CN-370000-HW685-DC034C.pdf

PDF 14 MB Posted

Attached to
Master Agreement FL|HW685|184b9800bda47b032a54413957b4b38d
Contract number
HW685
Issued by
Florida

About this file

This document is a Task Assignment (TA) entered into between the State of Florida Department of Environmental Protection (DEP) and WSP USA Inc. for environmental remediation services at the Former Hanners Cleaners site located at 35 North Dixie Highway, Pompano Beach, Broward County, Florida. The task assignment is authorized under Contract Number HW685 and assigned the reference number DC034C, with an effective date of August 13, 2025, and a completion date of April 24, 2026. The Department Project Manager is Patrick McGrane (850-245-8899), and the Contractor's Project Manager is Matt Crews (904-363-3430).

WSP USA Inc. will conduct monitoring well installations and groundwater sampling activities across five subtasks with a total contract value of $104,945.26. Subtask 1 covers project management ($5,955.82) through February 27, 2026. Subtask 2 involves monitoring well installation activities ($52,574.51), including utility location services, installation of up to 12 monitoring wells at various depths, well development, and investigation-derived waste (IDW) characterization, with deliverables due October 17, 2025. Subtask 3 includes the first groundwater monitoring event ($21,490.10) with sampling from 37 monitoring wells for chlorinated volatile organic compounds (VOCs) and per- and polyfluoroalkyl substances (PFAS) analysis, due November 14, 2025. Subtask 4 covers PFAS-related costs and IDW transportation and disposal ($4,241.38), including equipment blank sampling and waste profiling, due November 28, 2025. Subtask 5 provides the second groundwater monitoring event ($20,683.45) with sampling from 31 monitoring wells for VOC analysis, due February 27, 2026. The scope of work encompasses 411 total labor hours and includes subcontractor services for utility location (GeoTek Services, $750.00), drilling operations (Earth Tech Drilling, $28,670.00), laboratory analysis, equipment, and IDW transportation and disposal services. Invoicing is structured according to deliverable completion and FDEP approval of submitted field documentation and laboratory reports.

View the file

Other files

File Type Posted
CN-370000-HW685-BF01A.pdf PDF
CN-370000-HW685-BF01CCO1.pdf PDF
CN-370000-HW685-BF02A.pdf PDF
CN-370000-HW685-BF05A.pdf PDF
CN-370000-HW685-BF05ACO1.pdf PDF
CN-370000-HW685-BF1BCO1.pdf PDF
CN-370000-HW685-BIL02C.pdf PDF
CN-370000-HW685-BIL1ACO4.pdf PDF
CN-370000-HW685-BIL2CCO1.pdf PDF
CN-370000-HW685-BIL3ACO1.pdf PDF
CN-370000-HW685-CSS01.pdf PDF
CN-370000-HW685-CSS2ACO2.pdf PDF
CN-370000-HW685-DC001C.pdf PDF
CN-370000-HW685-DC001E.pdf PDF
CN-370000-HW685-DC002B.pdf PDF
CN-370000-HW685-DC002C.pdf PDF
CN-370000-HW685-DC002E.pdf PDF
CN-370000-HW685-DC003C.pdf PDF
CN-370000-HW685-DC004A.pdf PDF
CN-370000-HW685-DC007A.pdf PDF
CN-370000-HW685-DC007B.pdf PDF
CN-370000-HW685-DC008B.pdf PDF
CN-370000-HW685-DC008D.pdf PDF
CN-370000-HW685-DC009A.pdf PDF
CN-370000-HW685-DC009D.pdf PDF
CN-370000-HW685-DC009E.pdf PDF
CN-370000-HW685-DC010C.pdf PDF
CN-370000-HW685-DC012A.pdf PDF
CN-370000-HW685-DC012D.pdf PDF
CN-370000-HW685-DC014B.pdf PDF
CN-370000-HW685-DC016D.pdf PDF
CN-370000-HW685-DC017A.pdf PDF
CN-370000-HW685-DC017B.pdf PDF
CN-370000-HW685-DC018B.pdf PDF
CN-370000-HW685-DC019A.pdf PDF
CN-370000-HW685-DC019C.pdf PDF
CN-370000-HW685-DC01ACO1.pdf PDF
CN-370000-HW685-DC01ECO1.pdf PDF
CN-370000-HW685-DC021A.pdf PDF
CN-370000-HW685-DC021B.pdf PDF
CN-370000-HW685-DC021C.pdf PDF
CN-370000-HW685-DC021E.pdf PDF
CN-370000-HW685-DC022C.pdf PDF
CN-370000-HW685-DC023A.pdf PDF
CN-370000-HW685-DC023D.pdf PDF
CN-370000-HW685-DC024C.pdf PDF
CN-370000-HW685-DC025A.pdf PDF
CN-370000-HW685-DC027D.pdf PDF
CN-370000-HW685-DC028A.pdf PDF
CN-370000-HW685-DC028D.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O.

Object Code

Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev.

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department

Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature)

Date:

Additional signatures attached on separate page.

HW685

DC034C April 24, 2026

This Task Assignment authorizes WSP to conduct monitoring well installations and groundwater sampling at Hanners Cleaners in accordance with the August 12, 2025 Scope of Work, Cost Estimate, and Bid Documentation.

Patrick McGrane 850-245-8899 WSP USA Inc.

Matt Crews 904-363-3430

ERIC_4221

35 North Dixie Highway, Pompano Beach, Broward County

Hanners Cleaners

$ 104,945.26

$ 104,945.26

Scope of Work

WSP USA Inc.

Matthew Crews

Environmental Engineer

8/13/2025

Crews, Matt (USMC700671) Digitally signed by Crews, Matt (USMC700671) Date: 2025.08.13 15:19:32 -04'00' Tim Bahr Digitally signed by Tim Bahr

Date: 2025.08.13 12:12:21 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

BWC TAFORM

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Alexis A. Lambert Secretary

Memorandum

TO: Negotiation File Hanners Cleaners Pompano Beach, Broward County

ERIC_4221

FROM: Patrick McGrane, Project Manager

SUBJECT: Negotiation Summary Task Assignment DC034C (HW685)

DATE: August 1 , 2025

This Task Assignment authorizes WSP USA Inc. (WSP) to conduct monitoring well installations and groundwater sampling at the Hanners Cleaners site.

In April 2025, the DSCP was informed that the City of Pompano Beach was planning the construction of a new city hall. A portion of this building will overlap/sit on top of the Former Hanners Cleaners property.

With access to the property likely being greatly prohibited by this development, it was agreed to install/replace several monitoring wells around the property boundary and at locations of historically high

VOC concentrations.

Quarterly sampling will be performed following installations in an attempt to conditionally close the site using Risk Management Option II (RMO II). The first two quarters are included in this Task Assignment.

The following two quarters, along with reporting, will be approved in a separate TA. This is estimated to be tasked in Q2 2026, when construction timelines are more concrete and preliminary data is available.

The total cost for this project is $10 , . with 4 total labor hours. All work is to be completed in accordance with the August , 2025, Scope of Work, Cost Estimate, and Bid Documentation.

WSP may invoice according to the included schedule.

SITE : Hanners Cleaners SUBTASK 2: Monitoring Well Installation Activities

DATE: 8/12/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Sci/Eng (S. Sider) 12.5

Project Sci/Eng (J. Whipple) 55

Project Sci/Eng (M. Triano) 52

Senior Sci/Eng (B. Lucero) 2

TOTAL LABOR 121.5

VEHICLE TYPE RATE UNIT USEAGE

Truck $480.00 Per Week 1 $480.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

Per Diem J. Whipple $36.00 Per Day 5 $180.00

Per Diem M. Triano $36.00 Per Day 5 $180.00

Hotel J. Whipple Mob day before $150.00 Per Day 5 $750.00

Hotel M. Triano Mob day before $150.00 Per Day 5 $750.00

TOTAL PER DIEM $1,860.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Geotek Utility Locate $750.00 LS 1 $750.00

GWP Drilling $28,670.00 LS 1 $28,670.00

Erwin T&D - Non-Haz PFOS/PFAS Water $195.00 per drum 4 $780.00

TOTAL $30,200.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Chlorinated VOCs - EPA Method 8260B

Total VOCs EPA Method 8021 - IDW $110.00 1 $110.00

Sample Shipping Small $110.00 1 $110.00

TOTAL LAB $220.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Miscellaneous Expendables $40.00 Per Day 5 $200.00

Shallow Groundwater Sampling Kit $290.00 Per Day 1 $290.00

Tubing, Poly HDPE $0.30 Per Foot 25 $7.50

Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 1 $3.00

Monitor Well Installation Kit $325.00 Per Day 4 $1,300.00

Total GPS Station $175.00 Per Day 1 $175.00

TOTAL EQUIPMENT $1,975.50

Verification of property ownership with property access forms prior to monitoring well installation activities (1 hour). Characterize IDW and prepare waste profile for transportation and disposal of IDW (1.5 hours). Negotiation with property owner and development team regarding site condition and scheduled assessment activities (6 hours). Prepare and submit email summary with field data sheets, well construction logs, field notes, and utility locate report (4 hours).

Round Trip from Jacksonville to Pompano Beach (12 hours). Field event preparation (1 hour).

Oversee utility locate and installation of 12 new monitoring wells and IDW sampling and staging;

(10 hours per day x 4 days = 40 hours). Update well construction tables (2 hours).

Round Trip from Jacksonville to Pompano Beach (12 hours). Oversee utility locate and installation of 12 new monitoring wells and IDW sampling and staging; (10 hours per day x 4 days = 40 hours).

Prepare CADD figures with monitoring well locations

SUBTASK 3: Groundwater Monitoring Event 1

DATE: 8/12/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Sci/Eng (S. Sider) 5

Project Sci/Eng (J. Whipple) 58

Project Sci/Eng (M. Triano) 52

Senior Sci/Eng (B. Lucero) 3

TOTAL LABOR 118

VEHICLE TYPE RATE UNIT USEAGE

Truck $480.00 Per Week 1 $480.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

Per Diem J. Whipple $36.00 Per Day 5 $180.00

Per Diem M. Triano $36.00 Per Day 5 $180.00

Hotel J. Whipple Mob day before $150.00 Per Day 5 $750.00

Hotel M. Triano Mob day before $150.00 Per Day 5 $750.00

TOTAL PER DIEM $1,860.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Chlorinated VOCs - EPA Method 8260B

Total VOHs EPA Method 8260B $73.00 37 $2,701.00

Total VOCs EPA Method 8021 - IDW $110.00 1 $110.00

Sample Shipping Large $150.00 2 $300.00

TOTAL LAB $3,111.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Miscellaneous Expendables $40.00 Per Day 5 $200.00

Shallow Groundwater Sampling Kit $1,160.00 Per Week 1 $1,160.00

Tubing, Poly HDPE $0.30 Per Foot 1850 $555.00

Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 37 $111.00

TOTAL EQUIPMENT $2,026.00

Verification of property ownership with property access forms prior to groundwater monitoring activities (1 hour). Prepare and submit email summary with, field documentation, laboratory chain-of-custody, certified laboratory report, and updated tables and figures (4 hours).

Round Trip from Jacksonville to Pompano Beach (12 hours). Field event preparation (1 hour).

Instrument calibration, measure water levels, measure field parameters, collect samples from 37 wells for chlorinated VOC analysis (see Table in proposal), including IDW sampling and staging (10 hours per day x 4 days = 40 hours). Update water level and VOC analytical tables (5 hours).

Round Trip from Jacksonville to Pompano Beach (12 hours). Instrument calibration, measure water levels, measure field parameters, collect samples from 37 wells for chlorinated VOC analysis (see Table in proposal), including IDW sampling and staging (10 hours per day x 4 days = 40 hours).

Prepare CADD figures with water level and VOC analytical data

LEVEL OF EFFORT/EXPENSE WORKSHEET

SUBTASK 4: PFAS Related Costs and IDW T&D

DATE: 8/12/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Sci/Eng (S. Sider) 5.5

Project Sci/Eng (J. Whipple) 11

Project Sci/Eng (M. Triano) 6

Senior Sci/Eng (B. Lucero) 4

TOTAL LABOR 26.5

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin T&D - Non-Haz PFOS/PFAS Water $195.00 per drum 2 $390.00

TOTAL $390.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

PFAS Monitoring Wells $0.00 31 $0.00 PFAS Equipment Blank $0.00 1 $0.00

PFAS IDW $0.00 1 $0.00

TOTAL LAB

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Tubing, Poly HDPE $0.30 Per Day 100 $30.00 Tubing, Silicon 3/16 x 3/8 $3.00 Per Day 2 $6.00 Drum, 55-gallon $100.00 Per Each 2 $200.00

TOTAL EQUIPMENT $236.00

Complete forms to arrange for PFAS sample bottle order delivery and shipment from DEP Central Laboratory (1 hour). Characterize IDW and prepare waste profile for transportation and disposal of IDW (1.5 hours). Prepare and submit email summary with field documentation and certified laboratory report with PFAS results (3 hours).

Collect samples from 31 wells listed in Subtask 3 for PFAS analysis. Collect IDW and equipment blank for PFAS analysis (4 hours). Package and deliver PFAS samples to shipping point for DEP Central Laboratory (2 hours). Prepare data tables with PFAS analytical results (5 hours).

Collect samples from 31 wells listed in Subtask 3 for PFAS analysis. Collect IDW and equipment blank for PFAS analysis (4 hours). Package and deliver PFAS samples to shipping point for DEP Central Laboratory (2 hours).

Prepare CADD Figures with PFAS analytical data.

FINAL --7/24/96

SUBTASK 5: Groundwater Monitoring Event 2

DATE: 8/12/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Sci/Eng (S. Sider) 6.5

Project Sci/Eng (J. Whipple) 53

Project Sci/Eng (M. Triano) 48

Senior Sci/Eng (B. Lucero) 4

TOTAL LABOR 111.5

VEHICLE TYPE RATE UNIT USEAGE

Truck $480.00 Per Week 1 $480.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

Per Diem J. Whipple $36.00 Per Day 5 $180.00

Per Diem M. Triano $36.00 Per Day 5 $180.00

Hotel J. Whipple $150.00 Per Day 4 $600.00

Hotel M. Triano $150.00 Per Day 4 $600.00

TOTAL PER DIEM $1,560.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin T&D - Non-Haz PFOS/PFAS Water $195.00 per drum 2 $390.00

TOTAL $390.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Chlorinated VOCs - EPA Method 8260B

Total VOHs EPA Method 8260B $73.00 31 $2,263.00

Total VOCs EPA Method 8021 - IDW $110.00 1 $110.00

Sample Shipping Large $150.00 2 $300.00

TOTAL LAB $2,673.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Miscellaneous Expendables $40.00 Per Day 5 $200.00

Shallow Groundwater Sampling Kit $1,160.00 Per Week 1 $1,160.00

Tubing, Poly HDPE $0.30 Per Foot 1600 $480.00

Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 32 $96.00

Drum, 55-gallon $100.00 Per Each 2 $200.00

TOTAL EQUIPMENT $2,136.00

Verification of property ownership with property access forms prior to groundwater monitoring activities (1 hour). Characterize IDW and prepare waste profile for transportation and disposal of IDW (1.5 hours). Prepare and submit email summary with, field documentation, laboratory chain-of-custody, certified laboratory report, and updated tables and figures (4 hours).

Round Trip from Jacksonville to Pompano Beach (12 hours). Field event preparation (1 hour).

Instrument calibration, measure water levels, measure field parameters, collect samples from 31 wells for chlorinated VOC analysis (see Table in proposal), including IDW sampling and staging (9 hours per day x 4 days = 36 hours). Update water level and VOC analytical tables (4 hours).

Round Trip from Jacksonville to Pompano Beach (12 hours). Instrument calibration, measure water levels, measure field parameters, collect samples from 31 wells for chlorinated VOC analysis (see Table in proposal), including IDW sampling and staging (9 hours per day x 4 days = 36 hours).

Prepare CADD figures with water level and VOC analytical data

WSP USA Inc.

9428 Baymeadows Road, Suite 400, Jacksonville, Florida 32256 USA

T: +1 904 363-3430 F: +1 904 363-3445 wsp.com

August 12, 2025 Proposal No. 2025US414565.R2

Mr. Patrick McGrane Florida Department of Environmental Protection Division of Waste Management Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400

RE: COST PROPOSAL FOR WELL INSTALLATION AND

GROUNDWATER MONITORING

FORMER HANNERS CLEANERS

35 NORTH DIXIE HIGHWAY (FORMERLY 209 WEST ATLANTIC BOULEVARD)

POMPANO BEACH, BROWARD COUNTY, FLORIDA

DEP FACILITY ID NUMBER: ERIC_4221

PROPOSED TASK ASSIGNMENT: DC034C

Dear Mr. McGrane:

WSP USA Inc. (WSP) is pleased to provide the Florida Department of Environmental Protection (DEP) with this cost proposal for groundwater monitoring well installation and chlorinated volatile organic compound (VOC) and expanded per- and polyfluoroalkyl substances (PFAS) groundwater monitoring activities at the above-referenced site. This proposal includes a description of the proposed scope of services, level of effort sheets for each subtask, and a cost estimate form that summarizes the costs of the proposed services. The proposed scope of services is based on the recommendations in WSP�s 2024 Annual Groundwater Monitoring Report, subsequent email correspondence, and a teleconference completed on July 14, 2025, are described below.

SUBTASK 1 � PROJECT MANAGEMENT

To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with DEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with DEP Waste Site Cleanup Section requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the DEP-approved task assignment.

Mr. Patrick McGrane Proposal No. 2025US414565.R2

Florida Department of Environmental Protection August 12, 2025

SUBTASK 2 � MONITORING WELL INSTALLATION ACTIVITIES

Site Access and Utility Locate

Following authorization to proceed, WSP will use the Broward County Property Appraiser�s website to verify that the current property owner and relevant offsite property owners have an executed Permission to Enter Property agreement with the DEP. WSP will then coordinate with the real property owner, tenant, and offsite property owners for access to complete the scope of work. WSP or the DEP will attempt to obtain updated Permission to Enter Property forms from relevant property owners prior to and/or during mobilization to the site, as needed. This plan assumes adequate site access will be granted to perform the scope of work.

WSP will obtain the applicable local, county, and state-required permits before implementing the proposed scope of work. The location of underground utilities will be identified and marked. Sunshine State One Call, a utility location service provider, will be contacted at least three working days (72 hours) before any subsurface work begins. Given that the work will be conducted on private property, Sunshine State One Call might not be able to provide details regarding specific utilities across the entire property. Therefore, WSP will use a private utility location company to locate and map shallow subsurface anomalies present in the vicinity of the proposed monitoring well locations.

Monitoring Well Installation

WSP will supervise the installation of up to five shallow zone groundwater monitoring wells (MW003R, MW004R, MW026R, MW035R, and MW043), six intermediate zone monitoring wells (MW009R2, MW010R, MW014R, MW015R, MW032R, and MW033R) and one deep zone groundwater monitoring well (MW044) by a

Florida-licensed drilling subcontractor. Well screens will consist of 3/4-inch or 2-inch diameter, Schedule 40 PVC

(0.010-inch machine slot size, or pre-pack). The well risers will consist of 3/4-inch or 2-inch diameter, Schedule 40

PVC connected to the screens with flush-threaded joints, using an appropriate length to reach the ground surface.

The annular space between the borehole walls and the well screens will be filled with a 20/30 grade silica sand filter pack to approximately one foot above the top of the well screens. A minimum one-foot thick, fine (30/65) grade silica sand seal will be placed above the sand filter pack, and the remainder of the annular space will be filled with a Portland Cement Type II grout seal. The monitoring well construction details are summarized below, and the proposed locations are presented on Figure 1.

Well ID Well Diameter

(inches) Screen Interval

(feet bgs) Total Depth (feet bgs)

Shallow Zone Monitoring Wells

MW003R, MW004R, MW026R,

MW035R, and MW043

0.75 10 � 20 20

Intermediate Zone Monitoring Wells

MW009R2

0.75

30 � 35 35

MW010R, MW014R, and MW015R 34 � 40 40

MW032R 21 � 27 27

MW033R 32 � 38 38

Deep Zone Monitoring Wells

MW044 2 70 � 80 80

Monitoring wells will be completed at the surface with 8-inch diameter bolt-down steel covers inside flush-mounted

2-foot by 2-foot concrete pads, which will be sloped away from the wells to prevent surface water infiltration. The well risers will be capped with water-tight expandable locking plugs. To remove fine-grained particles in the filter pack and those adhered to the borehole walls, and to establish a good hydraulic connection with the aquifer, the newly installed wells will be developed until the purged water remains visibly clear and free of suspended particulate matter, or up to 30 minutes.

Investigation Derived Waste

WSP will containerize the investigation-derived waste (IDW) development water in a 55-gallon drum(s). WSP will collect a waste characterization sample from the drum for analysis of total VOCs. The drum(s) will be temporarily staged onsite, pending waste characterization. For cost-estimating purposes, WSP has assumed that the IDW can be transported and disposed of as non-hazardous waste at an approved facility. The IDW transportation and disposal subcontractor will provide WSP with a non-hazardous waste manifest upon delivery to the disposal facility. WSP estimates that four drums of IDW development water will be generated during the field activities.

Interim Deliverable

Upon completion of Subtask 2, an e-mail deliverable will be submitted, which will include copies of the field data sheets, well construction logs, field notes, and utility locate report (if available).

SUBTASK 3 � GROUNDWATER MONITORING EVENT 1

Groundwater Monitoring

WSP will collect groundwater samples from 37 monitoring wells. The attached Figures 2 through 9 from the June 2024 sampling event show the monitoring well locations, groundwater flow direction, chlorinated VOC results, and PFAS results.

Prior to groundwater sampling, the depth-to-groundwater will be measured at accessible monitoring well locations, using an electronic water level indicator to determine groundwater elevations and flow direction. During the sampling event, the locks and well caps will be inspected for damage or degradation and repaired or replaced, as necessary. Additionally, WSP will attempt to locate all existing onsite monitoring wells as presented on Figure 2

Groundwater sampling activities will be completed in accordance with DEP Standard Operating Procedures (SOPs) for Field Activities (DEP SOP-001/01), dated January 2017 (effective April 16, 2018) and DEP SOPs for Sampling and Analysis of PFAS, dated August 2020. Prior to collecting the groundwater sample, each well will be purged and field parameters including temperature, pH, specific conductance, dissolved oxygen, turbidity, and oxidation-reduction potential will be monitored. Purge volumes and field parameters will be recorded on field data sheets, and the field monitoring equipment will be calibrated in accordance with the manufacturer�s recommended procedures.

The groundwater samples to be analyzed for chlorinated VOCs will be delivered to a Florida Department of Health and National Environmental Laboratory Accreditation Program-certified, fixed-base laboratory along with the completed chain-of-custody documentation. The selected groundwater samples to be analyzed for PFAS will be shipped to the DEP Central Laboratory in Tallahassee, Florida. Upon receipt of the laboratory analytical results, WSP will evaluate the constituent concentrations to determine if offsite notification is required.

The samples will be analyzed as follows:

Sample ID Chlorinated VOCs

(EPA Method 8260D)

PFAS

(DEP SOP: LC-001-3)

Comment

Shallow Zone Monitoring Well (16)

MW001R2 X X Sampled for PFAS and VOC in June 2024

MW002 X X

Sampled for PFAS and VOC in June 2024.

VOCs below GCTL for 3 consecutive events

MW003R X X New Monitoring Well

MW004R X X New Monitoring Well

MW005 X X Sampled for PFAS in June 2024

MW006 X X

Sampled for PFAS in June 2024. VOCs below GCTL for 3 consecutive events

MW007 X X Sampled for PFAS and VOC in June 2024

MW008 X X Sampled for PFAS in June 2024

MW025 X X Sampled for PFAS in June 2024

MW026R X X New Monitoring Well

MW027 X X VOCs below GCTL for 3 consecutive events.

MW035R X X New Monitoring Well.

MW036 X X

Sampled for PFAS in June 2024. VOCs below GCTL for 3 consecutive events

MW041 X X Sampled for PFAS and VOC in June 2024

MW042 X X Sampled for PFAS and VOC in June 2024

MW043 X X New Monitoring Well

Intermediate Zone Monitoring Well (14)

MW009R2 X X New Monitoring Well

MW010R X X New Monitoring Well

MW011 X X Sampled for PFAS in June 2024

MW012 X X Sampled for PFAS in June 2024

MW013 X X VOCs below GCTL for 2 consecutive events

MW014R X X New Monitoring Well

MW015R X X New Monitoring Well

MW017 X --- Offsite

MW018 X --- Offsite

MW019 X --- Offsite

Sample ID Chlorinated VOCs

(EPA Method 8260D)

PFAS

(DEP SOP: LC-001-3)

Comment

MW028 X X Sampled for PFAS and VOC in June 2024

MW032R X X New Monitoring Well

MW033R X X New Monitoring Well

UNKMW001 X X Sampled for PFAS in June 2024

Deep Zone Monitoring Well (7)

MW020 X X VOCs below GCTL for 1 event

MW021 X --- Offsite

MW022R X X New Monitoring Well

MW024 X --- Offsite

MW029 X --- Offsite

MW031 X X VOCs below GCTL for 1 event

MW044 X X New Monitoring Well

Waste Characterization and Quality Assurance/Quality Control (2)

Equipment Blank --- X

Investigative Derived Waste

(IDW)

Total VOCs X

Interim Deliverable

Upon completion of Subtask 3, an e-mail deliverable will be submitted, which will include copies of the field data sheets, equipment calibration forms, field notes, laboratory analytical report, laboratory chain-of-custody documentation, and updated tables and figures.

SUBTASK 4 � PFAS-RELATED COSTS AND IDW TRANSPORTATION AND DISPOSAL

WSP will include costs associated with the expanded PFAS monitoring activities in this subtask. These activities include completing bottle order requests with the DEP Central Laboratory; waste characterization and waste profiling; packaging and shipping PFAS samples to the DEP Central Laboratory; labor involved in sampling wells associated with PFAS analysis only; and IDW transportation and disposal.

Quality Assurance/Quality Control

WSP will collect one equipment blank sample during the groundwater sampling event. The equipment blank will be collected by pumping (peristaltic pump) PFAS-free water through silicon and/or HDPE tubing and into laboratory-supplied containers. The equipment blank will be analyzed for PFAS using DEP SOP: LC001-3 (or similar), as shown in the above table.

Investigation Derived Waste

WSP will containerize the IDW purge water and decontamination water in a 55-gallon drum(s). WSP will collect a waste characterization sample from the drum for analysis of total VOCs using EPA Method 8260D and PFAS using DEP SOP: LC001-3 (or similar), as shown in the above table. The drum(s) will be temporarily staged onsite, pending waste characterization. For cost-estimating purposes, WSP has assumed that the IDW can be transported and disposed of as non-hazardous waste at an approved facility. The IDW transportation and disposal subcontractor will provide WSP with a non-hazardous waste manifest upon delivery to the disposal facility. WSP estimates two drums of IDW purge water will be generated during the field activities.

SUBTASK 5 � GROUNDWATER MONITORING EVENT 2

At a minimum of three months following completion of the Subtask 2 field activities, WSP will return to the site to collect groundwater samples from 31 monitoring wells listed below. The samples will be analyzed for chlorinated VOCs using EPA Method 8260D.

Sample ID Chlorinated VOCs

(EPA Method 8260D)

Shallow Zone Monitoring Well (16)

MW001R2 X

MW002 X

MW003R X

MW004R X

MW005 X

MW006 X

MW007 X

MW008 X

MW025 X

MW026R X

MW027 X

MW035R X

MW036 X

MW041 X

MW042 X

MW043 X

Intermediate Zone Monitoring Well (11)

MW009R2 X

MW010R X

MW011 X

Sample ID Chlorinated VOCs

(EPA Method 8260D)

MW012 X

MW013 X

MW014R X

MW015R X

MW028 X

MW032R X

MW033R X

UNKMW001 X

Deep Zone Monitoring Well (4)

MW020 X

MW022R X

MW031 X

MW044 X

Waste Characterization (1)

Investigative Derived Waste (IDW) Total VOCs

Investigation Derived Waste

WSP will containerize the IDW purge water in a 55-gallon drum. WSP will collect a waste characterization sample from the drum for analysis of total VOCs. The drum(s) will be temporarily staged onsite, pending waste characterization. For cost-estimating purposes, WSP has assumed that the IDW can be transported and disposed of as non-hazardous waste at an approved facility. The IDW transportation and disposal subcontractor will provide WSP with a non-hazardous waste manifest upon delivery to the disposal facility. WSP estimates that two drums of IDW purge water will be generated during the field activities.

Interim Deliverable

Upon completion of Subtask 5, an e-mail deliverable will be submitted, which will include copies of the field data sheets, equipment calibration forms, field notes, laboratory analytical report or laboratory sample login checklist, laboratory chain-of-custody documentation, and updated tables and figures.

HEALTH AND SAFETY

WSP will update the existing site-specific Health and Safety Plan for the fieldwork. The work will be completed in accordance with WSP�s safety policies and procedures. At a minimum, WSP will wear safety glasses, high-visibility safety vests, and steel-toed boots. A safety job briefing will be conducted prior to the start of work activities, and anytime the scope of work or site conditions change.

COST AND SCHEDULE

The estimated cost to complete the proposed scope of work is $104,945.26. WSP anticipates well installation activities will take place in late August or early September 2025; Groundwater Monitoring Event 1 will take place in September 2025; and Groundwater Monitoring Event 2 will take place in December 2025. The level of effort sheets and cost estimate form are included in Attachment A. The utility locate, drilling services, and IDW disposal subcontractor quotes are included in Attachment B. The following table summarizes the proposed costs and deliverable schedule.

Task Proposed Cost Proposed Schedule/Deliverables

Subtask 1 � Project Management $ 5,955.82 February 27, 2026

Subtask 2 � Monitoring Well Installation Activities

$ 52,574.51 October 17, 2025 (Email summary with field data sheets, well construction logs, field notes, and utility locate report (if available).

Subtask 3 � Groundwater Monitoring Event 1

$ 21,490.10

November 14, 2025 (E-mail summary with field data sheets, equipment calibration forms, field notes, laboratory analytical report, laboratory chain-of-custody documentation, and updated tables and figures.)

Subtask 4 � PFAS-Related Costs and IDW Transportation and Disposal

$ 4,241.38

November 28, 2025 (E-mail summary with field documentation and certified laboratory analytical report for PFAS and non-hazardous waste manifest for IDW)

Subtask 5 � Groundwater Monitoring Event 2

$ 20,683.45

February 27, 2026 (E-mail summary with field data sheets, equipment calibration forms, field notes, laboratory analytical report, laboratory chain-of-custody documentation, and updated tables and figures.)

Total/Completion Date $104,945.26 March 27, 2026

WSP appreciates the opportunity to provide services to the DEP. Should you require additional information or clarifications, please contact us at (904) 363-3430.

Sincerely, WSP USA Inc.

Stephen J.R. Sider, GISP, PG Matthew C. Crews, PE

Senior Consultant, Geology Assistant Vice President, Environmental Engineer

SJRS/MCC/as

Attachments: Figure 1 Proposed Monitoring Well Locations Figure 2 Site Layout � Onsite Figure 3 Site Layout - Offsite Figure 4 Potentiometric Map of the Shallow Zone of the Surficial Aquifer (June 25, 2024) Figure 5 Potentiometric Map of the Intermediate Zone of the Surficial Aquifer (June 25, 2024) Figure 6 VOC Analytical Summary of the Shallow Zone of the Surficial Aquifer (June 2024) Figure 7 VOC Analytical Summary of the Intermediate Zone of the Surficial Aquifer (June 2024) Figure 8 VOC Analytical Summary of the Deep Zone of the Surficial (June 2024) Figure 9 PFAS Analytical Results in Groundwater (June 2024)

Attachment A � Level of Effort Sheets and Cost Estimate Form Attachment B � Subcontractor Quotes

G:\Projects\DEP-WSCS\Projects\Fort Lauderdale\Hanners Cleaners\4 - DC034C - 2025 Well Install and GW Mon\Proposal\Revised 2\DC034C - Hanners Cleaners GW Mon Proposal (ERIC_4221).r2.docx

GeoTek Services, LLC

4060 Sparrow Hawk Road Melbourne, FL 32934-8525 info@GeoTekServices.com 321.473.7498

ESTIMATE

Blood Hound Corporate Headquarters 6500 Technology Center Dr., Suite 200 Indianapolis, IN 46278

Email: BHI@bhug.com bhug.com Website: Phone #: 888-858-9830 888-858-9829 Fax #:

ESTIMATE

Blood Hound Corporate Headquarters 6500 Technology Center Dr., Suite 200 Indianapolis, IN 46278

Email: BHI@bhug.com bhug.com Website: Phone #: 888-858-9830 888-858-9829 Fax #:

2703 NW 19th Street, Pompano Beach, FL 33069

Monitoring Wells Sparge Wells Direct Push Geotechnical Drilling SONIC Drilling

DATE

CLIENT: PHONE

SITE:

PROPOSED SCOPE OF WORK:

Unit Number Rate of Units

Sonic Daily Rate per day $3,800.00 2 Sonic Daily Rate 1/2 day $3,250.00 1 DPT Daily Rate per day $1,750.00 1

8" Sonic Override Casing per foot $25.00 0

Compact Loader for Tooling & Water Support per day $550.00 3

3/4" - 1" PVC Well Material (includes all annular backfill) per foot $14.00 320 2" PVC Well Material (includes all annular backfill) per foot $16.00 80 4" PVC Well Material (includes all annular backfill) per foot 3/4" x 5' Prepack Screen each $90.00 10

8" Bolt-down completion per well $200.00 12 12" Bolt-down completion per well

Above Grade Protector (Aluminum) per well

Mobilization (Sonic Drill with all associated equipment) roundtrip $1,500.00 1 Mobilization (DPT Drill with all associated equipment) roundtrip $450.00 1 Per Diem per night Permits each $85.00 1 Permits each $55.00 11 Decontamination Pad w/ Steamcleaner (IF NEEDED) lump sum $600.00 0 Water Meter and usage / OR Transport water from Shop lump sum $1,500.00 1 DOT Approved 55-gal Drum each $80.00 4

Development Time 1/2 hr $75.00 12 Onsite Pre-Drill Meeting each Standby / Difficult Moving Time per hour $575.00 0 Days to Complete Scope of Work 3.5 Submitted By: Charles Bucher TOTAL QUOTE PRICE $28,670.00

$1,500.00

$0.00 $85.00

$320.00

$0.00

$900.00 $0.00

$0.00

$0.00

Unit Extended Price

$7,600.00

MISCELLANEOUS

$1,650.00

$0.00

WELL MATERIALS

$0.00

$1,280.00

Provide/transport water from shop OR Water Meter

Sonic Daily Rate (Compact Track) Price Includes a ten hour work day ( 7 to 5 ) Unless otherwise stated in this quote.

$1,500.00

$450.00

$0.00

$0.00

$4,480.00

SONIC DRILL

$3,250.00

(1) MW 3/4" x 35' w/ 5' .010" Screen (20/30 Sand) - 8" BD Completion - Installed w/ Sonic

8/6/2025

Former Hanner's Cleaners - 35 N Dixie Hwy - Pompano Beach, FL 33060 Client to provide access to water source

(904) 207-6019WSP Stephen Sider

(5) MW 3/4" x 20' w/ 10' Pre-Pack Screen - 8" BD Completion - Installed w/ DPT

No Override Casing requested

$900.00

$1,750.00

$0.00

$0.00

$0.00

Well Completion (includes bolt-down manhole, concrete pad(2'x2' or 10" circle) & lockable well cap $2,400.00

2.5 Sonic and 1 DPT

(3) MW 3/4" x 40' w/ 6' .010" Screen (20/30 Sand) - 8" BD Completion - Installed w/ Sonic

(1) MW 3/4" x 27' w/ 6' .010" Screen (20/30 Sand) - 8" BD Completion - Installed w/ Sonic

(1) MW 3/4" x 38' w/ 6' .010" Screen (20/30 Sand) - 8" BD Completion - Installed w/ Sonic

(1) MW 2" x 80' w/ 10' .010" Screen (20/30 Sand) - 8" BD Completion - Installed w/ Sonic

Additional wells $605.00

Estimated 4 Drums - Actual # of drums will be invoiced

1st well

DATE: 8/1/2025

ESTIMATE #: 825003

Hanner's Cleaners 35 N Dixie Highway

ID QTY Unit Rate TOTAL

1 1 each 2,000.00$ 2,000.00$

2 4 night 450.00$ 1,800.00$

3 Sonic Rig and Crew 4 day 4,250.00$ 17,000.00$

4 Sonic Rig and Crew (up to 5 hours onsite) If Needed 1/2 day 3,000.00$ -$

5 Materials: 3/4" PVC Well Installation 240 foot 10.00$ 2,400.00$

6 Materials: 2" PVC Well Installation 80 foot 14.00$ 1,120.00$

7 2' x 2' Concrete Pad w/8" BD Manhole Completion (Asphalt) 12 each 200.00$ 2,400.00$

8 Well Development (up to 1/2 hour w/pump) 12 each 75.00$ 900.00$

9 New Drums (Soils) Client Requested) 2 each 110.00$ 220.00$

10 New Drums (Development/Decon Water) Client Requested 2 each 110.00$ 220.00$

11 Bobcat Loader for IDW and Tooling Management 1 week 1,500.00$ Included

12 Water Mater Rental and Use 1 each 500.00$ 500.00$

13 1 ls 650.00$ 650.00$

Subtotal 29,210.00$

Todd Hodgson Todd Hodgson

TOTAL 29,210.00$

Partner

Jacksonville, Florida 32223

DESCRIPTION

Mobilization / Demobilization

THANK YOU FOR YOUR BUSINESS!

Per Diem - Est. 3 Man Crew Est. (Hotel Cost + $50/per man)

"Actual quantities & days onsite will be invoiced"

Permits: (Broward County- $75 1st Well-$50 Ea Additional-up to 8 per App/Parcel)

Completion: 4 Days

PROJECT DESCRIPTION:

(904) 207-6019

(5) 3/4" x 20' PVC Well w/10' of .010 Standard Screen w/ 2' x 2' Pad w/8" BD Completion, No Soil Sampling. (4" Sonic Drilling)

Sonic Well Installation

(3) 3/4" x 40' PVC Well w/6' of .010 Standard Screen w/ 2' x 2' Pad w/8" BD Completion, No Soil Sampling. (4" Sonic Drilling)

(1) 3/4" x 27' PVC Well w/6' of .010 Standard Screen w/ 2' x 2' Pad w/8" BD Completion, No Soil Sampling. (4" Sonic Drilling)

CUSTOMER

Pompano Beach, Broward County, Florida

PROJECT

Stephen Sider, P.G., GISP

WSP

9428 Baymeadows Road, Ste. 400

(1) 3/4" x 35' PVC Well w/5' of .010 Standard Screen w/ 2' x 2' Pad w/8" BD Completion, No Soil Sampling. (4" Sonic Drilling)

(7) Locations in Grass and (5) Locations in Asphalt.

Client Requested (4) Four New Drums

Locations must be accessible with track mounted Sonic rig and support equipment Note: It is Groundwater Protection policy that if 'Pea Gravel' is encountered, ANY type of boring/drilling will be terminated immediately, and the boring location will need to be relocated to a clear location by the client.

Borehole clearance to 5' bgs beyond 20 minutes will require a change order for additional time and cost.

Utility locates on Private Property are the responsibility of the client.

Damage to utilities on private property is the responsibility of the client.

If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 or Todd@drillprollc.com.

(1) 3/4" x 38' PVC Well w/6' of .010 Standard Screen w/ 2' x 2' Pad w/8" BD Completion, No Soil Sampling. (4" Sonic Drilling)

(1) 2" x 80' PVC Well w/10' of .010 Screen w/ 2' x 2' Pad w/8" BD Completion, No Soil Sampling.

2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586

Rose Hood

*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner

2 150

8,675

No soil sampling

Drum development water

No soil sampling

25,385

2 150

File details come from the government source that posted it. Updated .