This document package represents a Task Assignment (TA) issued by the State of Florida Department of Environmental Protection (FDEP) to WSP USA Inc. for remediation work at the Jet Cleaners site located at 1346 Gandy Street in Jacksonville, Duval County, Florida (DEP Facility ID: ERIC_4540). The Task Assignment operates under Contract Number HW685 and is effective through October 2, 2026. The primary parties include the FDEP Division of Waste Management, WSP USA Inc. as the environmental consultant and project manager, and multiple subcontractors including JF Petroleum Group, LMS Remediation, Action Environmental, GeoTek Services, Ground Penetrating Radar Systems, Blood Hound, Erwin Remediation, Tetrasolv Services, HEPACO, and US Ecology.
Scope, Pricing, and Services
The Task Assignment authorizes WSP to design, install, and operate a Soil Vapor Extraction (SVE) system to remediate chlorinated volatile organic compounds in the vadose zone. The total contract value is $149,601.20, comprised of fixed unit rate services ($141,601.20) and cost reimbursement ($8,000.00). The scope includes seven subtasks: project management ($5,714.43), SVE system procurement ($2,835.88), baseline groundwater monitoring ($8,203.83), SVE system installation and start-up ($110,642.06), Week 1 and Month 1 operations and maintenance ($5,775.70), reporting ($8,124.30), and SVE system rental and utilities for two months ($8,305.00). Work includes well installation, piping conveyance systems, electrical connections, fencing, equipment rental, laboratory analysis, and site restoration. Subcontractor bids for system installation range from $70,936.07 to $76,649.70, with separate quotes for utility location ($690-$1,223), ground-penetrating radar services ($1,075-$1,143), and investigation-derived waste disposal. All work is to be completed in accordance with the January 15, 2026 Scope of Work and Cost Estimate document, with deliverables due on scheduled dates through August 2026.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev.
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW685
DC021E Completion October 2, 2026
This Task Assignment authorizes WSP to install a Soil Vapor Extraction System at Jet Cleaners in accordance with the January 15, 2026 Scope of Work, Cost Estimate, and Bid Documentation.
Patrick McGrane 850-245-8899 Contractor WSP USA Inc. Contractor
Contractor Matt Crews Contractor 904-363-3430
ERIC_4540
1346 Gandy Street, Jacksonville, Duval County
Jet Cleaners
Contractor Contractor
✔ $ 141,601.20 ✔ $ 8,000.00
$ 149,601.20
Scope of Work
WSP USA Inc.
Contractor Matthew Crews
Environmental Engineer
2/2/2026
Crews, Matt (USMC700671) Digitally signed by Crews, Matt (USMC700671) Date: 2026.02.02 15:34:44 -05'00' Tim Bahr Digitally signed by Tim Bahr
Date: 2026.01.29 14:40:44 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
BWC TAFORM
HW685
DC021E
Subtask 3 - Baseline Groundwater Monitoring
Subtask 4 - SVE System Installation & Start-Up
Subtask 5 - O&M (1st Month)
Subtasks 1 & 6 - Project Management; Reporting
Subtask 7 - Utilities & SVE Rental (2 Months)
Subtask 2 - SVE System Procurement 02/27/2026
03/27/2026
04/24/2026
06/26/2026
07/24/2026
08/07/2026
Subtask 2 - Submittal and FDEP approval of email summary with SVE system recommendations
Subtask 3 - Submittal and FDEP approval of email summary with field documentation, laboratory reports, and signed waste manifests
Subtask 4 - Submittal and FDEP approval of email summary with field documentation, laboratory reports, updated figures and tables, and signed waste manifests
Subtask 5 - Submittal and FDEP approval of email summary with field documentation, laboratory reports, and completed O&M forms
Subtasks 1 & 6 - Submittal and FDEP approval of Construction Completion Report
Subtask 7 - Submittal and FDEP approval of paid utilities / rental invoices Utilities / System Rental (Cost Plus Fixed Fee): not to exceed $2,000.00 / $6,000.00 Handling and Initiation Fees (Utilities / System Rental): $265.00 / $40.00
$ 2,835.88
$ 149,601.20
$ 8,203.83
$ 110,642.06
$ 5,775.70
$ 13,838.73
$ 8,305.00
Memorandum
TO: Negotiation File
Jet Cleaners Jacksonville, Duval County
ERIC_4540
FROM: Patrick McGrane, Project Manager
SUBJECT: Negotiation Summary Task Assignment DC021E (HW685)
DATE: January 20, 2026
This Task Assignment authorizes WSP USA Inc. (WSP) to install a Soil Vapor Extraction (SVE)
System at the Jet Cleaners site.
WSP’s recommendation of SVE for vadose zone remediation was approved by technical staff in a memo dated May 16, 2023. System specifications and a bid summary will be provided as outlined in Subtask 2 prior to construction activities beginning. Two months of SVE System rental costs and utilities will be approved as cost reimbursement pending submittal of paid monthly receipts.
The total cost for this project is $149,601.20 with 307 total labor hours. All work is to be completed in accordance with the January 15, 2026, Scope of Work, Cost Estimate, and Bid
Documentation.
WSP may invoice according to the included schedule.
FD
EP
C O
ST
E
ST
IM
A
TE
C on tra ct or
W S
P U
S A
In c.
D at e:
1/
/2
Ta sk
D C
1E
S ub Ta sk
P ro je ct
M an ag em en t
S ub
Ta sk
R ep or tin g
S ite
Je t C le an er s S ub Ta sk
S V
E S ys te m P ro cu re m en t
S ub
Ta sk
S
V E
S ys te m
R en ta l a nd U til iti es (T w o
M on th s)
A ct iv ity
/P ha se
IS
R
Ta sk
B as el in e G
W M on ito rin g
S ub
Ta sk
P ro je ct
M an ag er
P at ric k M cG ra ne
Ta sk
S
V E
S ys te m
In st al la tio n an d
S ys te m
S ta rt-up
S ub
Ta sk
S ub
Ta sk
W ee k
M on th
O
M S ub Ta sk
T T ot al s
La bo r R at e
C at eg or y $7
3.
PP
ro je ct
M an ag er
(R M
.0
$7 8.
P ra ct ic e
Le ad er
X -1
(M
C
.0 0.
.0 7.
4.
0.
0.
0.
$7 3.
P ra ct ic e
Le ad er
X -1
(R
M
0.
9.
0.
0.
.0 0.
0.
0.
$0 .0
S en io r C on su lta nt
X -1
0.
0.
0.
0.
0.
0.
0.
0.
$5
6.
S en io r S ci /E ng
X -1
(B
L)
0.
0.
0.
0.
8.
0.
0.
0.
$0
.0
S en io r P ro je ct S ci /E ng
P -1
0.
0.
0.
0.
0.
0.
0.
0.
$4
0.
P ro je ct
S ci
/E ng
P
-9 (J
W
0.
.0
4.
0.
0.
0.
0.
0.
$0 .0
S ta ff
S ci
/E ng
P
-8
0.
0.
0.
0.
0.
0.
0.
0.
$3 6.
S ta ff
S ci
/E ng
P
-8 (L
K
0.
.0 0.
0.
.0 0.
0.
0.
$3 8.
S ta ff
S ci
/E ng
P
-8 (A
S
0.
0.
0.
0.
3.
0.
0.
0.
$0 .0
S ci /E ng /A dm in
-7
0.
0.
0.
0.
0.
0.
0.
0.
$4 8.
S en io r S ci
/E ng
X
-1
(D M
0.
0.
.0
.0
0.
0.
0.
0.
$0
.0
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
H ou rs
.0
.0
.0
3.
.0
.0
0.
0.
0.
D ire ct L ab or
$1
6, 1.
$1 ,9
.4
$9
.0
$1
,9
.0
$7 ,9
.2
$1
,1
.8
$2 ,7
.3
$0
.0
$0 .0
$0
.0
$0 .0
O ve rh ea d
2.
$2
8, 5.
$3 ,2
.5
$1
,6
.9
$3 ,3
.3
$1
3, 2.
$1 ,9
.2
$4
,6
.3
$0 .0
$0
.0
$0 .0
$0
.0
G en
A dm in
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fr in ge 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
L ab or
$4 5, 6.
$5
,1
.9
$2 ,5
.0
$5
,2
.3
$2 1, 1.
$3
,0
.0
$7 ,3
.7
$0
.0
$0 .0
$0
.0
$0 .0
RE
V:
2/
CE
F
GO
LD
ER
Pa ge
FD
EP
C O
ST
E
ST
IM
A
TE
C on tra ct or
W S
P U
S A
In c.
at e:
1/
/2
Ta sk
D C
1E
Ta sk
P ro je ct
M an ag em en t
S ub
Ta sk
R ep or tin g
S ite
Je t C le an er s S ub Ta sk
S V
E S ys te m P ro cu re m en t
S ub
Ta sk
S
V E
S ys te m
R en ta l a nd U til iti es (T w o
M on th s)
A ct iv ity
/P ha se
IS
R
Ta sk
B as el in e G
W M on ito rin g
S ub
Ta sk
P ro je ct
M an ag er
P at ric k M cG ra ne
Ta sk
S
V E
S ys te m
In st al la tio n an d
S ys te m
S ta rt-up
S ub
Ta sk
S ub
Ta sk
W ee k
M on th
O
M S ub Ta sk
T T ot al s
T ra ve l
V eh ic le
R en ta l
$2 ,1
.0
$0
.0
$2
.0
$1 ,6
.0
$2
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ile ag e
C os ts $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
A ir Fa re $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M ea ls
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
H ot el
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l T ra ve l
$2 ,1
.0
$0
.0
$2
.0
$1 ,6
.0
$2
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (E qu ip m en t P ro cu re m en t)
C ar bo n
D ru m $1
,0
.0
$0 .0
$0
.0
$1 ,0
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S
V E
S ys te m
R en ta l
$6 ,0
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$6 ,0
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$7 ,0
.0
$0
.0
$0 .0
$1
,0
.0
$0 .0
$0
.0
$6 ,0
.0
$0
.0
$0 .0
$0
.0
P ro cu re m en t F ee
$1
.5
$0 .0
$0
.0
$1
.5
$0 .0
$0
.0
$4 0.
$0
.0
$0 .0
$0
.0
T ot al S ub co nt ra ct or
C os t $7
,2
.5
$0 .0
$0
.0
$1 ,1
.5
$0
.0
$0 .0
$6
,0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
(S er vi ce s P ro cu re m en t) ril lin g (C on ve nt io na l)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
D ril lin g
(N on
-c on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M ob ile
L ab or at or y
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ur ve yi ng $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
ID
W $1
,4
.0
$0 .0
$1
.0
$1
,2
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
U til iti es
$2 ,2
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$2 ,2
.0
$0
.0
$0 .0
$0
.0
U til ity L oc at io n
$6
.0
$0 .0
$0
.0
$6
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
R em ed ia tio n
C on tra ct or $7
0, 6.
$0 .0
$0
.0
$7 0, 6.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
S ub to ta l $7
5, 6.
$0 .0
$1
.0
$7
2, 6.
$0 .0
$0
.0
$2 ,2
.0
$0
.0
$0 .0
$0
.0
H an dl in g Fe e $6
,7
.0
$0 .0
$1
9.
$6 ,6
.5
$0
.0
$0 .0
$4
0.
$0 .0
$0
.0
$0 .0
T ot al
S ub co nt ra ct or C os t
$8 2, 5.
$0
.0
$2
.5
$7 9, 5.
$0
.0
$0 .0
$2
,2
.0
$0 .0
$0
.0
$0 .0
La bo ra to ry
A na ly tic al
C os ts $3
,2
.0
$0 .0
$9
.0
$1
,5
.0
$8
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Fa st T ur na ro un d C ha rg es $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S am pl e S hi pp in g
$6
.0
$0 .0
$1
.0
$3
.0
$2
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al L ab or at or y $3
,8
.0
$0 .0
$1
,0
.0
$1 ,8
.0
$1
,0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Fi el d
E xp en se s er so na l P ro te ct io n
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E xp en da bl es
$6
.0
$0 .0
$8
0.
$4
.0
$8 0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
D ril lin g re la te d)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
A na ly tic al re la te
d) $7
.0
$0
.0
$7
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t (
ID
W re la te
d) $1
,1
.0
$0 .0
$1
.0
$1
,0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
O th er
$2 ,1
.0
$0
.0
$0 .0
$1
,1
.0
$1 ,0
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al F ie ld
E xp en se s $4
,6
.0
$0 .0
$9
.0
$2
,6
.0
$1 ,1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub to ta l $1
,0
.6
$5
,1
.9
$2 ,5
.0
$7
,6
.8
$1
,4
.8
$5 ,4
.0
$7
,3
.7
$8 ,3
.0
$0
.0
$0 .0
$0
.0
C om pl et io n
Fe e
$4 ,5
.6
$5
.4
$2
.8
$5
.9
$2
,1
.1
$3
.6
$7
.5
$0 .0
$0
.0
$0 .0
$0
.0
T ot al E st im at ed
C os t $1
,6
.2
$5
,7
.4
$2 ,8
.8
$8
,2
.8
$1
,6
.0
$5 ,7
.7
$8
,1
.3
$8 ,3
.0
$0
.0
$0 .0
$0
.0
RE
V:
2/
CE
F
GO
LD
ER
Pa ge
SITE : Jet Cleaners SUBTASK 2: SVE System Procurement
DATE: 1/15/2026
LABOR CATEGORIES *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLES WORK DESCRIPTIONS HOURS
Practice Leader (M. Crews) 12.0
TOTAL LABOR 12.0
VEHICLE TYPE RATE UNIT USAGE
TOTAL VEHICLE $0.00
MEALS STAFF RATE UNIT USAGE
TOTAL MEALS $0.00
HOTEL STAFF RATE UNIT USAGE
TOTAL HOTEL $0.00
SUBCONTRACTOR COSTS
NAME RATE UNIT USAGE
TOTAL SUBS $0.00
LABORATORY COSTS
PARAMETERS RATES # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEMS RATES UNITS USAGES
TOTAL EQUIPMENT $0.00
Prepare and submit bid specifications to three remediation system vendors for system availability and rental rates. Evaluate bids; prepare rental rate evaluation table and submit recommendations to DEP via e-mail deliverable (12 hours).
PURPOSE
SUBTASK 3: Baseline GW Monitoring
DATE: 1/15/2026
LABOR CATEGORIES *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLES WORK DESCRIPTIONS HOURS
Practice Leader (R. McCann) 9.0
Project Sci/Eng (J. Whipple) 17.0
Staff Sci/Eng (L. Kamikazi) 16.0
TOTAL LABOR 42.0
VEHICLE TYPE RATE UNIT USAGE
Truck $120.00 Per Day 2 $240.00
TOTAL VEHICLE $240.00
MEALS STAFF RATE UNIT USAGE
TOTAL MEALS $0.00
HOTEL STAFF RATE UNIT USAGE
TOTAL HOTEL $0.00
SUBCONTRACTOR COSTS
NAME RATE UNIT USAGE
Erwin T&D - Non-Haz PFOS/PFAS Water $195.00 per drum 1 $195.00
TOTAL SUBS $195.00
LABORATORY COSTS
PARAMETERS RATES # SAMPLES #QAQC
Total VOHs EPA Method 8260B $73.00 11 $803.00 Total VOCs EPA Method 8260B - IDW $110.00 1 $110.00
Sample Shipping Large $150.00 1 $150.00
TOTAL LAB $1,063.00
EQUIPMENT ITEMS RATES UNITS USAGES
Miscellaneous Expendables $40.00 Per Day 2 $80.00 Shallow Groundwater Sampling Kit $290.00 Per Day 2 $580.00 Tubing, Poly HDPE $0.30 Per Foot 350 $105.00 Tubing, Silicon 1/4 x 7/16" $3.00 Per Foot 12 $36.00 Drum (55-gallon) $100.00 Each 1 $100.00
TOTAL EQUIPMENT $901.00
Verification of property ownership with property access forms prior to groundwater sampling (1 hour). Prepare health and safety plan for ISR activities (3 hours). Characterize IDW and prepare waste profile for transportation and disposal of IDW (2 hours). Prepare and submit email summary with field documentation, certified laboratory report, and IDW manifest (3 hours).
Field event preparation (1 hour). Round trip travel (1 hour per day x 2 days = 2 hours). Instrument calibration, measure water levels, collect samples and measure field parameters from 11 monitoring wells (see Table 7 in proposal), and IDW staging and sampling (14 hours).
Round trip travel (1 hour per day x 2 days = 2 hours). Instrument calibration, measure water levels, collect samples and measure field parameters from 11 monitoring wells (see Table 7 in proposal), and IDW staging and sampling (14 hours).
SUBTASK 4: SVE System Installation and System Start-up
DATE: 1/15/2026
LABOR CATEGORIES *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLES WORK DESCRIPTIONS HOURS
Practice Leader (M. Crews) 31.0
Project Sci/Eng (J. Whipple) 114.0
Senior Sci/Eng (D. McDaniels) 18.0
TOTAL LABOR 163.0
VEHICLE TYPE RATE UNIT USAGE
Truck (ISR) $480.00 Per Week 2 $960.00 Truck (ISR) $120.00 Per Day 1 $120.00 Truck (Kick-off Meeting) $120.00 Per Day 1 $120.00 Truck (Start-up - DM) $120.00 Per Day 1 $120.00 Truck (PM Site Visits & Start-up) $120.00 Per Day 3 $360.00
TOTAL VEHICLE $1,680.00
MEALS STAFF RATE UNIT USAGE
TOTAL MEALS $0.00
HOTEL STAFF RATE UNIT USAGE
TOTAL HOTEL $0.00
SUBCONTRACTOR COSTS
NAME RATE UNIT USAGE
GeoTek Utility Locate $690.00 LS 1 $690.00 Erwin T&D - Non-Haz Soil $125.00 per drum 10 $1,250.00 TetraSolv Carbon Drum $1,075.00 per drum 1 $1,075.00 JF Petroleum SVE System Installation $70,936.07 LS 1 $70,936.07
TOTAL SUBS $73,951.07
LABORATORY COSTS
PARAMETERS RATES # SAMPLES #QAQC
VOC Soil Vapor TO-15 - Start-up $200.00 7 $1,400.00 Total VOCs EPA Method 8260B - IDW $110.00 1 $110.00
Sample Shipping Large $150.00 2 $300.00
TOTAL LAB $1,810.00
EQUIPMENT ITEMS RATES UNITS USAGES TOTALS
Miscellaneous Expendables $40.00 Per Day 12 $480.00 Construction/O&M/Pilot Test Kit $360.00 Per Day 1 $360.00 Water Level Indicator $25.00 Per Day 1 $25.00 Air Flow Meter $33.00 Per Day 1 $33.00 Air Velocity Meter $33.00 Per Day 1 $33.00 Construction/O&M Supplies $300.00 Per Week 2 $600.00 Construction/O&M Supplies $75.00 Per Day 1 $75.00 Drum (55-gallon) $100.00 Each 10 $1,000.00
TOTAL EQUIPMENT $2,606.00
Project kick-off meeting (4 hours). Round trip travel for site visits (1 hour per trip x 2 trips = 2 hours). Construction oversight during site visits (2 hours per trip x 2 trips = 4 hours). SVE system start-up activities (6 hours). Submit daily reports (1 hour per day x 11 days = 11 hours).
Prepare and submit e-mail deliverable with field documentation, daily reports, lab report, and IDW manifest (4 hours).
ISR Oversight: Field event preparation (4 hours). Round trip travel (1 hour per day x 11 days = 11 hours). Subcontractor oversight, waste management, site control, health and safety, site restoration (9 hours per day x 11 days = 99 hours).
PURPOSE
Field event preparation (2 hours). Round trip travel (1 hour per trip x 2 trips = 2 hours).
Oversight during delivery and mounting/anchoring of SVE system (6 hours). SVE system start-up activities (8 hours).
SUBTASK 5: Week 1 & Month 1 O&M
DATE: 1/15/2026
LABOR CATEGORIES *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLES WORK DESCRIPTIONS HOURS
Practice Leader (M. Crews) 7.0
Senior Sci/Eng (D. McDaniels) 12.0
TOTAL LABOR 19.0
VEHICLE TYPE RATE UNIT USAGE
Truck $120.00 Per Day 2 $240.00
TOTAL VEHICLE $240.00
MEALS STAFF RATE UNIT USAGE
TOTAL MEALS $0.00
HOTEL STAFF RATE UNIT USAGE
TOTAL HOTEL $0.00
SUBCONTRACTOR COSTS
NAME RATE UNIT USAGE
TOTAL SUBS $0.00
LABORATORY COSTS
PARAMETERS RATES # SAMPLES #QAQC
VOC Soil Vapor TO-15 - Week 1 $200.00 2 $400.00 VOC Soil Vapor TO-15 - Month 1 $200.00 2 $400.00
Sample Shipping Small $110.00 2 $220.00
TOTAL LAB $1,020.00
EQUIPMENT ITEMS RATES UNITS USAGES TOTALS
Miscellaneous Expendables $40.00 Per Day 2 $80.00 Construction/O&M/Pilot Test Kit $360.00 Per Day 2 $720.00 Water Level Indicator $25.00 Per Day 2 $50.00 Air Flow Meter $33.00 Per Day 2 $66.00 Air Velocity Meter $33.00 Per Day 2 $66.00 Construction/O&M Supplies $75.00 Per Day 2 $150.00
TOTAL EQUIPMENT $1,132.00
Daily telemetry monitoring (4 hours per month x 1 month = 4 hours). Monthly e-mail to DEP with operational status, O&M results, and system recommendations (3 hours).
Field event preparation (1 hour per event x 2 events = 2 hours). Round trip travel (1 hour per trip x 2 trips). SVE system O&M (4 hours per trip x 2 trips = 8 hours).
LEVEL OF EFFORT/EXPENSE WORKSHEET
SUBTASK 6: Reporting
DATE: 1/15/2026
LABOR CATEGORIES *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLES WORK DESCRIPTIONS HOURS
Practice Leader (M. Crews) 4.0
Practice Leader (R. McCann) 20.0
Staff Sci/Eng (L. Kamikazi) 10.0
Senior Sci/Eng (B. Lucero) 8.0
Staff Sci/Eng (A. Strayer) 3.0
TOTAL LABOR 45.0
VEHICLE TYPE RATE UNIT USAGE
TOTAL VEHICLE $0.00
MEALS STAFF RATE UNIT USAGE
TOTAL MEALS $0.00
HOTEL STAFF RATE UNIT USAGE
TOTAL HOTEL $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE RATE UNIT USAGE
TOTAL SUBS $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE UNIT USAGE TOTALS
TOTAL EQUIPMENT $0.00
Develop conclusions and recommendations and prepare final ISR Report.
Prepare draft ISR Report to include baseline groundwater monitoring results; SVE system installation and start-up documentation; and analytical results from SVE system start-up, Week 1, and Month 1.
Prepare groundwater potentiometric maps; groundwater analytical figures, and SVE system as-built figures for report using CAD.
Reporting: document production. Create pdf for OCULUS.
Data entry for groundwater monitoring event, SVE system start-up, Week 1 O&M, and Month 1 O&M events. Calculate mass removal rates and prepare tables and figures (10 hours).
FINAL --7/24/96
LEVEL OF EFFORT/EXPENSE WORKSHEET
SUBTASK 7: SVE System Rental and Utilities (Two Months)
DATE: 1/15/2026
LABOR CATEGORIES *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLES WORK DESCRIPTIONS HOURS
TOTAL LABOR 0.0
VEHICLE TYPE RATE UNIT USAGE
TOTAL VEHICLE $0.00
MEALS STAFF RATE UNIT USAGE
TOTAL MEALS $0.00
HOTEL STAFF RATE UNIT USAGE
TOTAL HOTEL $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE RATE UNIT USAGE
Electrical Services (SVE) Utility Service $1,000.00 per month 2 $2,000.00 Electrical Services (SVE) Initiation Fee $225.00 LS 1 $225.00 Electrical Services Handling Fee $20.00 per month 2 $40.00
SVE System Rental Rental Fee $3,000.00 per month 2 $6,000.00 SVE System Rental Handling Fee $20.00 per month 2 $40.00
TOTAL SUBS $8,305.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE UNIT USAGE TOTALS
TOTAL EQUIPMENT $0.00
FINAL --7/24/96
Site Access, Utility Clearance, and Permits
Kick-Off Meeting
Site Security
Vice President, Geologist Assistant Vice President, Environmental Engineer
GeoTek Services, LLC
30 October 2025
To: Lisa Kamikazi
WSP
9428 Baymeadows Road, Suite 400 Jacksonville, Florida 32256
From: GeoTek Services, LLC 4060 Sparrow Hawk Road
Melbourne, Florida 32934
RE: Utility Locating Services – Jet Cleaners Site located in Jacksonville, Florida
Ms. Kamakazi, GeoTek Services is pleased to respond to your request for Utility Locating services at the Jet Cleaners Site located at 1345 Gandy Street in Jacksonville, Florida. We will scan a (10’ x 10’) area around ten proposed bore locations and the trenching areas shown in your PDF drawing with the goal of locating underground utilities. We can only scan the easily accessible open areas for utilities. Note that we cannot scan beneath fixed objects such as landscaping, fencing, buildings. We will scan as close as reasonably possible to fixed objects such as walls, landscaping, fences, etc. Our deliverable will be marking paint and/or flags indicating the location of potential underground utilities. It is the client’s responsibility to protect and preserve all marks.
We will use both Electromagnetic Induction instruments as well as Ground Penetrating Radar (GPR) to detect objects below the surface. Due to the nature of sub-surface detection and the physical laws governing radio wave propagation, some buried objects may not be detectable due to depth, obscuration, or a weak radar signature. GeoTek Services will use industry standard best practices to locate sub-surface objects, however some objects may not be detectable. Geotek Services does not guarantee that all underground objects can be found. GeoTek Services assumes no liability for any damages.
We request access to any as-built site plans of the scan areas prior to rendering services. Our fixed price quote for this effort is $690.00. No out-of-pocket expenses are expected for this project. This quote is valid for sixty days.
Best Regards, Martin (Bud) Connor GeoTek Services, LLC
4060 Sparrow Hawk Road Melbourne, FL 32934-8525 info@GeoTekServices.com 321.473.7498
From: GPRS Client Experience To: Kamikazi, Lisa Cc: Crews, Matt Subject: Re: Utility Locate Quote- Jet Cleaners - 1345 Gandy Street, Jacksonville Florida Date: Thursday, October 30, 2025 10:32:55 AM Attachments: 1761834761166008_613738493.png
1761834761219000_452072429.png 1761834761270026_596631819.png 1761834761321003_1755694524.png 1761834761375013_613738493.png 1761834761423012_27944380.png 1761834761469002_452072429.png 1761834761510001_596631819.png
ESTIMATE
Blood Hound Corporate Headquarters 6500 Technology Center Dr., Suite 200 Indianapolis, IN 46278
Email: BHI@bhug.com bhug.com Website: Phone #: 888-858-9830 888-858-9829 Fax #:
Proposal
3970 Pipkin Rd S, Lakeland, FL 33811 No. QUO-0327687
Sales Person : Tim Combs E-Mail: tim.combs@jfpetrogroup.com
Date: 10/3/2025
Sold to: WSP USA INC.
9428 BAYMEADOWS ROAD
SUITE 400
Jacksonville, FL 32256
Ship to: WSP USA INC
9428 BAYMEADOWS RD
STE 400
JACKSONVILLE, FL 32256-7979
Dispenser Terms:
Net 10 Days __________(Initial Here)
Other Terms: Net 30 Days PO:
Ship by:
No. Description Qty. Unit Price Amount
INSTALLATION
INSTALL LABOR INSTALLATION 1 $70,936.07 $70,936.07
INSTALLATION: 70,936.07
50% Deposit Required: $35,468.04 TOTAL PRICE: 70,936.07 This proposal includes estimated applicable taxes
SCOPE OF WORK
COMMERICAL SCOPE OF WORK
Provide the Customer with a detailed Construction schedule.
Hold an office Pre-Con meeting prior to ordering the equipment to verify quantities and sizes Mobilize to the job site.
Core drill the exterior of the building to provid access for piping.
Provide equipment to excavate pipe ditches to WSP wells.
Install fence around trailer per plans Supply and install SVE PVC piping from wells to SVE trailer Perform air test on all PVC piping prior to backfilling of pipe ditches Provide electrical to trailer. Current locaiton does not have 3 Phase power.
Provide concrete cover for pipe ditches and well pads with well covers Clean up of all debris caused by JFPG
GENERAL CONDITIONS:
The above prices are quoted F.O.B. destination and are subject to sales tax or use tax.
JF Petroleum Group requires that a pre-job conference be held prior to construction. All parties involved
JF CONSTRUCTION SERVICES - Confidential Page 1 of 5Quotation valid for 10 days
Customer Initials __________ JF CONSTRUCTION SERVICES Initials __________
QUO-0327687
in this project are requested to attend as a means of ensuring job quality and timely completion.
If any underground obstructions or conditions are encountered requiring dewatering, rock removal, shoring, additional excavation time, removal of sub surface concrete, removal of subsurface structures , relocation of utilities, excessive cave-in, etc., there will be additional charges to the customer.
JF Petroleum Group will exercise reasonable care in performing our work, but we cannot be responsible for damage done to your existing lot that may be in poor condition or "alligatored".
OUR INSTALLATION PRICE IS CONTINGENT ON THE FOLLOWING:
Existing circuit panel is to be adequately sized, and meeting the current electrical codes. Any repairs to or replacement of the existing conduit will be performed on a "time and material" basis at our normal rates and will be an added cost to the customer.
THIS PROPOSAL DOES NOT INCLUDE THE FOLLOWING:
Handling of any product or material classified as hazardous.
Start up of trialer or assistance thereof.
TERMS & CONDITIONS
UNLESS FREIGHT IS DEFINED AND INCLUDED ABOVE, FREIGHT CHARGES WILL BE ADDED TO THE INVOICE.
1. PURCHASE ORDER TERMS, CONDITIONS OR PROVISIONS INCONSISTENT WITH THOSE ON THIS AND THE OTHER SIDE HEREOF SHALL BE DEEMED INEFFECTIVE. It is mutually agreed that all terms, conditions and provisions (Whether printed, stamped, typed, or written ) on customer’s purchase order or other communications (except the description and specification of goods, ordered, quantity, price, invoice number, shipping instructions and tax exemption certificate) shall be ineffective, and in lieu thereof, the terms, conditions and provisions on this and the other side hereof shall govern all orders and shall be applicable thereto with the same force and effect as if they physically appeared thereon.
An acknowledgment of any such order or communication, or the making of deliveries pursuant thereto shall not be construed as an acceptance or approval of any terms, provisions or conditions printed, stamped, typed or written on such order or communication inconsistent with those herein set forth. No waiver, alteration or modification of the terms and conditions on this and the other side hereof shall be binding unless in writing and designed by an Executive Officer or Sales Manager of JF CONSTRUCTION SERVICES. For purposes hereof, the terms “we”, “us” and “JF CONSTRUCTION
SERVICES” shall mean JF Acquisition, LLC.
2. We will not accept goods returned for credit, unless we previously approve such return for credit in writing, in conformance with the Returns Goods Policy and subject to applicable restocking fees.
3. ALL EXPRESS AND IMPLIED WARRANTIES ARE HEREBY DISCLAIMED (INCLUDING THE WARRANTY OF MERCHANTABILITY, THE WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE, AND THE WARRANTY OF
TITLE) THAT ARE NOT OTHERWISE INCLUDED ON THE FACE HEREOF, OR PUBLISHED BY THE
MANUFACTURERS INVOLVED. IN NO EVENT SHALL THE OBLIGATION OF JF CONSTRUCTION SERVICES EXTEND BEYOND THE REPAIR OR REPLACEMENT OF ANY PRODUCT SOLD BY IT WHICH PROVES TO HAVE BEEN DEFECTIVE, AND THEN ONLY IF THE PRODUCT IS RETURNED TO THE DESTINATION WE DESIGNATE WITH ALL TRANSPORTATION CHARGES PREPAID AND IS FOUND BY INSPECTION TO HAVE BEEN DEFECTIVE. NO MERCHANDISE SHALL BE RETURNED WITHOUT JF CONSTRUCTION SERVICES’S PRIOR WRITTEN AUTHORIZATION.
WRITTEN NOTICE OF CLAIMED DEFECTS MUST BE GIVEN BY THE CUSTOMER TO JF CONSTRUCTION SERVICES WITHIN
JF CONSTRUCTION SERVICES - Confidential Page 2 of 5Quotation valid for 10 days
Customer Initials __________ JF CONSTRUCTION SERVICES Initials __________
QUO-0327687
3007 N. 50th St. Tampa, Florida 813-909-0040/0042 fax
October 3, 2025
RE: Jet Cleaners – SVE System Installation – Request for Bid 1346 Gandy Street, Jacksonville FL 32208
Dear Mr. Crews, Action Environmental is pleased to provide the following bid for the SVE System Installation at the Jet Cleaners site in Jacksonville, Florida.
Conditions/Assumptions:
- Assumes 4,000 PSI, fiber-reinforced concrete for resurfacing.
- Assumes water source (hose bib) is available for use onsite.
- Assumes no MOT will be required.
- Assumes WSP to provide additional 55-gallon drums to store excess soil generated during well installation and trenching activities.
- Assumes WSP to supply vapor-phase carbon drum and 55-gallon drum for entrained water storage.
- Assumes WSP will supply virgin or reactivated carbon.
- Except for SVE-1, bid excludes coring/cutting into foundation of building.
- Excludes trench plates. Assumes access to work area will be barricaded, restricting access to all non-construction personnel.
- Excludes concrete testing.
- Excludes density testing.
- Excludes disposal of IDW drums.
- Excludes clean fill. Native soil to be used as fill for trenches.
- Excludes flow indicators, pressure/temp gauges, relief valves, etc.
- $500 is included for direct permitting fees; additional will be invoiced at COST and any reduction will be CREDITED.
- Bid line items are priced as minimum quantities and shall be invoiced accordingly if actual quantities are less than the current estimate.
- Work is estimated to take 7 days to complete, assuming Monday-Saturday week.
Respectfully Submitted, Action Environmental
Chris Cipollina Environmental Estimator & Project Manager
Action Environmenta
Chris Cipollina
LMS Remediation
LEASE-MAINTENANCE-SERVICE
Powered By PRM Filtration 4430 Magnolia Road
Marianna, FL 32448, USA
FEIN # 45-4185593
LMS Remediation Powered by PRM Filtration. | 4430 Magnolia Road, Marianna, FL 32448 |(850) 526-0121
Quote 11502 / NS 00425 Date: 10/13/2025
Quoted By: Rick Pickett rick.pickett@lmsremediation.com | (850) 557-9286
CUSTOMER PROJECT SITE
Matt Crews
WSP
9428 Baymeadows Road, Suite 400 Jacksonville, Florida 32256
Jet Cleaners 1346 Gandy Street Jacksonville, Duval County, FL 32208
FAC ID: ERIC_4540
RAC - SCOPE OF WORK
Powered By PRM Filtration 4430 Magnolia Road
Based on the provided specifications and drawings dated May 2023 including emails between LMS and WSP, LMS personnel will mobilize to the client's project site and perform the remediation system installation. The site is the location of the former Jet Cleaners building. The selected remedy for the chlorinated solvent impacted soil is Soil Vapor Extraction (SVE). The construction start date is anticipated to start unknown at this time. The actual start date is subject to issuance of a Task Assignment from the FDEP WCP, the actual system build, and with the approval of the LMS cost estimate. LMS personnel will utilize a Mini Excavator, Skid steer, Plate Compactor, and Walk-behind concrete saw. The scope of work follows:
Mobilization One (1) preconstruction meeting Mobilize all resources to the project site, site prep and site security, etc.
Permits & Fees, as applicable.
SVE Well Construction PRM will include all labor, materials, equipment, subcontractors, and any other cost, to install up to three SVE Wells (SVE-1, SVE-02, and SVE-03). The exterior SVE wells shall be completed with an 8-inch manholes. See the approximate location indicated on Figure 8.
The location of these SVE wells are approximate and subject to change based on site conditions at the time of construction. LMS will receive verbal approval from WSP prior to adjusting well locations. The SVE wells will be constructed with 2-inch diameter PVC well screens from 1 to 4 feet bgs, 0.020-inch slot size, and 2-inch diameter PVC risers. The annular space will be filled with 20/30 sand filter pack to 3-inches above the top of the well screen followed by 30/65 fine sand seal then grouted to surface with neat cement. A 12-inch steel manhole and 2ft x 2 ft concrete pad will be placed around each of the exterior SVE wells. SVE well construction details are presented on Figure 9. The SVE wells will be installed via hand auger.
LMS will containerize all excavated soils collected during SVE well installation as investigation derived waste (IDW) into DOT-approved 55-gallon steel drums. IDW drums must be properly labeled prior to use or immediately upon initiating use. IDW drums must be secured when not in use. The estimated IDW soil volume is approximately 4 drums of soil which includes the excess material generated during the conveyance pipe trenching activities. The drums will be provided by WSP. This also includes any sampling, transport, and disposal.
Installation of one (1) Vapor Monitoring Points (VMP-1) (screened interval from 1-4 feet bgs). LMS will also convert MAGS wells MAG001 (SVE-04) and MAG003 (SVE-05) to SVE wells See Figure 8.
SVE Conveyance Piping (Interior and Exterior) LMS to include all labor, material, equipment, subcontractors, and any other cost to install SVE and electrical conveyance piping as indicated on Figures 8 through 11 in accordance with the specifications.
This item also includes the completion of the trench within the asphalt and concrete area, with the placement and site restoration with concrete in accordance with the specification.
The manifold as detailed on Figure 9 will be provided as detailed. The connection of the manifold tot he SVE is assumed to be 4-inch
Equipment Pad and Fencing No equipment pad is required.
A fence will be constructed surrounding the concrete pad and skid system. LMS will install fencing, including an access gate, on one side (i.e. 2 gates). The dimensions of the fence shall be no greater than 20 x 27 ft. The fence material will consist of chain link fence with privacy slats per Figure 10.
Remedial System Installation
Powered By PRM Filtration 4430 Magnolia Road
LMS will include all labor, material, equipment, subcontractors, and any other cost, and install a remedial system as indicated on Figure 10 in accordance with the specifications. The 7 legs of the conveyance pipe (5 SVE and 2 spares) to the exterior manifold and then connect the 2-inch header to the SVE system. Also include materials and labor to assemble a 7 leg exterior manifold.
This item also includes contracting the services of an Electrician. PRM will contract the services of an Electrical Contractor to provide the electrical service connections. Assumes the power provider is able to provide access to the existing transformer located adjacent to the Remedial System. Electrician to provide necessary meter can and disconnects for power hookup. LMS/Electrician will trench from transformer to treatment system, provide PVC conduit and wires, provide disconnect at the remedial system, and connect to single point on the Remedial System estimated to be approximately 30 feet as per the electrical load requirements of the SVE system and the SVE system Process and Instrumentation Diagram provided in Figure 11. Electrical Contractor to provide startup assistance (minimum 4 hours).
This item does not include providing the 55-gallon Drum of Vapor Phase Carbon (VP-55) with applicable hoses and fittings, which will be provided by WSP.
WSP to provide additional 55-gallon drums to store excess soil generated during well installation and trenching activities. WSP is responsible for the sample, transport, and disposal.
It is understood that WSP will be providing a FDEP owned remedial systemk. Both the system and the VGACs are assumed to be on-site prior to LMS arrival.
Site Restoration and Demobilization LMS will include all labor, material, equipment, subcontractors and any other cost to perform all site restoration, all other costs to remove contractor resources and materials that are not to be included within the final product and demobilization of all personnel, equipment, materials and any other incidental costs.
Assumptions and Exclusions
The excavation activities will occur between the hours of 7:00 AM or after 6:00 PM, Monday through Friday, unless obtaining prior written approval from WSP and OWNER. The costs provided are in accordance with this request and anything beyond would be considered beyond the scope of work.
Assumes no utilities that would interfere with the installation. If excessive underground utilities are found that impede progress on-site, LMS will discuss changes with the client on-site. Cost per day/per hour of $3,404.97/$340.49 may apply.
WSP is responsible for providing a 3rd party utility location. LMS will maintain an active 811 ticket through Sunshine State One Call of Florida.
All chlorinated-solvent contaminated soils to be stage on visqueen plastic and ultimately stored in 55-gallon drums. Any sampling and disposal required will be performed by others.
LMS assumes that the trenches material is free from large rocks or boulders that cannot be removed with the equipment on-site (mini ex) within a reasonable amount of time.
Project sign-off by others.
No compaction testing is included.
Existing asphalt and concrete to be removed are assumed to be approximately 6 inches thick and can be cut with a 14-inch walk-behind concrete saw.
PRM is not responsible for any charges from the power company to bring power to the new services.
No performance bonds are included in this proposal.
LMS will maintain a low-dust construction site and has included dust suppression measures (i.e. cutting by wet methods if water is available). Assumed water available on the site.
LMS will discuss any deviations from the provided Construction Drawings prior to performance of the work which could result in a change in scope and/or cost.
It is LMS’s understanding that a General Contractor’s license nor City of Jacksonville permitting is not required for this type of work.
LMS acknowledges that the quantities of work to be performed change and the locations of the SVE treatment points are subject to change based on site conditions.
Powered By PRM Filtration 4430 Magnolia Road
CUSTOMER SUBMITTALS - PRE CONSTRUCTION
Customer to provide LMS with the following documents prior to RAC implementation:
Authorized quote and/or purchase order signed and agreed to by both parties Confirmation that the Construction Drawings dated May 2023 is the final version to be adhered Electric service account # and contact information List of key personnel and contact information
CONTRACTOR SUBMITTALS - PRE CONSTRUCTION
LMS will provide the following documentation prior to RAC implementation:
Certificates of insurance (COI) - GL, PL, WC, & Auto Invoice template Change order template List of key personnel and contact information OSHA certificates for all LMS personnel that will be participating in onsite work Electrical permit - copy Utility locate ticket
CONTRACTOR SUBMITTALS - POST CONSTRUCTION
LMS will provide the following items upon completion of the scope of work outlined in this proposal:
Invoice Manifest &/or weight tickets for all material brought into or hauled off the project site Photo log of site work, trucks, and equipment Field notes Inspection reports - per permits TBD
Submittal Schedule Accepted By (Signature) Date PO # / Project Reference
Powered By PRM Filtration 4430 Magnolia Road
COST ESTIMATE AND PROJECT NOTES
Lead time to start is currently 6 - 8 weeks from date contract is fully executed and processed by LMS Please allow 7 - 10 business days for processing The quoted scope of work is expected to consume (10) 10-hour workdays to complete LMS shall not be held responsible for delays caused by inclement weather, shipping issues, supply chain disruptions, or any other factors outside the direct control of LMS Any work conducted outside of the proposed scope of work outlined in this proposal due to unforeseen circumstances, site conditions, or work process alterations by customer shall be documented in writing by way of change order request with customers approval signature and returned to and processed by LMS prior to implementing the revised work scope
Cost Estimate & Project Notes Accepted By (Signature) Date PO # / Project Reference
3.
3.
9.
3.
3.
in cl ud ed
2.
2.
in cl ud ed in cl ud ed in cl ud ed in cl ud ed in cl ud ed in cl ud ed in cl ud ed in cl ud ed in cl ud ed in cl ud ed in cl ud ed in cl ud ed in cl ud ed in cl ud ed in cl ud ed in cl ud ed in cl ud ed
Tetrasolv Filtration 444 E 29th Street Anderson, IN 46016 HQ (765) 634-3941 Fax (765) 643-3949
October 30, 2025
WSP
9428 Baymeadows Road, Suite 400 Jacksonville, Florida 32256 Attn: Lisa Kamikazi
Thank you for the opportunity to provide pricing for your Jacksonville, FL site, as follows:
Jet Cleaners Site 1345 Gandy Street Jacksonville Florida DEP Facility ID No. ERIC_4540
SScope of work:
One(1) VR-170, low pressure 55-gallon drum vapor phase vessel with 4” top in / top out connections and reactivated vapor phase carbon fill Freight to the WSP Jacksonville, FL, office Duval County’s 7.5% sales tax
Price for scope of work above $1,075.00
Terms are Net 30. Pricing is valid for 30 days.
Thank you for this potential opportunity. We look forward to providing you with the equipment.
Very truly, Jennifer Belmore jbelmore@tetrasolv.com 407.683.5950
408 Ditmar Street Pensacola, FL 32503
To: Mr. Ralph Mongillo
WSP
9428 Baymeadows Road, Suite 400 Jacksonville, FL 32256
June 16, 2023
Re: Non-Hazardous Disposal of PFOS/PFAS Impacted Materials
Mr. Mongillo:
The price for the transportation and disposal (T&D) of non-hazardous soil, mud, and water is listed below:
For Non-Hazardous Chlorinated Solvent Impacted Materials:
Description Rate Unit T&D - Non-Haz Chlorinated Solvents Impacted Soil $ 125.00 Per Drum T&D - Non-Haz Chlorinated Solvents Impacted Mud/Water $ 125.00 Per Drum T&D - Non-Haz Chlorinated Solvents Impacted Water $ 95.00 Per Bucket
For Non-Hazardous PFAS/PFOS Impacted Materials:
Description Rate Unit Profile Fee (Charged once per site) $ 350.00 Per Site T&D - Non-Haz PFOS/PFAS Impacted Water (5-gallon bucket) $ 95.00 Per Bucket T&D - Non-Haz PFOS/PFAS Impacted Soil $ 195.00 Per Drum T&D - Non-Haz PFOS/PFAS Impacted Mud/Water $ 195.00 Per Drum
Please ensure that all drum lids are properly secured and that drums are on a level surface like the surrounding area (i.e., not on a pallet, etc.). A single False Mobilization fee will apply if our driver is not able to locate a drum on site or if we are unable to access the property due to a locked gate, etc. This quote is valid for 90 days.
Respectfully, Robert Donado Erwin Remediation, Inc.
Email: robert@erwinremediation.com p y
File details come from the government source that posted it. Updated .