CN-370000-HW685-DC001C.pdf

PDF 775 KB Posted

Attached to
Master Agreement FL|HW685|184b9800bda47b032a54413957b4b38d
Contract number
HW685
Issued by
Florida

About this file

This is a Task Assignment (TA) issued by the State of Florida Department of Environmental Protection under Contract Number HW685. The Task Assignment DC001C was executed between the Department and Golder Associates USA Inc., with Ben Grubbs serving as the Department's Project Manager and Matt Crews as the Contractor's Project Manager. The assignment is effective through July 29, 2022, and addresses work related to multiple sites across Florida.

The Task Assignment authorizes Golder Associates USA Inc. to send two personnel to attend the Annual Site Review Meeting with FDEP and submit meeting notes in accordance with the June 1, 2022 Scope of Work and Cost Estimate. The work comprises two subtasks: Subtask 1 involves project management with an automatic calculation based on total direct labor hours, and Subtask 2 involves the 2022 Site Review Meeting requiring Golder to send two personnel to attend the annual meeting and submit meeting notes. The total Task Assignment value is $8,095.71 on a fixed unit rate basis, representing 51 total labor hours. The cost breakdown includes direct labor of $2,674.13, overhead at 172.50% totaling $4,612.88, a completion fee of $728.70, and travel expenses of $80.00 for vehicle rental. Invoicing is contingent upon submittal and FDEP approval of the Site Review Meeting Notes with a deliverable due date of June 22, 2022.

View the file

Other files

File Type Posted
CN-370000-HW685-BF01DCO1.pdf PDF
CN-370000-HW685-BF02B.pdf PDF
CN-370000-HW685-BF04A.pdf PDF
CN-370000-HW685-BIL01A.pdf PDF
CN-370000-HW685-BIL1ACO1.pdf PDF
CN-370000-HW685-BIL1ACO2.pdf PDF
CN-370000-HW685-BIL1ACO3.pdf PDF
CN-370000-HW685-BIL1BCO1.pdf PDF
CN-370000-HW685-DC001F.pdf PDF
CN-370000-HW685-DC001b.pdf PDF
CN-370000-HW685-DC002A.pdf PDF
CN-370000-HW685-DC002D.pdf PDF
CN-370000-HW685-DC002H.pdf PDF
CN-370000-HW685-DC003B.pdf PDF
CN-370000-HW685-DC004B.pdf PDF
CN-370000-HW685-DC008C.pdf PDF
CN-370000-HW685-DC009C.pdf PDF
CN-370000-HW685-DC010D.pdf PDF
CN-370000-HW685-DC014A.pdf PDF
CN-370000-HW685-DC015A.pdf PDF
CN-370000-HW685-DC016B.pdf PDF
CN-370000-HW685-DC016C.pdf PDF
CN-370000-HW685-DC018C.pdf PDF
CN-370000-HW685-DC01ACO3.pdf PDF
CN-370000-HW685-DC01ACO5.pdf PDF
CN-370000-HW685-DC021D.pdf PDF
CN-370000-HW685-DC024A.pdf PDF
CN-370000-HW685-DC024B.pdf PDF
CN-370000-HW685-DC024D.pdf PDF
CN-370000-HW685-DC026A.pdf PDF
CN-370000-HW685-DC026D.pdf PDF
CN-370000-HW685-DC028B.pdf PDF
CN-370000-HW685-DC028E.pdf PDF
CN-370000-HW685-DC02DCO1.pdf PDF
CN-370000-HW685-DC02ECO1.pdf PDF
CN-370000-HW685-DC02GCO1.pdf PDF
CN-370000-HW685-DC030A.pdf PDF
CN-370000-HW685-DC031B.pdf PDF
CN-370000-HW685-DC033B.pdf PDF
CN-370000-HW685-DC034C.pdf PDF
CN-370000-HW685-DC034D.pdf PDF
CN-370000-HW685-DC036A.pdf PDF
CN-370000-HW685-DC038A.pdf PDF
CN-370000-HW685-DC038D.pdf PDF
CN-370000-HW685-DC03ACO1.pdf PDF
CN-370000-HW685-DC03BCO1.pdf PDF
CN-370000-HW685-DC041A.pdf PDF
CN-370000-HW685-DC042C.pdf PDF
CN-370000-HW685-DC051B.pdf PDF
CN-370000-HW685-DC052D.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

HW685

DC001C Completion July 29, 2022

This Task Assignment authorizes Golder to send two personnel to attend the Annual Site Review Meeting with FDEP and submit meeting notes in accordance with the June 1, 2022, Scope of Work and Cost Estimate.

Ben Grubbs 850-245-8992 Contractor Golder Associates USA Inc. Contractor

Contractor Matt Crews Contractor 904-363-3430 N/A

N/A

N/A

Contractor Contractor

✔ $ 8,095.71

$ 8,095.71

Scope of Work

Golder Associates USA Inc.

Contractor Matthew Crews

Senior Lead Consultant

Matthew C. Crews Digitally signed by Matthew C. Crews Date: 2022.06.02 13:22:07 -04'00'

William E. Burns, Jr.

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2022.06.02 13:01:44 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtasks 1 & 2: Site Review Meeting Notes; Project Management 06/22/2022

Subtasks 1 & 2: Submittal and FDEP approval of the Site Review Meeting Notes;

Project Management $ 8,095.71

$ 8,095.71

HW685

DC001C

Printed on recycled paper.

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Secretary

To: HW685 Contract Negotiation File From: Ben Grubbs, Project Manager Date: June 2, 2022 Subject: Negotiation Summary

HW685 DC001C

This Task Assignment authorizes Golder to send two personnel to attend the Annual Site Review Meeting with FDEP and submit meeting notes in accordance with the June 1, 2022, Scope of Work and Cost Estimate.

Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.

Subtask 2: 2022 Site Review Meeting Golder will send two personnel to attend the Annual Site Review Meeting with FDEP and submit meeting notes.

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $8,095.71 with 51 labor hours.

Golder may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.

FDEP COST ESTIMATEContractor: Golder Associates USA Inc.

Date: 6/1/2022

Task #: DC001C SubTask 1 Project Management SubTask 6

Site: Multiple Sites SubTask 2 2022 Site Summary Meeting SubTask 7

Activity/Phase: Site Review Meeting SubTask 3 SubTask 8

Project Manager: Ben Grubbs SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$55.25 Project Manager (MC) 6 5.6 $0.00 Program Leader - X-14 0 0 0 0 0 0 0 0 0 0 $0.00 Practice Leader - X-13 0 0 0 0 0 0 0 0 0 0

$55.25 Senior Consultant - X-12 (MC) 29 29 0 0 0 0 0 0 0 0 $51.23 Senior Sci/Eng - X-11 (RM) 13 13 0 0 0 0 0 0 0 0

$0.00 Senior Project Sci/Eng - P-10 0 0 0 0 0 0 0 0 0 0 $0.00 Project Sci/Eng - P-9 0 0 0 0 0 0 0 0 0 0

$32.75 Staff Sci/Eng - P-8 (AS) 3 3 0 0 0 0 0 0 0 0 $0.00 Sci/Eng/Admin - P-7 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 51 5.6 45.0 0 0 0 0 0 0 0 0

Direct Labor $2,674.13 $307.64 $2,366.49 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.50% $4,612.88 $530.68 $4,082.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $7,287.01 $838.32 $6,448.69 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF ARCADIS Page 1

FDEP COST ESTIMATEContractor: Golder Associates USA Inc.

Date: 6/1/2022

Task #: DC001C SubTask 1 Project Management SubTask 6

Site: Multiple Sites SubTask 2 2022 Site Summary Meeting SubTask 7

Activity/Phase: Site Review Meeting SubTask 3 SubTask 8

Project Manager: Ben Grubbs SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Travel

Vehicle Rental $80.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $80.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $7,367.01 $838.32 $6,528.69 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $728.70 $83.83 $644.87 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $8,095.71 $922.15 $7,173.56 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF ARCADIS Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Multiple Sites SUBTASK 2: 2022 Site Summary Meeting

DATE: 6/1/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Consultant (M. Crews) 16

Senior Consultant (M. Crews) 13

Senior Sci/Eng (R Mongillo) 13

Staff Sci/Eng (A. Strayer) Document production for site summaries 3

TOTAL LABOR 45

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Per Day 1 $80.00

TOTAL VEHICLE $80.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

Round trip travel and attendance for annual site summary meeting

Preparation/updating of site summaries. Site summary final deliverable.

Round trip travel and attendance for annual site summary meeting

FINAL --7/24/96

From: Crews, Matt To: Grubbs, Benjamin Cc: Mongillo, Ralph Subject: DC001C - LOE & CEF for 2022 Site Summary Meeting Date: Wednesday, June 1, 2022 14:51:57 Attachments: image001.png image002.png DC001C - DEP Site Summary Meeting 2022 LOECEF.xlsx

EXTERNAL MESSAGE

This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.

Ben, I’ve attached the LOE & CEF for the task assignment to cover costs associated with the 2022 site summary meeting, which will be held on Wednesday, June 8th in Tallahassee, FL. Please review and let us know if you have any questions.

Thanks, Matt

Matthew Crews, P.E.

Senior Lead Consultant, Environmental Engineer

T: +1 904 363 3430 D: +1 904 207 6023 C: +1 904 327 8420

9428 Baymeadows Road, Suite 400, Jacksonville, Florida, USA 32256 wsp.com | golder.com

WSP and Golder have joined together to form the premier environmental consultancy in the industry. Together we are 14,000 strong, Future Ready©, and delivering innovative solutions to our clients around the globe.

As of October 28, 2021, Golder Associates Inc. is now Golder Associates USA Inc.

This email transmission is confidential and may contain proprietary information for the exclusive use of the intended recipient. Any use, distribution or copying of this transmission, other than by the intended recipient, is strictly prohibited. If you are not the intended recipient, please notify the sender and delete all copies. Electronic media is susceptible to unauthorized modification, deterioration, and incompatibility. Accordingly, the electronic media version of any work product may not be relied upon.

-LAEmHhHzdJzBlTWfa4Hgs7pbKl-BT-P365-c108p227-DayTwo-Disclaimer mailto:Matt_Crews@golder.com mailto:Benjamin.Grubbs@FloridaDEP.gov mailto:Ralph_Mongillo@golder.com http://secure-web.cisco.com/18DhyoeBg2XYPIpgzKdSxXd_0NIeLHsMAJ2FLSf5cQAh7v4_XlQYPzpOGXeWUkv8DH1xdyv4J2jLhT35Zfb4-9RowTvsV-yblNSXMfpGVsmNomNFJBhRxkGro_wknVIC2m9frr1u-_udm53lJ1DVz2Sxel_ZM26AC7eRNa1McmKXn3Tg7wgB4qAmuyKHLk2lfhaP__nL9r0ssHVDu3PWjOPEnt8Pu1vSqNNlk0-MUSAX1Bk6A5z3b8vsODUT9pRKNU5ge39JG8a0FxbCHF3yf5SpVDU2chnQobRbaENBXgc_STLaFNUMWUYekWNOzopTNV5gGE3SGs8QTLOcxNH0utw/http%3A%2F%2Fwsp.com%2F http://secure-web.cisco.com/1Ot2rQf_0TupuXEosUwU_mZZm0OiAW4lnXke-Jp9EBZnycQ0rrU_iL8bepBu38OzzA02fvi0TLYbV8coXHsn1ulbZr6-pDYYNEZFrAdh4h98R-ZHVgSlpWmT2RtcEaAoLxwffRL2q98RayB7p25X2uVndvW4JI61T0w486gCQKx75jfPJ2He_vedvomF-yw3bOqWutqav3vCa-B9sErtpSgPs8GTWjUcok_Zq37KsEh2W1FudIVjyKeaAge0ONQDjQXKGq5xSi1kXfwS8Ii_RuHQn22-wCRiFQluveJA1PA9-FtY0tqa2CAMK7MM_ayqp/http%3A%2F%2Fgolder.com%2F

Subtask 2

SITE : Multiple Sites

SUBTASK 2: 2022 Site Summary Meeting

DATE: 6/1/22

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Consultant (M. Crews) Preparation/updating of site summaries. Site summary final deliverable. 16

Senior Consultant (M. Crews) Round trip travel and attendance for annual site summary meeting 13

Senior Sci/Eng (R Mongillo) Round trip travel and attendance for annual site summary meeting 13

Staff Sci/Eng (A. Strayer) Document production for site summaries 3

TOTAL LABOR 45

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Per Day 1 $80.00

TOTAL VEHICLE $80.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

&"Times New Roman,Regular"&12LEVEL OF EFFORT/EXPENSE WORKSHEET

FINAL --7/24/96

Page &P

Cost Estimate

Contractor: Golder Associates USA Inc.

Date: 6/1/22

Task #: DC001C SubTask 1 Project Management SubTask 6

Site: Multiple Sites SubTask 2 2022 Site Summary Meeting SubTask 7

Activity/Phase: Site Review Meeting SubTask 3 SubTask 8

Project Manager: Ben Grubbs SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Labor Rate Category

$55.25 Project Manager (MC) 6 5.6

$0.00 Program Leader - X-14 0 0 0 0 0 0 0 0 0 0

$0.00 Practice Leader - X-13 0 0 0 0 0 0 0 0 0 0

$55.25 Senior Consultant - X-12 (MC) 29 29 0 0 0 0 0 0 0 0

$51.23 Senior Sci/Eng - X-11 (RM) 13 13 0 0 0 0 0 0 0 0

$0.00 Senior Project Sci/Eng - P-10 0 0 0 0 0 0 0 0 0 0

$0.00 Project Sci/Eng - P-9 0 0 0 0 0 0 0 0 0 0

$32.75 Staff Sci/Eng - P-8 (AS) 3 3 0 0 0 0 0 0 0 0

$0.00 Sci/Eng/Admin - P-7 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 51 5.6 45.0 0 0 0 0 0 0 0 0

Direct Labor $2,674.13 $307.64 $2,366.49 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.50% $4,612.88 $530.68 $4,082.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $7,287.01 $838.32 $6,448.69 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel

Vehicle Rental $80.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $80.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $7,367.01 $838.32 $6,528.69 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Completion Fee $728.70 $83.83 $644.87 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $8,095.71 $922.15 $7,173.56 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

&"CG Times,Bold"&16FDEP COST ESTIMATE

&"Courier New,Bold"&10REV: 02/03 &"Courier New,Bold"&10CEF ARCADIS &"Courier New,Bold"&10Page &P

Formula Sheet

Project Management

Subtask 1 Subtask 2 Subtask 3 Subtask 4 Subtask 5 Subtask 6 Subtask 7 Subtask 8 Subtask 9 Subtask 10

Labor Costs $309.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$1,602.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$665.99 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$98.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 total labor dollars $309.40 $2,366.49 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Project Management $2,366.49 = sum of Direct Labor Costs from Subtasks 2 through 10

$307.64 =13% of Direct Labor Costs (Project Management)

5.568 = Hours of Project Management (based on hourly salary of the Contractor Project Manager)

Subcontractor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Service Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

File details come from the government source that posted it. Updated .