This document is a Task Assignment (TA) executed between the State of Florida Department of Environmental Protection (FDEP) and Golder Associates USA Inc., a contractor providing environmental services. The task assignment is issued pursuant to underlying Contract Number HW685 and is identified as TA DC016B. The work is performed under the state's Drycleaning Solvent Cleanup Program and involves groundwater monitoring and assessment activities at the Cinderella Cleaners site located at 1454 10th Street, Lake Park, Palm Beach County, Florida (ERIC_5174).
The task assignment authorizes Golder to perform annual groundwater sampling and monitoring in accordance with the October 4, 2022 Scope of Work and Cost Estimate. The contract is structured on a fixed unit rate basis with a total task value of $19,454.72. The scope includes three subtasks: (1) Project Management ($1,658.67), (2) Annual Groundwater Monitoring ($13,927.59), comprising field work sampling from 23 monitoring wells and investigation-derived waste disposal management, and (3) Reporting ($5,527.13), with deliverable completion by June 29, 2023. Subtask 2 deliverables are due April 7, 2023, while Subtasks 1 and 3 deliverables are due May 12, 2023. The work includes 116 total labor hours distributed across project management, field sampling, laboratory analysis for chlorinated volatile organic compounds via EPA Method 8260B, and preparation of an annual groundwater monitoring report. Erwin Remediation was selected as the subcontractor for investigation-derived waste disposal at $110 per drum for two drums.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW685
DC016B Completion June 29, 2023
This Task Assignment authorizes Golder to perform annual groundwater sampling in accordance with the October 4, 2022 Scope of Work and Cost Estimate.
Ginger Shirah 850-245-8899 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Golder Associates USA Inc.
Golder Associates USA Inc.
Matt Crews 904-363-3430
ERIC_5174
1454 10th Street, Lake Park, Palm Beach County
Cinderella Cleaners
✔ $ 19,454.72
$ 19,454.72
Scope of Work
Matthew Crews
Senior Lead Consultant, Environmental Engineer
10/12/2022
Matthew C. Crews Digitally signed by Matthew C. Crews Date: 2022.10.12 15:57:58 -04'00' David Phillips Digitally signed by David Phillips
Date: 2022.10.11 12:53:01 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 2: Groundwater monitoring field documentation, sampling logs, certified laboratory analytical report, and IDW manifest 04/07/2023
Subtasks 1 & 3: Annual Groundwater Monitoring Report; Project Management 05/12/2023
Submittal and FDEP Approval of Subtask 2: Groundwater monitoring field documentation, sampling logs, certified laboratory analytical report, and IDW manifest
$ 13,927.59
Submittal and FDEP Approval of Subtasks 1 & 3: Annual Groundwater Monitoring Report; Project Management $ 5,527.13
$ 19,454.72
HW685
DC016B
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Shawn Hamilton Secretary
To:
From:
Date:
HW685 Contract Negotiation File Cinderella Cleaners Lake Park, Palm Beach County
ERIC_5174
Ginger Shirah, Project Manager October 10, 2022
Subject: Negotiation Summary
HW685 DC016B
This Task Assignment authorizes Golder to perform groundwater sampling for analysis of VOCs and PFAS in accordance with the October 4, 2022, Scope of Work and Cost Estimate.
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2: Groundwater Sampling and IDW Management This task includes labor, subcontractor and equipment costs to collect groundwater samples from 23 monitoring wells (shallow zone monitoring wells MW001R, MW002, MW003, MW004, MW005, MW006, MW009, MW010, MW013, MW032, MW033, MW034, MW035, and IW014; and intermediate zone monitoring wells MW011, MW012, MW014, MW015 MW019, MW020, MW026, MW027, and MW036) to be analyzed for chlorinated volatile organic compounds (VOCs) via EPA Method 8260B. Golder requested bids for the IDW drum disposal and Erwin was selected with the lowest bid.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $19,454.72 with 116 labor hours.
Golder and the FDEP confirmed on October 4, 2022, that an Access Agreement with the current real property owner of the Cinderella Cleaners (ERIC_5174) site has been executed.
Printed on recycled paper.
FDEP COST ESTIMATEContractor: Golder Associates USA Inc.
Date: 10/4/2022
Date: DC016B SubTask 1 Project Management SubTask 6
Date: Cinderella Cleaners SubTask 2 Annual GW Monitoring SubTask 7
Date: Assessment SubTask 3 Reporting SubTask 8
Date: Ginger Shirah SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$51.23 Project Manager (RFM) 11 10.8 $0.00 Program Leader - X-14 0 0 0 0 0 0 0 0 0 0
$63.65 Practice Leader - X-13 (JB) 3 0 3 0 0 0 0 0 0 0 $59.62 Senior Consultant - X-12 (MCC) 0 0 0 0 0 0 0 0 0 0 $51.23 Senior Sci/Eng - X-11 (RFM) 24 8 16 0 0 0 0 0 0 0 $45.42 Senior Project Sci/Eng - P-10 (BL) 4 0 4 0 0 0 0 0 0 0
$0.00 Project Sci/Eng - P-10 (JT) 0 0 0.0 0.0 0 0 0 0 0 0 $38.61 Project Sci/Eng - P-9 (LS) 36 36 0 0 0 0 0 0 0 0 $33.32 Staff Sci/Eng - P-8 (JS) 35 35 0 0 0 0 0 0 0 0 $32.75 Staff Sci/Eng - P-8 (AS) 3 0 3 0 0 0 0 0 0 0
$0.00 Sci/Eng/Admin - P-7 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 116 10.8 79.0 26.0 0.0 0 0 0 0 0 0
Direct Labor $4,809.91 $553.35 $2,966.00 $1,290.56 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.50% $8,297.10 $954.53 $5,116.35 $2,226.22 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $13,107.01 $1,507.88 $8,082.35 $3,516.78 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GOLDER Page 1
FDEP COST ESTIMATEContractor: Golder Associates USA Inc.
Date: 10/4/2022
Date: DC016B SubTask 1 Project Management SubTask 6
Date: Cinderella Cleaners SubTask 2 Annual GW Monitoring SubTask 7
Date: Assessment SubTask 3 Reporting SubTask 8
Date: Ginger Shirah SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $480.00 $480.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $822.00 $822.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $1,302.00 $1,302.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $220.00 $220.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $220.00 $220.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $22.00 $22.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $242.00 $242.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $1,789.00 $1,789.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $220.00 $220.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $2,009.00 $2,009.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $1,164.00 $1,164.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $200.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,484.00 $1,484.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $18,144.01 $1,507.88 $13,119.35 $3,516.78 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,310.71 $150.79 $808.24 $351.68 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $19,454.72 $1,658.67 $13,927.59 $3,868.46 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GOLDER Page 2
SITE : Cinderella Cleaners SUBTASK 2: Annual GW Monitoring
DATE: 10/4/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Sci/Eng (R. Mongillo) 8
Project Sci/Eng (L. Swindle) 36
Staff Sci/Eng (J. Spengler) 35
TOTAL LABOR 79
VEHICLE TYPE RATE UNIT USEAGE
Truck (S. Neal) $120.00 Per Day 4 $480.00
TOTAL VEHICLE $480.00
PER DIEM STAFF RATE UNIT USEAGE
Per Diem Project Sci/Eng (L. Swindle) $36.00 Per Day 4 $144.00 Per Diem Project Sci/Eng (J. Spengler) $36.00 Per Day 4 $144.00
Hotel Project Sci/Eng (L. Swindle) $89.00 Per Day 3 $267.00 Hotel Project Sci/Eng (J. Spengler) $89.00 Per Day 3 $267.00
TOTAL PER DIEM $822.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin IDW devel and sampling water $110.00 Per Drum 2 $220.00
TOTAL $220.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Chlorinated VOCs - EPA Method 8260B
Total VOHs EPA Method 8260B $73.00 23 $1,679.00 Total VOCs EPA Method 8021 - IDW $110.00 1 $110.00
Sample Shipping Small $110.00 2 $220.00
TOTAL LAB $2,009.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Miscellaneous Expendables $40.00 Per Day 3 $120.00 Shallow Groundwater Sampling Kit $290.00 Per Day 3 $870.00 Tubing, Poly HDPE $0.30 Per Day 750 $225.00 Tubing, Silicon 3/16 x 3/8 $3.00 Per Day 23 $69.00 Drum, 55-gallon $100.00 Per Day 2 $200.00
TOTAL EQUIPMENT $1,484.00
Contact property owner and DEP scheduling field work, collect depth to water measurements and groundwater samples from shallow zone wells MW001R, MW002, MW003, MW004, MW005, MW006, MW009, MW010, MW013, MW026, MW032, MW033, MW034, MW035, and IW014; and intermediate zone wells MW011, MW012, MW014, MW015, MW019, MW020, MW027, and MW036 for chlorinated VOC analysis, and profiling and securing IDW for transportation and disposal.
Communication with RPO and verification of property ownership prior to site access (2 hours), prepare and submit field notes, sample forms, laboratory report in an email deliverable to the DEP (4 hrs), and characterization and waste profile for transportation and disposal of purge water IDW drum(s) (2 hours). .
Conduct groundwater sampling event. Mobilization from Jacksonville to Lake Park (8 hours round trip), obtain field equipment (1 hour), instrument calibration, groundwater measure water levels, and sample shallow zone wells MW001R, MW002, MW003, MW004, MW005, MW006, MW009, MW010, MW013, MW032, MW033, MW034, MW035, and IW014; and intermediate zone wells MW011, MW012, MW014, MW015, MW019, MW020, MW026, MW027, and MW036, measure field parameters, and securing the IDW drum(s) (27 hours).
Conduct groundwater sampling event. Mobilization from Jacksonville to Lake Park (8 hours round trip), instrument calibration, groundwater measure water levels, and sample shallow zone wells
MW001R, MW002, MW003, MW004, MW005, MW006, MW009, MW010, MW013, MW032,
MW033, MW034, MW035, and IW014; and intermediate zone wells MW011, MW012, MW014, MW015, MW0019, MW020, MW026, MW027, and MW036, measure field parameters, and securing the IDW drum(s) (27 hours).
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Cinderella Cleaners SUBTASK 3: Reporting
DATE: 10/4/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Practice Leader (J. Brown) 3
Senior Sci/Eng (R.Mongillo) 16
Senior Project Sci/Eng (B. Lucero) 4
Staff Sci/Eng (A. Strayer) 3
TOTAL LABOR 26
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
Data entry, prepare tables and figures, and draft Annual Monitoring Report
CADD Update Figures (two groundwater flow and two CVOC detections).
Develop conclusions and recommendations and prepare final Annual Monitoring Report.
Reporting: Updating tables, document production, binding and shipping. Create pdf for OCULUS.
FINAL --7/24/96
Golder Associates USA Inc.
9428 Baymeadows Road, Suite 400, Jacksonville, Florida, USA 32256
T: +1 904 363-3430 F: +1 904 363-3445 golder.com
October 4, 2022 Proposal No. 202208346
Ms. Ginger Shirah Florida Department of Environment Protection Division of Waste Management Drycleaning Solvent Cleanup Program 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400
RE: COST PROPOSAL FOR CINDERELLA CLEANERS
2023 ANNUAL GROUNDWATER MONITORING
1454 10TH STREET
LAKE PARK, PALM BEACH COUNTY, FLORIDA
FACILITY ID NUMBER: ERIC_5174
PROPOSED TASK ASSIGNMENT: HW685__DC016B
Dear Ms. Shirah:
Golder Associates USA Inc. (Golder) is pleased to provide the Florida Department of Environmental Protection (DEP) with this cost proposal for groundwater monitoring at the Cinderella Cleaners site, located in Lake Park, Palm Beach County, Florida. This proposal includes a description of the proposed scope of services, level of effort (LOE) sheets for each subtask, and a Cost Estimate Form (CEF) that summarizes the costs of the proposed services.
The scope of work is based on the recommendations provided by Golder in the 2022 Annual Groundwater Monitoring Report dated September 28, 2022. The proposed scope of services is described below.
SUBTASK 1 – PROJECT MANAGEMENT
To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with DEP. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submission of project invoices in accordance with DEP Drycleaning Solvent Cleanup Program requirements. The project manager will be responsible seeing that the work is conducted in a manner that is consistent with the requirements of the DEP approved task assignment.
SUBTASK 2 – ANNUAL GROUNDWATER MONITORING
Golder will mobilize to the site and collect groundwater samples from the following monitoring wells: shallow zone monitoring wells MW001R, MW002, MW003, MW004, MW005, MW006, MW009, MW010, MW013, MW032, MW033, MW034, MW035, and IW014; and intermediate zone monitoring wells MW011, MW012, MW014, MW015, Ms. Ginger Shirah Proposal No. 202208346
Florida Department of Environment Protection October 4, 2022
MW019, MW020, MW026, MW027, and MW036. Golder also recommended replacing previously abandoned monitoring wells MW016 and MW018 in the 2022 annual groundwater monitoring report but that was not approved at the time of this proposal preparation. The attached figures (Figures 4 and 5) from the September 28, 2022 annual groundwater monitoring report showing the chlorinated volatile organic compound (VOC) results for the shallow and intermediate zones of the surficial aquifer.
Prior to groundwater sampling, the depth to groundwater will be at the wells that are sampled using an electronic water level indicator to determine groundwater elevations and flow direction. During the sampling event, the locks and well caps will be inspected for damage or degradation and repaired or replaced as necessary. Groundwater samples will be collected from the wells in accordance with DEP Standard Operating Procedures (SOPs) for Field Activities (DEP-SOP-001/01) dated January 2017 (effective April 16, 2018). Prior to collecting the groundwater sample, each well will be purged and field parameters including temperature, pH, specific conductance, dissolved oxygen, turbidity, and oxidation-reduction potential will be monitored. Purge volumes and field parameters will be recorded on field data sheets, and the field monitoring equipment will be calibrated in accordance with the manufacturer’s recommended procedures.
Groundwater samples will be collected using low flow sampling methods. The groundwater samples will be placed in laboratory-supplied containers, labeled with a unique identification number attached to the outside of the sample container, preserved on ice in a laboratory-provided cooler at a maximum temperature of four degrees Celsius, and delivered to a Florida Department of Health and National Environmental Laboratory Accreditation Program-certified fixed-base laboratory along with the completed chain-of-custody documentation to be analyzed for chlorinated VOCs using EPA Method 8260B.
Golder will temporarily store the investigation derived waste (IDW) purge water generated from the groundwater sampling event in a 55-gallon steel drum(s). A waste characterization sample will be collected from the IDW drum(s) for analysis of total VOCs using EPA Method 8021. If the waste characterization sample is acceptable to the disposal subcontractor, the IDW drum(s) will be picked up and transported to a facility for proper disposal. A non-hazardous waste manifest will be provided by the disposal subcontractor upon delivery to the disposal facility.
Upon completion of Subtask 2, an e-mail deliverable will be submitted and include copies of the field data sheets, equipment calibration forms, field notes, laboratory analytical report, and laboratory chain-of-custody documentation.
SUBTASK 3 – REPORTING
The annual groundwater monitoring report will include a description of the sampling procedures, evaluation of the analytical results, comparison of current to historical data, tabulated summary of the current and historical analytical data, a site map showing the groundwater analytical results, water level elevation information in tables and figures, laboratory analytical data, conclusions, and recommendations.
HEALTH AND SAFETY
Golder will update the existing site-specific Health and Safety Plan for the field work. The work will be completed in accordance with Golder’s safety policies and procedures. At a minimum, Golder will wear safety glasses, high visibility safety vests, and steel-toed boots. A safety job briefing will be conducted prior to the start of work activities, and anytime the scope of work or site conditions change.
Ms. Ginger Shirah Proposal No. 202208346
Florida Department of Environment Protection October 4, 2022
COST AND SCHEDULE
The estimated cost to complete the proposed scope of work is $19,454.72. Golder anticipates the groundwater monitoring event will take place in March 2023. The LOE/CEF sheets and the subcontractor bids are included in Attachment A. The following table summarizes the proposed costs and deliverable schedule.
Task Proposed Cost Proposed Schedule and Deliverables
Subtask 1: Project Management $ 1,658.67 May 12, 2023
Subtask 2: Annual Groundwater Monitoring
$ 13,927.59 April 7, 2023 (Field notes, sampling logs, IDW disposal, and laboratory report submittal)
Subtask 3: Reporting $ 3,868.46 May 12, 2023 (Groundwater Monitoring Report)
Total/Completion Date $ 19,454.72 June 30, 2023
Please be aware that Golder has been acquired by and is now a Member of the WSP family of companies. Golder remains as a legal entity and is the proposed contracting entity for this proposal. We are in the process of integrating the resources of our companies. Correspondence for this proposal should continue to be addressed to the undersigned.
Golder appreciates the opportunity to provide services under the Drycleaning Solvent Cleanup Program. Should you require additional information or clarifications, please contact us at 904 363-3430.
Sincerely, Golder Associates USA Inc.
Ralph F. Mongillo, Jr. PG Jesse C. Brown, PE Lead Consultant / Senior Geologist Director, Environmental Engineer
RFM/JCB/as
Attachments: Figure 4 Groundwater Characterization in the Shallow Zone of the Surficial Aquifer
Figure 5 Groundwater Characterization in the Intermediate Zone of the Surficial Aquifer
Attachment A - Level of Effort Sheets and Cost Estimate Form Attachment B - Subcontractor Bids
G:\Projects\DEP-Drycleaning\Projects\West Palm\Cinderella Cleaners - HW685\DC016B - 2023 Annual GW Mon\DC016B 2023 Annual Groundwater Monitoring Proposal ERIC_5174.docx
MW016
MW018
IW014
IW013
MW028
MW008
MW036
MW015
MW027
MW009
MW002MW007
MW010
MW001R MW032
MW034
MW004
MW033
MW003
MW011
MW005
MW035
MW012
MW013
MW014
MW026
PRP-1
MW019
MW020
MW006
in
31404452.5174 Control No.
5174-DC016A-004
FIGURE
2022-08-31
BCL
SJRS
SJRS
JCB
FL. DEPT. OF ENVIRONMENTAL PROTECTION
PROJECT NO. REV.
PROJECT
CINDERELLA LAUNDRY AND CLEANERS
1454 10th STREET, LAKE PARK
PALM BEACH COUNTY, FLORIDA
TITLE
GROUNDWATER CHARACTERIZATION IN THE SHALLOW ZONE
OF THE SURFICIAL AQUIFER
CLIENT
CONSULTANT
PREPARED
DESIGNED
REVIEWED
APPROVED
YYYY-MM-DD
IF
T
H
IS
M
EA
SU
R
EM
EN
T D
O
ES
N O
T M
AT
C
H W
H
AT
IS
S
H O
W N
, T H
E
SH
EE
T
SI
ZE
H
AS
B
EE
N M
O D
IF
IE
D F
R O
M : A
N
SI
B
Pa th
\g ol de r.g ds
\c om pl ex da ta
\O ffi ce \J ac ks on vi lle \d ra fti ng \P ro je ct s\
FD
EP
\F D
EP
-D
C \3
2\
_5
4_ C in de re lla
C le an er s\ D
C
6A \A ct iv e D ra w in gs
Fi le
N am e:
4-
D C
6A
-0
.d w g
DRAFT
APPROXIMATE SCALE
80 160
FEET
SHALLOW MONITORING WELL
LEGEND
DEEP MONITORING WELL
1. AERIAL IMAGE TAKEN FROM FL. DEPT. OF TRANSPORTATION - APLUS,
PUBLISHED MAY 31, 2021.
2. PROPERTY BOUNDARY TAKEN FROM FLORIDA DEPARTMENT OF REVENUE.
REFERENCE(S)
INTERMEDIATE MONITORING WELL
NOTE(S)
MW001 Sample ID 5 - 10 ft-bgs Screen Interval (feet below ground surface)
8/12/19 Date Sampled
3 300 Tetrachloroethene (PCE)
3 300 Trichloroethene (TCE)
70 700 Cis-1,2-Dichloroethene (DCE)
1 100 Vinyl Chloride (VC)
NADCsGCTLs
1. ALL RESULTS ARE REPORTED IN MICROGRAMS PER LITER (µg/L).
2. U - INDICATES THAT THE COMPOUND WAS ANALYZED FOR BUT NOT
DETECTED
3. I- REPORTED VALUE IS BETWEEN THE LABORATORY METHOD
DETECTION LIMIT AND LABORATORY PRACTICAL QUANTITATION LIMIT
4. BOLD FONT AND YELLOW SHADED CELL INDICATES AN EXCEEDANCE OF
THE APPLICABLE GCTL.
5. BOLD FONT AND BLUE SHADED CELL INDICATES AN EXCEEDANCE OF
THE APPLICABLE NADC.
6. GCTL - GROUNDWATER CLEANUP TARGET LEVEL PER CHAPTER 62-777,
TABLE I OF THE FLORIDA ADMINISTRATIVE CODE (FAC).
7. NADC - NATURAL ATTENUATION DEFAULT CONCENTRATION PER
CHAPTER 62-777, TABLE V OF THE FLORIDA ADMINISTRATIVE CODE (FAC)
8. NS - NOT SAMPLED.
MW001R
5 - 10 ft-bgs 10/10/19 11/04/20 05/04/21 06/09/22
0.48 U 0.48 U 0.48 U 0.38 U
0.46 U 0.46 U 0.46 U 0.36 U
0.48 U 0.48 U 0.48 U 0.83 U
0.12 U 11 0.12 U 2.2
MW002
9.8 - 19.8 ft-bgs
05/05/09 11/10/09 05/23/10 11/17/10
0.28 U 0.20 U 0.20 U 0.20 U
0.069 U 0.26 U 0.26 U 0.26 U
1.4 1.6 1.7 2.3
4.2 4.0 4.6 3.5
MW003
9 - 19 ft-bgs
11/22/08 05/05/09 11/10/09 05/23/10
0.49 I J 0.5 I 0.33 I 0.37 I
0.069 U 0.069 U 0.26 U 0.26 U
0.17 U 0.17 U 0.22 U 0.22 U
0.16 U 0.16 U 0.29 U 0.29 U
MW005
9.5 - 19.5 ft-bgs
10/10/19 11/04/20 05/04/21 06/09/22
0.48 U 0.48 U 0.48 U 0.38 U
0.46 U 0.46 U 0.46 U 0.36 U
0.48 U 33 0.48 U 0.83 U
0.12 U 170 0.12 U 1.0
MW006
9.9 - 19.9 ft-bgs
10/10/19 11/04/20 05/04/21 06/09/22
0.48 U 0.48 U 0.48 U 0.38 U
0.46 U 180 0.46 U 0.36 U
0.48 U 10 7.1 4.1
930 670 660 2,230
MW009
10.1 - 20.1 ft-bgs
11/22/08 05/05/09 11/10/09 05/23/10
0.28 U Q 1.4 U 1.0 U 1.0 U
0.069 U Q 0.34 U 1.3 U 1.3 U
88 Q 49 46 32 92 Q 74 130 73
MW011
18.7 - 28.7 ft-bgs
10/10/19 11/04/20 05/04/21 06/09/22
0.48 U 0.48 U 0.48 U 0.38 U
0.46 U 0.46 U 0.46 U 1.8
0.48 U 0.48 U 0.48 U 458
9.6 24 160 2170
MW012
15.2 - 25.2 ft-bgs
11/22/08 05/04/09 11/09/09 05/23/10
0.28 U 0.28 U 0.20 U 0.20 U
0.069 U 0.19 U 0.26 U 0.26 U
0.77 I 0.75 I 0.63 I 0.63 I
7.0 1.8 1.3 2.0
MW013
9.5 - 19.5 ft-bgs
10/10/19 11/04/20 05/04/21 06/09/22
0.48 U 0.48 U 0.48 U 0.38 U
0.46 U 0.46 U 0.46 U 0.36 U
0.48 U 0.48 U 0.48 U 0.83 U
0.12 U 0.87 I 6.2 2.2
MW014
14.7 - 24.7 ft-bgs
11/22/08 05/04/09 11/09/09 05/24/10
0.28 U 0.28 U 0.20 U 0.20 U
0.069 U 0.069 U 0.26 U 0.26 U
0.17 U 0.17 U 0.22 U 0.22 U
0.16 U 0.16 U 0.29 U 0.29 U
MW019
23.3 - 33.3 ft-bgs
11/09/17 10/10/18 10/10/19 11/04/20
0.48 U 0.48 U 0.48 U 0.48 U
0.46 U 0.46 U 0.46 U 0.46 U
0.48 U 0.48 U 0.48 U 1.48 U
0.12 U 1.3 0.12 U 1.4
MW020
25.8 - 35.8 ft-bgs
11/09/17 10/10/18 10/10/19 11/04/20
0.48 U 0.48 U 0.48 U 0.48 U
0.46 U 0.46 U 0.46 U 0.46 U
0.48 U 0.48 U 0.48 U 0.48 U
5.2 0.93 I 0.12 U 3.0
MW032
10 - 15 ft-bgs
10/10/19 11/04/20 05/04/21 06/09/22
0.48 U 0.48 U 0.48 U 0.38 U
0.46 U 0.46 U 0.46 U 0.36 U
0.48 U 0.48 U 0.48 U 0.83 U
0.12 U 1.2 0.12 U 14.6
MW033
10 - 15 ft-bgs
11/08/17 10/09/18 10/10/19 11/04/20
0.48 U 0.48 U 0.48 U 0.48 U
0.46 U 0.46 U 0.46 U 0.46 U
0.48 U 0.8 I 0.48 U 0.48 U
11 6.6 0.12 U 3.7
MW034
10 - 20 ft-bgs
11/08/17 10/09/18 10/10/19 11/04/20
0.48 U 0.48 U 0.48 U 0.48 U
0.46 U 0.46 U 0.46 U 0.46 U
4.10 0.48 U 0.48 U 0.48 U 170 0.12 U 0.12 U 0.12 U
MW035
10 - 20 ft-bgs
10/09/19 11/04/20 05/04/21 06/09/22 18 0.48 U 0.48 U 6.5 920 43 800 1,730
0.48 U 24 800 2,500
430 85 530 4,120
MW004
10.2 - 20.2 ft-bgs
08/08/07 11/16/10 11/04/20
1.3 0.77 I 0.48 U
0.13 U 0.26 U 0.46 U
1.7 0.22 U 0.48 U
0.058 U 0.29 U 0.12 U
MW001
5 - 10 ft-bgs
07/22/04
3.67 7.35 6.52
MW007
11/17/10
0.20 U
0.26 U
0.22 U
0.29 U
DESTROYED/ABANDONED MONITORING WELL
INJECTION WELL POINT
GCTL EXCEEDANCE CONTOUR
NADC EXCEEDANCE CONTOUR
IW014
14.7 - 24.7 ft-bgs
10/09/19 11/04/20 05/04/21 06/09/22 1300 2600 760 0.38 U 3700 5200 5600 56.9
67.0 3400 3500 882 430 580 460 382
PARCEL BOUNDARY
NORTHLAKE BOULEVARD
NORTHLAKE BOULEVARD
PR
O
SP
ER
IT
Y
FA
R
M S
R O
AD
10th STREET
MW016
MW018
IW014
IW013
MW028
MW008
MW036
MW015
MW027
MW009
MW002MW007
MW010
MW001R MW032
MW034
MW004
MW033
MW003
MW011
MW005
MW035
MW012
MW013
MW014
MW026
PRP-1
MW019
MW020
MW006
in
31404452.5174 Control No.
5174-DC016A-004
FIGURE
2022-08-31
BCL
SJRS
SJRS
JCB
FL. DEPT. OF ENVIRONMENTAL PROTECTION
PROJECT NO. REV.
PROJECT
CINDERELLA LAUNDRY AND CLEANERS
1454 10th STREET, LAKE PARK
PALM BEACH COUNTY, FLORIDA
TITLE
GROUNDWATER CHARACTERIZATION IN THE INTERMEDIATE
ZONE OF THE SURFICIAL AQUIFER
CLIENT
CONSULTANT
PREPARED
DESIGNED
REVIEWED
APPROVED
YYYY-MM-DD
IF
T
H
IS
M
EA
SU
R
EM
EN
T D
O
ES
N O
T M
AT
C
H W
H
AT
IS
S
H O
W N
, T H
E
SH
EE
T
SI
ZE
H
AS
B
EE
N M
O D
IF
IE
D F
R O
M : A
N
SI
B
Pa th
\g ol de r.g ds
\c om pl ex da ta
\O ffi ce \J ac ks on vi lle \d ra fti ng \P ro je ct s\
FD
EP
\F D
EP
-D
C \3
2\
_5
4_ C in de re lla
C le an er s\ D
C
6A \A ct iv e D ra w in gs
Fi le
N am e:
4-
D C
6A
-0
.d w g
DRAFT
APPROXIMATE SCALE
80 160
FEET
MW008
31.1 - 41.1 ft-bgs
11/17/10
0.20 U
0.26 U
0.22 U
0.29 U
MW016
30 - 40 ft-bgs
11/08/11 11/15/12 03/18/14 09/20/16
0.20 U 0.19 U 0.15 U 0.48 U
0.26 U 0.16 U 0.13 U 0.46 U
0.66 I 0.33 I 1.3 10
29 18 J3 29 110
MW018
25.9 - 35.9 ft-bgs
05/10/08 11/22/08 05/04/09 11/09/09
0.28 U 0.28 U 0.28 U 0.20 U
0.069 U 0.069 U 0.069 U 0.26 U
9.2 15 10 1.8 12 18 9.9 8.7
MW027
29.7 - 39.7 ft-bgs
11/22/08 05/04/09 11/09/09 05/24/10
0.28 U 0.28 U 0.20 U 0.20 U
0.069 U 0.069 U 0.26 U 0.26 U
5.1 0.31 I 0.31 I 0.22 U 15 1.6 3.1 0.53 I
MW036
20 - 30 ft-bgs
11/08/16 10/09/18 10/09/19 11/04/20
0.48 U 0.48 U 0.48 U 0.48 U
10 5.4 0.46 U 0.46 U 10 5.4 0.48 U 0.48 U
3.5 0.12 U 0.12 U 0.12 U
SHALLOW MONITORING WELL
LEGEND
DEEP MONITORING WELL
1. AERIAL IMAGE TAKEN FROM FL. DEPT. OF TRANSPORTATION - APLUS,
PUBLISHED MAY 31, 2021.
2. PROPERTY BOUNDARY TAKEN FROM FLORIDA DEPARTMENT OF REVENUE.
REFERENCE(S)
INTERMEDIATE MONITORING WELL
NOTE(S)
NADCsGCTLs
1. ALL RESULTS ARE REPORTED IN MICROGRAMS PER LITER (µg/L).
2. U - INDICATES THAT THE COMPOUND WAS ANALYZED FOR BUT NOT
DETECTED
3. I- REPORTED VALUE IS BETWEEN THE LABORATORY METHOD
DETECTION LIMIT AND LABORATORY PRACTICAL QUANTITATION LIMIT
4. BOLD FONT AND YELLOW SHADED CELL INDICATES AN EXCEEDANCE OF
THE APPLICABLE GCTL.
5. BOLD FONT AND BLUE SHADED CELL INDICATES AN EXCEEDANCE OF
THE APPLICABLE NADC.
6. GCTL - GROUNDWATER CLEANUP TARGET LEVEL PER CHAPTER 62-777,
TABLE I OF THE FLORIDA ADMINISTRATIVE CODE (FAC).
7. NADC - NATURAL ATTENUATION DEFAULT CONCENTRATION PER
CHAPTER 62-777, TABLE V OF THE FLORIDA ADMINISTRATIVE CODE (FAC)
8. NS - NOT SAMPLED.
DESTROYED/ABANDONED MONITORING WELL
INJECTION WELL POINT
GCTL EXCEEDANCE CONTOUR
NADC EXCEEDANCE CONTOUR
PARCEL BOUNDARY
MW016 Sample ID 30 - 40 ft-bgs Screen Interval (feet below ground surface)
8/12/19 Date Sampled
3 300 Tetrachloroethene (PCE)
3 300 Trichloroethene (TCE)
70 700 Cis-1,2-Dichloroethene (DCE)
1 100 Vinyl Chloride (VC)
NORTHLAKE BOULEVARD
NORTHLAKE BOULEVARD
PR
O
SP
ER
IT
Y
FA
R
M S
R O
AD
10th STREET
5/10/22, 12:47 PM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19536 1/2
Quote Number: 19536
QUOTE
QUOTED TO:
QUOTE DATE: 1/1/2022
COMPANY NAME: WSP / Golder QUOTED BY: Craig Burns
PHONE NUMBER:
Ext.
FAX NUMBER:
PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials
CUSTOMER PO:
CONTACT EMAIL:
SITE ADDRESS: TBD
CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING
COST ESTIMATE FOR
THE SITE/ PROJECT LISTED ABOVE.
DESCRIPTION PRICE QTY. UNIT TOTAL
NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00
NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00
TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$30.00 DRUM $0.00
TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$40.00 DRUM $0.00
TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site
$50.00 DRUM $0.00
Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax
$0.00 . $0.00
HAZ Drums to be quoted case-by-case $0.00 . $0.00
OPTIONAL LINE ITEMS
***10% FSC applied to the total cost of the invoice*** $0.00 . $0.00
TOTAL REQUIRED ITEMS $0.00
TOTAL OPTIONAL ITEMS $0.00
GRAND TOTAL $0.00
NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups.
**Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's**PFAS drum rates are the same as the Petro/Drycleaner NonHaz Drums rates T&D.**Haz rates will be quoted case-by-case** Craig Burns
863.327.6289 - cburns@clarkenv.com
Name (print) Title mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight
5/10/22, 12:47 PM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19536 2/2
Signature Date
CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854
WWW.ClarkEnvironmental.com
From: Fred Portofe To: Mongillo, Ralph Cc: Madison Rogers; Roger Pragle; Crews, Matt Subject: RE: Investigative Derived Waste Drum Costs for Transportation and Disposal at a Regulated Facility Date: Wednesday, March 9, 2022 9:33:38 AM Attachments: F0152F28A2B5418EBC7A4FD870EC8D28.png
AD282F6C3391468088CDA42829B8E703.png A719914B10184314957B0CA910CA8D14.png F1DF3C4322764E8A9076F1ADFF76864A.png 3409DF389C3B4156BA232DDC85C60E09.png
EXTERNAL EMAIL
EXTERNAL EMAIL - We could not verify the authenticity of this message. Please be cautious when clicking on links or opening attachments.
Ralph
We are not going to provide annual Pricing for the Statewide Contract . After reviewing the scope with my partners and the variability with respect to disposal costing and ever changing fuel costs, we feel we can not bid this work given the current uncertainty in the market. We would be please to bid this work on a casa by case basis.
Fred G. Portofe, PG President of Environmental Services (Professional Geologist in FL, GA, AL, MS, TX, SC, NC, TN, IN, LA, WI and AK) M & D Industrial Services, LLC 5896 Azalea Street Port Orange, Florida 32127 Email: Fportofe@mdindustrialservices.com Website: mdindustrialservices.com Cell: 813-951-1012 Emergencies: 888-307-2790
Sent from Mail for Windows
From: Mongillo, Ralph Sent: Tuesday, March 8, 2022 12:46 PM To: Fred Portofe Cc: Madison Rogers; Roger Pragle; Eddy Mendoza; Crews, Matt mailto:fportofe@mdindustrialservices.com mailto:ralph.mongillo@wsp.com mailto:mrogers@mdindustrialservices.com mailto:rpragle@mdindustrialservices.com mailto:matt.crews@wsp.com mailto:Fportofe@mdindustrialservices.com https://nam10.safelinks.protection.outlook.com/?url=http%3A%2F%2Fmdindustrialservices.com%2F&data=04%7C01%7Cmculbreth%40ectinc.com%7Cbfdc4a6d2ce945e1eaf008d9dcf8eabf%7C911eb1cc54d34d8ca5773bf3ccc8105c%7C0%7C0%7C637783784008834159%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C2000&sdata=ntkZP1OGe7McYRA722JXtcGwkbgN9EEhQtSgBSKqC3E%3D&reserved=0 https://go.microsoft.com/fwlink/?LinkId=550986 mailto:Ralph_Mongillo@golder.com mailto:fportofe@mdindustrialservices.com mailto:mrogers@mdindustrialservices.com mailto:rpragle@mdindustrialservices.com mailto:emendoza@mdindustrialservices.com mailto:Matt_Crews@golder.com
| HW005A - Jet Cleaners PFAS Sampling Proposal.pdf |
| Jet - Figures 5-6.pdf |
| Sheets and Views |
| 1 SITE LOCATION MAP |
| 2 SITE PLAN |
| 3 POTENTIOMETRIC MAP SHALLOW SURFICIAL AQUIFER |
| 4 POTENTIOMETRIC MAP INTERMEDIATE SURFICIAL AQUIFER |
| 5 GW ANALYTICAL RESULTS SHALLOW SURFICIAL AQUIFER |
| 6 GW ANALYTICAL RESULTS INTERMEDIATE SURFICIAL AQUIFER |