ar y of

ID

W

S ub co nt ra ct or s

C os ts

3_

6_

P

FA

S no p ro fil e

Pa ge o f 1

408 Ditmar Street Pensacola, FL 32503

To: Mr. Ralph Mongillo

WSP

9428 Baymeadows Road, Suite 400 Jacksonville, FL 32256

June 16, 2023

Re: Non-Hazardous Disposal of PFOS/PFAS Impacted Materials

Mr. Mongillo:

The price for the transportation and disposal (T&D) of non-hazardous soil, mud, and water is listed below:

For Non-Hazardous Chlorinated Solvent Impacted Materials:

Description Rate Unit T&D - Non-Haz Chlorinated Solvents Impacted Soil $ 125.00 Per Drum T&D - Non-Haz Chlorinated Solvents Impacted Mud/Water $ 125.00 Per Drum T&D - Non-Haz Chlorinated Solvents Impacted Water $ 95.00 Per Bucket

For Non-Hazardous PFAS/PFOS Impacted Materials:

Description Rate Unit Profile Fee (Charged once per site) $ 350.00 Per Site T&D - Non-Haz PFOS/PFAS Impacted Water (5-gallon bucket) $ 95.00 Per Bucket T&D - Non-Haz PFOS/PFAS Impacted Soil $ 195.00 Per Drum T&D - Non-Haz PFOS/PFAS Impacted Mud/Water $ 195.00 Per Drum

Please ensure that all drum lids are properly secured and that drums are on a level surface like the surrounding area (i.e., not on a pallet, etc.). A single False Mobilization fee will apply if our driver is not able to locate a drum on site or if we are unable to access the property due to a locked gate, etc. This quote is valid for 90 days.

Respectfully, Robert Donado Erwin Remediation, Inc.