CN-370000-HW685-BF01C.pdf
PDF 2 MB Posted
- Contract number
- HW685
- Issued by
- Florida
About this file
This Task Assignment (TA) is a state contract document issued by the Florida Department of Environmental Protection (FDEP) to Golder Associates USA Inc. for supplemental soil sampling services at the Former Slick's Garage site located at 904 4th Street West, Palmetto, Manatee County, Florida. The task assignment, numbered BF01C under Contract HW685, was executed on November 4, 2022, with a completion date of January 27, 2023. The work is being conducted using federal funds from the State & Tribal Response Program (SRP) cooperative agreement administered by FDEP on behalf of the U.S. Environmental Protection Agency (EPA). The Department Project Manager is Megan Johnson, and the Contractor's Project Manager is Matt Crews, a Senior Lead Consultant with Golder.
The contract encompasses two subtasks with a total value of $9,652.73. Subtask 1 covers project management activities at a cost of $784.44 and includes schedule management, budget tracking, invoicing, and project coordination. Subtask 2, valued at $8,868.29, involves supplemental soil sampling activities including utility coordination, collection of 36 discrete soil samples from 9 borings in Area 1 at depths ranging from 0 to 6 feet below ground surface analyzed for arsenic using EPA Method 6010, and collection of 7 discrete soil samples from Area 3 at 0 to 0.5 feet below ground surface analyzed for polynuclear aromatic hydrocarbons using EPA Method 8270. The deliverable, due December 9, 2022, consists of field documentation, laboratory analytical reports, tables, and figures. Payment is structured as a fixed unit rate with the total contract value of $9,652.73 to be invoiced upon Department approval of all project management and supplemental soil sampling deliverables. The contract includes detailed level of effort sheets documenting labor hours, travel expenses, laboratory costs, and field equipment requirements supporting the cost estimate.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW685
BF01C Completion January 27, 2023
The Department approves this Task Assignment (TA) based upon the Cost Proposal and Level of Effort (CP/LOE) to conduct supplemental soil sampling at the below project site, submitted to the Department on October 20, 2022 by Golder Associates USA Inc. The supplemental soil sampling activities involves collecting soil samples in areas 1 and 3 to establish final excavation areas and depths, prior to mobilization of equipment to complete the interim source removal activities.
Megan Johnson (850) 245-8994 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Golder Associates USA Inc.
Golder Associates USA Inc.
Matt Crews (904) 363-3430
ERIC_7517
904 4th Street West, Palmetto, Manatee County
Former Slick's Garage
✔ $ 9,652.73
$ 9,652.73
Scope of Work
Matt Crews, P.E.
Senior Lead Consultant
11/4/2022
Matthew C. Crews Digitally signed by Matthew C. Crews Date: 2022.11.04 10:35:36 -04'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2022.11.03 08:34:27 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Project Management and Supplemental Soil Sampling field documentation, laboratory analytical reports, tables, and figures. 12/09/2022
Department approval of Project Management and Supplemental Soil Sampling field documentation, laboratory analytical reports results, tables, and figures. (Subtasks 1 and 2)
$ 9,652.73
$ 9,652.73
HW685
BF01C
www.FloridaDEP.gov
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: Golder Associates USA Inc., HW685 Contract File
FROM: Megan Johnson, Contract Manager
DATE: November 2, 2022
SUBJECT: Negotiation Summary – SRP18 Task Assignment (TA) BF01C
Former Slick’s Garage – Site ID # ERIC_7517 Supplemental Soil Sampling
This TA is intended for conducting supplemental soil sampling at the Former Slick’s Garage site, located at 904 4th Street West, Palmetto, Manatee County. The services under this task are being conducted using federal funds from the State & Tribal Response Program (SRP) cooperative agreement that is administered by the Department on behalf of the U.S. Environmental Protection Agency (EPA).
Subtask 1: Project Management This subtask is a percentage of the overall project fees and has been negotiated as a contract rate. It includes project management, overhead, general and administrative, and fringe. The agreed upon cost of this subtask is $784.44.
Subtask 2: Supplemental Soil Sampling Under this subtask, prior to soil sampling activities, Golder will coordinate utility location in the proposed sampling areas. Golder will collect 36 discrete soil samples from 9 borings in Area 1 at depths of 0 to 0.5 feet below ground surface (bgs), 0.5 to 2 feet bgs, 2 to 4 feet bgs, and 4 to 6 feet bgs. Twelve samples will be analyzed immediately for arsenic using EPA Method 6010, while 24 will be held for step-out analysis, as needed. Golder will collect seven discrete soil samples from seven borings in Area 3 at a depth of 0 to 0.5 feet bgs. Three samples will be analyzed immediately for polynuclear aromatic hydrocarbons using EPA Method 8270, while four will be held for step-out analysis, as needed. The agreed upon cost of this subtask is $8,868.29.
Summary The Department’s SRP Contract Manager and Golder’s Contract Manager have both agreed to the scope of work and associated costs. The final cost associated with this TA is $9,652.73. Documentation of these costs is included in the Cost Proposal/Level of Effort (CP/LOE) Form and CP/LOE narrative provided by Golder on October 20, 2022, and the TA Form for BF01C prepared by the Department. The final deliverable for this TA must be received by the Department no later than December 9, 2022.
http://www.floridadep.gov/
Golder Associates USA Inc.
9428 Baymeadows Road, Suite 400, Jacksonville, Florida, USA 32256
T: +1 904 363-3430 F: +1 904 363-3445
Golder and the G logo are trademarks of Golder Associates Corporation golder.com
October 17, 2022 Proposal No. 202208350
Ms. Megan Johnson Florida Department of Environmental Protection 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400
RE: COST PROPOSAL FOR SUPPLEMENTAL SOIL SAMPLING
FORMER SLICK’S GARAGE
904 4TH STREET WEST
PALMETTO, MANATEE COUNTY, FLORIDA
DEP FACILITY ID NUMBER: ERIC_7517
BROWNFIELDS SITE ID: BF411201004
Dear Ms. Johnson:
Golder Associates USA Inc. (Golder) is providing the Florida Department of Environmental Protection (DEP) with this cost proposal to complete supplemental soil sampling activities for the above-referenced site. This proposal includes a description of the proposed scope of services, level of effort sheets for each subtask, and a cost estimate form that summarizes the costs of the proposed services. The proposed scope of services is described below.
SUBTASK 1 – PROJECT MANAGEMENT
To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with DEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with DEP requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the DEP-approved task assignment.
SUBTASK 2 – SUPPLEMENTAL SOIL SAMPLING ACTIVITIES
Following authorization to proceed, Golder will coordinate with the appropriate representatives of the Palmetto Community Redevelopment Agency for access to complete the scope of work. Golder will contact Sunshine State One Call at least three working days (72 hours) before any subsurface work begins to identify and mark underground utilities in the proposed sampling areas.
Golder proposes to collect supplemental soil samples using a decontaminated stainless-steel hand auger in Area 1 and Area 3 to establish final excavation areas and depths, prior to mobilization of equipment to complete the Phase 2 interim source removal activities. Sampling activities will be completed in accordance with DEP Standard Operating Procedures (SOPs) for Field Activities (DEP SOP-001/01), dated January 2017 (effective April 16, 2018).
Ms. Megan Johnson Proposal No. 202208350
Florida Department of Environmental Protection October 17, 2022
In Area 1, Golder will collect discrete soil samples from the ground surface to the top of the water table. Based on previous assessment data, the depth-to-groundwater ranges from approximately 3.5 to 7.5 feet below ground surface (bgs). For cost estimating purposes, Golder has assumed a depth-to-groundwater of 6 feet bgs. As such, Golder will collect soil samples at the following depth intervals: 0 to 0.5 feet bgs; 0.5 to 2.0 feet bgs; 2.0 to 4.0 feet bgs; and 4.0 to 6.0 feet bgs. The soil samples in Area 1 will be analyzed for arsenic using EPA Method 6010. In Area 3, Golder will collect discrete soil samples from 0 to 0.5 feet bgs. The soil samples in Area 3 will be analyzed for polynuclear aromatic hydrocarbons using EPA Method 8270. The proposed soil sampling plan is shown in the attached Table 1. The proposed sample locations and depth intervals are shown on Figure 4.
Once Golder has received the laboratory analytical report, Golder will prepare and submit an e-mail deliverable to the DEP. The deliverable will include field documentation, laboratory analytical reports, and updated data tables and figures. The deliverable will include recommendations for further sampling, if necessary.
HEALTH AND SAFETY
Golder will update the existing site-specific Health and Safety Plan for the field work. The work will be completed in accordance with Golder’s safety policies and procedures. At a minimum, Golder will wear safety glasses, high visibility safety vests, and steel-toed boots. A safety job briefing will be conducted prior to the start of work activities, and anytime the scope of work or site conditions change.
COST AND SCHEDULE
The estimated cost to complete the scope of work is $9,652.73. Golder anticipates the supplemental soil sampling activities can be completed in two days. The level of effort sheets and cost estimate form are included in Attachment A. The following table summarizes the proposed costs and deliverable schedule.
Task Proposed Cost Proposed Schedule/Deliverables
Subtask 1 Project Management
$ 784.44 December 16, 2022
Subtask 2 Supplemental Soil Sampling Activities
$8,868.29 November 18, 2022 (Field documentation, laboratory analytical report, tables, and figures via e-mail deliverable)
Total/Completion Date $9,652.73 January 27, 2023
Golder appreciates the opportunity to provide services to the DEP. Should you require additional information or clarifications, please contact us at (904) 363-3430.
Sincerely, Golder Associates USA Inc.
Matthew C. Crews, PE Jesse C. Brown, PE Senior Lead Consultant, Environmental Engineer Director, Environmental Engineer
Ms. Megan Johnson Proposal No. 202208350
Florida Department of Environmental Protection October 17, 2022
MCC/JCB/as
Attachments: Table 1 Proposed Soil Sampling Plan
Figure 4 Proposed Soil Sampling Locations and Excavation Areas Attachment A Level of Effort Sheets and Cost Estimate Form
G:\Projects\DEP - Brownfields\Slick's Garage\BF01C - Supplemental Soil Sampling\BF01C - Slick's Garage Supp Soil Sampling Proposal.docx
TABLE 1
October 2022 31404452.7517.BF01C feet bgs Method 8270 Method 6010
Area 1
SB-54-0.5 0.0 - 0.5 X
SB-54-2.0 0.5 - 2.0 X
SB-54-4.0 2.0 - 4.0 X
SB-54-6.0 4.0 - 6.0 X
SB-55-0.5 0.0 - 0.5 X
SB-55-2.0 0.5 - 2.0 X
SB-55-4.0 2.0 - 4.0 X
SB-55-6.0 4.0 - 6.0 X
SB-56-0.5 0.0 - 0.5 X
SB-56-2.0 0.5 - 2.0 X
SB-56-4.0 2.0 - 4.0 X
SB-56-6.0 4.0 - 6.0 X
SB-57-0.5 0.0 - 0.5 X HOLD
SB-57-2.0 0.5 - 2.0 X HOLD
SB-57-4.0 2.0 - 4.0 X HOLD
SB-57-6.0 4.0 - 6.0 X HOLD
SB-58-0.5 0.0 - 0.5 X HOLD
SB-58-2.0 0.5 - 2.0 X HOLD
SB-58-4.0 2.0 - 4.0 X HOLD
SB-58-6.0 4.0 - 6.0 X HOLD
SB-59-0.5 0.0 - 0.5 X HOLD
SB-59-2.0 0.5 - 2.0 X HOLD
SB-59-4.0 2.0 - 4.0 X HOLD
SB-59-6.0 4.0 - 6.0 X HOLD
SB-60-0.5 0.0 - 0.5 X HOLD
SB-60-2.0 0.5 - 2.0 X HOLD
SB-60-4.0 2.0 - 4.0 X HOLD
SB-60-6.0 4.0 - 6.0 X HOLD
TABLE 1
PROPOSED SOIL SAMPLING PLAN
Former Slick's Garage Palmetto, Manatee County, Florida
Facility Identification Number ERIC_7517
Comments PAHs
Soil Boring ID Sample ID
Depth Interval
Arsenic
SB-59
SB-60
SB-54
SB-55
SB-56
SB-57
SB-58
Table 1 - Proposed Soil Sampling Plan Page 1 of 2
October 2022 31404452.7517.BF01C feet bgs Method 8270 Method 6010
TABLE 1
PROPOSED SOIL SAMPLING PLAN
Former Slick's Garage Palmetto, Manatee County, Florida
Facility Identification Number ERIC_7517
Comments PAHs
Soil Boring ID Sample ID
Depth Interval
Arsenic
SB-61-0.5 0.0 - 0.5 X HOLD
SB-61-2.0 0.5 - 2.0 X HOLD
SB-61-4.0 2.0 - 4.0 X HOLD
SB-61-6.0 4.0 - 6.0 X HOLD
SB-62-0.5 0.0 - 0.5 X HOLD
SB-62-2.0 0.5 - 2.0 X HOLD
SB-62-4.0 2.0 - 4.0 X HOLD
SB-62-6.0 4.0 - 6.0 X HOLD
Area 3
SB-7EE SB-7EE-0.5 0.0 - 0.5 X
SB-48 SB-48-0.5 0.0 - 0.5 X
SB-49 SB-49-0.5 0.0 - 0.5 X
SB-50 SB-50-0.5 0.0 - 0.5 X HOLD
SB-51 SB-51-0.5 0.0 - 0.5 X HOLD
SB-52 SB-52-0.5 0.0 - 0.5 X HOLD
SB-53 SB-53-0.5 0.0 - 0.5 X HOLD
Notes:
X - Parameter measured or analyzed
PAHs - Polynuclear Aromatic Hydrocarbons feet bgs - feet below ground surface
SB-61
SB-62
Table 1 - Proposed Soil Sampling Plan Page 2 of 2
FIGURE 4
9TH
AVEN
U E W
10TH
AVEN
U E W
9TH
AVEN
U
E WAREA 1
PROPOSED EXCAVATION AREA TO 2 FT-BGS 727 SF
PROPOSED EXCAVATION AREA TO 4 FT-BGS 203 SF
PROPOSED EXCAVATION AREA TO 6 FT-BGS 1,786 SF
AREA 2
PROPOSED EXCAVATION AREA TO 2 FT-BGS 2,052 SF
PROPOSED EXCAVATION AREA TO 4 FT-BGS 1,451 SF
PROPOSED EXCAVATION AREA TO 6 FT-BGS 1,453 SF
AREA 3
PROPOSED EXCAVATION AREA TO 2 FT-BGS 898 SF
MW-1
MW-2
MW-3
MW-4
MW-5
MW-6
MW-7
MW-8
MW-9
MW-10
MW-11
MW-12
MW-13
SB-1
SB-2NN
SB-2NW SB-2NE
SB-2N
SB-2S
SB-2W
SB-2 SB-2E
SB-3
SB-3N
SB-3S
SB-3W SB-3E
SB-4
SB-4N
SB-4NE
SB-4W
SB-4E
SB-4EE
SB-4SE
SB-4S
SB-9
SB-9N SB-9NE
SB-9W
SB-9E SB-9EE
SB-9S
SB-9SE
SB-6
SB-6N
SB-6S
SB-6W SB-6E
SB-10NW
SB-10N SB-10NE SB-13
SB-10W
SB-10
SB-10E SB11NE
SB-10SW
SB-10S
SB-10SE
SB-11
SB-11E
SB-12
SB-11SW
SB-11S
SB-11SE
SB-11SE/10E
SB-11SE/10S
SB-5SB-7WW
SB-7W SB-7
SB-7S
SB-7SS
SB-7E
SB-7EE
SB-8
SB-36
SB-34
SB-33
SB-32
SB-31
SB-30 SB-29
SB-28
SB-27
SB-26
SB-25
SB-37
SB-39
SB-38 SB-40
SB-41
SB-42
SB-43
SB-44
SB-45
SB-46
SB-47
SB-14
SB-15
SB-16
SB-17
SB-18
SB-19
SB-20
SB-21
SB-22
SB-23
SB-7N/SB-24
SITE BOUNDARY
SB-1
in
31404452 Control No.
31404452-B004
FIGURE
2022-06-06
BCL
MCC
MCC
JCB
FORMER SLICK'S GARAGE
904 4th ST WEST, PALMETTO
MANATEE COUNTY, FL
FL. DEPT. OF ENVIRONMENTAL PROTECTION
PROPOSED SOIL SAMPLING LOCATIONS AND EXCAVATION
AREAS
TITLE
PROJECT NO. REV.
PROJECT
CLIENT
CONSULTANT
PREPARED
DESIGNED
REVIEWED
APPROVED
YYYY-MM-DD
IF
T
H
IS
M
EA
SU
R
EM
EN
T D
O
ES
N O
T M
AT
C
H W
H
AT
IS
S
H O
W N
, T H
E
SH
EE
T
SI
ZE
H
AS
B
EE
N M
O D
IF
IE
D F
R O
M : A
N
SI
B
Pa th go ld er
.g ds
\c om pl ex da ta
\O ffi ce \J ac ks on vi lle \d ra fti ng \P ro je ct s\
Sl ic ks _G ar ag e\
Ph
_B F0
1A _J un e2
2\
Ac tiv e D ra w in gs
F ile
N am e:
-B
4.
dw g
REFERENCE(S)
SCALE
0 20 40
FEET
1. BASEMAP SOURCE: CARDNO, DATED APRIL 2022.
2. AERIAL IMAGERY SOURCE: GOOGLE EARTH© PRO 2010, IMAGE DATED
MAY 2022. IMAGE GEOREFERENCED BY GOLDER AND INTENDED FOR
INDICATIVE PURPOSES ONLY.
MW-1 SHALLOW MONITOR WELL
SOIL BORING
LEGEND
NO EXCEEDANCE OF SCTL (IF ANALYZED)
CONCENTRATION ABOVE RESIDENTIAL OR INDUSTRIAL
DIRECT EXPOSURE SCTL FOR As OR PAHs (0-0.5 FT-BGS)
CONCENTRATION ABOVE RESIDENTIAL OR INDUSTRIAL
DIRECT EXPOSURE SCTL FOR As OR PAHs (0.5-2.0 FT-BGS)
CONCENTRATION ABOVE RESIDENTIAL OR INDUSTRIAL
DIRECT EXPOSURE SCTL FOR As OR PAHs (2-4 FT-BGS)
CONCENTRATION ABOVE RESIDENTIAL OR INDUSTRIAL
DIRECT EXPOSURE SCTL FOR As OR PAHs (4-6 FT-BGS)
NOTE(S)
1. SCTL - SOIL CLEANUP TARGET LEVEL, PER TABLE II, CHAPTER
62-777, FAC
2. As - ARSENIC
3. PAHs - POLYNUCLEAR AROMATIC HYDROCARBONS
4. FT-BGS - FEET BELOW GROUND SURFACE
5. SF - SQUARE FEET
6. PAH AND As CONCENTRATIONS IN SOIL ARE PRESENTED IN
TABLE 1 AND TABLE 4, RESPECTIVELY.
PROPOSED EXCAVATION AREA TO 2 FT-BGS (3677 SF)
PROPOSED EXCAVATION AREA TO 4 FT-BGS (1,654 SF)
PROPOSED EXCAVATION AREA TO 6 FT-BGS (3,239 SF)
PROPOSED NEW SOIL SAMPLING LOCATION (As) AT 0-0.5
FT-BGS; 0.5-2 FT-BGS; 2-4 FT-BGS; AND 4-6 FT-BGS
AREA 1
AREA 2
AREA 3
PROPOSED NEW SOIL SAMPLING LOCATION (PAHs) AT
0-0.5 FT-BGS
SSider Callout Excavation to 2-FT BGS
SSider Callout Excavation to 4-FT BGS
SSider Polygon
SSider Polygon mcrews Oval mcrews Oval mcrews Oval mcrews Oval mcrews Oval mcrews Oval mcrews Oval mcrews Oval mcrews Oval mcrews Oval mcrews Oval mcrews Callout
SB-48
mcrews Callout
SB-49
mcrews Callout
SB-7EE
mcrews Callout
SB-50
mcrews Callout
SB-51
mcrews Callout
SB-52
mcrews Callout
SB-53
mcrews Callout No samples (excavated) mcrews Line mcrews Line mcrews Callout
SB-54
mcrews Callout
SB-55
mcrews Callout
SB-57
mcrews Callout
SB-58
mcrews Callout
SB-59
mcrews Callout
SB-60
mcrews Callout
SB-61
mcrews Callout
SB-62
mcrews Callout
SB-56
ATTACHMENT A
Level of Effort Sheets and Cost Estimate Form
FDEP COST ESTIMATEContractor: Golder Associates USA Inc.
Date: 10/17/2022
Task #: BF01C SubTask 1 Project Management SubTask 6
Site: Former Slick's Garage SubTask 2 Supplemental Soil Sampling Activities SubTask 7
Activity/Phase: Assessment SubTask 3 SubTask 8
Project Manager: Megan Johnson SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$59.62 Project Manager (MC) 4 4.4 $0.00 Program Leader - X-14 0 0 0 0 0 0 0 0 0 0
$63.65 Practice Leader - X-13 (JB) 2 2 0 0 0 0 0 0 0 0 $59.62 Senior Consultant - X-12 (MC) 8 8 0 0 0 0 0 0 0 0
$0.00 Senior Sci/Eng - X-11 0 0 0 0 0 0 0 0 0 0 $45.42 Senior Project Sci/Eng - P-10 (BL) 2 2 0 0 0 0 0 0 0 0 $37.03 Senior Project Sci/Eng - P-10 (GM) 0 0 0 0 0 0 0 0 0 0 $33.19 Project Sci/Eng - P-9 (SS) 24 24 0 0 0 0 0 0 0 0 $32.75 Staff Sci/Eng - P-8 (AS) 1 1 0 0 0 0 0 0 0 0 $27.15 Staff Sci/Eng - P-8 (AM) 18 18 0 0 0 0 0 0 0 0
$0.00 Sci/Eng/Admin - P-7 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 59 4.4 55.0 0 0 0 0 0 0 0 0
Direct Labor $2,274.81 $261.70 $2,013.11 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.50% $3,924.04 $451.43 $3,472.61 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $6,198.85 $713.13 $5,485.72 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GOLDER Page 1
FDEP COST ESTIMATEContractor: Golder Associates USA Inc.
Date: 10/17/2022
Task #: BF01C SubTask 1 Project Management SubTask 6
Site: Former Slick's Garage SubTask 2 Supplemental Soil Sampling Activities SubTask 7
Activity/Phase: Assessment SubTask 3 SubTask 8
Project Manager: Megan Johnson SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $480.00 $480.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $161.00 $161.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $641.00 $641.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $1,238.00 $1,238.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $150.00 $150.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,388.00 $1,388.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $80.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $350.00 $350.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $375.00 $375.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $805.00 $805.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $9,032.85 $713.13 $8,319.72 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $619.88 $71.31 $548.57 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $9,652.73 $784.44 $8,868.29 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GOLDER Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Former Slick's Garage SUBTASK 2: Supplemental Soil Sampling Activities
DATE: 10/17/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Practice Leader (J. Brown) 2
Senior Consultant (M. Crews) 8
Project Sci/Eng (S. Sider) 24
Staff Sci/Eng (A. Morales) 18
Senior Project Sci/Eng (B. Lucero) 2
Staff Sci/Eng (A.Strayer) 1
TOTAL LABOR 55
VEHICLE TYPE RATE UNIT USEAGE
Truck - S. Sider $120.00 Per Day 2 $240.00 Truck - A. Morales $120.00 Per day 2 $240.00
TOTAL VEHICLE $480.00
PER DIEM STAFF RATE UNIT USEAGE
Per Diem S. Sider $36.00 Per Day 2 $72.00
Hotel S. Sider $89.00 Per Day 1 $89.00
TOTAL PER DIEM $161.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Arsenic - Method 6010 $13.00 36 0 $468.00 PAHs - Method 8270 $110.00 7 0 $770.00
Sample Shipment/Preparation $150.00 1 $150.00
TOTAL LAB $1,388.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Miscellaneous Expendables $40.00 Per Day 2 $80.00 Total GPS Station $175.00 Per Day 2 $350.00 Soil Assessment Kit $175.00 Per Day 2 $350.00 Water Level Indicator $25.00 Per Day 1 $25.00
TOTAL EQUIPMENT $805.00
Update site figures with new soil data and proposed excavation areas (2 hours)
Prepare revised soil excavation cut lines based on soil sampling results (2 hours).
E-mail deliverable with field documentation, lab report, updated data table, and revised figures with excavation layout (8 hours).
Reporting-document production (1 hour).
Soil Sampling: Field event preparation (1 hour). Round trip travel from Jacksonville (8 hours).
Soil sampling activities (10 hours per day x 1.5 days = 15 hours).
Soil Sampling: Round trip travel from Tampa (3 hours). Soil sampling activities (10 hours per day x 1.5 days = 15 hours).
FINAL --7/24/96
| BF01C - Slick's Garage Supp Soil Sampling Proposal.pdf |
| Figure 4 - Proposed Sampling Locatoins.pdf |
| Sheets and Views |
| 1 SITE LOCATION MAP |
| 2 SITE PLAN |
| OLE1 |
| 3A SOIL ANALYTICAL RESULTS (0-0.5 FEET BGS) |
| OLE1 |
| 3B SOIL ANALYTICAL RESULTS (0.5-2.0 FEET BGS) |
| OLE1 |
| 3C SOIL ANALYTICAL RESULTS (2-4 FEET BGS) |
| OLE1 |
| 3D SOIL ANALYTICAL RESULTS (4-6 FEET BGS) |
| OLE1 |
| 4 PROPOSED SOIL SAMPLING LOCATIONS AND EXCAVATION AREAS |
| OLE1 |
File details come from the government source that posted it. Updated .