This document is a Task Assignment Change Order (TACO #9) issued by the State of Florida Department of Environmental Protection (FDEP) to WSP USA Inc. The change order amends Task Assignment DC001A under Contract HW685, with Patrick McGrane serving as FDEP's Project Manager and Matthew Crews as the contractor's Project Manager. The contract involves work on multiple environmental sites under FDEP's jurisdiction.

TACO #9 authorizes a cost increase of $2,525.33, raising the total task assignment value from $31,910.34 to $34,435.67 on a fixed unit rate basis. The change order approves additional labor hours for revising the L&L Cleaners Interim Source Removal Plan (ISRP), including site activities (Work Change Directives #1-#14) and revised reporting and field work. Deliverables include submittal and FDEP approval of WCD #1-#13 and the revised L&L Interim Source Removal Plan with field notes verifying depth-to-water measurements, with all work due by December 27, 2026. Invoicing is authorized upon completion of these milestones, with $31,910.34 due for initial work approval and $2,525.33 due upon approval of the revised ISRP and field notes. The cost increase includes labor for plan revision, site travel, and depth-to-water level verification, with work authorized following a March 24, 2026 teleconference between FDEP and WSP.

View the file

Other files

File Type Posted
CN-370000-HW685-BF01DCO1.pdf PDF
CN-370000-HW685-BF02B.pdf PDF
CN-370000-HW685-BF04A.pdf PDF
CN-370000-HW685-BIL01A.pdf PDF
CN-370000-HW685-BIL1ACO1.pdf PDF
CN-370000-HW685-BIL1ACO2.pdf PDF
CN-370000-HW685-BIL1ACO3.pdf PDF
CN-370000-HW685-BIL1BCO1.pdf PDF
CN-370000-HW685-DC001F.pdf PDF
CN-370000-HW685-DC001b.pdf PDF
CN-370000-HW685-DC002A.pdf PDF
CN-370000-HW685-DC002D.pdf PDF
CN-370000-HW685-DC002H.pdf PDF
CN-370000-HW685-DC003B.pdf PDF
CN-370000-HW685-DC004B.pdf PDF
CN-370000-HW685-DC008C.pdf PDF
CN-370000-HW685-DC009C.pdf PDF
CN-370000-HW685-DC010D.pdf PDF
CN-370000-HW685-DC014A.pdf PDF
CN-370000-HW685-DC015A.pdf PDF
CN-370000-HW685-DC016B.pdf PDF
CN-370000-HW685-DC016C.pdf PDF
CN-370000-HW685-DC018C.pdf PDF
CN-370000-HW685-DC01ACO3.pdf PDF
CN-370000-HW685-DC01ACO5.pdf PDF
CN-370000-HW685-DC021D.pdf PDF
CN-370000-HW685-DC024A.pdf PDF
CN-370000-HW685-DC024B.pdf PDF
CN-370000-HW685-DC024D.pdf PDF
CN-370000-HW685-DC026A.pdf PDF
CN-370000-HW685-DC026D.pdf PDF
CN-370000-HW685-DC028B.pdf PDF
CN-370000-HW685-DC028E.pdf PDF
CN-370000-HW685-DC02DCO1.pdf PDF
CN-370000-HW685-DC02ECO1.pdf PDF
CN-370000-HW685-DC02GCO1.pdf PDF
CN-370000-HW685-DC030A.pdf PDF
CN-370000-HW685-DC031B.pdf PDF
CN-370000-HW685-DC033B.pdf PDF
CN-370000-HW685-DC034C.pdf PDF
CN-370000-HW685-DC034D.pdf PDF
CN-370000-HW685-DC036A.pdf PDF
CN-370000-HW685-DC038A.pdf PDF
CN-370000-HW685-DC038D.pdf PDF
CN-370000-HW685-DC03ACO1.pdf PDF
CN-370000-HW685-DC03BCO1.pdf PDF
CN-370000-HW685-DC041A.pdf PDF
CN-370000-HW685-DC042C.pdf PDF
CN-370000-HW685-DC051B.pdf PDF
CN-370000-HW685-DC052D.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department) Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

DC001A 9 HW685

Patrick McGrane 850-245-8899 Contractor WSP USA Inc. Contractor

Contractor Matt Crews Contractor 904-363-3430 Multiple

Multiple

✔ $ 34,435.67 $ 31,910.34

$ 34,435.67 $ 31,910.34 ✔ Completion

Completion 12/27/2026 12/27/2026 0

✔ 1 1 9

WSP USA Inc.

Contractor Matthew Crews

Environmental Engineer

4/2/2026

Crews, Matt (USMC700671) Digitally signed by Crews, Matt (USMC700671) Date: 2026.04.02 10:48:03 -04'00'

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2026.04.02 10:10:38 -04'00'

N/A

This Change Order authorizes a cost increase approving additional hours for revising the L&L Cleaners

ISRP.

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Change Order #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

BWC TAFORM 01/18

HW685

DC001A

Revised Reporting & Field Work

Site Activities (WCD #1 - WCD #14).

12/27/2026

12/27/2026

Submittal and FDEP approval of WCD #1 - WCD #13

Submittal and FDEP approval of revised L&L Interim Source Removal Plan and field notes verifying depth to water measurements

$ 31,910.34

$ 2,525.33

$ 34,435.67

Memorandum

TO: Negotiation File

FROM: Patrick McGrane, Project Manager

SUBJECT: Negotiation Summary Task Assignment Change Order DC001A-9 (HW685)

DATE: April 1, 2026

This Change Order authorizes a total cost increase allocating hours for revising the L&L Cleaners

Interim Source Removal Plan. The proposed scope of work was approved during a teleconference between the DEP and WSP on March 24, 2026. Part of these changes include WSP labor traveling to the site and ensuring that depth to water levels found during assessment are representative of current site conditions.

The previous cost total was $31,910.34. Total costs were increased by $2,525.33 resulting in a new final cost total of $34,435.67. WSP may invoice according to the included schedule.

FD

EP

C O

ST

E

ST

IM

A

TE

C on tra ct or

W

SP

U

SA

In c.

D at e:

3/

/2

Ta sk

D C

1A

S ub Ta sk

P ro je ct

M an ag em en t

S ub

Ta sk

S ite

S ub Ta sk

L& L

C le an er s

IS

R P

S ub

Ta sk

A ct iv ity

/P ha se

M ul tip le

S ite s

Ta sk

S ub Ta sk

P ro je ct

M an ag er

Pa tri ck

M cG ra ne

Ta sk

S ub

Ta sk

S ub

Ta sk

S ub Ta sk

T To ta ls

La bo r

R at e C at eg or y

$4 7.

Pr oj ec t M an ag er

(J S)

1.

$0

.0

Pr og ra m

L ea de r -

X -1

0.

0.

0.

0.

0.

0.

0.

0.

$7

8.

Pr ac tic e

Le ad er

X-

(M C

2.

0.

0.

0.

0.

0.

0.

0.

$0

.0

Se ni or C on su lta nt

X-

0.

0.

0.

0.

0.

0.

0.

0.

$5 6.

Se ni or

S ci

/E ng

X-

(B

L)

2.

0.

0.

0.

0.

0.

0.

0.

$4

9.

Se ni or S ci /E ng

X-

(J S)

5.

0.

0.

0.

0.

0.

0.

0.

$0 .0

Se ni or

P ro je ct

S ci

/E ng

P-

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

Pr oj ec t S ci /E ng

P-

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

Pr oj ec t S ci

/E ng

P-

0.

0.

0.

0.

0.

0.

0.

0.

$3

1.

St af f S ci

/E ng

P-

(S

S)

3.

0.

0.

0.

0.

0.

0.

0.

$3

8.

St af f S ci

/E ng

P-

(A

S)

2.

0.

0.

0.

0.

0.

0.

0.

$0

.0

St af f S ci

/E ng

P-

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

Sc i/E ng /A dm in

P-

0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

TTo ta l H ou rs

1.

.0 0.

0.

0.

0.

0.

0.

0.

D ire ct L ab or

$7

.7

$8

9.

$6

.9

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

O ve rh ea d

2.

$1

,3

.8

$1

.9

$1 ,1

.8

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

G en

A dm in 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fr in ge

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l L ab or

$2 ,1

.5

$2

.7

$1

,8

.8

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ul tip le

S ite s

RE

V:

2/

CE

F

GO

LD

ER

Pa ge

FD

EP

C O

ST

E

ST

IM

A

TE

C on tra ct or

W

SP

U

SA

In c.

at e:

3/

/2

Ta sk

D C

1A

Ta sk

P ro je ct

M an ag em en t

S ub

Ta sk

S ite

S ub Ta sk

L& L

C le an er s

IS

R P

S ub

Ta sk

A ct iv ity

/P ha se

M ul tip le

S ite

Ta sk

S ub Ta sk

P ro je ct

M an ag er

Pa tri ck

M cG ra ne

Ta sk

S ub

Ta sk

S ub

Ta sk

S ub Ta sk

TTo ta ls

M ul tip le

S ite s

TTr av el V eh ic le R en ta l $1

.0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M ile ag e C os ts

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

A ir

Fa re

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ea ls $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

H ot el $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l T ra ve l $ $1

.0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

(E qu ip m en t P ro cu re m en t)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P ro cu re m en t F ee

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or (S er vi ce s

P ro cu re m en t) ril lin g

(C on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

D ril lin g (N on -c on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ob ile L ab or at or y $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ur ve yi ng

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

U til iti es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

H an dl in g Fe e $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

La bo ra to ry

A na ly tic al

C os ts $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fa st T ur na ro un d C ha rg es $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S am pl e S hi pp in g

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l L ab or at or y

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fi el d E xp en se

P er so na l P ro te ct io n $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E xp en da bl es $4

0.

$4 0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( D ril lin g re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( A na ly tic al re la te d)

$2 5.

$2

5.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

ID

W re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

O th er

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l F ie ld E xp en se s

$6 5.

$6

5.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub to ta l $2

,3

.5

$2

.7

$2 ,0

.8

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

C om pl et io n Fe e $2

.7

$2

4.

$1

.2

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l E st im at ed C os t

$2 ,5

.3

$2

.2

$2

,2

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

RE

V:

2/

CE

F

GO

LD

ER

Pa ge

SITE : Multiple Sites SUBTASK 2: L&L Cleaners ISRP

DATE: 3/30/2026

LABOR CATEGORIES *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLES WORK DESCRIPTIONS HOURS

Practice Leader (M. Crews) 2

Senior Sci/Eng (J. Spengler) 5

Staff Sci/Eng (S. Svendsen) 3

Senior Sci/Eng (B. Lucero) CADD - Update figures for ISR Work Plan 2

Staff Sci/Eng (A. Strayer) 2

TOTAL LABOR 14.0

VEHICLE TYPE RATE UNIT USAGE

Truck $120.00 Per Day 1 $120.00

TOTAL VEHICLE $120.00

MEALS STAFF RATE UNIT USAGE

TOTAL MEALS $0.00

HOTEL STAFF RATE UNIT USAGE

TOTAL HOTEL $0.00

SUBCONTRACTOR COSTS

NAME RATE UNIT USAGE

TOTAL SUBS $0.00

LABORATORY COSTS

PARAMETERS RATES # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEMS RATES UNITS USAGES

Miscellaneous Expendables $40.00 Per Day 1 $40.00 Water Level Indicator $25.00 Per Day 1 $25.00

TOTAL EQUIPMENT $65.00

Prepare final ISR Work Plan to incorporate updated groundwater elevations and design changes per DEP recommendations via teleconference on 3/24/26 (2 hours).

Update draft ISR Work Plan to incorporate updated groundwater elevations and design changes per DEP recommendations via teleconference on 3/24/26 (5 hours).

PURPOSE

Travel to site and collect depth-to-groundwater measurements from monitoring wells (3 hours).

Reporting: report formatting, document production. Create pdf for OCULUS.

McGrane, Patrick

From: Crews, Matt <matt.crews@wsp.com> Sent: Monday, March 30, 2026 9:00 AM To: McGrane, Patrick Cc: Spengler, Justin Subject: DC001A (TACO #9) - Critical Response for L&L Cleaners ISRP Attachments: DC001A (Delta #9) - Critical Response LOECEF.xlsx

Follow Up Flag: Follow up Flag Status: Flagged

EXTERNAL MESSAGE

This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.

Good morning Patrick, WSP has attached the Delta #9 file to include costs associated with updating the ISRP for the L&L Cleaners site (ERIC_5402), as discussed during our 3/24/2026 teleconference. WSP has also included time and vehicle/equipment costs to collect a round of water levels, prior to updating the ISRP. Costs have been included on the Critical Response TA DC001A, as the task assignment associated with the ISRP (DC043C) has expired.

Please let us know if you have any questions or comments.

Thanks, Matt

Matthew Crews, P.E.

Assistant Vice President, Environmental Engineer

T+ 1 904-363-3430

M+ 1 904-327-8420

WSP USA Inc.

9428 Baymeadows Road, Suite 400 Jacksonville, Florida, USA 32256 wsp.com

NOTICE: This communication and any attachments ("this message") may contain information which is privileged, confidential, proprietary or otherwise subject to restricted disclosure under applicable law. This message is for the sole use of the intended recipient(s). Any unauthorized use, disclosure, viewing, copying, alteration, dissemination or distribution of, or reliance on, this message is strictly prohibited. If you have received this message in error, or you are not an authorized or intended recipient, please notify the sender immediately by replying to this message, delete this message and all copies from your e-mail system and destroy any printed copies.

-LAEmHhHzdJzBlTWfa4Hgs7pbKl

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department) Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

DC001A 8 HW685

Patrick McGrane 850-245-8899 Contractor WSP USA Inc. Contractor

Contractor Matt Crews Contractor 904-363-3430 Multiple

Multiple

✔ $ 31,910.34 $ 30,754.42

$ 31,910.34 $ 30,754.42 ✔ Completion

Completion 12/27/2026 12/27/2026 0

✔ 1 1 8

WSP USA Inc.

Contractor Matthew Crews

Environmental Engineer

10/9/2025

Crews, Matt (USMC700671) Digitally signed by Crews, Matt (USMC700671) Date: 2025.10.09 09:12:04 -04'00'

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2025.10.08 15:45:18 -04'00'

N/A

This Change Order authorizes a cost increase to reconcile work authorized in Work Change Directive #14.

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Change Order #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

BWC TAFORM 01/18

HW685

DC001A

Monitoring Well Abandonment (WCD #14)

Site Activities (WCD #1 - WCD #13).

12/27/2027

12/27/2027

Submittal and FDEP approval of WCD #1 - WCD #13

Submittal and FDEP approval of field documentation from WCD #14

$ 30,754.42

$ 1,155.92

$ 31,910.34